Sie sind auf Seite 1von 4

Sanitary Landfill Report

Table of Contents
Purpose .......................................................................................................... Error! Bookmark not defined.
Scope ............................................................................................................. Error! Bookmark not defined.
Conclusions and Recommendations .............................................................. Error! Bookmark not defined.
Landfill Location ............................................................................................. Error! Bookmark not defined.
Population Projections ................................................................................... Error! Bookmark not defined.
Quantity of Refuse ......................................................................................... Error! Bookmark not defined.
Character of Solid Wastes .............................................................................. Error! Bookmark not defined.
Classification of Solid Wastes......................................................................... Error! Bookmark not defined.
Industrial Wastes ........................................................................................... Error! Bookmark not defined.
Refuse Collection ........................................................................................... Error! Bookmark not defined.
Collection Vehicles ......................................................................................... Error! Bookmark not defined.
Design Data .................................................................................................... Error! Bookmark not defined.
Volume Per Year ........................................................................................ Error! Bookmark not defined.
Total Volume at End of Each Year .............................................................. Error! Bookmark not defined.
Overall Size of Landfill ................................................................................ Error! Bookmark not defined.
Compaction .................................................................................................... Error! Bookmark not defined.
Recycling ........................................................................................................ Error! Bookmark not defined.
Equipment ...................................................................................................... Error! Bookmark not defined.
Spreading ................................................................................................... Error! Bookmark not defined.
Compaction ................................................................................................ Error! Bookmark not defined.
Scraping / Hauling ...................................................................................... Error! Bookmark not defined.
Water Spreading ........................................................................................ Error! Bookmark not defined.
Manning ......................................................................................................... Error! Bookmark not defined.
Cover Material and Requirements ................................................................. Error! Bookmark not defined.
Shelter ............................................................................................................ Error! Bookmark not defined.
Attendance..................................................................................................... Error! Bookmark not defined.
Personal Hauling ........................................................................................ Error! Bookmark not defined.

MSW Collection Vehicles ........................................................................... Error! Bookmark not defined.


Commercial Waste Vehicles....................................................................... Error! Bookmark not defined.
Directional Signs............................................................................................. Error! Bookmark not defined.
Disposal Areas ................................................................................................ Error! Bookmark not defined.
Access Roads .................................................................................................. Error! Bookmark not defined.
Surface Drainage ............................................................................................ Error! Bookmark not defined.
Gas Control .................................................................................................... Error! Bookmark not defined.
Leachate Control ............................................................................................ Error! Bookmark not defined.
Fencing ........................................................................................................... Error! Bookmark not defined.
Dust ................................................................................................................ Error! Bookmark not defined.
Vectors ........................................................................................................... Error! Bookmark not defined.
Fire Protection ............................................................................................... Error! Bookmark not defined.
Weighing Facilities ......................................................................................... Error! Bookmark not defined.
Records .......................................................................................................... Error! Bookmark not defined.
Development Sequence ................................................................................. Error! Bookmark not defined.
Utilization of Recovered Land ........................................................................ Error! Bookmark not defined.
Greenbelt ....................................................................................................... Error! Bookmark not defined.
Hydrogeology ................................................................................................. Error! Bookmark not defined.
Method of Operation and Planning ............................................................... Error! Bookmark not defined.
Typical Refuse Cell Operation ........................................................................ Error! Bookmark not defined.
Hours of Operation ........................................................................................ Error! Bookmark not defined.
Traffic Flow and Unloading ............................................................................ Error! Bookmark not defined.
Site Maintenance ........................................................................................... Error! Bookmark not defined.
During Life Maintenance ........................................................................ Error! Bookmark not defined.
Post-Closure Maintenance ..................................................................... Error! Bookmark not defined.
Burning ........................................................................................................... Error! Bookmark not defined.
Dead Animals ................................................................................................. Error! Bookmark not defined.
Qualified Personnel........................................................................................ Error! Bookmark not defined.
Capital and Operating Costs........................................................................... Error! Bookmark not defined.
Capital Costs............................................................................................... Error! Bookmark not defined.
Operating Costs.......................................................................................... Error! Bookmark not defined.
Disposal Bulky Wastes ................................................................................... Error! Bookmark not defined.

Hazardous Refuse .......................................................................................... Error! Bookmark not defined.


Disposal of Offensive Substances .................................................................. Error! Bookmark not defined.
Acknowledgements........................................................................................ Error! Bookmark not defined.
Appendix ........................................................................................................ Error! Bookmark not defined.
References: .................................................................................................... Error! Bookmark not defined.

Introduction
Purpose
This report was prepared such that
Scope
The scope of this report encompasses the following:
1.

The location and description of the sanitary landfill site.

2.

A topographic of the site.

3.

Population projections for growth over a period of (landfill design period?) years.

4.

The characteristics and classification of the municipal solid waste.

5.

Design requirements for the sanitary landfill.

6.

An analysis of the landfill gas and leachate production.

7.

Recommendations for the final decommissioning of the landfill and utilization of recovered land.

8.

Operating and maintenance cost estimates for the facility.

9.

Recommendations for method of operation.

10.

Description of solid waste ordinances.

Conclusions and Recommendations


Conclusions
After investigation and analysis, the following conclusions have been drawn:
1.

The land location? is it suitable and ideal for the development of a sanitary landfill?

2.

is the depth of the groundwater table is sufficiently below the excavation requirements?

3.

when it is expected that the population to exceed the design capacity.

4.
how much is the average tons/day of solid waste over the course of the sanitary landfill
operation.
Recommendations
It is recommended that :
1.

2.

Das könnte Ihnen auch gefallen