Reference : Contractor/Project/month and year

dd/mm/yyyy

Date:

To: Contractors address


Attention : Proprietor of the company
Subject: Construction of Water body complete works

for HPL-Plant at

Rajendrawpur, Gazipur, Dhaka.

Dear Sir,
With due respect to be inform you that we are pleased to give you the work
order for
supply, installation and commissioning of Water Body of HPL-Plant,
Rajendawpur, Gazipur, Dhaka.
i) Items:
Sl
No
1
2
3
4
5
6
7
8
9
10
11
12
13

Description of Item
7.5 horse water Body Pump
(Origin Malaysia)
5.5 horse water Body Pump
(Origin Malaysia)
36" Sand Filter (Origin Malaysia)
Floor Inlet
Becom Hors Pipe
14" Becom Head
Becom Inlet
Skimmer
Telescop Handle
Lift Skimmer
18" Wall Brash
10" Algi Brash
12"x12" Sumpit Cover

Quantity
2
1
2
25
50
1
4
6
1
1
1
1
1

14
15

Sl
No
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35

SS 2 Step Leder
2" PVC Pipi- D Grade

1
1300

Description of Item

Quantity

2" Albow - D Grade


2" Tee - D Grade
2" Balll Bulb - D Grade
4" Balll Bulb - D Grade
Multipul Balb
2" Socket
Salt Clorine - 25 Grade (Origin
Malaysia)
Solven Cement
35 Watt LED Light
50 Watt Hellogen Spot Light
70x76 Cable
Auto Pannel Board
3/4 Electric PVC Pipe
3/4 Bend
4" UPVC Pipe
4" Albow
4" Det Cap
4'x2" Tee
4" Plance
4" Flackzible Joint

72
40
24
2
1
72
2
40
15
8
3
1
600
50
40
10
10
8
8
2

Total Value of the above mentioned items are Tk 3,093,550.00


ii) Payment Terms:
1. Mobilization Fee
2. Upon 50% work progress
3. Upon completion of work
And commissioning

25% of the Total value


:
40% of the Total value
:

35% of the Total value.

iii) Time of Completion:


Contractor will be responsible for completing the work within 3 months
after receiving work order. Failure to complete the above mentioned item will
violate the terms and condition of this work order.
vi) Other Terms and Conditions:

1. By accepting this work order the contractor agrees that it is solely his
responsibility to complete the items mentioned within prescribed time.
2. By accepting this work order the contractor he cannot leave the project
without completing the items mentioned above. If he do so he will be
subjected to monetary penalty or any other means deems suitable by
the employer.
3. By accepting this work order the contractor accepts that he is
responsible for any safety necessary for the workers during working.
4. The contractor will be responsible for the quality and quantity of
materials as stated in this work order. The contractor will rectify any
defect at own cost.
5. The contractor must ensure smooth operation of the existing lift till
installation and making good of the lift as per satisfaction of Index
Development LTD.
6. Index Development LTD are entitled to cancel out work order without
showing any advance notice or citing any reasons.

Thanking you,
For and on behalf of
Index Development LTD.
Md. Golam Mostafa
AGM (Construction)
Index Development LTD.