DESCRIPTION OF THE DEGREE OF COMPLETENESS AND THE TYPES OF INSTALLATIONS AND EQUIPMENT FOR THE PROJECTOFFICE BUILDING
WITH STORES AND UNDERGROUND GARAGES AT 5, SLAVYANSKA STREET
At basement level B1, the ground floor and the first floor there are shops with locker rooms for the
employees and sanitary units. The stores have a common access way from Slavyanska street, and a
separate staircase and elevator provide access to the underground levels.
There are offices on the other floors above the ground. In the entrance lobby there is an area for a doorkeepers station and a sanitary unit. A staircase and two elevators provide vertical connection between
all levels within the building. Therefore, the office units shown in the floor plans of the architectural
design may be combined to form offices with larger area.
The specifications of the entire design are as follows:
BUILT-UP AREA
TOTAL FLOOR AREA
ROOF TERRACES
BASEMENT LEVELS B1, B2 and B3 (-1,- 2 and -3)
YARD ATTACHED TO THE COMMERCIAL AREAS
BUILT-UP VOLUME
773.39 m2
4 837.10 m2
722.32 m2
2 932.44 m2
199.52 m2
14 720.00 m3
Walls
1.1 Exterior facade Brickwork 25 cm, red bricks, thermal insulation made of styropor/styrodur with
thickness of 10 cm;
1.2 Between the adjoining buildings Brickwork 25 cm, red bricks;
1.3 Standard interior light partition walls made of Rigips or other type of plasterboards, supported,
with thickness of 12,5 cm, two-layered, extending from the double floor to the upper ferroconcrete slab, insulation layer of 50 mm, made of 35 kg mineral wool
1.4 WC walls light partition walls made of Rigips or other type of water-resistant plasterboards, with
thickness of 10 cm (walls without installations) or 27 cm (walls with installed equipment), with
2/8 pages
DESCRIPTION OF THE DEGREE OF COMPLETENESS AND THE TYPES OF INSTALLATIONS AND EQUIPMENT FOR THE PROJECTOFFICE BUILDING
WITH STORES AND UNDERGROUND GARAGES AT 5, SLAVYANSKA STREET
built-in structures for the installation of wash-basins and built-in flushing cisterns VIEGA (or
similar type);
1.5 Kitchen units - partition walls, Rigips or compatible.
2.
Floors
2.1 In the office rooms sound-proofing, cement coat, office-type moquette flooring, self-adhesive,
antistatic, nonflammable, wear resistant (or, as an alternative option: parquet or linoleum
flooring);
2.2 WC and kitchens waterproofing materials for WC and bathrooms, sound-proofing, cement coat;
Flooring: terracotta/fine stoneware (Granitogres) tiles or roll flooring;
2.3 In the corridors sound-proofing, cement coat, office-type moquette flooring, self-adhesive,
antistatic, nonflammable, wear resistant.
3.
Ceiling
3.1 In the offices plasterboards painted in white latex paint, or suspended ceiling panels 600x600,
with integrated lighting fittings in open/covered configuration and fire alarm sensors, according to
the design;
3.2 WC and kitchens suspended ceiling panels made of waterproof plasterboards, painted in white
latex paint;
3.3 In the corridors plasterboards painted in white latex paint, or suspended ceiling panels 600x600,
with integrated lighting fittings in open/covered configuration and fire alarm sensors, according to
the design;
4.
Doors
4.1 Office rooms made of MDF, 90/200 frame, with laminated layer (HPL), steel stoppers, lock, solid
type, rubber sealing for the frame, wooden frame with edges;
4.2 Entrance made of MDF, 100/200 frame, with laminated layer (HPL), with closing mechanism,
stoppers, lock, solid type, rubber sealing for the frame, metal adjustable frame;
4.3 WC doors made of MDF, 75/200 frame, with laminated layer (HPL), stoppers, lock with WC
mechanism, solid type, rubber sealing for the frame, wooden frame with edges.
5.
FAADE WALL EXTERIOR WALLS AND WINDOWS in terms of architectural design, the faade of the
building facing the Slavyanska Street is both visually distinct and in harmony with the other buildings in this
area of the city.
5.1. WINDOWS
The faade windows are made of ALUMINIUM WINDOWS SCHCO AWS 60 FOR EXTERNAL WINDOWS AND
DOORS. Waterproof material will be installed along the perimeter of the window frames.
Characteristics:
Profile depth 60 mm
Good thermal insulation due to wide insulation zone 27,5 mm
Window series with narrow face widths from 51 mm
Profiles available in a variety of colours
3/8 pages
DESCRIPTION OF THE DEGREE OF COMPLETENESS AND THE TYPES OF INSTALLATIONS AND EQUIPMENT FOR THE PROJECTOFFICE BUILDING
WITH STORES AND UNDERGROUND GARAGES AT 5, SLAVYANSKA STREET
Concealed drainage
Drainage at the lowest profile point
Concealed Schco AvanTec system fittings
Fully concealed so as not to spoil the clean lines of the window.
New uniform handle design for all customary opening types.
Up to 160 kg vent weight.
Excellent corrosion resistance up to class 4 (>240 h SSN - tested in accordance with DIN EN 1670).
Extended horizontal, vertical adjustment as well as contact pressure adjustment
Extensive range of profiles with face widths from 26 to 250 mm
Insert outer frame with adapter gasket to compensate for glazing thicknesses
5.2. GLAZING
Insulation glazing is used, consisting of:
6 mm Stopray Vision-50 (with UV transmission = 0)
16 mm air 100%
Laminated glazing Stratobel 3.3.1. (shatter proofness)
with Ug value = 1.3 W/m2K and light reflection v = 19 for optimal thermal and light comfort.
6.
Most of the finishing construction works and installations are similar to those in the office areas of the
building. The differences in the installations are described below, and the specific finishing works will be
as follows:
1
Glass partition walls window displays The plasterboard partition walls will be combined with 10
mm single-layer glass walls and aluminum frames.
Flooring stone / fine stoneware (Granitogres) tiles (or compatible), the same interior finishing as in
the entrance lobby.
VI. INSTALLATIONS
1.
Elevators high-speed (driving system and control units manufactured in West Europe), luxury car
with glass doors, frequency controlled motor drive powered by the emergency supply system (diesel
generator).
4/8 pages
DESCRIPTION OF THE DEGREE OF COMPLETENESS AND THE TYPES OF INSTALLATIONS AND EQUIPMENT FOR THE PROJECTOFFICE BUILDING
WITH STORES AND UNDERGROUND GARAGES AT 5, SLAVYANSKA STREET
2.
2.1 Heating.
2.1.1 Heat source Daikin central air-conditioning system, Type VRV. Three-pipe configuration for
simultaneous cooling and heating of different areas of the building, with used air heat
recuperation resulting in 30% reduction in power consumption.
2.1.2 Heating installations the heating in the building will be provided by the air-conditioning
system, except for the technical rooms, staircases, corridors, restrooms and storage areas.
Electrical radiators will be installed in the areas not covered by the air-conditioning system.
2.2
Air-conditioning all office rooms and shops will be air-conditioned. The air-conditioning system is
based on ventilation convectors (fan coil units).
2.2.1 Air-conditioning in the shops area the air-conditioning system will be based on ventilation
convectors (fan coil units), mounted in a three-pipe configuration behind the suspended ceiling
panels. The air cooling function will be carried out by an air cooling chiller installed on the roof of
the building. The air-conditioning system will maintain a preset temperature in the rooms during
all seasons. Energy saving will be achieved by induced flow of fresh air processed in the airconditioning chambers and air suction by means of a rotor regenerator into the chambers.
2.2.2 Air-conditioning in the office area the air-conditioning system will be based on ventilation
convectors (fan coil units), mounted in a three-pipe configuration behind the suspended ceiling
panels. The air suction vents will be situated in the sanitary units and the kitchen units, and the
fans will be installed on the roof of the building. Energy saving will be achieved by heat
recuperation in intermediate heat units between the air supplied into the rooms and the
exhaust air from the sanitary units.
2.3 Ventilation.
2.3.1 Ventilation in the underground garage areas with 3-fold mechanical recirculation exhaust
ventilation and 8-fold emergency one, using channel-type explosion-proof fans, air ducts and
ventilation grilles. The exhaust air flow will be 50% from the upper and 50% from the lower parts
of rooms. The emergency ventilation will be triggered by gas detectors. The ventilation system
will be used to evacuate the smoke in case of fire.
2.3.2 Ventilation in the underground shops area induced inflow of processed fresh air and
evacuation of the used air.
2.3.3 Ventilation in the sanitary units all sanitary units will be equipped with exhaust ventilation
units, air ducts, cone exhaust units and fans.
2.3.4 Ventilation in the storage areas, machine rooms and all rooms without natural ventilation by
means of exhaust ventilation units, air ducts, ventilation grilles and in-channel fans.
3.
Electric power installations Own electric switchgear, main switch board and sub-boards, lowvoltage mains network.
The building will be treated as a Category 3 site in terms electric power safety. All individual
functional zones in the building will be treated as a individual power consumers, and the power used
by them for their own purposes and for common needs will be measured on a commercial base. Each
5/8 pages
DESCRIPTION OF THE DEGREE OF COMPLETENESS AND THE TYPES OF INSTALLATIONS AND EQUIPMENT FOR THE PROJECTOFFICE BUILDING
WITH STORES AND UNDERGROUND GARAGES AT 5, SLAVYANSKA STREET
office will be equipped with a commercial single-phase electric meter, and three-phase electric
meters will be used for the shops, garages, elevators, and for technical and common use.
Part of the power consumers in the building will be treated as Category 1 and Category 0
consumers (fire protection equipment, elevators, etc.). Backup diesel generators (approx.
200kW/250kVA), local UPS units (for the computer equipment) and rechargeable batteries (for the
fire escape and emergency lighting) will be used for that purpose.
The lighting system for the building will be designed in accordance with sample interior
solutions, based on the statutory provisions concerning illumination, using various types of lighting
fittings and bulbs. In terms of functionality, the lighting will be used the following purposes:
- Main lighting system operating lighting
- Backup and security lighting
- Emergency lighting
- Evacuation lighting
- Faade and advertising lighting.
The Power sockets system will be designed in accordance with the furnishing, functionality,
technological requirements and statutory provisions. There will be both general purpose power
sockets and sockets for special purposes and equipment. Sockets with the required degree of safety
will be used, depending on the rooms and places of installation, and mainly grounded Schuko-type
sockets will be used.
The installations in the shops are subject to individual design by the respective owners, in
accordance with the specific use of the shops.
4.
4.1
4.2
DESCRIPTION OF THE DEGREE OF COMPLETENESS AND THE TYPES OF INSTALLATIONS AND EQUIPMENT FOR THE PROJECTOFFICE BUILDING
WITH STORES AND UNDERGROUND GARAGES AT 5, SLAVYANSKA STREET
openings. The fixtures and equipment in the sanitary units, including the bell traps, will comply with
the Bulgarian State Standard (BDS). Ventilation flaps (110 mm) mounted to all vertical pipes will
ensure the ventilation of the sewerage system.
A pumping station (Q = 10 l/sec, H = 15 m) will be installed for the waste water on the B3
(underground -3) level.
There will be also bell traps at levels B1 and B2, as well as grilles at level B3 for any accidental
water in the basement. At the input of the pumping station there will be an oil-catching unit with
capacity of 1.5 l/sec.
5.
DESCRIPTION OF THE DEGREE OF COMPLETENESS AND THE TYPES OF INSTALLATIONS AND EQUIPMENT FOR THE PROJECTOFFICE BUILDING
WITH STORES AND UNDERGROUND GARAGES AT 5, SLAVYANSKA STREET
Access control system centralised access control system, connected with the security center
(security at elevation 0,00), one I/O sensor at each level and at the main entrance.
7.
8.
BMS construction of a building management system for automation and control of all building
installations.
VII. COMMON AREAS
The design concept of the office building allows combination of office areas and shops areas. Such
buildings are typically characterized by large common parts at the ground floor level large reception
area, lobby and shops, thus enhancing the impressive appearance of the building.
1
Lobby areas
1.1 Lobbies stone tiles flooring, fluorescent lighting, appropriately situated signs identifying the
tenants on the respective floor. Suspended ceiling.
1.2
Entrance lobby air-conditioned, mail boxes, sign board, reception area, ceiling configured in
accordance with the architectural design, stone tiles flooring (or compatible).
Staircases stone tiles on the steps, tracery stainless steel, dome lighting, fire detectors.
Roof ferro-concrete slab, 10 cm S thermal insulation. SBS damp-proof membrane, vents, heated
storm-water funnels. Roof terraces the same, except for the fine stoneware tiles (Granitogres).
VIII.
SURROUNDING
Underground parking spaces accessible to owners only. Access via the loading platform operated
by a door-keeper, incl. parking assistants for moving the vehicles, at each level.
Security 24-hour, guards and surveillance of the entire building, integral access control system.
8/8 pages
Slavyanska-Street
BLIND WALL
INSTALLATIONS
UNDERGROUND PARKING
FOR 24 CARS
UNDERGROUND STREET
UNDERGROUND PARKING
FOR 8 CARS
TECHN.ROOM
STAIRCASE
UNDERGROUND STREET
CORRIDOR
BLIND WALL
CORRIDOR
TECHN.ROOM
CAR
PLATFORM
3,6 X 6 M
STAIRCASE
BLIND WALL
DIESEL GENERATOR
BLIND WALL
UNDERGROUND STREET
TECH.ROOM
STAIRCASE
CORRIDOR
BLIND WALL
CORRIDOR
TECHN.ROOM
TECHN.ROOM
CAR
PLATFORM
3,6 X 6 M
STAIRCASE
BLIND WALL
BLIND WALL
TECHN.
ROOM
LANTERN-LIGHT/
ESCALATOR
STAIRCASE
CORRIDOR
SWITCHGEAR
CARPLATFORM
3,6 X 6 M
INSTALLATIONS
COMMUNICATION EQUIPMENT
STAIRCASE
BLIND WALL
END OF THE PLOT
SIDE
REGULATION
LINE
TERRACE
207,49 ..
STAFF
ROOM
side regulation
line
techn.
room
staircase
ENTRANCE FOYER
PORTER
ENTRANCE FOYER
El.panel
board
ENTRANCE OFFICES
CAR PLATFORM
3,60 X 6 M
STAIRCASE
BLIND WALL
BLIND WALL
TERRACE
78,18 m2
BLIND WALL
FLOOR AREA
SHOP 3: 814,96 M2
TECHN.
ROOM
STAIRCASE
BLIND WALL
staircase
TERRACE 33,60 M2
Office 8:
161,94 m2
Office 7:
78,90 m2
Office 6:
88,59 m2
Office 5:
100,75 m2
Office 4:
84,41 m2
STAIRCASE
CORRIDOR
Office 1:
108,16 m2
Office 2:
Office 3:
145,27 m2
75,56 m2
Office 16:
124,41 m2
Office 15:
78,90 m2
Office 14:
88,59 m2
Office 13:
100,75 m2
Office 12:
84,41 m2
corridor
staircase
Office 9:
108,16 m2
Office 10:
Office 11:
145,27 m2
75,56 m2
BLIND WALL
Office 24:
124,41 m2
78,90 m2
Office 23:
Office 22:
88,59 m2
Office 21:
100,75 m2
Office 20:
84,41 m2
corridor
staircase
Office 17:
108,16 m2
Office 18:
Office 19:
75,56 m2
145,27 m2
Office 32:
124,41 m2
Office 31:
78,90 m2
Office 30:
88,59 m2
Office 29:
100,75 m2
Office 25:
110,18 m2
Office 26:
Office 27:
149,99 m2
77,87 m2
BLIND WALL
TERRACE
STAIRCASE
Office 33:
corridor
216,14 m2
Office 34:
141,55 m2
BLIND WALL
BLIND WALL
STAIRCASE
INSTALLATIONS
TERRACE 24,22 M2