The Cost index is now revised with effect from 01-08-2015 . So proudly announcing the new version of DSR Analizer
Ver. 12 .In this new version the datas are based on the new cost Index and more observed datas are included with some corrections
along with the observed data approved by the Chief Engineers of PWD, LSGD and Irrigation .You can easily prepare the Observed data
at any places based on the revised cost Index.Now the specification part of the DSR is in editable mode and so you can copy and paste
the same for estimation purpose
Now Government have directed to implement the Public works using CPWD data and specification in all the
Government departments. Accordingly The cost index and rates are revised from 01-08-2015. In these circumstances I am introducing
a simple but powerful Excel tool namely DSR ANALYSER for preparing the Delhi Schedule of rates of various items of work based on
the Cost index at different places in Kerala. All the DSR items are included in Excel format with 1% water charges and 15% CPOH
charges .
While opening the file you can see eight sheets namely Home, Facing sheet ,Index, Basic Rates, DSR ,Observed DatasBldg. ,Observed Datas- Roads,and Quick reference a. In Home sheet You will get a clear idea about this programme . The second sheet
is Facing sheet of DSR . The third sheet is Index and you can find out the DSR Rates by clicking on the concerned item. The fourth
sheet contains the Basic rates of materials, Labours, Carriage and Market rates. Here you should enter the market rates of your
locality for obtaining the Observed data. Rates with CPOH and without CPOH are included. You just enter the ID code of the place that
you want to see the DSR 2014. ID Codes are given in the sheet itself. for example the ID code of Kollam is 4. The next sheet is
Observed Datas for Buildings and Roads and here some observed datas prepared based on DSR 2014 and Market rates . In the next
sheet a quick reference guide is included to identify the proper item of work. Take a printout for reference .
Maximum care has been taken for the accuracy of calculations of data. Any how the user should satisfy himself for the
accuracy of calculation . If any discrepancy is noticed mail immediately to pradeepenthulika@gmail.com and so we can correct the
same in the next version. If all are OK print the pages .It is better to take the print using a laser jet printer.
Please leave your comments and valuable suggestions to the comment box of Our Blog
http//:www.sahaayidotcom.blogspot.in and even a small comment will boost up my efforts to do more. Please share this programme
among the maximum Engineers in LSGD so that we can improve the quality of works.
HOME
BASIC RATES
DSR 2014
INDEX
FACING SHEET
QUICK REFERENCE
If you have experience any problem or have any valuable suggestions please mail to pradeepenthulika@gmail.com or dial to
9446242014 and leave your comments to the comment box of Our Blog http//:www.sahaayidotcom.blogspot.in
COST INDEX OF
THIRUVANANTHAPURAM
VISIT
www.sahaayidotcom.blogspot.in
Chapter
Description
Earth Work
Concrete Work
Brick Work
15
Stone Work
18
22
24
10
Steel Work
42
11
Flooring
45
10
12
Roofing
53
11
13
Finishing
62
12
14
Repairs to Buildings
68
13
15
73
14
16
Road Work
77
15
17
Sanitary Installations
90
16
18
Water Supply
98
17
19
Drainage
113
18
20
Pile Work
120
19
21
Aluminium Work
122
20
22
Water Proofing
125
21
24
129
22
25
131
23
26
132
24
27
136
25
28
152
Page No
Code
100
101
102
103
111
112
113
114
115
116
117
119
122
123
124
125
126
127
128
130
131
132
133
134
135
138
139
141
155
156
157
159
160
161
BASIC RATES
0.2 LABOUR
Description
Bandhani
Bhisti
Blacksmith 1 st class
Blacksmith 2nd class
Carpenter 1 st class
Carpenter 2nd class
Chowkidar
Beldar
Coolie
Fitter (grade 1)
Assistant Fitter or 2nd class Fitter
Glazier
Mason (for plaster of paris work) 1 st class
Mason (brick layer) 1 st class
Mason (brick layer) 2nd class
Mason (for plain stone work) 2nd class
Mason (for ornamental stone work) 1 st class
Driver (for Road Roller, Concrete Mixer, Truck etc.)
Mate
Mistry
Painter
Rock Excavator
Rock Breaker
Rock Hole Driller
Stone Chiseller
Sprayer (for bitumen, tar etc.)
Skilled Beldar (for floor rubbing etc.)
White Washer
Mason (average)
Carpenter (average)
Operator (Pile/ Special machine)
Skilled torch operator for laying tack
Technician
Helper (Technician
11
12
14
17
Tipper 5.5 cum capacity for carriage of aggregates from stockpile to chip spreader
23
55
61
MR
1
2
3
4
7
9
Unit
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
Rate
363.00
363.00
435.00
399.00
435.00
399.00
329.00
329.00
329.00
435.00
399.00
399.00
435.00
435.00
399.00
399.00
435.00
435.00
363.00
435.00
399.00
329.00
329.00
329.00
363.00
363.00
363.00
363.00
417.00
417.00
435.00
435.00
700.00
329.00
day
day
day
m3
day
830.00
800.00
1500.00
350.00
300.00
m3
day
day
day
150.00
600.00
350.00
5000.00
day
day
Hour
Hour
day
1700.00
4000.00
450.00
800.00
1500.00
Code
Description
0.2 CARRIAGE CHARGES
2200
2201
2202
2203
2204
2205
2206
2207
2209
2211
2215
2241
2273
2342
7318
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.1
3.11
3.12
3.13
3.14
3.15
3.16
3.17
3.18
0.2 MATERIALS
Cement mortar 1:1 (1 cement : 1 fine sand)
Cement mortar 1:2 (1 cement : 2 fine sand).
Cement mortar 1:3 (1 cement : 3 fine sand).
Cement mortar 1:4 (1 cement : 4 fine sand).
Cement mortar 1:5 (1 cement : 5 fine sand)
Cement mortar 1:6 (1 cement : 6 fine sand).
Cement mortar 1:2 (1 cement : 2 coarse sand).
Cement mortar 1:3 (1 cement : 3 coarse sand).
Cement mortar 1:4 (1 cement : 4 coarse sand).
Cement mortar 1:5 (1 cement : 5 coarse sand).
Cement mortar 1:6 (1 cement : 6 coarse sand).
Cement mortar 1:2 (1 cement : 2 stone dust).
Cement mortar 1:2 (1 cement : 2 marble dust).
Cement mortar 1:5 (1 cement : 5 marble dust).
White cement mortar 1:2 (1 white cement : 2 marble dust)
White cement mortar 1:3 (1 white cement : 3 marble dust).
White cement mortar 1:5 (1 white cement : 5 marble dust)
Mud mortar
3.19
293
295
296
297
298
309
364
365
367
370
586
595
597
Mortar in lime , surkhi ( 50% red and 50% light yellow) and marble dust 1:1.5:0.5
Stone aggregate 40 mm nominal size
Stone aggregate 20mm
Stone aggregate12.5mm
Stone aggregate 10 mm
Stone aggregate 6.0 mm nominal size
Paving Asphalt VG 10 of approved quality
Wire brush
Soft brush
Cement (0.2833 cum)
Coal
C.P. brass screws 40mm
Black enemelled M.S. Butt hinges-100x5 8x1.9mm
Black enemelled M.S. Butt hinges-50x37xl.5mm
Unit
T
1000 Nos
m3
m3
m3
T
m3
1000 Nos
T
T
m3
m3
T
Qtl
kg
Rate
121.70
283.96
106.49
106.49
121.70
94.65
115.75
170.38
94.65
106.49
125.28
133.11
94.65
10.65
38.00
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
7441.25
5458.65
4468.35
3637.05
3189.40
2805.75
5933.65
5003.35
4172.05
3724.40
3340.75
5338.65
5743.65
3510.40
10979.65
8716.35
5897.40
403.30
m3
m3
m3
m3
m3
m3
Tonne
each
each
Tonne
cum
100 Nos
10 Nos
10 Nos
2474.95
1050.00
1175.00
1175.00
1175.00
1140.00
50600.00
20.00
18.00
6300.00
400.00
220.00
90.00
55.00
Code
608
637
639
640
694
979
982
1008
1022
1023
1154
1157
1189
1190
1207
1208
1209
1215
1219
1235
1549
1550
2406
2611
2916
7048
7306
7309
7773
8689
9999
Description
Nickel plated mild steel piano hinges 1mm thick 25 mm wide
M.S. Screws 40mm
M.S. screws 25 mm
M.S. Screws 20mm
Anodised aluminium butt hingesRoyalty for good earth
Coarse sand
Flats up to 10 mm in thickness
Galvanized steel Bolts and nuts 6 mm dia 25 mm long round head
G.I. J or L hooks with nuts and bolts 8 mm dia.
Through and bond stones 7 nos.
Stone for masonry
Teak wood
Teak wood 2nd class planks
Limpet washers (total of seam and J
Bitumen washers
GI Plain washers thick
Welding by electric plant
Wire nail
Diesel oil
GI pipe 40mm
GI pipe 50mm
Float glasses 4.0mm thick
EPDM Gasket
Paving Asphalt VG 10 of approved quality
Rawl plug 50 mm (designation 10 no)
Aluminium T or L sections
Paving Asphalt of grade VG-30 of approved quality
Coloured inter locking C.C. paver Block
Interlocking C.C. paver block ( 60 mm thick, M-30)
Sundries
Unit
m
100 Nos
100 Nos
100 Nos
10 Nos
m3
m3
Quintel
10 Nos
10 Nos
100 Nos
m3
10 dm3
10 dm3
100 Nos
100 Nos
100 Nos
cm
Kg
L
m
m
m2
10 Nos
Tonne
each
Kg
Tonne
m2
m2
LS
Rate
42.00
52.00
38.00
32.00
400.00
30.00
1200.00
4200.00
25.00
120.00
1300.00
900.00
660.00
750.00
35.00
30.00
35.00
2.00
65.00
55.49
220.00
275.00
345.00
160.00
50600.00
10.00
200.00
41000.00
500.00
350.00
1.78
MR 1
MR 2
MR 3
MR 4
MR 5
MR 6
MR 7
MR 8
MR 9
MR 10
MR 11
MR 12
MR 13
MR 14
MR 15
MR 16
MR 17
MR 18
MR 19
MR 20
MR 21
MR 22
MR 23
MR 24
MR 25
MR 26
MR 27
MR 28
E
E
E
E
E
E
E
E
E
m3
m3
m3
m2
m2
10 Nos
10 Nos
10 Nos
10 Nos
10 Nos
sqm
sqm
sqm
sqm
sqm
sqm
sqm
sqm
sqm
57.00
43.00
42.50
32.00
28.50
38.00
28.00
20.00
45.00
65000.00
72000.00
45000.00
1380.00
1785.00
1520.00
1600.00
100.00
80.00
60.00
212.40
175.00
400.00
450.00
500.00
550.00
600.00
188.00
235.00
Code
MR 29
MR 30
MR 31
MR 32
MR 33
MR 34
MR 35
MR 36
MR 37
MR 38
MR 39
MR 40
MR 41
MR 42
MR 43
MR 44
MR 45
MR 46
MR 47
MR 48
MR 49
MR 50
MR 51
MR 52
MR 53
MR 54
MR 55
MR 56
MR 57
MR 58
MR 59
MR 60
MR 61
MR 62
MR 63
MR 64
MR 65
MR 66
MR 67
MR 68
MR 69
MR 70
MR 71
MR 72
MR 73
MR 74
MR 75
MR 76
MR 77
MR 78
MR 79
MR 80
MR 81
MR 82
MR 83
MR 84
MR 85
MR 86
MR 87
MR 88
MR 89
MR 90
Description
7.5mm thick PVC wooden grains panel
e board classic tile
Stainless steel soap dish
Supplying and fixing CP Towel rod 45cm
Supplying and fixing CP Towel rod 60cm
CP Health Faucet
CP Health Faucet superior quality (Jaguar or equvalent make)
PVC pipe 15mm dia 12Kgf/cm2
PVC pipe 15mm dia 10Kgf/cm2
PVC pipe 20mm dia 12Kgf/cm2
PVC pipe 20mm dia 10Kgf/cm2
PVC pipe 25mm dia 12Kgf/cm2
PVC pipe 25mm dia 10Kgf/cm2
PVC pipe 32mm dia 10Kgf/cm2
PVC pipe 32mm dia 6Kgf/cm2
PVC pipe 40mm dia 10Kgf/cm2
PVC pipe 40mm dia 6Kgf/cm2
PVC pipe 50mm dia 10Kgf/cm2
PVC pipe 50mm dia 6Kgf/cm2
Soil gravel mixture/quarry waste
PVC pipe 63mm dia 6Kgf/cm2
PVC pipe 63mm dia 4Kgf/cm2
PVC pipe 75mm dia 6Kgf/cm2
PVC pipe 75mm dia 4Kgf/cm2
PVC pipe 110mm dia 6Kgf/cm2
PVC pipe 110mm dia 4Kgf/cm2
PVC pipe 150mm dia 6Kgf/cm2
63 mm dia Elbow
63 mm dia 45 degree Elbow
63 mm dia Door Elbow
63 mm dia Bend
63 x 63 x 63 mm dia Tee
63 x 63 x 63 mm dia Door Tee
Cost of 63mm Vent cowl
63 mm dia End cap
63 mm dia Socket/ coupling
63 x 50 mm dia Reducer
75 mm dia Elbow
75 mm dia 45 degree Elbow
75 mm dia Door Elbow
75 mm dia Bend
75x 75 x 75 mm dia Tee
75x 75 x 75 mm dia Door Tee
75mm Vent cowl
75mm dia End cap
75 mm dia Socket/ coupling
75 x 63 mm dia Reducer
110 mm dia Elbow
110 mm dia 45 degree Elbow
110 mm dia Door Elbow
110 mm dia Bend
110x 110 x 110 mm dia Tee
110x 110 x 110 mm dia Door Tee
110x 110 x 75 mm dia Door Tee
110 mm Vent cowl
110 mm offset
110 mm dia End cap
110 mm dia Socket/ coupling
110 x 75 mm dia Reducer
150 mm dia Bend
100x50x16g MS hollow section
80x40x16g MS hollow section
Unit
sqm
sqm
each
each
each
each
each
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
m3
metre
metre
metre
metre
metre
metre
metre
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
metre
metre
Rate
340.00
360.00
55.00
70.00
105.00
650.00
1100.00
38.00
27.00
40.50
30.00
61.00
48.00
65.00
48.00
84.00
53.00
90.00
60.00
800.00
118.00
83.00
129.00
95.00
211.00
170.00
520.00
30.00
22.40
36.40
35.50
39.60
46.50
33.00
18.90
24.10
22.00
48.75
27.80
48.75
43.50
47.20
57.55
42.00
22.75
29.80
27.50
140.00
160.00
175.00
129.00
170.00
202.00
117.00
70.00
170.00
60.00
63.00
56.00
550.00
215.00
172.00
Code
MR 91
MR 92
MR 93
MR 94
MR 95
MR 96
MR 97
MR 98
MR 99
MR 100
MR 101
MR 102
MR 103
MR 104
MR 105
MR 106
MR 107
MR 108
MR 112
Description
60x40x16g MS hollow section
50x30x16gMS hollow section
37.5x20x16gMS hollow section
25x25x16g MS hollow section
GI Pipe 75 mm dia
GI Pipe 65 mm dia
GI Pipe 50 mm dia
GI Pipe 40 mm dia
GI Pipe 32 mm dia
GI Pipe 25 mm dia
wire cut bricks of size 22.9x11.2x7cm
first class M P Tiles 340 mm or nearest available size
MP hip and ridge tiles
Tile profile / Trafford sheet 0.35 mm thick
PVC half split pipe 150mm dia
GI Pipe 25 mm dia
wire cut bricks of size 22.9x11.2x7cm
first class M P Tiles 340 mm or nearest available size
8mm grip plug
Unit
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
1000 Nos
1000 Nos
1000 Nos
sqm
metre
metre
1000 Nos
1000 Nos
100 Nos
Rate
145.00
110.00
88.00
73.00
390.00
299.00
241.00
170.00
140.00
123.00
7200.00
9500.00
21800.00
370.00
260.00
123.00
7200.00
9500.00
50.00
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
Basic Rate
2. Earth Work
2.1.1
2.2.1
a)
2.3.1
4
5
Without CPOH
5044.15
1 m3
383.10
7398.25
6433.27
0.00
0.00
561.89
488.60
0.00
0.00
1 m3
241.70
354.50
308.26
2.4
1 m3
-3.00
4.40
3.83
2.5
1 m3
-16.85
24.71
21.49
0.00
0.00
228.22
198.45
0.00
0.00
358.75
613.30
906.57
311.96
533.30
788.32
2.6.1
1 m3
155.60
a)
b)
c)
100 m2
a)
a)
With CPOH
a)
2.7.1
2.7.2
2.7.3
Ordinary rock
Hard rock (requiring blasting)
Hard rock (blasting prohibited)
1 m3
1 m3
1 m3
Page 11 of 368
244.60
418.15
618.10
12/26/2016 10:20:51
DSR 2014
visit www.sahaayidotcom.blogspot.in
2.8.1
2.9.1
2.9.2
2.9.3
(ii)
(iii)
(ii)
(iii)
b)
(i)
(ii)
1 m3
Ordinary rock
Hard rock (requiring blasting)
Hard rock (blasting prohibited)
157.50
0.00
0.00
231.01
200.87
0.00
1 m3
1 m3
1 m3
263.50
454.35
620.55
Ordinary rock :
2.13.1.1 Pipes, cables etc. not exceeding 80 mm dia.
Pipes, cables etc. exceeding 80 mm dia but not
2.13.1.2
exceeding 300 mm dia.
Pipes, cables exceeding 300 mm dia but not
exceeding 600mm dia
Hard rock (requiring blasting)
2.13.2.1 Pipes, cables etc. not exceeding 80 mm dia.
Pipes, cables etc. exceeding 80 mm dia. but not
2.13.2.2
exceeding 300 mm dia.
2.13.1.3
Page 12 of 368
386.48
666.40
910.16
336.07
579.47
791.44
0.00
0.00
1m
127.55
0.00
187.08
0.00
162.68
1m
208.30
305.51
265.66
1m
325.20
476.97
414.76
0.00
0.00
11
a)
(i)
10
a)
(i)
Basic Rate
a)
b)
c)
Unit
a)
Description of items
1m
181.85
0.00
266.72
0.00
231.93
1m
450.30
660.46
574.31
1m
518.15
759.97
660.84
1m
273.10
0.00
400.56
0.00
348.31
1m
676.25
991.86
862.48
12/26/2016 10:20:51
DSR 2014
visit www.sahaayidotcom.blogspot.in
2.13.3.3
2.16.1
2.16.2
2.16.3
15
2.17.1
2.17.2
2.17.3
2.18.1
2.18.2
2.18.3
2.19
2.20.1
2.20.2
2.20.3
992.38
1m
351.65
0.00
515.77
0.00
448.49
1m
870.70
1277.06
1110.48
1m
1001.90
1469.49
1277.81
0.00
0.00
158.55
113.95
127.25
137.87
145.33
162.29
0.00
0.00
165.00
183.48
202.92
143.48
159.55
176.45
0.00
0.00
1 m2
1 m2
1 m2
108.10
113.95
127.25
1 m2
1 m2
1 m2
112.50
125.10
138.35
1 m2
1 m2
1 m2
96.10
103.05
110.50
140.95
151.14
162.07
122.57
131.43
140.93
1 m2
1384.85
2031.16
1766.23
0.00
0.00
81.84
87.34
96.22
71.17
75.95
83.67
0.00
0.00
71.21
79.86
91.16
61.92
69.45
79.27
0.00
0.00
48.77
54.78
64.24
42.41
47.64
55.86
1 m2
1 m2
1 m2
55.80
59.55
65.60
1 m2
1 m2
1 m2
48.55
54.45
62.15
18
a)
b)
c)
1141.24
17
a)
b)
c)
778.10
16
a)
b)
c)
2.22.1
2.22.2
2.22.3
1m
14
a)
b)
c)
Basic Rate
13
a)
b)
c)
Unit
12
a)
b)
c)
Description of items
Page 13 of 368
1 m2
1 m2
1 m2
33.25
37.35
43.80
12/26/2016 10:20:51
DSR 2014
visit www.sahaayidotcom.blogspot.in
19
20
Description of items
Unit
2.23
1 m2
713.55
1046.56
910.06
2.25
1 m3
112.40
164.86
143.35
0.00
0.00
21
a)
b)
2.26.1
2.26.2
22
2.27
2.28.1
24
a)
2.29.1
a)
b)
c)
d)
1 m3
1 m3
46.25
82.95
67.83
121.66
58.99
105.79
1 m3
910.25
1335.06
1160.92
0.00
0.00
1827.14
1588.82
0.00
0.00
1850.54
1609.16
0.00
0.00
100 m2
100 m2
1245.75
1261.70
25
2.30.1
2.30.2
2.30.3
2.30.4
1 No.
1 No.
1 No.
1 No.
50.05
81.85
139.10
188.95
73.41
120.05
204.02
277.13
63.83
104.39
177.41
240.99
100 m2
642.00
941.62
818.80
100 m2
328.60
481.96
419.09
0.00
0.00
26
2.31
27
2.32
28
23
a)
Basic Rate
a)
2.33.1
1 No.
196.70
288.50
250.87
b)
2.33.2
1 No.
871.10
1277.64
1110.99
Page 14 of 368
12/26/2016 10:20:51
DSR 2014
visit www.sahaayidotcom.blogspot.in
2.33.3
d)
2.33.4
29
a)
2.34.1
Description of items
Unit
Basic Rate
1 No.
4029.05
5909.41
5138.62
1 No.
8080.45
11851.60
10305.74
0.00
0.00
272.73
237.16
1 Ltr
185.95
30
0.00
0.00
a)
0.00
0.00
22.59
19.64
0.00
0.00
33.29
28.95
0.00
0.00
174.39
151.64
0.00
0.00
(i)
2.35.1.1
2.35.2.1
15.40
1m
22.70
c)
(i)
1m
b)
(i)
2.35.3.1
1 m2
118.90
d)
2.35.4.1
1m
17.50
25.67
22.32
e)
2.35.5
1m
200.70
294.37
255.97
31
2.36
1 m3
-33.95
49.79
43.30
2.37
Supply and stacking of Fly ash conforming to IRC58 at site, including carriage, loading , unloading &
stacking up to any lead (measured stacks will be
reduced by 20% for payment).
1 m3
132.95
195.00
169.56
(i)
32
Page 15 of 368
12/26/2016 10:20:51
DSR 2014
visit www.sahaayidotcom.blogspot.in
33
2.38
34
Description of items
Unit
1 m3
Basic Rate
112.40
164.86
143.35
4. Concrete Work
0.00
0.00
0.00
0.00
a)
4.1.1
1 m3
7530.35
11044.76
9604.14
b)
4.1.2
1 m3
5970.60
8757.08
7614.85
c)
4.1.3
1 m3
5466.30
8017.42
6971.67
d)
4.1.4
1 m3
5335.25
7825.21
6804.53
e)
4.1.5
1 m3
4834.30
7090.47
6165.62
f)
4.1.6
1 m3
4672.50
6853.16
5959.27
g)
4.1.7
1 m3
4399.55
6452.82
5611.15
h)
4.1.8
1 m3
4301.15
6308.50
5485.65
i)
4.1.9
1 m3
4028.15
5908.09
5137.47
j)
4.1.10
1 m3
4004.00
5872.67
5106.67
k)
4.1.11
1 m3
3721.65
5458.54
4746.56
l)
4.1.12
1 m3
4178.90
6129.19
5329.73
m)
4.1.13
1 m3
3836.30
5626.70
4892.78
0.00
0.00
12487.56
10858.75
35
a)
4.2.1
Page 16 of 368
1 m3
8514.05
12/26/2016 10:20:51
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
Basic Rate
b)
4.2.2
1 m3
6954.30
10199.87
8869.45
c)
4.2.3
1 m3
6450.00
9460.22
8226.27
d)
4.2.4
1 m3
6318.95
9268.00
8059.13
e)
4.2.5
1 m3
5818.00
8533.26
7420.23
f)
4.2.6
1 m3
5656.20
8295.95
7213.87
g)
4.2.7
1 m3
5383.25
7895.61
6865.75
h)
4.2.8
1 m3
4981.75
7306.73
6353.68
0.00
0.00
36
a)
4.3.1
b)
4.3.2
c)
4.3.3
1 m2
196.45
288.13
250.55
1 m2
360.80
529.19
460.16
1 m2
453.35
664.93
578.20
0.00
0.00
37
a)
4.4.1
1 m3
5466.30
8017.42
6971.67
b)
4.4.2
1 m3
4834.30
7090.47
6165.62
0.00
0.00
38
a)
4.5.1
1 m3
6774.05
9935.50
8639.56
b)
4.5.2
1 m3
6269.80
9195.92
7996.45
c)
4.5.3
1 m3
5637.80
8268.96
7190.40
0.00
0.00
8382.12
7288.80
39
a)
4.6.1
Page 17 of 368
1 m3
5714.95
12/26/2016 10:20:51
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
Basic Rate
40
0.00
0.00
a)
4.7.1
1 m3
9334.80
13691.35
11905.52
b)
4.7.2
1 m3
8702.80
12764.40
11099.48
0.00
0.00
41
a)
4.8.1
1 m3
7128.80
10455.81
9092.01
b)
4.8.2
1 m3
6838.20
10029.59
8721.38
4.9
1 No.
546.65
801.77
697.19
4.10
1 m2
257.80
378.12
328.80
44
4.11
1 m2
314.85
461.79
401.56
45
4.12
1 units
48.15
70.62
61.41
46
4.13
1 m2
132.00
193.60
168.35
47
4.14
1 m3
573.20
840.71
731.05
0.00
0.00
42
43
48
Page 18 of 368
12/26/2016 10:20:51
DSR 2014
visit www.sahaayidotcom.blogspot.in
49
50
51
Description of items
Unit
4.15
1 unit
426.15
625.03
543.51
4.16
1 m3
172.20
252.57
219.62
4.17
1 m2
419.30
614.99
534.77
4.18
1 unit
53.00
77.74
67.60
0.00
0.00
0.00
0.00
0.00
0.00
52
a)
(i)
(ii)
b)
(i)
(ii)
4.19.2.2
Page 19 of 368
Basic Rate
1 m3
5872.90
8613.78
7490.25
1 m3
5719.90
8389.38
7295.11
0.00
0.00
1 m3
6417.05
9411.89
8184.25
1 m3
6264.10
9187.56
7989.18
12/26/2016 10:20:51
DSR 2014
visit www.sahaayidotcom.blogspot.in
53
a)
(i)
(ii)
b)
(i)
(ii)
Description of items
Unit
0.00
0.00
0.00
0.00
0.00
0.00
1 m3
5996.70
8795.36
7648.14
1 m3
5843.75
8571.03
7453.07
0.00
0.00
1 m3
6540.90
9593.54
8342.21
1 m3
6387.95
9369.21
8147.14
0.00
0.00
0.00
0.00
54
4.20.2.2
Basic Rate
a)
5.1.1
1 m3
7789.95
11425.52
9935.23
b)
5.1.2
1 m3
6230.20
9137.83
7945.94
c)
5.1.3
1 m3
5725.90
8398.18
7302.76
0.00
0.00
55
a)
5.2.1
1 m3
8634.05
12663.56
11011.79
b)
5.2.2
1 m3
7074.30
10375.88
9022.50
c)
5.2.3
1 m3
6570.00
9636.22
8379.32
Page 20 of 368
12/26/2016 10:20:51
DSR 2014
visit www.sahaayidotcom.blogspot.in
56
57
58
59
60
61
Description of items
Unit
5.3
1 m3
6778.20
9941.59
8644.86
5.4
1 m3
6362.85
9332.39
8115.12
5.5
1 m3
7047.25
10336.20
8988.00
5.6
1 m3
6669.35
9781.94
8506.03
5.7
1 m3
5496.85
8062.23
7010.63
5.8
1 m3
6690.80
9813.40
8533.39
0.00
0.00
Basic Rate
62
a)
5.9.1
1 m2
196.45
288.13
250.55
b)
5.9.2
1 m2
360.80
529.19
460.16
c)
5.9.3
1 m2
401.65
589.10
512.26
d)
5.9.4
1 m2
401.65
589.10
512.26
e)
5.9.5
1 m2
332.15
487.16
423.62
f)
5.9.6
1 m2
453.35
664.93
578.20
g)
5.9.7
1 m2
395.65
580.30
504.61
h)
5.9.8
1 m2
363.65
533.37
463.80
Page 21 of 368
12/26/2016 10:20:51
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
Basic Rate
i)
5.9.9
1 m2
1066.30
1563.94
1359.95
j)
5.9.10
1 m2
446.65
655.10
569.65
k)
l)
5.9.11
5.9.12
1 m2
1 m2
360.80
214.55
529.19
314.68
460.16
273.64
m)
5.9.13
1 m2
587.35
861.47
749.10
5.9.15
1 m2
196.45
288.13
250.55
1m
1 m2
1 m2
116.40
508.55
549.20
0.00
170.72
745.89
805.51
0.00
148.46
648.60
700.44
n)
o)
(i)
(ii)
p)
q)
5.9.18
1 m2
483.70
709.44
616.91
r)
5.9.19
1 m2
492.35
722.13
627.94
s)
5.9.20
1 m2
493.55
723.89
629.47
t)
5.9.21
1 m2
423.65
621.37
540.32
0.00
0.00
205.92
223.01
248.53
274.13
179.06
193.92
216.12
238.37
0.00
0.00
63
a)
b)
c)
d)
5.10.1
5.10.2
5.10.3
5.10.4
65
1 sets
1 sets
1 sets
1 sets
140.40
152.05
169.45
186.90
64
a)
5.11.1
1 m2
159.05
233.28
202.85
5.12
1 m3
6447.95
9457.21
8223.66
Page 22 of 368
12/26/2016 10:20:51
DSR 2014
visit www.sahaayidotcom.blogspot.in
66
67
68
69
70
Description of items
Unit
5.13
1 m3
8797.80
12903.73
11220.64
5.14
1 m3
9894.35
14512.04
12619.17
5.15
1 m3
8191.40
12014.33
10447.24
5.16
1 m3
12174.70
17856.63
15527.51
5.17
1 m3
7177.85
10527.75
9154.57
0.00
0.00
1070.62
937.07
885.96
930.97
814.85
770.40
71
a)
b)
c)
Basic Rate
5.18.1
5.18.2
5.18.3
50 mm thick
40 mm thick
25 mm thick
1 m2
1 m2
1 m2
Page 23 of 368
729.95
638.90
604.05
12/26/2016 10:20:51
DSR 2014
visit www.sahaayidotcom.blogspot.in
72
73
74
Description of items
Unit
5.19
1 m3
8953.65
13132.32
11419.41
5.20
1 m3
6024.05
8835.47
7683.02
5.21
1 m2
393.65
577.37
502.06
0.00
0.00
95.26
112.35
99.88
99.88
112.72
99.88
82.84
97.69
86.85
86.85
98.01
86.85
0.00
0.00
64.95
76.60
68.10
68.10
76.85
68.10
95.26
112.35
99.88
99.88
112.72
99.88
82.84
97.69
86.85
86.85
98.01
86.85
75
a)
b)
c)
d)
e)
f)
Basic Rate
5.22.1
5.22.2
5.22.3
5.22.4
5.22.5
5.22.6
1 Kg
1 Kg
1 Kg
1 Kg
1 Kg
1 Kg
64.95
76.60
68.10
68.10
76.85
68.10
76
a)
b)
c)
d)
e)
f)
5.22A.1
5.22A.2
5.22A.3
5.22A.4
5.22A.5
5.22A.6
77
5.23
1 m2
134.70
197.56
171.80
78
5.24
1 m2
89.20
130.83
113.76
79
5.25
1 Kg
325.80
477.85
415.52
80
5.26
1 units
698.20
1024.05
890.48
Page 24 of 368
1 Kg
1 Kg
1 Kg
1 Kg
1 Kg
1 Kg
12/26/2016 10:20:51
DSR 2014
visit www.sahaayidotcom.blogspot.in
81
82
Description of items
Unit
5.27
1 units
224.90
329.86
286.84
5.28
1 units
446.90
655.47
569.97
0.00
0.00
0.00
0.00
156.30
209.99
0.00
420.94
587.45
Basic Rate
83
a)
(i)
(ii)
b)
(i)
(ii)
5.29.1.1
5.29.1.2
84
5.30
5.29.2.1
5.29.2.2
1m
1m
122.55
164.65
1m
1m
330.05
460.60
179.74
241.49
0.00
484.08
675.56
1m
30.75
45.10
39.22
0.00
0.00
85
86
5.31
1 m3
426.15
625.03
543.51
5.32
1 m3
172.20
252.57
219.62
0.00
0.00
9234.56
10288.24
8030.05
8946.30
87
a)
b)
5.33.1
5.33.2
Page 25 of 368
1 m3
1 m3
6296.15
7014.55
12/26/2016 10:20:51
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
Basic Rate
88
0.00
0.00
a)
5.34.1
1 m3
76.50
112.20
97.57
b)
5.34.2
1 m3
152.95
224.33
195.07
c)
5.34.3
1 m3
229.45
336.53
292.64
89
5.35
1 Qtl
742.75
1089.39
947.30
5.36
1 m3
17292.75
25363.28
22055.02
0.00
0.00
0.00
0.00
90
91
a)
b)
5.37.1
5.37.2
92
5.38
Page 26 of 368
1 m3
1 m3
6644.60
7363.00
9745.63
10799.31
8474.47
9390.71
1 m3
174.20
255.50
222.17
12/26/2016 10:20:51
DSR 2014
visit www.sahaayidotcom.blogspot.in
93
a)
b)
5.40.1
5.40.2
5.41.1
5.41.2
95
a)
b)
c)
d)
e)
Unit
Basic Rate
5.42.1
5.42.2
5.42.3
5.42.4
5.42.5
0.00
0.00
0.00
0.00
0.00
0.00
9623.31
10676.99
8368.10
9284.34
0.00
0.00
156.57
177.03
136.15
153.94
0.00
0.00
0.00
0.00
179.45
244.13
337.63
464.80
539.23
156.04
212.29
293.60
404.17
468.90
1 m3
1 m3
6561.20
7279.60
94
a)
b)
Description of items
Page 27 of 368
1 m2
1 m2
1 No.
1 No.
1 No.
1 No.
1 No.
106.75
120.70
122.35
166.45
230.20
316.90
367.65
12/26/2016 10:20:51
DSR 2014
visit www.sahaayidotcom.blogspot.in
5.43.1
5.43.2
97
a)
b)
c)
Unit
Basic Rate
96
a)
b)
Description of items
5.44.1
5.44.2
5.44.3
0.00
0.00
1221.76
736.47
1062.40
0.00
0.00
0.00
0.00
9326.09
10241.75
10987.05
8109.64
8905.87
9553.96
200 mm wide.
300 mm wide.
1 metre
1 metre
1m
1m
1m
Page 28 of 368
577.45
833.00
6358.55
6982.85
7491.00
12/26/2016 10:20:51
DSR 2014
visit www.sahaayidotcom.blogspot.in
99
Unit
Basic Rate
98
a)
b)
c)
Description of items
5.45.1
5.45.2
5.45.3
0.00
0.00
7452.16
8602.05
6480.14
6980.09
7480.04
0.00
0.00
0.00
0.00
1m
1m
1m
Page 29 of 368
5080.90
5472.90
5864.90
12/26/2016 10:20:51
DSR 2014
visit www.sahaayidotcom.blogspot.in
5.46.1
5.46.2
5.46.3
Unit
1m
1m
1m
Basic Rate
6358.55
6750.55
7026.40
5.47.1
5.47.2
5.47.3
101
a)
b)
5.48.1
5.48.2
c)
5.48.3
9326.09
9901.03
10305.62
8109.64
8609.59
8961.41
0.00
0.00
654.07
600.25
571.87
568.76
521.95
497.28
0.00
0.00
0.00
0.00
100
a)
b)
c)
Description of items
1m
1m
1m
Page 30 of 368
445.95
409.25
389.90
1 m3
1 m3
6873.00
7985.60
8765.76
10184.76
1 m3
635.10
810.00
12/26/2016 10:20:51
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
102
Basic Rate
0.00
Page 31 of 368
12/26/2016 10:20:51
DSR 2014
visit www.sahaayidotcom.blogspot.in
5.49
Description of items
Unit
1 m3
Basic Rate
13966.75
6. Brick Work
Brick work with common burnt clay F.P.S. (non
modular) bricks of class designation 7.5 in
foundation and plinth in:
103
a)
b)
6.1.1
6.1.2
6.2.1
6.2.2
6.3.1
6.3.2
107
108
1 m3
1 m3
4753.45
4541.05
1 m3
1 m3
5483.55
5560.40
106
a)
b)
4918.65
4677.25
105
a)
b)
1 m3
1 m3
104
a)
b)
6.4.1
6.4.2
17813.07
0.00
0.00
0.00
0.00
7214.18
6860.12
6273.20
5965.32
0.00
0.00
6971.89
6660.36
6062.51
5791.62
0.00
0.00
8042.72
8155.44
6993.67
7091.69
0.00
0.00
1 m3
1 m3
5667.55
5426.15
8312.60
7958.53
7228.34
6920.46
6.5
1 m3
289.05
423.95
368.65
6.6
1 m2
101.15
148.36
129.01
Page 32 of 368
12/26/2016 10:20:52
DSR 2014
visit www.sahaayidotcom.blogspot.in
109
110
111
112
113
Unit
Basic Rate
6.7
1m
188.85
276.99
240.86
6.8
1 m2
517.60
759.16
660.14
6.9
1 m3
8546.20
12534.71
10899.75
6.10
1 m3
10185.85
14939.59
12990.94
6.11
1 m2
446.65
655.10
569.65
0.00
0.00
897.33
857.65
780.28
745.79
0.00
0.00
114
a)
b)
Description of items
6.12.1
6.12.2
1 m2
1 m2
611.80
584.75
115
a)
b)
6.13.1
6.13.2
1 m2
1 m2
692.80
665.80
1016.13
976.53
883.59
849.16
116
6.14
1 m2
25.60
37.55
32.65
117
6.15
1 m2
69.50
101.94
88.64
0.00
0.00
118
a)
6.16.1
1 m3
8145.35
11946.78
10388.51
b)
6.16.2
1 m3
7759.10
11380.27
9895.89
Page 33 of 368
12/26/2016 10:20:52
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
6.17
1 m3
7804.25
11446.49
9953.47
6.18
1 m3
8553.90
12546.01
10909.57
6.20
1 m3
11500.20
16867.34
14667.26
6.21
1 m3
13085.45
19192.43
16689.07
6.22
1 m2
550.10
806.83
701.59
124
6.23
1 m2
433.80
636.25
553.26
125
6.24
1 units
426.15
625.03
543.51
126
6.25
1 m3
172.20
252.57
219.62
0.00
0.00
119
120
121
122
123
127
a)
b)
6.26.1
CS2
6.26.2
6.27.1
1 m3
7772.20
11399.49
9912.60
1 m3
5559.35
8153.90
7090.35
0.00
0.00
6701.72
5827.58
128
a)
Basic Rate
1 m3
Page 34 of 368
4569.25
12/26/2016 10:20:52
DSR 2014
visit www.sahaayidotcom.blogspot.in
6.27.2
6.28.1
6.28.2
6.29.1
6.29.2
6.30.1
6.30.2
6.31.1
6.31.2
1 m3
1 m3
4936.90
5685.85
1 m3
1 m3
4992.35
5712.20
1 m3
1 m3
4762.85
5511.75
1 m3
1 m3
4852.05
5601.00
133
a)
b)
5318.15
132
a)
b)
1 m3
131
a)
b)
Basic Rate
130
a)
b)
Unit
129
a)
b)
Description of items
6.32.1
6.32.2
1 m3
1 m3
5697.25
5455.85
134
7800.13
6782.72
0.00
0.00
7240.95
8339.44
6296.48
7251.68
0.00
0.00
7322.28
8378.08
6367.20
7285.29
0.00
0.00
6985.67
8084.08
6074.50
7029.64
0.00
0.00
7116.50
8214.99
6188.26
7143.47
0.00
0.00
8356.16
8002.10
7266.22
6958.34
0.00
0.00
a)
6.34.1
1 m3
6218.60
9120.82
7931.15
b)
6.34.2
1 m3
6006.20
8809.29
7660.26
0.00
0.00
135
a)
6.35.1
1 m3
6162.05
9037.88
7859.02
b)
6.35.2
1 m3
5949.60
8726.28
7588.07
Page 35 of 368
12/26/2016 10:20:52
DSR 2014
visit www.sahaayidotcom.blogspot.in
Unit
Basic Rate
136
a)
Description of items
0.00
0.00
1 m3
5460.50
8008.92
6964.27
6.37
1 m3
8515.35
12489.46
10860.40
6.38
1 m3
6386.95
9367.74
8145.86
139
6.40
1 m2
783.50
1149.16
999.27
140
6.41
1 m2
66.10
96.95
84.30
6.44
1 metre
38.15
55.95
48.66
0.00
0.00
137
138
141
6.36.1
142
a)
6.45.1
1 m2
778.15
1141.31
992.45
b)
6.45.2
1 m2
751.10
1101.64
957.95
0.00
0.00
0.00
0.00
5746.68
4997.11
0.00
0.00
7. Stone Work
Random rubble masonry with hard stone in
foundation and plinth including levelling up with
cement concrete 1:6:12 (1 cement : 6 coarse sand :
12 graded stone aggregate 20mm nominal size) up
to plinth level with :
143
a)
144
7.1.1
Page 36 of 368
1 m3
3918.10
12/26/2016 10:20:52
DSR 2014
visit www.sahaayidotcom.blogspot.in
7.2.1
145
7.4.1
7.4.2
146
7.5
147
7.6.1
148
a)
Unit
1 m3
Basic Rate
4664.85
a)
b)
a)
Description of items
7.7.1
6841.94
5949.51
0.00
0.00
1 m3
1 m3
371.95
1137.20
545.54
1667.93
474.38
1450.37
1 m3
446.75
655.25
569.78
0.00
0.00
6640.56
5774.40
0.00
0.00
6203.70
5394.52
0.00
0.00
1 m3
1 m3
4527.55
4229.70
149
a)
7.8.1
1 m3
5263.60
7720.12
6713.15
b)
7.8.2
1 m3
4965.75
7283.27
6333.27
0.00
0.00
150
a)
b)
7.10.1
7.10.2
151
7.11
152
a)
(i)
(ii)
b)
(i)
(ii)
153
a)
(i)
(ii)
b)
(i)
(ii)
1 m3
1 m3
413.70
1288.75
606.77
1890.21
527.63
1643.66
1 m3
486.45
713.48
620.41
0.00
0.00
0.00
40844.66
41978.42
0.00
53690.02
54825.25
0.00
35517.10
36502.97
0.00
46686.97
47674.13
0.00
0.00
0.00
47389.08
48524.30
0.00
60235.90
61369.66
0.00
41207.89
42195.05
0.00
52379.05
53364.92
1 m3
1 m3
27848.00
28621.00
1 m3
1 m3
36606.00
37380.00
Page 37 of 368
1 m3
1 m3
32310.00
33084.00
1 m3
1 m3
41069.00
41842.00
12/26/2016 10:20:52
DSR 2014
visit www.sahaayidotcom.blogspot.in
Basic Rate
1 m3
1 m3
49340.00
50112.00
1 m3
1 m3
71069.00
71843.00
155
a)
(i)
(ii)
b)
(i)
(ii)
Unit
154
a)
(i)
(ii)
b)
(i)
(ii)
Description of items
0.00
0.00
0.00
72366.98
73499.27
0.00
104236.90
105372.13
0.00
62927.81
63912.41
0.00
90640.78
91627.94
0.00
0.00
0.00
33802.97
34790.12
0.00
43258.72
44245.88
1 m3
1 m3
26504.00
27278.00
1 m3
1 m3
33918.00
34692.00
0.00
38873.42
40008.64
0.00
49747.53
50882.76
1 m3
765.00
1122.03
975.67
1 m3
1855.00
0.00
2720.73
0.00
2365.85
156
7.16
157
a)
7.17.1
158
7.18
1 m3
1290.00
1892.04
1645.25
159
7.19
1 m2
446.65
655.10
569.65
0.00
0.00
57088.36
58223.59
49642.06
50629.21
0.00
0.00
2420.00
6854.00
3549.41
10052.76
3086.45
8741.53
23.05
33.81
29.40
160
a)
b)
7.20.1
7.20.2
161
a)
b)
7.21.1
7.21.2
162
7.22
Page 38 of 368
1 m3
1 m3
1 m3
1 m3
1 units
38923.00
39697.00
12/26/2016 10:20:52
DSR 2014
visit www.sahaayidotcom.blogspot.in
a)
7.23.1.1
7.23.1.2
7.23.1.3
7.23.1.4
7.23.1.5
b)
(i)
(ii)
(iii)
(iv)
(v)
7.23.2.1
7.23.2.2
7.23.2.3
7.23.2.4
7.23.2.5
c)
(i)
(ii)
(iii)
(iv)
(v)
7.23.3.1
7.23.3.2
7.23.3.3
7.23.3.4
7.23.3.5
d)
(i)
(ii)
(iii)
(iv)
(v)
7.23.4.1
7.23.4.2
7.23.4.3
7.23.4.4
7.23.4.5
164
7.24
165
166
167
Unit
Basic Rate
163
(i)
(ii)
(iii)
(iv)
(v)
Description of items
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
2588.20
2484.15
2380.35
2276.10
2172.00
3452.85
3348.80
3245.00
3140.75
3036.60
2642.40
2530.60
2419.05
2306.80
2195.20
0.00
0.00
0.00
0.00
3796.11
3643.50
3491.26
3338.36
3185.67
3300.97
3168.26
3035.88
2902.92
2770.15
0.00
0.00
5064.30
4911.68
4759.44
4606.54
4453.78
4403.73
4271.03
4138.64
4005.69
3872.85
0.00
0.00
3875.61
3711.63
3548.02
3383.38
3219.70
3370.09
3227.51
3085.24
2942.07
2799.74
0.00
0.00
1 m2
1 m2
1 m2
1 m2
1 m2
3507.05
3395.25
3283.70
3171.45
3059.85
5143.79
4979.81
4816.20
4651.57
4487.88
4472.86
4330.27
4188.00
4044.84
3902.51
1 m3
1855.00
2720.73
2365.85
7.25
1 Kg
574.65
842.84
732.90
7.26
1 No.
36.75
53.90
46.87
7.27
1 No.
31.75
46.57
40.49
Page 39 of 368
12/26/2016 10:20:52
DSR 2014
visit www.sahaayidotcom.blogspot.in
(i)
b)
(i)
170
171
Basic Rate
1 m2
1 m2
1297.40
1329.35
169
a)
b)
Unit
168
a)
Description of items
7.29.1
7.29.2
0.00
0.00
0.00
0.00
1902.90
1654.69
0.00
0.00
1949.76
1695.44
0.00
0.00
1 m2
1 m2
797.60
825.45
1169.84
1210.69
1017.25
1052.77
7.30
1 m2
979.95
1437.29
1249.82
7.31
1 No.
2905.35
4261.28
3705.46
0.00
0.00
172
a)
7.32.1
CS2
1 m3
38249.90
56101.13
48783.59
b)
7.32.2
CS2
1 m3
39022.00
57233.57
49768.32
0.00
0.00
13966.94
14004.42
12145.17
12177.76
173
a)
b)
7.33.1
7.33.2
1 m2
1 m2
Page 40 of 368
9522.70
9548.25
12/26/2016 10:20:52
DSR 2014
visit www.sahaayidotcom.blogspot.in
174
175
Description of items
Unit
Basic Rate
1 units
426.10
624.96
543.44
7.35
1 m3
172.20
252.57
219.62
7.36
1 m2
1529.60
2243.46
1950.84
177
0.00
0.00
a)
0.00
0.00
2462.74
2141.51
0.00
0.00
0.00
0.00
176
(i)
7.37.1.1 25 mm thick.
178
a)
(i)
(ii)
179
1 m2
Page 41 of 368
1679.10
1 m2
1725.00
2530.06
2200.05
1 m2
1486.90
2180.84
1896.38
1 m2
83.35
122.25
106.30
12/26/2016 10:20:52
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
180
a)
7.40.1 Red sand stone.
b)
7.40.2 White sand stone
DSR Analyser Ver.12 Powered By Pradeepen Thulika
181
182
Basic Rate
1 m2
1 m2
0.00
0.00
2486.30
2520.00
3646.66
3696.08
3171.01
3213.99
210.54
183.08
7.41
1 Kg
143.55
7.42
1 No.
206.15
262.92
0.00
Page 42 of 368
0.00
12/26/2016 10:20:52
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
Basic Rate
183
0.00
0.00
0.00
0.00
4081.31
4274.33
3548.97
3716.81
0.00
0.00
0.00
0.00
3434.35
3613.29
0.00
5670.26
5730.98
2986.39
3141.99
0.00
4930.66
4983.46
0.00
0.00
136.10
230.55
199.62
338.15
173.58
294.04
8.4
247.40
362.86
315.53
187
8.5
386.60
567.03
493.07
188
8.6
212.85
312.19
271.47
a)
(i)
(ii)
8.1.1.1
8.1.1.2
a)
8.2.1.1
8.2.1.2
8.2.2.1
8.2.2.2
186
2341.55
2463.55
3866.00
3907.40
185
a)
b)
2782.65
2914.25
184
(i)
(ii)
b)
(i)
(ii)
8.3.1
8.3.2
Marble work
Granite work.
1m
1m
Page 43 of 368
12/26/2016 10:20:52
DSR 2014
visit www.sahaayidotcom.blogspot.in
8.7.1
8.7.2
8.8.1.1
8.8.1.2
8.8.1.3
1 Kg
1 Kg
Gunmetal cramps.
Stainless steel cramps.
Each
Each
Each
a)
(i)
8.9.1.1
(ii)
8.9.1.2
8mm thick.
Raj nagar plain white marble/ Udaipur green marble/ 1 m2
Zebra black marble.
1 m2
Granite of any colour and shade.
0.00
802.14
842.84
697.51
732.90
0.00
0.00
0.00
39.38
41.58
64.24
0.00
34.24
36.16
55.86
0.00
0.00
0.00
0.00
1564.70
2294.95
1995.60
1921.85
2818.78
2451.11
0.00
0.00
4786.58
4786.58
4162.24
4162.24
0.00
0.00
10300.05
8956.56
546.90
574.65
26.85
28.35
43.80
192
8.10.1
8.10.2
1 m2
1 m2
3263.50
3263.50
193
8.11
Page 44 of 368
0.00
191
a)
b)
Basic Rate
190
a)
(i)
(ii)
(iii)
Unit
189
a)
b)
Description of items
7022.60
12/26/2016 10:20:52
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
Basic Rate
194
8.12
0.00
0.00
4758.49
4137.82
0.00
0.00
0.00
0.00
91496.90
134198.50
116694.35
75558.60
110821.80
96366.78
53698.60
78759.74
68486.73
97153.60
142495.19
123908.86
0.00
0.00
70880.90
103961.02
90400.88
48848.40
71645.95
62300.82
0.00
0.00
9149.45
7555.55
13419.50
11081.73
11669.13
9636.28
5369.45
7875.37
6848.15
0.00
0.00
0.00
3944.03
3529.32
0.00
3429.59
3068.97
3244.35
195
a)
b)
c)
1 m3
1 m3
Sal wood
Kiln seasoned and chemically treated hollock wood.
1 m3
9.2
a)
9.3.1
b)
9.3.2
196
197
198
a)
b)
9.4.1
9.4.2
c)
9.4.3
199
a)
(i)
(ii)
9.5.1.1
9.5.1.2
1 m2
1 m2
Page 45 of 368
2689.05
2406.30
12/26/2016 10:20:52
DSR 2014
visit www.sahaayidotcom.blogspot.in
9.5.2.1
9.5.2.2
b)
c)
9.5.3.1
9.5.3.2
b)
1 m2
1 m2
35 mm thick shutters
30 mm thick shutters
1731.05
1581.00
1 m2
1 m2
35 mm thick shutters
30 mm thick shutters
2435.40
2172.05
0.00
0.00
2538.93
2318.85
2207.77
2016.39
0.00
0.00
3572.00
3185.75
3106.09
2770.21
0.00
0.00
9.6.1
2453.00
3597.82
3128.53
9.6.2
2685.30
3938.53
3424.81
9.6.3
2627.25
3853.39
3350.77
0.00
0.00
2155.60
3161.62
2749.23
1383.50
2029.18
1764.50
0.00
0.00
201
a)
Basic Rate
200
a)
Unit
c)
(i)
(ii)
Description of items
9.7.1
9.7.2
c)
1 m2
1 m2
(i)
9.7.3.1
1934.20
2836.89
2466.86
(ii)
9.7.3.2
1652.60
2423.87
2107.71
0.00
0.00
d)
Page 46 of 368
12/26/2016 10:20:52
DSR 2014
visit www.sahaayidotcom.blogspot.in
9.7.4.1
Description of items
Unit
Basic Rate
1793.40
2630.38
2287.29
0.00
0.00
e)
(i)
9.7.5.1
920.50
1350.10
1174.00
(ii)
9.7.5.2
1188.00
1742.44
1515.16
(iii)
1511.80
2217.36
1928.14
(iv)
9.7.5.4
1568.15
2300.01
2000.00
1181.70
1406.75
0.00
2114.10
0.00
1733.20
2063.28
0.00
1838.35
0.00
1507.13
1794.16
1602.40
2350.24
2043.69
0.00
0.00
0.00
4785.70
4311.73
0.00
4161.47
3749.33
0.00
0.00
3186.04
2934.43
2770.47
2551.68
0.00
0.00
4362.55
3946.96
3793.52
3432.14
0.00
0.00
3342.32
2906.36
f)
(i)
g)
(i)
(ii)
h)
9.7.6.1
9.7.7.1
9.7.7.2
9.7.8
9.9.1.1
9.9.1.2
b)
(i)
(ii)
9.9.2.1
9.9.2.2
1 m2
1 m2
3262.90
2939.75
1 m2
1 m2
35 mm thick
30 mm thick
2172.25
2000.70
1 m2
1 m2
35 mm thick
30 mm thick
2974.40
2691.05
203
a)
1 m2
1 m2
1441.40
c)
(i)
(ii)
1 m2
202
a)
(i)
(ii)
9.10.1
30 mm thick shutters
1 m2
Page 47 of 368
2278.80
12/26/2016 10:20:52
DSR 2014
visit www.sahaayidotcom.blogspot.in
205
206
207
Unit
Basic Rate
204
a)
Description of items
0.00
0.00
203.25
298.11
259.22
9.12
5.80
8.51
7.40
9.13
-29.05
42.61
37.05
9.14
253.50
371.81
323.31
9.11.1
1 m2
208
0.00
0.00
a)
0.00
0.00
444.78
386.76
0.00
0.00
72.97
63.45
0.00
0.00
0.00
0.00
(i)
9.15.1.1
209
a)
-303.25
b)
(i)
9.15.2.1
-49.75
(i)
2760.25
4048.46
3520.40
(ii)
2799.60
4106.17
3570.59
0.00
0.00
b)
Glazed shutters :
(i)
2746.10
4027.70
3502.35
(ii)
2720.85
3990.67
3470.15
0.00
0.00
210
Page 48 of 368
12/26/2016 10:20:52
DSR 2014
visit www.sahaayidotcom.blogspot.in
9.17.1
9.17.2
Unit
1 m2
1 m2
12 mm thick
18 mm thick
Basic Rate
528.60
664.55
211
a)
b)
Description of items
9.18.1
9.18.2
1 m2
1 m2
18 mm thick
25 mm thick
1202.00
1290.55
212
775.30
974.70
674.17
847.56
0.00
0.00
1762.97
1892.85
1533.02
1645.96
0.00
0.00
a)
9.20.1
2606.45
3822.88
3324.24
b)
9.20.2
2374.15
3482.17
3027.97
c)
9.20.3
2109.35
3093.78
2690.25
0.00
0.00
213
a)
9.21.1
1909.55
2800.74
2435.42
b)
9.21.2
1735.35
2545.24
2213.25
c)
9.21.3
1482.15
2173.87
1890.32
0.00
0.00
394.90
579.20
503.65
365.85
536.59
466.60
0.00
0.00
204.46
332.21
177.79
288.88
214
a)
9.22.1
215
9.23
1 m2
216
a)
b)
9.24.1
9.24.2
Rectangular or square.
Circular.
1 m2
1 m2
Page 49 of 368
139.40
226.50
12/26/2016 10:20:52
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
Basic Rate
217
a)
9.25.1
218
9.26
219
a)
0.00
0.00
377.50
553.68
481.46
104.55
153.34
133.34
0.00
0.00
35 mm thick shutters.
0.00
0.00
1 m2
Decorative type door.
Extra for cutting rebate in flush door shutters (Total 1 m2
area of the shutter to be measured).
(i)
9.27.1.11
3063.05
4492.58
3906.59
(ii)
2097.35
3076.18
2674.94
(iii)
2807.40
4117.61
3580.53
(iv)
9.27.1.21
3316.55
4864.38
4229.90
(v)
2350.85
3447.99
2998.25
(vi)
3060.90
4489.42
3903.85
0.00
0.00
b)
30 mm thick shutters.
(i)
9.27.2.11
2709.25
3973.66
3455.35
(ii)
1883.95
2763.19
2402.77
(iii)
2490.40
3652.67
3176.23
(iv)
9.27.2.21
2962.75
4345.47
3778.67
(v)
2137.30
3134.78
2725.89
(vi)
2743.90
4024.48
3499.55
Page 50 of 368
12/26/2016 10:20:52
DSR 2014
visit www.sahaayidotcom.blogspot.in
221
9.31.1
9.31.2
9.32
9.33.1
9.33.2
9.33.3
9.33.4
9.34.1
9.34.2
9.34.3
9.34.4
9.35.1
9.35.2
9.35.3
226
0.00
2278.80
2046.50
3342.32
3001.60
2906.36
2610.09
20.65
30.29
26.34
0.00
0.00
Each
Each
Each
Each
25 mm long
32 mm long
40 mm long
50 mm long
23.32
26.62
31.75
33.44
20.28
23.15
27.61
29.08
0.00
0.00
40 mm thick.
25 mm thick.
20 mm thick
12 mm thick
1 m2
1 m2
1 m2
1 m2
7236.62
4703.41
3803.81
2452.76
6292.72
4089.92
3307.66
2132.84
0.00
0.00
1726.89
1933.04
2064.16
1501.65
1680.90
1794.92
0.00
0.00
141952.65
123437.09
0.00
0.00
15.90
18.15
21.65
22.80
4933.95
3206.80
2593.45
1672.30
1 m2
1 m2
1 m2
12 mm thick
18 mm thick
25 mm thick
1177.40
1317.95
1407.35
225
a)
9.36.1
1 m3
Page 51 of 368
0.00
224
a)
b)
c)
1 m2
1 m2
35 mm thick shutters
30 mm thick shutters
223
a)
b)
c)
d)
Basic Rate
222
a)
b)
c)
d)
Unit
220
a)
b)
Description of items
96783.70
12/26/2016 10:20:52
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
9.37.1
227
1474.61
975.00
1430.03
1243.51
0.00
0.00
2214.06
2345.25
1925.27
2039.35
0.00
0.00
0.00
173.00
230.05
0.00
150.43
200.05
0.00
0.00
132.52
162.58
115.23
141.38
0.00
0.00
1793.60
2630.67
2287.54
9.42
372.75
546.71
475.40
9.43
478.25
701.45
609.96
0.00
0.00
9.38
9.39.1
9.39.2
231
232
233
1 m2
1 m2
18 mm thick
25 mm thick
1509.55
1599.00
1m
1m
117.95
156.85
9.40.2.1 50x12 mm
9.40.2.2 50x20 mm
90.35
110.85
230
a)
b)
(i)
(ii)
1695.80
229
a)
(i)
(ii)
1 m2
Basic Rate
1156.20
228
a)
b)
Unit
9.41.1
1 m2
Page 52 of 368
12/26/2016 10:20:52
DSR 2014
visit www.sahaayidotcom.blogspot.in
9.44.1
b)
9.44.2
234
9.45
92.90
136.26
118.48
49.00
71.87
62.49
0.00
0.00
397.92
500.14
687.52
346.01
434.91
597.84
0.00
0.00
185.68
202.70
161.46
176.26
0.00
0.00
109.00
159.87
139.02
116.90
171.46
149.09
9.49
949.25
1392.26
1210.67
9.50
1118.10
1639.92
1426.02
0.00
0.00
861.65
578.30
1263.78
848.19
1098.94
737.56
9.46.1
9.46.2
9.46.3
9.47.1
9.47.2
1m
12 mm dia.
1m
20 mm dia.
1m
25 mm dia.
Providing and fixing nickel plated M.S. pipe curtain
rods with nickel plated brackets :
1m
20 mm dia (heavy type)
1m
25 mm dia (heavy type)
271.30
341.00
468.75
126.60
138.20
a)
9.48.1
b)
9.48.2
239
42.66
237
238
1m
Non decorative veneer on both sides.
Particle board with decorative veneering on both 1 m
sides.
Basic Rate
49.06
236
a)
b)
Unit
33.45
235
a)
b)
c)
Description of items
1 Kg
Fixed to steel windows by welding.
Fixed to openings /wooden frames with rawl plugs 1 Kg
screws etc.
240
9.51.1
9.51.2
241
9.52
-110.35
161.85
140.74
9.53
117.35
172.12
149.67
0.00
0.00
242
243
1 m2
1 m2
a)
b)
Page 53 of 368
12/26/2016 10:20:52
DSR 2014
visit www.sahaayidotcom.blogspot.in
9.54.1
9.54.2
CS2
9.55.1
9.55.2
9.55.3
9.55.4
9.56.1
9.56.2
9.56.3
9.56.4
9.57.1
9.57.2
9.57.3
9.57.4
9.58.1
9.58.2
9.58.3
9.58.4
9.59.1
9.59.2
9.59.3
9.60.1
9.60.2
9.60.3
9.61.1
9.61.2
9.61.3
252
150x125x27x2.80 mm
125x125x27x2.80 mm
100x125x27x2.80 mm
75x100x20x2.24 mm
150 mm
125 mm
100 mm
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
150 mm
125 mm
100 mm
1m
1m
1m
9.62.1
9.62.2
Each
Each
300x16 mm
250x16 mm
Providing and fixing ISI marked oxidised M.S. tower
bolt black finish, (Barrel type) with necessary screws
etc. complete :
Page 54 of 368
69087.40
101330.49
88113.47
46573.20
68308.91
59399.05
0.00
0.00
49.35
37.84
30.51
17.23
42.92
32.91
26.53
14.99
0.00
0.00
84.26
56.54
36.45
23.25
73.27
49.17
31.69
20.21
0.00
0.00
52.14
40.41
32.12
18.55
45.34
35.14
27.93
16.13
0.00
0.00
86.68
82.43
67.91
60.79
75.38
71.68
59.05
52.86
0.00
0.00
254.55
237.53
201.38
221.34
206.55
175.11
0.00
0.00
246.04
254.55
209.96
213.95
221.34
182.57
0.00
0.00
255.72
242.08
264.23
222.36
210.50
229.76
0.00
0.00
254.03
243.77
220.90
211.97
0.00
0.00
33.65
25.80
20.80
11.75
57.45
38.55
24.85
15.85
35.55
27.55
21.90
12.65
59.10
56.20
46.30
41.45
173.55
161.95
137.30
167.75
173.55
143.15
174.35
165.05
180.15
251
a)
b)
125x65x2.12 mm
100x58x1.90 mm
75x47x1.70 mm
50x37x1.50 mm
250
a)
b)
c)
125x90x4.00 mm
100x75x3.50 mm
75x60x3.10 mm
50x40x2.50 mm
Each
Each
Each
Each
Basic Rate
249
a)
b)
c)
125x65x2.12 mm
100x58x1.90 mm
75x47x1.70 mm
50x37x1.50 mm
248
a)
b)
c)
Hollock wood.
247
a)
b)
c)
d)
1 m3
246
a)
b)
c)
d)
1 m3
Sal wood.
245
a)
b)
c)
d)
Unit
244
a)
b)
c)
d)
Description of items
173.20
166.20
12/26/2016 10:20:52
DSR 2014
visit www.sahaayidotcom.blogspot.in
9.63.1
9.63.2
9.63.3
9.63.4
9.64
9.65.1
9.65.2
9.66.1
9.66.2
9.66.3
b)
c)
9.67.1
9.67.2
CS2
9.67.3
a)
b)
c)
9.68.1
9.68.2
9.68.3
258
9.69
9.70.1
9.70.2
9.70.3
9.70.4
150 mm
Each
Each
Each
Each
Each
Each
Each
115 mm
Each
90 mm
Each
Each
Each
125x64x1.90 mm
100X58X1.90 mm
75x47x1.80 mm
50x37x1.50 mm
Each
Each
Each
Each
Basic Rate
9.71.1
9.71.2
9.71.3
261
9.72.1
9.72.2
9.72.3
9.72.4
9.72.5
9.72.6
9.72.7
Each
125x64x2.50 mm
Each
100x60x2.50 mm
Each
75x50x2.50 mm
Providing and fixing bright finished brass butt hinges
with necessary screws etc. complete :
Each
125x85x5.5 mm (heavy type)
Each
125x70x4 mm (ordinary type)
Each
100x85x5.5 mm (heavy type)
Each
100x70x4 mm (ordinary type)
Each
75x65x4 mm (heavy type)
Each
75x40x2.5 mm (ordinary type)
Each
50x40x2.5 mm (ordinary type)
Page 55 of 368
66.95
58.65
45.85
39.10
98.20
86.02
67.25
57.35
85.39
74.80
58.48
49.87
76.80
112.64
97.95
0.00
0.00
102.08
88.44
88.77
76.91
0.00
0.00
42.39
38.72
35.27
36.86
33.67
30.67
0.00
0.00
23.85
34.98
30.42
20.95
30.73
26.72
17.45
25.59
22.26
0.00
0.00
36.20
32.70
30.40
53.09
47.96
44.59
46.17
41.71
38.77
78.00
114.40
99.48
0.00
0.00
164.93
130.61
81.55
48.40
143.42
113.57
70.91
42.09
0.00
0.00
205.85
161.26
113.08
179.00
140.23
98.33
0.00
0.00
616.75
201.08
517.01
162.66
201.45
107.80
47.01
536.30
174.86
449.58
141.44
175.17
93.74
40.88
69.60
60.30
28.90
26.40
24.05
112.45
89.05
55.60
33.00
260
a)
b)
c)
d)
e)
f)
g)
125 mm
100 mm
75 mm
259
a)
b)
c)
300x20x6 mm
250x20x6 mm
257
a)
b)
c)
d)
256
a)
Each
Each
Each
Each
250x10 mm
200x10 mm
150x10 mm
100x10 mm
255
a)
b)
c)
Unit
254
a)
b)
Description of items
140.35
109.95
77.10
420.50
137.10
352.50
110.90
137.35
73.50
32.05
12/26/2016 10:20:52
DSR 2014
visit www.sahaayidotcom.blogspot.in
9.73.1
9.73.2
9.73.3
9.73.4
9.74.1
9.74.2
9.74.3
9.74.4
264
a)
b)
150x125x27x5 mm
125x125x27x5 mm
100x125x27x5 mm
75x100x20x3.2 mm
Each
Each
Each
Each
Basic Rate
9.75.1
9.75.2
CS2
Each
250x10 mm
Each
200x10 mm
Each
150x10 mm
Each
100x10 mm
Providing and fixing bright finished brass door latch
with necessary screws etc. complete :
Each
300x16x5 mm
Each
250x16x5 mm
0.00
0.00
544.81
485.11
451.08
339.98
473.74
421.84
392.25
295.64
0.00
0.00
441.48
350.98
282.85
192.87
383.89
305.20
245.96
167.71
0.00
0.00
226.35
331.99
288.68
214.70
314.90
273.83
371.45
330.75
307.55
231.80
263
a)
b)
c)
d)
Unit
262
a)
b)
c)
d)
Description of items
301.00
239.30
192.85
131.50
265
9.76
546.40
801.40
696.87
266
9.77
476.70
699.18
607.98
267
9.78
674.15
988.78
859.81
0.00
0.00
174.70
186.35
192.15
209.55
256.23
273.32
281.83
307.35
222.81
237.67
245.07
267.26
48.30
70.84
61.60
0.00
0.00
182.45
170.50
135.65
267.60
250.07
198.96
232.70
217.45
173.01
268
a)
b)
c)
d)
9.79.1
9.79.2
9.79.3
9.79.4
269
9.80
270
40 mm
50 mm
65 mm
75 mm
Each
Each
Each
Each
a)
b)
c)
9.81.1
9.81.2
9.81.3
271
9.82
85.70
125.70
109.30
9.83
753.75
1105.53
961.33
272
Page 56 of 368
12/26/2016 10:20:52
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
273
9.84
274
9.85
275
a)
b)
c)
9.86.1
9.86.2
9.86.3
276
a)
b)
c)
9.87.1
9.87.2
9.87.3
150 mm
115 mm
90 mm
Each
Each
Each
Each
Each
Each
277
9.88
278
9.89
a)
b)
c)
d)
9.90.1
9.90.2
9.90.3
9.90.4
280
9.91
281
a)
b)
c)
9.92.1
9.92.2
9.92.3
282
9.93
Each
Each
Each
Each
Size 40 mm
Size 50 mm
Size 65 mm
Size 75 mm
283
9.94.1
9.94.2
9.94.3
Each
Each
Each
Page 57 of 368
1043.60
1530.65
1331.00
79.60
116.75
101.52
0.00
0.00
264.23
218.90
201.89
229.76
190.35
175.56
0.00
0.00
106.65
89.95
78.35
156.42
131.93
114.92
136.02
114.72
99.93
790.30
1159.13
1007.94
732.25
1073.99
933.91
0.00
0.00
174.70
186.35
197.95
227.00
256.23
273.32
290.33
332.94
222.81
237.67
252.46
289.51
65.70
96.36
83.79
0.00
0.00
240.55
211.15
182.10
352.81
309.69
267.09
306.80
269.30
232.25
127.20
186.56
162.23
0.00
0.00
305.81
254.69
229.17
265.92
221.47
199.28
180.15
149.25
137.65
279
a)
b)
c)
Basic Rate
208.50
173.65
156.25
12/26/2016 10:20:52
DSR 2014
visit www.sahaayidotcom.blogspot.in
287
288
289
a)
b)
c)
290
a)
0.00
159.65
151.07
136.55
134.79
134.79
119.24
115.80
100.47
138.83
131.37
118.74
117.21
117.21
103.69
100.69
87.36
0.00
0.00
336.83
277.21
292.89
241.05
0.00
0.00
112.10
95.25
79.25
65.35
52.35
164.42
139.70
116.24
95.85
76.78
142.97
121.48
101.07
83.35
66.77
9.98
76.80
112.64
97.95
9.99
169.20
248.17
215.80
0.00
0.00
102.38
80.82
68.86
89.02
70.27
59.88
0.00
0.00
55.00
47.83
9.95.1
9.95.2
9.95.3
9.95.4
9.95.5
9.95.6
9.95.7
9.95.8
Each
Each
Each
Each
Each
Each
Each
Each
125x75x4 mm
125x63x4 mm
100x75x4 mm
100x63x4 mm
100x63x3.2 mm
75x63x4 mm
75x63x3.2 mm
75x45x3.2 mm
108.85
103.00
93.10
91.90
91.90
81.30
78.95
68.50
Each
Each
300x16 mm
250x16 mm
229.65
189.00
286
a)
b)
c)
d)
e)
Basic Rate
0.00
285
a)
b)
Unit
284
a)
b)
c)
d)
e)
f)
g)
h)
Description of items
9.97.1
9.97.2
9.97.3
9.97.4
9.97.5
Each
Each
Each
Each
Each
300x10 mm
250x10 mm
200x10 mm
150x10 mm
100x10 mm
9.100.1 125 mm
9.100.2 100 mm
9.100.3 75 mm
69.80
55.10
46.95
Each
Page 58 of 368
37.50
12/26/2016 10:20:52
DSR 2014
visit www.sahaayidotcom.blogspot.in
291
292
293
294
a)
Description of items
Unit
Each
Basic Rate
83.95
123.13
107.07
9.102
74.95
109.93
95.59
9.103
815.45
1196.02
1040.02
64.70
94.90
82.52
0.00
0.00
1325.65
1944.33
1690.72
b)
1197.90
1756.96
1527.79
c)
1325.65
1944.33
1690.72
Page 59 of 368
12/26/2016 10:20:52
DSR 2014
visit www.sahaayidotcom.blogspot.in
d)
Description of items
Unit
Basic Rate
1348.90
1978.43
1720.38
0.00
0.00
45.75
67.10
58.35
51.55
75.61
65.75
0.00
0.00
295
a)
b)
296
hinges
Each
Each
with
a)
9.107.1
71.30
104.58
90.94
b)
9.107.2
90.80
133.18
115.81
0.00
0.00
88.50
129.80
112.87
113.65
166.69
144.95
297
a)
b)
298
299
301
302
Each
9.109
43.60
63.95
55.61
9.110
396.60
581.69
505.82
0.00
0.00
199.85
293.12
254.89
9.112
61.80
90.64
78.82
9.113
465.95
683.41
594.27
300
a)
Each
1m
Page 60 of 368
12/26/2016 10:20:52
DSR 2014
visit www.sahaayidotcom.blogspot.in
304
305
Unit
Basic Rate
303
a)
b)
Description of items
Each
Each
9.116
0.00
0.00
28.60
22.80
41.95
33.44
36.48
29.08
198.95
291.80
253.74
12.60
18.48
16.07
0.00
0.00
213.75
202.15
313.51
296.49
0.00
272.61
257.82
0.00
2718.60
3987.37
3467.28
306
a)
b)
307
a)
1m
1m
Page 61 of 368
12/26/2016 10:20:52
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
Basic Rate
b)
2834.75
4157.73
3615.42
c)
2718.60
3987.37
3467.28
Page 62 of 368
12/26/2016 10:20:52
DSR 2014
visit www.sahaayidotcom.blogspot.in
308
309
a)
b)
310
311
9.119
Description of items
Unit
9.121
Page 63 of 368
Basic Rate
458.95
673.14
585.34
0.00
0.00
2749.60
3214.20
4032.84
4714.27
3506.82
4099.36
482.20
707.24
614.99
0.00
0.00
12/26/2016 10:20:52
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
Basic Rate
a)
2401.15
3521.77
3062.41
b)
2749.60
4032.84
3506.82
377.65
553.90
481.65
312
9.123
Page 64 of 368
12/26/2016 10:20:52
DSR 2014
visit www.sahaayidotcom.blogspot.in
b)
314
315
a)
b)
316
a)
b)
Unit
Basic Rate
313
a)
Description of items
1 m2
9.125
1 m2
0.00
0.00
2691.55
3947.70
3432.78
3330.35
4884.62
4247.50
803.30
1178.20
1024.52
0.00
0.00
2387.71
2448.73
2076.27
2129.33
0.00
0.00
1216.92
992.08
1058.19
862.67
1 m2
1 m2
1627.95
1669.55
1 m2
1 m2
Page 65 of 368
829.70
676.40
12/26/2016 10:20:52
DSR 2014
visit www.sahaayidotcom.blogspot.in
317
318
b)
Unit
Basic Rate
9.128
5060.75
7422.60
6454.44
9.129
1629.75
2390.35
2078.57
0.00
0.00
1409.05
2066.65
1797.09
1304.55
1913.38
1663.81
319
a)
Description of items
and 1 m2
1 m2
Page 66 of 368
12/26/2016 10:20:52
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
Basic Rate
Providing and fixing factory made shutters of Prelaminated particle board flat pressed three layer or
graded wood particle board with one side decorative
finish and other side balancing lamination
conforming to IS: 12823 Grade l Type ll, of approved
design, and edges sealed with water resistant paint
and lipped with aluminium 'U' type edge beading allround the shutter, including fixing with angle cleat,
grip strip, cadmium plated steel screws including
fixing of aluminium hinges 100x63x4 mm etc.
complete as per architectural drawing and direction
of Engineer-in-Charge (Cost of 'U' beading and
hinges will be paid for separately).
320
0.00
0.00
1310.30
1921.82
1671.15
442.35
648.79
564.17
322
0.00
0.00
a)
0.00
0.00
1469.85
1278.13
0.00
0.00
1207.39
1049.90
0.00
0.00
1085.58
943.98
a)
321
(i)
b)
(i)
c)
(i)
1 m2
9.131.1 25 mm thick.
9.132
1 m2
1002.15
9.133.2.1 18 mm thick.
823.20
1 m2
Page 67 of 368
740.15
12/26/2016 10:20:52
DSR 2014
visit www.sahaayidotcom.blogspot.in
324
325
Unit
Basic Rate
323
a)
b)
Description of items
0.00
0.00
1600.95
1317.55
2348.11
1932.45
2041.84
1680.39
9.136
1250.05
1833.45
1594.30
9.137
6268.20
9193.57
7994.41
0.00
0.00
1 m2
1 m2
326
a)
27658.70
40567.02
35275.67
327
6133.20
8995.56
7822.23
9.139
Page 68 of 368
12/26/2016 10:20:52
DSR 2014
visit www.sahaayidotcom.blogspot.in
329
330
Unit
Basic Rate
328
a)
Description of items
9.140.1
9.141
9.142
0.00
0.00
1059.20
1553.53
1350.89
611.55
896.96
779.97
0.00
0.00
3960.38
4727.03
3443.81
4110.46
1 m2
1 m2
Page 69 of 368
2700.20
3222.90
12/26/2016 10:20:52
DSR 2014
visit www.sahaayidotcom.blogspot.in
331
332
333
Description of items
Unit
Basic Rate
9.143
422.85
620.19
539.30
9.144
2950.90
4328.09
3763.55
9.145
469.30
688.32
598.54
Page 70 of 368
12/26/2016 10:20:52
DSR 2014
visit www.sahaayidotcom.blogspot.in
334
a)
Description of items
Unit
Basic Rate
0.00
0.00
0.00
0.00
0.00
0.00
436.85
640.73
557.15
418.55
613.89
533.82
461.25
676.52
588.27
100.15
146.89
127.73
130.65
191.62
166.63
0.00
0.00
491.70
721.18
627.11
528.30
774.86
673.79
174.55
256.01
222.62
0.00
0.00
586.20
859.78
747.63
544.75
798.98
694.77
149.95
219.93
191.24
174.55
256.01
222.62
0.00
0.00
562.40
824.87
717.28
683.90
1003.08
872.24
149.95
219.93
191.24
174.55
256.01
222.62
1m
(i)
(ii)
(iii)
(iv)
9.147.1.4
(v)
1m
1m
b)
1m
(i)
(ii)
9.147.2.2
(iii)
c)
(i)
(ii)
(iii)
9.147.3.3
(iv)
d)
1m
1m
(i)
(ii)
(iii)
9.147.4.3
(iv)
1m
1m
1m
Page 71 of 368
12/26/2016 10:20:52
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
Basic Rate
335
Each
Each
Each
Each
Each
0.00
0.00
304.25
362.35
455.25
524.95
652.70
446.24
531.46
667.72
769.94
957.32
388.04
462.14
580.62
669.52
832.45
a)
b)
c)
d)
e)
9.148.1
9.148.2
9.148.3
9.148.4
9.148.5
336
9.149
216.65
317.76
276.31
337
9.150
146.95
215.53
187.42
338
9.151
71.45
104.80
91.13
339
9.152
Providing and fixing steel roller for uPVC sliding door Each
with necessary screws etc. complete.
112.10
164.42
142.97
340
9.153
135.35
198.52
172.62
9.154
94.60
138.75
120.65
9.155
1441.40
2114.10
1838.35
0.00
0.00
341
342
343
200 x 19 x 1.9 mm
250 x 19 x 1.9 mm
300 x 19 x 1.9 mm
350 x 19 x 1.9 mm
400 x 19 x 1.9 mm
Page 72 of 368
12/26/2016 10:20:52
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
Basic Rate
a)
979.80
1437.07
1249.63
b)
1042.65
1529.25
1329.79
0.00
0.00
344
a)
1394.55
2045.39
1778.60
b)
1818.40
2667.05
2319.17
0.00
0.00
1016.70
1304.15
1744.95
1491.19
1912.80
2559.32
1296.69
1663.30
2225.49
1883.00
2761.80
2401.56
0.00
0.00
2449.39
3095.91
0.00
2129.90
2692.10
0.00
345
a)
b)
c)
346
347
a)
b)
1 m2
1 m2
1 m2
9.158.1 12 mm thick.
9.158.2 18 mm thick.
9.158.3 25 mm thick.
9.159
1 m2
1 m2
Page 73 of 368
1670.00
2110.80
12/26/2016 10:20:52
DSR 2014
visit www.sahaayidotcom.blogspot.in
348
349
350
351
Description of items
Unit
Basic Rate
10.1
67.70
99.30
86.34
10.2
73.95
108.46
94.32
10.3
5291.30
7760.75
6748.48
10.4
Providing and fixing 1mm thick M.S. sheet slidingshutters, with frame and diagonal braces of
40x40x6mm angle iron, 3mm M.S. gusset plates at
1 m2
the junctions and corners, 25mm dia pulley,
40x40x6mm angle and T-iron guide at the top and
bottom respectively, including applying a priming
coat of approved steel primer.
3547.30
5202.82
4524.20
0.00
0.00
3073.85
4508.42
3920.36
2906.65
4263.18
3707.12
0.00
0.00
2142.10
3141.82
2732.02
1921.40
2818.12
2450.54
1797.50
2636.39
2292.52
352
1 m2
a)
10.5.1
b)
10.5.2
353
a)
10.6.1
b)
10.6.2
c)
10.6.3
1 m2
1 m2
1 m2
Page 74 of 368
12/26/2016 10:20:52
DSR 2014
visit www.sahaayidotcom.blogspot.in
10.7
Unit
Each
Basic Rate
438.95
a)
10.8.1
b)
10.8.2
10.9
559.83
0.00
0.00
724.85
1063.14
924.47
724.85
1063.14
924.47
313.60
459.96
399.96
0.00
0.00
357
643.81
355
356
Description of items
a)
36.40
53.39
46.42
b)
10.10.2
19.35
28.38
24.68
0.00
0.00
358
a)
114.15
167.42
145.59
b)
10.11.2
77.75
114.04
99.16
10.12
38.55
56.54
49.17
359
Page 75 of 368
12/26/2016 10:20:53
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
Basic Rate
360
0.00
0.00
a)
83.70
122.76
106.75
b)
10.13.2
80.15
117.56
102.22
0.00
0.00
0.00
0.00
377.70
553.97
481.72
369.45
541.87
471.19
0.00
0.00
400.95
588.07
511.37
392.70
575.97
500.85
0.00
0.00
424.20
622.17
541.02
415.90
610.00
530.44
0.00
0.00
204.02
177.41
361
a)
(i)
Profile B
Fixing with adjustable lugs with split end tail to each 1 m
10.14.1.1
jamb.
Fixing with carbon steel galvanised dash fastener of 1 m
required dia and size (to be paid for separately).
(ii)
10.14.1.2
b)
Profile C
Fixing with adjustable lugs with split end tail to each 1 m
10.14.2.1
jamb.
(i)
(ii)
10.14.2.2
c)
Profile E
Fixing with adjustable lugs with split end tail to each 1 m
10.14.3.1
jamb.
(i)
(ii)
10.14.3.2
362
a)
10.15.1
Page 76 of 368
139.10
12/26/2016 10:20:53
DSR 2014
visit www.sahaayidotcom.blogspot.in
10.15.2
Description of items
Unit
Basic Rate
191.26
166.31
0.00
0.00
102.90
115.10
150.92
168.82
131.24
146.80
123.65
181.36
157.70
10.17
124.45
182.53
158.72
365
10.18
142.95
209.66
182.32
366
10.19
73.95
108.46
94.32
367
10.20
98.25
144.10
125.31
368
10.21
139.65
204.82
178.11
2.85
4.18
3.63
0.00
0.00
363
1 Kg
1 Kg
a)
b)
c)
364
369
130.40
10.22
1 Kg
1 Kg
One
including
Centimetre
370
a)
75.30
110.44
96.04
b)
10.25.2
90.10
132.15
114.91
0.00
0.00
153.56
189.42
159.28
133.53
164.72
138.51
371
a)
b)
c)
1 Kg
1 Kg
1 Kg
Page 77 of 368
104.70
129.15
108.60
12/26/2016 10:20:53
DSR 2014
visit www.sahaayidotcom.blogspot.in
373
Unit
Basic Rate
372
a)
b)
c)
d)
e)
Description of items
10.27.1
10.27.2
10.27.3
10.27.4
10.27.5
10.28
Each
Each
Each
Each
Each
10 x60 mm
10 x80 mm
10 x120 mm
10 x140 mm
10 x160 mm
0.00
0.00
66.10
70.75
86.75
97.80
119.60
96.95
103.77
127.24
143.44
175.42
84.30
90.23
110.64
124.73
152.54
619.40
908.47
789.98
0.00
0.00
374
a)
10.29.1
538.30
789.52
686.54
b)
10.29.2
1277.60
1873.86
1629.44
0.00
0.00
1121.22
1449.10
0.00
974.97
1260.09
0.00
0.00
0.00
375
a)
b)
1 m2
1 m2
764.45
988.00
11. Flooring
Brick on edge flooring with bricks of class
designation 7.5 on a bed of 12 mm cement mortar,
including filling the joints with same mortar, with
common burnt clay non modular bricks :
376
a)
b)
377
11.1.1
11.1.2
11.2
1 m2
1 m2
672.00
630.10
985.62
924.17
857.06
803.62
1 m2
498.95
731.81
636.36
Page 78 of 368
12/26/2016 10:20:53
DSR 2014
visit www.sahaayidotcom.blogspot.in
379
380
Unit
Basic Rate
378
a)
Description of items
11.3.1
40mm thick
aggregate.
with
20mm
nominal
size
stone
0.00
0.00
1 m2
353.35
518.26
450.66
11.4
1 m2
535.25
785.05
682.65
11.5
1 m2
588.90
863.74
751.08
0.00
0.00
381
a)
11.6.1
CS2
382
383
18 mm thick.
1 m2
337.25
494.64
430.13
11.7
1 m3
5759.20
8447.02
7345.23
11.8
1 m2
33.25
48.77
42.41
Page 79 of 368
12/26/2016 10:20:53
DSR 2014
visit www.sahaayidotcom.blogspot.in
a)
b)
11.9.1
11.9.2
c)
11.9.3
d)
e)
f)
11.9.4
11.9.5
11.9.6
d)
e)
f)
386
a)
b)
c)
d)
e)
f)
Basic Rate
11.10.1
11.10.2
11.10.3
CS2
11.10.4
11.10.5
11.10.6
Page 80 of 368
0.00
0.00
584.25
627.05
856.92
919.69
745.15
799.73
1 m2
607.35
890.80
774.61
1 m2
1 m2
1 m2
603.85
590.85
564.60
885.67
866.60
828.10
770.15
753.56
720.09
0.00
0.00
1 m2
1 m2
601.10
662.20
881.63
971.25
766.64
844.56
1 m2
634.00
929.89
808.60
1 m2
1 m2
1 m2
631.35
607.70
574.10
926.00
891.31
842.03
805.22
775.06
732.20
0.00
0.00
1 m2
1 m2
385
c)
Unit
384
a)
b)
Description of items
1 m2
1 m2
627.50
713.10
920.35
1045.90
800.31
909.48
1 m2
673.60
987.97
859.10
1 m2
1 m2
1 m2
662.55
640.65
590.10
971.76
939.64
865.50
845.01
817.08
752.61
12/26/2016 10:20:53
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
Basic Rate
387
0.00
0.00
a)
0.00
0.00
(i)
1 m2
806.55
1182.97
1028.67
(ii)
1 m2
849.35
1245.74
1083.25
(iii)
11.12.1.3
1 m2
829.65
1216.85
1058.13
(iv)
1 m2
826.10
1211.64
1053.60
(v)
1 m2
813.15
1192.65
1037.08
(vi)
1 m2
787.75
1155.39
1004.69
0.00
0.00
388
a)
389
391
a)
b)
c)
d)
1m
50.05
73.41
63.83
1 m2
36.85
54.05
47.00
0.00
0.00
1349.29
1173.30
0.00
0.00
390
a)
11.15.1
1 m2
919.95
Page 81 of 368
1 m2
1029.05
1509.31
1312.44
1 m2
943.70
1384.12
1203.59
1 m2
1 m2
918.65
880.85
1347.38
1291.94
1171.64
1123.43
12/26/2016 10:20:53
DSR 2014
visit www.sahaayidotcom.blogspot.in
393
a)
b)
c)
d)
394
a)
b)
c)
d)
395
a)
11.17
Description of items
Unit
1 m2
Basic Rate
46.00
58.67
0.00
0.00
1316.15
1930.40
1678.61
1 m2
1220.05
1789.45
1556.04
1 m2
1 m2
1182.50
1134.85
1734.37
1664.48
1508.15
1447.38
0.00
0.00
1 m2
933.25
1368.80
1190.26
1 m2
943.70
1384.12
1203.59
1 m2
1 m2
867.55
829.85
1272.44
1217.14
1106.47
1058.38
0.00
0.00
905.75
1328.46
1155.19
1 m2
1112.50
1631.70
1418.87
1 m2
1 m2
695.95
658.15
1020.75
965.31
887.61
839.40
396
0.00
0.00
a)
0.00
0.00
1804.48
1569.11
0.00
0.00
1896.44
1649.08
b)
c)
d)
(i)
b)
(i)
67.47
1 m2
1 m2
1230.30
1 m2
Page 82 of 368
1293.00
12/26/2016 10:20:53
DSR 2014
visit www.sahaayidotcom.blogspot.in
397
a)
(i)
11.23.1
11.23.2
11.23.3
11.23.4
11.23.5
11.23.6
399
11.24
400
11.25
a)
b)
404
a)
b)
0.00
0.00
0.00
0.00
1349.36
1173.36
0.00
0.00
3360.45
1757.60
2158.30
1356.85
1757.60
1757.60
4928.77
2577.87
3165.58
1990.09
2577.87
2577.87
4285.89
2241.63
2752.68
1730.51
2241.63
2241.63
1m
274.90
403.20
350.61
1 m2
320.30
469.78
408.51
0.00
0.00
1 m2
11.26.1 25 mm thick.
11.27
920.00
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
401
403
Basic Rate
a)
b)
c)
d)
e)
f)
402
Unit
11.22.1.1 8 mm thick.
398
a)
Description of items
1 m2
1141.40
1674.09
1455.73
1 m2
1191.25
1747.21
1519.31
0.00
0.00
854.79
892.27
743.30
775.88
0.00
0.00
1006.82
1044.29
875.49
908.08
1 m2
1 m2
582.80
608.35
1 m2
1 m2
Page 83 of 368
686.45
712.00
12/26/2016 10:20:53
DSR 2014
visit www.sahaayidotcom.blogspot.in
406
407
409
410
411
Basic Rate
11.34
11.35
11.36
Page 84 of 368
0.00
0.00
752.65
778.20
1103.91
1141.39
959.92
992.51
1m
75.80
111.18
96.67
1 m2
16.90
24.79
21.55
0.00
0.00
1 m2
1 m2
408
a)
b)
Unit
405
a)
b)
Description of items
1 m2
1 m2
3332.85
2290.85
4888.29
3359.99
4250.69
2921.73
1 m2
7067.05
10365.24
9013.25
92.20
135.23
117.59
836.65
1227.11
1067.06
1 Kg
1 m2
12/26/2016 10:20:53
DSR 2014
visit www.sahaayidotcom.blogspot.in
412
413
414
415
Description of items
Unit
11.37
1 m2
785.40
1151.95
1001.69
11.38
1 m2
904.45
1326.56
1153.53
11.39
1 m2
950.05
1393.44
1211.69
11.40
1 m2
1009.60
1480.78
1287.64
0.00
0.00
416
a)
b)
c)
d)
11.41.1
11.41.2
11.41.3
11.41.4
417
418
Basic Rate
1 m2
1 m2
1 m2
1 m2
1310.70
1405.95
1522.85
2296.70
1922.40
2062.11
2233.56
3368.57
1671.66
1793.14
1942.23
2929.19
11.42
1 m2
-457.15
670.50
583.05
11.43
1 m2
432.85
634.86
552.05
Page 85 of 368
12/26/2016 10:20:53
DSR 2014
visit www.sahaayidotcom.blogspot.in
419
420
Description of items
Unit
11.44
1 m2
467.00
684.95
595.61
11.45
1 m2
1831.15
2685.75
2335.43
0.00
0.00
1936.26
2075.97
2250.58
3385.58
1683.71
1805.19
1957.02
2943.99
0.00
0.00
2251.31
2391.01
2565.62
3700.63
1957.66
2079.14
2230.98
3217.94
0.00
0.00
421
a)
b)
c)
d)
11.46.1
11.46.2
11.46.3
11.46.4
423
1 m2
1 m2
1 m2
1 m2
1320.15
1415.40
1534.45
2308.30
422
a)
b)
c)
d)
Basic Rate
11.47.1
11.47.2
11.47.3
11.47.4
1 m2
1 m2
1 m2
1 m2
Page 86 of 368
1534.95
1630.20
1749.25
2523.10
12/26/2016 10:20:53
DSR 2014
visit www.sahaayidotcom.blogspot.in
11.48.1
11.48.2
11.48.3
11.48.4
a)
b)
c)
d)
11.49.1
11.49.2
11.49.3
11.49.4
425
427
Unit
1 m2
1 m2
1 m2
1 m2
Basic Rate
223.45
187.95
152.45
111.00
424
426
Description of items
327.73
275.67
223.60
162.80
284.99
239.71
194.43
141.57
0.00
0.00
1 m2
1 m2
1 m2
1 m2
1471.45
1566.70
1685.75
2459.60
2158.18
2297.88
2472.49
3607.50
1876.67
1998.16
2149.99
3136.95
11.50
1 m2
-8.50
12.47
10.84
11.51
1 m2
5520.40
8096.77
7040.67
11.52
1 m2
5766.80
8458.17
7354.93
Page 87 of 368
12/26/2016 10:20:53
DSR 2014
visit www.sahaayidotcom.blogspot.in
428
429
11.53
Description of items
Unit
1 m2
Basic Rate
2570.54
2235.25
0.00
0.00
0.00
0.00
0.00
0.00
Page 88 of 368
1752.60
12/26/2016 10:20:53
DSR 2014
visit www.sahaayidotcom.blogspot.in
a)
b)
Description of items
Unit
Basic Rate
0.00
0.00
0.00
0.00
5866.14
5843.11
0.00
5100.99
5080.97
0.00
0.00
0.00
1 m2
1 m2
3999.55
3983.85
12. Roofing
Providing corrugated G.S. sheet roofing including
vertical/curved surface fixed with polymer coated J or
L hooks, bolts and nuts 8 mm diameter with bitumen
and G.I. limpet washers or with G.I. limpet washers
filled with white lead, including a coat of approved
steel primer and two coats of approved paint on
overlapping of sheets complete (up to any pitch in
horizontal/ vertical or curved surfaces), excluding the
cost of purlins, rafters and trusses and including
cutting to size and shape wherever required.
430
a)
12.1.1
1030.50
1511.43
1314.29
b)
12.1.2
875.45
1284.02
1116.54
c)
12.1.3
743.45
1090.42
948.19
0.00
0.00
431
Page 89 of 368
12/26/2016 10:20:53
DSR 2014
visit www.sahaayidotcom.blogspot.in
12.2.1
12.2.2
12.2.3
Unit
1m
1m
1m
1.00 mm thick
0.80 mm thick
0.63 mm thick
Extra for circular cutting in C.G.S. sheet roofing for
making opening of area exceeding 40 square
decimetre :
432
a)
b)
c)
Description of items
12.3.1
12.3.2
12.3.3
1.00 mm thick
0.80 mm thick
0.63 mm thick
1m
1m
1m
Basic Rate
44.35
35.50
35.50
252.95
202.00
202.00
433
65.05
52.07
52.07
56.56
45.28
45.28
0.00
0.00
371.00
296.27
296.27
322.61
257.63
257.63
0.00
0.00
a)
12.4.1
568.90
834.41
725.57
b)
12.4.2
502.75
737.38
641.20
0.00
0.00
1540.92
1339.93
0.00
0.00
639.55
556.13
0.00
0.00
434
a)
12.5.1
1050.60
435
a)
12.6.1
436.05
Providing and fixing 15 cm wide 45 cm overall semicircular plain G.S. sheet gutter with iron brackets
40x3mm size, bolts, nuts and washers etc. including
making necessary connections with rain water pipes
complete.
436
a)
12.7.1
534.60
784.10
681.82
b)
12.7.2
479.50
703.28
611.55
12.8
396.10
580.96
505.18
12.9
35.50
52.07
45.28
437
438
Page 90 of 368
12/26/2016 10:20:53
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
439
12.10
440
12.11
12.12.1
12.12.2
12.12.3
12.12.4
a)
b)
c)
d)
e)
f)
g)
h)
12.13.1
12.13.2
12.13.3
12.13.4
12.13.5
12.13.6
12.13.7
12.13.8
443
12.14
125.05
113.75
166.84
145.08
0.00
0.00
1m
1m
1m
1m
503.22
503.22
571.72
686.93
437.59
437.59
497.15
597.33
0.00
0.00
328.65
235.65
439.35
571.85
552.65
223.55
742.60
334.35
482.03
345.63
644.39
838.73
810.57
327.88
1089.17
490.39
419.16
300.55
560.34
729.33
704.85
285.11
947.11
426.43
52.30
76.71
66.70
0.00
0.00
208.12
180.98
0.00
0.00
808.15
702.74
343.10
343.10
389.80
468.35
1m
1m
1m
1m
1m
Each Pair
Each
1m
444
12.15.1
141.90
445
a)
143.81
442
a)
12.16.1
Page 91 of 368
98.05
441
a)
b)
c)
d)
Basic Rate
551.00
12/26/2016 10:20:53
DSR 2014
visit www.sahaayidotcom.blogspot.in
447
449
451
452
a)
(i)
0.00
0.00
553.20
811.38
705.55
10.90
15.99
13.90
0.00
0.00
12.18
420.50
616.75
536.30
12.20
487.85
715.53
622.20
0.00
0.00
143.10
209.88
182.51
186.65
273.76
238.05
0.00
0.00
0.00
0.00
690.01
600.01
450
a)
Basic Rate
448
a)
Unit
446
a)
Description of items
1m
12.22
1 m2
Page 92 of 368
470.45
12/26/2016 10:20:53
DSR 2014
visit www.sahaayidotcom.blogspot.in
12.24.1.1 12 mm thick
a)
b)
(i)
673.34
0.00
0.00
0.00
0.00
854.35
742.92
0.00
0.00
1004.32
873.32
0.00
0.00
929.37
808.15
0.00
0.00
947.27
823.71
0.00
0.00
722.42
628.19
0.00
0.00
400.35
587.19
0.00
510.60
0.00
215.15
315.56
274.40
0.00
0.00
334.19
290.60
0.00
0.00
324.87
282.50
0.00
0.00
190.40
279.26
242.83
194.40
285.13
247.94
173.30
254.18
221.03
582.50
684.75
633.65
12.25.1 12 mm thick
645.85
492.55
12.27.3.1 12 mm thick
227.85
e)
1m
221.50
(i)
12.27.5.1 3 mm thick
(ii)
457
1 m2
12.24.3.1 12 mm thick
d)
(i)
774.34
527.95
c)
(i)
1 m2
12.24.2.1 12 mm thick
455
456
0.00
454
a)
1 m2
12.28
1m
1m
Page 93 of 368
0.00
c)
a)
Basic Rate
b)
(i)
1 m2
12.23.2.1 40 to 50 mm thick
a)
(i)
Unit
453
(i)
Description of items
12/26/2016 10:20:53
DSR 2014
visit www.sahaayidotcom.blogspot.in
458
459
461
462
463
464
Unit
Basic Rate
12.29
650.15
953.58
829.20
12.30
360.05
528.09
459.20
0.00
0.00
828.45
961.55
1215.09
1410.31
1056.60
1226.35
249.45
365.87
318.15
460
a)
b)
Description of items
1 m2
12.31.1 Flat surfaces
1 m2
12.31.2 Curved surfaces
Extra for any sunk or raised mouldings in the plaster 1 m2
12.32
of Paris (Gypsum anhydrous) ceiling
12.33
102.10
149.75
130.22
12.34
481.65
706.44
614.29
12.35
240.40
352.59
306.60
Page 94 of 368
12/26/2016 10:20:53
DSR 2014
visit www.sahaayidotcom.blogspot.in
465
a)
b)
466
a)
467
a)
b)
468
a)
b)
469
a)
(i)
470
a)
b)
471
a)
Description of items
Thermal Insulation of roofing with Expanded
polystyrene fixed with suitable adhesive to the false
ceiling as per the directions of the Engineer-incharge :
1 m2
Each
Each
12.38.1 100 mm diameter
Each
12.38.2 150 mm diameter
Providing lead caulked joints to sand cast iron rain
water pipes and fittings :
Each
12.39.1 100 mm dia. Pipe
Each
12.39.2 150 mm dia. Pipe
0.00
226.75
332.57
289.19
265.05
388.75
338.04
0.00
0.00
127.60
110.96
0.00
0.00
224.26
241.35
195.01
209.87
0.00
0.00
405.69
561.16
352.77
487.96
0.00
0.00
0.00
0.00
581.33
505.50
0.00
0.00
213.70
339.76
185.82
295.44
0.00
0.00
0.00
0.00
108.65
159.36
138.57
138.30
202.84
176.39
0.00
0.00
127.20
186.56
162.23
173.15
253.96
220.83
0.00
0.00
87.00
152.90
164.55
276.60
382.60
396.35
12.41.1 75 mm diameter
12.41.2 110 mm diameter
145.70
231.65
(ii)
12.42.1.2 110mm
Each
Each
(i)
12.42.2.1 75mm
(ii)
12.42.2.2 110mm
Each
Each
Page 95 of 368
0.00
12.42.1.1 75mm
c)
1 m2
Basic Rate
(i)
b)
Unit
12/26/2016 10:20:53
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
(i)
12.42.3.1 75x75x75 mm
(ii)
12.42.3.2 110x110x110 mm
d)
12.42.4.1 75x75x75 mm
(ii)
12.42.4.2 110x110x110 mm
e)
12.42.5.1 75 mm bend
(ii)
f)
325.61
283.14
306.60
449.69
391.03
Each
0.00
0.00
195.30
286.45
249.08
Each
248.55
364.55
317.00
Each
0.00
0.00
113.25
166.10
144.44
Each
161.55
236.95
206.04
0.00
0.00
167.85
246.19
214.07
295.10
432.82
376.37
0.00
0.00
172.80
189.05
253.45
277.28
220.39
241.11
41.10
60.28
52.42
0.00
0.00
Shoe (Plain)
(i)
12.42.6.1 75 mm Shoe
(ii)
Each
Each
472
474
Each
Each
Each
12.43.1 75 mm
12.43.2 110 mm
12.44
Page 96 of 368
222.00
Bend 87.5
(i)
473
Each
Basic Rate
(i)
a)
b)
Unit
12/26/2016 10:20:53
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
Basic Rate
0.00
0.00
a)
12.45.1
907.10
1330.44
1156.91
b)
12.45.2
1022.95
1500.36
1304.66
c)
12.45.3
1059.50
1553.97
1351.28
d)
1236.35
1813.35
1576.83
475
98.05
143.81
125.05
0.00
0.00
476
12.46
Page 97 of 368
12/26/2016 10:20:53
DSR 2014
visit www.sahaayidotcom.blogspot.in
477
478
479
Unit
Basic Rate
975.90
1431.35
1244.65
869.95
1275.96
1109.53
303.65
445.36
387.27
12.48
12.49
135.65
198.96
173.01
12.50
622.00
912.29
793.29
0.00
0.00
929.74
893.29
973.38
851.64
931.35
1195.36
808.47
776.78
846.41
740.56
809.87
1039.44
480
a)
b)
c)
d)
e)
f)
Description of items
12.51.1
12.51.2
12.51.3
12.51.4
12.51.5
12.51.6
1m
1m
1m
1m
1 m2
1m
Page 98 of 368
633.90
609.05
663.65
580.65
635.00
815.00
12/26/2016 10:20:53
DSR 2014
visit www.sahaayidotcom.blogspot.in
481
Description of items
Unit
Basic Rate
0.00
0.00
0.00
0.00
a)
1551.55
2275.66
1978.83
b)
1673.50
2454.52
2134.37
Page 99 of 368
12/26/2016 10:20:53
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
Basic Rate
c)
1136.90
1667.49
1449.99
d)
1155.20
1694.33
1473.33
0.00
0.00
482
12/26/2016 10:20:53
DSR 2014
visit www.sahaayidotcom.blogspot.in
12.53
483
a)
Description of items
Unit
Basic Rate
1649.15
1682.60
2418.81
2103.31
0.00
0.00
2467.87
2145.97
12/26/2016 10:20:53
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
Basic Rate
b)
1810.65
2655.68
2309.29
484
12.55
1133.85
1663.02
1446.10
12.56
1167.20
1711.93
1488.64
12.57
319.90
469.20
408.00
485
486
12/26/2016 10:20:53
DSR 2014
visit www.sahaayidotcom.blogspot.in
487
a)
Description of items
Unit
Basic Rate
0.00
0.00
0.00
0.00
2002.85
1741.61
1365.55
12/26/2016 10:20:53
DSR 2014
visit www.sahaayidotcom.blogspot.in
488
a)
Description of items
Unit
Basic Rate
0.00
0.00
0.00
0.00
1491.93
1297.33
1017.20
12/26/2016 10:20:53
DSR 2014
visit www.sahaayidotcom.blogspot.in
489
490
491
492
Description of items
Unit
Basic Rate
12.60
490.60
719.56
625.71
12.61
324.70
476.24
414.12
12.62
328.85
482.32
419.41
12.63
257.60
377.82
328.54
0.00
0.00
0.00
0.00
239.59
219.20
208.34
190.61
0.00
0.00
277.79
253.45
0.00
334.55
302.87
0.00
252.71
232.33
241.56
220.39
0.00
290.92
263.37
0.00
219.75
202.02
0.00
0.00
293.41
269.07
255.14
233.97
13. Finishing
493
a)
b)
13.1.1
13.1.2
494
a)
b)
495
a)
b)
496
a)
b)
13.2.1
13.2.2
13.3.1
13.3.2
13.4.1
13.4.2
497
a)
b)
13.5.1
13.5.2
163.35
149.45
189.40
172.80
228.10
206.50
172.30
158.40
200.05
183.45
12/26/2016 10:20:53
DSR 2014
visit www.sahaayidotcom.blogspot.in
13.6.1
13.6.2
499
a)
b)
13.7.1
13.7.2
Unit
1 m2
1 m2
1 m2
1 m2
Basic Rate
13.8.1
13.8.2
501
1 m2
1:3 (1 cement: 3 fine sand)
1 m2
1:4 (1 cement: 4 fine sand)
Cement plaster 1:3 (1 cement: 3 coarse sand)
finished with a floating coat of neat cement.
1 m2
12 mm cement plaster
1 m2
20 mm cement plaster
0.00
355.01
323.26
0.00
308.71
281.10
0.00
0.00
318.49
298.11
276.95
259.22
0.00
0.00
360.66
336.31
313.62
292.45
0.00
0.00
226.10
303.60
331.62
445.29
288.37
387.21
242.05
220.40
217.15
203.25
500
a)
b)
Description of items
245.90
229.30
a)
b)
13.9.1
13.9.2
502
13.10
256.60
376.36
327.27
13.11
240.55
352.81
306.80
504
13.12
258.90
379.73
330.20
505
13.13
200.15
293.56
255.27
506
13.14
233.35
342.25
297.61
507
13.15
285.40
418.60
364.00
134.70
0.00
197.56
0.00
171.80
181.95
266.87
232.06
41.40
60.72
52.80
0.00
0.00
610.00
530.44
503
508
a)
1 m2
1 m2
1 m2
509
13.17
510
13.18
511
a)
1 m2
1 m2
415.90
12/26/2016 10:20:53
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
13.20
513
514
512
515
a)
b)
394.65
578.83
503.33
13.21
Per 50 kg bag
Extra for providing and mixing water proofing
of cement
material in cement plaster work in proportion
used in the mix
recommended by the manufacturers.
50.65
74.29
64.60
13.22
37.95
55.66
48.40
0.00
0.00
27.57
42.17
23.98
36.67
0.00
0.00
70.15
76.35
46.10
400.78
659.87
0.00
102.89
111.98
67.61
348.50
573.80
0.00
89.47
97.38
58.80
18.80
28.75
516
a)
b)
517
a)
b)
c)
Basic Rate
1 m2
1 m2
1 m2
1 m2
1 m2
273.25
449.90
518
13.26
110.95
162.73
141.50
519
13.27
43.70
64.09
55.73
0.00
0.00
4.62
5.06
5.72
9.46
4.02
4.40
4.97
8.23
0.00
0.00
3.90
4.25
4.85
8.75
5.72
6.23
7.11
12.83
4.97
5.42
6.19
11.16
8.75
12.83
11.16
0.00
0.00
155.98
135.64
520
a)
b)
c)
d)
13.28.1
13.28.2
13.28.3
13.28.4
521
a)
b)
c)
d)
522
523
a)
13.29.1
13.29.2
13.29.3
13.29.4
13.30
3.15
3.45
3.90
6.45
106.35
12/26/2016 10:20:53
DSR 2014
visit www.sahaayidotcom.blogspot.in
531
Unit
13.31.2
Raised and cut pointing
CS2
1 m2
529
a)
530
Description of items
Basic Rate
172.75
253.37
220.32
0.00
0.00
213.62
185.76
0.00
0.00
152.85
276.70
224.19
405.84
194.94
352.90
295.40
433.26
376.75
0.00
0.00
86.85
127.38
110.77
5.55
8.14
7.08
0.00
0.00
23.76
9.68
20.66
8.42
0.00
0.00
145.65
1 m2
1 m2
16.20
6.60
a)
13.39.1
22.05
32.34
28.12
b)
13.39.2
21.70
31.83
27.68
13.40
68.60
100.62
87.49
0.00
0.00
131.56
114.40
0.00
0.00
74.29
64.60
0.00
0.00
52.58
45.72
0.00
0.00
84.85
73.78
0.00
0.00
214.80
186.78
532
533
a)
13.41.1
534
a)
536
a)
537
a)
1 m2
89.70
50.65
535
a)
1 m2
35.85
57.85
146.45
12/26/2016 10:20:53
DSR 2014
visit www.sahaayidotcom.blogspot.in
539
a)
540
Description of items
Unit
Basic Rate
90.00
94.95
0.00
0.00
132.00
114.79
0.00
0.00
139.26
121.10
0.00
0.00
a)
100.00
146.67
127.54
b)
88.20
129.36
112.49
c)
90.00
132.00
114.79
0.00
0.00
541
a)
32.95
48.33
42.02
b)
36.45
53.46
46.49
c)
27.00
39.60
34.44
d)
14.65
21.49
18.68
0.00
0.00
100.69
160.24
87.56
139.34
0.00
0.00
170.94
177.69
148.65
154.51
0.00
0.00
542
a)
b)
543
a)
b)
544
68.65
109.25
116.55
121.15
12/26/2016 10:20:53
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
545
Basic Rate
78.50
115.14
100.12
0.00
0.00
a)
13.54.1
27.00
39.60
34.44
b)
26.80
39.31
34.18
0.00
0.00
34.05
49.94
43.43
50.85
74.58
64.85
0.00
0.00
56.69
84.48
49.29
73.46
0.00
0.00
31.90
46.79
40.68
247.65
363.23
315.85
31.75
46.57
40.49
0.00
0.00
118.07
102.67
0.00
0.00
109.12
94.89
0.00
0.00
155.84
135.51
546
a)
b)
548
a)
1m
547
a)
b)
1m
1m
13.56.1 100 mm diameter pipes
1m
13.56.2 150 mm diameter pipes
Painting with oil type wood preservative of approved
brand and manufacture:
1 m2
13.57.1 New work (two or more coats)
549
13.58
550
13.59
551
a)
552
a)
553
a)
38.65
57.60
80.50
74.40
106.25
12/26/2016 10:20:53
DSR 2014
visit www.sahaayidotcom.blogspot.in
556
a)
557
a)
558
a)
13.67.1
b)
13.67.2
559
a)
560
a)
1 m2
555
a)
Unit
1 m2
1 m2
1 m2
561
13.70
562
13.71
13.72
563
564
Basic Rate
554
a)
Description of items
0.00
0.00
96.51
83.92
0.00
0.00
113.01
98.27
0.00
0.00
90.06
78.31
0.00
0.00
110.08
95.72
0.00
0.00
114.70
168.23
146.29
116.35
170.65
148.39
0.00
0.00
284.47
247.36
0.00
0.00
85.15
124.89
108.60
39.60
58.08
50.51
2.45
3.59
3.12
553.45
811.75
705.87
0.00
0.00
65.80
77.05
61.40
75.05
193.95
12/26/2016 10:20:53
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
1m
1m
Basic Rate
31.60
32.10
46.35
47.08
40.30
40.94
565
13.74
83.35
122.25
106.30
566
13.75
55.50
81.40
70.78
567
13.76
70.75
103.77
90.23
568
13.77
89.45
131.20
114.08
13.78
244.35
358.39
311.64
13.79
58.05
85.14
74.04
13.80
89.65
131.49
114.34
0.00
0.00
41.80
67.03
36.35
58.29
0.00
0.00
569
570
571
572
a)
b)
573
28.50
45.70
12/26/2016 10:20:53
DSR 2014
visit www.sahaayidotcom.blogspot.in
b)
1 m2
1 m2
Basic Rate
50.10
75.35
1 m2
1 m2
63.90
96.10
0.00
0.00
72.23
110.52
62.81
96.10
0.00
0.00
47.40
69.52
60.45
71.60
105.02
91.32
0.00
0.00
49.25
75.35
1 m2
1 m2
576
73.48
110.52
575
a)
Unit
574
a)
b)
Description of items
a)
36.10
52.95
46.04
b)
30.80
45.17
39.28
c)
13.85.3
35.85
52.58
45.72
0.00
0.00
0.00
0.00
247.80
363.45
316.04
259.15
380.10
330.52
0.00
0.00
577
a)
14.1.1
b)
14.1.2
578
1 m2
1 m2
12/26/2016 10:20:53
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
a)
14.2.1 Door chowkhats .
b)
14.2.2 Window chowkhats .
c)
14.2.3 Clerestory window chowkhats .
DSR Analyser Ver.12 Powered By Pradeepen Thulika
579
1159.79
714.80
520.39
1008.52
621.56
452.51
156.10
228.95
199.09
0.00
0.00
724.62
630.11
0.00
0.00
1013.05
1340.93
880.91
1166.03
0.00
0.00
1294.44
1622.32
1125.60
1410.71
0.00
0.00
1077.29
1405.25
936.77
1221.95
0.00
0.00
37.30
31.80
23.15
300.75
54.71
46.64
33.95
441.11
47.57
40.56
29.53
383.57
264.70
388.24
337.60
14.12
247.00
362.27
315.02
14.13
282.10
413.76
359.79
14.3
14.4.1
14.5.1
14.5.2
14.6.1
14.6.2
583
a)
b)
14.7.1
14.7.2
584
a)
b)
585
586
14.8.1
14.8.2
14.9
14.10
587
14.11
588
589
1 m2
494.05
582
a)
b)
581
a)
b)
790.75
487.35
354.80
580
a)
Each
Each
Each
Basic Rate
1 m2
Float glass panes of thickness 4 mm.
1 m2
Float glass panes of thickness 5.5 mm .
Renewing glass panes, with wooden fillets wherever
necessary:
1 m2
Float glass panes of thickness 4 mm .
1 m2
Float glass panes of thickness 5.5 mm .
Renewing glass panes and refixing existing wooden
fillets:
1 m2
Float glass panes of thickness 4 mm .
1 m2
Float glass panes of thickness 5.5 mm .
Supplying and fixing new wooden fillets wherever
necessary:
1m
2nd class teak wood fillets .
1m
Hollock wood fillets.
1m
Renewal of old putty of glass panes (length) .
1 m2
Refixing old glass panes with putty and nails .
Fixing old glass panes with wooden fillets (excluding 1 m2
cost of fillets) .
690.70
914.25
882.55
1106.10
734.50
958.10
12/26/2016 10:20:53
DSR 2014
visit www.sahaayidotcom.blogspot.in
(i)
(ii)
(ii)
14.17
597
1 m3
1 m3
594
596
0.00
823.26
715.88
0.00
0.00
99949.30
86912.43
0.00
0.00
0.00
0.00
70367.60
103208.16
89746.23
47627.90
69855.84
60744.21
0.00
0.00
71408.10
104734.26
91073.27
48643.50
71345.42
62039.50
26.55
38.94
33.86
0.00
0.00
57.90
59.05
84.92
86.61
73.85
75.31
561.30
68145.70
595
1 m3
(i)
a)
b)
1 m3
1 m2
1 m2
0.00
b)
593
1 m2
1 m3
592
a)
Basic Rate
591
a)
Unit
590
a)
Description of items
14.19
2.05
3.01
2.61
14.20
74.10
108.68
94.51
14.21
147.60
216.48
188.25
12/26/2016 10:20:53
DSR 2014
visit www.sahaayidotcom.blogspot.in
Unit
598
a)
b)
Description of items
599
14.23
600
14.24
601
14.25
Per Wheel
Per Wheel
Pumping out water caused by springs, tidal or river One Kilo Litre
seepage, broken water mains or drains and the like.
1 m3
Mud mortar made with local clay good earth.
Brick work with common burnt clay bricks of class 1 m3
designation 7.5 in mud mortar
Basic Rate
0.00
0.00
124.15
191.15
182.09
280.36
158.34
243.79
94.00
137.87
119.89
403.30
591.52
514.37
3824.30
5609.10
4877.48
0.00
0.00
0.00
0.00
602
a)
(i)
3442.10
5048.53
4390.02
(ii)
14.26.1.2
2904.35
4259.81
3704.18
0.00
0.00
b)
Glazed shutters :
(i)
3538.65
5190.14
4513.16
(ii)
14.26.2.2
2960.60
4342.31
3775.92
0.00
0.00
4395.63
3822.28
0.00
0.00
211.90
235.10
310.79
344.82
270.26
299.84
70.20
102.96
89.53
0.00
0.00
67117.50
98441.24
85601.08
44607.70
65426.11
56892.27
0.00
0.00
617.11
548.91
536.62
477.32
603
a)
604
a)
b)
605
606
1 m2
14.28.1 20 mm diameter.
14.28.2 25 mm diameter.
14.29
1m
1m
a)
14.30.1
Sal wood.
CS2
1 m3
b)
14.30.2
Hollock wood.
CS2
1 m3
607
a)
b)
2996.95
Each
Each
420.75
374.25
12/26/2016 10:20:53
DSR 2014
visit www.sahaayidotcom.blogspot.in
c)
610
611
a)
b)
c)
d)
e)
Each
Each
Each
Each
Basic Rate
253.45
Each
Each
Each
14.33.1 250 mm
14.33.2 150 mm
14.33.3 100 mm
14.34
371.74
323.25
0.00
0.00
653.05
490.40
957.83
719.27
832.89
625.45
427.70
627.31
545.48
0.00
0.00
192.05
167.10
120.65
281.68
245.09
176.96
244.94
213.12
153.88
210.75
309.11
268.79
0.00
0.00
90.35
132.52
115.23
84.50
123.94
107.77
78.15
75.25
64.20
114.62
110.37
94.16
99.67
95.97
81.88
609
a)
b)
c)
Unit
14.31.3 100 mm .
608
a)
b)
Description of items
612
14.36
34.80
51.04
44.38
613
14.37
56.35
82.65
71.87
614
14.38
155.05
227.41
197.75
615
14.39
401.25
588.51
511.75
0.00
0.00
139.40
113.40
138.55
75.85
32.10
204.46
166.32
203.21
111.25
47.08
177.79
144.63
176.71
96.74
40.94
210.35
308.52
268.28
0.00
0.00
14.23
8.73
12.37
7.59
616
a)
b)
c)
d)
e)
14.40.1
14.40.2
14.40.3
14.40.4
14.40.5
617
14.41
618
a)
b)
Each
Each
Each
Each
Each
1 m2
1 m2
9.70
5.95
12/26/2016 10:20:53
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
619
14.43
620
14.44
621
a)
622
623
a)
624
a)
625
a)
b)
c)
626
a)
b)
c)
627
a)
b)
c)
628
a)
629
14.46
1 m2
1 m2
Basic Rate
7.60
11.15
9.69
28.20
41.36
35.97
0.00
0.00
32.00
46.93
40.81
9.90
14.52
12.63
0.00
0.00
59.47
51.72
0.00
0.00
37.33
32.46
0.00
0.00
18.26
23.98
34.32
15.88
20.85
29.84
0.00
0.00
38.94
55.37
82.50
33.86
48.15
71.74
0.00
0.00
19.21
24.71
35.35
16.71
21.49
30.74
0.00
0.00
36.15
31.44
0.00
0.00
40.55
1m
1m
1m
25.45
12.45
16.35
23.40
26.55
37.75
56.25
1m
14.51.1 75 mm diameter pipes .
1m
14.51.2 100 mm diameter pipes .
1m
14.51.3 150 mm diameter pipes .
Painting with oil type wood preservative of approved
brand and manufacture :
1 m2
14.52.1 Old work (one or more coats) .
Wall painting with plastic emulsion paint of approved
brand and manufacture to give an even shade :
13.10
16.85
24.10
24.65
12/26/2016 10:20:54
DSR 2014
visit www.sahaayidotcom.blogspot.in
635
a)
636
637
638
a)
b)
640
1 m2
1 m2
1 m2
1 m2
per letter per
cem height
52.50
1 m2
77.00
66.96
0.00
0.00
71.13
61.86
0.00
0.00
62.26
54.14
0.00
0.00
73.56
63.96
0.00
0.00
60.06
0.00
144.10
52.23
0.00
125.31
0.00
0.00
43.25
63.43
55.16
1.55
2.27
1.98
42.00
61.60
53.57
0.00
0.00
92.55
92.55
80.48
80.48
0.00
0.00
42.24
36.73
0.00
0.00
48.50
42.45
50.15
40.95
98.25
63.10
63.10
639
a)
1 m2
633
a)
634
a)
1 m2
Basic Rate
632
a)
1 m2
631
a)
Unit
630
a)
Description of items
28.80
a)
54.45
79.86
69.45
b)
14.64.2
36.95
54.19
47.13
0.00
0.00
641
a)
14.65.1
125.00
183.34
159.42
b)
14.65.2
75.80
111.18
96.67
0.00
0.00
98.71
85.83
642
a)
14.66.1
67.30
12/26/2016 10:20:54
DSR 2014
visit www.sahaayidotcom.blogspot.in
14.66.2
Description of items
Unit
Basic Rate
43.85
643
64.31
55.93
0.00
0.00
a)
14.67.1
73.35
107.58
93.55
b)
14.67.2
48.25
70.77
61.54
0.00
0.00
48.25
49.10
70.77
72.01
61.54
62.62
76.70
112.50
97.82
14.71
44.50
65.27
56.75
647
14.72
159.90
234.53
203.94
648
14.73
482.05
707.02
614.80
649
14.74
47.05
69.01
60.01
0.00
0.00
457.10
397.48
0.00
0.00
644
a)
b)
645
646
651
15.1
311.65
12/26/2016 10:20:54
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
Basic Rate
a)
15.2.1
892.70
1309.32
1138.54
b)
15.2.2
550.50
807.42
702.10
15.3
1302.30
1910.08
1660.94
15.4
1163.70
1706.80
1484.17
654
15.5
450.45
660.68
574.50
655
15.6
3.55
5.21
4.53
0.00
0.00
378.63
955.92
457.10
1106.04
329.24
831.24
397.48
961.77
0.00
0.00
2519.28
2924.97
3669.68
2190.68
2543.45
3191.03
0.00
0.00
622.39
1319.81
541.21
1147.66
0.00
0.00
787.32
1544.00
684.63
1342.60
0.00
0.00
259.75
373.06
225.87
324.40
652
653
656
a)
b)
c)
d)
15.7.1
15.7.2
15.7.3
15.7.4
657
a)
b)
c)
15.8.1
15.8.2
15.8.3
659
a)
b)
660
a)
b)
1 m3
1 m3
1 m3
1 m3
1000 nos
1000 nos
1000 nos
258.15
651.75
311.65
754.10
1717.65
1994.25
2502.00
658
a)
b)
In mud mortar
In lime mortar with old mughal bricks
In lime mortar
In cement mortar
15.9.1
15.9.2
1 m3
1 m3
In lime mortar
In cement mortar
424.35
899.85
1 m3
1 m3
536.80
1052.70
177.10
254.35
12/26/2016 10:20:54
DSR 2014
visit www.sahaayidotcom.blogspot.in
662
a)
b)
Unit
661
a)
b)
Description of items
a)
b)
1 m3
1m
Cum per
15.15.1 Of sectional area 40 square centimetres and above. metre span
15.15.2 Of sectional area below 40 square centimetres.
207.17
284.32
180.15
247.23
0.00
0.00
80.38
106.41
69.89
92.53
0.00
0.00
1718.80
2520.96
2192.14
6.85
10.05
8.74
0.00
0.00
235.00
344.67
299.72
0.65
0.95
0.83
0.00
0.00
334.60
490.76
426.75
1.30
1.91
1.66
0.00
0.00
1.30
0.90
1.91
1.32
1.66
1.15
2.15
3.15
2.74
141.25
193.85
54.80
72.55
Metre per
metre span
665
a)
b)
Metre per
metre height
666
a)
b)
0.00
664
b)
Each
Each
1 Kg
1 Kg
0.00
663
a)
Each
Each
Basic Rate
667
15.18
668
15.19
1.45
2.13
1.85
669
15.20
0.30
0.44
0.38
670
15.21
0.30
0.44
0.38
671
15.22
1.75
2.57
2.23
12/26/2016 10:20:54
DSR 2014
visit www.sahaayidotcom.blogspot.in
b)
Unit
672
a)
Description of items
1 m2
1 m2
Basic Rate
0.00
0.00
28.20
41.36
35.97
43.95
64.46
56.05
15.24
483.30
708.86
616.40
674
15.25
97.95
143.66
124.92
675
15.26
40.80
59.84
52.04
676
15.27
334.60
490.76
426.75
0.00
0.00
62.80
29.50
92.11
43.27
80.09
37.62
979.65
1436.85
1249.44
673
677
a)
b)
1 m2
1 m2
678
15.29
679
15.30
93.40
136.99
119.12
15.31
77.35
113.45
98.65
681
15.32
21.40
31.39
27.29
682
15.33
7.65
11.22
9.76
0.00
0.00
97.65
110.50
143.22
162.07
124.54
140.93
8.60
12.61
10.97
680
683
a)
b)
684
Each
Each
12/26/2016 10:20:54
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
Basic Rate
685
15.36
13.50
19.80
17.22
686
15.37
24.30
35.64
30.99
687
15.38
28.40
41.65
36.22
0.00
0.00
34.25
43.63
51.26
29.78
37.94
44.57
0.00
0.00
107.55
161.10
157.74
236.29
137.17
205.47
21.85
32.05
27.87
0.00
0.00
40.63
41.95
43.19
35.33
36.48
37.56
0.00
0.00
119.68
233.28
104.07
202.85
0.00
0.00
84.85
95.70
73.78
83.22
0.00
0.00
247.29
327.37
215.03
284.67
688
a)
b)
c)
15.39.1 Up to 10 mm thick
15.39.2 Thickness above 10 mm up to 25 mm
15.39.3 Thickness above 25 mm up to 40 mm
Dismantling precast concrete or stone slabs in walls,
partition walls etc. including stacking within 50
metres lead:
689
a)
b)
690
691
a)
b)
c)
692
a)
b)
693
a)
b)
694
a)
b)
15.40.1 Thickness up to 40 mm
15.40.2 Thickness above 40 mm up to 75 mm
15.41
1 m2
1 m2
1 m2
1 m2
1 m2
1m
1m
1m
23.35
29.75
34.95
27.70
28.60
29.45
81.60
159.05
57.85
65.25
1m
1m
168.60
223.20
12/26/2016 10:20:54
DSR 2014
visit www.sahaayidotcom.blogspot.in
697
698
699
700
701
702
a)
b)
1m
Basic Rate
289.55
424.68
369.29
0.00
0.00
398.80
1000.07
346.78
869.63
0.00
0.00
121.35
147.40
177.98
216.19
154.77
187.99
15.48
Taking out C.I. cover with frame from R.C.C. top slab
of manholes of various sizes including demolishing
of R.C.C. work manually/ by mechanical means and Each
stacking of useful materials near the site and
disposal of unserviceable materials within 50 metres
lead as per direction of Engineer-in-charge.
262.05
384.35
334.22
15.49
Taking out C.I. cover with frame from R.C.C. top slab
of inspection chambers of various sizes including
demolishing of R.C.C. work manually/ by mechanical Each
means and stacking of useful materials near the site
and disposal of unserviceable materials within 50
metres lead as per direction of Engineer-in-charge.
153.75
225.51
196.09
15.50
1754.75
2573.69
2237.99
15.51
357.30
524.05
455.70
15.52
354.45
519.87
452.06
0.00
0.00
188.54
668.45
163.95
581.26
271.90
681.85
696
a)
b)
Unit
695
a)
b)
Description of items
1m
1m
Each
Each
128.55
455.75
12/26/2016 10:20:54
DSR 2014
visit www.sahaayidotcom.blogspot.in
15.54
705
706
707
708
709
Unit
Basic Rate
275.00
403.34
350.73
0.00
0.00
404.20
620.05
877.45
592.84
909.43
1286.96
515.51
790.81
1119.09
15.56
20.05
29.41
25.57
15.57
21.85
32.05
27.87
15.58
1374.50
2015.98
1753.03
15.59
204.75
300.31
261.14
15.60
123.70
181.43
157.77
0.00
0.00
704
a)
b)
c)
Description of items
Each
Each
Each
81.30
119.24
103.69
16.2
10.15
14.89
12.95
712
16.3
0.00
0.00
a)
b)
16.3.1
16.3.2
1310.45
1348.20
1922.04
1977.40
1671.34
1719.48
710
711
1 m3
1 m3
12/26/2016 10:20:54
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
1 m3
53 mm to 22.4 mm size stone aggregate.
Over burnt (Jhama) brick aggregate 120 mm to 40 1 m3
mm.
c)
16.3.3
d)
16.3.4
e)
16.3.5
f)
16.3.6
g)
16.3.7
h)
i)
j)
713
1 m3
1 m3
1 m3
1 m3
16.4
1 m3
Basic Rate
1354.00
1985.91
1726.88
657.10
963.77
838.06
680.35
997.87
867.71
1558.15
2285.34
1987.25
1471.00
2157.52
1876.10
1459.40
320.90
646.35
2140.50
470.66
948.00
1861.31
409.27
824.35
425.05
623.42
542.11
0.00
0.00
714
a)
16.5.1
328.60
481.96
419.09
b)
16.5.2
328.60
481.96
419.09
0.00
0.00
21.85
19.00
0.00
0.00
182.31
158.53
0.00
0.00
715
a)
16.6.1
16.7.1
718
124.30
717
a)
14.90
716
a)
1 m2
16.8.1
35.40
51.92
45.15
16.9
13.75
20.17
17.54
12/26/2016 10:20:54
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
719
16.10
720
16.11
16.12.1
723
189.72
164.97
422.80
620.12
539.24
0.00
0.00
643.00
559.13
0.00
0.00
2447.70
1276.10
3590.04
1871.66
3121.78
1627.53
120.15
176.22
153.24
0.00
0.00
438.40
722
a)
b)
1 m3
1 m3
724
129.35
721
a)
Basic Rate
Supplying at site :
a)
20469.55
30022.69
26106.69
b)
66.05
96.88
84.24
155.35
227.85
198.13
0.00
0.00
12.32
10.71
725
726
a)
16.16
Supplying and fixing turn buckles and straining bolts Each set
for barbed wire fencing.
Fencing with R.C.C. post placed at required
distance, embedded in cement concrete blocks,
every 15th post, last but one end post and corner
post shall be strutted on both sides and end post one
side only, provided with horizontal lines and two
diagonals of barbed wire weighing 9.38 kg per
100metres (minimum), between the two posts fitted
and fixed with G.I. staples on wooden plugs or G.I.
binding wire tied to 6 mm bar nibs fixed while casting
the post (cost of R.C.C. posts, struts, earth work and
concrete to be paid for separately) :- Payment to be
made per metre cost of total length of barbed wire
used.
1m
8.40
12/26/2016 10:20:54
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
Basic Rate
727
0.00
0.00
12.95
18.99
16.52
16.19
70.90
103.99
90.43
729
16.20
28.15
41.29
35.90
730
16.21
4.30
6.31
5.48
16.22
135.75
199.10
173.13
16.23
461.40
676.74
588.47
a)
728
731
732
1m
per cm height
per letter
12/26/2016 10:20:54
DSR 2014
visit www.sahaayidotcom.blogspot.in
734
735
736
0.00
1804.75
3307.20
1216.15
2647.03
4850.67
1783.73
2301.76
4217.97
1551.07
16.25
192.85
282.85
245.96
16.26
260.20
381.64
331.86
16.27
159.60
234.09
203.55
0.00
0.00
207.17
180.15
0.00
0.00
132.08
114.85
Each
Each
Each
16.28.1
141.25
738
a)
Basic Rate
0.00
737
a)
Unit
733
a)
b)
c)
Description of items
16.29.1
90.05
12/26/2016 10:20:54
DSR 2014
visit www.sahaayidotcom.blogspot.in
Unit
Basic Rate
739
a)
b)
Description of items
1 m2
1 m2
0.00
0.00
78.84
56.83
68.55
49.42
0.00
0.00
0.00
0.00
15.30
22.44
19.51
10.10
14.81
12.88
0.00
0.00
19.70
28.89
25.13
12.85
18.85
16.39
0.00
0.00
173.25
254.11
220.96
154.25
226.24
196.73
176.70
259.17
225.36
0.00
0.00
211.60
310.35
269.87
187.85
275.52
239.58
215.95
316.73
275.42
53.75
38.75
740
a)
(i)
(ii)
b)
1 m2
(i)
(ii)
1 m2
741
a)
b)
c)
16.32.3
Bitumen
CRMB
1 m2
55 1 m2
742
a)
b)
c)
16.33.3
Bitumen
CRMB
1 m2
55 1 m2
12/26/2016 10:20:54
DSR 2014
visit www.sahaayidotcom.blogspot.in
743
744
745
Description of items
Unit
Basic Rate
16.34
164.35
241.05
209.61
16.35
200.60
294.22
255.84
0.00
0.00
a)
455.85
668.60
581.39
b)
649.05
951.96
827.79
0.00
0.00
1411.63
2258.64
1227.50
1964.04
746
a)
b)
1 m2
1 m2
962.45
1539.95
12/26/2016 10:20:54
DSR 2014
visit www.sahaayidotcom.blogspot.in
b)
c)
Unit
0.00
289.60
424.76
369.35
249.65
366.16
318.40
296.90
435.46
378.66
0.00
0.00
445.75
653.78
568.51
382.60
561.16
487.96
457.30
670.72
583.24
16.40
77.10
113.08
98.33
16.41
100.35
147.18
127.99
a)
b)
c)
16.39.3
750
0.00
748
749
Basic Rate
747
a)
Description of items
Bitumen
CRMB
1 m2
55 1 m2
12/26/2016 10:20:54
DSR 2014
visit www.sahaayidotcom.blogspot.in
751
16.42
752
a)
b)
753
754
16.43.1
Description of items
Unit
6951.46
0.00
0.00
0.00
0.00
6795.00
9966.23
8666.28
7143.45
10477.30
9110.69
234.05
489.00
343.28
717.22
298.51
623.67
46.45
68.13
59.24
2.45
3.59
3.12
0.00
0.00
3.01
2.61
0.00
0.00
160.31
139.40
batch
mixing 1 m3
756
16.45
Per cm depth
Providing and fixing in position pre-moulded joint
per cm width
filler in expansion joints.
per m length
a)
758
a)
5450.45
7994.18
755
757
Basic Rate
2.05
1 m2
109.30
12/26/2016 10:20:54
DSR 2014
visit www.sahaayidotcom.blogspot.in
760
761
762
a)
Unit
1 m2
Basic Rate
68.50
100.47
87.36
0.00
0.00
122.15
79.60
179.16
116.75
155.79
101.52
16.49
1807.85
2651.57
2305.72
16.50
243.00
356.41
309.92
0.00
0.00
974.18
847.11
759
a)
b)
Description of items
1 m2
1 m2
1 m3
664.20
12/26/2016 10:20:54
DSR 2014
visit www.sahaayidotcom.blogspot.in
763
764
765
Description of items
Unit
Basic Rate
16.52
6537.00
9587.82
8337.23
16.53
287.05
421.02
366.10
0.00
0.00
a)
8790.95
12893.69
11211.90
b)
8555.10
12547.77
10911.10
12/26/2016 10:20:54
DSR 2014
visit www.sahaayidotcom.blogspot.in
766
Description of items
Unit
Basic Rate
0.00
0.00
a)
6742.35
9889.00
8599.13
b)
6517.95
9559.88
8312.94
0.00
0.00
767
a)
220.50
323.41
281.22
b)
214.60
314.75
273.70
0.00
0.00
768
12/26/2016 10:20:54
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
Basic Rate
a)
9597.65
14076.87
12240.76
b)
10079.30
14783.31
12855.05
c)
12306.80
18050.38
15695.99
d)
11365.70
16670.07
14495.71
e)
9356.85
13723.69
11933.65
f)
9838.50
14430.13
12547.94
g)
12066.00
17697.20
15388.87
h)
11124.90
16316.89
14188.60
12/26/2016 10:20:54
DSR 2014
visit www.sahaayidotcom.blogspot.in
769
Description of items
Unit
Manufacturing, supplying and fixing retro reflective
sign boards made up of 2 mm thick aluminium sheet,
face
to
be
fully
covered
with
high
intensityencapsulated type heat activated retro
reflective sheeting conforming to type - IV of ASTMD 4956-01 in blue and silver white or other colour
combination including subject matter, message (bilingual), symbols and borders etc. as per IRC ;
67:2001, pasted on substrate by an adhesive
backing which shall be activated by applying heat
and pressure conforming to class -2 of ASTM-D4956-01 and fixing the same with suitable sized
aluminium alloy rivets @ 20 cm c/c to back support
frame of M.S. angle iron of size 25x25x3 mm along
with theft resistant measures, mounted and fixed
with 2 Nos. M.S. angles of size 35x35x5 mm to a
vertical post made up to M.S. Tee section ISMT
50x50x6 mm welded with base plate of size
100x100x5 mm at the bottom end and including
making holes in pipes, angles flats, providing & fixing
M.S. message plate of required size, steel work to
be painted with two or more coats of synthetic
enamel paint of required shade and of approved
brand & manufacture over priming coat of zinc
chromate yellow primer vertical MS-Tee support to
be painted in black and white colours).Backside of
aluminium sheet to be painted with two or more
coats of epoxy paint over and including appropriate
priming coat including all leads and lifts etc.
complete as per drawing , pecification and direction
of Engineerin-charge. sign boards of 900 mm Each
Mandatory/Regulatory
a)
16.59.1
b)
770
a)
Basic Rate
0.00
0.00
4912.35
7204.94
6265.17
3587.20
5261.35
4575.08
0.00
0.00
6930.74
6026.73
Each
4725.40
12/26/2016 10:20:54
DSR 2014
visit www.sahaayidotcom.blogspot.in
771
772
773
774
775
Description of items
Unit
Basic Rate
16.61
5441.30
7980.75
6939.79
16.62
486.35
713.33
620.29
16.63
354.20
519.51
451.74
16.64
120.60
176.88
153.81
16.65
561.30
823.26
715.88
12/26/2016 10:20:54
DSR 2014
visit www.sahaayidotcom.blogspot.in
777
778
779
780
Unit
Basic Rate
776
a)
Description of items
0.00
0.00
16.70
24.49
21.30
16.67
643.45
943.75
820.65
16.68
602.20
883.25
768.04
16.69
5295.90
7767.50
6754.34
0.00
0.00
544.10
798.03
693.94
577.05
846.36
735.96
Each
a)
b)
12/26/2016 10:20:54
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
Basic Rate
781
16.71
782
16.72
668.20
980.05
852.22
16.73
249.70
366.23
318.47
0.00
0.00
55.30
120.00
109.95
81.11
176.00
161.26
70.53
153.05
140.23
6848.85
10045.21
8734.96
783
784
a)
b)
c)
16.74.1 Moorum.
16.74.2 Stone aggregate 20 mm nominal size.
16.74.3 Stone aggregate 40 mm nominal size.
1 m2
1 m2
1 m2
644.10
944.70
821.48
785
16.75
786
16.76
-206.50
302.87
263.37
16.77
3.15
4.62
4.02
0.00
0.00
3109.26
2703.70
787
788
a)
16.78.1
2119.90
12/26/2016 10:20:54
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
Basic Rate
b)
16.78.2
2124.85
3116.52
2710.02
c)
16.78.3
2127.65
3120.62
2713.59
16.79
2119.75
3109.04
2703.51
16.80
3291.55
4827.72
4198.01
16.81
1467.00
2151.65
1871.00
789
790
791
12/26/2016 10:20:54
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
Basic Rate
792
16.81X
42.20
61.89
53.82
793
16.81Y
836.70
1227.19
1067.12
16.82
14.35
21.05
18.30
16.83
CS2
48.30
70.84
61.60
16.84
195.70
287.03
249.59
16.85
44.30
64.97
56.50
0.00
0.00
4617.98
4015.63
794
795
796
797
798
a)
1 m2
3148.55
12/26/2016 10:20:54
DSR 2014
visit www.sahaayidotcom.blogspot.in
800
801
802
Unit
Basic Rate
799
a)
Description of items
0.00
0.00
3636.40
5333.51
4637.83
16.88
1474.20
2162.21
1880.18
16.89
986.35
1446.68
1257.98
16.90
1439.35
2111.09
1835.73
1 m2
12/26/2016 10:20:54
DSR 2014
visit www.sahaayidotcom.blogspot.in
803
804
Description of items
Unit
Basic Rate
16.91
740.35
1085.87
944.24
16.92
1375.20
2017.01
1753.92
0.00
0.00
0.00
0.00
17 .Sanitary Installations
Providing and fixing water closet squatting pan
(Indian type W.C. pan ) with 100 mm sand cast Iron
P or S trap, 10 litre low level white P.V.C. flushing
cistern, including flush pipe, with manually controlled
device(handle lever) conforming to IS : 7231, with all
fittings and fixtures complete, including cutting and
making good the walls and floors wherever required :
805
a)
17.1.1
3392.80
4976.22
4327.15
b)
17.1.2
6900.55
10121.04
8800.90
0.00
0.00
806
a)
17.2.1
W.C. pan with ISI marked white solid plastic seat and Each
lid
3317.30
4865.48
4230.86
b)
17.2.2
W.C. pan with ISI marked black solid plastic seat and Each
lid
3294.05
4831.38
4201.20
12/26/2016 10:20:54
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
Basic Rate
807
0.00
0.00
a)
17.3.1
W.C. pan with ISI marked white solid plastic seat and Each
lid.
4784.60
7017.57
6102.24
b)
17.3.2
W.C. pan with ISI marked black solid plastic seat and Each
lid.
4761.35
6983.47
6072.58
0.00
0.00
808
a)
17.4.1
3326.10
4878.39
4242.08
b)
17.4.2
5399.40
7919.30
6886.35
c)
17.4.3
7210.50
10575.64
9196.21
d)
17.4.4
10045.40
14733.59
12811.82
0.00
0.00
809
a)
17.5.1
6591.10
9667.17
8406.23
b)
17.5.2
10332.25
15154.31
13177.66
c)
17.5.3
13411.10
19670.06
17104.40
d)
17.5.4
16360.25
23995.58
20865.72
12/26/2016 10:20:54
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
Basic Rate
810
0.00
0.00
a)
17.6.1
4869.95
7142.76
6211.09
b)
17.6.2
7399.70
10853.14
9437.51
c)
17.6.3
9952.55
14597.41
12693.40
d)
17.6.4
12225.05
17930.48
15591.72
0.00
0.00
811
a)
17.7.1
2331.15
3419.10
2973.13
b)
17.7.2
2010.35
2948.58
2563.98
c)
17.7.3
2127.90
3120.99
2713.91
d)
17.7.4
1807.10
2650.47
2304.76
e)
17.7.5
2010.35
2948.58
2563.98
f)
17.7.6
1661.90
2437.51
2119.57
g)
17.7.7
1661.90
2437.51
2119.57
h)
17.7.8
3812.05
5591.13
4861.86
i)
17.7.9
2968.60
4354.05
3786.13
j)
17.7.10
3317.05
4865.12
4230.54
12/26/2016 10:20:54
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
Basic Rate
k)
17.7.11
3317.05
4865.12
4230.54
812
17.8
979.95
1437.29
1249.82
0.00
0.00
3582.56
3115.27
0.00
0.00
0.00
0.00
7052.15
10343.39
8994.25
6779.20
9943.05
8646.13
5966.15
8750.55
7609.18
4514.25
6621.05
5757.44
0.00
0.00
4343.45
6370.54
5539.60
3989.20
5850.96
5087.79
3147.10
4615.85
4013.78
0.00
0.00
3437.80
4638.81
2989.39
4033.74
0.00
0.00
1493.03
1298.28
0.00
0.00
1498.97
2061.15
1303.45
1792.31
813
a)
17.9.1
clay
kitchen
a)
(ii)
(iii)
(iv)
b)
(ii)
(iii)
Each
Each
Each
Each
Each
Each
Each
815
Each
Each
2343.90
3162.75
816
a)
b)
2442.60
(i)
817
size Each
(i)
a)
of
814
a)
b)
sink
17.12.1
1017.95
1022.00
1405.30
12/26/2016 10:20:54
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
819
17.15
820
17.16
821
a)
b)
17.17.1 250x130x30 mm
17.17.2 250x125x25 mm
Providing and fixing P.V.C. low level flushing cistern
with manually controlled device (handle lever)
conforming to IS : 7231, with all fittings and fixtures
complete.
822
a)
b)
824
a)
b)
c)
Each
Each
Each
17.19.1 10 litre (full flush) capacity-white
Each
17.19.2 10 litre (full flush) capacity-coloured
Providing and fixing solid plastic seat with lid for
pedestal type W.C. pan complete :
Each
17.20.1 White solid plastic seat with lid
Each
17.20.2 Black solid plastic seat with lid
Coloured (other than black & white) solid plastic seat Each
17.20.3
with lid
0.00
0.00
627.20
919.91
799.93
1312.40
1924.90
1673.82
1446.05
2120.92
1844.28
0.00
0.00
239.29
239.29
208.08
208.08
0.00
0.00
1268.77
1350.90
1103.28
1174.70
0.00
0.00
2352.73
3247.13
2045.86
2823.59
0.00
0.00
411.00
387.75
602.81
568.71
524.19
494.53
666.50
977.56
850.05
163.15
163.15
865.05
921.05
823
a)
b)
One Pair
One Pair
Basic Rate
1604.10
2213.90
825
17.22
103.20
151.36
131.62
826
17.23
891.10
1306.98
1136.50
827
17.24
2424.10
3555.43
3091.68
0.00
0.00
1427.10
1128.92
1427.10
916.03
916.03
2065.92
1240.96
981.67
1240.96
796.55
796.55
1796.45
0.00
0.00
2455.18
2134.94
828
a)
b)
c)
d)
e)
f)
17.25.1
17.25.2
17.25.3
17.25.4
17.25.5
17.25.6
829
a)
Each
Each
Each
Each
Each
Each
Each
973.00
769.70
973.00
624.55
624.55
1408.55
1673.95
12/26/2016 10:20:55
DSR 2014
visit www.sahaayidotcom.blogspot.in
Unit
830
a)
b)
Description of items
Each
Each
Basic Rate
0.00
0.00
1552.28
2753.29
1349.81
2394.16
0.00
0.00
0.00
0.00
76.75
112.57
97.89
82.60
121.15
105.35
0.00
0.00
74.45
109.20
94.95
76.75
112.57
97.89
1058.35
1877.20
831
a)
(i)
17.28.1.1 32 mm dia
(ii)
17.28.1.2 40 mm dia
b)
Each
Each
Flexible pipe
(i)
17.28.2.1 32 mm dia
(ii)
17.28.2.2 40 mm dia
Each
Each
832
17.29
29.50
43.27
37.62
833
17.30
38.60
56.61
49.23
17.31
793.95
1164.49
1012.60
0.00
0.00
884.10
727.90
783.95
1332.45
1296.71
1067.61
1149.82
1954.30
1127.57
928.36
999.84
1699.40
543.80
797.59
693.56
415.90
334.55
0.00
610.00
490.68
0.00
530.44
426.68
0.00
0.00
0.00
0.00
859.00
1259.90
1095.56
917.75
1346.06
1170.49
0.00
0.00
1040.04
904.38
834
835
a)
b)
c)
d)
836
837
a)
b)
17.32.1
17.32.2
17.32.3
17.32.4
17.33
838
100 mm dia.
(i)
(ii)
17.35.1.2
(i)
Each
Each
a)
b)
Each
Each
Each
Each
1m
709.10
12/26/2016 10:20:55
DSR 2014
visit www.sahaayidotcom.blogspot.in
840
a)
b)
841
a)
17.35.2.2
Description of items
Centrifugally cast (spun) iron socketed pipe as per 1 m
IS: 3989.
Providing and filling the joints with spun yarn, cement
slurry and cement mortar 1:2 ( 1 cement : 2 fine
sand) in S.C.I./ C.I. Pipes :
(ii)
0.00
96.36
113.52
83.79
98.72
0.00
0.00
224.26
220.89
195.01
192.07
0.00
0.00
0.00
0.00
341.55
500.95
435.61
385.70
565.71
491.92
0.00
0.00
272.05
399.02
346.97
318.50
467.14
406.21
0.00
0.00
0.00
0.00
434.50
637.28
554.16
335.75
492.44
428.21
0.00
0.00
219.75
322.31
280.27
248.80
364.91
317.32
0.00
0.00
0.00
0.00
318.35
466.92
406.02
371.75
545.25
474.13
0.00
0.00
277.85
407.52
354.37
312.70
458.64
398.81
0.00
0.00
65.70
77.40
152.90
150.60
Each
Each
Each
100 mm dia
17.39.1.1 Sand cast iron S&S as per IS - 1729
(ii)
Each
Each
75 mm dia
(i)
(ii)
Each
Each
(i)
(ii)
Each
Each
75 mm dia
(i)
(ii)
844
0.00
(i)
b)
1009.22
75 mm dia
(i)
843
a)
Each
Each
Each
1160.60
100 mm dia
b)
791.30
(ii)
a)
Each
Each
842
Each
Each
Basic Rate
(i)
b)
Unit
12/26/2016 10:20:55
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
(ii)
(ii)
a)
(ii)
(ii)
a)
(ii)
(ii)
(ii)
(ii)
a)
1118.95
973.00
Each
0.00
0.00
533.35
782.26
680.23
Each
597.25
875.99
761.73
0.00
0.00
Each
0.00
0.00
631.95
926.88
805.98
Each
748.10
1097.24
954.12
Each
0.00
0.00
424.20
622.17
541.02
Each
558.90
819.74
712.82
0.00
0.00
Each
0.00
0.00
485.60
712.23
619.33
Each
623.80
914.93
795.59
Each
0.00
0.00
362.65
531.90
462.52
Each
472.95
693.68
603.20
0.00
0.00
Each
0.00
0.00
550.65
807.64
702.29
Each
576.20
845.11
734.88
0.00
0.00
330.10
484.16
421.01
405.60
594.89
517.30
0.00
0.00
0.00
0.00
687.70
1008.65
877.09
1036.15
1519.72
1321.50
75x75x75 mm
(i)
848
762.90
(i)
b)
876.70
75x75x75 mm
(i)
a)
1008.21
100x100x100 mm
17.43.1.1 Sand cast iron S&S as per IS - 1729
847
687.40
(i)
b)
0.00
75x75x75x75 mm
(i)
846
Each
Each
Each
(i)
(ii)
Each
Each
0.00
(i)
b)
Each
75x75x75x75 mm
(i)
845
Basic Rate
100x100x100x100 mm
(i)
b)
Unit
12/26/2016 10:20:55
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
(ii)
a)
(ii)
(ii)
a)
(ii)
(ii)
a)
(ii)
(ii)
a)
(ii)
a)
957.15
1403.85
1220.74
0.00
0.00
Each
0.00
0.00
513.45
753.08
654.85
Each
792.20
1161.92
1010.36
0.00
0.00
Each
0.00
0.00
457.70
671.31
583.75
Each
690.00
1012.02
880.02
0.00
0.00
Each
0.00
0.00
666.80
978.00
850.43
Each
643.55
943.89
820.78
Each
0.00
0.00
498.50
731.15
635.78
Each
515.95
756.74
658.04
0.00
0.00
Each
0.00
0.00
504.15
739.44
642.99
Each
521.60
765.03
665.24
Each
0.00
0.00
394.00
577.88
502.50
Each
397.45
582.94
506.90
0.00
0.00
0.00
0.00
690.00
1012.02
880.02
870.05
1276.10
1109.65
0.00
0.00
0.00
0.00
(i)
855
850.43
75x75x75 mm
(i)
854
978.00
(i)
b)
666.80
75x75x75x75 mm
(i)
853
0.00
(i)
b)
0.00
(i)
852
Each
0.00
100x100x75 mm
17.47.1.1 Sand cast iron S&S as per IS - 1729
a)
Each
Each
Each
0.00
(i)
851
Basic Rate
(i)
850
Unit
12/26/2016 10:20:55
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
(i)
(ii)
856
a)
(ii)
(ii)
(ii)
a)
(i)
b)
842.97
0.00
0.00
0.00
0.00
275.50
404.08
351.37
Each
443.95
651.14
566.21
Each
0.00
0.00
376.40
552.07
480.06
Each
472.80
693.46
603.01
Each
0.00
0.00
452.90
664.27
577.62
Each
577.20
846.58
736.16
0.00
0.00
Each
0.00
0.00
416.03
361.76
0.00
0.00
364.35
534.39
464.69
486.30
713.26
620.22
0.00
0.00
0.00
0.00
513.45
753.08
654.85
513.45
753.08
654.85
0.00
0.00
359.15
526.77
458.06
382.40
560.87
487.71
0.00
0.00
0.00
0.00
248.65
364.69
317.13
434.50
637.28
554.16
0.00
0.00
197.70
289.97
252.14
370.75
543.78
472.85
0.00
0.00
0.00
0.00
283.65
Each
Each
100 mm
17.55.1.1 Sand cast iron S&S as per IS - 1729
(ii)
Each
Each
75 mm
(i)
(ii)
Each
Each
(i)
(ii)
b)
969.42
(i)
859
a)
660.95
(ii)
b)
Each
a)
768.93
(i)
858
884.27
(i)
857
Each
Each
Each
75 mm
(i)
(ii)
860
a)
Each
Each
602.90
(i)
c)
Each
Basic Rate
(i)
b)
Unit
12/26/2016 10:20:55
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
(i)
(ii)
b)
(ii)
Each
Each
Each
861
17.58.1 100 mm
17.58.2 75 mm
17.58.3 50 mm
Providing and fixing M.S. stays and clamps for sand
cast iron/centrifugally cast (spun) iron pipes of
diameter :
862
a)
b)
c)
Each
17.59.1 100 mm
17.59.2 75 mm
17.59.3 50 mm
a)
284.61
247.49
318.35
466.92
406.02
0.00
0.00
153.55
225.21
195.84
219.75
322.31
280.27
0.00
0.00
357.51
301.11
239.66
310.88
261.84
208.40
0.00
0.00
Each
Each
Each
100.62
83.82
76.49
87.49
72.89
66.51
0.00
0.00
0.00
0.00
982.55
1441.11
1253.14
796.70
1168.52
1016.10
0.00
0.00
1020.90
1497.35
1302.05
730.50
1071.42
931.67
0.00
0.00
332.00
237.60
151.80
486.94
348.49
222.65
423.43
303.03
193.60
445.20
652.97
567.80
243.75
205.30
163.40
68.60
57.15
52.15
(i)
(ii)
b)
Each
(i)
(ii)
Each
864
865
Each
Each
Each
17.62
1m
1m
1m
Painting C.I. cistern with bitumastic or any other anticorrosive paint inside and white paint over a coat of
Each
zinc chromate yellow primer (of approved quality ) on
the outside surface of the cistern, flush pipe, other
fittings, etc. complete for new work.
194.05
863
a)
b)
c)
Basic Rate
75 mm
(i)
a)
b)
c)
Unit
12/26/2016 10:20:55
DSR 2014
visit www.sahaayidotcom.blogspot.in
866
867
870
313.65
460.03
400.03
17.64
132.25
193.97
168.67
0.00
0.00
56.69
43.27
49.29
37.62
0.00
0.00
19.30
14.45
28.31
21.19
24.62
18.43
444.90
652.53
567.42
0.00
0.00
9549.10
8303.56
0.00
0.00
38.65
29.50
871
a)
Basic Rate
17.63
869
a)
b)
Unit
868
a)
b)
Description of items
6510.60
872
a)
17.69.1
113.95
167.13
145.33
b)
17.69.2
144.15
211.42
183.85
0.00
0.00
873
12/26/2016 10:20:55
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
Basic Rate
a)
494.90
725.87
631.19
b)
518.15
759.97
660.84
874
17.71
228.85
335.65
291.87
17.72
218.50
320.47
278.67
0.00
0.00
875
876
a)
483.45
709.08
616.59
b)
541.50
794.22
690.62
877
17.74
567.05
831.69
723.21
878
17.75
188.20
276.03
240.03
0.00
0.00
228.88
199.02
879
a)
156.05
12/26/2016 10:20:55
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
Basic Rate
880
0.00
0.00
a)
17.77.1
197.80
290.11
252.27
b)
17.77.2
240.30
352.45
306.48
c)
17.77.3
282.75
414.71
360.62
17.78
10100.90
14814.99
12882.60
17.79
21835.55
32026.20
27848.87
17.80
16724.95
24530.48
21330.86
0.00
0.00
881
882
883
12/26/2016 10:20:55
DSR 2014
visit www.sahaayidotcom.blogspot.in
18.1.1
18.1.2
18.1.3
18.1.4
18.1.5
18.1.6
18.2.1
18.2.2
18.2.3
18.2.4
1m
1m
1m
1m
1m
1m
216.50
269.20
329.45
409.95
641.95
694.80
1m
1m
1m
1m
351.30
412.25
483.40
574.85
886
a)
b)
c)
d)
e)
f)
Basic Rate
885
a)
b)
c)
d)
Unit
884
a)
b)
c)
d)
e)
f)
Description of items
18.3.1
18.3.2
18.3.3
18.3.4
18.3.5
18.3.6
1m
1m
1m
1m
1m
1m
204.05
249.35
302.20
370.15
584.50
637.35
0.00
0.00
317.54
394.84
483.20
601.27
941.55
1019.06
276.12
343.34
420.18
522.85
818.74
886.14
0.00
0.00
515.25
604.65
709.00
843.13
448.04
525.78
616.52
733.16
0.00
0.00
299.28
365.72
443.24
542.90
857.29
934.80
260.24
318.02
385.42
472.09
745.47
812.87
12/26/2016 10:20:55
DSR 2014
visit www.sahaayidotcom.blogspot.in
18.4.1
18.4.2
18.4.3
18.4.4
18.4.5
18.4.6
18.5.1
18.5.2
18.5.3
18.5.4
1m
1m
1m
1m
1m
1m
PN - 16 Pipe, 16 mm OD
PN - 16 Pipe, 20 mm OD
PN - 16 Pipe, 25 mm OD
PN - 16 Pipe, 32 mm OD
PN - 16 Pipe, 40 mm OD
PN - 16 Pipe, 50 mm OD
128.90
166.55
220.75
314.80
450.15
631.35
1m
1m
1m
1m
PN - 16 Pipe, 16 mm OD
PN - 16 Pipe, 20 mm OD
PN - 16 Pipe, 25 mm OD
PN - 16 Pipe, 32 mm OD
233.40
274.05
337.05
446.80
889
a)
b)
c)
d)
e)
f)
g)
h)
i)
j)
k)
Basic Rate
888
a)
b)
c)
d)
Unit
887
a)
b)
c)
d)
e)
f)
Description of items
18.6.1
18.6.2
18.6.3
18.6.4
18.6.5
18.6.6
18.6.7
18.6.8
18.6.9
18.6.10
18.6.11
1m
1m
1m
1m
1m
1m
1m
1m
1m
1m
1m
116.45
146.65
198.95
280.45
392.75
573.95
862.90
1145.25
1726.50
1928.85
3954.75
0.00
0.00
189.06
244.28
323.77
461.72
660.24
926.00
164.40
212.42
281.54
401.49
574.12
805.22
0.00
0.00
342.33
401.95
494.35
655.32
297.68
349.52
429.87
569.84
0.00
0.00
170.80
215.09
291.80
411.34
576.05
841.81
1265.62
1679.74
2532.26
2829.04
5800.43
148.52
187.04
253.74
357.68
500.91
732.01
1100.54
1460.64
2201.96
2460.04
5043.85
12/26/2016 10:20:55
DSR 2014
visit www.sahaayidotcom.blogspot.in
18.7.1
18.7.2
18.7.3
18.7.4
18.7.5
18.7.6
18.8.1
18.8.2
18.8.3
18.8.4
893
a)
b)
c)
1m
1m
1m
1m
1m
1m
163.50
190.55
231.30
296.70
407.90
581.55
1m
1m
1m
1m
270.00
296.40
351.30
422.40
892
a)
b)
c)
d)
e)
f)
g)
h)
i)
j)
Basic Rate
891
a)
b)
c)
d)
Unit
890
a)
b)
c)
d)
e)
f)
Description of items
18.9.1
18.9.2
18.9.3
18.9.4
18.9.5
18.9.6
18.9.7
18.9.8
18.9.9
18.9.10
1m
1m
1m
1m
1m
1m
1m
1m
1m
1m
143.65
163.30
209.50
262.35
350.50
524.10
1462.35
2051.25
2834.80
3426.25
1m
1m
1m
215.10
249.30
304.15
0.00
0.00
239.81
279.48
339.25
435.17
598.27
852.96
208.53
243.03
295.00
378.41
520.23
741.70
0.00
0.00
396.01
434.73
515.25
619.53
344.36
378.03
448.04
538.73
0.00
0.00
210.69
239.51
307.27
384.79
514.08
768.70
2144.83
3008.57
4157.80
5025.28
183.21
208.27
267.19
334.60
447.02
668.43
1865.07
2616.15
3615.48
4369.81
0.00
0.00
315.49
365.65
446.10
274.34
317.96
387.91
12/26/2016 10:20:55
DSR 2014
visit www.sahaayidotcom.blogspot.in
897
18.14
18.15.1
18.15.2
899
a)
b)
18.16.1
18.16.2
900
a)
b)
c)
d)
e)
f)
901
a)
b)
c)
902
a)
898
a)
b)
1m
1m
896
a)
b)
1m
1m
1m
Basic Rate
343.20
425.65
527.20
18.17.1
18.17.2
18.17.3
18.17.4
18.17.5
18.17.6
1m
1m
1m
1m
1m
1m
1m
1m
Each
Each
437.71
542.87
672.39
0.00
0.00
448.88
489.66
390.33
425.79
0.00
0.00
273.17
307.93
377.38
412.22
490.10
585.95
768.92
934.36
237.54
267.77
328.16
358.45
426.17
509.52
668.62
812.49
0.00
0.00
367.75
761.10
539.38
1116.31
469.03
970.70
315.50
462.74
402.39
0.00
0.00
382.22
412.07
332.37
358.32
0.00
0.00
382.22
505.79
332.37
439.82
0.00
0.00
628.99
735.62
858.75
1101.13
1888.74
2816.94
546.95
639.67
746.74
957.50
1642.39
2449.52
0.00
0.00
423.14
601.20
659.94
367.95
522.78
573.86
0.00
0.00
0.00
0.00
306.05
333.85
186.25
209.95
257.30
281.05
334.15
399.50
524.25
637.05
260.60
280.95
260.60
344.85
428.85
501.55
585.50
750.75
1287.75
1920.60
Each
18.18.1 15 mm nominal bore
Each
18.18.2 20 mm nominal bore
Each
18.18.3 25 mm nominal bore
Providing and fixing gun metal non- return valve of
approved quality (screwed end) :
25 mm nominal bore
503.37
624.30
773.24
895
a)
b)
c)
d)
e)
f)
g)
h)
Unit
894
a)
b)
Description of items
288.50
409.90
449.95
12/26/2016 10:20:55
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
(i)
18.19.1.1 Horizontal
(ii)
18.19.1.2 Vertical
b)
Unit
Each
Each
18.19.2.1 Horizontal
(ii)
18.19.2.2 Vertical
c)
Each
Each
(i)
18.19.3.1 Horizontal
(ii)
18.19.3.2 Vertical
d)
18.19.4.1 Horizontal
(ii)
18.19.4.2 Vertical
e)
18.19.5.1 Horizontal
(ii)
18.19.5.2 Vertical
f)
18.19.6.1 Horizontal
(ii)
18.19.6.2 Vertical
Each
Each
Each
Each
Each
Each
Each
(i)
Each
18.20.1 15 mm nominal bore
Each
18.20.2 20 mm nominal bore
Each
18.20.3 25 mm nominal bore
Providing and fixing uplasticised PVC connection
pipe with brass unions :
30 cm length
Each
18.21.1.1 15 mm nominal bore
(ii)
b)
(ii)
907
0.00
0.00
553.30
811.53
705.67
634.60
930.77
809.36
0.00
0.00
683.75
1002.86
872.05
904.45
1326.56
1153.53
0.00
0.00
988.70
1450.13
1260.98
1209.40
1773.83
1542.46
0.00
0.00
1769.60
2595.47
2256.93
2025.15
2970.29
2582.86
0.00
0.00
2504.30
3673.06
3193.96
3398.65
4984.80
4334.61
0.00
0.00
360.73
415.66
537.99
313.68
361.45
467.81
0.00
0.00
0.00
0.00
60.10
88.15
76.65
Each
65.90
96.66
84.05
0.00
0.00
68.60
100.62
87.49
83.70
122.76
106.75
0.00
0.00
72.05
86.35
105.68
126.65
91.89
110.13
137.40
201.52
175.24
255.40
374.60
325.73
245.95
283.40
366.80
45 cm length
(i)
906
568.95
903
a)
b)
654.29
80 mm nominal bore
(i)
905
446.10
65 mm nominal bore
(i)
a)
524.50
50 mm nominal bore
(i)
904
603.18
40 mm nominal bore
Each
Each
Each
411.25
32 mm nominal bore
(i)
a)
b)
c)
Basic Rate
12/26/2016 10:20:55
DSR 2014
visit www.sahaayidotcom.blogspot.in
18.27.1
18.27.2
18.27.3
18.27.4
18.27.5
18.27.6
18.27.7
18.27.8
18.27.9
18.27.10
18.27.11
1m
1m
1m
1m
1m
1m
1m
1m
1m
1m
1m
18.28.1
18.28.2
18.28.3
18.28.4
18.28.5
18.28.6
18.28.7
18.28.8
18.28.9
18.28.10
18.28.11
18.29
6654.65
7003.10
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
One Quintal
1075.25
1339.95
1616.75
2743.50
3582.15
4829.35
5792.95
7630.60
9239.55
10726.85
14998.40
204.85
302.30
307.60
408.00
509.70
613.85
632.10
825.05
925.00
979.00
1320.60
10464.50
913
a)
b)
c)
d)
e)
f)
g)
h)
i)
j)
k)
l)
4447.80
4563.95
911
a)
b)
c)
d)
e)
f)
g)
h)
i)
j)
k)
912
One Quintal
One Quintal
910
a)
b)
c)
d)
e)
f)
g)
h)
i)
j)
k)
One Quintal
One Quintal
Basic Rate
909
a)
b)
Unit
908
a)
b)
Description of items
18.30.1
18.30.2
18.30.3
18.30.4
18.30.5
18.30.6
18.30.7
18.30.8
18.30.9
18.30.10
18.30.11
18.30.12
80 mm diameter pipe
100 mm diameter pipe
125 mm diameter pipe
150 mm diameter pipe
200 mm diameter pipe
250 mm diameter pipe
300 mm diameter pipe
350 mm diameter pipe
400 mm diameter pipe
450 mm diameter pipe
500 mm diameter pipe
600 mm diameter pipe
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
118.85
195.70
198.00
234.55
240.35
359.00
364.80
499.45
712.55
882.05
1004.55
1178.95
0.00
0.00
6523.59
6693.95
5672.69
5820.82
0.00
0.00
9760.38
10271.45
8487.28
8931.69
0.00
0.00
1577.07
1965.30
2371.29
4023.89
5253.94
7083.21
8496.52
11191.80
13551.65
15733.07
21998.15
1371.36
1708.96
2061.99
3499.04
4568.64
6159.31
7388.28
9732.00
11784.04
13680.93
19128.83
0.00
0.00
300.45
443.38
451.16
598.41
747.58
900.33
927.10
1210.10
1356.70
1435.90
1936.92
15348.28
261.26
385.55
392.31
520.36
650.07
782.90
806.17
1052.26
1179.74
1248.61
1684.28
13346.33
0.00
0.00
174.32
287.03
290.41
344.01
352.52
526.55
535.05
732.54
1045.10
1293.70
1473.37
1729.17
151.58
249.59
252.53
299.14
306.54
457.87
465.26
636.99
908.78
1124.96
1281.19
1503.62
12/26/2016 10:20:55
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Basic Rate
914
a)
18.31.1.1 Class I
(ii)
18.31.1.2 Class II
b)
Each
Each
0.00
0.00
0.00
3308.60
4852.72
4219.76
3921.30
5751.37
5001.19
0.00
0.00
3565.85
5230.03
4547.85
4643.15
6810.11
5921.83
0.00
0.00
4843.60
7104.11
6177.49
5694.00
8351.39
7262.08
0.00
0.00
9515.65
13956.60
12136.18
11579.00
16982.92
14767.76
0.00
0.00
13950.50
20461.20
17792.35
18520.65
27164.24
23621.08
0.00
0.00
19378.55
28422.52
24715.23
23025.60
33771.65
29366.65
0.00
0.00
1698.07
1476.58
125 mm diameter
(i)
18.31.2.1 Class I
(ii)
18.31.2.2 Class II
c)
Each
Each
150 mm diameter
(i)
18.31.3.1 Class I
(ii)
18.31.3.2 Class II
d)
Each
Each
200 mm diameter
(i)
18.31.4.1 Class I
(ii)
18.31.4.2 Class II
e)
Each
Each
250 mm diameter
(i)
18.31.5.1 Class I
(ii)
18.31.5.2 Class II
f)
Each
Each
300 mm diameter
(i)
18.31.6.1 Class I
(ii)
18.31.6.2 Class II
Each
Each
915
18.32.1
0.00
100 mm diameter
(i)
a)
Unit
1157.75
12/26/2016 10:20:55
DSR 2014
visit www.sahaayidotcom.blogspot.in
18.33.1
18.34.1
6754.30
11672.35
918
a)
Basic Rate
917
a)
Unit
916
a)
Description of items
18.35.1
16095.10
0.00
0.00
9906.53
8614.38
0.00
0.00
17119.84
14886.81
0.00
0.00
23606.68
20527.55
12/26/2016 10:20:55
DSR 2014
visit www.sahaayidotcom.blogspot.in
18.36.1
18.37.1
18.38.1
18.38.2
18.38.3
18.38.4
18.38.5
18.38.6
923
a)
b)
1m
1m
1m
1m
1m
1m
15 mm diameter pipe.
20 mm diameter pipe.
25 mm diameter pipe.
32 mm diameter pipe.
40 mm diameter pipe.
50 mm diameter pipe.
Repainting G.I. pipes and fittings with synthetic
enamel white paint with one coat of approved
quality :
922
a)
b)
c)
d)
e)
f)
6431.70
6039.95
921
a)
b)
c)
d)
e)
f)
Basic Rate
920
a)
Unit
919
a)
Description of items
18.39.1
18.39.2
18.39.3
18.39.4
18.39.5
18.39.6
15 mm diameter pipe.
20 mm diameter pipe.
25 mm diameter pipe
32 mm diameter pipe
40 mm diameter pipe
50 mm diameter pipe
1m
1m
1m
1m
1m
1m
9.60
11.35
14.95
17.70
21.00
24.75
4.95
5.75
7.40
8.75
10.15
12.00
Painting G.I. pipes and fittings with two coats of anticorrosive bitumastic paint of approved quality :
18.40.1 15 mm diameter pipe
18.40.2 20 mm diameter pipe
1m
1m
5.80
6.85
0.00
0.00
9433.37
8202.93
0.00
0.00
8858.79
7703.30
0.00
0.00
14.08
16.65
21.93
25.96
30.80
36.30
12.24
14.48
19.07
22.57
26.78
31.57
0.00
0.00
7.26
8.43
10.85
12.83
14.89
17.60
6.31
7.33
9.44
11.16
12.95
15.30
0.00
0.00
8.51
10.05
7.40
8.74
12/26/2016 10:20:55
DSR 2014
visit www.sahaayidotcom.blogspot.in
18.40.3
18.40.4
18.40.5
18.40.6
18.40.7
18.40.8
18.41.1
18.41.2
18.41.3
18.41.4
18.41.5
18.41.6
18.41.7
18.41.8
18.41.9
18.41.10
1m
1m
1m
1m
1m
1m
25 mm diameter pipe
32 mm diameter pipe
40 mm diameter pipe
50 mm diameter pipe
65 mm diameter pipe
80 mm diameter pipe
15 mm diameter pipe
20 mm diameter pipe
25 mm diameter pipe
32 mm diameter pipe
40 mm diameter pipe
50 mm diameter pipe
65 mm diameter pipe
80 mm diameter pipe
100 mm diameter pipe
150 mm diameter pipe
1m
1m
1m
1m
1m
1m
1m
1m
1m
1m
Basic Rate
8.75
10.40
11.85
14.15
17.45
20.25
1m
1m
1m
12.83
15.25
17.38
20.75
25.59
29.70
11.16
13.26
15.11
18.05
22.26
25.83
0.00
0.00
97.39
98.71
101.28
103.92
105.24
109.20
172.34
177.62
188.10
280.21
84.69
85.83
88.07
90.36
91.51
94.95
149.86
154.45
163.57
243.66
0.00
0.00
323.05
383.60
446.50
473.82
562.63
654.88
412.02
489.24
569.46
66.40
67.30
69.05
70.85
71.75
74.45
117.50
121.10
128.25
191.05
925
a)
b)
c)
Unit
924
a)
b)
c)
d)
e)
f)
g)
h)
i)
j)
Description of items
926
18.43
593.65
870.71
757.14
927
18.44
309.30
453.65
394.48
928
18.45
904.05
1325.97
1153.02
0.00
0.00
242.37
276.47
293.49
353.11
463.84
575.53
933.26
1069.59
210.76
240.41
255.21
307.05
403.34
500.46
811.53
930.08
0.00
0.00
528.75
562.77
579.79
639.48
750.14
459.78
489.37
504.16
556.07
652.30
929
a)
b)
c)
d)
e)
f)
g)
h)
18.46.1
18.46.2
18.46.3
18.46.4
18.46.5
18.46.6
18.46.7
18.46.8
Each
Each
Each
Each
Each
Each
Each
Each
165.25
188.50
200.10
240.75
316.25
392.40
636.30
729.25
930
a)
b)
c)
d)
e)
15 mm nominal bore
20 mm nominal bore
25 mm nominal bore
32 mm nominal
40 mm nominal bore
50mm nominal bore
65mm nominal bore
80 mm nominal bore
18.47.1
18.47.2
18.47.3
18.47.4
18.47.5
15 mm nominal bore.
20 mm nominal bore.
25 mm nominal bore.
32 mm nominal bore.
40 mm nominal bore.
Each
Each
Each
Each
Each
360.50
383.70
395.30
436.00
511.45
12/26/2016 10:20:55
DSR 2014
visit www.sahaayidotcom.blogspot.in
931
932
a)
18.48
937
Each
Each
Each
965.97
1323.77
1460.03
839.97
1151.10
1269.59
7.25
10.63
9.25
0.00
0.00
673.95
586.04
0.00
0.00
1168.52
1016.10
0.00
0.00
895.64
778.82
0.00
0.00
908.99
790.42
0.00
0.00
744.64
647.52
0.00
0.00
459.50
796.70
610.65
619.75
Each
658.60
902.55
995.45
936
a)
Basic Rate
935
a)
Each
Each
Each
934
a)
Unit
933
a)
Description of items
507.70
a)
18.54.1
156.05
228.88
199.02
b)
18.54.2
171.15
251.03
218.28
c)
18.54.3
202.50
297.01
258.27
d)
18.54.4
185.10
271.49
236.07
0.00
0.00
938
a)
18.55.1
156.05
228.88
199.02
b)
18.55.2
190.90
279.99
243.47
c)
18.55.3
200.20
293.63
255.33
0.00
0.00
939
a)
18.56.1
228.70
335.43
291.68
b)
18.56.2
298.40
437.66
380.58
12/26/2016 10:20:55
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
Basic Rate
940
0.00
0.00
a)
18.57.1
152.55
223.75
194.56
b)
18.57.2
121.20
177.76
154.58
0.00
0.00
0.00
0.00
49.25
72.23
62.81
57.35
84.12
73.14
0.00
0.00
220.45
191.69
0.00
0.00
7008.33
9052.62
11895.01
6094.20
7871.84
10343.49
0.00
0.00
4568.55
6826.61
9994.31
10850.43
3972.65
5936.18
8690.71
9435.15
0.00
0.00
5332.77
8612.98
10901.17
15232.56
4637.20
7489.54
9479.28
13245.70
0.00
0.00
941
a)
Each
(i)
(ii)
b)
(i)
942
a)
b)
c)
18.59.1 50 mm dia
18.59.2 80 mm dia
18.59.3 100 mm dia
18.60.1
18.60.2
18.60.3
18.60.4
4778.30
6172.10
8110.05
Each
Each
Each
Each
3114.85
4654.40
6814.15
7397.85
Providing and fixing C.I. dirt box strainer for bulk type
water meter with nuts, bolts, rubber insertions etc.
complete conforming to IS : 2373 :
944
a)
b)
c)
d)
Each
Each
Each
150.30
943
a)
b)
c)
d)
Each
18.61.1
18.61.2
18.61.3
18.61.4
Each
Each
Each
Each
80 mm dia
100 mm dia.
150 mm dia
200 mm dia
3635.90
5872.35
7432.45
10385.60
945
a)
18.62.1
232.75
341.37
296.85
b)
18.62.2
285.60
418.89
364.25
c)
18.62.3
554.50
813.29
707.20
d)
18.62.4
1007.45
1477.63
1284.89
e)
18.62.5
1402.40
2056.90
1788.61
946
18.63
190.90
279.99
243.47
12/26/2016 10:20:55
DSR 2014
visit www.sahaayidotcom.blogspot.in
948
207.90
180.79
18.65
164.95
241.93
210.38
0.00
0.00
9675.16
14360.02
8413.18
12486.97
0.00
0.00
15722.88
16574.66
13672.07
14412.75
0.00
0.00
22537.17
31055.03
19597.54
27004.37
0.00
0.00
23729.67
33865.96
20634.49
29448.66
0.00
0.00
90.72
141.02
214.14
259.97
348.41
377.38
612.20
705.78
761.07
977.78
1371.00
1566.88
1726.82
2211.93
2603.47
78.88
122.63
186.21
226.06
302.97
328.16
532.35
613.72
661.80
850.24
1192.17
1362.50
1501.58
1923.42
2263.88
0.00
0.00
2400.77
3758.35
5931.04
7172.02
9167.24
11543.66
2087.62
3268.13
5157.43
6236.54
7971.51
10037.97
One Quintal
One Quintal
10719.90
11300.65
15365.90
21173.40
16178.95
23089.90
One Joint
One Joint
One Joint
One Joint
One Joint
One Joint
One Joint
One Joint
One Joint
One Joint
One Joint
One Joint
One Joint
One Joint
One Joint
954
a)
b)
c)
d)
e)
f)
6596.55
9790.70
953
a)
b)
c)
d)
e)
f)
g)
h)
i)
j)
k)
l)
m)
n)
o)
One Quintal
One Quintal
952
a)
b)
141.75
951
a)
b)
Basic Rate
950
a)
b)
Unit
18.64
949
a)
b)
Description of items
18.71.1
18.71.2
18.71.3
18.71.4
18.71.5
18.71.6
1m
1m
1m
1m
1m
1m
61.85
96.15
146.00
177.25
237.55
257.30
417.40
481.20
518.90
666.65
934.75
1068.30
1177.35
1508.10
1775.05
1636.85
2562.45
4043.80
4889.90
6250.25
7870.50
12/26/2016 10:20:55
DSR 2014
visit www.sahaayidotcom.blogspot.in
18.71.7
18.71.8
18.71.9
18.71.10
})
18.72.1
18.72.2
18.72.3
18.72.4
18.72.5
18.72.6
18.72.7
18.72.8
18.72.9
18.72.10
18.72.11
18.72.12
18.72.13
18.72.14
18.72.15
18.72.16
18.72.17
18.72.18
18.72.19
18.72.20
18.72.21
18.72.22
18.72.23
18.72.24
18.72.25
18.72.26
18.72.27
18.72.28
18.72.29
CS2
i)
j)
k)
957
1m
1m
1m
1m
Basic Rate
10184.60
12967.40
16102.60
22314.60
1m
1m
1m
1m
1m
1m
1m
1m
1m
1m
1m
1m
1m
1m
1m
1m
1m
1m
1m
1m
1m
1m
1m
1m
1m
1m
1m
1m
1m
18.73.1
18.73.2
18.73.3
18.73.4
18.73.5
18.73.6
18.73.7
18.73.8
18.73.9
CS2
18.73.10
600 mm dia Ductile Iron Double Flanged
CS2
18.73.11 700 mm dia Ductile Iron Double Flanged
1m
1m
1m
1m
1m
1m
1m
1m
1m
1m
1m
14937.75
19019.29
23617.68
32728.82
12989.35
16538.51
20537.12
28459.85
0.00
0.00
924.05
1336.70
1849.00
2503.55
3447.75
4110.05
4795.60
5791.20
6837.70
8923.50
11470.10
14433.80
19121.30
20351.20
1130.55
1434.40
1973.45
3851.25
3487.55
4250.90
5381.60
6222.30
7850.60
9487.50
13105.45
14222.75
14395.10
17373.30
1355.30
1960.54
2711.93
3671.96
5056.81
6028.21
7033.71
8493.95
10028.85
13088.10
16823.20
21170.05
28045.21
29849.11
1658.18
2103.83
2894.46
5648.63
5115.19
6234.80
7893.19
9126.25
11514.48
13915.32
19221.76
20860.51
21113.29
25481.42
1178.53
1704.82
2358.20
3193.01
4397.23
5241.92
6116.27
7386.05
8720.74
11380.95
14628.87
18408.74
24387.14
25955.74
1441.89
1829.42
2516.92
4911.85
4447.99
5421.56
6863.65
7935.87
10012.59
12100.28
16714.58
18139.57
18359.39
22157.76
19544.90
28666.50
24927.40
0.00
0.00
2564.75
4114.55
4841.85
4070.15
8201.90
10364.80
12496.50
15189.00
3761.72
6034.81
7101.54
5969.69
12029.73
15202.05
18328.62
22277.71
3271.06
5247.66
6175.25
5191.03
10460.63
13219.18
15937.93
19371.92
17772.05
26066.27
22666.32
24280.20
35611.77
30966.76
30114.80
44169.38
38408.15
0.00
0.00
956
a)
b)
c)
d)
e)
f)
g)
h)
Unit
955
a)
b)
c)
d)
e)
f)
g)
h)
i)
j)
k)
l)
m)
n)
o)
p)
q)
r)
s)
t)
u)
v)
w)
x)
y)
z)
{)
|)
Description of items
12/26/2016 10:20:55
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
Each
Each
Basic Rate
62.45
91.60
79.65
74.70
109.56
95.27
0.00
0.00
44.15
64.75
56.31
51.15
75.02
65.24
73.20
107.36
93.36
0.00
0.00
207.95
305.00
265.22
193.00
283.07
246.15
958
a)
18.75.1
b)
c)
959
a)
Each
Each
Each
960
18.77
961
18.78
85.70
125.70
109.30
18.79
130.80
191.84
166.82
0.00
0.00
1032.56
1359.04
1701.30
2046.63
2741.12
3462.88
3874.43
4303.08
4759.15
5225.12
5719.54
6734.43
897.88
1181.78
1479.39
1779.68
2383.58
3011.20
3369.07
3741.81
4138.39
4543.58
4973.52
5856.02
0.00
0.00
962
963
a)
b)
c)
d)
e)
f)
g)
h)
i)
j)
k)
l)
964
18.80.1
18.80.2
18.80.3
18.80.4
18.80.5
18.80.6
18.80.7
18.80.8
18.80.9
18.80.10
18.80.11
18.80.12
100 m
100 m
100 m
100 m
100 m
100 m
100 m
100 m
100 m
100 m
100 m
100 m
704.00
926.60
1159.95
1395.40
1868.90
2361.00
2641.60
2933.85
3244.80
3562.50
3899.60
4591.55
12/26/2016 10:20:55
DSR 2014
visit www.sahaayidotcom.blogspot.in
18.81.1
18.81.2
18.81.3
18.81.4
18.81.5
18.81.6
18.81.7
18.81.8
18.81.9
18.81.10
18.81.11
18.81.12
967
a)
968
a)
Unit
100 m
100 m
100 m
100 m
100 m
100 m
100 m
100 m
100 m
100 m
100 m
100 m
Basic Rate
258.05
315.95
386.85
452.25
689.90
796.65
899.00
1057.75
1218.95
1386.10
1555.05
1902.00
965
a)
b)
c)
d)
e)
f)
g)
h)
i)
j)
k)
l)
966
a)
b)
c)
d)
e)
f)
g)
h)
i)
j)
k)
l)
Description of items
18.82.1
18.82.2
18.82.3
18.82.4
18.82.5
18.82.6
18.82.7
18.82.8
18.82.9
18.82.10
18.82.11
18.82.12
18.83.1
18.83.2
18.83.3
18.83.4
18.83.5
18.83.6
18.83.7
18.83.8
18.83.9
18.83.10
18.83.11
18.83.12
1m
1m
1m
1m
1m
1m
1m
1m
1m
1m
1m
1m
Each cut
Each cut
Each cut
Each cut
Each cut
Each cut
Each cut
Each cut
Each cut
Each cut
Each cut
Each cut
Each
162.00
168.70
175.10
181.70
202.60
223.10
241.10
257.90
273.50
289.55
303.55
328.25
57.00
76.65
106.75
144.15
192.25
238.50
286.65
332.90
380.75
427.30
475.15
565.75
6778.90
1m
248.70
378.48
463.40
567.39
663.32
1011.88
1168.45
1318.56
1551.40
1787.83
2032.99
2280.79
2789.66
329.11
402.96
493.39
576.80
879.89
1016.04
1146.58
1349.05
1554.64
1767.82
1983.30
2425.79
0.00
0.00
237.61
247.43
256.82
266.50
297.15
327.22
353.62
378.26
401.14
424.68
445.22
481.44
0.00
83.60
112.42
156.57
211.42
281.97
349.81
420.43
488.26
558.45
626.72
696.90
829.79
206.61
215.16
223.32
231.74
258.39
284.54
307.50
328.92
348.82
369.29
387.15
418.65
0.00
72.70
97.76
136.15
183.85
245.19
304.18
365.59
424.58
485.61
544.97
606.00
721.55
0.00
0.00
9942.61
8645.75
0.00
0.00
364.77
317.19
12/26/2016 10:20:55
DSR 2014
visit www.sahaayidotcom.blogspot.in
18.85.2
18.85.3
18.85.4
18.85.5
18.85.6
Basic Rate
382.90
475.90
644.20
783.50
903.05
1m
1m
333.85
468.00
Each
Each
Each
Each
Each
Each
66.20
102.20
125.45
268.30
383.30
518.05
971
a)
b)
c)
d)
e)
f)
g)
h)
i)
j)
k)
l)
m)
n)
o)
1m
1m
1m
1m
1m
970
a)
b)
c)
d)
e)
f)
Unit
969
a)
b)
Description of items
18.88.1
18.88.2
18.88.3
18.88.4
18.88.5
18.88.6
18.88.7
18.88.8
18.88.9
18.88.10
18.88.11
18.88.12
18.88.13
18.88.14
18.88.15
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
119.65
163.75
168.40
271.80
275.30
275.30
417.00
420.45
420.45
449.50
543.60
545.90
550.55
556.35
606.30
561.60
698.00
944.85
1149.16
1324.50
488.35
606.96
821.61
999.27
1151.74
0.00
0.00
489.66
686.42
425.79
596.88
0.00
0.00
97.10
149.90
184.00
393.52
562.19
759.82
84.43
130.34
160.00
342.19
488.86
660.72
0.00
0.00
175.49
240.17
246.99
398.65
403.78
403.78
611.61
616.67
616.67
659.28
797.30
800.67
807.49
816.00
889.26
152.60
208.85
214.78
346.65
351.12
351.12
531.84
536.24
536.24
573.29
693.30
696.24
702.17
709.56
773.27
12/26/2016 10:20:55
DSR 2014
visit www.sahaayidotcom.blogspot.in
18.89.1
18.89.2
18.89.3
18.89.4
18.89.5
18.89.6
18.90.1
18.90.2
18.90.3
18.90.4
18.90.5
18.90.6
18.91.1
18.91.2
18.91.3
18.91.4
18.91.5
18.91.6
976
131.25
213.70
274.10
405.35
569.15
707.35
Each
Each
Each
Each
Each
Each
99.90
177.70
245.10
498.30
763.10
938.50
Each
Each
Each
Each
Each
Each
171.90
250.90
256.70
372.85
459.95
810.75
975
a)
b)
c)
d)
e)
f)
Each
Each
Each
Each
Each
Each
974
a)
b)
c)
d)
e)
f)
Basic Rate
973
a)
b)
c)
d)
e)
f)
Unit
972
a)
b)
c)
d)
e)
f)
Description of items
18.92.1
18.92.2
18.92.3
18.92.4
18.92.5
18.92.6
Each
Each
Each
Each
Each
Each
184.70
268.30
343.80
716.65
1003.55
1194.00
0.00
0.00
192.50
313.43
402.02
594.53
834.77
1037.47
167.40
272.55
349.58
516.98
725.89
902.15
0.00
0.00
146.52
260.63
359.49
730.86
1119.24
1376.50
127.41
226.64
312.60
635.53
973.25
1196.95
0.00
0.00
252.13
368.00
376.50
546.86
674.61
1189.13
219.24
320.00
327.39
475.53
586.62
1034.02
0.00
0.00
270.90
393.52
504.25
1051.11
1471.91
1751.24
235.56
342.19
438.48
914.01
1279.92
1522.82
0.00
0.00
12/26/2016 10:20:55
DSR 2014
visit www.sahaayidotcom.blogspot.in
18.93.1
18.93.2
18.93.3
18.93.4
18.93.5
18.93.6
18.93.7
18.93.8
18.93.9
18.93.10
18.93.11
18.93.12
18.93.13
18.93.14
18.93.15
Description of items
Unit
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Basic Rate
261.35
325.20
338.00
636.50
648.10
655.10
951.25
953.60
954.75
964.05
1038.40
1060.45
1068.60
1112.70
1153.35
977
383.32
476.97
495.74
933.55
950.57
960.84
1395.20
1398.65
1400.33
1413.97
1523.02
1555.36
1567.32
1632.00
1691.62
333.32
414.76
431.08
811.79
826.58
835.51
1213.22
1216.21
1217.68
1229.54
1324.37
1352.49
1362.88
1419.13
1470.97
0.00
0.00
a)
18.94.1
332.20
487.24
423.68
b)
18.94.2
399.55
586.02
509.58
c)
18.94.3
427.45
626.94
545.17
d)
18.94.4
480.85
705.26
613.27
e)
18.94.5
501.75
735.92
639.93
f)
18.94.6
561.00
822.82
715.49
g)
18.94.7
699.20
1025.52
891.75
h)
18.94.8
756.15
1109.05
964.39
i)
18.94.9
902.50
1323.70
1151.04
j)
18.94.10
1139.45
1671.23
1453.24
k)
18.94.11
1067.40
1565.56
1361.35
l)
18.94.12
1092.95
1603.03
1393.94
m)
18.94.13
1189.40
1744.49
1516.95
n)
18.94.14
1320.65
1937.00
1684.35
o)
18.94.15
1604.05
2352.66
2045.79
p)
18.94.16
1161.50
1703.57
1481.37
q)
18.94.17
1196.35
1754.69
1525.81
12/26/2016 10:20:55
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
Basic Rate
r)
18.94.18
1247.45
1829.63
1590.99
s)
18.94.19
1498.35
2197.63
1910.98
t)
18.94.20
1662.10
2437.80
2119.83
u)
18.94.21
2031.45
2979.53
2590.89
0.00
0.00
978
a)
18.95.1
339.15
497.43
432.55
b)
18.95.2
399.55
586.02
509.58
c)
18.95.3
413.50
606.48
527.37
d)
18.95.4
516.85
758.06
659.19
e)
18.95.5
528.50
775.15
674.04
f)
18.95.6
578.45
848.41
737.75
g)
18.95.7
775.90
1138.01
989.58
h)
18.95.8
788.65
1156.71
1005.84
i)
18.95.9
889.70
1304.92
1134.72
j)
18.95.10
1056.95
1550.23
1348.02
k)
18.95.11
1038.40
1523.02
1324.37
l)
18.95.12
1056.95
1550.23
1348.02
m)
18.95.13
1187.05
1741.05
1513.95
n)
18.95.14
1239.30
1817.68
1580.59
o)
18.95.15
1349.65
1979.53
1721.33
p)
18.95.16
1237.00
1814.31
1577.66
q)
18.95.17
1249.75
1833.01
1593.92
r)
18.95.18
1295.05
1899.45
1651.70
s)
18.95.19
1375.20
2017.01
1753.92
t)
18.95.20
1432.15
2100.53
1826.55
u)
18.95.21
1586.60
2327.07
2023.54
12/26/2016 10:20:55
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
Basic Rate
979
0.00
0.00
a)
18.96.1
220.70
323.70
281.48
b)
18.96.2
267.15
391.83
340.72
c)
18.96.3
275.30
403.78
351.12
d)
18.96.4
321.75
471.91
410.36
e)
18.96.5
332.20
487.24
423.68
f)
18.96.6
391.45
574.14
499.25
g)
18.96.7
475.05
696.76
605.87
h)
18.96.8
624.90
916.54
796.99
i)
18.96.9
669.00
981.22
853.24
j)
18.96.10
791.00
1160.16
1008.83
k)
18.96.11
973.35
1427.61
1241.40
l)
18.96.12
1120.85
1643.95
1429.52
0.00
0.00
980
a)
18.97.1
224.15
328.76
285.88
b)
18.97.2
263.65
386.70
336.26
c)
18.97.3
288.05
422.48
367.38
d)
18.97.4
363.55
533.22
463.67
e)
18.97.5
371.70
545.17
474.06
f)
18.97.6
535.45
785.34
682.91
g)
18.97.7
656.25
962.52
836.98
h)
18.97.8
753.80
1105.60
961.39
i)
18.97.9
843.25
1236.79
1075.47
12/26/2016 10:20:55
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
Basic Rate
j)
18.97.10
975.65
1430.99
1244.34
k)
18.97.11
1321.80
1938.68
1685.81
0.00
0.00
981
a)
18.98.1
271.80
398.65
346.65
b)
18.98.2
320.55
470.15
408.83
c)
18.98.3
342.65
502.56
437.01
d)
18.98.4
492.50
722.35
628.13
e)
18.98.5
730.60
1071.57
931.80
f)
18.98.6
1016.30
1490.61
1296.18
g)
18.98.7
1365.90
2003.37
1742.06
0.00
0.00
982
a)
18.99.1
238.10
349.22
303.67
b)
18.99.2
319.40
468.46
407.36
c)
18.99.3
329.85
483.79
420.69
d)
18.99.4
489.00
717.22
623.67
e)
18.99.5
851.40
1248.75
1085.87
f)
18.99.6
1068.60
1567.32
1362.88
g)
18.99.7
1155.70
1695.07
1473.97
h)
18.99.8
1281.15
1879.06
1633.97
i)
18.99.9
1493.70
2190.81
1905.05
0.00
0.00
983
12/26/2016 10:20:55
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
Basic Rate
a)
18.100.1
250.90
368.00
320.00
b)
18.100.2
317.10
465.09
404.43
c)
18.100.3
334.50
490.61
426.62
d)
18.100.4
437.90
642.27
558.49
e)
18.100.5
702.70
1030.65
896.22
f)
18.100.6
854.85
1253.81
1090.27
g)
18.100.7
1084.85
1591.15
1383.61
h)
18.100.8
1231.20
1805.80
1570.26
i)
18.100.9
1382.20
2027.27
1762.85
j)
18.100.10
1683.00
2468.46
2146.48
0.00
0.00
76.64
109.05
143.08
294.73
430.99
562.19
66.64
94.83
124.41
256.29
374.77
488.86
0.00
0.00
364.55
461.64
693.38
0.00
317.00
401.43
602.94
0.00
0.00
0.00
302.95
461.06
677.84
1021.56
1129.95
263.43
400.92
589.42
888.31
982.56
984
a)
b)
c)
d)
e)
f)
18.101.1
18.101.2
18.101.3
18.101.4
18.101.5
18.101.6
52.25
74.35
97.55
200.95
293.85
383.30
985
a)
b)
c)
Each
Each
Each
Each
Each
Each
Each
Each
Each
248.55
314.75
472.75
19. Drainage
Providing, laying and jointing glazed stoneware pipes
class SP-1 with stiff mixture of cement mortar in the
proportion of 1:1 (1 cement : 1 fine sand) including
testing of joints etc. complete :
986
a)
b)
c)
d)
e)
19.1.1
19.1.2
19.1.3
19.1.4
19.1.5
100 mm diameter
150 mm diameter
200 mm diameter
250 mm diameter
300 mm diameter
1m
1m
1m
1m
1m
206.55
314.35
462.15
696.50
770.40
12/26/2016 10:20:55
DSR 2014
visit www.sahaayidotcom.blogspot.in
19.2.1
19.2.2
19.2.3
19.2.4
19.3.1
19.3.2
19.3.3
19.3.4
19.3.5
a)
(i)
19.4.1.1
(ii)
b)
19.4.1.2
(i)
19.4.2.1
(ii)
c)
19.4.2.2
(i)
19.4.3.1
(ii)
19.4.3.2
0.00
869.17
1062.92
1239.14
1432.97
755.80
924.28
1077.51
1246.06
0.00
0.00
413.10
669.48
786.96
916.10
1057.05
359.21
582.15
684.31
796.61
919.17
0.00
0.00
0.00
0.00
1571.25
2304.55
2003.96
1641.70
2407.88
0.00
2093.81
0.00
1594.35
2338.43
2033.42
1664.80
2441.76
0.00
2123.27
0.00
1678.85
2462.37
2141.19
1749.30
2565.70
2231.04
0.00
0.00
47.67
52.65
56.03
59.40
62.77
72.31
79.06
82.36
41.45
45.79
48.72
51.65
54.59
62.88
68.74
71.61
0.00
0.00
467.14
406.21
592.60
724.70
844.85
977.00
1m
1m
1m
1m
1m
281.65
456.45
536.55
624.60
720.70
990
19.5.1
19.5.2
19.5.3
19.5.4
19.5.5
19.5.6
19.5.7
19.5.8
1m
1m
1m
1m
1m
1m
1m
1m
100 mm diameter
150 mm diameter
200 mm diameter
250 mm diameter
300 mm diameter
350 mm diameter
400 mm diameter
450 mm diameter
32.50
35.90
38.20
40.50
42.80
49.30
53.90
56.15
991
a)
1m
1m
1m
1m
19.6.1
1m
0.00
989
a)
b)
c)
d)
e)
f)
g)
h)
Basic Rate
988
a)
b)
c)
d)
e)
Unit
987
a)
b)
c)
d)
Description of items
318.50
12/26/2016 10:20:55
DSR 2014
visit www.sahaayidotcom.blogspot.in
Unit
1m
1m
1m
1m
1m
1m
1m
1m
1m
1m
1m
1m
992
0.00
0.00
a)
0.00
0.00
8507.00
12477.22
10849.75
8691.25
12747.46
11084.74
0.00
0.00
18304.45
26847.14
23345.34
18808.40
27586.28
23988.07
0.00
0.00
22876.75
33553.33
29176.81
23310.25
34189.14
0.00
0.00
29729.69
0.00
0.00
5638.20
8269.55
7190.91
6174.65
9056.36
7875.09
b)
(i)
(ii)
c)
(i)
(ii)
993
a)
(i)
(ii)
348.30
468.60
506.35
705.90
934.10
1379.45
1562.70
1748.75
1962.85
2433.05
2868.75
3061.30
444.22
597.65
645.79
900.30
1191.34
1759.34
1993.05
2230.34
2503.40
3103.09
3658.78
3904.36
(ii)
Basic Rate
510.85
687.30
742.66
1035.34
1370.04
2023.24
2292.01
2564.89
2878.91
3568.55
4207.60
4490.01
(i)
19.6.2
19.6.3
19.6.4
19.6.5
19.6.6
19.6.7
19.6.8
19.6.9
19.6.10
19.6.11
19.6.12
19.6.13
Description of items
12/26/2016 10:20:55
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
0.00
0.00
6753.65
9905.58
8613.55
7393.00
10843.31
9428.97
994
0.00
0.00
a)
0.00
0.00
8738.55
12816.83
11145.07
9025.15
13237.19
11510.60
0.00
0.00
4842.40
7102.35
6175.95
5291.55
7761.12
6748.80
0.00
0.00
(i)
(ii)
(i)
(ii)
995
a)
b)
996
Size 120x90 cm
With common burnt clay F.P.S. (non modular) bricks 1 m
19.8.2.1
of class designation 7.5
1m
19.8.2.2 With Sewer bricks conforming to IS : 4885
Basic Rate
12/26/2016 10:20:55
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
Basic Rate
a)
0.00
0.00
16467.90
24153.47
21003.02
17166.25
25177.74
21893.69
0.00
0.00
6270.70
9197.24
7997.60
6856.95
10057.09
8745.29
998
0.00
0.00
a)
0.00
0.00
34976.25
51299.67
44608.41
36969.05
54222.51
47150.00
0.00
0.00
14842.95
21770.15
18930.57
16358.95
23993.67
20864.06
(i)
19.11.1.1
(ii)
997
a)
b)
(i)
19.13.1.1
(ii)
b)
Each
999
a)
Each
12/26/2016 10:20:55
DSR 2014
visit www.sahaayidotcom.blogspot.in
1001
1003
Each
Each
19.16
Basic Rate
Each
19.17.1 With 20x20 mm square bar
Each
19.17.2 With 20 mm diameter round bar
Supplying and fixing C.I. cover without frame for
manholes :
0.00
0.00
275.50
242.05
404.08
355.01
351.37
308.71
311.60
457.02
397.41
0.00
0.00
474.77
425.71
412.84
370.18
0.00
0.00
1002
a)
b)
Unit
1000
a)
b)
Description of items
323.70
290.25
a)
19.18.1
1222.15
1792.53
1558.72
b)
19.18.2
2745.15
4026.31
3501.14
c)
19.18.3
5886.70
8634.02
7507.85
0.00
0.00
0.00
0.00
1131.70
1659.86
1443.36
960.90
1409.35
1225.52
902.80
1324.14
1151.42
0.00
0.00
1584.18
1377.55
1004
a)
(i)
(ii)
(iii)
b)
(i)
Each
Each
Each
M D - 10
19.19.2.1 Square shape 450mm internal dimension
Each
1080.10
12/26/2016 10:20:55
DSR 2014
visit www.sahaayidotcom.blogspot.in
1005
1006
a)
b)
1008
Each
Each
Each
Each
Each
1159.65
0.00
0.00
2216.99
1927.82
0.00
0.00
1656.70
2429.88
2112.94
278.40
408.33
355.07
0.00
0.00
534.76
639.77
933.41
465.01
556.33
811.66
0.00
0.00
9098.01
12531.92
7911.32
10897.33
0.00
0.00
1903.05
2791.20
2427.13
2508.70
3679.51
3199.57
0.00
0.00
1511.55
364.60
436.20
636.40
Each
19.22.1 100 mm dia. sand cast iron drop connection
Each
19.22.2 150 mm dia. sand cast iron drop connection
Extra for depths beyond 60 cm of sand cast iron
drop connection complete :
19.23.1 For 100 mm dia. sand cast iron drop connection
b)
1m
1m
1333.60
a)
1009
909.25
EHD - 35
a)
19.21.1 For pipes 100 to 250 mm diameter
b)
19.21.2 For pipes 250 to 300 mm diameter
c)
19.21.3 For pipes 350 to 450 mm diameter
DSR Analyser Ver.12 Powered By Pradeepen Thulika
1007
Each
Basic Rate
H D - 20
d)
(i)
Unit
c)
(i)
Description of items
6203.05
8544.30
12/26/2016 10:20:56
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
a)
b)
c)
19.24.3
d)
1010
a)
Each
Each
Basic Rate
937.25
1374.66
1195.36
1645.75
2413.82
2098.98
3113.50
4566.57
3970.93
2385.15
3498.30
3042.00
0.00
0.00
750.30
1100.47
956.93
b)
19.25.2
893.60
1310.64
1139.69
c)
19.25.3
723.40
1061.01
922.62
d)
19.25.4
816.00
1196.83
1040.72
0.00
0.00
1011
a)
19.26.1
1597.15
2342.54
2036.99
b)
19.26.2
2503.55
3671.96
3193.01
c)
19.26.3
2329.40
3416.53
2970.90
d)
19.26.4
213.65
313.36
272.49
0.00
0.00
5804.47
5047.36
0.00
0.00
6466.61
5623.14
0.00
0.00
11002.38
9567.28
1012
a)
19.27.1
19.28.1
4408.95
1014
a)
3957.50
1013
a)
19.29.1
7501.45
12/26/2016 10:20:56
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
Basic Rate
1015
Constructing
brick
masonry
chamber
for
underground C.I. inspection chamber and bends with
bricks in cement mortar 1:4 (1 cement : 4coarse
sand) C.I. cover with frame (light duty) 455x610 mm
internal dimensions, total weight of cover with frame
to be not less than 38 kg(weight of cover 23 kg and
weight of frame 15 kg), R.C.C. top slab with1:2:4 mix
(1 cement :2 coarse sand : 4 graded stone
aggregate 20 mm nominal size) foundation concrete
1:5:10 (1 cement : 5 fine sand : 10graded stone
aggregate 40 mm nominal size), inside plastering 12
mm thick with cement mortar 1:3 (1 cement : 3
coarse sand) finished smooth with a floating coat of
neat cement on walls and bed concrete etc.
complete as per standard design :
0.00
0.00
a)
0.00
0.00
6881.83
5984.20
0.00
0.00
7883.81
6855.48
0.00
0.00
9149.57
7956.15
0.00
0.00
0.00
0.00
5756.28
5005.46
0.00
0.00
6278.65
5459.70
0.00
0.00
7310.18
6356.68
0.00
0.00
(i)
19.30.1.1
19.30.2.1
1016
a)
(i)
b)
(i)
c)
(i)
5375.20
c)
(i)
4692.05
b)
(i)
19.30.3.1
6238.20
3924.65
4280.80
4984.10
1017
a)
19.32.1
18309.50
26854.54
23351.78
1018
19.33
2082.45
3054.33
2655.94
0.00
0.00
424.46
576.19
369.10
501.04
1019
a)
b)
Each
Each
289.40
392.85
12/26/2016 10:20:56
DSR 2014
visit www.sahaayidotcom.blogspot.in
d)
Unit
1m
19.35.1 450 mm dia RCC pipes.
1m
19.35.2 600 mm dia RCC pipes.
1m
19.35.3 900 mm dia RCC pipes.
1000 mm dia RCC pipes. (Laying by manual/ 1 m
19.35.4
mechanical means)
e)
19.35.5
f)
19.35.6
1800
mm
dia
RCC
manual/mechanical means)
d)
pipes.
(Laying
by 1 m
1m
1m
1m
pipes.
(Laying
by 1 m
e)
19.36.5
1200
mm
dia
RCC
manual/mechanical means)
pipes.
(Laying
by 1 m
f)
19.36.6
1800
mm
dia
RCC
manual/mechanical means)
pipes.
(Laying
by 1 m
0.00
1920.50
2504.60
3944.25
2816.80
3673.50
5785.03
2449.39
3194.35
5030.46
4879.20
7156.32
6222.89
6410.20
9401.84
8175.51
11758.15
17245.68
14996.24
0.00
0.00
2195.75
2870.45
5622.60
3220.51
4210.09
8246.67
2800.44
3660.95
7171.02
6830.55
10018.37
8711.62
8117.60
11906.08
10353.12
16583.20
24322.58
21150.07
0.00
0.00
0.00
0.00
2825.67
3463.10
4175.40
4532.40
7680.30
12668.33
16369.40
23069.80
2457.11
3011.39
3630.78
3941.21
6678.52
11015.94
14234.26
20060.69
1022
a)
b)
c)
d)
e)
f)
g)
h)
20.1.1
20.1.2
20.1.3
20.1.4
20.1.5
20.1.6
20.1.7
20.1.8
1m
1m
1m
1m
1m
1m
1m
1m
0.00
1021
a)
b)
c)
Basic Rate
1020
a)
b)
c)
Description of items
1926.55
2361.15
2846.80
3090.20
5236.45
8637.30
11160.70
15729.05
12/26/2016 10:20:56
DSR 2014
visit www.sahaayidotcom.blogspot.in
b)
c)
d)
1024
a)
b)
c)
d)
e)
1025
Unit
Basic Rate
1023
a)
Description of items
20.2.3
20.2.4
CS2
20.2.5
20.2.6
0.00
0.00
0.00
0.00
1665.35
2442.57
2123.97
1953.85
2865.71
2491.92
2671.00
4022.95
3917.56
5900.46
3406.57
5130.84
0.00
0.00
0.00
0.00
3629.25
5215.40
8683.15
5323.02
7649.43
12735.58
4628.71
6651.68
11074.41
11332.45
16621.30
14453.31
16241.80
23821.85
20714.65
0.00
0.00
12/26/2016 10:20:56
DSR 2014
visit www.sahaayidotcom.blogspot.in
20.3.1
20.3.2
20.3.3
20.3.4
20.4.1
20.4.2
20.4.3
20.4.4
d)
e)
f)
1028
a)
1m
1m
1m
1m
2707.85
3276.54
3616.95
4021.76
0.00
0.00
2163.31
2456.21
2633.02
2909.05
1881.14
2135.83
2289.58
2529.61
0.00
0.00
2438.50
2930.45
3112.30
3576.55
4298.09
4564.81
3110.04
3737.47
3969.40
3505.15
5141.00
4470.44
6424.25
8719.50
9422.45
12788.89
8193.43
11120.77
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
38561.80
56558.59
49181.38
17422.50
25553.58
22220.51
0.00
0.00
68653.95
59699.09
Each
Each
Each
Each
20.5.1
20.5.2
20.5.3
20.5.4
CS2
20.5.5
20.5.6
1m
1m
1m
1m
1m
1m
1474.95
1674.65
1795.20
1983.40
(ii)
20.6.1.2 Routine test ( Test load 1.5 times the safe capacity)
(i)
2123.15
2569.05
2835.95
3153.35
3114.02
3768.03
4159.49
4625.02
(i)
b)
Basic Rate
1027
a)
b)
c)
Unit
1026
a)
b)
c)
d)
Description of items
Per Test
Per Test
Per Test
46808.45
12/26/2016 10:20:56
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
20.6.2.2 Routine test. ( Test load 1.5 times the safe capacity)
(i)
20.6.3.1 Initial test ( Test load 2.5 times the safe capacity)
(ii)
20.6.3.2 Routine test ( Test load 1.5 times the safe capacity)
b)
(i)
b)
Per Test
Single pile.
Per Test
20.7.1.1 Up to 50 tonne safe capacity pile.
Above 50 tonne and up to 100 tonne safe capacity Per Test
20.7.1.2
pile.
Group of two or more piles.
Per Test
20.7.2.1 Up to 400 tonne safe capacity of group
34071.44
0.00
0.00
56332.80
82623.32
71846.36
34264.20
50255.30
43700.26
0.00
0.00
17422.50
0.00
25553.58
0.00
22220.51
26714.50
39182.16
34071.44
34264.20
0.00
50255.30
0.00
43700.26
0.00
0.00
17422.50
25553.58
22220.51
27411.40
40204.30
34960.26
0.00
0.00
1093.42
950.80
0.00
0.00
1030
a)
Per Test
20.8.1
20.8.2
Per Test
Per Test
1031
20.9
39182.16
1029
(ii)
26714.50
c)
a)
(i)
Per Test
Basic Rate
745.50
12/26/2016 10:20:56
DSR 2014
visit www.sahaayidotcom.blogspot.in
1032
a)
Description of items
Unit
Basic Rate
0.00
0.00
0.00
0.00
(i)
348.50
511.14
444.47
(ii)
21.1.1.2
377.75
554.05
481.78
(iii)
21.1.1.3
385.10
564.83
491.15
0.00
0.00
b)
(i)
405.90
595.33
517.68
(ii)
21.1.2.2
435.75
639.11
555.75
(iii)
21.1.2.3
443.20
650.04
565.25
0.00
0.00
1033
a)
21.2.1
1040.95
1526.76
1327.62
b)
21.2.2
1089.75
1598.34
1389.86
with
decorative 1 m2
12/26/2016 10:20:56
DSR 2014
visit www.sahaayidotcom.blogspot.in
Unit
0.00
1215.53
1546.20
1963.03
1056.98
1344.52
1706.98
0.00
0.00
2039.00
2990.60
2600.52
2213.20
3246.10
2822.70
21.5
468.40
687.00
597.39
21.6
107.00
156.94
136.47
21.3.1
21.3.2
21.3.3
1 m2
1 m2
1 m2
828.75
1054.20
1338.40
a)
21.4.1
b)
21.4.2
1037
0.00
1035
1036
Basic Rate
1034
a)
b)
c)
Description of items
Each
12/26/2016 10:20:56
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
Basic Rate
1038
0.00
0.00
a)
21.7.1
480.25
704.38
612.51
b)
21.7.2
509.50
747.28
649.81
0.00
0.00
130.17
113.19
0.00
0.00
11.60
11.60
17.01
17.01
14.79
14.79
3487.10
5114.53
4447.42
0.00
0.00
335.51
403.71
514.37
897.69
1596.21
291.75
351.05
447.28
780.60
1388.01
0.00
0.00
1039
a)
21.8.1
1041
1043
1 Kg
1 Kg
21.9.1
21.9.2
21.10
1042
a)
b)
c)
d)
e)
88.75
1040
a)
b)
1m
21.11.1
21.11.2
21.11.3
21.11.4
21.11.5
Each
Each
Each
Each
Each
205 x 19 mm
255 x 19 mm
355 x 19 mm
510 x 19 mm
710 x 19 mm
Providing and fixing aluminium tubular handle bar 32
mm outer dia, 3.0 mm thick & 2100 mm long with SS
screws etc .complete as per direction of Engineer-inCharge.
228.75
275.25
350.70
612.05
1088.30
12/26/2016 10:20:56
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
a)
b)
21.12.2
c)
1044
1045
b)
c)
679.08
590.51
508.55
745.89
648.60
21.12.3
519.95
762.61
663.14
21.13
418.65
614.03
533.94
21.14
312.20
457.90
398.18
0.00
0.00
54.00
79.20
68.87
55.15
80.89
70.34
54.00
79.20
68.87
0.00
0.00
65.60
96.22
83.67
72.60
106.48
92.59
b)
c)
1048
1047
a)
463.00
1046
a)
Each
Basic Rate
Each
21.16.1 Anodized (AC 15 ) aluminium
Powder coated minimum thickness 50 micron Each
21.16.2
aluminium
21.16.3
77.25
113.30
98.52
21.17
403.35
591.59
514.43
12/26/2016 10:20:56
DSR 2014
visit www.sahaayidotcom.blogspot.in
1049
21.18
Description of items
Unit
Basic Rate
4746.25
1050
a)
22.1.1
1022.45
1051
a)
1 m2
22.2.1
1 m2
1243.25
6961.32
6053.33
0.00
0.00
0.00
0.00
1499.63
1304.02
0.00
0.00
1823.47
1585.63
12/26/2016 10:20:56
DSR 2014
visit www.sahaayidotcom.blogspot.in
1052
22.3
Unit
Basic Rate
522.90
a)
22.4.1
b)
22.4.2
c)
22.4.3
22.5
766.94
666.90
0.00
0.00
490.20
718.98
625.20
461.15
676.37
588.15
443.75
650.85
565.95
283.10
415.22
361.06
1053
1054
Description of items
12/26/2016 10:20:56
DSR 2014
visit www.sahaayidotcom.blogspot.in
1055
1056
22.6
Description of items
Unit
Basic Rate
572.53
497.85
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
390.35
12/26/2016 10:20:56
DSR 2014
visit www.sahaayidotcom.blogspot.in
a)
22.7.1
1058
1059
Unit
Basic Rate
0.00
0.00
0.00
0.00
1494.64
1299.69
0.00
0.00
1019.05
1057
a)
Description of items
22.8.1
356.05
522.22
454.10
22.9
553.90
812.41
706.44
22.10
608.55
892.56
776.14
12/26/2016 10:20:56
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
1060
22.11
1061
22.12
1062
a)
b)
1063
a)
22.14.1
b)
c)
1064
22.15
1 m2
1 m2
1 m3
1 m3
Basic Rate
608.80
892.93
776.46
31.40
46.05
40.05
0.00
0.00
-14.55
-18.55
21.34
27.21
0.00
18.56
23.66
0.00
5570.55
8170.33
7104.63
9205.70
8238.25
13502.00
12083.04
11740.87
10506.99
526.25
771.85
671.17
12/26/2016 10:20:56
DSR 2014
visit www.sahaayidotcom.blogspot.in
1065
1066
Description of items
Unit
Basic Rate
22.16
356.90
523.47
455.19
22.17
572.25
839.32
729.84
12/26/2016 10:20:56
DSR 2014
visit www.sahaayidotcom.blogspot.in
1067
a)
1068
a)
Description of items
Unit
Basic Rate
1 m2
279.70
22.19.1 3 mm thick
1 m2
407.50
0.00
0.00
410.24
356.73
0.00
0.00
597.68
519.72
12/26/2016 10:20:56
DSR 2014
visit www.sahaayidotcom.blogspot.in
1070
Unit
Basic Rate
1069
a)
Description of items
1 m2
22.20.1 3 mm thick
22.21
0.00
0.00
425.35
623.86
542.49
74.85
109.78
95.46
0.00
0.00
0.00
0.00
0.00
597.09
653.05
835.87
0.00
1349.51
1405.10
1599.51
0.00
519.21
567.87
726.85
0.00
1173.49
1221.82
1390.88
1071
a)
(i)
(ii)
(iii)
b)
(i)
(ii)
(iii)
1m
1m
1m
1m
1m
1m
407.10
445.25
569.90
920.10
958.00
1090.55
12/26/2016 10:20:56
DSR 2014
visit www.sahaayidotcom.blogspot.in
1075
1076
1077
0.00
0.00
696.54
773.98
1044.88
0.00
1449.83
1498.82
1888.82
0.00
605.68
673.02
908.59
0.00
1260.72
1303.32
1642.45
0.00
0.00
622.17
861.03
1288.64
541.02
748.72
1120.56
0.00
0.00
447.65
528.95
820.80
656.57
775.81
1203.87
570.93
674.62
1046.84
24.5
504.15
739.44
642.99
24.6
910.65
1335.65
1161.44
24.7
852.60
1250.51
1087.40
1m
1m
1m
1m
1m
1m
474.90
527.70
712.40
988.50
1021.90
1287.80
1m
1m
1m
424.20
587.05
878.60
1074
a)
b)
c)
Basic Rate
0.00
1073
a)
b)
c)
Unit
1072
a)
(i)
(ii)
(iii)
b)
(i)
(ii)
(iii)
Description of items
24.4.1
24.4.2
24.4.3
1m
1m
1m
12/26/2016 10:20:56
DSR 2014
visit www.sahaayidotcom.blogspot.in
1078
1079
Description of items
Unit
Basic Rate
24.8
987.85
1448.88
1259.90
24.9
960.20
1408.33
1224.63
0.00
0.00
1080
a)
24.10.1
978.70
1435.46
1248.23
b)
24.10.2
1335.40
1958.63
1703.16
c)
24.10.3
1638.55
2403.26
2089.79
0.00
0.00
1527.05
2080.73
2526.32
1327.87
1809.33
2196.80
1081
a)
b)
c)
1m
1m
1m
1041.15
1418.65
1722.45
12/26/2016 10:20:56
DSR 2014
visit www.sahaayidotcom.blogspot.in
1082
24.12
Each
Each
Each
1085
a)
b)
c)
1084
a)
b)
c)
Unit
Basic Rate
677.10
Each
Each
Each
Each
Each
Each
863.57
0.00
0.00
232.55
286.23
357.73
202.21
248.89
311.07
0.00
0.00
1624.81
1717.43
1949.76
1412.88
1493.42
1695.44
0.00
0.00
196.20
242.65
265.85
287.77
355.89
389.92
0.00
250.23
309.47
339.06
0.00
26.55
38.94
33.86
158.55
195.15
243.90
1107.80
1170.95
1329.35
1086
25.1
993.10
1083
a)
b)
c)
Description of items
12/26/2016 10:20:56
DSR 2014
visit www.sahaayidotcom.blogspot.in
1087
1088
1089
Description of items
Unit
Basic Rate
0.00
0.00
0.00
0.00
25.2
159.90
234.53
203.94
25.3
81.75
119.90
104.26
25.4
33.75
49.50
43.04
12/26/2016 10:20:56
DSR 2014
visit www.sahaayidotcom.blogspot.in
1090
1091
1092
1093
Description of items
Unit
Basic Rate
25.5
143.55
210.54
183.08
25.6
143.55
210.54
183.08
25.7
264.80
388.38
337.72
25.8
81.10
118.95
103.43
0.00
0.00
496.11
431.40
1094
26.1
338.25
12/26/2016 10:20:56
DSR 2014
visit www.sahaayidotcom.blogspot.in
1095
Description of items
Unit
Basic Rate
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12/26/2016 10:20:56
DSR 2014
visit www.sahaayidotcom.blogspot.in
1096
Description of items
Unit
Basic Rate
26.2
2556.15
3749.11
3260.09
26.3
4090.95
6000.20
5217.56
12/26/2016 10:20:56
DSR 2014
visit www.sahaayidotcom.blogspot.in
1097
1098
1099
1100
Description of items
Unit
Basic Rate
26.4
3062.25
4491.40
3905.57
26.5
1634.50
2397.32
2084.63
26.6
2997.25
4396.07
3822.67
0.00
0.00
12/26/2016 10:20:56
DSR 2014
visit www.sahaayidotcom.blogspot.in
26.7
Description of items
Unit
Basic Rate
0.00
0.00
0.00
0.00
0.00
0.00
5537.23
4814.98
3775.30
12/26/2016 10:20:56
DSR 2014
visit www.sahaayidotcom.blogspot.in
1101
26.8
Description of items
Unit
Basic Rate
0.00
0.00
0.00
0.00
5030.63
4374.46
0.00
0.00
3429.90
/Each
198.84
172.90
/Each
359.03
312.20
12/26/2016 10:20:56
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
/Each
493.87
429.45
/Each
662.01
575.66
/m3
442.72
384.97
/m3
295.85
257.26
/day
190.14
165.34
/m3
7975.67
6935.37
/m3
10678.41
9285.57
10
/m3
10069.28
8755.90
10
Basic Rate
12/26/2016 10:20:56
DSR 2014
visit www.sahaayidotcom.blogspot.in
11
12
13
14
15
Description of items
Unit
11
/m3
11075.86
9631.18
12
/m3
10521.59
9149.21
13
/m3
8801.92
7653.84
14
/m3
9234.55
8030.04
/m3
10288.23
8946.29
15
Basic Rate
12/26/2016 10:20:56
DSR 2014
visit www.sahaayidotcom.blogspot.in
16
17
18
19
20
21
22
23
Description of items
Unit
16
/m3
5715.05
4969.61
17
/m3
6813.46
5924.75
18
/m3
5769.23
5016.72
19
/m3
6867.66
5971.88
20
/m3
5987.36
5206.40
21
/m3
7119.81
6191.14
22
/m3
6013.68
5229.29
23
/m3
7146.13
6214.03
Basic Rate
12/26/2016 10:20:56
DSR 2014
visit www.sahaayidotcom.blogspot.in
24
25
26
27
28
29
30
31
Description of items
Unit
24
/m3
6285.73
5465.85
25
/m3
6818.86
5929.44
26
/m3
7541.86
6558.14
27
/m3
4259.00
3703.48
28
/m3
5307.00
4614.78
29
/m3
4455.51
3874.36
30
/m3
5537.51
4815.23
31
/m3
4880.16
4243.62
Basic Rate
12/26/2016 10:20:56
DSR 2014
visit www.sahaayidotcom.blogspot.in
32
33
34
35
36
37
38
39
40
Description of items
Unit
32
/m3
6085.87
5292.06
33
/m3
6195.17
5387.10
34
/m3
7327.62
6371.84
35
/m3
3716.41
3231.66
36
/m3
4792.37
4167.28
37
/m3
94989.44
82599.52
38
/m3
103571.67
90062.32
39
/m3
70468.89
61277.29
40
/m2
2704.99
2352.16
Basic Rate
12/26/2016 10:20:56
DSR 2014
visit www.sahaayidotcom.blogspot.in
41
42
43
44
45
46
47
Description of items
Unit
41
/m2
2896.96
2519.09
42
/m2
2156.50
1875.22
43
/m2
2460.32
2139.41
44
/m2
2625.94
2283.43
45
/m2
1987.12
1727.93
46
/m2
2140.00
1860.87
47
/m2
2298.91
1999.05
Basic Rate
12/26/2016 10:20:56
DSR 2014
visit www.sahaayidotcom.blogspot.in
48
49
50
51
52
53
54
55
56
Description of items
Unit
48
/m2
1685.95
1466.05
49
/m2
3382.34
2941.16
50
/m2
3600.66
3131.01
51
/m2
2758.57
2398.76
52
/m2
3101.76
2697.19
53
/m2
3289.97
2860.84
54
/m2
2564.03
2229.59
55
/m2
3076.64
2675.34
56
/m2
3227.21
2806.27
Basic Rate
12/26/2016 10:20:56
DSR 2014
visit www.sahaayidotcom.blogspot.in
57
58
59
60
61
62
63
64
65
66
67
Description of items
Unit
57
/m2
2646.46
2301.27
58
/m2
3134.38
2725.55
59
/m2
3284.94
2856.47
60
/m2
2704.19
2351.47
61
/m2
2639.21
2294.97
62
/m2
2801.07
2435.71
63
/m2
2176.76
1892.84
64
/m2
2945.99
2561.73
65
/m2
3107.85
2702.48
66
/m2
2483.54
2159.60
67
/m2
1862.13
1619.25
Basic Rate
12/26/2016 10:20:56
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
68
/m2
2356.06
2048.75
69
69
/m2
2473.42
2150.80
70
70
/m3
80873.33
70324.64
71
71
/m3
89003.81
77394.62
72
72
/m3
57643.81
50125.05
73
73
/m3
5375.24
4674.12
74
74
/m3
89321.00
77670.43
75
75
/m3
97451.00
84740.00
76
76
/m3
66091.00
57470.43
77
77
/m3
13269.00
11538.26
78
78
179.58
156.16
79
79
188.87
164.24
80
80
120.87
105.11
81
81
97.64
84.91
82
82
74.41
64.71
83
83
/m3
1899.19
1651.47
84
84
/m3
1240.58
1078.77
68
Basic Rate
12/26/2016 10:20:56
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
Basic Rate
85
85
/m3
1343.03
1167.85
86
86
/m3
947.89
824.25
87
/m3
190525.12
165674.02
88
/m3
187080.32
162678.54
89
/m3
159884.48
139029.98
90
/m3
126768.00
110233.04
91
/Kg
161.26
140.23
92
/Kg
131.20
114.09
93
/m2
554.18
481.89
94
/m2
497.58
432.68
87
88
89
90
91
92
93
94
12/26/2016 10:20:56
DSR 2014
visit www.sahaayidotcom.blogspot.in
95
96
97
98
99
Description of items
Unit
95
/m2
719.22
625.41
96
/m2
662.72
576.28
97
/m2
723.70
629.30
98
/m2
784.68
682.33
99
/m2
845.66
735.36
Basic Rate
12/26/2016 10:20:56
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
100
/m2
352.49
306.52
101
/m2
629.93
547.77
102
/m2
764.08
664.42
103
103
/m2
651.32
566.37
104
104
/m2
224.98
195.63
105
105
292.17
254.06
106
206.12
179.23
107
96.73
84.11
108
125.31
108.97
109
184.94
160.82
110
1110.36
965.53
111
1876.96
1632.14
100
101
102
106
107
108
109
110
111
Basic Rate
12/26/2016 10:20:56
DSR 2014
visit www.sahaayidotcom.blogspot.in
112
113
114
115
116
117
118
119
Description of items
Unit
112
/m
168.77
146.76
113
/m
154.08
133.98
114
/m
182.99
159.12
115
/m
168.96
146.92
116
/m
210.37
182.93
117
/m
193.00
167.83
118
/m
234.08
203.55
119
/m
211.37
183.80
Basic Rate
12/26/2016 10:20:56
DSR 2014
visit www.sahaayidotcom.blogspot.in
120
121
122
123
124
125
126
Description of items
Unit
120
/m
300.74
261.51
121
/m
259.33
225.51
122
/m
308.75
268.48
123
/m
268.68
233.64
124
/m
349.89
304.25
125
/m
333.28
289.81
126
/m
353.66
307.53
Basic Rate
12/26/2016 10:20:56
DSR 2014
visit www.sahaayidotcom.blogspot.in
127
128
129
130
131
132
133
Description of items
Unit
127
/m
337.81
293.75
128
/m
384.62
334.45
129
/m
364.99
317.38
130
/m
390.66
339.70
131
/m
364.99
317.38
132
/m
419.34
364.65
133
/m
372.54
323.94
Basic Rate
12/26/2016 10:20:56
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
134
/m
428.40
372.53
135
135
/m
383.11
333.13
136
136
/m
183.59
159.64
137
/m
562.98
489.54
138
/m
520.29
452.43
139
/m
576.39
501.21
140
/m
534.93
465.15
134
137
138
139
140
Basic Rate
12/26/2016 10:20:57
DSR 2014
visit www.sahaayidotcom.blogspot.in
141
142
143
144
145
146
147
148
149
150
Description of items
Unit
141
/m
676.40
588.17
142
/m
626.39
544.69
143
/m
139.64
121.42
144
/m
124.94
108.65
145
/m
142.98
124.33
146
/m
128.95
112.13
147
/m
178.37
155.10
148
/m
161.00
140.00
149
/m
183.71
159.75
150
/m
161.00
140.00
Basic Rate
12/26/2016 10:20:57
DSR 2014
visit www.sahaayidotcom.blogspot.in
151
152
153
154
155
156
157
158
159
160
161
Description of items
Unit
151
/m
216.54
188.29
152
/m
175.13
152.29
153
/m
224.55
195.26
154
/m
184.48
160.42
155
/m
287.12
249.67
156
/m
240.37
209.01
157
/m
301.81
262.44
158
/m
256.40
222.95
159
/m
453.30
394.17
160
/m
398.53
346.55
161
/m
866.04
753.08
Basic Rate
12/26/2016 10:20:57
DSR 2014
visit www.sahaayidotcom.blogspot.in
162
163
164
165
166
167
168
169
Description of items
Unit
162
/m
178.16
154.92
163
/m
180.87
157.27
164
/m
192.38
167.29
165
/m
178.35
155.09
166
/m
219.76
191.10
167
/m
201.57
175.28
168
/m
243.47
211.71
169
/m
220.76
191.97
Basic Rate
12/26/2016 10:20:57
DSR 2014
visit www.sahaayidotcom.blogspot.in
170
171
172
173
174
175
176
177
Description of items
Unit
170
/m
310.13
269.68
171
/m
268.73
233.67
172
/m
318.15
276.65
173
/m
278.08
241.80
174
/m
229.75
199.78
175
/m
85.84
74.65
176
/m
243.17
211.45
177
/m
201.70
175.39
Basic Rate
12/26/2016 10:20:57
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
178
/m
343.17
298.41
179
179
/m
293.17
254.93
180
180
71.52
62.19
181
181
62.69
54.51
182
182
78.95
68.65
183
183
77.91
67.75
184
184
84.73
73.68
185
185
92.75
80.65
186
186
75.00
65.22
187
187
58.63
50.98
188
188
64.66
56.23
189
189
62.23
54.11
178
Basic Rate
12/26/2016 10:20:57
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
Basic Rate
190
190
93.30
81.13
191
191
68.97
59.97
192
192
93.30
81.13
193
193
87.20
75.83
194
194
93.55
81.35
195
195
105.58
91.81
196
196
85.46
74.31
197
197
63.10
54.87
198
198
71.29
61.99
199
199
68.62
59.67
200
200
203.62
177.06
201
201
226.85
197.26
202
202
244.27
212.41
203
203
190.84
165.95
12/26/2016 10:20:57
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
Basic Rate
204
240.51
209.14
205
277.68
241.46
206
206
178.95
155.61
207
207
122.31
106.36
208
208
238.46
207.36
209
209
110.70
96.26
210
210
114.18
99.29
211
211
106.05
92.22
212
212
679.83
591.16
213
/m3
6356.57
5527.45
214
214
/m3
7717.37
6710.76
215
215
/10m2
2117.87
1841.63
216
216
/1000 Nos
25610.95
22270.39
217
217
/10m2
475.80
413.74
218
218
/10m2
1735.91
1509.49
219
219
/10m
1775.21
1543.66
204
205
213
12/26/2016 10:20:57
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
220
/m2
585.20
508.87
221
221
/m2
#REF!
#REF!
222
226
Conveying handling and lowering CC rings 1.2m1.8m dia 30-40 cm height including joining cc rings
with cement mortar etc. complete
/Each
740.64
644.03
223
227
/Each
560.47
487.37
224
224
/Each
741.05
644.39
225
225
/m2
875.85
761.61
226
226
/m3
1780.60
1548.35
227
/m3
2856.57
2483.97
228
/m2
857.54
745.69
/m2
354.03
307.85
220
227
228
Basic Rate
229
12/26/2016 10:20:57
DSR 2014
visit www.sahaayidotcom.blogspot.in
230
231
232
233
234
235
Description of items
Unit
/m2
277.32
241.15
/m3
788.10
685.30
/m3
584.41
508.18
/m3
1209.27
1051.54
/m2
79.50
69.13
/m3
6948.08
6041.81
Basic Rate
12/26/2016 10:20:57
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
/m3
8390.87
7296.41
237
/m2
291.15
253.17
238
10
/m3
2183.11
1898.36
239
11
/m2
2123.49
1846.51
240
12
/m3
1970.16
1713.19
13
/m3
3303.74
2872.82
14
/m3
7728.82
6720.71
236
241
242
Basic Rate
12/26/2016 10:20:57
DSR 2014
visit www.sahaayidotcom.blogspot.in
243
244
245
246
247
Description of items
Unit
15
/m2
2731.32
2375.06
16
/m3
4419.28
3842.85
17
/m3
9830.94
8548.64
18
/m3
6308.47
5485.63
19
/m3
8275.80
7196.35
Basic Rate
12/26/2016 10:20:57
DSR 2014
visit www.sahaayidotcom.blogspot.in
Description of items
Unit
Basic Rate
12/26/2016 10:20:57
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Unit
Rate
Amount
Each
Each
LS
329.00
329.00
1.78
65.80
46.06
4.86
116.72
1.17
117.89
17.68
135.57
63.27
198.84
0.2000 Nos
0.1400 Nos
2.7300
114
115
9999
Beldar
Cooli
sundries for hire charges
Total
Add water charges 1%
Total
Add CPOH 15%
Total
Add Cost Index (46.67 % )
Total
Say
Rs 198.84 /Each
0.3500 Nos
0.2500 Nos
7.5000
114
115
9999
Beldar
Cooli
sundries for hire charges
Total
Add water charges 1%
Total
Add CPOH 15%
Total
Add Cost Index (46.67 % )
Total
Say
Each
Each
LS
329.00
329.00
1.78
115.15
82.25
13.35
210.75
2.11
212.86
31.93
244.79
114.24
359.03
Rs 359.03 /Each
0.4500 Nos
0.3500 Nos
15.0000
114
115
9999
Beldar
Cooli
sundries for hire charges
Total
Add water charges 1%
Total
Add CPOH 15%
Total
Add Cost Index (46.67 % )
Total
Say
Each
Each
LS
329.00
329.00
1.78
148.05
115.15
26.70
289.90
2.90
292.80
43.92
336.72
157.15
493.87
Rs 493.87 /Each
12/26/2016 10:20:57
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Unit
Rate
Amount
Each
Each
LS
329.00
329.00
1.78
203.98
157.92
26.70
388.60
3.89
392.49
58.87
451.36
210.65
662.01
0.6200 Nos
0.4800 Nos
15.0000
114
115
9999
Beldar
Cooli
sundries for hire charges
Total
Add water charges 1%
Total
Add CPOH 15%
Total
Add Cost Index (46.67 % )
Total
Say
Rs 662.01 /Each
1.0000 m3
1.0000 m3
0.0200 Nos.
0.2500 Nos.
0.0200 Nos.
979
2241
128
115
101
cum
cum
Each
Each
Each
30.00
133.11
363.00
329.00
363.00
30.00
133.11
7.26
82.25
7.26
259.88
2.60
262.48
39.37
301.85
140.87
442.72
30.00
133.11
363.00
329.00
363.00
30.00
133.11
3.63
3.29
3.63
173.66
1.74
175.40
26.31
201.71
94.14
295.85
Rs 442.72 /m3
1.0000 m3
1.0000 m3
0.0100 Nos.
0.0100 Nos.
0.0100 Nos.
979
2241
128
115
101
cum
cum
Each
Each
Each
Rs 295.85 /m3
12/26/2016 10:20:57
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Unit
Rate
Amount
day
600.00
16.20
day
329.00
95.41
111.61
1.12
112.73
16.91
129.64
60.50
190.14
cum
cum
cum
cum
cum
tonne
tonne
1175.00
1175.00
106.49
1200.00
106.49
6300.00
94.65
787.25
258.50
94.78
534.00
47.39
2016.00
30.29
Day
Day
Day
Day
L.S.
417.00
329.00
363.00
800.00
1.78
41.70
536.27
254.10
56.00
25.45
4681.73
46.82
4728.55
709.28
5437.83
2537.84
7975.67
1175.00
1175.00
106.49
1200.00
106.49
669.75
329.00
90.52
510.00
45.26
0.0270 day
11
0.2900 Nos
114
Rs 190.14 /Hr.
0.6700 m3
0.2200 m3
0.8900 m3
0.4450 m3
0.4450 m3
0.3200 tonne
0.3200 tonne
0.1000 Nos
1.6300 Nos
0.7000 Nos
0.0700 day
14.3000
296
297
2202
982
2203
367
2209
155
114
101
2
9999
Stone aggregate12.5mm
Stone aggregate 10 mm
Carriage of Stone aggregate
Coarse sand
Carriage of coarse sand
Portland Cement
Carriage of cement
LABOUR:
Mason
Beldar
Bhishti
Mixer
Sundries
Total
Add water charges 1%
Total
Add CPOH 15%
Total
Add Cost Index (46.67 % )
Total
Say
Rs 7975.67 /m3
0.5700
0.2800
0.8500
0.4250
0.4250
m3
m3
m3
m3
m3
295
297
2202
982
2203
MATERIALS:
Stone aggregate 20mm
Stone aggregate 10mm
Carriage of Stone aggregate
Coarse sand
Carriage of Coarse sand
cum
cum
cum
cum
cum
12/26/2016 10:20:57
visit www.sahaayidotcom.blogspot.in
Quantity
0.4000 tonne
0.4000 tonne
Code
367
2209
0.2400 Nos
2.7500 Nos
0.9000 Nos
0.0800 day
0.0800 day
14.3000
155
114
101
2
12
9999
1.8750 Nos
115
Description of items
Portland Cement
Carriage of Cement
LABOUR:
Mason
Beldar
Bhishti
Mixer
Vibrator
Sundries
Extra labour for lifting material up to floor V
level:
Coolie (2.5x0.75)
Total
Add water charges 1%
Total
Add CPOH 15%
Total
Add Cost Index (46.67 % )
Total
Say
Unit
tonne
tonne
Rate
6300.00
94.65
Amount
2520.00
37.86
Day
Day
Day
Day
Day
L.S.
417.00
329.00
363.00
800.00
350.00
1.78
100.08
904.75
326.70
64.00
28.00
25.45
Day
329.00
616.88
6268.25
62.68
6330.93
949.64
7280.57
3397.84
10678.41
cum
Day
Day
Day
Day
Day
5140.42
329.00
363.00
435.00
399.00
363.00
5140.42
32.90
72.60
17.40
15.96
14.52
Day
329.00
616.88
5910.68
59.11
5969.79
895.47
6865.26
3204.02
10069.28
1175.00
1175.00
106.49
1200.00
106.49
6300.00
17902.42
8794.17
2419.51
13632.36
1209.76
67359.60
Rs 10678.41 /m3
10
1.0000 m3
0.1000 Nos
0.2000 Nos
0.0400 Nos
0.0400 Nos
0.0400 Nos
4.1.2
114
101
123
124
128
1.8750 Nos
CC 1:1.5:3
Beldar
Bhishti
Mason 1st class
Mason 2nd class
Mate
(B) Extra labour for lifting material up to
Coolie 2.5 x 0.75 = 1.88
Total
Add water charges 1%
Total
Add CPOH 15%
Total
Add Cost Index (46.67 % )
Total
Say
Rs 10069.28 /m3
11
15.2361 m3
7.4844 m3
22.7205 m3
11.3603 m3
11.3603 m3
10.6920 tonne
295
297
2202
982
2203
367
LABOUR:
Stone aggregate 20mm
Stone aggregate 10mm
Carriage of Stone aggregate
Coarse sand
Carriage of Coarse sand
Portland Cement
cum
cum
cum
cum
cum
tonne
12/26/2016 10:20:57
visit www.sahaayidotcom.blogspot.in
Quantity
10.6920 tonne
6.4200 Nos
73.5100 Nos
24.0600 Nos
2.1400 Nos
2.1400 Nos
401.8900
Code
2209
155
114
101
2
12
9999
Description of items
Carriage of Cement
Mason
Beldar
Bhishti
Mixer
Vibrator
Sundries
Unit
tonne
Day
Day
Day
Day
Day
L.S.
Rate
94.65
417.00
329.00
363.00
800.00
350.00
1.78
Amount
1012.00
2677.14
24184.79
8733.78
1712.00
749.00
715.36
Day
Day
Day
Day
435.00
399.00
363.00
329.00
2175.00
1995.00
544.50
1480.50
Day
329.00
16489.48
173786.37
1737.86
175524.23
26328.63
201852.86
7551.55
3524.31
11075.86
123
124
101
115
50.1200 Nos
Rs 11075.86 /m3
12
1.0000 m3
5.2.2
0.2600 Nos
115
(A)RCC 1:1.5:3
cum
6090.66
6090.66
(B) Coolie
Total
Add water charges 1%
Total
Add CPOH 15%
Total
Add Cost Index (46.67 % )
Total
Say
Day
329.00
85.54
6176.20
61.76
6237.96
935.69
7173.65
3347.94
10521.59
cum
5140.42
5140.42
Day
329.00
26.32
5166.74
51.67
5218.41
782.76
6001.17
2800.75
8801.92
Rs 10521.59 /m3
13
1.0000 m3
4.1.2
0.0800 Nos
115
12/26/2016 10:20:57
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Say
Unit
Rs 8801.92 /m3
Rate
Amount
cum
1175.00
669.75
cum
1175.00
329.00
cum
cum
cum
tonne
tonne
106.49
1200.00
106.49
6300.00
94.65
90.52
510.00
45.26
2079.00
31.23
kg
38.00
62.70
14
0.5700 m3
295
0.2800 m3
297
0.8500 m3
0.4250 m3
0.4250 m3
0.3300 tonne
0.3300 tonne
2202
982
2203
367
2209
1.6500 kg
7318
MATERIAL:
Stone Aggregate (Single size) : 20 mm
nominal size
Stone Aggregate (Single size) : 10 mm
nominal size
Carriage of Stone aggregate
Coarse sand
Carriage of Coarse sand
Portland Cement
Carriage of Cement
Plasticizer / super plasticizer 50% of
cement
Production cost, pumping to respective
floors and laying in position
1.0000 m3
cum
350.00
350.00
1.0000 m3
cum
150.00
150.00
0.1700 Nos
155
2.0000 Nos
0.9000 Nos
0.0700 Nos
13.0000
114
101
12
9999
&
0.00
Day
417.00
Day
Day
Day
L.S.
329.00
363.00
350.00
1.78
70.89
0.00
658.00
326.70
24.50
23.14
5420.69
54.21
5474.90
821.24
6296.14
2938.41
9234.55
Rs 9234.55 /m3
12/26/2016 10:20:57
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Unit
Rate
Amount
cum
1175.00
669.75
cum
1175.00
329.00
cum
cum
cum
tonne
tonne
106.49
1200.00
106.49
6300.00
94.65
90.52
510.00
45.26
2079.00
31.23
38.00
62.70
15
0.5700 m3
295
0.2800 m3
297
0.8500 m3
0.4250 m3
0.4250 m3
0.3300 tonne
0.3300 tonne
2202
982
2203
367
2209
1.6500 kg
7318
MATERIAL:
Stone Aggregate (Single size) : 20 mm
nominal size
Stone Aggregate (Single size) : 10 mm
nominal size
Carriage of Stone aggregate
Coarse sand
Carriage of Coarse sand
Portland Cement
Carriage of Cement
Plasticizer / super plasticizer 50% of
cement
kg
0.00
1.0000 m3
cum
350.00
350.00
1.0000 m3
cum
150.00
150.00
0.1700 Nos
2.0000 Nos
0.9000 Nos
0.0700 Nos
13.0000
155
114
101
12
9999
1.8800 Nos
115
LABOUR:
Labour for pouring, consolidating &
curing
Mason (average)
Beldar
Bhisti
Vibrator (Needle type 40mm)
Sundries
Extra labour for lifting up to floor five
level
0.75 x 2.50 = 1.88
Coolie
Total
Add water charges 1%
Total
Add CPOH 15%
Total
Add Cost Index (46.67 % )
0.00
0.00
Day
Day
Day
Day
L.S.
417.00
329.00
363.00
350.00
1.78
70.89
658.00
326.70
24.50
23.14
Day
329.00
618.52
6039.21
60.39
6099.60
914.94
7014.54
3273.69
12/26/2016 10:20:57
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Total
Say
Unit
Rate
Amount
10288.23
57.00
3306.00
Rs 10288.23 /m3
16
MR 1
MATERIALS :
Solid blocks of size 40x20x20cm
0.0815
3.011
cum
3340.75
272.27
2.7300
9999
L.S.
1.78
4.86
0.3600 Nos
0.3600 Nos
1.3700 Nos
0.2000 Nos.
123
124
115
101
Sundries
LABOUR:
Mason 1st Class
Mason Ilnd Class
Coolie
Bhishti
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Day
Day
Day
Day
435.00
399.00
329.00
363.00
156.60
143.64
450.73
72.60
4406.70
3306.00
33.06
3339.06
1100.70
11.01
1111.71
4969.61
745.44
5715.05
57.00
3306.00
58.0000 Nos
Rs 5715.05 /m3
17
MR 1
MATERIALS :
Solid blocks of size 40x20x20cm
0.0815
3.011
cum
3340.75
272.27
2.7300
9999
Sundries
LABOUR:
Mason 1st Class
Mason Ilnd Class
Coolie
Bhishti
Scaffolding
L.S.
1.78
4.86
Day
Day
Day
Day
L.S.
435.00
399.00
329.00
363.00
1.78
204.45
187.53
592.20
72.60
39.80
Day
329.00
371.77
5051.48
3306.00
33.06
3339.06
1745.48
58.0000 Nos
0.4700 Nos
0.4700 Nos
1.8000 Nos
0.2000 Nos.
22.3600
123
124
115
101
9999
115
Coolie
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
12/26/2016 10:20:57
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Unit
Rate
Amount
17.45
1762.93
5924.75
888.71
6813.46
43.00
3311.00
Rs 6813.46 /m3
18
MR 2
MATERIALS :
Solid blocks of size 30x20x20cm
0.0900
3.011
cum
3340.75
300.67
2.7300
9999
L.S.
1.78
4.86
0.3600 Nos
0.3600 Nos
1.3700 Nos
0.2000 Nos.
123
124
115
101
Sundries
LABOUR:
Mason 1st Class
Mason Ilnd Class
Coolie
Bhishti
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Day
Day
Day
Day
435.00
399.00
329.00
363.00
156.60
143.64
450.73
72.60
4440.10
3311.00
33.11
3344.11
1129.10
11.29
1140.39
5016.72
752.51
5769.23
43.00
3311.00
77.0000 Nos
Rs 5769.23 /m3
19
77.0000 Nos
MR 2
MATERIALS :
Solid blocks of size 30x20x20cm
0.0900 m3
3.011
cum
3340.75
300.67
2.7300
9999
Sundries
LABOUR:
Mason 1st Class
Mason Ilnd Class
Coolie
Bhishti
Scaffolding
L.S.
1.78
4.86
Day
Day
Day
Day
L.S.
435.00
399.00
329.00
363.00
1.78
204.45
187.53
592.20
72.60
39.80
Day
329.00
371.77
5084.88
0.4700 Nos
0.4700 Nos
1.8000 Nos
0.2000 Nos.
22.3600
123
124
115
101
9999
115
Coolie
Total
12/26/2016 10:20:57
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Unit
Rate
Amount
3311.00
33.11
3344.11
1773.88
17.74
1791.62
5971.88
895.78
6867.66
42.50
3315.00
Rs 6867.66 /m3
20
MR 3
MATERIALS :
Solid blocks of size 40x20x15cm
0.0815
3.011
cum
3340.75
272.27
2.7300
9999
L.S.
1.78
4.86
0.4000 Nos
0.4000 Nos
1.4600 Nos
0.4500 Nos.
123
124
115
101
Sundries
LABOUR:
Mason 1st Class
Mason Ilnd Class
Coolie
Bhishti
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Day
Day
Day
Day
435.00
399.00
329.00
363.00
174.00
159.60
480.34
163.35
4569.42
3315.00
33.15
3348.15
1254.42
12.54
1266.96
5206.40
780.96
5987.36
42.50
3315.00
78.0000 Nos
Rs 5987.36 /m3
21
78.0000 Nos
MR 3
MATERIALS :
Solid blocks of size 40x20x15cm
0.0815 m3
3.011
cum
3340.75
272.27
2.7300
9999
Sundries
LABOUR:
Mason 1st Class
Mason Ilnd Class
Coolie
Bhishti
Scaffolding
L.S.
1.78
4.86
Day
Day
Day
Day
L.S.
435.00
399.00
329.00
363.00
1.78
230.55
211.47
625.10
163.35
39.80
0.5300 Nos
0.5300 Nos
1.9000 Nos
0.4500 Nos.
22.3600
123
124
115
101
9999
12/26/2016 10:20:57
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Unit
Rate
Amount
Day
329.00
371.77
5234.17
3315.00
33.15
3348.15
1919.17
19.19
1938.36
6191.14
928.67
7119.81
32.00
3296.00
115
Coolie
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Rs 7119.81 /m3
22
MR 4
MATERIALS :
Solid blocks of size 30x20x15cm
0.0900
3.011
cum
3340.75
300.67
2.7300
9999
L.S.
1.78
4.86
0.4000 Nos
0.4000 Nos
1.4600 Nos
0.4500 Nos.
123
124
115
101
Sundries
LABOUR:
Mason 1st Class
Mason Ilnd Class
Coolie
Bhishti
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Day
Day
Day
Day
435.00
399.00
329.00
363.00
174.00
159.60
480.34
163.35
4578.82
3296.00
32.96
3328.96
1282.82
12.83
1295.65
5229.29
784.39
6013.68
32.00
3296.00
103.0000 Nos
Rs 6013.68 /m3
23
MR 4
MATERIALS :
Solid blocks of size 30x20x15cm
0.0900 m3
3.011
cum
3340.75
300.67
2.7300
9999
L.S.
1.78
4.86
0.5300 Nos
0.5300 Nos
123
124
Sundries
LABOUR:
Mason 1st Class
Mason Ilnd Class
Day
Day
435.00
399.00
230.55
211.47
103.0000 Nos
12/26/2016 10:20:57
visit www.sahaayidotcom.blogspot.in
Quantity
1.9000 Nos
0.4500 Nos.
22.3600
Code
115
101
9999
Description of items
Coolie
Bhishti
Scaffolding
Unit
Day
Day
L.S.
Rate
329.00
363.00
1.78
Amount
625.10
163.35
39.80
Day
329.00
371.77
5243.57
3296.00
32.96
3328.96
1947.57
19.48
1967.05
6214.03
932.10
7146.13
28.50
3306.00
115
Coolie
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Rs 7146.13 /m3
24
116.0000 Nos
0.0815 m3
13.5200
0.4500 Nos
0.4500 Nos
1.5500 Nos
0.7000 Nos.
MR 5
MATERIALS :
Solid blocks of size 40x20x10cm
3.011
cum
3340.75
272.27
9999
Sundries
LABOUR:
Mason 1st Class
Mason Ilnd Class
Coolie
Bhishti
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
L.S.
1.78
24.07
Day
Day
Day
Day
435.00
399.00
329.00
363.00
195.75
179.55
509.95
254.10
4741.69
3306.00
33.06
3339.06
1435.69
14.36
1450.05
5465.85
819.88
6285.73
28.50
3306.00
3340.75
272.27
123
124
115
101
Rs 6285.73 /m3
25
116.0000 Nos
0.0815 m3
MR 5
MATERIALS :
Solid blocks of size 40x20x10cm
3.011
E
cum
12/26/2016 10:20:57
visit www.sahaayidotcom.blogspot.in
Quantity
13.5200
Code
9999
0.6000 Nos
0.6000 Nos
2.0000 Nos
0.7000 Nos.
22.3600
123
124
115
101
9999
Description of items
Sundries
LABOUR:
Mason 1st Class
Mason Ilnd Class
Coolie
Bhishti
Scaffolding
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Unit
L.S.
Rate
1.78
Day
Day
Day
Day
L.S.
435.00
399.00
329.00
363.00
1.78
Amount
24.07
0.00
261.00
239.40
658.00
254.10
39.80
5054.64
3306.00
33.06
3339.06
1748.64
17.49
1766.13
5929.44
889.42
6818.86
Rs 6818.86 /m3
26
MR 5
MATERIALS :
Solid blocks of size 40x20x10cm
3.011
13.5200
9999
0.6000 Nos
0.6000 Nos
2.0000 Nos
0.7000 Nos.
22.3600
123
124
115
101
9999
Sundries
LABOUR:
Mason 1st Class
Mason Ilnd Class
Coolie
Bhishti
Scaffolding
116.0000 Nos
0.0815 m3
28.50
3306.00
cum
3340.75
272.27
L.S.
1.78
24.07
Day
Day
Day
Day
L.S.
435.00
399.00
329.00
363.00
1.78
261.00
239.40
658.00
254.10
39.80
Day
329.00
424.41
5479.05
3306.00
33.06
3339.06
2173.05
21.73
2194.78
6558.14
983.72
7541.86
115
Coolie
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Rs 7541.86 /m3
12/26/2016 10:20:57
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Unit
Rate
Amount
38.00
2204.00
27
58.0000 Nos
MR 6
MATERIALS :
Hollow blocks of size 40x20x20cm
0.0815 m3
3.011
cum
3340.75
272.27
2.7300
9999
L.S.
1.78
4.86
0.3600 Nos
0.3600 Nos
1.1000 Nos
0.1600 Nos.
123
124
115
101
Sundries
LABOUR:
Mason 1st Class
Mason Ilnd Class
Coolie
Bhishti
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Day
Day
Day
Day
435.00
399.00
329.00
363.00
156.60
143.64
361.90
58.08
3201.35
2204.00
22.04
2226.04
997.35
9.97
1007.32
3703.48
555.52
4259.00
38.00
2204.00
Rs 4259.00 /m3
28
58.0000 Nos
MR 6
MATERIALS :
Hollow blocks of size 40x20x20cm
0.0815 m3
3.011
cum
3340.75
272.27
2.7300
9999
Sundries
LABOUR:
Mason 1st Class
Mason Ilnd Class
Coolie
Bhishti
Scaffolding
L.S.
1.78
4.86
Day
Day
Day
Day
L.S.
435.00
399.00
329.00
363.00
1.78
204.45
187.53
473.76
58.08
39.80
Day
329.00
371.77
3816.52
2204.00
22.04
2226.04
1612.52
16.13
1628.65
0.4700 Nos
0.4700 Nos
1.4400 Nos
0.1600 Nos.
22.3600
123
124
115
101
9999
115
Coolie
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
12/26/2016 10:20:57
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Unit
Rate
Amount
4614.78
692.22
5307.00
28.00
2184.00
Rs 5307.00 /m3
29
78.0000 Nos
MR 7
MATERIALS :
Hollow blocks of size 40x20x15cm
0.0815 m3
3.011
cum
3340.75
272.27
2.7300
9999
L.S.
1.78
4.86
0.4000 Nos
0.4000 Nos
1.1700 Nos
0.3600 Nos.
123
124
115
101
Sundries
LABOUR:
Mason 1st Class
Mason Ilnd Class
Coolie
Bhishti
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Day
Day
Day
Day
435.00
399.00
329.00
363.00
174.00
159.60
384.93
130.68
3310.34
2184.00
21.84
2205.84
1126.34
11.26
1137.60
3874.36
581.15
4455.51
28.00
2184.00
Rs 4455.51 /m3
30
78.0000 Nos
MR 7
MATERIALS :
Hollow blocks of size 40x20x15cm
0.0815 m3
3.011
cum
3340.75
272.27
2.7300
9999
Sundries
LABOUR:
Mason 1st Class
Mason Ilnd Class
Coolie
Bhishti
Scaffolding
L.S.
1.78
4.86
Day
Day
Day
Day
L.S.
435.00
399.00
329.00
363.00
1.78
230.55
211.47
500.08
130.68
39.80
Day
329.00
371.77
3945.48
2184.00
21.84
0.5300 Nos
0.5300 Nos
1.5200 Nos
0.3600 Nos.
22.3600
123
124
115
101
9999
115
Coolie
Total
Market Rate cost
Add water charges 1% on MR
12/26/2016 10:20:57
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Unit
Rate
Amount
2205.84
1761.48
17.61
1779.09
4815.23
722.28
5537.51
20.00
2320.00
Rs 5537.51 /m3
31
116.0000 Nos
0.0815 m3
13.5200
0.4500 Nos
0.4500 Nos
1.2400 Nos
0.5600 Nos.
MR 8
MATERIALS :
Hollow blocks of size 40x20x10cm
3.011
cum
3340.75
272.27
9999
Sundries
LABOUR:
Mason 1st Class
Mason Ilnd Class
Coolie
Bhishti
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
L.S.
1.78
24.07
Day
Day
Day
Day
435.00
399.00
329.00
363.00
195.75
179.55
407.96
203.28
3602.88
2320.00
23.20
2343.20
1282.88
12.83
1295.71
4243.62
636.54
4880.16
20.00
2320.00
123
124
115
101
Rs 4880.16 /m3
32
MR 8
MATERIALS :
Hollow blocks of size 40x20x10cm
3.011
cum
3340.75
272.27
13.5200
9999
L.S.
1.78
0.6000 Nos
0.6000 Nos
1.6000 Nos
0.5600 Nos.
22.3600
123
124
115
101
9999
Sundries
LABOUR:
Mason 1st Class
Mason Ilnd Class
Coolie
Bhishti
Scaffolding
Day
Day
Day
Day
L.S.
435.00
399.00
329.00
363.00
1.78
24.07
0.00
261.00
239.40
526.40
203.28
39.80
116.0000 Nos
0.0815 m3
12/26/2016 10:20:57
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Unit
Rate
Amount
Day
329.00
424.41
4310.63
2320.00
23.20
2343.20
1990.63
19.91
2010.54
5292.06
793.81
6085.87
45.00
3465.00
115
Coolie
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Rs 6085.87 /m3
33
77.0000 Nos
MR 9
MATERIALS :
Laterite stone of size 40X20X15cm
0.0874 m3
3.011
cum
3340.75
291.98
2.7300
9999
L.S.
1.78
4.86
0.4000 Nos
0.4000 Nos
1.4600 Nos
0.4500 Nos.
123
124
115
101
Sundries
LABOUR:
Mason 1st Class
Mason Ilnd Class
Coolie
Bhishti
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Day
Day
Day
Day
435.00
399.00
329.00
363.00
174.00
159.60
480.34
163.35
4739.13
3465.00
34.65
3499.65
1274.13
12.74
1286.87
5387.10
808.07
6195.17
45.00
3465.00
Rs 6195.17 /m3
34
77.0000 Nos
MR 9
MATERIALS :
Laterite stone of size 40X20X15cm
0.0874 m3
3.011
cum
3340.75
291.98
2.7300
9999
L.S.
1.78
0.5300 Nos
0.5300 Nos
1.9000 Nos
0.4500 Nos.
123
124
115
101
Sundries
LABOUR:
Mason 1st Class
Mason Ilnd Class
Coolie
Bhishti
Day
Day
Day
Day
435.00
399.00
329.00
363.00
4.86
0.00
230.55
211.47
625.10
163.35
12/26/2016 10:20:57
visit www.sahaayidotcom.blogspot.in
Quantity
22.3600
Code
9999
Description of items
Scaffolding
Unit
L.S.
Rate
1.78
Amount
39.80
Day
329.00
371.77
5403.88
3465.00
34.65
3499.65
1938.88
19.39
1958.27
6371.84
955.78
7327.62
cum
100 Nos
900.00
1300.00
900.00
91.00
cum
125.28
145.32
Day
Day
Day
Day
399.00
329.00
329.00
363.00
426.93
352.03
233.59
32.67
2181.54
21.82
2203.36
330.50
2533.86
1182.55
3716.41
cum
100 nos
900.00
1300.00
900.00
91.00
cum
125.28
145.32
day
day
day
day
399.00
329.00
329.00
363.00
534.66
477.05
233.59
32.67
115
Coolie
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Rs 7327.62 /m3
35
1.0000 m3
7.0000 Nos
1157
1154
1.1600 m3
2215
1.0700 Nos
1.0700 Nos
0.7100 Nos
0.0900 Nos.
125
114
115
101
MATERIALS :
Stone at quarry
Through and bond stones 7 nos.
Carriage of stone7.00x24cmx24cmx39cm = 0.16 cum.
Carriage of Stone (1 .00 cum. + 0.16 cum.
= 1.16 cum.)
LABOUR
Mason 2nd class
Beldar
Coolie
Bhishti
Total
Add water charges 1%
Total
Add CPOH 15%
Total
Add Cost Index (46.67 % )
Total
Say
Rs 3716.41 /m3
36
1.00 cum
7.00 Nos
1157
1154
1.16 cum
2215
1.34 day
1.45 day
0.71 day
0.09 day
125
114
115
101
12/26/2016 10:20:57
visit www.sahaayidotcom.blogspot.in
Quantity
15.21 LS
1.13 day
Code
9999
115
Description of items
Scaffolding
Unit
LS
Rate
1.78
Amount
27.07
Day
329.00
371.77
Total
Add water charges 1%
Total
Add CPOH 15%
Total
Add Cost Index (46.67 % )
Total
Say
2813.13
28.13
2841.26
426.19
3267.45
1524.92
4792.37
Rs 4792.37 /m3
37
0.0380 m3
MR 10
0.7200 Nos
0.0700 Nos
156
114
MATERIALS:
Anjili wood scantls+ 5% wastage
LABOUR:
Carpenter (average)
Beldar
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 0.036 m3
Hence for 1 m3
Say
cum
65000.00
2470.00
Day
Day
417.00
329.00
300.24
23.03
2793.27
2470.00
24.70
2494.70
323.27
3.23
326.50
2973.58
446.04
3419.62
94989.44
cum
72000.00
2736.00
Day
Day
417.00
329.00
300.24
23.03
3059.27
2736.00
27.36
2763.36
323.27
3.23
326.50
3242.24
486.34
Rs 94989.44 /m3
38
0.0380 m3
MR 11
0.7200 Nos
0.0700 Nos
156
114
MATERIALS:
Pincoda wood + 5% wastage
LABOUR:
Carpenter (average)
Beldar
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
12/26/2016 10:20:57
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Total for 0.036 m3
Hence for 1 m3
Say
Unit
Rate
Amount
3728.58
103571.67
cum
45000.00
1710.00
Day
Day
417.00
329.00
300.24
23.03
2033.27
1710.00
17.10
1727.10
323.27
3.23
326.50
2205.98
330.90
2536.88
70468.89
65000.00
3315.00
10 Nos
90.00
54.00
10 Nos
55.00
11.00
100 Nos
100 Nos
52.00
32.00
24.96
2.56
Day
Day
L.S.
417.00
329.00
1.78
763.11
250.04
63.87
4484.54
3315.00
33.15
3348.15
1169.54
11.70
1181.24
Rs 103571.67 /m3
39
0.0380 m3
MR 12
0.7200 Nos
0.0700 Nos
156
114
MATERIALS:
Vengai wood + 5% wastage
LABOUR:
Carpenter (average)
Beldar
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 0.036 m3
Hence for 1 m3
Say
Rs 70468.89 /m3
40
0.0510 m3
MR 10
6.0000 Nos
595
2.0000 Nos
597
48.0000 Nos
8.0000
637
640
1.8300 Nos
0.7600 Nos
35.8800
156
114
9999
hinges-
cum
12/26/2016 10:20:57
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Total A + 1.4667 B
Add CPOH 15%
Total for 2.16 m2
Hence for 1 m2
Say
Unit
Rate
Amount
5080.67
762.10
5842.77
2704.99
72000.00
3672.00
10 Nos
90.00
54.00
10 Nos
55.00
11.00
100 Nos
100 Nos
52.00
32.00
24.96
2.56
Day
Day
L.S.
417.00
329.00
1.78
763.11
250.04
63.87
4841.54
3672.00
36.72
3708.72
1169.54
11.70
1181.24
5441.24
816.19
6257.43
2896.96
45000.00
2295.00
10 Nos
90.00
54.00
10 Nos
55.00
11.00
100 Nos
100 Nos
52.00
32.00
24.96
2.56
Day
417.00
763.11
Rs 2704.99 /m2
41
0.0510 m3
MR 11
6.0000 Nos
595
2.0000 Nos
597
48.0000 Nos
8.0000
637
640
1.8300 Nos
0.7600 Nos
35.8800
156
114
9999
Pincoda wood
Black enamelled M.S. Butt hinges-100x5
8x1.9mm
Black enamelled M.S. Butt
50x37xl.5mm
M.S. Screws 40mm
M.S. Screws 20mm
LABOUR:
Carpenter (average)
Beldar
Sundries
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 2.16 m2
Hence for 1 m2
Say
hinges-
cum
Rs 2896.96 /m2
42
0.0510 m3
MR 12
6.0000 Nos
595
2.0000 Nos
597
48.0000 Nos
8.0000
637
640
1.8300 Nos
156
Vengai wood
Black enamelled M.S. Butt hinges-100x5
8x1.9mm
Black enamelled M.S.
50x37xl.5mm
M.S. Screws 40mm
M.S. Screws 20mm
LABOUR:
Carpenter (average)
Butt
hinges-
cum
12/26/2016 10:20:57
visit www.sahaayidotcom.blogspot.in
Quantity
0.7600 Nos
35.8800
Code
114
9999
Description of items
Beldar
Sundries
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 2.16 m2
Hence for 1 m2
Say
Unit
Day
L.S.
Rate
329.00
1.78
Amount
250.04
63.87
3464.54
2295.00
22.95
2317.95
1169.54
11.70
1181.24
4050.47
607.57
4658.04
2156.50
65000.00
2860.00
10 Nos
90.00
54.00
10 Nos
55.00
11.00
100 Nos
100 Nos
52.00
32.00
24.96
2.56
Day
Day
L.S.
417.00
329.00
1.78
763.11
250.04
63.87
4029.54
2860.00
28.60
2888.60
1169.54
11.70
1181.24
4621.12
693.17
5314.29
2460.32
Rs 2156.50 /m2
43
0.0440 m3
MR 10
6.0000 Nos
595
2.0000 Nos
597
48.0000 Nos
8.0000
637
640
1.8300 Nos
0.7600 Nos
35.8800
156
114
9999
hinges-
cum
Rs 2460.32 /m2
12/26/2016 10:20:57
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Unit
Rate
Amount
cum
72000.00
3168.00
10 Nos
90.00
54.00
10 Nos
55.00
11.00
100 Nos
100 Nos
52.00
32.00
24.96
2.56
Day
Day
L.S.
417.00
329.00
1.78
763.11
250.04
63.87
4337.54
3168.00
31.68
3199.68
1169.54
11.70
1181.24
4932.20
739.83
5672.03
2625.94
45000.00
1980.00
10 Nos
90.00
54.00
10 Nos
55.00
11.00
100 Nos
100 Nos
52.00
32.00
24.96
2.56
Day
Day
L.S.
417.00
329.00
1.78
763.11
250.04
63.87
3149.54
1980.00
44
0.0440 m3
MR 11
6.0000 Nos
595
2.0000 Nos
597
48.0000 Nos
8.0000
637
640
1.8300 Nos
0.7600 Nos
35.8800
156
114
9999
Pincoda wood
Black enamelled M.S. Butt hinges-100x5
8x1.9mm
Black enamelled M.S. Butt
50x37xl.5mm
M.S. Screws 40mm
M.S. Screws 20mm
LABOUR:
Carpenter (average)
Beldar
Sundries
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 2.16 m2
Hence for 1 m2
Say
hinges-
Rs 2625.94 /m2
45
0.0440 m3
MR 12
6.0000 Nos
595
2.0000 Nos
597
48.0000 Nos
8.0000
637
640
1.8300 Nos
0.7600 Nos
35.8800
156
114
9999
Vengai wood
Black enamelled M.S. Butt hinges-100x5
8x1.9mm
Black enamelled M.S.
50x37xl.5mm
M.S. Screws 40mm
M.S. Screws 20mm
LABOUR:
Carpenter (average)
Beldar
Sundries
Total
Market Rate cost
Butt
hinges-
cum
12/26/2016 10:20:57
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 2.16 m2
Hence for 1 m2
Say
Unit
Rate
Amount
19.80
1999.80
1169.54
11.70
1181.24
3732.32
559.85
4292.17
1987.12
cum
cum
65000.00
121.70
Day
L.S.
435.00
1.78
838.50
1.57
0.00
247.95
7.87
1095.89
838.50
8.39
846.89
257.39
2.57
259.96
1228.17
184.23
1412.40
2140.00
Rs 1987.12 /m2
46
0.0129 m3
0.0129 m3.
MR 10
2204
0.5700 Nos
4.4200
111
9999
Rs 2140.00 /m2
47
0.0129 m3
0.0129 m3.
MR 11
2204
0.5700 Nos
4.4200
111
9999
Pincoda wood
Carriage of timber
LABOUR:
Carpenter 1st class
Sundries
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
cum
cum
72000.00
121.70
Day
L.S.
435.00
1.78
928.80
1.57
0.00
247.95
7.87
1186.19
928.80
9.29
938.09
257.39
12/26/2016 10:20:57
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 0.66 m2
Hence for 1 m2
Say
Unit
Rate
Amount
2.57
259.96
1319.37
197.91
1517.28
2298.91
cum
cum
45000.00
121.70
580.50
1.57
Day
L.S.
435.00
1.78
247.95
7.87
837.89
580.50
5.81
586.31
257.39
2.57
259.96
967.59
145.14
1112.73
1685.95
65000.00
345.00
3770.00
438.15
10 No
90.00
54.00
10 Nos
55.00
11.00
100 Nos
100 Nos
cum
52.00
32.00
121.70
24.96
2.56
7.30
Day
Day
Day
L.S.
417.00
399.00
329.00
1.78
763.11
91.77
253.33
71.97
5488.15
3770.00
Rs 2298.91 /m2
48
0.0129 m3
0.0129 m3.
MR 12
2204
0.5700 Nos
4.4200
111
9999
Vengai wood
Carriage of timber
LABOUR:
Carpenter 1st class
Sundries
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 0.66 m2
Hence for 1 m2
Say
Rs 1685.95 /m2
49
0.0580 m3
1.2700 m2
MR 10
2406
6.0000 Nos
595
2.0000 Nos
597
48.0000 Nos
8.0000
0.0600 m3.
637
640
2204
1.8300 Nos
0.2300 Nos
0.7700 Nos
40.4300
156
119
114
9999
M.S.
Butt
hinges-
cum
sqm
12/26/2016 10:20:57
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 2.16 m2
Hence for 1 m2
Say
Unit
Rate
Amount
37.70
3807.70
1718.15
17.18
1735.33
6352.91
952.94
7305.85
3382.34
72000.00
345.00
4176.00
438.15
10 No
90.00
54.00
10 Nos
55.00
11.00
100 Nos
100 Nos
cum
52.00
32.00
121.70
0.00
417.00
399.00
329.00
1.78
24.96
2.56
7.30
0.00
763.11
91.77
253.33
71.97
5894.15
4176.00
41.76
4217.76
1718.15
17.18
1735.33
6762.97
1014.45
7777.42
3600.66
45000.00
345.00
2610.00
438.15
10 No
90.00
54.00
10 Nos
55.00
11.00
100 Nos
52.00
24.96
Rs 3382.34 /m2
50
0.0580 m3
1.2700 m2
MR 11
2406
6.0000 Nos
595
2.0000 Nos
597
48.0000 Nos
8.0000
0.0600 m3.
637
640
2204
1.8300 Nos
0.2300 Nos
0.7700 Nos
40.4300
156
119
114
9999
Pincoda wood
Float glasses 4.0mm thick
Black enamelled M.S. Butt hinges-100x5
8x1.9mm
Black enamelled M.S. Butt
50x37xl.5mm
M.S. Screws 40mm
M.S. Screws 20mm
Carriage of Timber
LABOUR:
Carpenter (Avg.)
Glazier
Beldar
Sundries
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 2.16 m2
Hence for 1 m2
Say
hinges-
cum
sqm
Day
Day
Day
L.S.
Rs 3600.66 /m2
51
0.0580 m3
1.2700 m2
MR 12
2406
6.0000 Nos
595
2.0000 Nos
597
48.0000 Nos
637
Vengai wood
Float glasses 4.0mm thick
Black enamelled M.S. Butt hinges-100x5
8x1.9mm
Black enamelled
50x37xl.5mm
M.S. Screws 40mm
M.S.
Butt
hinges-
cum
sqm
12/26/2016 10:20:57
visit www.sahaayidotcom.blogspot.in
Quantity
8.0000
0.0600 m3.
Code
640
2204
1.8300 Nos
0.2300 Nos
0.7700 Nos
40.4300
156
119
114
9999
Description of items
M.S. Screws 20mm
Carriage of Timber
LABOUR:
Carpenter (Avg.)
Glazier
Beldar
Sundries
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 2.16 m2
Hence for 1 m2
Say
Unit
100 Nos
cum
Rate
32.00
121.70
0.00
417.00
399.00
329.00
1.78
Amount
2.56
7.30
0.00
763.11
91.77
253.33
71.97
4328.15
2610.00
26.10
2636.10
1718.15
17.18
1735.33
5181.31
777.20
5958.51
2758.57
65000.00
345.00
3250.00
438.15
10 No
90.00
54.00
10 Nos
55.00
11.00
100 Nos
100 Nos
cum
52.00
32.00
121.70
24.96
2.56
6.09
Day
Day
Day
L.S.
417.00
399.00
329.00
1.78
763.11
91.77
253.33
71.97
4966.94
3250.00
32.50
3282.50
1716.94
17.17
1734.11
5825.92
873.89
6699.81
3101.76
Day
Day
Day
L.S.
Rs 2758.57 /m2
52
0.0500 m3
1.2700 m2
MR 10
2406
6.0000 Nos
595
2.0000 Nos
597
48.0000 Nos
8.0000
0.0500 m3.
637
640
2204
1.8300 Nos
0.2300 Nos
0.7700 Nos
40.4300
156
119
114
9999
hinges-
cum
sqm
Rs 3101.76 /m2
12/26/2016 10:20:57
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Unit
Rate
Amount
cum
sqm
72000.00
345.00
3600.00
438.15
10 No
90.00
54.00
10 Nos
55.00
11.00
100 Nos
100 Nos
cum
52.00
32.00
121.70
0.00
417.00
399.00
329.00
1.78
24.96
2.56
6.09
0.00
763.11
91.77
253.33
71.97
5316.94
3600.00
36.00
3636.00
1716.94
17.17
1734.11
6179.42
926.91
7106.33
3289.97
45000.00
345.00
2250.00
438.15
10 No
90.00
54.00
10 Nos
55.00
11.00
100 Nos
100 Nos
cum
52.00
32.00
121.70
0.00
417.00
399.00
329.00
1.78
24.96
2.56
6.09
0.00
763.11
91.77
253.33
71.97
3966.94
2250.00
53
0.0500 m3
1.2700 m2
MR 11
2406
6.0000 Nos
595
2.0000 Nos
597
48.0000 Nos
8.0000
0.0500 m3.
637
640
2204
1.8300 Nos
0.2300 Nos
0.7700 Nos
40.4300
156
119
114
9999
hinges-
Day
Day
Day
L.S.
Rs 3289.97 /m2
54
0.0500 m3
1.2700 m2
MR 12
2406
6.0000 Nos
595
2.0000 Nos
597
48.0000 Nos
8.0000
0.0500 m3.
637
640
2204
1.8300 Nos
0.2300 Nos
0.7700 Nos
40.4300
156
119
114
9999
M.S.
Butt
hinges-
cum
sqm
Day
Day
Day
L.S.
12/26/2016 10:20:57
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 2.16 m2
Hence for 1 m2
Say
Unit
Rate
Amount
22.50
2272.50
1716.94
17.17
1734.11
4815.92
722.39
5538.31
2564.03
65000.00
345.00
2600.00
341.55
10 Nos
100 Nos
400.00
220.00
240.00
105.60
Day
Day
Day
L.S.
435.00
399.00
329.00
1.78
1044.00
71.82
253.33
71.97
4728.27
2600.00
26.00
2626.00
2128.27
21.28
2149.55
5778.74
866.81
6645.55
3076.64
72000.00
345.00
2880.00
341.55
10 Nos
100 Nos
400.00
220.00
240.00
105.60
Day
Day
Day
L.S.
435.00
399.00
329.00
1.78
1044.00
71.82
253.33
71.97
5008.27
2880.00
Rs 2564.03 /m2
55
0.0400 m3
0.9900 m2
MR 10
2406
6.0000
48.0000 Nos
694
586
2.4000 Nos
0.1800 Nos
0.7700 Nos
40.4300
111
119
114
9999
cum
sqm
Rs 3076.64 /m2
56
0.0400 m3
0.9900 m2
MR 11
2406
6.0000
48.0000 Nos
694
586
2.4000 Nos
0.1800 Nos
0.7700 Nos
40.4300
111
119
114
9999
Pincoda wood
Float glasses 4.0mm thick
FittingsAnodised aluminium butt hingesC.P. brass screws 40mm
LABOURCarpenter 1st class
Glazier
Beldar
Sundries
Total
Market Rate cost
cum
sqm
12/26/2016 10:20:57
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 2.16 m2
Hence for 1 m2
Say
Unit
Rate
Amount
28.80
2908.80
2128.27
21.28
2149.55
6061.54
909.23
6970.77
3227.21
45000.00
345.00
1800.00
341.55
10 Nos
100 Nos
400.00
220.00
240.00
105.60
Day
Day
Day
L.S.
435.00
399.00
329.00
1.78
1044.00
71.82
253.33
71.97
3928.27
1800.00
18.00
1818.00
2128.27
21.28
2149.55
4970.74
745.61
5716.35
2646.46
65000.00
345.00
2600.00
341.55
metre
42.00
168.00
100 Nos
220.00
250.80
Day
Day
Day
L.S.
435.00
399.00
329.00
1.78
1044.00
71.82
253.33
71.97
Rs 3227.21 /m2
57
0.0400 m3
0.9900 m2
MR 12
2406
6.0000 Nos
48.0000 Nos
694
586
2.4000 Nos
0.1800 Nos
0.7700 Nos
40.4300
111
119
114
9999
Vengai wood
Float glasses 4.0mm thick
FittingsAnodised aluminium butt hingesC.P. brass screws 40mm
LABOURCarpenter 1st class
Glazier
Beldar
Sundries
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 2.16 m2
Hence for 1 m2
Say
cum
sqm
Rs 2646.46 /m2
58
0.0400 m3
0.9900 m2
MR 10
2406
4.0000 m
608
114.0000 Nos
586
2.4000 Nos
0.1800 Nos
0.7700 Nos
40.4300
111
119
114
9999
cum
sqm
12/26/2016 10:20:57
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 2.16 m2
Hence for 1 m2
Say
Unit
Rate
Amount
4801.47
2600.00
26.00
2626.00
2201.47
22.01
2223.48
5887.18
883.08
6770.26
3134.38
72000.00
345.00
2880.00
341.55
0.00
metre
42.00
168.00
100 Nos
220.00
250.80
Day
Day
Day
L.S.
435.00
399.00
329.00
1.78
1044.00
71.82
253.33
71.97
5081.47
2880.00
28.80
2908.80
2201.47
22.01
2223.48
6169.98
925.50
7095.48
3284.94
45000.00
345.00
1800.00
341.55
0.00
metre
42.00
168.00
100 Nos
220.00
250.80
Day
Day
Day
435.00
399.00
329.00
1044.00
71.82
253.33
Rs 3134.38 /m2
59
0.0400 m3
0.9900 m2
MR 11
2406
4.0000 m
608
114.0000 Nos
586
2.4000 Nos
0.1800 Nos
0.7700 Nos
40.4300
111
119
114
9999
Pincoda wood
Float glasses 4.0mm thick
FittingsNickel plated mild steel piano hinges 1mm
thick 25 mm wide
C.P. brass screws 40mm
LABOURCarpenter 1st class
Glazier
Beldar
Sundries
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 2.16 m2
Hence for 1 m2
Say
cum
sqm
Rs 3284.94 /m2
60
0.0400 m3
0.9900 m2
MR 12
2406
4.0000 m
608
114.0000 Nos
586
2.4000 Nos
0.1800 Nos
0.7700 Nos
111
119
114
Vengai wood
Float glasses 4.0mm thick
FittingsNickel plated mild steel piano hinges 1mm
thick 25 mm wide
C.P. brass screws 40mm
LABOURCarpenter 1st class
Glazier
Beldar
cum
sqm
12/26/2016 10:20:57
visit www.sahaayidotcom.blogspot.in
Quantity
40.4300
Code
9999
Description of items
Sundries
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 2.16 m2
Hence for 1 m2
Say
Unit
L.S.
Rate
1.78
Amount
71.97
4001.47
1800.00
18.00
1818.00
2201.47
22.01
2223.48
5079.18
761.88
5841.06
2704.19
65000.00
345.00
2795.00
2.26
0.00
240.00
18.24
Rs 2704.19 /m2
61
0.0430 m3
1.2700 m2
MR 10
2406
6.0000 Nos
48.0000 Nos
694
639
1.8300 Nos
0.2300 Nos
0.7700 Nos
40.4300
156
119
114
9999
cum
sqm
10 Nos
100 Nos
400.00
38.00
Day
Day
Day
L.S.
417.00
399.00
329.00
1.78
763.11
91.77
253.33
71.97
4235.68
2795.00
27.95
2822.95
1440.68
14.41
1455.09
4957.13
743.57
5700.70
2639.21
72000.00
345.00
3096.00
2.26
0.00
240.00
18.24
Rs 2639.21 /m2
62
0.0430 m3
1.2700 m2
MR 11
2406
6.0000 Nos
48.0000 Nos
694
639
1.8300 Nos
0.2300 Nos
0.7700 Nos
40.4300
156
119
114
9999
Pincoda wood
Float glasses 4.0mm thick
FittingsAnodised Aluminium butt hinges
M.S. screws 25 mm
LABOURCarpenter average
Glazier
Beldar
Sundries
Total
cum
sqm
10 Nos
100 Nos
400.00
38.00
Day
Day
Day
L.S.
417.00
399.00
329.00
1.78
763.11
91.77
253.33
71.97
4536.68
12/26/2016 10:20:57
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 2.16 m2
Hence for 1 m2
Say
Unit
Rate
Amount
3096.00
30.96
3126.96
1440.68
14.41
1455.09
5261.14
789.17
6050.31
2801.07
45000.00
345.00
1935.00
2.26
0.00
240.00
18.24
Rs 2801.07 /m2
63
0.0430 m3
1.2700 m2
MR 12
2406
6.0000 Nos
48.0000 Nos
694
639
1.8300 Nos
0.2300 Nos
0.7700 Nos
40.4300
156
119
114
9999
Vengai wood
Float glasses 4.0mm thick
FittingsAnodised Aluminium butt hinges
M.S. screws 25 mm
LABOURCarpenter average
Glazier
Beldar
Sundries
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 2.16 m2
Hence for 1 m2
Say
cum
sqm
10 Nos
100 Nos
400.00
38.00
Day
Day
Day
L.S.
417.00
399.00
329.00
1.78
763.11
91.77
253.33
71.97
3375.68
1935.00
19.35
1954.35
1440.68
14.41
1455.09
4088.53
613.28
4701.81
2176.76
65000.00
345.00
2795.00
438.15
0.00
metre
42.00
168.00
100 Nos
38.00
Day
Day
Day
L.S.
417.00
399.00
329.00
1.78
43.32
0.00
763.11
91.77
253.33
71.97
4624.65
Rs 2176.76 /m2
64
0.0430 m3
1.2700 m2
MR 10
2406
4.0000 m
608
114.0000 Nos
639
1.8300 Nos
0.2300 Nos
0.7700 Nos
40.4300
156
119
114
9999
cum
sqm
12/26/2016 10:20:57
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 2.16 m2
Hence for 1 m2
Say
Unit
Rate
Amount
2795.00
27.95
2822.95
1829.65
18.30
1847.95
5533.34
830.00
6363.34
2945.99
72000.00
345.00
3096.00
438.15
metre
42.00
168.00
100 Nos
38.00
43.32
Day
Day
Day
L.S.
417.00
399.00
329.00
1.78
763.11
91.77
253.33
71.97
4925.65
3096.00
30.96
3126.96
1829.65
18.30
1847.95
5837.35
875.60
6712.95
3107.85
45000.00
345.00
1935.00
438.15
metre
42.00
168.00
100 Nos
38.00
0.00
417.00
399.00
329.00
43.32
Rs 2945.99 /m2
65
0.0430 m3
1.2700 m2
MR 11
2406
4.0000 m
608
114.0000 Nos
639
1.8300 Nos
0.2300 Nos
0.7700 Nos
40.4300
156
119
114
9999
Pincoda wood
Float glasses 4.0mm thick
FittingsNickel plated mild steel piano hinges 1mm
thick 25 mm wide
M.S. screws 25 mm
LABOURCarpenter average
Glazier
Beldar
Sundries
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 2.16 m2
Hence for 1 m2
Say
cum
sqm
Rs 3107.85 /m2
66
0.0430 m3
1.2700 m2
MR 12
2406
4.0000 m
608
114.0000 Nos
639
1.8300 Nos
0.2300 Nos
0.7700 Nos
156
119
114
Vengai wood
Float glasses 4.0mm thick
FittingsNickel plated mild steel piano hinges 1mm
thick 25 mm wide
M.S. screws 25 mm
LABOURCarpenter average
Glazier
Beldar
cum
sqm
Day
Day
Day
763.11
91.77
253.33
12/26/2016 10:20:57
visit www.sahaayidotcom.blogspot.in
Quantity
40.4300
Code
9999
Description of items
Sundries
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 2.16 m2
Hence for 1 m2
Say
Unit
L.S.
Rate
1.78
Amount
71.97
3764.65
1935.00
19.35
1954.35
1829.65
18.30
1847.95
4664.74
699.71
5364.45
2483.54
sqm
L.S.
1380.00
1.78
10143.00
47.90
Day
Day
399.00
329.00
359.10
329.00
10879.00
10143.00
101.43
10244.43
736.00
7.36
743.36
11334.72
1700.21
13034.93
1862.13
sqm
L.S.
1785.00
1.78
13119.75
47.90
Day
Day
399.00
329.00
359.10
329.00
13855.75
13119.75
131.20
13250.95
736.00
7.36
743.36
14341.24
Rs 2483.54 /m2
67
7.3500 m2
26.9100
0.9000 Day
1.0000 Nos
MR 13
9999
112
114
Rs 1862.13 /m2
68
7.3500 m2
26.9100
0.9000 Day
1.0000 Nos
MR 14
9999
112
114
12/26/2016 10:20:58
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Add CPOH 15%
Total for 7.00 m2
Hence for 1 m2
Say
Unit
Rate
Amount
2151.19
16492.43
2356.06
sqm
1785.00
Day
Day
L.S.
399.00
329.00
1.78
1124.55
26.91
43.89
19.74
13.88
1228.97
1124.55
11.25
1135.80
104.42
1.04
105.46
1290.48
193.57
1484.05
2473.42
Rs 2356.06 /m2
69
0.6300 m2
MR 14
0.1100 Day
0.0600 Nos
7.8000
112
114
9999
Rs 2473.42 /m2
70
0.0105 m3
MR 10
0.0400 Nos
0.0400 Nos
0.0100 Nos
156
115
114
cum
65000.00
682.50
Day
Day
Day
417.00
329.00
329.00
16.68
13.16
3.29
715.63
682.50
6.83
689.33
33.13
0.33
33.46
738.41
110.76
849.17
80873.33
cum
72000.00
756.00
Day
417.00
16.68
Rs 80873.33 /m3
71
0.0105 m3
MR 11
0.0400 Nos
156
Pingoda Wood (
wastage )
LABOUR:
Carpenter (average)
Qty
including
5%
12/26/2016 10:20:58
visit www.sahaayidotcom.blogspot.in
Quantity
0.0400 Nos
0.0100 Nos
Code
115
114
Description of items
Coolie
Beldar
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 0.0105m3
Hence for 1 m3
Say
Unit
Day
Day
Rate
329.00
329.00
Amount
13.16
3.29
789.13
756.00
7.56
763.56
33.13
0.33
33.46
812.64
121.90
934.54
89003.81
cum
45000.00
472.50
Day
Day
Day
417.00
329.00
329.00
16.68
13.16
3.29
505.63
472.50
4.73
477.23
33.13
0.33
33.46
526.31
78.95
605.26
57643.81
417.00
329.00
329.00
16.68
13.16
3.29
33.13
0.33
33.46
5.02
38.48
17.96
56.44
5375.24
65000.00
650.00
Rs 89003.81 /m3
72
0.0105 m3
MR 12
0.0400 Nos
0.0400 Nos
0.0100 Nos
156
115
114
Rs 57643.81 /m3
73
0.0400 Nos
0.0400 Nos
0.0100 Nos
156
115
114
LABOUR:
Carpenter (average)
Coolie
Beldar
Total
Add water charges 1%
Total
Add CPOH 15%
Total
Add Cost Index (46.67 % )
Total for 0.0105m3
Hence for 1 m3
Say
Day
Day
Day
Rs 5375.24 /m3
74
0.0100 m3
MR 10
cum
12/26/2016 10:20:58
visit www.sahaayidotcom.blogspot.in
Quantity
0.0500 Kg
0.1000 Nos
0.1000 Nos
0.0100 Nos
Code
1219
156
115
114
Description of items
Wire nail
LABOUR:
Carpenter (average)
Coolie
Beldar
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 0.01m3
Hence for 1 m3
Say
Unit
Kg
Rate
65.00
Amount
3.25
Day
Day
Day
417.00
329.00
329.00
41.70
32.90
3.29
731.14
650.00
6.50
656.50
81.14
0.81
81.95
776.70
116.51
893.21
89321.00
72000.00
720.00
Kg
65.00
3.25
Day
Day
Day
417.00
329.00
329.00
41.70
32.90
3.29
801.14
720.00
7.20
727.20
81.14
0.81
81.95
847.40
127.11
974.51
97451.00
45000.00
450.00
Kg
65.00
3.25
Day
Day
Day
417.00
329.00
329.00
41.70
32.90
3.29
531.14
450.00
4.50
454.50
81.14
0.81
81.95
574.70
Rs 89321.00 /m3
75
0.0100 m3
MR 11
0.0500 Kg
1219
0.1000 Nos
0.1000 Nos
0.0100 Nos
156
115
114
cum
Rs 97451.00 /m3
76
0.0100 m3
MR 12
0.0500 Kg
1219
0.1000 Nos
0.1000 Nos
0.0100 Nos
156
115
114
cum
12/26/2016 10:20:58
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Add CPOH 15%
Total for 0.01m3
Hence for 1 m3
Say
Unit
Rate
Amount
86.21
660.91
66091.00
417.00
329.00
329.00
41.70
32.90
3.29
77.89
0.78
78.67
11.80
90.47
42.22
132.69
13269.00
152.00
1.78
1520.00
17.80
1537.80
1520.00
15.20
1535.20
17.80
0.18
17.98
1561.57
234.24
1795.81
179.58
Rs 66091.00 /m3
77
0.1000 Nos
0.1000 Nos
0.0100 Nos
156
115
114
78
10.0000 Nos
10.0000
MR 15
9999
79
10.0000 Nos
10.0000
MR 16
9999
80
10.0000 Nos
0.9100
MR 17
9999
LABOUR:
Carpenter (average)
Coolie
Beldar
Total
Add water charges 1%
Total
Add CPOH 15%
Total
Add Cost Index (46.67 % )
Total for 0.01m3
Hence for 1 m3
Say
Supplying and fixing 200 mm Aluminium
16mm dia aldrop
200 mm Aluminium 16mm dia aldrop
Carriage of material and fixing charge
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 Nos
Hence for 1 No.
Say
Supplying and fixing 300 mm Aluminium
16mm dia aldrop
300 mm Aluminium 16mm dia aldrop
Carriage of material and fixing charge
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 Nos
Hence for 1 No.
Say
Supplying and fixing iron hooks and eyes
200 mm size
MATERIALSiron hooks & eyes 200 mm
Carriage of material
LABOUR-
Day
Day
Day
Rs 13269.00 /m3
each
L.S.
Rs 179.58 /each
each
L.S.
160.00
1.78
1600.00
17.80
1617.80
1600.00
16.00
1616.00
17.80
0.18
17.98
1642.37
246.36
1888.73
188.87
Rs 188.87 /each
10 Nos
L.S.
100.00
1.78
1000.00
1.62
12/26/2016 10:20:58
visit www.sahaayidotcom.blogspot.in
Quantity
0.0600 Nos
Code
111
81
10.0000 Nos
0.9100
MR 18
9999
0.0600 Nos
111
82
10.0000 Nos
0.9100
MR 19
9999
0.0600 Nos
111
Description of items
Carpenter 1st class
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 Nos
Hence for 1 No.
Say
Supplying and fixing iron hooks and eyes
100 mm size
MATERIALSiron hooks & eyes 100 mm
Carriage of material
LABOURCarpenter 1st class
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 Nos
Hence for 1 No.
Say
Supplying and fixing iron hooks and eyes
75 mm size
MATERIALSiron hooks & eyes 75 mm
Carriage of material
LABOURCarpenter 1st class
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 Nos
Hence for 1 No.
Say
Unit
Day
Rate
435.00
Amount
26.10
1027.72
1000.00
10.00
1010.00
27.72
0.28
28.00
1051.07
157.66
1208.73
120.87
Rs 120.87 /10Nos
10 Nos
L.S.
80.00
1.78
800.00
1.62
Day
435.00
26.10
827.72
800.00
8.00
808.00
27.72
0.28
28.00
849.07
127.36
976.43
97.64
Rs 97.64 /each
10 Nos
L.S.
60.00
1.78
600.00
1.62
Day
435.00
26.10
627.72
600.00
6.00
606.00
27.72
0.28
28.00
647.07
97.06
744.13
74.41
83
0.1260 m3
0.2500 Kg
3.7000
DSR Analyser Ver.12
Powered By Pradeepen Thulika
1190
1219
9999
MATERIALS
Teak wood 2nd class planks
Wire nails
Add for scaffolding
cum
Kg
L.S.
75000.00
65.00
1.78
9450.00
16.25
6.59
12/26/2016 10:20:58
visit www.sahaayidotcom.blogspot.in
Quantity
3.1500 Nos
1.1000 Nos
Code
156
115
Description of items
LABOUR
Carpenter (average)
Coolie
Total
Add water charges 1%
Total
Add CPOH 15%
Total
Add Cost Index (46.67 % )
Total for 10 m2
Hence for 1 m2
Say
Unit
Rate
Amount
Day
Day
417.00
329.00
1313.55
361.90
11148.29
111.48
11259.77
1688.97
12948.74
6043.18
18991.92
1899.19
cum
Kg
L.S.
65000.00
65.00
1.78
8190.00
16.25
6.59
Day
Day
417.00
329.00
1313.55
361.90
9888.29
8190.00
81.90
8271.90
1698.29
16.98
1715.27
10787.69
1618.15
12405.84
1240.58
cum
Kg
L.S.
72000.00
65.00
1.78
9072.00
16.25
6.59
Day
Day
417.00
329.00
1313.55
361.90
10770.29
9072.00
90.72
9162.72
1698.29
16.98
1715.27
11678.51
1751.78
13430.29
1343.03
Rs 1899.19 /m3
84
0.1260 m3
0.2500 Kg
3.7000
MR 10
1219
9999
3.1500 Nos
1.1000 Nos
156
115
MATERIALS
Anjili / Jack wood
Wire nails
Add for scaffolding
LABOUR
Carpenter (average)
Coolie
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m2
Hence for 1 m2
Say
Rs 1240.58 /m3
85
0.1260 m3
0.2500 Kg
3.7000
MR 11
1219
9999
3.1500 Nos
1.1000 Nos
156
115
MATERIALS
Pingoda Wood
Wire nails
Add for scaffolding
LABOUR
Carpenter (average)
Coolie
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m2
Hence for 1 m2
12/26/2016 10:20:58
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Say
Unit
Rs 1343.03 /m3
Rate
Amount
cum
Kg
L.S.
45000.00
65.00
1.78
5670.00
16.25
6.59
Day
Day
417.00
329.00
1313.55
361.90
7368.29
5670.00
56.70
5726.70
1698.29
16.98
1715.27
8242.49
1236.37
9478.86
947.89
cum
cum
66000.00
121.70
2178.00
4.02
Day
Day
L.S.
435.00
329.00
1.78
435.00
82.25
12.03
m2
28.37
106.38
86
0.1260 m3
0.2500 Kg
3.7000
MR 12
1219
9999
3.1500 Nos
1.1000 Nos
156
115
MATERIALS
Vengai Wood
Wire nails
Add for scaffolding
LABOUR
Carpenter (average)
Coolie
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m2
Hence for 1 m2
Say
Rs 947.89 /m3
87
0.0330 m3
0.0330 m3.
1189
2204
1.0000 Nos
0.2500 Nos
6.7600
111
114
9999
3.7500 m2
13.50.1
55.0000 Nos
7048
each
10.00
550.00
71.5000
9999
L.S.
1.78
127.27
Total
Add water charges 1%
Total
Add CPOH 15%
Total
Add Cost Index (46.67 % )
Total for 0.03125 m3
Hence for 1 m3
3494.95
34.95
3529.90
529.49
4059.39
1894.52
5953.91
190525.12
12/26/2016 10:20:58
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Say
Unit
Rs 190525.12 /m3
Rate
Amount
cum
65000.00
2145.00
Day
Day
L.S.
435.00
329.00
1.78
435.00
82.25
12.03
m2
28.37
106.38
each
L.S.
10.00
1.78
550.00
127.27
3457.93
82.25
0.82
83.07
3375.68
33.76
3409.44
5083.70
762.56
5846.26
187080.32
cum
72000.00
2376.00
Day
Day
L.S.
435.00
329.00
1.78
435.00
82.25
12.03
88
0.0330 m3
MR 10
1.0000 Nos
0.2500 Nos
6.7600
111
114
9999
3.7500 m2
55.0000 Nos
71.5000
Rs 187080.32 /m3
89
0.0330 m3
MR 11
1.0000 Nos
0.2500 Nos
6.7600
111
114
9999
12/26/2016 10:20:58
visit www.sahaayidotcom.blogspot.in
Quantity
3.7500 m2
55.0000 Nos
71.5000
Code
Description of items
Unit
Rate
Amount
m2
28.37
106.38
each
L.S.
10.00
1.78
550.00
127.27
3688.93
2376.00
23.76
2399.76
1312.93
13.13
1326.06
4344.69
651.70
4996.39
159884.48
cum
45000.00
1485.00
Day
Day
L.S.
435.00
329.00
1.78
435.00
82.25
12.03
m2
28.37
106.38
each
L.S.
10.00
1.78
550.00
127.27
2797.93
1485.00
14.85
1499.85
1312.93
13.13
1326.06
3444.78
516.72
3961.50
126768.00
Rs 159884.48 /m3
90
0.0330 m3
MR 12
1.0000 Nos
0.2500 Nos
6.7600
111
114
9999
3.7500 m2
55.0000 Nos
71.5000
Rs 126768.00 /m3
12/26/2016 10:20:58
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Unit
Rate
Amount
M
M
tonne
275.00
220.00
94.65
4793.25
2195.60
6.15
Sqm
23.25
65.09
cm
2.00
714.00
Day
Day
Day
L.S.
435.00
363.00
329.00
1.78
652.50
272.25
1809.50
143.70
10652.04
106.52
10758.56
1613.78
12372.34
5774.17
18146.51
161.26
91
17.4300 m
9.9800 m
0.0650 tonne
2.8000
357.0000 cm
1.5000 Nos
0.7500 Nos
5.5000 Nos
80.7300
1550
1549
2205
13.50.3
1215
102
100
114
9999
MATERIALS:
50mm dia. tube
Tie beam-(lx8.0m = 8.00m)+(Principal rafter
2x4.30m = 8.60m) =16.60m
16.60m @ 4.65kg./m = 77.19kg.
40mm dia. tube
Members
=
2(0.45+1.25+0.90+2.15)
=9.50m
9.50m @3.72kg/m = 35.34Kg.
Total = 77.19 +35.34 = 112.53kg.
Add wastage @ 5% = 5.63Kg.
Total 118.16Kg
GI pipe 50mm
GI pipe 40mm
Carriage of steel
Priming coat
50mm dia. tube 16.60x0.157m = 1.61
40mm dia. tube 9.50x0.125m = 1.91
=2.80sqm
Applying priming coat With ready mixed red
oxide zinc chromate primer of approved
brand and manufacture on steel galvanised
iron/steel works
Welding charges:Rafter:- 4x22/7x6.03 = 75.80cm.+
Ties:- 2x22/7x6.03=37.90cm.+
Members:-2x4x2x22/7x4.83=242.87cm
= 356.57cm say 357cm
Welding charges (electric)
For cutting, assembling & erection
LABOUR:
Blaks smith I Class
Bandhani
Beldar
Sundries
Total
Add water charges 1%
Total
Add CPOH 15%
Total
Add Cost Index (46.67 % )
Total for 112.53 kg
Hence for 1 kg
Say
Rs 161.26 /Kg
12/26/2016 10:20:58
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Unit
Rate
Amount
92
10.5000 m
0.0396 tonne
2.6200
1549
2205
13.50.3
29.0000 cm
1215
0.3000 Nos
0.1500 Nos
1.1000 Nos
16.1400
102
100
114
9999
MATERIALS:
40mm dia. tube
10.5m @3.72kg/m = 39.06Kg.
GI pipe 40mm
Carriage of steel
Priming coat
40mm dia. tube 10.50x0.125m = 2.62
=2.62sqm
M
tonne
220.00
94.65
2310.00
3.75
Sqm
23.25
60.90
cm
2.00
58.00
Day
Day
Day
L.S.
435.00
363.00
329.00
1.78
130.50
54.45
361.90
28.73
3008.23
30.08
3038.31
455.75
3494.06
1630.68
5124.74
131.20
Rs 131.20 /Kg
Total:
93
240.4080
104.0000
MR 20
9999
sqm
L.S.
212.40
1.78
51062.66
185.12
26.91
12/26/2016 10:20:58
visit www.sahaayidotcom.blogspot.in
Quantity
Code
884.0000 Nos
1022
810.0000 Nos
1023
1694.0000 Nos
1207
1694.0000 Nos
26.9100
53.8200
1208
9999
9999
1.3000 Nos
15.5000
15.5000 Nos
130
112
114
Description of items
Breadth is 5.1 metre
No. of bolts in one lap 5.1/0.3 =17 nos.
2x26(laps)xl7 nos. = 884 nos.
Bolts and nuts
G.I.,J or L hooks 8mm dia.
(No. of purlins to be used 5 on either
side)2x5x27
(No. of sheets)x23 nos. of bolts
in each sheet = 810 nos.
G.I. J or L hooks with nuts and bolts 8 mm
dia.
Limpet washers (total of seam and J
884+810= 1694)
Bitumen washers
Carriage of bolts and washers
Sundries
LABOUR:
Mistry
Carpenter 2nd class
Beldar
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 184.518 m2
Hence for 1 m2
Say
Unit
10 Nos
Rate
53.82
104.00
26.91
25.00
Amount
2210.00
10 Nos
120.00
9720.00
100 Nos
35.00
592.90
100 Nos
L.S.
L.S.
30.00
1.78
1.78
508.20
47.90
95.80
Day
Day
Day
435.00
399.00
329.00
565.50
6184.50
5099.50
76272.08
51062.66
510.63
51573.29
25209.42
252.09
25461.51
88917.69
13337.65
102255.34
554.18
sqm
L.S.
175.00
1.78
42071.40
185.12
10 Nos
25.00
2210.00
Rs 554.18 /m2
94
240.4080
104.0000
MR 21
9999
884.0000 Nos
1022
12/26/2016 10:20:58
visit www.sahaayidotcom.blogspot.in
Quantity
Code
810.0000 Nos
1023
1694.0000 Nos
1207
1694.0000 Nos
26.9100
53.8200
1208
9999
9999
1.3000 Nos
15.5000
15.5000 Nos
130
112
114
Description of items
(No. of sheets)x23 nos. of bolts in each
sheet = 810 nos.
G.I. J or L hooks with nuts and bolts 8 mm
dia.
Limpet washers (total of seam and J
884+810= 1694
Bitumen washers
Carriage of bolts and washers
Sundries
LABOUR:
Mistry
Carpenter 2nd class
Beldar
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 184.518 m2
Hence for 1 m2
Say
Unit
Rate
Amount
10 Nos
120.00
9720.00
100 Nos
35.00
592.90
100 Nos
L.S.
L.S.
30.00
1.78
1.78
508.20
47.90
95.80
Day
Day
Day
435.00
399.00
329.00
565.50
6184.50
5099.50
67280.82
42071.40
420.71
42492.11
25209.42
252.09
25461.51
79836.51
11975.48
91811.99
497.58
sqm
400.00
96163.20
L.S.
L.S.
10 Nos
L.S.
1.78
1.78
160.00
1.78
185.12
71.20
134.40
95.80
Day
Day
Day
435.00
399.00
329.00
565.50
6184.50
5099.50
108499.22
96163.20
961.63
97124.83
12336.02
123.36
Rs 497.58 /m2
95
240.4080
MR 22
104.0000
40.0000
8.4000 Nos
53.8200
9999
9999
2611
9999
1.3000 Nos
15.5000
15.5000 Nos
130
112
114
12/26/2016 10:20:58
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 184.518 m2
Hence for 1 m2
Say
Unit
Rate
Amount
12459.38
115399.00
17309.85
132708.85
719.22
sqm
450.00
87187.50
L.S.
L.S.
10 Nos
L.S.
1.78
1.78
160.00
1.78
185.12
71.20
134.40
95.80
Day
Day
Day
435.00
399.00
329.00
565.50
6184.50
5099.50
99523.52
87187.50
871.88
88059.38
12336.02
123.36
12459.38
106333.55
15950.03
122283.58
662.72
Rs 719.22 /m2
96
193.7500 m2
MR 23
104.0000
40.0000
8.4000 Nos
53.8200
9999
9999
2611
9999
1.3000 Nos
15.5000
15.5000 Nos
130
112
114
97
Rs 662.72 /m2
12/26/2016 10:20:58
visit www.sahaayidotcom.blogspot.in
Quantity
Code
193.7500 m2
MR 24
104.0000
40.0000
8.4000 Nos
53.8200
9999
9999
2611
9999
1.3000 Nos
15.5000
15.5000 Nos
130
112
114
Description of items
Details of cost for area of roof. 2x18.09x5.1
= 184.518 sqm.
MATERIALS:
Poly carbonate multi wall plain sheet 5 mm
thick
Carriage of sheet
Self drilling/ self tapping screw
EPDM Gasket
Sundries
LABOUR:
Mistry
Carpenter 2nd class
Beldar
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 184.518 m2
Hence for 1 m2
Say
Unit
Rate
Amount
sqm
500.00
96875.00
L.S.
L.S.
10 Nos
L.S.
1.78
1.78
160.00
1.78
185.12
71.20
134.40
95.80
Day
Day
Day
435.00
399.00
329.00
565.50
6184.50
5099.50
109211.02
96875.00
968.75
97843.75
12336.02
123.36
12459.38
116117.92
17417.69
133535.61
723.70
sqm
550.00
106562.50
L.S.
L.S.
10 Nos
L.S.
1.78
1.78
160.00
1.78
185.12
71.20
134.40
95.80
Day
Day
Day
435.00
399.00
329.00
565.50
6184.50
5099.50
118898.52
106562.50
1065.63
107628.13
12336.02
123.36
Rs 723.70 /m2
98
193.7500 m2
MR 25
104.0000
40.0000
8.4000 Nos
53.8200
9999
9999
2611
9999
1.3000 Nos
15.5000
15.5000 Nos
130
112
114
12/26/2016 10:20:58
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 184.518 m2
Hence for 1 m2
Say
Unit
Rate
Amount
12459.38
125902.30
18885.35
144787.65
784.68
sqm
600.00
116250.00
L.S.
L.S.
10 Nos
L.S.
1.78
1.78
160.00
1.78
185.12
71.20
134.40
95.80
Day
Day
Day
435.00
399.00
329.00
565.50
6184.50
5099.50
128586.02
116250.00
1162.50
117412.50
12336.02
123.36
12459.38
135686.67
20353.00
156039.67
845.66
Rs 784.68 /m2
99
193.7500 m2
MR 26
104.0000
40.0000
8.4000 Nos
53.8200
9999
9999
2611
9999
1.3000 Nos
15.5000
15.5000 Nos
130
112
114
100
MATERIALS:
Poly carbonate multi wall plain sheet 8 mm
thick
Carriage of sheet
Self drilling/ self tapping screw
EPDM Gasket
Sundries
LABOUR:
Mistry
Carpenter 2nd class
Beldar
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 184.518 m2
Hence for 1 m2
Say
Rs 845.66 /m2
12/26/2016 10:20:58
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Sheets used = 2x20 nos.
x3.00 mx 1.05m= 126.00sqm+
2x20nos.x2.50mx1.05m=105.00sqm.
231.00sqm. +Add 3% wastage = 6.93
= 237.93sqm.
Unit
Rate
Amount
237.9300 m2
MR 27
sqm
188.00
44730.84
tonne
94.65
301.37
10 Nos
120.00
5712.00
100 Nos
100 Nos
30.00
35.00
142.80
166.60
476.0000 Nos
1023
476.0000 Nos
476.0000 Nos
1208
1209
2x20x0.42147= 1.68588 +
2x20x0.35123= 1.4049
= 3.0908+
Add 3 % wastage = 0.092
= 3.1835 Say 3.184 t
Carriage of sheets
G.I. J or L hooks with nuts and bolts 8 mm
dia.
Bitumen washers
Bitumen washers thick
8.0600
9999
L.S.
1.78
14.35
39.5200
9999
Sundries
LABOUR:
Mistry
Carpenter 2nd class
Beldar
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 216.14 m2
Hence for 1 m2
Say
L.S.
1.78
70.35
Day
Day
Day
435.00
399.00
329.00
1017.90
3726.66
3072.86
58955.73
44730.84
447.31
45178.15
14224.89
142.25
14367.14
66250.43
9937.56
76187.99
352.49
sqm
L.S.
L.S.
235.00
1.78
1.78
2585.00
31.24
47.90
Day
Day
L.S.
L.S.
435.00
329.00
1.78
1.78
1087.50
658.00
55.30
55.30
4520.24
2585.00
25.85
2610.85
1935.24
19.35
1954.59
3.1840 tonne
2.3400 Nos
9.3400
9.3400 Nos
2273
130
112
114
Rs 352.49 /m2
101
11.0000 m2
17.5500
26.9100
MR 28
9999
9999
2.5000 Nos
2.0000 Nos
31.0700
31.0700
111
114
9999
9999
12/26/2016 10:20:58
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m2
Hence for 1 m2
Say
Unit
Rate
Amount
5477.65
821.65
6299.30
629.93
Rs 629.93 /m2
102
MATERIAL :11.0000 m2
MR 29
17.5500
26.9100
9999
9999
2.5000 Nos
2.0000 Nos
31.0700
31.0700
111
114
9999
9999
sqm
340.00
3740.00
Carriage of material
Nails / Screws
LABOUR:
Carpenter 1st class
Beldar
Scaffolding
Sundries
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m2
Hence for 1 m2
Say
L.S.
L.S.
1.78
1.78
31.24
47.90
Day
Day
L.S.
L.S.
435.00
329.00
1.78
1.78
1087.50
658.00
55.30
55.30
5675.24
3740.00
37.40
3777.40
1935.24
19.35
1954.59
6644.20
996.63
7640.83
764.08
sqm
L.S.
360.00
1.78
3960.00
31.24
Day
Day
L.S.
L.S.
435.00
329.00
1.78
1.78
652.50
329.00
55.30
55.30
5083.34
3960.00
39.60
3999.60
1123.34
11.23
1134.57
5663.67
849.55
6513.22
Rs 764.08 /m2
103
11.0000 m2
17.5500
MR 30
9999
1.5000 Nos
1.0000 Nos
31.0700
31.0700
111
114
9999
9999
12/26/2016 10:20:58
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Hence for 1 m2
Say
Unit
Rate
Amount
651.32
Rs 651.32 /m2
104
MATERIALS :
0.1080 m3
3.3
Cum
4468.35
482.58
0.5100 Nos
155
Day
417.00
212.67
0.7500 Nos
0.9200 Nos.
13.3900
11.7000
115
101
9999
9999
Mason (avge)
LABOUR :
Coolie
Bhisthi
Extra for removing burrs, cleaning with
Scaffolding and sundries
Total
Add water charges 1%
Total
Add CPOH 15%
Total
Add Cost Index (46.67 % )
Total for 10 m2
Hence for 1 m2
Say
Day
Day
L.S.
L.S.
329.00
363.00
1.78
1.78
246.75
333.96
23.83
20.83
1320.62
13.21
1333.83
200.07
1533.90
715.87
2249.77
224.98
435.00
417.00
1.78
100.05
62.55
8.90
171.50
1.72
173.22
25.98
199.20
92.97
292.17
Rs 224.98 /m2
105
0.2300 Nos
0.1500 Nos
5.0000
111
155
9999
MATERIALS :
Carpenter
Coolie
Scaffolding and sundries
Total
Add water charges 1%
Total
Add CPOH 15%
Total
Add Cost Index (46.67 % )
Total
Say
Day
Day
L.S.
Rs 292.17 /each
106
0.1700 Nos
0.1000 Nos
3.0000
111
155
9999
MATERIALS :
Carpenter
Coolie
Scaffolding and sundries
Total
Add water charges 1%
Total
Add CPOH 15%
Total
Add Cost Index (46.67 % )
Total
Say
Day
Day
L.S.
435.00
417.00
1.78
73.95
41.70
5.34
120.99
1.21
122.20
18.33
140.53
65.59
206.12
Rs 206.12 /each
12/26/2016 10:20:58
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Unit
Rate
Amount
each
L.S.
55.00
1.78
550.00
17.80
567.80
5.68
573.48
86.02
659.50
307.79
967.29
96.73
107
10.0000 Nos
10.0000
MR 31
9999
MATERIALS:
Stainless steel soap dish
Carriage of material and fixing charge
Total
Add water charges 1%
Total
Add CPOH 15%
Total
Add Cost Index (46.67 % )
Total for 10 Nos
Hence for 1 No
Say
Rs 96.73 /each
108
MATERIALS:
5.0000 Nos
10.0000
MR 32
9999
each
70.00
350.00
L.S.
1.78
17.80
367.80
3.68
371.48
55.72
427.20
199.37
626.57
125.31
Rs 125.31 /each
109
MATERIALS:
5.0000 Nos
10.0000
110
MR 33
9999
each
105.00
525.00
L.S.
1.78
17.80
542.80
5.43
548.23
82.23
630.46
294.24
924.70
184.94
Rs 184.94 /each
12/26/2016 10:20:58
visit www.sahaayidotcom.blogspot.in
Quantity
10.0000 Nos
10.0000
Code
MR 34
9999
Description of items
CP Health Faucet
Carriage of material and fixing charge
Total
Add water charges 1%
Total
Add CPOH 15%
Total
Add Cost Index (46.67 % )
Total for 10 Nos
Hence for 1 No
Say
Unit
each
L.S.
Rate
650.00
1.78
Amount
6500.00
17.80
6517.80
65.18
6582.98
987.45
7570.43
3533.12
11103.55
1110.36
Rs 1110.36 /each
111
10.0000 Nos
10.0000
MR 35
9999
MATERIALS:
CP Health Faucet superior quality (Jaguar
or equivalent make)
Carriage of material and fixing charge
Total
Add water charges 1%
Total
Add CPOH 15%
Total
Add Cost Index (46.67 % )
Total for 10 Nos
Hence for 1 No
Say
each
1100.00
11000.00
L.S.
1.78
17.80
11017.80
110.18
11127.98
1669.20
12797.18
5972.44
18769.62
1876.96
metre
38.00
437.00
L.S.
1.78
4.86
Day
Day
Day
435.00
399.00
329.00
143.55
327.18
217.14
1129.73
437.00
4.37
441.37
692.73
6.93
699.66
1467.56
220.13
1687.69
168.77
Rs 1876.96 /each
112
MATERIALS:
11.5000 m
MR 36
2.7300
9999
0.3300 Nos
0.8200 Nos
0.6600 Nos
116
117
114
Rs 168.77 /m
12/26/2016 10:20:58
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Unit
Rate
Amount
metre
27.00
310.50
L.S.
1.78
4.86
Day
Day
Day
435.00
399.00
329.00
143.55
327.18
217.14
1003.23
310.50
3.11
313.61
692.73
6.93
699.66
1339.80
200.97
1540.77
154.08
metre
40.50
465.75
L.S.
1.78
4.86
Day
Day
Day
435.00
399.00
329.00
143.55
391.02
217.14
1222.32
465.75
4.66
470.41
756.57
7.57
764.14
1591.17
238.68
1829.85
182.99
113
MATERIALS:
11.5000 m
MR 37
2.7300
9999
0.3300 Nos
0.8200 Nos
0.6600 Nos
116
117
114
Rs 154.08 /m
114
11.5000 m
MR 38
2.7300
9999
0.3300 Nos
0.9800 Nos
0.6600 Nos
116
117
114
MATERIALS:
PVC pipe 20mm dia 12Kgf/cm2 (Adding
15% for fittings wastage)
Adhesive and sundries etc
LABOUR:
Fitter grade-I
Assistant Fitter or II class Fitter
Beldar
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Rs 182.99 /m
12/26/2016 10:20:58
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Unit
Rate
Amount
metre
30.00
345.00
L.S.
1.78
4.86
Day
Day
Day
435.00
399.00
329.00
143.55
391.02
217.14
1101.57
345.00
3.45
348.45
756.57
7.57
764.14
1469.21
220.38
1689.59
168.96
metre
61.00
701.50
L.S.
1.78
4.86
Day
Day
Day
435.00
399.00
329.00
143.55
391.02
217.14
1458.07
701.50
7.02
708.52
756.57
7.57
764.14
1829.28
274.39
2103.67
210.37
115
11.5000 m
MR 39
2.7300
9999
0.3300 Nos
0.9800 Nos
0.6600 Nos
116
117
114
MATERIALS:
PVC pipe 20mm dia 10Kgf/cm2 (Adding
15% for fittings wastage)
Adhesive and sundries etc
LABOUR:
Fitter grade-I
Assistant Fitter or II class Fitter
Beldar
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Rs 168.96 /m
116
11.5000
MR 40
2.7300
9999
0.3300 Nos
0.9800 Nos
0.6600 Nos
116
117
114
MATERIALS:
PVC pipe 25mm dia 12Kgf/cm2 (Adding
15% for fittings wastage)
Adhesive and sundries etc
LABOUR:
Fitter grade-I
Assistant Fitter or II class Fitter
Beldar
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Rs 210.37 /m
12/26/2016 10:20:58
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Unit
Rate
Amount
metre
48.00
552.00
L.S.
1.78
4.86
Day
Day
Day
435.00
399.00
329.00
143.55
391.02
217.14
1308.57
552.00
5.52
557.52
756.57
7.57
764.14
1678.28
251.74
1930.02
193.00
metre
65.00
747.50
L.S.
1.78
7.40
Day
Day
Day
435.00
399.00
329.00
143.55
391.02
322.42
1611.89
747.50
7.48
754.98
864.39
8.64
873.03
2035.45
305.32
2340.77
234.08
117
11.5000
MR 41
2.7300
9999
0.3300 Nos
0.9800 Nos
0.6600 Nos
116
117
114
MATERIALS:
PVC pipe 25mm dia 10Kgf/cm2 (Adding
15% for fittings wastage)
Adhesive and sundries etc
LABOUR:
Fitter grade-I
Assistant Fitter or II class Fitter
Beldar
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Rs 193.00 /m
118
11.5000
MR 42
4.1600
9999
0.3300 Nos
0.9800 Nos
0.9800 Nos
116
117
114
MATERIALS
PVC pipe 32mm dia 10Kgf/cm2 (Adding
15% for fittings wastage)
Adhesive and sundries etc
LABOUR
Fitter
Asstt. Fitter
Beldar
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Rs 234.08 /m
12/26/2016 10:20:58
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Unit
Rate
Amount
metre
48.00
552.00
L.S.
1.78
7.40
Day
Day
Day
435.00
399.00
329.00
143.55
391.02
322.42
1416.39
552.00
5.52
557.52
864.39
8.64
873.03
1837.99
275.70
2113.69
211.37
metre
84.00
966.00
L.S.
1.78
9.49
Day
Day
Day
435.00
399.00
329.00
143.55
522.69
430.99
2072.72
966.00
9.66
975.66
1106.72
11.07
1117.79
2615.12
392.27
3007.39
300.74
119
11.5000
MR 43
4.1600
9999
0.3300 Nos
0.9800 Nos
0.9800 Nos
116
117
114
MATERIALS
PVC pipe 32mm dia 6Kgf/cm2 (Adding
15% for fittings wastage)
Adhesive and sundries etc
LABOUR
Fitter
Asstt. Fitter
Beldar
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Rs 211.37 /m
120
11.5000
MR 44
5.3300
9999
0.3300 Nos
1.3100 Nos
1.3100 Nos
116
117
114
MATERIALS
PVC pipe 40mm dia 10Kgf/cm2 (Adding
15% for fittings wastage)
Adhesive and sundries etc
LABOUR
Fitter
Asstt. Fitter
Beldar
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Rs 300.74 /m
12/26/2016 10:20:58
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Unit
Rate
Amount
metre
53.00
609.50
L.S.
1.78
9.49
Day
Day
Day
435.00
399.00
329.00
143.55
522.69
430.99
1716.22
609.50
6.10
615.60
1106.72
11.07
1117.79
2255.06
338.26
2593.32
259.33
metre
90.00
1035.00
L.S.
1.78
9.49
Day
Day
Day
435.00
399.00
329.00
143.55
522.69
430.99
2141.72
1035.00
10.35
1045.35
1106.72
11.07
1117.79
2684.81
402.72
3087.53
308.75
121
11.5000
MR 45
5.3300
9999
0.3300 Nos
1.3100 Nos
1.3100 Nos
116
117
114
MATERIALS
PVC pipe 40mm dia 6Kgf/cm2 (Adding
15% for fittings wastage)
Adhesive and sundries etc
LABOUR
Fitter
Asstt. Fitter
Beldar
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Rs 259.33 /m
122
11.5000
MR 46
5.3300
9999
0.3300 Nos
1.3100 Nos
1.3100 Nos
116
117
114
MATERIALS:
PVC pipe 50mm dia 10Kgf/cm2 (Adding
15% for fittings wastage)
Adhesive and sundries etc
LABOUR:
Fitter grade-I
Assistant Fitter or II class Fitter
Beldar
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Rs 308.75 /m
12/26/2016 10:20:58
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Unit
Rate
Amount
metre
60.00
690.00
L.S.
1.78
9.49
Day
Day
Day
435.00
399.00
329.00
143.55
522.69
430.99
1796.72
690.00
6.90
696.90
1106.72
11.07
1117.79
2336.36
350.45
2686.81
268.68
metre
38.00
494.00
metre
109.30
1093.00
Day
Day
Day
435.00
399.00
329.00
143.55
263.34
217.14
2211.03
494.00
4.94
498.94
1717.03
17.17
1734.20
3042.49
456.37
3498.86
349.89
123
11.5000
MR 47
5.3300
9999
0.3300 Nos
1.3100 Nos
1.3100 Nos
116
117
114
MATERIALS:
PVC pipe 50mm dia 6Kgf/cm2 (Adding
15% for fittings wastage)
Adhesive and sundries etc
LABOUR:
Fitter grade-I
Assistant Fitter or II class Fitter
Beldar
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Rs 268.68 /m
124
13.0000 m
MR 36
10.0000
18.78
0.3300 Nos
0.6600 Nos
0.6600 Nos
116
117
114
MATERIALS
PVC pipe 15mm dia 12 Kgf/cm2 (Adding
30% for fittings wastage)
Making chases up to 7.5x7.5 cm in walls
including making good and finishing with
matching surface after housing G.I. pipe
etc.
LABOUR
Fitter
Asstt. Fitter
Beldar
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
12/26/2016 10:20:58
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Say
Unit
Rs 349.89 /m
Rate
Amount
metre
27.00
351.00
metre
109.30
1093.00
Day
Day
Day
435.00
399.00
329.00
143.55
263.34
217.14
2068.03
351.00
3.51
354.51
1717.03
17.17
1734.20
2898.06
434.71
3332.77
333.28
metre
40.50
526.50
metre
109.30
1093.00
Day
Day
Day
435.00
399.00
329.00
143.55
263.34
217.14
2243.53
526.50
5.27
531.77
1717.03
17.17
125
13.0000 m
MR 37
10.0000
18.78
0.3300 Nos
0.6600 Nos
0.6600 Nos
116
117
114
MATERIALS
PVC pipe 15mm dia 10 Kgf/cm2 (Adding
30% for fittings wastage)
Making chases up to 7.5x7.5 cm in walls
including making good and finishing with
matching surface after housing G.I. pipe
etc.
LABOUR
Fitter
Asstt. Fitter
Beldar
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Rs 333.28 /m
126
13.0000 m
10.0000
0.3300 Nos
0.6600 Nos
0.6600 Nos
MR 38
18.78
116
117
114
MATERIALS
PVC pipe 20mm dia 12 Kgf/cm2 (Adding
30% for fittings wastage)
Making chases up to 7.5x7.5 cm in walls
including making good and finishing with
matching surface after housing G.I. pipe
etc.
LABOUR
Fitter
Asstt. Fitter
Beldar
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
12/26/2016 10:20:58
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Unit
Rate
Amount
1734.20
3075.32
461.30
3536.62
353.66
metre
30.00
390.00
metre
109.30
1093.00
Day
Day
Day
435.00
399.00
329.00
143.55
263.34
217.14
2107.03
390.00
3.90
393.90
1717.03
17.17
1734.20
2937.45
440.62
3378.07
337.81
metre
61.00
793.00
metre
109.30
1093.00
Day
Day
Day
435.00
399.00
329.00
143.55
263.34
217.14
2510.03
Rs 353.66 /m
127
13.0000 m
MR 39
10.0000
18.78
0.3300 Nos
0.6600 Nos
0.6600 Nos
116
117
114
MATERIALS
PVC pipe 20mm dia 10 Kgf/cm2 (Adding
30% for fittings wastage)
Making chases up to 7.5x7.5 cm in walls
including making good and finishing with
matching surface after housing G.I. pipe
etc.
LABOUR
Fitter
Asstt. Fitter
Beldar
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Rs 337.81 /m
128
13.0000
10.0000
0.3300 Nos
0.6600 Nos
0.6600 Nos
MR 40
18.78
116
117
114
MATERIALS
PVC pipe 20mm dia 12 Kgf/cm2 (Adding
30% for fittings wastage)
Making chases up to 7.5x7.5 cm in walls
including making good and finishing with
matching surface after housing G.I. pipe
etc.
LABOUR
Fitter
Asstt. Fitter
Beldar
Total
12/26/2016 10:20:58
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Unit
Rate
Amount
793.00
7.93
800.93
1717.03
17.17
1734.20
3344.48
501.67
3846.15
384.62
metre
48.00
624.00
metre
109.30
1093.00
Day
Day
Day
435.00
399.00
329.00
143.55
263.34
217.14
2341.03
624.00
6.24
630.24
1717.03
17.17
1734.20
3173.79
476.07
3649.86
364.99
metre
65.00
845.00
metre
109.30
1093.00
Rs 384.62 /m
129
13.0000
MR 41
10.0000
18.78
0.3300 Nos
0.6600 Nos
0.6600 Nos
116
117
114
MATERIALS
PVC pipe 25mm dia 10 Kgf/cm2 (Adding
30% for fittings wastage)
Making chases up to 7.5x7.5 cm in walls
including making good and finishing with
matching surface after housing G.I. pipe
etc.
LABOUR
Fitter
Asstt. Fitter
Beldar
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Rs 364.99 /m
130
13.0000
10.0000
MR 42
18.78
MATERIALS
PVC pipe 32mm dia 10 Kgf/cm2 (Adding
30% for fittings wastage)
Making chases up to 7.5x7.5 cm in walls
including making good and finishing with
matching surface after housing G.I. pipe
etc.
12/26/2016 10:20:58
visit www.sahaayidotcom.blogspot.in
Quantity
0.3300 Nos
0.6600 Nos
0.6600 Nos
Code
116
117
114
Description of items
LABOUR
Fitter
Asstt. Fitter
Beldar
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Unit
Rate
Amount
Day
Day
Day
435.00
399.00
329.00
143.55
263.34
217.14
2562.03
845.00
8.45
853.45
1717.03
17.17
1734.20
3397.00
509.55
3906.55
390.66
metre
48.00
624.00
metre
109.30
1093.00
Day
Day
Day
435.00
399.00
329.00
143.55
263.34
217.14
2341.03
624.00
6.24
630.24
1717.03
17.17
1734.20
3173.79
476.07
3649.86
364.99
Rs 390.66 /m
131
13.0000
10.0000
0.3300 Nos
0.6600 Nos
0.6600 Nos
132
MR 43
18.78
116
117
114
MATERIALS
PVC pipe 32mm dia 6 Kgf/cm2 (Adding
30% for fittings wastage)
Making chases up to 7.5x7.5 cm in walls
including making good and finishing with
matching surface after housing G.I. pipe
etc.
LABOUR
Fitter
Asstt. Fitter
Beldar
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Rs 364.99 /m
12/26/2016 10:20:58
visit www.sahaayidotcom.blogspot.in
Quantity
13.0000
10.0000
0.3300 Nos
0.6600 Nos
0.6600 Nos
Code
MR 44
18.78
116
117
114
Description of items
PVC pipe 40mm dia 10 Kgf/cm2 (Adding
30% for fittings wastage)
Making chases up to 7.5x7.5 cm in walls
including making good and finishing with
matching surface after housing G.I. pipe
etc.
LABOUR
Fitter
Asstt. Fitter
Beldar
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Unit
Rate
Amount
metre
84.00
1092.00
metre
109.30
1093.00
Day
Day
Day
435.00
399.00
329.00
143.55
263.34
217.14
2809.03
1092.00
10.92
1102.92
1717.03
17.17
1734.20
3646.47
546.97
4193.44
419.34
metre
53.00
689.00
metre
109.30
1093.00
Day
Day
Day
435.00
399.00
329.00
143.55
263.34
217.14
2406.03
689.00
6.89
695.89
1717.03
17.17
1734.20
3239.44
485.92
3725.36
372.54
Rs 419.34 /m
133
13.0000
10.0000
0.3300 Nos
0.6600 Nos
0.6600 Nos
MR 45
18.78
116
117
114
MATERIALS
PVC pipe 40mm dia 6 Kgf/cm2 (Adding
30% for fittings wastage)
Making chases up to 7.5x7.5 cm in walls
including making good and finishing with
matching surface after housing G.I. pipe
etc.
LABOUR
Fitter
Asstt. Fitter
Beldar
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Rs 372.54 /m
12/26/2016 10:20:58
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Unit
Rate
Amount
metre
90.00
1170.00
metre
109.30
1093.00
Day
Day
Day
435.00
399.00
329.00
143.55
263.34
217.14
2887.03
1170.00
11.70
1181.70
1717.03
17.17
1734.20
3725.25
558.79
4284.04
428.40
metre
60.00
780.00
metre
109.30
1093.00
Day
Day
Day
435.00
399.00
329.00
143.55
263.34
217.14
2497.03
780.00
7.80
787.80
1717.03
17.17
1734.20
134
13.0000
MR 46
10.0000
18.78
0.3300 Nos
0.6600 Nos
0.6600 Nos
116
117
114
MATERIALS
PVC pipe 50mm dia 10 Kgf/cm2 (Adding
30% for fittings wastage)
Making chases up to 7.5x7.5 cm in walls
including making good and finishing with
matching surface after housing G.I. pipe
etc.
LABOUR
Fitter
Asstt. Fitter
Beldar
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Rs 428.40 /m
135
13.0000
10.0000
0.3300 Nos
0.6600 Nos
0.6600 Nos
MR 47
18.78
116
117
114
MATERIALS
PVC pipe 50mm dia 6 Kgf/cm2 (Adding
30% for fittings wastage)
Making chases up to 7.5x7.5 cm in walls
including making good and finishing with
matching surface after housing G.I. pipe
etc.
LABOUR
Fitter
Asstt. Fitter
Beldar
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
12/26/2016 10:20:58
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Unit
Rate
Amount
3331.35
499.70
3831.05
383.11
Day
Day
Day
435.00
399.00
329.00
174.00
159.60
394.80
Cum
5009.04
550.99
Cum
5059.13
556.50
1835.89
183.59
metre
118.00
1239.00
metre
183.59
1835.89
Day
Day
Day
435.00
399.00
329.00
143.55
263.34
217.14
3698.92
1239.00
12.39
1251.39
2459.92
24.60
2484.52
4895.44
734.32
5629.76
562.98
Rs 383.11 /m
136
0.4000 Nos
0.4000 Nos
1.2000 Nos
123
124
114
0.1100 m3
4.2.5
Rs 183.59 /m
137
10.5000
10.0000
0.3300 Nos
0.6600 Nos
0.6600 Nos
MR 49
OD
116
117
114
MATERIALS
PVC pipe 63mm dia 6 Kgf/cm2 (Adding 5%
for fittings wastage)
Making chases up to 12.5x12.5 cm in walls
including making good and finishing with
matching surface after housing G.I. pipe
etc.
LABOUR
Fitter
Asstt. Fitter
Beldar
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Rs 562.98 /m
12/26/2016 10:20:58
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Unit
Rate
Amount
metre
83.00
871.50
metre
183.59
1835.89
Day
Day
Day
435.00
399.00
329.00
143.55
263.34
217.14
3331.42
871.50
8.72
880.22
2459.92
24.60
2484.52
4524.27
678.64
5202.91
520.29
metre
129.00
1354.50
metre
183.59
1835.89
Day
Day
Day
435.00
399.00
329.00
143.55
263.34
217.14
3814.42
1354.50
13.55
1368.05
2459.92
24.60
2484.52
138
10.5000
MR 50
10.0000
OD
0.3300 Nos
0.6600 Nos
0.6600 Nos
116
117
114
MATERIALS
PVC pipe 63mm dia 4 Kgf/cm2 (Adding 5%
for fittings wastage)
Making chases up to 12.5x12.5 cm in walls
including making good and finishing with
matching surface after housing G.I. pipe
etc.
LABOUR
Fitter
Asstt. Fitter
Beldar
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Rs 520.29 /m
139
10.5000
10.0000
0.3300 Nos
0.6600 Nos
0.6600 Nos
MR 51
OD
116
117
114
MATERIALS
PVC pipe 75mm dia 6 Kgf/cm2 (Adding 5%
for fittings wastage)
Making chases up to 12.5x12.5 cm in walls
including making good and finishing with
matching surface after housing G.I. pipe
etc.
LABOUR
Fitter
Asstt. Fitter
Beldar
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
12/26/2016 10:20:58
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Unit
Rate
Amount
5012.10
751.82
5763.92
576.39
metre
95.00
997.50
metre
183.59
1835.89
Day
Day
Day
435.00
399.00
329.00
143.55
263.34
217.14
3457.42
997.50
9.98
1007.48
2459.92
24.60
2484.52
4651.53
697.73
5349.26
534.93
metre
211.00
2215.50
metre
183.59
1835.89
Day
Day
Day
435.00
399.00
329.00
143.55
263.34
217.14
4675.42
2215.50
Rs 576.39 /m
140
10.5000
MR 52
10.0000
OD
0.3300 Nos
0.6600 Nos
0.6600 Nos
116
117
114
MATERIALS
PVC pipe 75mm dia 4 Kgf/cm2 (Adding 5%
for fittings wastage)
Making chases up to 12.5x12.5 cm in walls
including making good and finishing with
matching surface after housing G.I. pipe
etc.
LABOUR
Fitter
Asstt. Fitter
Beldar
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Rs 534.93 /m
141
10.5000
10.0000
0.3300 Nos
0.6600 Nos
0.6600 Nos
MR 53
OD
116
117
114
MATERIALS
PVC pipe 110mm dia 6 Kgf/cm2 (Adding
5% for fittings wastage)
Making chases up to 12.5x12.5 cm in walls
including making good and finishing with
matching surface after housing G.I. pipe
etc.
LABOUR
Fitter
Asstt. Fitter
Beldar
Total
Market Rate cost
12/26/2016 10:20:58
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Unit
Rate
Amount
22.16
2237.66
2459.92
24.60
2484.52
5881.71
882.26
6763.97
676.40
Rs 676.40 /m
Total:
142
10.5000
10.0000
0.3300 Nos
0.6600 Nos
0.6600 Nos
MR 54
OD
116
117
114
MATERIALS
PVC pipe 110mm dia 4 Kgf/cm2 (Adding
5% for fittings wastage)
Making chases up to 12.5x12.5 cm in walls
including making good and finishing with
matching surface after housing G.I. pipe
etc.
LABOUR
Fitter
Asstt. Fitter
Beldar
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
metre
170.00
1785.00
metre
183.59
1835.89
Day
Day
Day
435.00
399.00
329.00
143.55
263.34
217.14
4244.92
1785.00
17.85
1802.85
2459.92
24.60
2484.52
5446.90
817.04
6263.94
626.39
metre
38.00
437.00
Day
Day
435.00
329.00
34.80
52.64
Day
Day
329.00
329.00
217.14
217.14
958.72
Rs 626.39 /m
143
11.5000 m
MR 36
0.0800 Nos
0.1600 Nos
116
114
0.6600 Nos
0.6600 Nos
114
115
MATERIALS:
15 mm dia 12Kgf/cm2 ( Add 15% for fittings
and wastage etc.)
LABOUR
Fitter
Belder
Labour for Trenching and refilling etc.
Beldar
Coolie
Total
12/26/2016 10:20:58
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Unit
Rate
Amount
437.00
4.37
441.37
521.72
5.22
526.94
1214.23
182.13
1396.36
139.64
metre
27.00
310.50
Day
Day
435.00
329.00
34.80
52.64
Day
Day
329.00
329.00
217.14
217.14
832.22
310.50
3.11
313.61
521.72
5.22
526.94
1086.47
162.97
1249.44
124.94
metre
40.50
465.75
Day
Day
435.00
329.00
34.80
52.64
Day
Day
329.00
329.00
217.14
217.14
987.47
465.75
4.66
470.41
521.72
5.22
Rs 139.64 /m
144
11.5000 m
MR 37
0.0800 Nos
0.1600 Nos
116
114
0.6600 Nos
0.6600 Nos
114
115
MATERIALS:
15 mm dia 10Kgf/cm2 ( Add 15% for fittings
and wastage etc.)
LABOUR
Fitter
Belder
Trenching and refilling etc.
Beldar
Coolie
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Rs 124.94 /m
145
11.5000 m
MR 38
0.0800 Nos
0.1600 Nos
116
114
0.6600 Nos
0.6600 Nos
114
115
MATERIALS:
20 mm dia 12Kgf/cm2 ( Add 15% for fittings
and wastage etc.)
LABOUR
Fitter
Belder
Trenching and refilling etc.
Beldar
Coolie
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
12/26/2016 10:20:58
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Unit
Rate
Amount
526.94
1243.27
186.49
1429.76
142.98
metre
30.00
345.00
Day
Day
435.00
329.00
34.80
52.64
Day
Day
329.00
329.00
217.14
217.14
866.72
345.00
3.45
348.45
521.72
5.22
526.94
1121.31
168.20
1289.51
128.95
metre
61.00
701.50
Day
Day
435.00
329.00
52.20
82.25
Day
Day
329.00
329.00
217.14
217.14
1270.23
701.50
7.02
708.52
568.73
5.69
574.42
1551.02
232.65
1783.67
178.37
Rs 142.98 /m
146
11.5000 m
MR 39
0.0800 Nos
0.1600 Nos
116
114
0.6600 Nos
0.6600 Nos
114
115
MATERIALS:
20 mm dia 10Kgf/cm2 ( Add 15% for fittings
and wastage etc.)
LABOUR
Fitter
Belder
Trenching and refilling etc.
Beldar
Coolie
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Rs 128.95 /m
147
11.5000 m
MR 40
0.1200 Nos
0.2500 Nos
116
114
0.6600 Nos
0.6600 Nos
114
115
MATERIALS:
25 mm dia 12Kgf/cm2 ( Add 15% for fittings
and wastage etc.)
LABOUR
Fitter
Belder
Trenching and refilling etc.
Beldar
Coolie
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
12/26/2016 10:20:58
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Say
Unit
Rs 178.37 /m
Rate
Amount
metre
48.00
552.00
Day
Day
435.00
329.00
52.20
82.25
Day
Day
329.00
329.00
217.14
217.14
1120.73
552.00
5.52
557.52
568.73
5.69
574.42
1400.02
210.00
1610.02
161.00
metre
65.00
747.50
Day
Day
435.00
329.00
52.20
82.25
Day
Day
329.00
329.00
217.14
217.14
1316.23
747.50
7.48
754.98
568.73
5.69
574.42
1597.48
239.62
1837.10
183.71
148
11.5000 m
MR 41
0.1200 Nos
0.2500 Nos
116
114
0.6600 Nos
0.6600 Nos
114
115
MATERIALS:
25 mm dia 10Kgf/cm2 ( Add 15% for fittings
and wastage etc.)
LABOUR
Fitter
Belder
Trenching and refilling etc.
Beldar
Coolie
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Rs 161.00 /m
149
11.5000 m
MR 42
0.1200 Nos
0.2500 Nos
116
114
0.6600 Nos
0.6600 Nos
114
115
MATERIALS:
32 mm dia 10Kgf/cm2 ( Add 15% for fittings
and wastage etc.)
LABOUR
Fitter
Belder
Trenching and refilling etc.
Beldar
Coolie
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Rs 183.71 /m
12/26/2016 10:20:58
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Unit
Rate
Amount
metre
48.00
552.00
Day
Day
435.00
329.00
52.20
82.25
Day
Day
329.00
329.00
217.14
217.14
1120.73
552.00
5.52
557.52
568.73
5.69
574.42
1400.02
210.00
1610.02
161.00
metre
84.00
966.00
Day
Day
435.00
329.00
69.60
108.57
Day
Day
329.00
329.00
217.14
217.14
1578.45
966.00
9.66
975.66
612.45
6.12
618.57
1882.92
282.44
2165.36
216.54
150
11.5000 m
MR 43
0.1200 Nos
0.2500 Nos
116
114
0.6600 Nos
0.6600 Nos
114
115
MATERIALS:
32 mm dia 6Kgf/cm2 ( Add 15% for fittings
and wastage etc.)
LABOUR
Fitter
Belder
Trenching and refilling etc.
Beldar
Coolie
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Rs 161.00 /m
151
11.5000 m
MR 44
0.1600 Nos
0.3300 Nos
116
114
0.6600 Nos
0.6600 Nos
114
115
MATERIALS:
40 mm dia 10Kgf/cm2 ( Add 15% for fittings
and wastage etc.)
LABOUR
Fitter
Belder
Trenching and refilling etc.
Beldar
Coolie
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Rs 216.54 /m
12/26/2016 10:20:58
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Unit
Rate
Amount
metre
53.00
609.50
Day
Day
435.00
329.00
69.60
108.57
Day
Day
329.00
329.00
217.14
217.14
1221.95
609.50
6.10
615.60
612.45
6.12
618.57
1522.86
228.43
1751.29
175.13
metre
90.00
1035.00
Day
Day
435.00
329.00
69.60
108.57
Day
Day
329.00
329.00
217.14
217.14
1647.45
1035.00
10.35
1045.35
612.45
6.12
618.57
1952.61
292.89
2245.50
224.55
152
11.5000 m
MR 45
0.1600 Nos
0.3300 Nos
116
114
0.6600 Nos
0.6600 Nos
114
115
MATERIALS:
40 mm dia 6Kgf/cm2 ( Add 15% for fittings
and wastage etc.)
LABOUR
Fitter
Belder
Trenching and refilling etc.
Beldar
Coolie
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Rs 175.13 /m
153
11.5000 m
MR 46
0.1600 Nos
0.3300 Nos
116
114
0.6600 Nos
0.6600 Nos
114
115
MATERIALS:
50 mm dia 10Kgf/cm2 ( Add 15% for fittings
and wastage etc.)
LABOUR
Fitter
Belder
Trenching and refilling etc.
Beldar
Coolie
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Rs 224.55 /m
12/26/2016 10:20:58
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Unit
Rate
Amount
metre
60.00
690.00
Day
Day
435.00
329.00
69.60
108.57
Day
Day
329.00
329.00
217.14
217.14
1302.45
690.00
6.90
696.90
612.45
6.12
618.57
1604.16
240.62
1844.78
184.48
metre
118.00
1357.00
Day
Day
435.00
329.00
108.75
217.14
Day
Day
329.00
329.00
217.14
217.14
2117.17
1357.00
13.57
1370.57
760.17
7.60
767.77
2496.66
374.50
2871.16
287.12
154
11.5000 m
MR 47
0.1600 Nos
0.3300 Nos
116
114
0.6600 Nos
0.6600 Nos
114
115
MATERIALS:
50 mm dia 6Kgf/cm2 ( Add 15% for fittings
and wastage etc.)
LABOUR
Fitter
Belder
Trenching and refilling etc.
Beldar
Coolie
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Rs 184.48 /m
155
11.5000 m
MR 49
0.2500 Nos
0.6600 Nos
116
114
0.6600 Nos
0.6600 Nos
114
115
MATERIALS:
63 mm dia 6Kgf/cm2 ( Add 15% for fittings
and wastage etc.)
LABOUR
Fitter
Belder
Trenching and refilling etc.
Beldar
Coolie
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Rs 287.12 /m
12/26/2016 10:20:58
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Unit
Rate
Amount
metre
83.00
954.50
Day
Day
435.00
329.00
108.75
217.14
Day
Day
329.00
329.00
217.14
217.14
1714.67
954.50
9.55
964.05
760.17
7.60
767.77
2090.14
313.52
2403.66
240.37
metre
129.00
1483.50
Day
Day
435.00
329.00
108.75
217.14
Day
Day
329.00
329.00
217.14
217.14
2243.67
1483.50
14.84
1498.34
760.17
7.60
767.77
2624.43
393.66
3018.09
301.81
156
11.5000 m
MR 50
0.2500 Nos
0.6600 Nos
116
114
0.6600 Nos
0.6600 Nos
114
115
MATERIALS:
63 mm dia 4Kgf/cm2 ( Add 15% for fittings
and wastage etc.)
LABOUR
Fitter
Belder
Trenching and refilling etc.
Beldar
Coolie
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Rs 240.37 /m
157
11.5000 m
MR 51
0.2500 Nos
0.6600 Nos
116
114
0.6600 Nos
0.6600 Nos
114
115
MATERIALS:
75 mm dia 6Kgf/cm2 ( Add 15% for fittings
and wastage etc.)
LABOUR
Fitter
Belder
Trenching and refilling etc.
Beldar
Coolie
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Rs 301.81 /m
12/26/2016 10:20:58
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Unit
Rate
Amount
metre
95.00
1092.50
Day
Day
435.00
329.00
108.75
217.14
Day
Day
329.00
329.00
217.14
217.14
1852.67
1092.50
10.93
1103.43
760.17
7.60
767.77
2229.52
334.43
2563.95
256.40
metre
211.00
2426.50
Day
Day
435.00
329.00
160.95
319.13
Day
Day
329.00
329.00
263.20
263.20
3432.98
2426.50
24.27
2450.77
1006.48
10.06
1016.54
3941.73
591.26
4532.99
453.30
158
11.5000 m
MR 52
0.2500 Nos
0.6600 Nos
116
114
0.6600 Nos
0.6600 Nos
114
115
MATERIALS:
75 mm dia 4Kgf/cm2 ( Add 15% for fittings
and wastage etc.)
LABOUR
Fitter
Belder
Trenching and refilling etc.
Beldar
Coolie
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Rs 256.40 /m
159
11.5000 m
MR 53
0.3700 Nos
0.9700 Nos
116
114
0.8000 Nos
0.8000 Nos
114
115
MATERIALS:
110 mm dia 6Kgf/cm2 ( Add 15% for fittings
and wastage etc.)
LABOUR
Fitter
Belder
Trenching and refilling etc.
Beldar
Coolie
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Rs 453.30 /m
12/26/2016 10:20:58
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Unit
Rate
Amount
metre
170.00
1955.00
Day
Day
435.00
329.00
160.95
319.13
Day
Day
329.00
329.00
263.20
263.20
2961.48
1955.00
19.55
1974.55
1006.48
10.06
1016.54
3465.51
519.83
3985.34
398.53
metre
520.00
5980.00
Day
Day
435.00
329.00
160.95
319.13
Day
Day
329.00
329.00
263.20
263.20
6986.48
5980.00
59.80
6039.80
1006.48
10.06
1016.54
7530.76
1129.61
8660.37
866.04
160
11.5000 m
MR 54
0.3700 Nos
0.9700 Nos
116
114
0.8000 Nos
0.8000 Nos
114
115
MATERIALS:
110 mm dia 6Kgf/cm2 ( Add 15% for fittings
and wastage etc.)
LABOUR
Fitter
Belder
Trenching and refilling etc.
Beldar
Coolie
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Rs 398.53 /m
161
11.5000 m
MR 55
0.3700 Nos
0.9700 Nos
116
114
0.8000 Nos
0.8000 Nos
114
115
MATERIALS:
150 mm dia 6Kgf/cm2 ( Add 15% for fittings
and wastage etc.)
LABOUR
Fitter
Belder
Trenching and refilling etc.
Beldar
Coolie
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Rs 866.04 /m
12/26/2016 10:20:59
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Unit
Rate
Amount
metre
38.00
437.00
L.S.
1.78
4.86
Day
Day
Day
L.S.
435.00
399.00
329.00
1.78
143.55
327.18
217.14
55.14
1184.87
437.00
4.37
441.37
747.87
7.48
755.35
1549.24
232.39
1781.63
178.16
metre
27.00
310.50
L.S.
L.S.
1.78
1.78
4.86
4.86
Day
Day
Day
L.S.
435.00
399.00
329.00
1.78
143.55
327.18
217.14
55.14
1063.23
4.86
0.05
4.91
1058.37
10.58
1068.95
1572.74
235.91
1808.65
180.87
162
11.5000 m
MR 36
2.7300
9999
0.3300 Nos
0.8200 Nos
0.6600 Nos
30.9800
116
117
114
9999
MATERIALS:
PVC pipe 15mm dia 12Kgf/cm2 (Adding
15% for fittings and wastage)
Adhesive and sundries etc
LABOUR:
Fitter grade-I
Assistant Fitter or II class Fitter
Beldar
Scaffolding etc.
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Rs 178.16 /m
163
11.5000 m
MR 37
2.7300
2.7300
9999
9999
0.3300 Nos
0.8200 Nos
0.6600 Nos
30.9800
116
117
114
9999
MATERIALS:
PVC pipe 15mm dia 10Kgf/cm2 (Adding
15% for fittings and wastage)
Adhesive and sundries etc
Adhesive and sundries etc
LABOUR:
Fitter grade-I
Assistant Fitter or II class Fitter
Beldar
Scaffolding etc.
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Rs 180.87 /m
12/26/2016 10:20:59
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Unit
Rate
Amount
metre
40.50
465.75
L.S.
1.78
4.86
Day
Day
Day
L.S.
435.00
399.00
329.00
1.78
143.55
391.02
217.14
55.14
1277.46
465.75
4.66
470.41
811.71
8.12
819.83
1672.85
250.93
1923.78
192.38
metre
30.00
345.00
L.S.
1.78
4.86
Day
Day
Day
L.S.
435.00
399.00
329.00
1.78
143.55
391.02
217.14
55.14
1156.71
345.00
3.45
348.45
811.71
8.12
819.83
1550.89
232.63
1783.52
178.35
164
11.5000 m
MR 38
2.7300
9999
0.3300 Nos
0.9800 Nos
0.6600 Nos
30.9800
116
117
114
9999
MATERIALS:
20 mm dia 12Kgf/cm2 ( Add 15% for fittings
and wastage etc.)
Adhesive and sundries etc
LABOUR:
Fitter grade-I
Assistant Fitter or II class Fitter
Beldar
Scaffolding etc.
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Rs 192.38 /m
165
11.5000 m
MR 39
2.7300
9999
0.3300 Nos
0.9800 Nos
0.6600 Nos
30.9800
116
117
114
9999
MATERIALS:
20 mm dia 10Kgf/cm2 ( Add 15% for fittings
and wastage etc.)
Adhesive and sundries etc
LABOUR:
Fitter grade-I
Assistant Fitter or II class Fitter
Beldar
Scaffolding etc.
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Rs 178.35 /m
12/26/2016 10:20:59
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Unit
Rate
Amount
metre
61.00
701.50
L.S.
1.78
4.86
Day
Day
Day
L.S.
435.00
399.00
329.00
1.78
143.55
391.02
217.14
55.14
1513.21
701.50
7.02
708.52
811.71
8.12
819.83
1910.96
286.64
2197.60
219.76
metre
48.00
552.00
Day
Day
Day
L.S.
435.00
399.00
329.00
1.78
143.55
391.02
217.14
55.14
1358.85
552.00
5.52
557.52
806.85
8.07
814.92
1752.76
262.91
2015.67
201.57
166
11.5000 m
MR 40
2.7300
9999
0.3300 Nos
0.9800 Nos
0.6600 Nos
30.9800
116
117
114
9999
MATERIALS:
25 mm dia 12Kgf/cm2 ( Add 15% for fittings
and wastage etc.)
Adhesive and sundries etc
LABOUR:
Fitter grade-I
Assistant Fitter or II class Fitter
Beldar
Scaffolding etc.
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Rs 219.76 /m
167
11.5000 m
0.3300 Nos
0.9800 Nos
0.6600 Nos
30.9800
MR 41
116
117
114
9999
MATERIALS:
25 mm dia 10Kgf/cm2 ( Add 15% for fittings
and wastage etc.)
LABOUR:
Fitter grade-I
Assistant Fitter or II class Fitter
Beldar
Scaffolding etc.
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Rs 201.57 /m
12/26/2016 10:20:59
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Unit
Rate
Amount
metre
65.00
747.50
L.S.
1.78
7.40
Day
Day
Day
L.S.
435.00
399.00
329.00
1.78
143.55
391.02
322.42
55.14
1667.03
747.50
7.48
754.98
919.53
9.20
928.73
2117.15
317.57
2434.72
243.47
metre
48.00
552.00
L.S.
1.78
7.40
Day
Day
Day
L.S.
435.00
399.00
329.00
1.78
143.55
391.02
322.42
55.14
1471.53
552.00
5.52
557.52
919.53
9.20
928.73
1919.69
287.95
2207.64
220.76
168
11.5000 m
MR 42
4.1600
9999
0.3300 Nos
0.9800 Nos
0.9800 Nos
30.9800
116
117
114
9999
MATERIALS
32 mm dia 10Kgf/cm2 ( Add 15% for fittings
and wastage etc.)
Adhesive and sundries etc
LABOUR
Fitter
Asstt. Fitter
Beldar
Scaffolding etc.
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Rs 243.47 /m
169
11.5000 m
MR 43
4.1600
9999
0.3300 Nos
0.9800 Nos
0.9800 Nos
30.9800
116
117
114
9999
MATERIALS
32 mm dia 6Kgf/cm2 ( Add 15% for fittings
and wastage etc.)
Adhesive and sundries etc
LABOUR
Fitter
Asstt. Fitter
Beldar
Scaffolding etc.
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Rs 220.76 /m
12/26/2016 10:20:59
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Unit
Rate
Amount
metre
84.00
966.00
L.S.
1.78
9.49
Day
Day
Day
L.S.
435.00
399.00
329.00
1.78
143.55
522.69
430.99
55.14
2127.86
966.00
9.66
975.66
1161.86
11.62
1173.48
2696.80
404.52
3101.32
310.13
metre
53.00
609.50
L.S.
1.78
9.49
Day
Day
Day
L.S.
435.00
399.00
329.00
1.78
143.55
522.69
430.99
55.14
1771.36
609.50
6.10
615.60
1161.86
11.62
1173.48
2336.74
350.51
2687.25
268.73
170
11.5000 m
MR 43
5.3300
9999
0.3300 Nos
1.3100 Nos
1.3100 Nos
30.9800
116
117
114
9999
MATERIALS
40 mm dia 10Kgf/cm2 ( Add 15% for fittings
and wastage etc.)
Adhesive and sundries etc
LABOUR
Fitter
Asstt. Fitter
Beldar
Scaffolding etc.
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Rs 310.13 /m
171
11.5000 m
MR 45
5.3300
9999
0.3300 Nos
1.3100 Nos
1.3100 Nos
30.9800
116
117
114
9999
MATERIALS
40 mm dia 6Kgf/cm2 ( Add 15% for fittings
and wastage etc.)
Adhesive and sundries etc
LABOUR
Fitter
Asstt. Fitter
Beldar
Scaffolding etc.
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Rs 268.73 /m
12/26/2016 10:20:59
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Unit
Rate
Amount
metre
90.00
1035.00
L.S.
1.78
9.49
Day
Day
Day
L.S.
435.00
399.00
329.00
1.78
143.55
522.69
430.99
55.14
2196.86
1035.00
10.35
1045.35
1161.86
11.62
1173.48
2766.49
414.97
3181.46
318.15
metre
60.00
690.00
L.S.
1.78
9.49
Day
Day
Day
L.S.
435.00
399.00
329.00
1.78
143.55
522.69
430.99
55.14
1851.86
690.00
6.90
696.90
1161.86
11.62
1173.48
2418.04
362.71
2780.75
278.08
172
11.5000 m
MR 46
5.3300
9999
0.3300 Nos
1.3100 Nos
1.3100 Nos
30.9800
116
117
114
9999
MATERIALS:
50 mm dia 10Kgf/cm2 ( Add 15% for fittings
and wastage etc.)
Adhesive and sundries etc
LABOUR:
Fitter grade-I
Assistant Fitter or II class Fitter
Beldar
Scaffolding etc.
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Rs 318.15 /m
173
11.5000 m
MR 47
5.3300
9999
0.3300 Nos
1.3100 Nos
1.3100 Nos
30.9800
116
117
114
9999
MATERIALS:
50 mm dia 6Kgf/cm2 ( Add 15% for fittings
and wastage etc.)
Adhesive and sundries etc
LABOUR:
Fitter grade-I
Assistant Fitter or II class Fitter
Beldar
Scaffolding etc.
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Rs 278.08 /m
12/26/2016 10:20:59
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Unit
Rate
Amount
118.00
1239.00
L.S.
L.S.
1.78
1.78
40.10
18.28
Day
Day
Day
L.S.
435.00
329.00
363.00
1.78
139.20
203.98
47.19
55.14
1742.89
1239.00
12.39
1251.39
503.89
5.04
508.93
1997.84
299.68
2297.52
229.75
metre
83.00
871.50
L.S.
L.S.
1.78
1.78
40.10
18.28
Day
Day
Day
L.S.
435.00
329.00
363.00
1.78
139.20
203.98
47.19
55.14
503.89
0.00
0.00
0.00
503.89
5.04
508.93
746.45
174
10.5000 m
MR 49
22.5300
10.2700
9999
9999
0.3200 Nos
0.6200 Nos
0.1300 Nos
30.9800
116
114
100
9999
MATERIALS:
63 mm dia 6Kgf/cm2 ( Add 5% for fittings
and wastage etc.)
Carriage of materials
Adhesive, and sundries etc.
LABOUR:
Fitter
Beldar
Bandhani
Scaffolding etc.
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
metre
Rs 229.75 /m
175
10.5000 m
MR 50
22.5300
10.2700
9999
9999
0.3200 Nos
0.6200 Nos
0.1300 Nos
30.9800
116
114
100
9999
MATERIALS:
63 mm dia 4Kgf/cm2 ( Add 5% for fittings
and wastage etc.)
(5% added for wastage etc)
Carriage of materials
Adhesive, and sundries etc.
LABOUR:
Fitter
Beldar
Bandhani
Scaffolding etc.
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
12/26/2016 10:20:59
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Unit
Rate
Amount
111.97
858.42
85.84
129.00
1354.50
L.S.
L.S.
1.78
1.78
40.10
18.28
Day
Day
Day
L.S.
435.00
329.00
363.00
1.78
139.20
203.98
47.19
55.14
1858.39
1354.50
13.55
1368.05
503.89
5.04
508.93
2114.50
317.18
2431.68
243.17
metre
95.00
997.50
L.S.
L.S.
1.78
1.78
40.10
18.28
Day
Day
Day
L.S.
435.00
329.00
363.00
1.78
139.20
203.98
47.19
55.14
1501.39
997.50
9.98
1007.48
503.89
Rs 85.84 /m
176
10.5000 m
MR 51
22.5300
10.2700
9999
9999
0.3200 Nos
0.6200 Nos
0.1300 Nos
30.9800
116
114
100
9999
MATERIALS:
75mm dia 6Kgf/cm2 ( Add 5% for fittings
and wastage etc.)
Carriage of materials
Adhesive, and sundries etc.
LABOUR:
Fitter
Beldar
Bandhani
Scaffolding etc.
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
metre
Rs 243.17 /m
177
10.5000 m
MR 52
22.5300
10.2700
9999
9999
0.3200 Nos
0.6200 Nos
0.1300 Nos
30.9800
116
114
100
9999
MATERIALS:
75 mm dia 4Kgf/cm2 ( Add 5% for fittings
and wastage etc.)
Carriage of materials
Adhesive, and sundries etc.
LABOUR:
Fitter
Beldar
Bandhani
Scaffolding etc.
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
12/26/2016 10:20:59
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Unit
Rate
Amount
5.04
508.93
1753.93
263.09
2017.02
201.70
211.00
2215.50
L.S.
L.S.
1.78
1.78
40.10
18.28
Day
Day
Day
L.S.
435.00
329.00
363.00
1.78
139.20
203.98
47.19
55.14
2719.39
2215.50
22.16
2237.66
503.89
5.04
508.93
2984.11
447.62
3431.73
343.17
170.00
1785.00
L.S.
L.S.
1.78
1.78
40.10
18.28
Day
Day
Day
L.S.
435.00
329.00
363.00
1.78
139.20
203.98
47.19
55.14
2288.89
1785.00
Rs 201.70 /m
178
10.5000 m
MR 53
22.5300
10.2700
9999
9999
0.3200 Nos
0.6200 Nos
0.1300 Nos
30.9800
116
114
100
9999
MATERIALS:
110 mm dia 6Kgf/cm2 ( Add 5% for fittings
and wastage etc.)
Carriage of materials
Adhesive, and sundries etc.
LABOUR:
Fitter
Beldar
Bandhani
Scaffolding etc.
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
metre
Rs 343.17 /m
179
10.5000 m
MR 54
22.5300
10.2700
9999
9999
0.3200 Nos
0.6200 Nos
0.1300 Nos
30.9800
116
114
100
9999
MATERIALS:
110 mm dia 4Kgf/cm2 ( Add 5% for fittings
and wastage etc.)
Carriage of materials
Adhesive, and sundries etc.
LABOUR:
Fitter
Beldar
Bandhani
Scaffolding etc.
Total
Market Rate cost
metre
12/26/2016 10:20:59
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 10 m
Hence for 1 m
Say
Unit
Rate
Amount
17.85
1802.85
503.89
5.04
508.93
2549.30
382.40
2931.70
293.17
each
L.S.
30.00
1.78
30.00
4.86
L.S.
1.78
16.66
51.52
30.00
0.30
30.30
21.52
0.22
21.74
62.19
9.33
71.52
each
L.S.
22.40
1.78
22.40
4.86
L.S.
1.78
16.66
43.92
22.40
0.22
22.62
21.52
0.22
21.74
54.51
8.18
62.69
36.40
1.78
36.40
4.86
Rs 293.17 /m
180
1.0000 Nos
2.7300
9.3600
MR 56
9999
9999
MATERIALS:
63 mm dia Elbow
Adhesive, and sundries etc.
LABOURCarriage and fixing charges
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Rs 71.52 /Each
181
1.0000 Nos
2.7300
9.3600
MR 57
9999
9999
MATERIALS:
63 mm dia 45 degree Elbow
Adhesive, and sundries etc.
LABOURCarriage and fixing charges
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Rs 62.69 /Each
182
1.0000 Nos
2.7300
MR 58
9999
MATERIALS:
63 mm dia Door Elbow
Adhesive, and sundries etc.
each
L.S.
12/26/2016 10:20:59
visit www.sahaayidotcom.blogspot.in
Quantity
Code
9.3600
9999
Description of items
LABOURCarriage and fixing charges
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Unit
Rate
Amount
L.S.
1.78
16.66
57.92
36.40
0.36
36.76
21.52
0.22
21.74
68.65
10.30
78.95
each
L.S.
35.50
1.78
35.50
4.86
L.S.
1.78
16.66
57.02
35.50
0.36
35.86
21.52
0.22
21.74
67.75
10.16
77.91
each
L.S.
39.60
1.78
39.60
6.07
L.S.
1.78
16.66
62.33
39.60
0.40
40.00
22.73
0.23
22.96
73.68
11.05
84.73
Rs 78.95 /Each
183
1.0000 Nos
2.7300
9.3600
MR 59
9999
9999
MATERIALS:
63 mm dia Bend
Adhesive, and sundries etc.
LABOURCarriage and fixing charges
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Rs 77.91 /Each
184
1.0000 Nos
3.4100
9.3600
185
MR 60
9999
9999
MATERIALS:
63 x 63 x 63 mm dia Tee
Adhesive, and sundries etc.
LABOURCarriage and fixing charges
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Rs 84.73 /Each
12/26/2016 10:20:59
visit www.sahaayidotcom.blogspot.in
Quantity
Code
1.0000 Nos
3.4100
MR 61
9999
9.3600
9999
Description of items
MATERIALS:
63 x 63 x 63 mm dia Door Tee
Adhesive, and sundries etc.
LABOURCarriage and fixing charges
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Unit
Rate
Amount
each
L.S.
46.50
1.78
46.50
6.07
L.S.
1.78
16.66
69.23
46.50
0.47
46.97
22.73
0.23
22.96
80.65
12.10
92.75
each
L.S.
33.00
1.78
33.00
4.86
L.S.
1.78
16.66
54.52
33.00
0.33
33.33
21.52
0.22
21.74
65.22
9.78
75.00
each
L.S.
18.90
1.78
18.90
4.86
L.S.
1.78
16.66
40.42
18.90
0.19
19.09
21.52
0.22
21.74
50.98
7.65
58.63
Rs 92.75 /Each
186
1.0000 Nos
2.7300
9.3600
MR 62
9999
9999
MATERIALS:
Cost of 63mm Vent cowl
Adhesive, and sundries etc.
LABOURCarriage and fixing charges
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Rs 75.00 /Each
187
1.0000 Nos
2.7300
9.3600
MR 63
9999
9999
MATERIALS:
63 mm dia End cap
Adhesive, and sundries etc.
LABOURCarriage and fixing charges
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Rs 58.63 /Each
12/26/2016 10:20:59
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Unit
Rate
Amount
each
L.S.
24.10
1.78
24.10
4.86
L.S.
1.78
16.66
45.62
24.10
0.24
24.34
21.52
0.22
21.74
56.23
8.43
64.66
each
L.S.
22.00
1.78
22.00
4.86
L.S.
1.78
16.66
43.52
22.00
0.22
22.22
21.52
0.22
21.74
54.11
8.12
62.23
each
L.S.
48.75
1.78
48.75
4.86
L.S.
1.78
16.66
70.27
48.75
0.49
49.24
21.52
0.22
21.74
81.13
188
1.0000 Nos
2.7300
9.3600
MR 64
9999
9999
MATERIALS:
63 mm dia Socket/ coupling
Adhesive, and sundries etc.
LABOURCarriage and fixing charges
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Rs 64.66 /Each
189
1.0000 Nos
2.7300
9.3600
MR 65
9999
9999
MATERIALS:
63 x 50 mm dia Reducer
Adhesive, and sundries etc.
LABOURCarriage and fixing charges
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Rs 62.23 /Each
190
1.0000 Nos
2.7300
9.3600
MR 66
9999
9999
MATERIALS:
75 mm dia Elbow
Adhesive, and sundries etc.
LABOURCarriage and fixing charges
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
12/26/2016 10:20:59
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Add CPOH 15%
Total
Say
Unit
Rate
Amount
12.17
93.30
each
L.S.
27.80
1.78
27.80
4.86
L.S.
1.78
16.66
49.32
27.80
0.28
28.08
21.52
0.22
21.74
59.97
9.00
68.97
each
L.S.
48.75
1.78
48.75
4.86
L.S.
1.78
16.66
70.27
48.75
0.49
49.24
21.52
0.22
21.74
81.13
12.17
93.30
each
L.S.
43.50
1.78
43.50
4.86
L.S.
1.78
16.66
65.02
43.50
0.44
43.94
21.52
Rs 93.30 /Each
191
1.0000 Nos
2.7300
9.3600
MR 67
9999
9999
MATERIALS:
75 mm 45 degree Elbow
Adhesive, and sundries etc.
LABOURCarriage and fixing charges
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Rs 68.97 /Each
192
1.0000 Nos
2.7300
9.3600
MR 68
9999
9999
MATERIALS:
75 mm dia Door Elbow
Adhesive, and sundries etc.
LABOURCarriage and fixing charges
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Rs 93.30 /Each
193
1.0000 Nos
2.7300
9.3600
MR 69
9999
9999
MATERIALS:
75 mm dia Bend
Adhesive, and sundries etc.
LABOURCarriage and fixing charges
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
12/26/2016 10:20:59
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Unit
Rate
Amount
0.22
21.74
75.83
11.37
87.20
each
L.S.
47.20
1.78
47.20
6.07
L.S.
1.78
16.66
69.93
47.20
0.47
47.67
22.73
0.23
22.96
81.35
12.20
93.55
each
L.S.
57.55
1.78
57.55
6.07
L.S.
1.78
16.66
80.28
57.55
0.58
58.13
22.73
0.23
22.96
91.81
13.77
105.58
each
L.S.
42.00
1.78
42.00
4.86
L.S.
1.78
16.66
63.52
42.00
Rs 87.20 /Each
194
1.0000 Nos
3.4100
9.3600
MR 70
9999
9999
MATERIALS:
75x 75 x 75 mm dia Tee
Adhesive, and sundries etc.
LABOURCarriage and fixing charges
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Rs 93.55 /Each
195
1.0000 Nos
3.4100
9.3600
MR 71
9999
9999
MATERIALS:
75 x 75 x 75 mm dia Door Tee
Adhesive, and sundries etc.
LABOURCarriage and fixing charges
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Rs 105.58 /Each
196
1.0000 Nos
2.7300
9.3600
MR 72
9999
9999
MATERIALS:
75mm Vent cowl
Adhesive, and sundries etc.
LABOURCarriage and fixing charges
Total
Market Rate cost
12/26/2016 10:20:59
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Unit
Rate
Amount
0.42
42.42
21.52
0.22
21.74
74.31
11.15
85.46
each
L.S.
22.75
1.78
22.75
4.86
L.S.
1.78
16.66
44.27
22.75
0.23
22.98
21.52
0.22
21.74
54.87
8.23
63.10
each
L.S.
29.80
1.78
29.80
4.86
L.S.
1.78
16.66
51.32
29.80
0.30
30.10
21.52
0.22
21.74
61.99
9.30
71.29
27.50
1.78
27.50
4.86
Rs 85.46 /Each
197
1.0000 Nos
2.7300
9.3600
MR 73
9999
9999
MATERIALS:
75mm dia End cap
Adhesive, and sundries etc.
LABOURCarriage and fixing charges
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Rs 63.10 /Each
198
1.0000 Nos
2.7300
9.3600
MR 74
9999
9999
MATERIALS:
75 mm dia Socket/ coupling
Adhesive, and sundries etc.
LABOURCarriage and fixing charges
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Rs 71.29 /Each
199
1.0000 Nos
2.7300
MR 75
9999
MATERIALS:
75 x 63 mm dia Reducer
Adhesive, and sundries etc.
LABOUR-
each
L.S.
12/26/2016 10:20:59
visit www.sahaayidotcom.blogspot.in
Quantity
9.3600
Code
9999
Description of items
Carriage and fixing charges
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Unit
L.S.
Rate
1.78
Amount
16.66
49.02
27.50
0.28
27.78
21.52
0.22
21.74
59.67
8.95
68.62
each
L.S.
140.00
1.78
140.00
4.86
L.S.
1.78
19.21
164.07
140.00
1.40
141.40
24.07
0.24
24.31
177.06
26.56
203.62
each
L.S.
160.00
1.78
160.00
4.86
L.S.
1.78
19.21
184.07
160.00
1.60
161.60
24.07
0.24
24.31
197.26
29.59
226.85
Rs 68.62 /Each
200
1.0000 Nos
2.7300
10.7900
MR 76
9999
9999
MATERIALS:
110 mm dia Elbow
Adhesive, and sundries etc.
LABOURCarriage and fixing charges
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Rs 203.62 /Each
201
1.0000 Nos
2.7300
10.7900
202
MR 77
9999
9999
MATERIALS:
110 mm dia 45 degree Elbow
Adhesive, and sundries etc.
LABOURCarriage and fixing charges
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Rs 226.85 /Each
12/26/2016 10:20:59
visit www.sahaayidotcom.blogspot.in
Quantity
1.0000 Nos
2.7300
10.7900
Code
MR 78
9999
9999
Description of items
110 mm dia Door Elbow
Adhesive, and sundries etc.
LABOURCarriage and fixing charges
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Unit
each
L.S.
Rate
175.00
1.78
Amount
175.00
4.86
L.S.
1.78
19.21
199.07
175.00
1.75
176.75
24.07
0.24
24.31
212.41
31.86
244.27
each
L.S.
129.00
1.78
129.00
4.86
L.S.
1.78
19.21
153.07
129.00
1.29
130.29
24.07
0.24
24.31
165.95
24.89
190.84
each
L.S.
170.00
1.78
170.00
6.07
L.S.
1.78
19.21
195.28
170.00
1.70
171.70
25.28
0.25
25.53
209.14
31.37
240.51
Rs 244.27 /Each
203
1.0000 Nos
2.7300
10.7900
MR 79
9999
9999
MATERIALS:
110 mm dia Bend
Adhesive, and sundries etc.
LABOURCarriage and fixing charges
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Rs 190.84 /Each
204
1.0000 Nos
3.4100
10.7900
MR 80
9999
9999
MATERIALS:
110x 110 x 110 mm dia Tee
Adhesive, and sundries etc.
LABOURCarriage and fixing charges
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Rs 240.51 /Each
12/26/2016 10:20:59
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Unit
Rate
Amount
each
L.S.
202.00
1.78
202.00
6.07
L.S.
1.78
19.21
227.28
202.00
2.02
204.02
25.28
0.25
25.53
241.46
36.22
277.68
each
L.S.
117.00
1.78
117.00
6.07
L.S.
1.78
19.21
142.28
117.00
1.17
118.17
25.28
0.25
25.53
155.61
23.34
178.95
each
L.S.
70.00
1.78
70.00
4.86
L.S.
1.78
19.21
94.07
70.00
0.70
70.70
24.07
0.24
24.31
205
1.0000 Nos
3.4100
10.7900
MR 81
9999
9999
MATERIALS:
110x 110 x 110 mm dia Door Tee
Adhesive, and sundries etc.
LABOURCarriage and fixing charges
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Rs 277.68 /Each
206
1.0000 Nos
3.4100
10.7900
MR 82
9999
9999
MATERIALS:
110x 110 x 75 mm dia Door Tee
Adhesive, and sundries etc.
LABOURCarriage and fixing charges
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Rs 178.95 /Each
207
1.0000 Nos
2.7300
10.7900
MR 83
9999
9999
MATERIALS:
110 mm Vent cowl
Adhesive, and sundries etc.
LABOURCarriage and fixing charges
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
12/26/2016 10:20:59
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Unit
Rate
Amount
106.36
15.95
122.31
each
L.S.
170.00
1.78
170.00
4.86
L.S.
1.78
19.21
194.07
170.00
1.70
171.70
24.07
0.24
24.31
207.36
31.10
238.46
each
L.S.
60.00
1.78
60.00
4.86
L.S.
1.78
19.21
84.07
60.00
0.60
60.60
24.07
0.24
24.31
96.26
14.44
110.70
each
L.S.
63.00
1.78
63.00
4.86
L.S.
1.78
19.21
87.07
63.00
0.63
63.63
24.07
Rs 122.31 /Each
208
1.0000 Nos
2.7300
10.7900
MR 84
9999
9999
MATERIALS:
110 mm offset
Adhesive, and sundries etc.
LABOURCarriage and fixing charges
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Rs 238.46 /Each
209
1.0000 Nos
2.7300
10.7900
MR 85
9999
9999
MATERIALS:
110 mm dia End cap
Adhesive, and sundries etc.
LABOURCarriage and fixing charges
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Rs 110.70 /Each
210
1.0000 Nos
2.7300
10.7900
MR 86
9999
9999
MATERIALS:
110 mm dia Socket/ coupling
Adhesive, and sundries etc.
LABOURCarriage and fixing charges
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
12/26/2016 10:20:59
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Unit
Rate
Amount
0.24
24.31
99.29
14.89
114.18
each
L.S.
56.00
1.78
56.00
4.86
L.S.
1.78
19.21
80.07
56.00
0.56
56.56
24.07
0.24
24.31
92.22
13.83
106.05
each
L.S.
550.00
1.78
550.00
4.86
L.S.
1.78
19.21
574.07
550.00
5.50
555.50
24.07
0.24
24.31
591.16
88.67
679.83
7200.00
283.96
3312.00
130.62
Rs 114.18 /Each
211
1.0000 Nos
2.7300
10.7900
MR 87
9999
9999
MATERIALS:
110 x 75 mm dia Reducer
Adhesive, and sundries etc.
LABOURCarriage and fixing charges
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Rs 106.05 /Each
212
1.0000 Nos
2.7300
10.7900
MR 88
9999
9999
MATERIALS:
150 mm dia bend
Adhesive, and sundries etc.
LABOURCarriage and fixing charges
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Rs 679.83 /Each
213
460.0000 Nos
460.0000 Nos
MATERIALS :
MR 101 wire cut bricks of size 22.9x11.2x7cm
2201
Carriage of bricks
1000 Nos
1000 Nos
12/26/2016 10:20:59
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Unit
Rate
Amount
0.2000 m3
3.011
cum
3340.75
668.15
2.7300
9999
L.S.
1.78
4.86
0.3300 Nos
0.3300 Nos
1.0000 Nos
0.1800 Nos.
123
124
115
101
Sundries
LABOUR:
Mason 1st Class
Mason Ilnd Class
Coolie
Bhishti
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Day
Day
Day
Day
435.00
399.00
329.00
363.00
143.55
131.67
329.00
65.34
4785.19
3312.00
33.12
3345.12
1473.19
14.73
1487.92
5527.45
829.12
6356.57
1000 Nos
1000 Nos
7200.00
283.96
3312.00
130.62
Rs 6356.57 /m3
214
460.0000 Nos
460.0000 Nos
MR 101
2201
MATERIALS :
wire cut bricks of size 22.9x11.2x7cm
Carriage of bricks
0.2000 m3
3.011
cum
3340.75
668.15
2.7300
9999
Sundries
LABOUR:
Mason 1st Class
Mason Ilnd Class
Coolie
Bhishti
Scaffolding
L.S.
1.78
4.86
Day
Day
Day
Day
L.S.
435.00
399.00
329.00
363.00
1.78
204.45
187.53
592.20
72.60
39.80
Day
329.00
371.77
5583.98
3312.00
33.12
3345.12
2271.98
22.72
2294.70
6710.76
1006.61
7717.37
9500.00
1377.50
0.4700 Nos
0.4700 Nos
1.8000 Nos
0.2000 Nos.
22.3600
123
124
115
101
9999
115
215
145.0000 Nos
MR 102
Coolie
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Roofing with first class M P Tiles 340 mm or
nearest available size
MATERIALS :
first class M P Tiles 340 mm or nearest
available size
Rs 7717.37 /m3
1000 Nos
12/26/2016 10:20:59
visit www.sahaayidotcom.blogspot.in
Quantity
145.0000 Nos
0.3500 Nos
0.3500 Nos.
Code
2207
123
101
Description of items
Carriage of tiles
LABOUR:
Mason 1st Class
Bhishti
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Unit
1000 Nos
Rate
170.38
Amount
24.71
Day
Day
435.00
363.00
152.25
127.05
1681.51
1377.50
13.78
1391.28
304.01
3.04
307.05
1841.63
276.24
2117.87
Rs 2117.87 /10m2
216
1000.0000 Nos
1000.0000 Nos
MR 103
2207
217
0.3500 Nos
0.3500 Nos.
123
101
MATERIALS :
MP hip and ridge tiles
Carriage of tiles
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
Roofing with Departmental M P Tiles 340
mm or nearest available size
LABOUR:
Mason 1st Class
Bhishti
Total
Add water charges 1%
Total
Add CPOH 15%
Total
Add Cost Index (46.67 % )
Total
Say
1000 Nos
1000 Nos
21800.00
170.38
21800.00
170.38
21970.38
21800.00
218.00
22018.00
170.38
1.70
172.08
22270.39
3340.56
25610.95
Day
Day
435.00
363.00
152.25
127.05
279.30
2.79
282.09
42.31
324.40
151.40
475.80
Rs 475.80 /10m2
218
0.1000 m3
3.8
0.7500 Nos
0.5300 Nos.
123
101
MATERIALS :
Cement mortar 1:3
LABOUR:
Mason 1st Class
Bhishti
Total
Add water charges 1%
Total
Add CPOH 15%
Total
Add Cost Index (46.67 % )
m3
5003.35
500.34
Day
Day
435.00
363.00
326.25
192.39
1018.98
10.19
1029.17
154.38
1183.55
552.36
12/26/2016 10:20:59
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Total
Say
Unit
Rate
Amount
1735.91
21800.00
170.38
1175.00
588.60
4.60
117.50
435.00
363.00
326.25
192.39
1229.34
588.60
5.89
594.49
640.74
6.41
647.15
1543.66
231.55
1775.21
Rs 1735.91 /10m2
219
27.0000 Nos
27.0000 Nos
0.1000 m3
0.7500 Nos
0.5300 Nos.
MR 103
2207
3.8
123
101
MATERIALS :
MP hip and ridge tiles
Carriage of tiles
Cement mortar 1:3
LABOUR:
Mason 1st Class
Bhishti
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
1000 Nos
1000 Nos
m3
Day
Day
Rs 1775.21 /10m
220
MR 104
476.0000 Nos
1023
476.0000 Nos
476.0000 Nos
1208
1209
2x20x0.42147= 1.68588 +
2x20x0.35123= 1.4049
= 3.0908+
Add 3 % wastage = 0.092
= 3.1835 Say 3.184 t
Carriage of sheets
G.I. J or L hooks with nuts and bolts 8 mm
dia.
Bitumen washers
Bitumen washers thick
9999
3.1840 tonne
8.0600
2273
sqm
370.00
88034.10
tonne
94.65
301.37
10 Nos
120.00
5712.00
100 Nos
100 Nos
30.00
35.00
142.80
166.60
L.S.
1.78
14.35
12/26/2016 10:20:59
visit www.sahaayidotcom.blogspot.in
Quantity
39.5200
2.3400 Nos
9.3400
9.3400 Nos
Code
9999
130
112
114
Description of items
Sundries
LABOUR:
Mistry
Carpenter 2nd class
Beldar
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 216.14 m2
Hence for 1 m2
Say
Unit
L.S.
Rate
1.78
Amount
70.35
Day
Day
Day
435.00
399.00
329.00
1017.90
3726.66
3072.86
102258.99
88034.10
880.34
88914.44
14224.89
142.25
14367.14
109986.72
16498.01
126484.73
585.20
m
L.S.
Qtl.
tonne
260.00
1.78
4200.00
#REF!
1560.00
3.56
289.80
#REF!
Day
Day
435.00
363.00
108.75
54.45
#REF!
1560.00
15.60
1575.60
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
82.25
1175.00
411.25
23.50
434.75
4.35
439.10
65.87
504.97
235.67
740.64
Rs 585.20 /m2
221
6.0000 m
2.0000
6.9000 Kg
6.9000 Kg
0.2500 Nos
0.1500 Nos.
MR 105
9999
1008
2205
116
101
MATERIALS :
PVC half split pipe 150mm dia
Carriage of sheets
32x5mm MS flat
Carriage of steel
LABOUR:
Plumber
Bhishti
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Hence for 1 m
Say
#REF! /m2
222
5.0000 Nos
0.0200 m3
115.00
3.8
223
Each
m3
Rs 740.64 /Each
115.00
Coolie
Each
329.00
329.00
12/26/2016 10:20:59
visit www.sahaayidotcom.blogspot.in
Quantity
Code
224
1.0000 No
111.00
Description of items
Total
Add water charges 1%
Total
Add CPOH 15%
Total
Add Cost Index (46.67 % )
Total
Say
Engaging Carpenter for specified work
Carpenter 1 st class
Total
Add water charges 1%
Total
Add CPOH 15%
Total
Add Cost Index (46.67 % )
Total
Say
Unit
Rate
Amount
329.00
3.29
332.29
49.84
382.13
178.34
560.47
435.00
435.00
435.00
4.35
439.35
65.90
505.25
235.80
741.05
Rs 560.47 /Each
Each
Rs 741.05 /Each
225
/m2
235.00
2220.75
3.120 kg
7306
Kg
200.00
624.00
5.241 kg
7306
Kg
200.00
1048.20
0.9345 Kg
7306
Kg
200.00
186.90
18.000 nos
MR 112
100nos
50.00
9.00
24.000 No.
637
100nos
52.00
12.48
100.000 No.
639
100nos
38.00
38.00
72.000 No.
639
100nos
38.00
27.36
63.000 No.
639
100nos
38.00
23.94
1.500 no
102
Day
435.00
652.50
1.500 Nos
114
Beldar
Total
Market Rate cost
Add water charges 1% on MR
Day
329.00
493.50
5336.63
2229.75
22.30
9.450 m2
12/26/2016 10:20:59
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total for 9 m2
Hence for 1 m2
Say
Unit
Rate
Amount
2252.05
3106.88
31.07
3137.95
6854.48
1028.17
7882.65
875.85
399.00
329.00
329.00
363.00
426.93
352.03
233.59
32.67
1045.22
10.45
1055.67
158.35
1214.02
566.58
1780.60
day
day
day
day
LS
399.00
329.00
329.00
363.00
1.78
534.66
477.05
233.59
32.67
27.07
Day
329.00
371.77
Rs 875.85 /m2
226
1.0700 Nos
1.0700 Nos
0.7100 Nos
0.0900 Nos.
125
114
115
101
LABOUR
Mason 2nd class
Beldar
Coolie
Bhishti
Total
Add water charges 1%
Total
Add CPOH 15%
Total
Add Cost Index (46.67 % )
Total
Say
Day
Day
Day
Day
Rs 1780.60 /m3
227
1.34 day
1.45 day
0.71 day
0.09 day
15.21 LS
125
114
115
101
9999
1.13 day
115
1676.81
16.77
1693.58
254.04
1947.62
908.95
2856.57
Rs 2856.57 /m3
12/26/2016 10:20:59
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Unit
Rate
Amount
228
10.0000 m2
0.5000 m3
0.5000 m3
0.5000 Nos.
0.5000 Nos.
1.00 Nos.
0.5000 Nos.
Details of cost of 10 m2
Interlocking C.C. paver block ( 60 mm thick,
8689
cum
350.00
M-30)
298
6mm metal
cum
1140.00
2202
Carriage of 6mm metal
cum
106.49
LABOUR
123
Mason (brick layer) 1 st class
day
435.00
124
Mason (brick layer) 2 nd class
day
399.00
114
Beldar
day
329.00
115
coolie
day
329.00
Total
Add water charges 1%
Total
Add CPOH 15%
Total
Add Cost Index (46.67 % )
Total for 10 m2
Hence for 1 m2
Say
Rs 857.54 /m2
DSR Analyser Ver.12 Powered By Pradeepen Thulika
3500.00
570.00
53.25
217.50
199.50
329.00
164.50
5033.75
50.34
5084.09
762.61
5846.70
2728.65
8575.35
857.54
12/26/2016 10:20:59
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Unit
Rate
Amount
128
139
114
6.000 hour
61
1.250 day
17
4.220 day
0.750 day
3
14
9.000 T
9.000 T
309
2211
405.000 cum
293
405.000 cum
2206
81.000 cum
296
81.000 cum
2202
LABOUR
Mate
Skilled Beldar
Beldar
MACHINERY
Bitumen pressure distributor for @ 1750 sqm
per hour
Tipper 5.5 cum capacity for carriage of
aggregates from stockpile to chip spreader
Three wheel 80-100 kN static roller
Front end loader 1 cum bucket capacity
MATERIAL
VG -30 Bitumen @ 2 kg per sqm
Carriage of bitumen
40 mm size hand broken metal @ 0.09 cum
per sqm
Conveyance of 40 mm size hand broken
metal
12 mm size stone chips @ 0.018 cum per
sqm
Carriage of 12 mm size stone chips
Total
Add water charges 1%
Total
Add CPOH 15%
Total for 4500 m2
Hence for 1 m2
Add Cost Index (41.9 % )
Total
Say
day
day
day
363.00
363.00
329.00
145.20
2904.00
658.00
hour
800.00
4800.00
day
1700.00
2125.00
day
day
1500.00
5000.00
6330.00
3750.00
T
T
41000.00
106.49
369000.00
958.41
cum
1050.00
425250.00
cum
115.75
46878.75
cum
1175.00
95175.00
cum
106.49
8625.69
966600.05
9666.00
976266.05
146439.91
1122705.96
249.49
104.54
354.03
363.00
363.00
329.00
116.16
2178.00
658.00
Rs 354.03 /m2
128
139
114
LABOUR
Mate
Skilled Beldar
Beldar
day
day
day
12/26/201610:20:59
visit www.sahaayidotcom.blogspot.in
Quantity
Code
2.570 hour
61
1.250 day
17
2.810 day
0.750 day
3
14
7.870 T
7.870 T
309
2211
270.000 cum
293
270.000 cum
2206
81.000 cum
296
81.000 cum
2202
Description of items
MACHINERY
Bitumen pressure distributor for @ 1750 sqm
per hour
Tipper 5.5 cum capacity for carriage of
aggregates from stockpile to chip spreader
Three wheel 80-100 kN static roller
Front end loader 1 cum bucket capacity
MATERIAL
VG -30 Bitumen @ 1.748 kg per sqm
Carriage of bitumen
40 mm size hand broken metal @ 0.09 cum
per sqm
Conveyance of 40 mm size hand broken
metal
12 mm size stone chips @ 0.018 cum per
sqm
Carriage of 12 mm size stone chips
Total
Add water charges 1%
Total
Add CPOH 15%
Total
Hence for 1 m2
Add Cost Index (41.9 % )
Total
Say
Unit
Rate
Amount
hour
800.00
2056.00
day
1700.00
2125.00
day
day
1500.00
5000.00
4215.00
3750.00
T
T
41000.00
106.49
322670.00
838.08
cum
1050.00
283500.00
cum
115.75
31252.50
cum
1175.00
95175.00
cum
106.49
8625.69
757159.43
7571.59
764731.02
114709.65
879440.67
195.43
81.89
277.32
cum
133.11
1331.10
day
Day
day
Day
329.00
329.00
363.00
329.00
1941.10
1184.40
145.20
2.63
Day
litre
Qtl
L.S.
1500.00
55.49
10.65
1.78
12.00
7.99
0.01
1.78
4626.22
46.26
4672.48
700.87
5373.35
537.33
Rs 277.32 /m2
10.00 cum
2241
5.90 day
3.60 day
0.40 day
0.008 Day
114
115
101
113
0.0080 day
0.1440 litre
0.0014 Qtl.
L.S.
3
1235
2342
9999
12/26/201610:20:59
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Unit
Rate
Amount
250.77
788.10
Say
Rs 788.10 /m3
0.177 day
0.167 day
114
115
1.000 Cum
2241
0.020 day
0.250 day
0.020 day
128
115
101
day
Day
329.00
329.00
58.23
54.94
Cum
133.11
133.11
Day
Day
day
363.00
329.00
363.00
7.26
82.25
7.26
343.05
3.43
346.48
51.97
398.45
185.96
584.41
cum
800.00
307200.00
Nos
Nos
Nos
363.00
363.00
329.00
145.20
726.00
2632.00
310703.20
307200.00
3072.00
310272.00
3503.20
35.03
3538.23
315461.52
47319.23
362780.75
1209.27
Rs 584.41 /m3
384.00 cum
0.40 Nos
2.00 Nos
8.00 Nos
MR 48
128
139
114
Rs 1209.27 /m3
12/26/201610:20:59
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Unit
Rate
Amount
1.00 m2
16.1
m2
81.30
81.30
54.20
25.30
79.50
Say
Rs 79.50 /m3
0.40 m3
4.1.5
day
4162.12
1664.85
0.60 m3
4.1.6
day
4022.82
2413.69
Total
Add water charges 1%
Total
Add CPOH 15%
Total
Add Cost Index (46.67 % )
Total
4078.54
40.79
4119.33
617.90
4737.22
2210.86
6948.08
Say
Rs 6948.08 /m3
0.40 m3
4.2.5
m3
5009.04
2003.62
0.60 m3
4.2.6
m3
4869.74
2921.84
12/26/201610:20:59
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Unit
Rate
Total
Add water charges 1%
Total
Add CPOH 15%
Total
Add Cost Index (46.67 % )
Total
Amount
4925.46
49.25
4974.71
746.21
5720.92
2669.95
8390.87
Say
Rs 8390.87 /m3
128
115
115
138
23
1
55
309
2211
LABOUR
Mate
Mazdoor (Unskilled) including labour for tackin
Mazdoor (Semi skilled)
Bitumen sprayer
MACHINERY
Hot bitumen mixer
Bitumen boiler
Three wheel 80-100 kN static roller
MATERIAL
Bitumen
Carriage of bitumen
Total
Add water charges 1%
Total
Add CPOH 15%
Total for 500 m2
Hence for 1 m2
Add Cost Index (46.67 % )
Total
Say
day
day
day
day
363.00
329.00
329.00
363.00
580.80
10528.00
2872.17
165.17
day
day
hour
4000.00
830.00
450.00
2000.00
518.75
1350.00
T
T
50600.00
106.49
67298.00
141.63
85454.52
854.55
86309.07
12946.36
99255.43
198.51
92.64
291.15
Rs 291.15 /m2
10
1.000 m3
1.000 m3
296
2202
Cost of metal
Carriage of aggregate
Total
Add water charges 1%
Total
Add CPOH 15%
Total
m3
m3
1175.00
106.49
1175.00
106.49
1281.49
12.81
1294.30
194.15
1488.45
12/26/201610:20:59
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Unit
Rate
Amount
694.66
2183.11
Say
Rs 2183.11 /m3
11
1.000 m3
1.000 m3
298
2202
Cost of metal
Carriage of aggregate
Total
Add water charges 1%
Total
Add CPOH 15%
Total
Add Cost Index (46.67 % )
Total
m3
m3
Say
1140.00
106.49
1140.00
106.49
1246.49
12.46
1258.95
188.84
1447.80
675.69
2123.49
Rs 2123.49 /m3
12
1.000 m3
1.000 m3
293
2202
Cost of metal
Carriage of aggregate
Total
Add water charges 1%
Total
Add CPOH 15%
Total
Add Cost Index (46.67 % )
Total
m3
m3
Say
503(1),508(
1),and
510(1) of
MORD
13
0.600 day
15.000 day
54.000 day
22.500 day
128
115
115
115
0.750 Day
0.625 Day
23
1
0.480 T
0.480 T
309
2211
1970.16
1050.00
106.49
1050.00
106.49
1156.49
11.56
1168.05
175.21
1343.26
626.90
1970.16
/m3
day
day
day
day
363.00
329.00
329.00
329.00
217.80
4935.00
17766.00
7402.50
day
day
4000.00
830.00
3000.00
518.75
T
T
50600.00
106.49
24288.00
51.12
58179.17
581.79
58760.96
8814.14
67575.10
2252.50
1051.24
3303.74
Rs 3303.74 /m3
12/26/201610:20:59
visit www.sahaayidotcom.blogspot.in
Quantity
14
Code
Description of items
K.S.S
3.1.2.2
3.750 day
1.500 day
115
115
0.045 day
0.135 Day
0.045 Day
0.045 Day
55
MR
1
23
0.048 T
0.048 T
309
2211
Unit
LABOUR
special man Mazdoor
Women
MACHINERY
Three wheel 80-100 kN static roller
Auto pickup
Bitumen boiler
Hot bitumen mixer
MATERIAL
Bitumen
Carriage of bitumen
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
K.S.S
3.1.2.2
15
1.000 day
0.500 day
115
115
0.022 day
0.066 Day
0.022 Day
55
MR
1
0.020 T
0.020 T
309
2211
Rate
Amount
day
day
329.00
329.00
1233.75
493.50
day
day
day
day
450.00
1500.00
830.00
4000.00
20.25
202.50
37.35
180.00
T
T
50600.00
106.49
2428.80
5.11
4601.26
202.50
2.03
204.53
4398.76
43.99
4442.75
6720.71
1008.11
7728.82
Rs 7728.82 /m3
LABOUR
special man Mazdoor
Women
MACHINERY
Three wheel 80-100 kN static roller
Auto pickup
Bitumen boiler
MATERIAL
Bitumen
Carriage of bitumen
Total
Market Rate cost
day
day
329.00
329.00
329.00
164.50
day
day
day
450.00
1500.00
830.00
9.90
99.00
18.26
T
T
50600.00
106.49
1012.00
2.13
1634.79
99.00
12/26/201610:20:59
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Unit
Rate
0.99
99.99
1535.79
15.36
1551.15
2375.06
356.26
2731.32
Say
K.S.S
3.6.1.2
16
1.750 day
0.750 day
0.750 day
115
115
115
0.030 day
0.090 Day
0.030 Day
55
MR
1
0.0275 T
0.0275 T
309
2211
K.S.S
3.6.1.2
5.000 day
115
Rs 2731.32 /m3
LABOUR
special man Mazdoor
Women
Man
MACHINERY
Three wheel 80-100 kN static roller
Auto pickup
Bitumen boiler
MATERIAL
Bitumen VG10
Carriage of bitumen
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
17
Amount
day
day
day
329.00
329.00
329.00
575.75
246.75
246.75
day
day
day
450.00
1500.00
830.00
13.50
135.00
24.90
T
T
50600.00
106.49
1391.50
2.93
2637.08
135.00
1.35
136.35
2502.08
25.02
2527.10
3842.85
576.43
4419.28
Rs 4419.28 /m3
LABOUR
special man Mazdoor
day
329.00
1645.00
12/26/201610:20:59
visit www.sahaayidotcom.blogspot.in
Quantity
Code
2.000 day
0.500 day
115
115
0.060 day
0.180 Day
0.060 Day
55
MR
1
0.0600 T
0.0600 T
309
2211
Description of items
Unit
Women
Man
MACHINERY
Three wheel 80-100 kN static roller
Auto pickup
Bitumen boiler
MATERIAL
Bitumen VG 10
Carriage of bitumen
Total
Market Rate cost
Add water charges 1% on MR
Net Total ( A)
Total excluding Market rate
Add water charges 1% on this
Net Total (B)
Total A + 1.4667 B
Add CPOH 15%
Total
Say
16.42
Modified
18
Rate
Amount
day
day
329.00
329.00
658.00
164.50
day
day
day
450.00
1500.00
830.00
27.00
270.00
49.80
T
T
50600.00
106.49
3036.00
6.39
5856.69
270.00
2.70
272.70
5586.69
55.87
5642.56
8548.64
1282.30
9830.94
Rs 9830.94 /m3
0.650 m3
293
m3
1050.00
682.50
0.240 m3
295
m3
1175.00
282.00
0.650 m3
2206
m3
115.75
75.24
0.240 m3
2202
m3
106.49
25.56
0.470 m3
0.470 m3
0.170 m3
0.170 m3
982
2203
367
2209
m3
m3
tonne
tonne
1200.00
106.49
6300.00
94.65
564.00
50.05
1071.00
16.09
0.100 day
1.630 day
0.700 day
155
114
101
day
day
day
417.00
329.00
363.00
41.70
536.27
254.10
0.070 day
day
800.00
56.00
0.070 Day
13.520 L S
12
9999
day
LS
350.00
1.78
24.50
24.07
3703.08
37.03
3740.11
561.02
4301.13
2007.34
6308.47
Rs 6308.47 /m3
12/26/201610:20:59
visit www.sahaayidotcom.blogspot.in
Quantity
19
Code
Description of items
16.42
Modified
0.670 m3
295
0.220 m3
297
0.890 m3
2202
0.445 m3
0.470 m3
0.320 m3
0.320 m3
982
2203
367
2209
0.100 day
1.630 day
0.700 day
155
114
101
0.070 day
0.070 Day
14.300 L S
12
9999
Unit
Rate
m3
1175.00
787.25
m3
1175.00
258.50
m3
106.49
94.78
m3
m3
tonne
tonne
1200.00
106.49
6300.00
94.65
534.00
50.05
2016.00
30.29
day
day
day
417.00
329.00
363.00
41.70
536.27
254.10
day
800.00
56.00
day
LS
350.00
1.78
24.50
25.45
sq m
LS
169.13
1.78
146.47
2.55
4857.91
48.58
4906.49
735.97
5642.46
2633.34
8275.80
MATERIAL
Stone Aggregate (Single Size) 20 mm
Nominal Size
Stone Aggregate (Single Size) 10 mm Nominl
Size
Carriage of stone aggregate below 40mm
nominal size
coarse sand zone III
Carriage of coarse sand
portland cement
Carriage of cement
LABOUR
Mason
Beldar
Bhisti
MACHINERY
hire charges of concrete mixer 0.25 to 0.40
cum with hopper
vibrator (needle type 40 mm)
Sundries
SHUTTERING
Amount
5.9.1
9999
Rs 8275.80 /m3
12/26/201610:20:59
visit www.sahaayidotcom.blogspot.in
Quantity
Code
Description of items
Unit
Rate
Amount
12/26/201610:20:59
Item of Work
Formation of subgrade
7
8
9
Item No in DSR
2.2
2.2 modified
Remarks
Grade cutting and forming embankment with cut
earth. This item may be used for construction of
shoulders also.
Conveying filling earth and forming embankment
with conveyed earth. This item may be used for
construction of shoulders also.
2.28.1
16.1
16.78 modified
16.3.2
16.3.3
16.3.9
16.3.7
10
Laying WBM
11
12
16.30.1
16.30.2
13
16.32.1
14
16.41
15
16.68
16.4
Modified penetration
macadam as per clause
Measurement in sq.m for 75mm and 50mm
506 of MoRD
thickness as per requirement.
sepecification 75mm and
50mm thick.
16
Filling up potholes
17
18
Boundary stones
16.22
19
16.24
20
21
16.9
22
16.77
16.30, 16.32.1
15.43, 15.59
Formation (filling)
2.25
2.25 modified
16.78 modified
16.42 modified
16.42 modified
Building
1
2
3
4
8
9
10
11
12
13
14
15
16
Mortar
Damp proof course
Plinth protection
Extra for laying concrete in/ under
water
Providing ready mixed plain
cement concrete
RCC slab (1:1 1/2:3)
RCC Column (1:2:4)
RCC Beam, lintel, shade, stair
cases etc (1:1 1/2:3)
RCC arches, sloping roofs
Cement concrte 1:3:6
Form work
Reinforcement
Extra for laying RCC in/ under
water
Brick work in CM 1:6
Dry rubble masonry
Random Rubble masonry in CM
1:6
Cement solid block masonry
Cement hollow block masonry
Wood work
MS grill
Flat iron hold fast
Butt hinges
MS tower bolt
Aluminium tower bolt
Aluminium handle
Aluminium door stopper
Brass mortice latch and lock
PVC door
Trusswork
Collapsible steel shutter
5
6
7
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
2.28
2.31, 2.32
2.33
2.1
2.6, 2.7,2.8,2.9
2.24
2.10,2.11,2.12
2.26
2.6+2.26
2.16-2.23
2.25
Observed Data
Observed Data
3.3-3.6, 3.8-3.11
4.11
4.17
4.15
4.2
5.1.2, 5.2.2
5.2.3
Observed Data
5.5
Observed Data
5.9, 5.11
5.22.6, 5.22A.6
5.31
Observed Data
Observed Data
7.1, 7.2
Observed Data
Observed Data
Observed Data for Anjili wood
9.48
9.53
9.55, 9.56
9.63
9.96, 9.97
9.1
9.101
9.103
9.141, 9.142
10.1, 10.2
10.3
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
10.4
10.6
10.5
10.16.1
10.25
10.26.3
10.28
10.3
11.2
11.36
11.37, 11.38
11.41
11.41-11.42+11.43
11.46
11.47
11.48
12.5
12.51
13.4, 13.5
13.9
13.16
13.4
5.23
13.37
13.43
13.44
13.46
13.5
13.52.1
13.57
13.6
13.61
13.71
13.8
13.81
13.85.2
14.23
14.61
17.1.1
17.7.3, 17.7.4
17.15, 17.16
17.28.1.1
18.8
18.9
18.42
18.48
19.7.1.1
21.1.1.2, 21.1.2.2
93
94
95
96
97
98
99
21.3
14.1
14.43
14.45
15.2
15.3
15.7
15.9
15.12
15.14, 15.16
Observed Data
15.17-15.21
15.23
15.28
15.31
15.32
15.52
15.56
15.57