Beruflich Dokumente
Kultur Dokumente
:6 :
VERTICAL LIFT GATE WITH HOISTING AND ELECTRIFICATION
Sr. No.
Description of Item
Unit
Quantity
Ton
1381
Ton
9468
Ton
782
Ton
998
Ton
10
300
Rm
3330
Ton
14203
10
11
12
13
Design
and
providing
electrification
including required capacity, cable wiring and
street/flood light etc. complete. Lump Sump
rate
Total
Ton
1650
Nos.
90
L.S
L.S
L.S
Rs. In Cro
Executive Engineer
Project Implementation Unit-2
Vadodara
ELECTRIFICATION
Rate
Amount
85500
118075500
117100
1108702800
86700
67799400
110470
110249060
149115
1491150
149715
94380
28314000
145200
94380
169158
5135
17099550
7900
5135
9204
48279
685706637
50820
48279
60730
101840
168036000
50000
107200
101840
4500000
50000
55000
L.S
8500000
8500000
L.S
15913431
L.S
10907158
In Rs.
Rs. In Crore
2345294686
234.60
60500
9350000 10285000
e Engineer
mentation Unit-2
110470 1.355255
SUB-ESTIMATE NO.:6 :
VERTICAL LIFT GATE WITH HOISTING AND ELECTRIFICATION
Item
Sr. No.
(a)
(b)
(c)
Upstream
Normal block
Sluice block and navigation lock
fish ladder
Total
Say
Nos
80
10
Weight
(MT)
15.1
17.12
1.82
Item
Sr. No.
(a)
(b)
(c)
Upstream
Normal block
Sluice block and navigation lock
fish ladder
Total
Say
Nos
Weight
(MT)
80
10
103.55
116.96
14.5
Item
Nos
Weight
(MT)
80
10
4.29
4.86
4.86
80
10
4.22
4.31
4.31
Sr. No.
(a)
(b)
(c)
(a)
(b)
(c)
Upstream
Normal block
Sluice block and navigation lock
fish ladder
Total
Say
Sr. No.
(a)
Item
Upstream of U/s gate
Upstream
Nos
Weight
(MT)
94.94
(b)
(c)
Normal block
Sluice block and navigation lock
fish ladder
Total
Say
107.59
23.19
Item
Sr. No.
(a)
(b)
Nos
Weight
(MT)
2
2
3.5
0.8
Total
Say
Item No. :6:
Item
Sr. No.
Nos
Weight
(MT)
150
Design, fabrication, supply, erection and commissioning of rail track using 45 kg/
spillway bridge for movement of gantry crane for handling and operating spillw
elements/ river
sluice/ canal sluice emergency gate including cost of all m
labour, aligning, anchoring, welding, cleaning etc., complete as per specifica
drawings with all leads and lifts. (As per SOR Item No-7.9 P-146 of WRD Karnataka
Sr. No.
Item
Nos
2
Say
Length
(m)
1663
Sr. No.
Item
(a)
(b)
(c)
Nos
Weight
(MT)
80
10
155.32
175.44
22.97
Total
Say
Item No. :9:
Sr. No.
Item
Structural
steel
Hoist
Upstream of U/s gate
(a)
(b)
Nos
Weight
(MT)
91
1
18
7.5
Bridge
Item
electrification including
capacity DG set
Nos
required
90
Say
Nos
1
Say
Item No. :12:
Providing 11 KVA electrict line with charge, substation, transformer etc from Naveth
Barrage Site Rates as per DGVCL, Bharuch
Sr. No.
Item
Nos
1
Say
Item No. :13:
Security Deposit for 11 KVA line at Bhadbhut Barrage SiteRates as per DGVCL, Bha
Sr. No.
Item
Nos
1
Say
ECTRIFICATION
Quantity
(MT)
1208
171.2
1.82
1381.02
1381
Quantity
(MT)
8284
1169.6
14.5
9468.1
9468
Quantity
(MT)
343.2
48.6
4.86
337.6
43.1
4.31
781.67
782
Quantity
(MT)
759.52
215.18
23.19
997.89
998
Quantity
(MT)
7
1.6
8.6
10
Quantity
(MT)
300
300
Quantity
(Rmt)
3326
3330
Quantity
(MT)
12425.6
1754.4
22.97
14202.97
14203
Quantity
(MT)
1638
7.50
1645.5
1650
90
90
Quantity
(Nos)
1
1
SUB-ESTIMATE NO.: 13 :
LEFT BANK FLOOD PROTECTION EMBANKMENT WIT
Sr. No.
Description of Item
Unit
ha
Cum
Cum
Cum
4a
Sqm
Cum
No
10
11
Sqm
Rmt
cum
cum
12
13
14
cum
sqm
cum
15
16
17
18
cum
sqm
No.
No.
19
20
No.
Lumpsum
Total
Say
Executive E
Project Implemen
STIMATE NO.: 13 :
TION EMBANKMENT WITH ROAD AT TOP
Quantity
Rate
Amount
295
3403
1003885
528532
41
21669812
192408
48
9235584
7691327
69
530701563
7691327
64
492244928
430504
263
113222552
42089
484
20371076
1524213
2718
4142810934
1043193
78
81369054
48102
200
9620400
432920
404
174899680
144306
697
100581282
180383
787
721530
20
122660
6053
141961421
14430600
742460980
36077
7445
268593265
19241
480
9235680
12000
322
3864000
24
1159
27816
2203
11015
446008657
Rs.
Rs. In Crore
Executive Engineer
Project Implementation Unit-2
Vadodara
7324324184
732.50