Feed Water Tank


1

Fabrication and supply of Feed water Tank - 25KL capacity with Manhole,
Overflow, Air vent coated with Epoxy, insulated with 2" Thick mineral wool
and cladded with Aluminum Sheet

a
b
c

Installation charge for feed water tank


150 NB Globe Valve -outlet of the FWT
150 NB Strainer

15NB Globe valve for sampling point and chemical dosing pump isolation

150 NB Black Carbon Steel Schd40, Feed water Line from FWT to Boiler water
Pump with minaral wool insulation cladding with Al sheet

40 NB Black Carbon Steel Schd40, Feed water Line from FWT to Boiler water
Pump with minaral wool insulation cladding with Al sheet

15 NB Black Carbon Steel Schd40, Feed water Line from FWT to Boiler water
Pump with minaral wool insulation cladding with Al sheet

15 NB Black steel sch 40 ,air line


BOILER ROOM VENT, DRAIN, AND SAFTEY VALVE PIPING

25NB Drain Piping from Mobrey level controller,gauge glass and pressure
switch with drain provisions connecting to Blowdown Pit

50NB Black Carbon Steel sch 40, Air vent piping with drain provisions
connecting to common drain and Blowdown Pit with insulation

100 NB Black Carbon Steel, Sch 40 safety valve piping, with drain provisions
connecting to common drain and Blowdown drain to Sewage Pit

25 NB Black steel sch 40 ,air line for view glass


BLOWDOWN PIPING SYSTEM
50 NB carbon steel Sch 40, blow down piping from Boiler to Blowdown vessel
with insulated with minaral wooland cladded with AL Sheet
STRAIGHT STAND ALONE CHIMNEY

Facrication of flue gas chimney 30 Mtr height made of M.S sheet,chimney

Detailed drg attached

Installation,fabrication and supply of flue gas duct 950mm dia made of 5 mm


thick sheet connecting boiler to chimney including necessary
flanges,nuts,bolt and gaskets and heat resistanting aluminum painting with
insulation in boiler room and also faricate in 3 damper

10

Installation,fabrication and supply of fresh air duct 750 mm 3 mm thk square


duct with 50 mm insulation and AL cladding

STEAM PIPING INSIDE BOILER ROOM


9

200NB Black Carbon Steel Sch 40 steam piping until steam header with
necessary structural support , insulated with minaral wool and cladded with
AL Sheet

10

80NB Black Carbon Steel Sch 40 steam piping with necessary structural
support , insulated with mineral wool and cladded with AL Sheet

11

100NB Black Carbon Steel Sch 40 steam piping with necessary structural
support , insulated with mineral wool and cladded with AL Sheet

12

25NB Black Carbon Steel Sch 40 steam piping from steam header to Feed
water Tank with necessary structural support , insulated with mineral wool
and cladded with AL Sheet(steam trap line from header to feed water tank)
40NB Black Carbon Steel Sch 40 steam piping from steam header to Feed
water Tank with necessary structural support , insulated with mineral wool
and cladded with AL Sheet(feed water temp.control valve line)

13

50NB Black Carbon Steel Sch 40 steam piping from steam header to Feed
water Tank with necessary structural support , insulated with mineral wool
and cladded with AL Sheet(condansate line form chiller)
14

80NB Black Carbon Steel Sch 40 steam piping from steam header to Feed
water Tank with necessary structural support , insulated with minaral wool
and cladded with AL Sheet(condansate line form chiller)
14

DIESEL DAY OIL TANK 4 KL

14

a
b
c

19

installation,fabrication and supply of 4.5 KL Diesel Storage Tank .the tank


shall be made of 5mm thk M.S sheet including all required fitting .like
inlet,outlet, drain,and airvent.manhole with cover,level gauge and provision
for level controller.all complete with one coat of metal primer and one coat of
enamel paint and with insulation
80 NB ball valave
25 NB Ball valve
fuel circulation header
3 " Black Sch 40 CS oil piping from Diesel Tank to Burner with insulation
1 " Black Sch 40 CS oil piping from Diesel Tank to Burner with insulation
1/2 " Black Sch 40 CS oil piping from Diesel Tank to Burner with insulation
INSTALLATION
Unloading .leading and Assembly of the Boiler,APH,PRS station and various
components supplied with the Boiler within the Boiler House

20

Electrical cabling from boiler control panel to feed water pumps fuel pump
and various control in boiler house etc

Total =

Quantity

Unit

Unit Cost Total Cost

Nos.

0.00

1
3
2

Nos.
Nos.
Nos.

Nos.

0.00
0.00
0.00
0.00

15

Mtr

0.00

15

Mtr

0.00

12

Mtr

0.00

35

Mtr

0.00
0.00

18

Mtr.

0.00

Mtr.

0.00

15

Mtr.

0.00

Mtr

0.00
0.00

18

Mtr

0.00
0.00

Nos.

0.00

Nos

0.00

28

Mtr

0.00

12

Mtr

0.00

0.00
0.00
20

Mtr.

10

Mtr.

0.00

0.00
10

Mtr

0.00
10

Mtr

0.00
10

Mtr

0.00
6

Mtr

0.00
18

Mtr

0.00

Nos

0.00

1
1
2

Nos

0.00
0.00
0.00

45

Mtr

18

Mtr

Mtr

Nos
Nos

0.00
0.00
0.00
0.00

Nos

0.00

A
1
1.1

1.2
1.3
1.4
1.5
1.6
1.7
1.8
2
2.1

2.2
2.3
2.4
2.5
2.6
2.7
2.8
B)
3.0

VAPOR ABSORPTION CHILLERS & EQUIPMENTS


Chilled Water Return Pumps
supply and installation of Valves / Fittings
Butter fly Valves
200 mm dia
Check Valve
200 mm dia
Y-Strainer
200 mm dia
Expansion bellow
200 mm dia
Dial type pressure gauge with cock valve
Dial type thermometer with cock valve
Automatic Air vent
25 mm dia with Ball valve
Globe Valve flanged end
200mm dia
Cooling water pumps
Valves / Fittings
Butter fly valves
250 mm dia
Check Valve
250 mm dia
Y-Strainer
250mm dia
Automatic Air vent
25 mm dia
Dial type pressure gauge with cock valve
Dial type thermometer with cock valve
Expansion bellow
250 mm dia
Globe Valve flanged end
250mm dia
PIPING
Providing, jointing, testing & commissioning of following sizes of

Nos.
Nos.
Nos.
Nos
Nos.
Nos.
Nos
Nos

Nos.
Nos.
Nos.
Nos
Nos.
Nos.
Nos
Nos

Seamless tubes conforming to A-106 Gr.B (Sch 40 rating)


with all fittings including required sturctural supports
40 mm dia(drain PVC drain line)
50 mm dia(chilled water line top up)
100 mm dia

RM
RM
RM

125
150
200
250
300
350

mm
mm
mm
mm
mm
mm

dia
dia
dia(chilled water line pumps inlet and out let )
dia(chilled water header)
dia(cooling water tapping line)
dia(cooling line header)

4.0

Providing & fixing insulation to chilled water pipes & fittings


with 50mm thk high density performed reppharase
property Armaflex insulation with 0.5mm thck aluminium
cladding.

4.1

Pipes in False Ceiling / Shaft / Plant Room


100 mm dia
125 mm dia
200 mm dia
250 mm dia

4.0
5.0

6.0
7.0

8.0

Installation of chilled water and cooling water pumps on


foundation with proper alignment
Unloading from the truck and installation of 2 Cell cooling tower
on foundation with proper alignment and assembling in 2 nd
floor
Unloading the chiller from truck and installation of chiller in first
floor
Installation of the panel board in the frist floor and do the power
cabling and control cabling from panel board to all pump motors
and fan motors with cable tray
Supply and installation of syntex tank in second floor for Make
up forchilled water line 1000Ltrs with and aceessories

Notes :
we will supply chiller,cooling tower and all pumps and control
panel board for chilled water and cooling water pumps.you may
consider the installation charges for this.

Grand Total

RM
RM
RM
RM
RM
RM
RM

Mtr
Mtr
RM
RM
Nos
Nos
Nos
LS

LS

Rounded off to

chilled water flow rate 200 m3/hr in two pumps running


cooling water flow rate 640 m3/hr in two pumps running

Amount
Qty

8.00
3.00
3.00
6.00
10.00
10.00
4.00
2.00

12.00
3.00
3.00
4.00
10.00
10.00
6.00

Rate

Amount
-

2.00
60.00
20.00
-

9.00
35.00
50.00
45.00
60.00

35.00

50.00

6.00

2.00

2.00

1.00

1.00