Version:
Issue Date:
Review By Date:
Owned By:
Authorised By:
1.1
August 2006
June 2008
Engineering Manager D & P
Executive Manager D & P
Date of Revision
1.0
June 2006
1.1
August 2006
Details of Amendment
Initial Release
Numbering changed to represent previous version
The above table lists in summary the amendments which have been made with most recent issues of this standard.
The table is updated with each re-issue. The latest amendments within the documents are marked with a change
indicator (|) in the outer margin.
CONTACT
This standard is the responsibility of the
Development and Projects Division, ElectraNet.
Please contact the indicated owner of the standard
with any inquiries.
ElectraNet
52-55 East Terrace, Adelaide, South Australia 5000
PO Box 7096, Hutt Street Post Office,
Adelaide, South Australia 5000
Ph (08) 8404 7966, Fx (08) 8404 7104
L I M I TATI O N O F L I A B I L I T Y AN D
D I S C L A I M E R O F W AR R A N T Y
ElectraNet makes no representation or warranty as
to the accuracy, reliability, completeness or
suitability for particular purposes of the information
in this document. ElectraNet and its employees,
agents and consultants shall have no liability
(including liability to any person by reason of
negligence or negligent misstatement) for any
statements, opinions, information or matter
(expressed or implied) arising out of, contained in
or derived from or for any omissions from the
information in this document, except in so far as
liability under any statute cannot be excluded.
2006 ElectraNet Pty Limited trading as ElectraNet. No part of this document may be reproduced
or copied in any form or by any means (graphic, electronic, mechanical, including photocopying,
recording, taping or information retrieval systems) without the prior written permission of ElectraNet.
LCM16
ElectraNet
TABLE OF CONTENTS
16.1
SCOPE......................................................................................................................................................3
16.2
GENERAL...............................................................................................................................................3
16.3
GEOTECHNICAL INVESTIGATIONS..............................................................................................3
16.3.1
16.3.2
16.4
SCOPE OF INVESTIGATION...................................................................................................................3
RESPONSIBILITY FOR CONSTRUCTION PROCEDURES..........................................................................3
PILE FOOTING SYSTEMS..................................................................................................................4
16.4.1
16.4.2
16.4.3
16.5
GENERAL............................................................................................................................................4
SETTING OUT......................................................................................................................................4
UNDERGROUND SERVICES..................................................................................................................4
PILE MANUFACTURE & INSTALLATION......................................................................................4
16.5.1
16.5.2
16.5.3
16.5.4
16.5.5
16.5.6
16.5.7
16.5.8
16.5.9
16.6
TOLERANCE........................................................................................................................................5
STEEL PILES........................................................................................................................................5
PRE-CAST CONCRETE PILES...............................................................................................................5
CAST-IN-PLACE PILES OR BORED PIERS.............................................................................................5
PILE DRIVING RECORDS.....................................................................................................................6
CUTTING OFF OF CONCRETE PILES.....................................................................................................6
PILE TESTS..........................................................................................................................................6
DEFECTIVE PILES................................................................................................................................6
CONSTRAINTS ON PILING OPERATIONS..............................................................................................6
EXCAVATION FOR PILE CAPS..........................................................................................................6
16.6.1
16.6.2
16.6.3
SETTING OUT......................................................................................................................................6
EXCAVATION.......................................................................................................................................7
DEWATERING & SHORING...................................................................................................................7
16.7
WELDING...............................................................................................................................................7
16.8
16.9
AS-BUILT REVISIONS.........................................................................................................................7
16.1 SCOPE
This section specifies requirements for supply
and installation of pile footings and pile caps
for transmission structures.
16.2 GENERAL
The Contractor shall excavate soil and/or rock,
fix tower steel and reinforcement and place
concrete in foundations in accordance with
this section and the Drawings.
Concrete work shall be carried out in
accordance with the Drawings and LCM20
Normal Class Concrete.
The Contractor shall allow, in the Structure
Foundations Schedule, for all costs for the
construction of the foundation in the soil types
shown on the appropriate drawings including
The Designer shall:
Version: 1.1
Page 2 of 7
ElectraNet
LCM16
Provide a line
schedule
detailing the type of structure &
footing required at each
location;
Provide
footing
structural
drawings;
Layout Details;
K-pt heights;
Supply
concrete,
steel
reinforcement, stubs and all
materials necessary for footing
construction;
16.3 GEOTECHNICAL
INVESTIGATIONS
16.3.1
Scope
Investigation
of
Version: 1.1
16.3.2
Responsibility
Construction
Procedures
for
General
Page 3 of 7
LCM16
16.4.2
ElectraNet
Setting Out
16.4.3
Underground
Services
It is the Contractor's responsibility to locate
any
underground
services
such
as
telecommunication, electricity, water, gas, or
other services, which could interfere with
construction. If any such services are
subsequently damaged by the Contractor
during the course of the work, this will
become the responsibility of the Contractor
and the cost of restoration of the damaged
services shall be paid by the Contractor.
Version: 1.1
16.5.1
Tolerance
16.5.2
Steel Piles
16.5.3
Pre-cast Concrete
Piles
Pre-cast concrete piles shall be manufactured
and installed as per AS2159. Minimum
Page 4 of 7
ElectraNet
LCM16
longitudinal reinforcement shall extend for the
full length of the pile.
b)
c)
d)
All
information
regarding
observations, delays and other
interruptions to the sequence of
work.
16.5.4
Cast-in-place Piles
or Bored Piers
The contractor shall demonstrate to the
satisfaction of ElectraNet that construction
procedures ensure the removal of debris from
the base of the pile/pier toe that would
otherwise cause undue contamination of
concrete and/or disruption of concrete-steel
bond. Extensive clean out of the excavation
should then not be necessary.
Cast-in-place concrete may be placed by the
wet-shaft process. Concrete shall be placed in
a continuous operation. Appropriate work
procedures shall be adopted for placing
concrete under water if necessary and/or to
prevent necking of pile by ingress of soil
upon withdrawal of the temporary casing.
Where applicable, the sequence of pile driving
shall be arranged so as not to disrupt green
concrete in adjacent piles. Before commencing
pile installation, the Contractor shall consult
with the Designer on the proposed driving
sequence.
16.5.5
Pile
Records
Driving
Version: 1.1
16.5.6
Cutting
off
Concrete Piles
of
16.5.7
Pile Tests
16.5.8
Defective Piles
Page 5 of 7
LCM16
ElectraNet
16.5.9
Constraints
Piling Operations
on
Setting Out
16.6.2
Excavation
16.6.3
Dewatering
Shoring
&
16.7 WELDING
Welding shall conform to AS1554.3.
Version: 1.1
Page 6 of 7
ElectraNet
LCM16
approval not be granted, construction shall be
carried out in accordance with approved
design specifications.
Non-conformance reports shall be submitted
to the Designer for review and approval.
Should approval not be granted, construction
shall be corrected to conform to design
specifications.
For any item that varies from its initial design,
the Contractor shall prepare and supply to
ElectraNet, documents and/or drawings that
represent the item as it is actually constructed
or supplied.
Version: 1.1
Page 7 of 7