AQIS GUIDELINES
AND
PROCESS HANDBOOK
2013-14
Research Promotion Scheme (RPS), Nationally Coordinated Project (NCP), National Facilities in Engineering &
Technology with Industrial Collaboration (NAFETIC), Modernization and Removal of Obsolescence (MODROBS),
Entrepreneurship Development Cell (EDC), Industry Institute Partnership Cell (IIPC), Travel Grant (TG),
Seminar Grant (SG), Faculty Development Programme (FDP), Emeritus Fellowship (EF), Career Award for Young
Teachers (CAYT), Visiting Professorship (VP), AICTE INAE Distinguished Visiting Professorship (DVP), National
Doctoral Fellowship (NDF), Research Park (RP), Innovation Promotion Scheme (IPS), PG Scholarship (Institutions
shall apply), AICTE - INAE - TRF (Teacher Research Fellowship), AICTE - INAE - TG (Travel grant to
Students), Winter and Summer Schools for the Faculty (SWSS), Employability Enhancement Training Programme
(EETP), Indian National Digital Library in Engineering Sciences and Technology (INDEST), Quality Improvement
Program (QIP), Hostels for reserved category students (HRCS)
RIFD BUREAU, 4TH FLOOR, EAST TOWER, NBCC PLACE, LODHI ROAD,
NEW DELHI-110003
S.No
A
B
C
Chapter 1
Chapter 2
Chapter 3
Chapter 4
Chapter 5
Chapter 6
Chapter 7
Chapter 8
Chapter 9
Chapter 10
Chapter 11
Chapter 12
Chapter 13
Chapter 14
Chapter 15
Chapter 16
Chapter 17
Chapter 18
Chapter 19
Chapter 20
Chapter 21
Chapter 22
Chapter 23
Chapter 24
Chapter 25
Chapter 26
Chapter 27
Chapter 28
CONTENTS
Introduction
Overview
Highlights of The Year
General Guidelines
Career Award For Young Teachers
Entrepreneurship Development Cell
Emeritus Fellowship
Modernisation And Removal Of Obsolescence
National Facilities In Engineering And Technology With Industrial Collaboration
Nationally Coordinated Project Scheme
Research Promotion Scheme
Scheme of Seminar Grant
Scheme of Travel Grant
National Doctoral Fellowship Scheme
Industry Institute Partnership Cell
Hostels for SC/ST Students
Research Park
Innovation Promotion Scheme
Faculty Development Programme
Summer Winter School Scheme
Project Centre for Technical Education
Skill and Personality development Program centre for SC/ST Students
E-Learning Centre for Technical Education
Visiting Professorship
AICTE-INAE-DVP
AICTE-INAE-TG
AICTE-INAE-TRF
Scholarship Scheme to Girl Child (SSGC)
Scholarship Scheme to Physically Handicap Students
PG scholarship
INDEST
Annexure
2
AQIS GUIDELINES AND PROCESS HANDBOOK
INTRODUCTION
All India Council for Technical Education (AICTE) was established by an Act of Parliament
in 1987 with a view to promote proper planning and coordinated development of
technical education system throughout the country. AICTE helps promotion of
qualitative improvements in technical education in relation to the planned quantitative
growth and regulates proper maintenance of norms and standards and matters
connected therewith. The technical education covers programmes of education,
research, training in Engineering & Technology, Architecture, Town Planning,
Management, Pharmacy, Applied Arts and Crafts and other related areas of Engineering
& Technology
Important Provisions of the AICTE Act on AQIS
Clause 10 (1) b :
Clause 10 (1) c :
Allocate and disburse out of the fund of the Council such as grants, on such
terms and conditions as it may think fit to(i)
(ii)
Clause 10 (1) d :
Clause 10 (1) e :
Clause 10 (1) f :
Clause 10 (1) h :
Formulate schemes for the initial and in service training of the teachers and
identify institutions or centres and set up new centres for offering staff
development programmes including continuing education of teachers;
Clause 10 (1) q :
3
AQIS GUIDELINES AND PROCESS HANDBOOK
OVERVIEW
AICTE Quality Improvement Schemes (AQIS), promotes Quality in Technical Education through Research
and Development and several other schemes which aim to create technical work on a systematic basis
in order to increase the available body of knowledge, which includes the technical institutes, its faculty
and students and their interdependence on technology and the use of this knowledge to devise new
applications.
These schemes are being operated by the RIFD Bureau through which, as a part of its functions, AICTE
provides financial assistance to various Institutions for improvement in quality of education. It also
promotes research and development in technical institutions and to enhance industry Institute
Interaction. Some of the popular schemes are as follows ;
4
AQIS GUIDELINES AND PROCESS HANDBOOK
The scheme provides an opportunity to faculty, academicians and working professionals for sharing of ideas,
innovations and inventions by means of funding a seminar.
Scheme of Travel Grant (TG):
The scheme enables meritorious faculty to interact at International Level Conferences, both within and outside
India, Seminars, and Symposia. Teachers from AICTE approved Technical Institutions / University departments are
eligible for this grant.
National Doctoral Fellowship Scheme (NDF):
The scheme offers selected persons in emerging areas / disciplines of technical education approved by AICTE to
pursue Doctoral Program with an objective to attract highly qualified and motivated person and offer themselves
for teaching position in the technical education system. It is provide research support to bright young people for
pursuing exciting and innovative research in the field of technical education.
Industry Institute Partnership Cell (IIPC):
This scheme aims to create an IIP Cell in a Technical Institution which promotes interaction between faculty,
students and industry. The objective of the IIP Cell is to reduce the gap between industry expectations (practice)
and academic offerings (theory) by direct involvement of industry to attain a symbiosis.
Quality Improvement Programme (QIP):
The main objective of the programme is to upgrade the expertise and capabilities of the faculty members of the
degree level institutions in the country. The aim is to enable the teachers to acquire Masters/ Doctoral degrees
and imbibe in them a culture of research and better teaching educational capabilities by exposing them to the
environment of the institutes of study.
Hostels for SC/ST Students:
The scheme aims to support Government / Government-aided engineering colleges for construction of girls /
boys hostels for providing residential accommodation for students / researchers belonging to SC/ST category.
Research Park (RP):
This scheme provides financial assistance to institutions for setting up Research Park in collaboration with the
Industry or group of Industries. Grant of Rs. 1 crore (per State-UT) shall be given under this scheme.
Innovation Promotion Scheme (IPS):
The scheme provides financial assistance to institutions for organizing technical projects exhibition at state/UT
level. The scheme intends to bring out practical talent among students by providing a forum for exhibiting their
technical knowledge and innovations. This scheme also intends to exhibit this talent to industry in order to
convert useful / innovative / commercially viable projects into products. This will also initiate interest in
entrepreneurship activities or in registering for patents/IPR etc.
Faculty Development Programme (FDP):
The scheme is intended to provide opportunities through AICTE approved Staff Colleges / Institutions for induction
training to teachers employed in AICTE approved Technical Institutions to facilitate upgradation of knowledge and
skill.
Summer Winter School (SWS)
The scheme is intended to provide opportunities through AICTE approved Staff Colleges / Institutions for Subject
training that enhances teaching skills to teachers employed in AICTE approved Technical Institutions to facilitate
up gradation of knowledge and skill.
5
AQIS GUIDELINES AND PROCESS HANDBOOK
6
AQIS GUIDELINES AND PROCESS HANDBOOK
S. No
Scheme
No. of
Beneficiaries
Amount released
in Rs.
365
434097973
7372600
505
505671143
30
9340850
2215000
31
1871356
154
10542841
340
90482507
12
3649519
10
18
4451574
11
32
8612185
12
PG Scholarship
997
2028585522
13
60
23937543
14
22
58577832
15
41
409000000
Total
3598408445
7
AQIS GUIDELINES AND PROCESS HANDBOOK
All the proposals are to be uploaded online. Following steps are to be carried out for
submitting proposal.
Read overview about schemes at link Departments> AQIS> Schemes
athttp://www.aicte-india.org/ridschemes.htm
Download softcopy format for the desired scheme from Departments> AQIS>Format
of Application
http://www.aicte-india.org/ridschemes.htm
Download and fill softcopy format (MS Word) for desired scheme.
Refer to Departments> AQIS> Schemes >AQIS User Manual for filling and submitting
AQIS application for desired scheme on portal.
You may copy paste data from softcopy (as above) form to the application form on
the portal.
Follow the steps given below to complete the submission of your application -
Submit/Post hardcopy of PDF and copy of proof of payment to All India Council for
Technical Education, (AICTE), NBCC Place, 4th Floor, Eastern Tower, Bhisham
PitmahMarg, PargatiVihar, Lodhi Road, New Delhi-110003.( In case if it is specified in
the Advertisement.)
Every Institute shall enter the data on web portal about earlier grants received from
AICTE. In order to complete this, log in to web portal with your Institute user Id and
password and select AQIS History tab. Fill the details as required and periodically
update the details.
1.2
Documents to be annexed with the application form and uploaded without which
the application will be treated as incomplete. In case no data is available, a nil
report has to be provided on the format.
AQIS Project Status report of previously awarded AQIS schemes need to be filled as
8
AQIS GUIDELINES AND PROCESS HANDBOOK
Attested copy of the Letter of AICTE approval for the year of establishment.
Attested copy of the Letter of AICTE approval for the relevant Undergraduate &
Postgraduate department for the current academic year along with Specific
Conditions, if any.
Attested copy of the Letter of Accreditation.
1.3
The project must be initiated within one month of receipt of the funds. An activity
register is to be maintained for listing the date and respective activity. It must be
ensured that projects are completed within the specified period of time.
1.4
1.5
A stock register of equipments should be maintained for purchases made out of the
project grant for likely verification by AICTE appointed experts at any time. List of
assets procured from funds provided by AICTE should be submitted to the Council
every year.
1.6
1.7
1.8
It may be noted that If AICTE does not receive the Utilization certificate within
one month from the date of completion of the project or earlier, then AICTE will be
at liberty to recover the entire amount of the grant including the interest thereon, in a
manner it finds proper. Without submitting the projects closure certificate, the
department shall not be eligible for further funding.
1.9
If the funds are awarded for recurring expenses, no part of it may be used for nonrecurring expenditure such as purchase of fixed assets, and vice versa.
1.10
Interest earned on the project fund, if any, should be reported to AICTE. The interest
so earned will be treated as a part of the grant and can be utilized under permitted
heads of recurring expenses.
9
AQIS GUIDELINES AND PROCESS HANDBOOK
1.11
Any unspent balance from the amount sanctioned on the completion of the tenure of
the project must be surrendered to AICTE within one month through a Demand Draft
drawn in favour of the Member Secretary, All India Council for Technical Education.
1.12
The Comptroller and Auditor General of India/AICTE at their discretion shall have the
right of access to the books of accounts of the Institute in respect of the grant
received from AICTE. The Institute must, therefore, maintain separate record of
expenditure and audited accounts for the project.
The Institution which has availed the grant, shall observe all financial norms and
guidelines as prescribed by the AICTE/GOI from time to time.
AICTE reserves the right to terminate the grant at any stage if it is convinced that the
grant has not been properly utilized or appropriate progress is not made.
Constitution of Project Monitoring Committee (PMC) at Institutional level has to be
constituted by the Coordinator of the Project for reviewing the progress of the
project from time to time.
The composition of PMC should be as follows in case specific instructions are not
issued for any specific scheme:
Director/Principal/Dean of the Institution, College and University respectively
(Chairman of the Committee).
Dean (Academic affairs/Research)
Coordinator of the Project (Convener/Secretary)/ Head of the Department.
1.13
1.14
1.15
a
b
c
d
1.16
a
b
1.17
1.18
a
b
c
1.19
1.20
1.21
1.22
1.23
1.24
a
b
c
the Council.
The Council shall not provide any maintenance grant-in-aid after the expiry of the
incubation period for the programme.
The following details of temporary manpower employed under any project grant shall
be provided with the utilization certificate.
Recruitment procedure adopted with copy of advertisement.
Muster roll.
Salary payment details.
11
AQIS GUIDELINES AND PROCESS HANDBOOK
CHAPTER - 2
2.1.1
a
2.1.2
Objective
The scheme promotes young talented teachers for advancing their professional growth
by enabling them to devote maximum time in research and study with minimum
teaching responsibility.
The purpose of the scheme is to identify young talented teachers who have established
competence in their area of specialization. The scheme helps them in promoting their
professional growth by enabling them to devote maximum time in research and study
with minimum teaching responsibilities.
Eligibility
The awardee should be a full time regular faculty working in AICTE approved Institution
/ AICTE approved University Departments.
The age of awardee shall be less than 35 years.
Limit of Funding
Total funding of Rs. 9 Lakh.
2.1.3
2.1.4
2.1.5
a
b
c
d
e
f
g
2.1.6
a
b
2.1.7
a
The awardee shall be treated as on duty and therefore shall continue draw his/her pay
and allowance and the respective Institute / University / College shall not disturb the
seniority of the awardee(s) in their respective cadre.
The awardee is not allowed to shift from the host institution, that is the institution
where the awardee is working under this scheme, and the awardee will have to execute
an undertaking with the institution in this regard. In case the awardee shifts from the
host institution, the award will automatically get terminated and the award money
released by the AICTE to the Institution with respect to the awardee shall be refunded
immediately by the concerned Institution. The concerned Institution will have to
execute an undertaking to the AICTE in this regard.
Any equipment, books, journals purchased under the scheme shall be the property of
the Institute / University / College. The books and journals can be retained by the
awardee, if so desired.
The awardee is entitled for holidays and such other service privileges from the Institute
as per the entitlements of the awardee in the University/College/Institute.
The awardee shall submit an annual report on the project, each year through the Head
of the Institute on completion of one year from the date of acceptance of offer letter.
The Second instalment will be released on receipt of Utilization certificate and
statement of accounts in prescribed proforma duly audited by the Chartered
accountant in the case of private institution and by the finance officer/account officer in
respect of government/government-aided institutions.
The final report of the project shall be submitted by the awardee through the Head of
the Department / Institution to the AICTE.
13
AQIS GUIDELINES AND PROCESS HANDBOOK
2.2
2.2.1
Details of Institutions
a
Address
Contact details
Application Id
FAX
Telephone
2.2.2
a
Name
Designation
Appointment Type
Department
Qualifications
UG
PG
Experience in years
Teaching
Industry
Publications
IPR
PG students guided
Memberships of
professional bodies/
fellowships awarded
Professional activities
Date of joining
Scale of Pay
Research
14
AQIS GUIDELINES AND PROCESS HANDBOOK
Techno-commercial
activities
Outstanding
achievements at
school level
Outstanding
achievements at
college / University
level
Other information
Give any other information that will help in accepting /funding this project
Cell number
2.2.3
Details of Proposals
a
Title of proposal
Abstract
Background/Current status of
activities in the area
Plan of work / methodology
j
k
l
Receive Grant
Purchase of
equipment
10
11
p
Profile of collaborating/participating Industry/s or other organization/s, if any.
15
AQIS GUIDELINES AND PROCESS HANDBOOK
12
Na
me
Address
Website
Contact
person ,
designation,
email
Role$ in
collaborating/participating
Financial
commitment#
towards project in
Rs.
r
s
t
Total Rs.
Mention role of Industry/orgnisation.
Provide resume of participating personnel from Industry/orgnisation with their strength and role in the research project.
Add rows as required. Attach additional pages if required.
#
Attach copy of letters received from participating industry showing intent / financial commitment etc.
Add rows as required
Pl note R1=R2=R3
Budget Estimates
Recurring
AMC/Service
charges
Salary
Consumables &
Contingencies
Printing/
publication Office
Exp
aa
Other
ab
2.2.4
Total
Installment
on
completion
of year 2
R1=R/3
R2=R/3
R3=R/3
R=R1+R2+R3
2.2.5
Signature
16
AQIS GUIDELINES AND PROCESS HANDBOOK
2.2.6
Name of
the
coordinator
Amt sanctioned
NR
Sanctione
d letter
details
Funds
Utilisation
position as
on today
2.2.7
a
b
c
d
2.2.8
Date :
Institute Seal
Important: You need to apply on web portal using your Institute login and password. Select tab AQIS application. Press New to create
new application. Your application is assigned unique application Id. Fill all the details over there. Prepare application in this proforma also.
Attach PDF of it to the application on web portal. Now press submit on web portal to submit application. Pay processing fees on web portal
using appropriate payment option
17
AQIS GUIDELINES AND PROCESS HANDBOOK
2.3
EVALUATION SHEET FOR PROPOSALS UNDER THE SCHEME OF CAREER AWARD FOR YOUNG TEACHERS
(CAYT)
2.3.1
SCHEME: CAYT
DATE OF MEETING:
GROUP:
PROPOSAL NO.
a
b
c
GOVT.
(Write details)
Status of Applicant :
Permanent
Date of Birth :
(Write details)
(Write details)
(Write details)
Yes
No
If yes, details of the project: AICTE sanction letter no
& date
2.3.2
on appropriate tab)
(Write details)
Temp.
SELF FINANCING
Ad-hoc
Criteria/ Parameters
PG
d
e
Ph.D.
Teaching Experience
3
4
h
i
j
Signature of Expert
(Name of Expert)
MAX.
MARKS
MARKS
AWARDED
REMARKS
2
4
2
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
18
AQIS GUIDELINES AND PROCESS HANDBOOK
k
l
m
n
o
p
q
2.3.3
Publication of Proceedings
No(s) of Ph.D. Guided
No. of PG dissertation supervised
Membership of the Professional/ Learned bodies/Societies
Patents granted
Other (Awards etc.)
Sub Total
1
2
2
3
2
1
35
Credentials of Institute
a
b
Type of Institute
No. of Years of Establishment
3
10
d
2.3.4
15
Credentials of Department
a
UG/PG
2.3.5
15
Extension of PhD/
Research work
Relevance & Soundness
Proposed Methodology
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
19
AQIS GUIDELINES AND PROCESS HANDBOOK
f
g
35
100
2.3.6
5
5
Marks Allotted
Grade
Remarks:
Signature of Expert
(Name of Expert)
0-24
25-49
50-65
66-85
86-100
Recommended
Signature of Expert
(Name of Expert)
Not Recommended
Signature of Expert
(Name of Expert)
20
AQIS GUIDELINES AND PROCESS HANDBOOK
Objectives
This Scheme is launched with a view to encourage students in AICTE approved polytechnics
and degree technical institutions to consider self employment as a career option, provide
training in Entrepreneurship through modular courses and increase the relevance of
Management particularly in the non-corporate and under managed sectors. Following are
the objectives of the scheme:
a
Eligibility
The institute must be an AICTE approved Institutes/AICTE approved University Department.
The Coordinator shall be Full time regular faculty.
Only one proposal per institute shall be considered for funding.
Existing AICTE sponsored EDC Institutes are not eligible to apply again.
Duration of the Project
Two Years
Limit of Funding
Total funding of Rs.10 Lakh.
Rs. 6 Lakh recurring and Rs. 4 lakh non-recurring.
Disbursement of the Funds
100% of non-recurring to be released at the time of the award of the project.
50% of recurring for first year
50% of recurring for second year
Processing Methodology:
The proposal shall be assessed by an Expert Committee is to be constituted as follows:
Three member expert committee not below the rank of Associate Professor.
At least one member among the experts shall be from the concerned stream
Terms and Conditions
Minimum set of activities shall be performed by the EDC per year
At least one Entrepreneurship Awareness Programme (EAP) - (3 days duration) - batch size
up to 30 participants.
One EDC Core Faculty to undergo training in Entrepreneurship (FDP) at EDI, Ahmedabad, etc.
At least ten Expert Talks by successful entrepreneurs.
At least two Skill Development Programmes (SDP) *- batch size up to 30.
At least one Entrepreneurship Awareness Programme (EAP) - (6-8 weeks duration) - batch
21
AQIS GUIDELINES AND PROCESS HANDBOOK
size up to 20 participants
g
h The Skill Development Programmes run under the aegis of the EDC Cell of the institute are
non-formal programmes and do not carry any AICTE approval. Hence the host institute,
while advertising for such programmes or while issuing participation certificates to the
participants at the end of the Programme/Workshop, shall not carry any logo/emblem of
AICTE/GOI. Any violation will lead to termination of the violating cell.
i
The non-recurring grant-in-aid is for fitting, furnishing and for the purchase of important
equipment like Desktop PC with internet facility, Fax/Modem, back-up, Multimedia/O.H.P,
equipment, audio-visual aids, library books, journals, LCD Projector etc. This grant is given
initially once only for setting up the centre, subject to a maximum limit of Rs. Four lakh.
The recurring grant-in-aid is given for honorarium to supporting staff, working expenses,
travelling allowances, contingencies, printing & stationery and other organizational expenses
etc. subject to a maximum limit of Rs. Three lakh (every year for 2 years). The recurring grant
for subsequent years will be decided by the Council based on the performance of the
centres.
22
AQIS GUIDELINES AND PROCESS HANDBOOK
3.2
Details of Institutions
a
b
c
d
e
f
3.2.2
FAX
Telephone
Name
Designation
Appointment Type
Department
Qualifications
Experience in years
Relevant experience
Number of publications
Number of patents
Research/Consultancy projects done in the last
3 years
Other information
l
m
n
Cell number
Email
Signature
3.2.3
Date of joining
Scale of pay
UG
Teaching
PG
Industry
PhD
Research
Details of proposals
a
Title of proposal
Abstract
23
AQIS GUIDELINES AND PROCESS HANDBOOK
Profile of collaborating/participating
Industry/s or other organisation/s
Name
Address
Website
Contact
person,
Email
Role in
current
project
Financial commitment
towards project in Rs.
k
l
Total(NR)
Cost in Rs.
Justification
NR
Add rows as required
Max NR= 40% of total assistance requested
Max assistance 5 Lakh
n
o
p
q
r
s
t
AMC/Service charges
Consumables &
Contingencies
Printing/ publication Office
Exp
Other
Total
3.2.4
Advance Installment
Total (Max 5
Lakh)
R=NR+R1+R2
NR
R1
R2
24
AQIS GUIDELINES AND PROCESS HANDBOOK
3.2.5
Name of the
coordinator
Amt sanctioned
NR
Sanctioned
letter details
Funds
Utilisation
position as on
today
Utilisation Certificate
details/ Reason for
non- submission of
Utilisation Certificate
Add rows as required
3.2.6
a
b
c
d
3.2.7
Date :
Institute Seal
Important: You need to apply on web portal using your Institute login and password. Select tab AQIS application. Press New to create
new application. Your application is assigned unique application Id. Fill all the details over there. Prepare application in this proforma also.
Attach PDF of it to the application on web portal. Now press submit on web portal to submit application. Pay processing fees on web portal
using appropriate payment option.
25
AQIS GUIDELINES AND PROCESS HANDBOOK
3.3
EVALUATION SHEET FOR PROPOSALS UNDER THE SCHEME OF ENTREPRENEURSHIP DEVELOPMENT CELL (EDC)
3.3.1
SCHEME: EDC
DATE OF MEETING
GROUP:
PROPOSAL NO.
b
c
(Write details)
GOVT.
on appropriate tab)
(tick on appropriate
Permanent
Temp.
SELF FINANCING
Ad-hoc
tab)
(Write details)
(Write details)
(Write details)
Yes
No
If yes, details of the project:
AICTE Sanction
Date Status
Letter No.
Complete
3.3.2
On-going
Credentials of Applicant
MAX.
MARKS AWARDED
MARKS
Academic credentials of Chief Coordinator
PG
Ph. D
e
f
Experience
Experience or conducting
training in Entrepreneurship
as Chief Coordinator
2
5
Sub
Total
Signature of Expert
(Name of Expert)
REMARKS
10
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
26
AQIS GUIDELINES AND PROCESS HANDBOOK
3.3.3
Type of Institute
10
j
k
3.3.4
a
b
c
d
e
f
Signature of Expert
(Name of Expert)
10
5
50
10
10
10
10
40
100
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
27
AQIS GUIDELINES AND PROCESS HANDBOOK
3.3.4
3.3.5
a
b
Grade
Over All Observations
Remarks:
0-24
25-49
50-65
66-85
86-100
Recommended
AMOUNT RECOMMENDED:
Recurring (Rs.)
3.3.6
Not Recommended
1
2
3
4
5
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
28
AQIS GUIDELINES AND PROCESS HANDBOOK
4.1.2
a
b
c
4.1.3
a
4.1.4
Objective
The Scheme of Emeritus Fellowship intends to utilize the services of highly qualified and
experienced superannuated Professors at AICTE approved Institutions / Colleges /
University Departments imparting technical education (excluding MHRD funded Institutes
/ Universities i.e., IITs, IISc, IIMs & NITs etc.) in stimulating and achieving excellence in
Technical Education i.e. in Engineering and Technology, Architecture, Town Planning,
Management, Pharmacy, Applied Arts and Crafts and other areas as per the AICTE Act.
Eligibility
AICTE approved Institutes / AICTE approved University Departments.
The Awardee must be a superannuated professor and/or scientist from IIT/NIT, IIM, IISc,
CSIR laboratories, defence establishments, like BARC, TIFR, INSA, INA, etc.
Only applicable to institutes offering PG Programme.
Duration of the Project
The duration of the project shall be for a period of two years or till the awardee fellow
attains the age of 70 years whichever is earlier.
Limit of Funding
Total funding of Rs.13 Lakh.
a
4.1.5
a
b
4.1.6
a
b
4.1.7
a
c
d
e
f
h
i
j
k
l
Technical Education.
As a part of the objectives of the fellowship, an Emeritus Fellow may provide technical
consultancy to a developing institution located in a nearby area of the host institution,
where the Emeritus Fellow can devote a part of his time (20 percent of total time) for
giving impetus to consultancy, research, redesigning of courses, industry-instituteinteraction, formulation for research of those projects for which expertise is not available
in the adopted institution.
The honorarium indicated above will be over and above any superannuation benefits, the
Emeritus Fellow may be in receipt of.
The contingency funds will be used for inputs needed for various developmental activities
undertaken by the Emeritus Fellow in the adopted institution.
Change of host institution is usually not allowed. However, a change may be
permitted by AICTE only in special circumstances.
An Emeritus Fellow will be allowed to avail Forty Five (45) days of leave in a year with
honorarium. Leave will be sanctioned by the Host Institution
The Host Institution shall take steps to ensure that the audited utilization certificate and
the audited statements of accounts for the grants along with the list of assets created
from out of the grants to be submitted and refund of unspent amount from the grants
made to AICTE, immediately on termination of the Fellowship.
A feedback shall be submitted by the Fellow at the end of first year and at the end of the
tenure.
30
AQIS GUIDELINES AND PROCESS HANDBOOK
4.2
EMERITUS FELLOWSHIP
4.2.1
Details of Institute
a
Address
Contact details
4.2.2
FAX
Telephone
Name
Designation
Appointment Type
Department
Qualifications
UG
PG
PhD
Experience in years
Teaching
Industry
Research
Experience
Organisation
Worked as
Current status
Working / retired
Date of joining
Scale of Pay
From to
Achievements
Publications
IPR
PG students guided
Other information
Cell number
PhD
students
guided
Give any other information that will help in accepting /funding this
project
A detailed CV to be attached
31
AQIS GUIDELINES AND PROCESS HANDBOOK
4.2.3
4.2.4
Details of proposal
a
Title of proposal
Abstract
Objective
Expected outcome
4.2.5
Declaration by the proposed candidate:
I presently employed as / superannuated from is willing to work as an
Emeritus Fellow in for a period of two years. I shall comply with the requirements
of the scheme
Signature
4.2.6
Advance installment
NR
R1
R=NR+R1
32
AQIS GUIDELINES AND PROCESS HANDBOOK
4.2.7
Name of the
coordinator
Amt sanctioned
NR
Sanctioned
letter details
Funds
Utilisation
position as on
today
Utilisation Certificate
details/ Reason for
non- submission of
Utilisation Certificate
Add rows as required
4.2.8
a
b
c
d
4.2.9
Date :
Institute Seal
Important: You need to apply on web portal using your Institute login and password. Select tab AQIS application. Press New to create
new application. Your application is assigned unique application Id. Fill all the details over there. Prepare application in this proforma also.
Attach PDF of it to the application on web portal. Now press submit on web portal to submit application. Pay processing fees on web portal
using appropriate payment option.
33
AQIS GUIDELINES AND PROCESS HANDBOOK
4.3
EVALUATION SHEET FOR PROPOSALS UNDER THE SCHEME OF EMERITUS FELLOWSHIP (EF)
4.3.1
SCHEME: EF
DATE OF MEETING
GROUP:
PROPOSAL NO.
(Write details)
(Write details)
d
e
f
g
h
i
j
4.3.2
SELF
(Write details)
(Write details)
(Write details)
(Write details)
(Write details)
PARAMETER / CRITERIA
MAX. MARKS
PG Qualification
Ph. D
Research Experience
10
Publications/Patents
10
j
k
2
40
Sub Total
Signature of Expert
(Name of Expert)
MARKS AWARDED
Signature of Expert
(Name of Expert)
REMARKS
Signature of Expert
(Name of Expert)
34
AQIS GUIDELINES AND PROCESS HANDBOOK
4.3.3
d
e
f
4.3.4
a
20
Grand Total
100
d
e
Signature of Expert
(Name of Expert)
4
4
4
4
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
35
AQIS GUIDELINES AND PROCESS HANDBOOK
4.3.5
Marks Allotted
b
c
Grade
Over All Observations
Remarks:
4.3.6
0-24
25-49
50-65
66-85
86-100
Recommended
Not Recommended
AMOUNT RECOMMENDED:
a
Head
Rs. in Lakh.
st
1 Year
b
2nd Year
Honorarium
Contingency
TOTAL
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
36
AQIS GUIDELINES AND PROCESS HANDBOOK
5.1.1
a
5.1.2
a
b
c
5.1.3
a
5.1.4
a
5.1.5
a
b
5.1.6
a
b
5.1.7
a
Objective
The scheme aims to modernize and remove obsolescence in the Laboratories /
Workshops / Computing facilities (Libraries are excluded), so as to enhance the
functional efficiency of Technical Institutions for Teaching, Training and Research
purposes.
It also supports new innovations in Class Room and Laboratory / Teaching Technology,
development of Lab Instructional Material and appropriate Technology to ensure that
the practical work and project work to be carried out by students is contemporary and
suited to the needs of the Industry.
The equipment financed under the scheme could be ideally used for upgradation of
equipment in existing laboratories, enhancement of performance parameter
specification of existing equipment, incorporation of latest development in the field and
replacement of old depreciated equipment by modern equipment.
In addition to above major objectives, the equipment installed through
MODROBS can be used for indirect benefit to Faculty / Students through Continuing
Education programmes, Training programmes for local industry and consultancy work.
Eligibility
AICTE approved Technical Institutions / University Departments with at least 10 years of
existence.
For self financing/Institutes not more than 3 proposals per Institutes per year would be
considered.
For Govt. /Govt. aided Institutes not more than 10 proposals per Institute per year
would be considered.
Duration of the Project
Duration of project will be one year from the date of receipt of funds in the institutes
account.
Limit of Funding
Total funding of Rs.20 Lakh.
Disbursement of the Funds
100% grant of sanctioned amount will be released to Government Institutions.
To private institutions, grants will be sanctioned in the form of 80% of the sanctioned
amount as advance followed by 20% as reimbursement on submission of the Utilization
certificate and other supporting documents as specified in terms and conditions of
MODROB.
Processing Methodology:
The proposal shall be assessed by an expert committee constituted as follows:
Three member expert committee not below the rank of Associate Professor.
At least two members among the experts shall be from the concerned stream.
Terms and Conditions
In MODROBS scheme, the Head of the Department (HOD) submitting the proposal is
always the Project Coordinator. To enable subject specific knowledge to be utilized, a
Co-Coordinator can also be proposed. The HOD should critically analyze the
requirements of the laboratory / laboratories of the Department for preparation of the
project proposal, which should relate to the future development of the academic
37
AQIS GUIDELINES AND PROCESS HANDBOOK
f
g
h
i
j
k
38
AQIS GUIDELINES AND PROCESS HANDBOOK
5.2
Details of Institutions
a
Address
Contact details
Application Id
Department
Lab to be funded
a
b
Name
Designation
c
d
e
f
g
h
i
j
k
Appointment Type
Department
Qualifications
Experience in years
Relevant experience
Number of publications
Number of patents
Research/Consultancy projects done in the
last 3 years
Other information
Cell number
5.2.2
FAX
Telephone
PG
Industry
PhD
Research
39
AQIS GUIDELINES AND PROCESS HANDBOOK
m
n
Email
Signature
5.2.3
a
Name of equipment
Cost in Rs.
Year purchased
b
Add rows as required
Details of proposal
5.2.4
a
Title of proposal
Abstract
Objective
5.2.5
Proposed equipment/s
Specifications
No of units
Cost in Rs.
Justification
b
c
Total(NR)
NR
Add rows as required
5.2.6
Other
Total
Add rows as required
5.2.7
Advance installment
NR
R1
R=NR+R1
40
AQIS GUIDELINES AND PROCESS HANDBOOK
5.2.8
Name of the
coordinator
Amt
sanctioned
NR
Sanctioned
letter details
R
Funds
Utilisation
position as
on today
Utilisation
Certificate details/
Reason for nonsubmission of
Utilisation
Certificate
Add rows as required
5.2.9
b
c
d
5.2.10
Date :
Important: You need to apply on web portal using your Institute login and password. Select tab AQIS application. Press New to create
new application. Your application is assigned unique application Id. Fill all the details over there. Prepare application in this proforma also.
Attach PDF of it to the application on web portal. Now press submit on web portal to submit application. Pay processing fees on web portal
using appropriate payment option.
41
AQIS GUIDELINES AND PROCESS HANDBOOK
5.3
EVALUATION SHEET FOR PROPOSALS UNDER THE SCHEME OF MODERNISATION AND REMOVAL OF
OBSOLESCENCE (MODROBS)
5.3.1
SCHEME: MODROBS
a
DATE OF MEETING:
(Write details)
Type of Institution:
GOVT.
FINANCING
YES
(Write details)
Status of Coordinator :
Permanent
h
i
GOVT. AIDED
NO
Temp.
Ad-hoc
(Write details)
5.3.2
OBSERVATION OF THE EXPERT COMMITTEE
a
PARAMETER / CRITERIA
PG
Ph. D
Teaching Experience
h
i
MAX.
MARKS
MARKS
AWARDED
REMARKS
1
3
2
2
2
2
3
Sub Total
Signature of Expert
(Name of Expert)
15
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
42
AQIS GUIDELINES AND PROCESS HANDBOOK
SELF
5.3.3
Type of Institute
10
10
10
e
5.3.4
Sub Total
35
Objectives
10
10
20
10
Sub Total
50
5.3.5
100
Marks Allotted
Grade
Over All
Recommendations
Over All
Observations
0-24
25-49
50-65
66-85
86-100
Not Recommended
Recommended
Remarks:
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
43
AQIS GUIDELINES AND PROCESS HANDBOOK
5.3.6
AMOUNT RECOMMENDED:
a
5.3.7
Head
b
c
Recurring
Manpower
Consumables
Contingency
Travel
Non Recurring
Rs. in Lakh.
EQUIPMENTS
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
44
AQIS GUIDELINES AND PROCESS HANDBOOK
CHAPTER - 6
6.1.1
a
6.1.2
Objective
AICTE launched a scheme of National Facilities in Engineering and Technology with
Industrial Collaboration (NAFETIC), aimed at establishment of National Facilities in the
frontier areas of engineering and Technology in collaboration with industry.
Educational institutions having good rapport with industries can submit proposals for
the AICTE seed grant of up to Rs. 50 Lakh to prepare the Detailed Project Report for
setting up of NAFETIC in emerging or thrust areas of engineering and technology with
matching grant from the Industry of which 15% may be recurring
b
c
d
Eligibility
AICTE approved institute, or AICTE approved university Department with relevant PG
programmes with Accreditation from NBA at UG/PG level.
Coordinator must be full time regular faculty of the institute.
Matching grant from the Industry.
Having accreditation of the UG/PG programme under respective department from NBA.
6.1.3
6.1.4
a
6.1.5
a
b
c
d
6.1.6
a
b
6.1.7
a
b
c
d
e
Limit of Funding
Up to Rs. 50 lakh from AICTE and a matching grant from the Industry
Disbursement of the Funds
Sanctioned fund from AICTE and matching grant from the Industry of which maximum
of 15% may be recurring.
On sanction of proposal 60% of non-recurring and recurring for the first year.
30% of non-recurring and recurring for second year
10% of non-recurring and recurring for third year.
Processing Methodology
The proposal to be assessed by an expert committee constituted as follows:
Three experts not below the rank of Associate Professor.
At least two members among the experts shall be from the concerned stream.
Terms and Conditions
NAFETIC centre is expected to do the following activities:
To provide state-of-the-art R&D facilities in specific areas of engineering and technology
for intramural research and development, education and training.
To provide sophisticated testing, instrumentation and design facilities to industry in
specialized/ emerging areas of engineering and technology.
To provide necessary expertise, facilities and know-how for undertaking R&D projects
on a turnkey basis, in emerging inter-disciplinary areas of relevance to industry.
To aim and achieve breakthrough in relevant specific technology areas.
To aim at intensifying technology transfer from participating Institution for the benefit
45
AQIS GUIDELINES AND PROCESS HANDBOOK
f
g
h
i
j
k
of industrial development.
Provide technology incubator facility in the early stages of commercialization of new
technologies.
To plan, coordinate and execute integrated R&D programmes, involving interested
institutions, R&D organizations and industries, at national level.
To promote the culture of hardware and applied research relevant to socio-economic
needs of the country in academic institutions.
To provide advanced knowledge and know-how to industry in the new areas of
relevance through short-term training/continuing education programmes.
To provide effective linkage between industry and academic institutions for sponsored
research and consultancy.
To provide state-of-the-art R&D facilities in specific areas of engineering and technology
for intramural research and development, education and training.
46
AQIS GUIDELINES AND PROCESS HANDBOOK
6.2
6.2.1
Details of Institutions
a
Address
Contact details
Application Id
Department
6.2.2
Telephone
k
l
m
Signature
a
b
c
d
e
f
g
h
i
j
FAX
6.2.3
Date of joining
Scale of Pay
UG
Teaching
PG
Industry
Research
Details of Proposals
Technical Field of proposal
Title of proposal
Abstract
47
AQIS GUIDELINES AND PROCESS HANDBOOK
Objective
f
Name
Total Rs.
Mention role of Industry/organisation.
Provide resume of participating personnel from Industry/organisation with their strength and role in the research project.
Add rows as required. Attach additional pages if required.
#
Attach copy of letters received from participating industry showing intent / financial commitment etc.
Add rows as required
Pl note R1=R2=R3
Specifications
No of
units
Total(NR)
h
Cost in Rs.
Justification
NR
Estimate
for Year 2
(R2)
Estimate
for Year 3
(R3)
AMC/Service charges
Salary
Consumables &
Contingencies
Printing/ publication
Office Exp
Travel, Stay & DA
Other
Total
$
48
AQIS GUIDELINES AND PROCESS HANDBOOK
6.2.4
Advance installment
NR
Installment on
completion of
year 1
Installment on
completion of
year 2
R2
R3
R=NR+R1+R2+R3
R1
6.2.5
a
Academic year
Year 1
Post
Number
Period for
to
Total
months
Salary
/month
Total salary
exp.
Year 2
Year 2
6.2.6
Name of
the
coordinator
Amt
sanctioned
NR
Sanctioned
letter
details
Funds
Utilisation
position as
on today
Utilisation
Certificate details/
Reason for nonsubmission of
Utilisation
Certificate
Add rows as required
6.2.7
a
b
c
d
49
AQIS GUIDELINES AND PROCESS HANDBOOK
6.2.8
a
b
Date :
Institute Seal
Important: You need to apply on web portal using your Institute login and password. Select tab AQIS application. Press New to create
new application. Your application is assigned unique application Id. Fill all the details over there. Prepare application in this proforma also.
Attach PDF of it to the application on web portal. Now press submit on web portal to submit application. Pay processing fees on web portal
using appropriate payment option.
50
AQIS GUIDELINES AND PROCESS HANDBOOK
6.3
EVALUATION SHEET FOR PROPOSALS UNDER THE SCHEME OF NAFETIC PROJECT SCHEME
6.3.1
SCHEME NAFETIC
DATE OF
MEETING:
PROPOSAL
NO.
(Write details)
d
e
f
Type of Institutions
Name of the Coordinator
Status of Coordinator
(Write details)
GROUP-
(Write details)
PERMANENT
TEMP.
AD-HOC
6.3.2
(Write details)
(Write details)
Criteria / Parameters
b
c
d
e
f
g
h
i
j
1
3
3
4
2
4
5
1
k
l
m
Patents granted
Other (Awards etc.)
Sub Total
1
1
25
Signature of Expert
(Name of Expert)
Max
Marks
Marks
Awarded
Remarks
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
51
AQIS GUIDELINES AND PROCESS HANDBOOK
6.3.3
Type of Institute
15
Sub Total
Credentials of Programme
Level
a) International
b) National
c) State Level
Objectives & Context
Relevance
Technical Novelty
Benefit to Society
Benefit to Industry
f
a
Sub Total
Credentials of Participant Industry
35
10
e
f
Sub Total
Grand Total
6.3.4
a
6.3.5
Signature of Expert
(Name of Expert)
10
10
10
25
100
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
52
AQIS GUIDELINES AND PROCESS HANDBOOK
6.3.6
6.4.7
Marks Allotted
Grade
Over all Observations
0-24
E
25-49
D
Recommended
Remarks
50-65
C
66-85
B
86-100
A
Not Recommended
AMOUNT RECOMMENDED
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
53
AQIS GUIDELINES AND PROCESS HANDBOOK
7.1.1
a
Objective
Nationally Coordinated Project Scheme aims to plan, co-ordinate and execute
integrated R&D programs, involving collaboration between several institutions, industry
user organizations at National Level for societal Development Programs. This scheme
Promotes R & D on themes of National / Social importance, which may involve
networking and collaboration amongst several institutions and industry user
organizations
Research ventures that may be considered within Nationally Coordinated Project
Scheme include the following:
(i)
(ii)
To aim and achieve break- through technology in relevant specific areas of national
importance.
(ii)
(iv)
(v)
(vi)
To create good quality courseware (in the form of book, CD, Multimedia) for core and
emerging subjects.
(vii)
(viii)
Multi-institutional projects.
Association between reputed institutes like IIT, NIT, IIM, IISC & AICTE approved
institutes and University Departments.
7.1.2
a
54
AQIS GUIDELINES AND PROCESS HANDBOOK
Limit of Funding
Rs. 50 lakh
a
b
c
f
7.1.3
7.1.4
7.1.5
7.1.6
a
b
7.1.7
a
Processing Methodology:
The proposal shall be assessed by an Experts Committee constituted as follows:
Three member expert committee not below the rank of Associate Professor.
At least two members among the experts shall be from the concerned stream
Terms and Conditions
The thrust areas where a nationally co-ordinated project is to be set up must be clearly
identified by institution/university in consultation with industry, keeping in view its own
strength, availability of expert manpower and infrastructural facilities within the
institution.
The Chief Coordinator shall be a full time faculty member of the lead institute. The
participating institutions are required to nominate full time faculty members (one from
each participating institutions) as the co-coordinators of the project.
The Chief Coordinator shall be primarily responsible for the implementation of the
project.
The chief coordinator is required to provide a brief two page write up on the proposed
NCP indicating the following points at the time of submitting the initial proposal. This
may undergo some degree of modification in the Detailed Project Report, which is
required to be submitted within three months from the date of receipt of seed money
from AICTE
(i)
(ii)
(iii)
55
AQIS GUIDELINES AND PROCESS HANDBOOK
(iv)
(v)
(vi)
(viii)
A time activity chart indicating time schedule along with deliverables from each
participating institution.
Copies of letters of intents / MOUs signed between the participating institutions.
(ix)
(vii)
Proposals shall be considered on the basis of justification of the project with respect to
relevance of the project with important issues of national importance and or / issues of
technical education development.
The University/ Institute may nominate a permanent faculty as Chief Coordinator
preferably not below the rank of a Reader to coordinate the activities of the cell and
also nominate a Co-coordinator not below the rank of Assistant Professor.
Proposals from Departments of self-financing Institutions (as one of the participating
institution) shall be considered, only if they are accredited by AICTE. However, this
condition does not apply to the five years old Institutions located Jammu & Kashmir and
North Eastern States.
The Chief Coordinator/ University/ Institute should inform the council of their consent
to implement the programme as approved, by way of Acceptance Letter. If the
Acceptance Letter is not received by the AICTE within one month of issue of offer letter,
it shall be presumed that Chief Coordinator/ University/ Institution is not interested to
take up the programme, and the approval of the programme shall stand withdrawn.
The Chief- Coordinator must submit Annual Progress Report every year indicating the
progress of the cell and the status of the grant-in-aid utilized. If it is found that the
grant-in-aid released is not being utilized for the purposes for which it was intended for
and the progress of the programmes is not satisfactory, the project programmes shall
be closed down. Action may be taken to seek refund of grant released. Further
extension of financial support from AICTE shall be based on the progress of the project
and effective utilization of the earlier grant-in-aid provided.
If the Chief Coordinator leaves the institution, retires, or goes on long leave, the
institute will appoint another Chief Coordinator to the programme, under intimation to
the council immediately.
56
AQIS GUIDELINES AND PROCESS HANDBOOK
7.2
7.2.1
Details of Institutes
a
b
c
d
e
Department
a
b
c
d
e
f
g
h
i
j
k
Name
Designation
Appointment Type
Department
Qualifications
Experience in years
Students guided
Publications
Relevant experience
Number of patents
Research/Consultancy projects done
in the last 3 years
Other information
Cell number
Email
Signature
Email
FAX
Telephone
This Id is available on AICTE web portal
Unique application Id as assigned to your application on web portal. See important note on the
last page of this proforma.
7.2.2
Details of Candidates
l
m
n
o
Date of joining
Scale of Pay
UG
Teaching
UG
National
PG
Industry
PG
International
PhD
Research
PhD
Books
7.2.3
Details of Proposals
a
Title of proposal
Abstract
d
e
Objective
The brief writ up on current status
of Industry Institute
relations/activities
Budget Estimates Non Recurring
Proposed
Specifications
equipment/s
g
h
No of
units
Cost in
Rs.
Justification
57
AQIS GUIDELINES AND PROCESS HANDBOOK
i
j
k
l
Total(NR)
Budget Estimates Recurring
Estimate for Year 1
AMC/Service charges Nil (warranty
period)
Consumables &
Contingencies
Other
Total R1
NR
Estimate for Year 2
R2
R3
Total Rs.
$
7.2.4
Advance installment
NR
R1
R=NR+R1
7.2.5
Name of the
coordinator
Amt sanctioned
NR
Sanctioned
letter details
7.2.6
Funds
Utilisation
position as on
today
Utilisation Certificate
details/ Reason for
non- submission of
Utilisation Certificate
Post
Number
Period
for to
Total
months
Salary
/month
Total
salary
exp.
Year 1
Year 2
Year 2
58
AQIS GUIDELINES AND PROCESS HANDBOOK
7.2.7
a
b
c
d
7.2.8
Date :
Important: You need to apply on web portal using your Institute login and password. Select tab AQIS application. Press New to create
new application. Your application is assigned unique application Id. Fill all the details over there. Prepare application in this proforma also.
Attach PDF of it to the application on web portal. Now press submit on web portal to submit application. Pay processing fees on web portal
using appropriate payment option.
59
AQIS GUIDELINES AND PROCESS HANDBOOK
7.3
EVALUATION SHEET FOR PROPOSALS UNDER THE SCHEME OF NATIONAL COORDINATE PROJECT (NCP)
7.3.1
a
b
c
d
e
f
SCHEME NCP
DATE OF
MEETING:
PROPOSAL
NO.
GROUP-
(Write details)
PERMANENT
TEMP.
AD-HOC
Criteria / Parameters
7.3.2
b
c
d
e
f
g
h
i
j
k
l
m
7.3.3
(Write details)
(Write details)
Type of Institute
No. of years of
Establishment
Sub Total
Credentials of Program
Objectives of the Project
Justification of the
Project with the
15
c
7.3.4
a
b
10
10
60
AQIS GUIDELINES AND PROCESS HANDBOOK
d
e
Department / Intuitional
needs
Networking with
partnering institutions
with relation to
technical, administrative
and financial aspects
Linkages with Industry
Innovativeness
15
10
f
g
Sub Total
Grand Total
65
100
a
b
c
Remarks
7.3.5
7.3.6
15
Recommended
50-65
C
66-85
B
86-100
A
Not Recommended
AMOUNT RECOMMENDED:
: Rs.____________________ Lakh
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
61
AQIS GUIDELINES AND PROCESS HANDBOOK
Signature
SignatureSCHEME
of Expert (RPS)
CHAPTER
- 8of Expert
RESEARCH PROMOTION
(Name of Expert)
(Name of Expert)
8.1.1
Signature of Expert
(Name of Expert)
objective
a
8.1.2
a
b
c
d
8.1.3
a
8.1.4
8.1.5
a
b
c
8.1.6
RPS Promotes Research in identified thrust areas of in Technical Education. RPS is aimed
to create research ambience in the institutes by promoting research in engineering
sciences and innovations in established and newer technologies; and to generate
Masters and Doctoral degree candidates to augment the quality of faculty and research
personnel in the country.
Research and development activities are considered as an essential component of higher
education because of their role in creating new knowledge and insight and imparting
excitement and dynamism to the educational process, as well as make them need based
in view of the national requirements. The objective of this scheme is to create and
update the general research capabilities of the faculty members of the various Technical
Institutes. The proposal should include a specific project theme with a clear statement of
the objectives, details of equipments and other research facilities proposed to be
acquired and the expected deliverables from the project.
Eligibility
AICTE approved Technical Institutions / University Departments with relevant PG
programme.
Full time regular faculty with research experience and publications.
The preliminary research facilities should be available in the institute.
One proposal from one PI will be sanctioned at any point in time with in the duration of
project.
Duration of the Project
Duration of project will be three year from the date of receipt of funds in the institutes
account.
Limit of Funding
Total funding of Rs.25Lakh.
Disbursement of the Funds
100% of the total funds of non-recurring and one third of recurring for the first year.
Recurring of one third for second year.
Recurring of one third for third year.
Processing Methodology:
At least two members among the experts shall be from the concerned stream.
8.1.7
c
d
h
i
j
The departments not having relevant Post Graduate Programme intended for execution
of the proposed project as well as Diploma level Courses are not eligible for financial
assistance under RPS Scheme.
The Principal Investigator has the primary responsibility for the implementation of the
project.
If the Principal Investigator of RPS programme joins another institution, AICTE will have
no objection to transfer the project if No Objection Certificates are obtained from both
the parent Institute and the Institute where the Principal Investigator intends to join.
In case the Principal Investigator leaves the Institution without transfer of the project or
goes on long leave, the Co-Investigator would be allowed to continue with the project,
subject to the consent of the Principal Investigator in case of long leave and approval of
AICTE. All such requests should be sent to AICTE in advance. Therefore, association of a
Co-Investigator in the project is desirable.
In case the Principal Investigator leaves the Institute and there is no other associated CoInvestigator to carry out the project, the Head of the Department should take the
responsibility for identifying a competent person in the Institution in the relevant subject
area and submit his/her bio-data to the Council for further consideration.
The grant will be utilized strictly for the purpose as specified in the sanction letter. Reappropriation of funds from one head to another is strictly not permitted; Recurring and
Non-Recurring heads are 15% and 85% of the total grant, unless otherwise
recommended by AICTE experts. The list of equipment decided by the experts is final and
there can be no changes later on.
Once the project is sanctioned, the Council shall not consider any request for additional
grant.
Separate institutional overheads for execution of the project shall not be provided by
AICTE.
Out of the project grant, no funds can be used for going abroad to attend
Conferences/Seminars. However, for presenting a paper in a Seminar/Conference within
the Country, the travel expenses may be met from the recurring component of the grant
63
AQIS GUIDELINES AND PROCESS HANDBOOK
8.2
8.2.1
Details of Institutes
a
b
c
d
e
g
h
i
Email
FAX
Telephone
This Id is available on AICTE web portal
Unique application Id as assigned to your application on web portal. See important
note on the last page of this proforma.
8.2.2
Details of Candidates
a
b
c
d
e
f
g
h
i
j
k
l
m
n
o
Name
Designation
Appointment Type
Department
Qualifications
Experience in years
Students guided
Publications
Relevant experience
Number of patents
Research/Consultancy projects done
in the last 3 years
Other information
Cell number
Email
Signature
8.2.3
Date of joining
Scale of Pay
UG
Teaching
UG
National
PG
Industry
PG
International
PhD
Research
PhD
Books
Details of Proposals
a
b
c
d
e
f
g
64
AQIS GUIDELINES AND PROCESS HANDBOOK
generation
Time & activity chart
j
k
l
m
n
Activity
Name of equipment
10
11
12
Receive Grant
Purchase of equipment
Add rows as required
This is sample activity chart. Modify as needed.
Add activities/rows as required
Cost in Rs.
Year purchased
Add rows as required
q
r
s
t
u
v
Total(NR)
Budget Estimates Recurring
Estimate for Year 1
AMC/Service charges Nil (warranty
period)
Consumables &
Contingencies
Other
Total R1
w
x
y
No of
units
Cost in
Rs.
Justification
NR
Estimate for Year 2
R2
R3
Add rows as required
8.2.4
b
c
8.2.5
Advance installment
NR
R1
R2
R3
NR+R1+R2+R3
Total Rs.
$
8.2.6
65
AQIS GUIDELINES AND PROCESS HANDBOOK
Institute
Scheme Name of
the
coordinator
Amt
sanctioned
NR
Sanctioned
letter
details
Funds
Utilisation
position as on
today
Utilisation Certificate
details/ Reason for nonsubmission of Utilisation
Certificate
Add rows as required
8.2.7
a
b
c
d
8.2.8
a
Important: You need to apply on web portal using your Institute login and password. Select tab AQIS application. Press New to create
new application. Your application is assigned unique application Id. Fill all the details over there. Prepare application in this proforma also.
Attach PDF of it to the application on web portal. Now press submit on web portal to submit application. Pay processing fees on web portal
using appropriate payment option.
66
AQIS GUIDELINES AND PROCESS HANDBOOK
8.3
EVALUATION SHEET FOR PROPOSALS UNDER THE SCHEME OF RESEARCH PROMOTION SCHEME (RPS)
8.3.1
SCHEME: RPS
DATE OF MEETING
GROUP:1
PROPOSAL NO.
e
f
(Write details)
g
h
(Write details)
a
b
c
8.3.2
a
b
c
d
e
f
g
h
i
Signature of Expert
(Name of Expert)
(Write details)
SELF
Temp
Ad-hoc
(Write details)
(Write details)
Yes
No
(tick on appropriate tab)
If yes, details of the project: AICTE sanction
letter no & date (Write details)
MARKS
AWARDED
Signature of Expert
(Name of Expert)
REMARKS
Signature of Expert
(Name of Expert)
67
AQIS GUIDELINES AND PROCESS HANDBOOK
8.3.3
Sub Total
Research proposal including its Objectives, Technical Novelty etc.
a
b
c
d
e
f
g
8.3.4
8.4.5
5
5
25
10
10
10
10
5
45
100
Grade
0-24
25-49
50-65
66-85
86-100
Recommended
Not Recommended
e Remarks:
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
68
AQIS GUIDELINES AND PROCESS HANDBOOK
8.4.6
AMOUNT RECOMMENDED:
Head
A
Rs. in Lakh.
Recurring
Recurring
Manpower
Consumable
Contingency
8.4.7
Non Recurring
EQUIPMENTS
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
69
AQIS GUIDELINES AND PROCESS HANDBOOK
9.1.1
objective
The scheme provides financial assistance to institutions for organizing Symposium /
Conference / Seminar / Workshop at National and International level in various fields of Technical
Education. The Scheme intends to promote high standards in Technical Education by way of
extending opportunities to the academicians and working professionals by providing a forum for
sharing their knowledge, experiences, innovations and inventions. Preference shall be given to
topics of interdisciplinary nature, emerging and thrust areas in Technical Education.
9.1.2
Eligibility
a
b
c
9.1.3
Duration of Project
a
The proposed/approved Seminar shall be conducted within six month from the date of
receipt of offer letter.
Limit of funding
Rs. 2 Lakh for National Conference and Rs. 3 Lakh for International Conference.
9.1.4
9.1.5
9.1.6
Processing Methodology:
The proposal shall be assessed by an expert committee constituted as follows
a
At least one member among the experts shall be from the concerned stream.
9.1.7
70
AQIS GUIDELINES AND PROCESS HANDBOOK
interest incurred.
(i)
(ii)
(iii)
(iv)
(V)
Copies of proceedings.
The University/Institution should submit the documents necessary for release of 1st
installment within 15 days of receipt of the offer letter and document necessary for
release of 2nd installment within 1 month of the conduct of the event.
71
AQIS GUIDELINES AND PROCESS HANDBOOK
9.2
Details of Institutes
9.2.1
a
Address
Contact details
FAX
Telephone
accredited by NBA
e
Application Id
a
b
c
d
e
Name
Designation
Appointment Type
Department
Whether the Department is
accredited by NBA
Qualifications
Experience in years
Publications
Relevant experience
Number of patents
Research/Consultancy projects done
in the last 3 years
Other information
Cell number
Email
Signature
9.2.2
Details of Candidates
f
g
h
i
j
k
l
m
n
o
Date of joining
Scale of Pay
UG
Teaching
National
PG
Industry
International
PhD
Research
Books
9.2.3
Details of Proposals
Technical Field Title of proposal
Abstract
Objective & level of activity
(Regional/National/Internati
onal) and target audience.
e Project Impact -Expected
outcome
f programme details
a
b
c
d
Date
Time
Activity
Venue
Infrastructura
72
AQIS GUIDELINES AND PROCESS HANDBOOK
l
requirements
and
availability
Lecture by /
Demonstratio
n / Industry
visit / Poster
presentation/
other
Add rows as
required
g Eminent personalities
expected to participate
Name
Designation
Organization
Activity
9.2.4
a
Total Rs.
$
9.2.5
a
Title of the
activity
(Latest first)
Grant by
AICTE, Rs.
9.2.6
a
b
c
d
e
F
External
Sponsorships
Assistance
requested
from
Council r
Remuneration to speakers
Stationery, printing, Pre-event
expenditure etc.
Travel, Stay and DA
Other
Total
Add rows as required.
Max assistance 3 Lakh
73
AQIS GUIDELINES AND PROCESS HANDBOOK
9.2.7
Advance disbursement
R1=R/2
R2=R/2
R=R1+R2
9.2.8
Sanctioned
letter
details
Funds
Utilisation
position as
on today
Utilisation Certificate
details/ Reason for nonsubmission of Utilisation
Certificate
Add rows as required
9.2.9
a
b
c
9.2.10
Important: You need to apply on web portal using your Institute login and password. Select tab AQIS application. Press New to create
new application. Your application is assigned unique application Id. Fill all the details over there. Prepare application in this proforma also.
Attach PDF of it to the application on web portal. Now press submit on web portal to submit application. Pay processing fees on web portal
using appropriate payment option.
74
AQIS GUIDELINES AND PROCESS HANDBOOK
9.3
EVALUATION SHEET FOR PROPOSALS UNDER THE SCHEME OF SEMINAR GRANT (SG)
9.3.1
SCHEME: SEMINAR
DATE OF
MEETING
Name and address of the institution:
GROUP:
b
c
(Write details)
Type of Institution:
GOVT.
PROPOSAL NO.
SELF FINANCING
(Write details)
on appropriate
Permanent
(Write details)
Temp.
Ad-hoc
tab)
g
h
9.3.2
(Write details)
Credentials of Applicant
PG
Ph. D
e
f
Sub Total
Credentials of Organizing Institute
Type of Institute
h
i
j
k
l
Signature of Expert
(Name of Expert)
MAX.
MARKS
MARKS
AWARDED
REMARKS
10
10
30
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
75
AQIS GUIDELINES AND PROCESS HANDBOOK
9.3.3
Credentials of Seminar
a
Level of Seminar
a)
b)
b
c
d
e
f
c)
Objectives & Context
Relevance
Technical Novelty
Benefit to Society
Benefit to Industry
Sub Total
9.3.4
Credentials of Participants
No & Level of guest speakers
proposed
No & Level of collaborating
industry/professional bodies
Sub Total
Grand Total
a
b
9.3.5
10
5
6
5
4
40
10
15
25
100
Marks Allotted
9.3.6
10
International
National
State Level
Grade
Remarks:
0-24
25-49
50-65
66-85
86-100
Recommended
Not Recommended
AMOUNT RECOMMENDED:
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
76
AQIS GUIDELINES AND PROCESS HANDBOOK
objective
The scheme is aimed at promoting research and development activities in various
areas of technical education in an approved institution / department by providing
opportunity to meritorious faculties to interact at International level to update the
global changes in the concerned field of specializations.
ELIGIBILITY
AICTE approved Institutes/ AICTE approved University Departments.
10.1.2
a
b
Duration of project will be three year from the date of receipt of funds in the
institutes account.
Limit of Funding
10.1.3
10.1.4
10.1.5
Three member expert committee not below the rank of Associate Professor.
At least two members among the experts shall be from the concerned stream.
a
10.1.6
10.1.7
a
c
d
e
In case an application of a candidate for a particular event (for a particular date as well
as a particular venue) is rejected, the same shall not be considered again and no
correspondence in this regard shall be entertained by the Council.
Applications should be properly bound to avoid any lose paper. The Council shall not
be responsible for loss of any documents.
The grant offered / sanctioned to attend a specific conference, can not in any case, be
utilized for the purposes of Travel abroad to attend any other Conference.
The following are the document to be submitted by the awardee in original/ signed by
Head of Institution for claim of reimbursement
Travel Documents.
Statement of Expenditure along with Air Ticket & Boarding pass.
A brief report of the conference.
A brief report of any other scientific and technical activities under taken during the
visit.
Other visits undertaken during the period, duly signed by the Registrar / Principal /
Director.
Receipt of the Registration Fee paid issued by the organizer.
Voucher indicating the rate at which foreign currency is purchased.
h
i
j
(i)
(ii)
(iii)
(iv)
(v)
(vi)
(vii)
(viii)
(ix)
k
78
AQIS GUIDELINES AND PROCESS HANDBOOK
10.2
10.2.1
Details of Institutes
a
b
c
d
e
f
FAX
Telephone
10.2.2
Details of Candidates
a
b
c
d
e
f
g
i
j
k
l
m
n
o
p
Name
Designation
Appointment Type
Department
Whether the Department is
accredited by NBA
Qualifications
Experience in years
Publications
Relevant experience
Number of patents
Research/Consultancy projects done
in the last 3 years
Other information
Cell number
Email
Signature
10.2.3
Date of joining
Scale of Pay
UG
Teaching
National
PG
Industry
International
PhD
Research
Books
Details of Proposals
a
b
c
d
79
AQIS GUIDELINES AND PROCESS HANDBOOK
e
f
presentation /
participation / any
other
Project Impact -Expected
outcome
Travel Plan & Duration of stay
Date
From
Time
To
Time
Mode of
Travel
Stay at
10.2.4
Status of
application
Financial assistance
requested/agreed in
Rs.
Applied
for/received
Add rows as required.
Attach copy of letters received from participating industry showing intent / financial commitment etc.
10.2.5
a
b
c
d
e
f
g
10.2.5
10.2.6
a
b
c
Sanctioned
letter
details
Funds
Utilization
position as
on today
Utilization Certificate
details/ Reason for nonsubmission of Utilization
Certificate
10.2.7
80
AQIS GUIDELINES AND PROCESS HANDBOOK
Attach PDF of it to the application on web portal. Now press submit on web portal to submit application. Pay processing fees on web portal
using appropriate payment option.
81
AQIS GUIDELINES AND PROCESS HANDBOOK
10.3
EVALUATION SHEET FOR PROPOSALS UNDER THE SCHEME OF TRAVEL GRANT (TG)
10.3.1
SCHEME: TRAVEL
GRANT
DATE OF MEETING
GROUP
PROPOSAL NO.
(Write details)
Type of Institution:
GOVT.
(tick on appropriate
GOVT. AIDED
SELF FINANCING
tab)
(Write details)
Permanent
(tick on
Temp.
Ad-hoc
appropriate tab)
Department
(Write details)
(Write details)
Yes
No
(tick on appropriate tab)
If yes, details of the project: AICTE sanction letter no & date
(Write details)
10.3.2
PARAMETERS/
CRITERIA
MAXIMUM MARKS
MARKS AWARDED
REMARKS
Credentials of
Applicant
a
b
PG
PhD
2
3
Sub Total
Teaching
Experience
UG-Teaching
Experience in No.
of years
PG- Teaching
Experience in No.
of years
Type of Institute
taught
g
h
Sub Total
Signature of Expert
(Name of Expert)
2
5
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
82
AQIS GUIDELINES AND PROCESS HANDBOOK
10.3.3
a
b
Research Experience
a) Research Projects completed in last 5 years
b) Financial Sanction Sought for these projects
2
3
c
d
Books Published
Articles Published Papers presented in Conferences in last 3 years
3
2
Sub Total
15
10.3.4
Consultancy Experience
a
Industrial Experience
Sub Total
a
b
Other Achievements
Awards Conferred,
Fellowship Received,
2
2
Sub Total
10.3.5
10.3.6
Level of Participants
Sub Total
20
Signature of Expert
(Name of Expert)
5
5
3
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
83
AQIS GUIDELINES AND PROCESS HANDBOOK
10.3.7
a
b
Quality of Paper
Objective
Relevance
10
5
Research methodology
d
e
5
5
Possibility of commercialization
Sub Total
35
10
10.3.8
10.3.9
100
Marks Allotted
10.3.10
Grade
Remarks:
0-24
25-49
50-65
66-85
86-100
Recommended
AMOUNT RECOMMENDED:
Head
Not Recommended
Rs. in Lakh.
Recurring
Air Fare
Registration Fee
Per-Dim
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
84
AQIS GUIDELINES AND PROCESS HANDBOOK
Objective
a
To attract highly qualified and motivated candidates to pursue doctoral degree and
offer themselves for teaching position in the Technical Education system.
To provide research support to bright young candidates for pursuing exciting and
innovative research in the field of Technical Education.
Eligibility:
Applicants enrolled for Ph. D. in AICTE approved institutes/ AICTE approved University
departments, IITs, NITs, IISc, IIMs, BARC, TIFR, DRDO, IISER, Institutes of excellence and
Central Govt. labs.
The Candidate should be less than 35 years of age.
11.1.2
11.1.3
Duration of Project
a
11.1.4
Limit of funding
a
11.1.5
11.1.6
The Scholarship @ Rs. 18,000/- per month per candidate (for 1st & 2nd Year). Rs.
216000/- per Annum plus contingency grant of Rs. 25000/- per annum per candidate
and over head charges of Rs. 20,000/- per annum per candidate to the host institution
i.e. Institution where the candidate will be pursuing Ph.D./Doctoral Programme.
The Scholarship @ Rs. 20,000/- per month per candidate (for 3rd & 4th Year). Rs.
240000/- per Annum plus contingency grant of Rs. 25000/- per annum per candidate
and over head charges of Rs. 20,000/- per annum per candidate to the host institution
i.e. Institution where the candidate will be pursuing Ph.D./Doctoral Programme.
House Rent Allowance (HRA) : All research fellows may be provided hostel
accommodation wherever available and those residing in accommodation provided by
the Institute will not be eligible for drawing HRA. Wherever provision of hostel
accommodation is not possible, HRA may be allowed to all the above categories ; JRF,
SRF as per central Government norms applicable in the city/location where they are
working. The fellowship amount may be taken as basic for calculating the HRA.
Processing Methodology:
The proposal to be assessed by an expert committee constituted as follows:
85
AQIS GUIDELINES AND PROCESS HANDBOOK
Three member expert committee not below the rank of Associate Professor.
At least one member among the experts shall be from the concerned stream.
11.1.7
b
c
d
e
f
The awardee shall submit an annual report on the project, each year through the Head
of the Institute on completion of one year from the date of acceptance of offer letter.
The Second installment & subsequent Installment will be released on receipt of
Utilization certificate and statement of accounts in prescribed proforma duly audited by
the Chartered accountant in the case of private institution and by the finance
officer/account officer in respect of government/government-aided institutions.
The final report of the project should be submitted by the awardee through the Head of
the Department / Institution to the AICTE.
The awardee shall not be allowed for transfer of award from the Institution where the
Awardee is presently working during the entire tenure of the award.
The awardee shall devote full time to research during the tenure of Fellowship.
The awardee shall obtain the approval of the Council before accepting any award or
allowance, if offered to me during the tenure of Fellowship.
The awardee shall give a declaration that if the results of research are such that can be
exploited commercially by taking a patent or otherwise commercial exploitation and
patent rights will rest exclusively the Council (This clause is applicable for the guide
also).
86
AQIS GUIDELINES AND PROCESS HANDBOOK
11.2
11.2.1
Details of Institutes
a
b
c
d
e
f
FAX
Telephone
11.2.2
Details of Candidates
a
b
c
d
e
f
g
h
i
j
k
l
m
n
o
p
q
r
Name
Designation
Appointment Type
Department
Whether the Department is
accredited by NBA
Qualifications
Experience in years
Field of study/specialisation
Publications
IPR
PG students guided
Memberships of professional bodies/
fellowships awarded
Professional activities
Techno-commercial activities
Outstanding achievements at school
level
Outstanding achievements at college
/ University level
Other information
Cell number
Date of joining
Scale of Pay
UG
Teaching
PG
Industry
PhD
Research
11.2.3
Details of Proposals
a
b
c
d
e
f
87
AQIS GUIDELINES AND PROCESS HANDBOOK
11.2.4
a
Plan of work/methodology
Time & activity chart
Months(add columns as required)
0
b
c
d
10
11
12
Activity
Receive Grant
Purchase of equipment
Add rows as required
This is sample activity chart. Modify as needed.
Add activities/rows as required
11.2.5
a
b
c
d
11.2.6
a
b
c
11.2.7
Likely Impactacademic/social/commercial
Details of guiding faculty
Name
University/Institutions
Field of Study/specialization
Details of guiding faculty
Name
University/ Institution
Field of study / specialization
Name
Address
Website
Contact person ,
designation, email
Roles in
collaborating/participating
Financial commitment#
towards project in Rs.
Total Rs.
$
11.2.8
a
Total Rs.
No of units
Cost in Rs.
Justification
b
c
11.2.9
a
b
c
d
AMC
Consumables
Total Rs.
Office
Expenses
Nil
88
AQIS GUIDELINES AND PROCESS HANDBOOK
11.2.10
11.2.11
Sanctioned
letter
details
Funds
Utilization
position as
on today
Utilization Certificate
details/ Reason for nonsubmission of Utilization
Certificate
Abide by all the rules / regulations regarding utilization of amount that may be granted to the
Institute.
11.2.12
Date :
Institute Seal
Important :You need to apply on web portal using your Institute login and password. Select tab AQIS application. Press New to create
new application. Your application is assigned unique application Id. Fill all the details over there. Prepare application in this proforma also.
Attach PDF of it to the application on web portal. Now press submit on web portal to submit application. Pay processing fees on web portal
using appropriate payment option.
For office use only:
NDF
NR
Equip
purchase
AMC
Consumables
Salary
Fellowship
R
Printing&
Stationery /
office Exp
Y
89
AQIS GUIDELINES AND PROCESS HANDBOOK
11.3
EVALUATION SHEET FOR PROPOSALS UNDER THE SCHEME OF NATIONAL DOCTOROL FELLOWSHIP (NDF)
11.3.1
SCHEME: NDF
DATE OF MEETING:
GROUP:
PROPOSAL NO.
(Write details)
Type of institutions:
(Write details)
(Write details)
Permanent
Date of Birth :
(Write details)
Age as on :-2013
(Write details)
(Write details)
(Write details)
11.3.2
Temp.
Ad-hoc
Criteria/ Parameters
MAX. MARKS
b
c
PG
Teaching Experience
GATE/GPAT/CMAT/CAT
Publication of Proceedings
i
j
MARKS
AWARDED
REMARKS
Criteria/
Parameters
90
AQIS GUIDELINES AND PROCESS HANDBOOK
Patents granted
sub total
35
11.3.3
Credentials of Institute
a
Type of Institute
10
Sub Total
15
11.3.4
Credentials of Department
a
b
Signature of Expert
(Name of Expert)
Sub Total
Signature of Expert
(Name of Expert)
10
Signature of Expert
(Name of Expert)
91
AQIS GUIDELINES AND PROCESS HANDBOOK
11.3.5
b
c
5
5
Proposed Methodology
Industry/Organizations Collaborating
11.4.
5
40
100
Marks Allotted
Grade
Remarks:
Signature of Expert
(Name of Expert)
0-24
25-49
50-65
66-85
86-100
Recommended
Signature of Expert
(Name of Expert)
Not
Recommended
Signature of Expert
(Name of Expert)
92
AQIS GUIDELINES AND PROCESS HANDBOOK
objective
a
The objective of the IIP Cell is to reduce the gap between industry expectations
(practice) and academic offerings (theory) by direct involvement of industry to attain a
symbiosis.
All the Stakeholders, namely: Institutions, Industry, Students and Society stand to
gain as it can be a win-win partnership. The Institutions stand to gain by way of up to
date curricula, source of revenue generation by consultancy and R & D, source of
manpower for employment, societal relevance, and most importantly acquisition of
brand name/equity; industry stands to gain by way of availability of employable
manpower pool, and increased productivity; faculty stand to gain by way of exposure to
latest industry practices for more effective teaching-learning processes, etc; students
stand to gain by way of hands-on training, reduction of learning curve in industrial
practices; and, society stands to gain by way of improved quality of goods and services.
12.1.2
Eligibility
a
12.1.3
12.1.4
a
12.1.5
Rs 15 Lakh
Disbursement of the Funds
93
AQIS GUIDELINES AND PROCESS HANDBOOK
12.1.6
Processing Methodology:
The proposal shall be assessed by an expert committee constituted as follows:
a
Three member expert committee not below the rank of Associate Professor.
At least two members among the experts shall be from the concerned stream.
12.1.7
The AICTE shall provide a limited one time financial assistance, up to a maximum of
Rs.25.00 lakh, required for infrastructure development, including the purchase of
Desktop PC with Internet facility, fax/modem, back-up, multimedia/OHP, equipment,
furniture, audio visual aids, library books, journals, LCD Projector etc (non-recurring
expenditure).
The centre shall function as a separate entity within the Parent Institution. It should
function as a Central Facility of the entire institution and not as a facility for a particular
Department of the parent institution.
The parent institution shall provide adequate building space for setting up of the centre
and also usage of classrooms for conducting the programs for SC/ST students
The center will function under the guidance and control of the Director/Head of the
Parent Institution.
The Following activities are expected of the center :
d
e
(i)
(ii)
(iii)
(iv)
For the centre to function smoothly and to meet its objectives effectively, it is essential
that this centre must have adequate man power in the form of dedicated facility and
support staff.
94
AQIS GUIDELINES AND PROCESS HANDBOOK
12.2
12.2.1
Details of Institutes
a
b
c
d
e
Whether institution is
accredited by NBA
a
b
c
d
e
F
g
h
i
j
k
Name
Designation
Appointment Type
Department
Qualifications
Experience in years
Publications
Relevant experience
Number of patents
Research/Consultancy projects done
in the last 3 years
Other information
l
m
n
Cell number
Email
Signature
Email
FAX
Telephone
This Id is available on AICTE web portal
Unique application Id as assigned to your application on web portal. See important
note on the last page of this proforma.
12.2.2
Details of Candidates
12.2.3
Date of joining
Scale of Pay
UG
PG
Teaching
Industry
Journals & conference attach details
Attach separately as needed
Attach Details
Attach Details
Give any other information that will help in accepting /funding this
project
Details of Proposals
Title of proposal
Abstract
Objective Specific objective for
proposed industry institute
partnership Cell
Background/Current status of activities
in the area
Present partnerships/tie ups with Industry/s or other organization/s
Name
a
b
c
g
h
i
j
k
PhD
Research
Address
Website
Contact
person,
Email
Present activities,
financial /other
contributions
No of
Cost
Proposed activities,
financial /other
contributions
Justification
95
AQIS GUIDELINES AND PROCESS HANDBOOK
units
l
m
n
Total(NR)
Budget Estimates Recurring
AMC/Service charges
p
q
r
s
t
in Rs.
NR
Estimate for
Year 1
Nil (warranty
period)
Estimate for
Year 2
R1
R2
R3
Add rows as required
Add rows as required.
Attach copy of relevant documents.
Add rows as required
12.2.4
a
b
Max 1/3
rd
NR
of total assistance
requested R
Max 1/3
rd
Installment on completion of
year 1
Total (Max 15
Lakh)
R2
R=NR+R1+R2
R1
of total assistance
requested R
Max 1/3
rd
of total assistance
requested R
12.2.5
12.2.6
a
b
c
12.2.7
Date :
Institute Seal
Important: You need to apply on web portal using your Institute login and password. Select tab AQIS application. Press New to create
new application. Your application is assigned unique application Id. Fill all the details over there. Prepare application in this proforma also.
Attach PDF of it to the application on web portal. Now press submit on web portal to submit application. Pay processing fees on web portal
using appropriate payment option.
96
AQIS GUIDELINES AND PROCESS HANDBOOK
12.3
12.3.1
EVALUATION SHEET FOR PROPOSALS UNDER THE SCHEME OF INDUSTRY INSTITUTE PARTNERSHIP CELL
(IIPC)
SCHEME: IIPC
DATE OF MEETING
GROUP:
PROPOSAL NO.
b
c
(Write details)
GOVT.
e
f
g
h
i
on appropriate tab)
SELF FINANCING
(Write details)
on appropriate tab)
Permanent
Temp.
Ad-hoc
(Write details)
2 years
Yes
No
(tick on appropriate tab)
If yes, details of the project: (Write details)
AICTE Sanction Letter Date
Status
No.
(Write details)
(Write
Complete
Ondetails)
going
(Write details)
12.3.2
Credentials of Applicant
PG
PhD
Experience or conducting
industrial trainee
Sub Total
Signature of Expert
(Name of Expert)
MAX. MARKS
MARKS AWARDED
REMARKS
10
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
97
AQIS GUIDELINES AND PROCESS HANDBOOK
12.3.3
a
10
g
h
i
j
k
l
12.3.4
2
3
1
40
a
b
10
10
c
d
Activities envisaged/proposed
Benefit to Students
10
10
Sub Total
10
50
Grand Total
100
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
98
AQIS GUIDELINES AND PROCESS HANDBOOK
12.3.5
Marks Allotted
b
c
Grade
0-24
25-49
50-65
66-85
86-100
:
12.3.6
Recommended
Not
Recommended
Remarks:
AMOUNT RECOMMENDED
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
99
AQIS GUIDELINES AND PROCESS HANDBOOK
13.1.1
objective
a
13.1.2
a
b
c
13.1.3
a
13.1.4
a
13.1.5
a
b
c
100
AQIS GUIDELINES AND PROCESS HANDBOOK
13.1.6
a
(i)
Processing Methodology:
The proposal to be assessed by an expert committee constituted as follows:
Vice Chancellor of any University
Chairman
(ii)
(iii)
(iv)
13.1.7
Member
Member
Member
d
e
13.1.8
a
b
c
d
e
f
g
h
i
Hostel Plan
Abstract of the estimates
PWD rate certificate
Two copies of the plan and detailed estimates duly signed by the Engineer/Architect
and countersigned by the Principal
Conformity with the norms as suggested by the AICTE and the rates are as per CSR of
the region
A certificate from the college indicating the covered area in sq. meters, cost per sq.
meter, basis of the estimates on the rates/schedule of rate, period for the completion
of the project and likely date of starting the construction
Land ownership and possession certificate from the concerned Tehsildar/SDM duly
counter sign by the Principal
Mode of construction viz. Contract/ Departmentally (at most competitive rates) or
Deposit work by the PWD
A certificate from the competent authority (concerned Secretary, State Government for
Technical Education) that expenditure over and above AICTE grant, if any, will be met
by the State Govt./ or the college and the construction will not be delayed for want of
funds.
A certificate from a competent structural engineer to certify the structural soundness of
structure to
101
AQIS GUIDELINES AND PROCESS HANDBOOK
13.2
13.2.1
Details of Institutes
a
Address
Contact details
Application Id
13.2.2
FAX
Telephone
Academic
Year
Male
students
SC
ST
Other
Female
students
Total
SC
ST
13.2.3
Other
Total
Details of Proposals
a
Field of Proposal
Title of proposal
Abstract
Objective
g
h
Number of rooms
Total
Female
Total Actual
Number of
rooms with
Total
Total Actual
102
AQIS GUIDELINES AND PROCESS HANDBOOK
with occupancy
Sin
gle
Capacity
Doubl
e
Tri
ple
more
occupants
Numb
er
occupancy
Single
Dou
ble
Capacity
Triple
occupants
more
Num
ber
13.2.4
Hostel type
Accommodation for
13.2.5
Name
Address
Website
Contact person ,
designation, email
Roles in
collaborating/participating
Financial commitment#
towards project in Rs.
b
c
Total Rs.
$
13.2.6
a
b
Land area
d
Plinth area
e
Total built up area
f
Total carpet area
g
h
103
AQIS GUIDELINES AND PROCESS HANDBOOK
Details
Cost in Rs lakh
j
Toilets
k
Water Supply
l
Electricity Supply & backup
m
Hostel room furniture/fixture
n
furniture/fixtures in other room
o
p
q
Library
r
Television Hall
s
Sport Faculty
t
Landscape and approach road
u
any other
Budget Estimates
Head of
expenditure
Anticipated
expenditure
Budget by parent
organization
External
Assistance
Assistance
requested
from Council r
Add rows as required.
Max assistance 200
Lakh
13.2.7
Installment on completion
Advance disbursement
of the project
R2=R/2
R=R1+R2
R1=R/2
104
AQIS GUIDELINES AND PROCESS HANDBOOK
13.2.8
Name of
the
coordinator
Amt
sanctioned
NR
13.2.9
Sanctioned
letter
details
Funds
Utilization
position as
on today
13.2.11
The land on which the proposed building is to be constructed is under the undisputed ownership and
possession of the college.
The expenditure over and above the AICTE grant if any will be:
Borne by the college from its own resources or support by the State Government
The structure on which the construction is proposed to be undertaken is structurally sound to bear the
load of the proposed construction (if applicable, The soil test report etc., be attached with requisite
certificate).
The enrolment figures given above are as per office record and depict actual physical strength of students
in that particular year.
(i)
Abide by all the rules / regulations regarding utilization of amount that may be granted to the Institute.
(ii)
(iii)
(iv)
Date :
105
AQIS GUIDELINES AND PROCESS HANDBOOK
Important:
You need to apply on web portal using your Institute login and password. Select tab AQIS application. Press New to
create new application. Your application is assigned unique application Id. Fill all the details over there. Prepare application in this
proforma also. Attach PDF of it to the application on web portal. Now press submit on web portal to submit application. Pay processing
fees on web portal using appropriate payment option.
13.2.12
List of Information / Documents Required For Submitting Various Building Projects and the Campus
c
d
e
f
g
h
i
Conformity with the norms as suggested by the AICTE and the rates are as per CSR of the region
A certificate from the college indicating the covered area in sq. meters, cost per sq. meter, basis of the
estimates on the rates/schedule of rate, period for the completion of the project and likely date of
starting the construction
Land ownership and possession certificate from the concerned Tehsildar/SDM duly counter sign by the
Principal
Mode of construction viz. Contract/ Departmentally (at most competitive rates) or Deposit work by the
PWD
A certificate from the competent authority (concerned Secretary, State Government for Technical
Education) that expenditure over and above AICTE grant, if any, will be met by the State Govt./ or the
college and the construction will not be delayed for want of funds.
A certificate from a competent structural engineer to certify the structural soundness of structure to bear
the load of the proposed building and soil test report etc.
106
AQIS GUIDELINES AND PROCESS HANDBOOK
13.3.
EVALUATION SHEET FOR PROPOSALS UNDER THE SCHEME OF SC/ST STUDENT HOSTEL GRANT
13.3.1
a
b
c
d
e
f
g
h
i
j
DATE OF MEETING:
Name and Address of the Institution:
Type of Institution
Year of Establishment
No. of SC/ST Students Studying in the Institute
during the last 3 years
PROPOSAL NO.
GOVT.
GOVT. AIDED
MALE
SC ST
FEMALE
SC
ST
2010-11
2011-12
2012-13
Amount Requested
If amount requested is more than 2 crore,
whether undertaking from State Govt.
obtained
k Institute Permanent ID No.
l
AICTE Approval for 2012-13
m List of Documents
n
o
p Drawings
YES/NO/NOT APPLICABLE
1.
2.
3.
4.
5.
6.
7.
8.
9.
A. Original
B. Revised Drawing
With Kitchen
Without Kitchen
C. Up gradation of existing Hostel
(Top up construction)
13.3.2
RECOMMENDED
a
AMOUNT
REMARKS:
1.SIGNATURE
(NAME OF EXPERT)
2.SIGNATURE
(NAME OF EXPERT)
NOT RECOMMENDED
3.SIGNATURE
(NAME OF EXPERT)
SIGNATURE OF CHAIRMAN
(NAME OF CHAIRMAN)
107
AQIS GUIDELINES AND PROCESS HANDBOOK
objective
a
14.1.2
Academic Institutes can be major resources in a companys innovation strategy. In the western
countries, extensive collaboration between universities and industry and the ensuing transfer of
scientific knowledge has been viewed as one of the main contributors to the successful
technological innovation and economic growth during past few decades. Transfer of knowledge
from universities to industry should be of primary concern of academic Institutions.
To promote this concept, this scheme provides financial assistance to institutions for setting up
Research Park in collaboration with the Industry or group of Industries. Grant of Rs. 1 crore (per
State-UT) shall be given under this scheme.
Eligibility
AICTE approved Institutes / AICTE approved University Departments with NBA accreditation.
14.1.3
Duration of Project
a
14.1.4
Three years.
Limit of funding
14.1.5
14.1.6
Processing Methodology:
a
14.1.7
a
b
c
d
e
The proposal shall be assessed by an Expert Committee consisting of three members not below
the rank of Professor.
Terms and Conditions
The Institute shall provide 300-500 sq m built up area for setting up research facilities in the
Institute premises.
The Institute shall collaborate with Industry or a cluster of Industries.
The Industry partner/s shall also contribute Rs. 1 Crore as matching grant for setting up research
facilities at the Institute. To this extant, the Institute shall obtain a written consent from the
Industry partner and provide the same to AICTE, in original
Industry shall pass on their research/innovation work to the Institute or to a cluster of Institutes.
Institute students and teaching faculty shall work on such ideas for converting into successful
technological innovations / outcome based projects.
Neighboring Institutes can also join the activity.
108
AQIS GUIDELINES AND PROCESS HANDBOOK
14.2
14.2.1
Details of Institutes
a
Address
Contact details
Permanent Id of the
Institute
Application Id
Unique application Id as assigned to your application on web portal. See important note on
the last page of this proforma.
FAX
14.2.2
Telephone
Details of Candidates
a
Name
Designation
Appointment Type
Department
Qualifications
UG
PG
PhD
Experience in years
Teaching
Industry
Research
Cell number
Signature
Date of joining
Scale of Pay
14.2.3
Details of Proposals
a
b
c
d
e
f
109
AQIS GUIDELINES AND PROCESS HANDBOOK
14.2.4
Name
Address
Website
Contact person ,
designation, email
Roles in
collaborating/participating
Financial
#
commitment
towards project
in Rs.
Total Rs.
$
Provide resume of participating personnel from Industry/organization with their strength and role in the research project.
Add rows as required. Attach additional pages if required.
#
Attach copy of letters received from participating industry showing intent / financial commitment etc
14.2.5
a
b
c
d
e
f
g
h
i
j
k
l
m
Specifications
No of
units
Total(NR)
Cost in
Rs.
Justification
NR
AMC/Service charges
Salary
Consumables & Contingencies
Printing/ publication Office Exp
Travel, Stay & DA
Other
Total
Add rows as required
14.2.6
Advance installment
NR
R1
R2
R3
NR+R1+R2+R3
110
AQIS GUIDELINES AND PROCESS HANDBOOK
14.2.7
Name of
the
coordinator
Amt
sanctioned
NR
14.2.8
14.2.9
Sanctioned
letter
details
Funds
Utilization
position as
on today
Abide by all the rules / regulations regarding utilization of amount that may be granted to the
Institute.
Date :
Important: You need to apply on web portal using your Institute login and password. Select tab AQIS application. Press New to create
new application. Your application is assigned unique application Id. Fill all the details over there. Prepare application in this proforma also.
Attach PDF of it to the application on web portal. Now press submit on web portal to submit application. Pay processing fees on web portal
using appropriate payment option.
111
AQIS GUIDELINES AND PROCESS HANDBOOK
14.3
EVALUATION SHEET FOR PROPOSALS UNDER THE SCHEME OF UNDER RESEARCH PARK (RP)
14.3.1
DATE OF
MEETING:
PROPOSAL NO.
b
c
(Write details)
GOVT.
GOVT. AIDED
FINANCING
SELF
Permanent
Ad-hoc
(Write details)
h
i
(Write details)
Objective :
(Write details)
(Write details)
14.3.2
a
b
c
d
e
f
g
h
i
on appropriate tab)
on appropriate tab)
(Write details)
Signature of Expert
(Name of Expert)
Temp.
Signature of Expert
(Name of Expert)
Remarks
Signature of Expert
(Name of Expert)
112
AQIS GUIDELINES AND PROCESS HANDBOOK
14.3.3
a
b
c
d
e
g
h
i
14.3.4
a
b
c
d
e
f
g
Credential of department/ institution including research facilities/ equipment available for work level of
the institution over all academic & research standing of the institution
Overall academic standing of the institute.
2
Required equipments with reference to proposed project available with the
5
departments
Required journals and other facilities with reference to proposed project
5
available with the departments
Research Project completed in last five year
7
Number ..
Amount..
Industry consultancy projects completed in last five year
7
Number ..
Amount..
Number of courses Accredited in the Institute
4
NBA Accreditation applicant department
5
SUB TOTAL
35
Research Proposal including its Objectives, Technical Novelty, of etc.
Objectives
7
Relevance
8
Research methodologies
10
Technical novelty
7
Possible Patentability of research outcome
3
SUB TOTAL
35
GRAND TOTAL
100
14.3.5
Marks Allotted
Grade
0-24
25-49
50-65
66-85
86-100
Recommended
Not Recommended
e Remarks:
SIGNATURE OF EXPERT
(Name of Expert)
SIGNATURE OF EXPERT
(Name of Expert)
SIGNATURE OF EXPERT
(Name of Expert)
113
AQIS GUIDELINES AND PROCESS HANDBOOK
objective
a
The scheme provides financial assistance to institutions for organizing technical projects
exhibition at state/UT level. The scheme intends to bring out practical talent among
students by providing a forum for exhibiting their technical knowledge and innovations.
This scheme also intends to exhibit this talent to industry in order to convert useful /
innovative / commercially viable projects into products. This will also initiate interest in
entrepreneurship activities or in registering for patents/IPR etc.
Exhibition shall also include:
(i)
(ii)
seminars / webinars
(iii)
(iv)
poster presentations
(v)
(vi)
visits to nearby industry / city / places as appropriate to the technical field of exhibition
(vi)
(vii)
Institutes interested in hosting exhibition shall submit its proposal. Grant up to Rs.
10,00,000/- per state/UT per Technical Programme(as per list appended) may be
granted.
Eligibility
U.G. third and final year students and PG students willing to create innovating projects.
15.1.2
15.1.3
Duration of Project
a
15.1.4
One year
Limit of funding
Up to Rs. 5 Lakh to host institution for expenses towards holding innovation exhibition.
114
AQIS GUIDELINES AND PROCESS HANDBOOK
b
15.1.5
a
15.1.6
15.1.7
a
b
c
The Institute shall provide 300-500 sq m built up area for setting up research facilities in
the Institute premises.
The Institute shall collaborate with Industry or a cluster of Industries.
The Industry partner/s shall also contribute Rs. 50 Lakh as matching grant for setting up
research facilities at the Institute.
Industry shall pass on their research/innovation work to the Institute or to a cluster of
Institutes.
Institute students and teaching faculty shall work on such ideas for converting into
successful technological innovations / outcome based projects.
Neighboring Institutes can also join the activity.
d
e
115
AQIS GUIDELINES AND PROCESS HANDBOOK
15.2
15.2.1
Details of Institutes
a
b
c
d
e
Whether institution is
accredited by NBA
a
b
c
d
e
f
g
h
i
j
k
Name
Designation
Appointment Type
Department
Qualifications
Experience in years
Students guided
Publications
Relevant experience
Number of patents
Research/Consultancy
projects done in the
last 3 years
Other information
Cell number
Email
Signature
Email
FAX
Telephone
This Id is available on AICTE web portal
Unique application Id as assigned to your application on web portal. See important
note on the last page of this proforma.
15.2.2
Details of Candidates
l
m
n
o
Date of joining
Scale of Pay
UG
Teaching
UG
National
PG
Industry
PG
International
PhD
Research
PhD
Books
Give any other information that will help in accepting /funding this project
15.2.3
Details of Proposals
Technical Field -
Title of proposal
Abstract
d
e
Objective
Project Impact -Expected
outcomeacademic/social/commercial
Programme details
Date
Time
Activity
Venue
Infrastructural
requirements and
availability
Lecture by /
Demonstration /
116
AQIS GUIDELINES AND PROCESS HANDBOOK
i
j
k
l
m
n
o
p
q
r
s
u
v
w
Activity
keynote address/Chairing
sessions/speaker/ advisor/ Reviewers/
Sponsorer
Budget Estimates
Head of expenditure
Anticipated
expenditure
Remuneration to
speakers
Exhibition venue
preparation - stalls /
pandals, electricity,
etc.
Stationery, printing,
Pre-event
expenditure etc.
Travel, Stay and DA
Other
Total
National /
International
)
Budget by
parent
organizati
on
Name of
by
external
body
involved,
if any
Grant by
AICTE, Rs.
Title of the
activity
External
Sponsors
hips
NR
15.2.4
Name
Address
Website
Contact person ,
designation, email
Roles in
collaborating/participating
Financial commitment#
towards project in Rs.
Total Rs.
$
117
AQIS GUIDELINES AND PROCESS HANDBOOK
15.2.5
Advance installment
NR
15.2.6
R2
R3
NR+R1+R2+R3
R1
Name of the
coordinator
Amt sanctioned
NR
15.2.7
Sanctioned
letter details
Funds
Utilization
position as on
today
Abide by all the rules / regulations regarding utilization of amount that may be granted to the Institute.
15.2.8
a
Important: You need to apply on web portal using your Institute login and password. Select tab RID application. Press New to create
new application. Your application is assigned unique application Id. Fill all the details over there. Prepare application in this proforma also.
Attach PDF of it to the application on web portal. Now press submit on web portal to submit application. Pay processing fees on web portal
using appropriate payment option.
For office use only:
SEM
NR
Equip
purchase
AMC
Consumables
Salary
Fellowship
R
Printing&
Stationery /
office Exp
Exhibition
venue
preparation stalls /
pandals,
electricity, etc.
Y
118
AQIS GUIDELINES AND PROCESS HANDBOOK
15.3
EVALUATION SHEET FOR PROPOSALS UNDER THE SCHEME OF INNOVATION PROMOTION SCHEME (IPS)
SCHEME: IPS
DATE OF
MEETING
15.3.1
GROUP:
PROPOSAL NO.
b
c
(Write details)
Type of Institution:
GOVT.
GOVT. AIDED
SELF FINANCING
(Write details)
Status of PI :
Permanent
hoc
Temp.
Ad-
(Write details)
Letter No (Write details)
Date
(Write details)
(Write details)
Yes
No
(tick on
appropriate tab)
15.3.2
Credentials of Applicant
c
d
PG
PhD
2
3
e
f
g
Experience ( Teaching)
Experience (Industry)
Sub Total
6
4
15
15.3.3
MAX.
MARKS
MARKS AWARDED
REMARKS
Type of Institute
b
c
d
2
2
2
Signature of Expert
(Name of Expert)
4
Sub Total
Signature of Expert
(Name of Expert)
15
Signature of Expert
(Name of Expert)
119
AQIS GUIDELINES AND PROCESS HANDBOOK
15.3.4
Credentials of Scheme
20
c
d
e
f
g
h
i
j
Level of Proposal
d) International
e) National
f) State Level
Objectives & Context
Technical Novelty
Benefit to Society
Benefit to Industry
Sub Total
Credentials of Participants
No. & Level of expected participants
No & Level of guest speakers/industry invited
k
l
m
5
25
100
15.3.5
10
5
5
5
45
10
10
Marks Allotted
Grade
Remarks:
0-24
25-49
50-65
66-85
86-100
Recommended
Not
Recommended
15.4.6
AMOUNT RECOMMENDED:
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
120
AQIS GUIDELINES AND PROCESS HANDBOOK
objective
a
The scheme is designed to enhance the teaching and other skills of the faculty. it
makes them aware about modern teaching tools and methodologies. it provides
an opportunity to acquire knowledge about current technological developments
in relevant fields. It not only promotes the professional practices relevant to technical
education but also motivates the faculty to achieve competitive teaching and learning
environment, thus channelizing development with respect to academic qualifications and
personal matters.
16.1.2
Eligibility
a
16.1.3
Duration of Project
a
16.1.4
Limit of funding
a
16.1.5
The proposed/approved FDP shall be conducted within six month from the date
of receipt of offer letter. The Duration of the FDP shall be 2 weeks.
Rs. 7 Lakh
Disbursement of the Funds
121
AQIS GUIDELINES AND PROCESS HANDBOOK
90% amount as advance to Government/ Govt. aided institutions and 10% after
submission of UC and all required documents.
10% amount as advance to self financing institutions and 90% after submission of
UC and all required documents.
16.1.6
Processing Methodology:
The proposal shall be assessed by an Expert Committee constituted as follows:
a
Three member expert committee not below the rank of Associate Professor.
At least one member among the experts shall be from the concerned stream.
16.1.7
Prior permission of the Council sponsorship is essential for conducting the FDP.
Funds once released/sanctioned for organizing the particular topic/ area of FDP
cannot be utilized for any other programme.
In case the event is cancelled, the funds will be returned back to AICTE
immediately with interest incurred.
Any change in the schedule for holding FDP, change of Coordinator name and
Venue date would require prior approval of the council, failing which the offer for
the grant already issued would be treated as automatically withdrawn.
The funds under the scheme are released in two installments. (a) the first
installment (fifty percent of the total amount sanctioned) is released before the
event on the receipt of acceptance letter ;(b) the second installment is released
after the receipt of the following documents.
(i)
(ii)
(iii)
(iv)
Copies of proceedings.
Newly recruited teachers having less than/up to ten years of experience in areas
of technical education in AICTE approved institutions are eligible to participate.
The council shall sanction a maximum grant of Rs.7.0 lakh to conduct one
programme with maximum expenditure to be incurred on various heads not to
exceed the amount as mentioned below:
% of total amount
sanctioned
40.000
(i)
(ii)
(iii)
TA to outstation participants
17.500
(iv)
0.825
(v)
7.500
(vi)
10.000
9.000
15.175
100.000
123
AQIS GUIDELINES AND PROCESS HANDBOOK
16.2
16.2.1
Details of Institutes
a
b
c
d
e
Whether institution is
accredited by NBA
a
b
c
d
e
f
g
h
i
j
k
Name
Designation
Appointment Type
Department
Qualifications
Experience in years
Students guided
Publications
Relevant experience
Number of patents
Research/Consultancy
projects done in the
last 3 years
Other information
Cell number
Email
Signature
Email
FAX
Telephone
This Id is available on AICTE web portal
Unique application Id as assigned to your application on web portal. See important
note on the last page of this proforma.
16.2.2
Details of Candidates
l
m
n
o
Date of joining
Scale of Pay
UG
Teaching
UG
National
PG
Industry
PG
International
PhD
Research
PhD
Books
Give any other information that will help in accepting /funding this project
16.2.3
Details of Proposals
Technical Field -
Title of proposal
Abstract
d
e
Objective
Project Impact -Expected
outcomeacademic/social/commercial
Level
of
activity
(Regional/national) and target
audience
Programme details
Date
Time
Activity
Venue
Infrastructural
124
AQIS GUIDELINES AND PROCESS HANDBOOK
requirements and
availability
Lecture by /
Demonstration /
Industry visit / Poster
presentation/ other
j
k
l
m
n
O
p
q
Budget Estimates
Head of expenditure
Stationery, printing,
Pre-event
expenditure etc.
Travel, Stay and DA
Other
Total
s
t
u
Activity
keynote address/Chairing
sessions/speaker/ advisor/ Reviewers/
Sponsorer
Anticipated
expenditure
National /
International
)
Budget by
parent
organizati
on
Name of
by
external
body
involved,
if any
External
Sponsors
hips
Grant by
AICTE, Rs.
Title of the
activity
NR
16.2.4
Name
Address
Website
Contact person ,
designation, email
Roles in
collaborating/participating
Financial commitment#
towards project in Rs.
b
c
Total Rs.
$
125
AQIS GUIDELINES AND PROCESS HANDBOOK
16.2.5
16.2.6
Advance installment
NR
R2
R3
NR+R1+R2+R3
R1
Name of the
coordinator
Amt sanctioned
NR
16.2.7
Sanctioned
letter details
Funds
Utilization
position as on
today
d
16.2.8
Abide by all the rules / regulations regarding utilization of amount that may be granted to the Institute.
Submit timely progress reports about grant utilization.
Submit utilization certificate duly authenticated by CA on/before project period is over.
Return full/partial unutilized grant amount to the Council.
Project forwarded to AICTE
Date :
Institute Seal
Important: You need to apply on web portal using your Institute login and password. Select tab AQIS application. Press New to create
new application. Your application is assigned unique application Id. Fill all the details over there. Prepare application in this proforma also.
Attach PDF of it to the application on web portal. Now press submit on web portal to submit application. Pay processing fees on web portal
using appropriate payment option.
126
AQIS GUIDELINES AND PROCESS HANDBOOK
16.3
16.3.1
EVALUATION SHEET FOR PROPOSALS UNDER THE SCHEME OF FACULTY DEVELOPMENT PROGRAM (FDP)
SCHEME: FDP
DATE OF MEETING:
b
c
(Write details)
GOVT.
(Write details)
Status of Coordinator
Permanent
on appropriate tab)
(tick on appropriate
GROUP:
PROPOSAL NO.
Temp.
SELF FINANCING
Ad-hoc
tab)
i
j
k
(Write details)
(Write details)
(Write details)
(Write details)
Yes
No
(tick on appropriate tab)
If yes, details of the project: (Write details)
AICTE Sanction Letter No.
Date
Status
(tick on appropriate tab)
Signature of Expert
(Name of Expert)
(Write details)
(Write
details)
(Write details)
(Write
details)
(Write details)
(Write
details)
Signature of Expert
(Name of Expert)
Completed
On-going
Completed
On-going
Completed
On-going
Signature of Expert
(Name of Expert)
127
AQIS GUIDELINES AND PROCESS HANDBOOK
16.3.2
k
l
m
n
16.3.3
Criteria/ Parameters
MAX.
MARKS
MARKS AWARDED
Academic credentials of Coordinator
PG
1
Ph.D.
3
Teaching Experience
3
Research Experience in
years
Industrial Experience
Publications
(National/International)
No(s) of Ph.D. Guided
Membership of the
Professional/ Learned
bodies/Societies
Patents granted
Other (Awards etc.)
Experience of organizing
Seminar/FDP
Sub Total
REMARKS
4
2
4
3
2
1
1
1
25
Type of Institute
d
16.3.4
10
c
16.3.5
UG/PG
NBA Accreditation of the
course for which the proposal is
submitted.
Sub Total
5
5
10
Signature of Expert
(Name of Expert)
15
10
10
10
5
5
55
100
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
128
AQIS GUIDELINES AND PROCESS HANDBOOK
16.3.6
Marks Allotted
Grade
Remarks:
0-24
25-49
50-65
66-85
86-100
Recommended
Not
Recommended
AMOUNT RECOMMENDED:
Number of Participants approved:
16.3.7
1.
2.
TA to outstation participants
17.500
3.
0.825
4.
7.500
5.
10.000
6.
9.000
7.
Actual Amount
15.175
100.000
129
AQIS GUIDELINES AND PROCESS HANDBOOK
objective
a
(i)
(ii)
(iii)
(iv)
(v)
(vi)
Through each SWSS 50 faculty members of AICTE approved Institutes are trained for
duration of two weeks at a time.
SWSS is intended to provide opportunities for Teacher training for faculty employed in
AICTE approved institutions in Engineering, Pharmacy, Management and Architecture
to facilitate up gradation of knowledge and skill.
17.1.2
The program is proposed to cover the areas such as technical Subject areas, new
concepts, methods and techniques, theory and skill enrichment and up gradation of
pedagogy, technology, motivation, communication skills, management and other
relevant issues to keep pace with the changing scenario in Technical Education.
Eligibility
Coordinator must be full time regular faculty with adequate experience in teaching
and research with publications.
130
AQIS GUIDELINES AND PROCESS HANDBOOK
17.1.3
Duration of Project
a
17.1.4
The proposed/approved SWSS shall be conducted within six month from the date of
receipt of offer letter. The Duration of the SWSS shall be 2 weeks.
Limit of funding
a
17.1.5
Rs. 7 Lakh.
Disbursement of the Funds
a
17.1.6
90% amount as advance and 10% after submission of UC and all required documents.
Processing Methodology:
The proposal shall be assessed by an expert committee constituted as follows:
Three member expert committee not below the rank of Associate Professor.
At least two members among the experts shall be from the concerned stream.
17.1.7
Prior permission of the Council sponsorship is essential for conducting the SWSS.
Funds once released/sanctioned for organizing the particular topic/ area of SWSS
cannot be utilized for any other programme.
In case the event is cancelled, the funds will be returned back to AICTE immediately
with interest incurred.
Any change in the schedule for holding SWSS, change of Coordinator name and Venue
date would require prior approval of the council, failing which the offer for the grant
already issued would be treated as automatically withdrawn.
The funds under the scheme are released in two installments. (a) the first is to be
released before the event on the receipt of acceptance letter; (b) the second
installment would be released after the receipt of the following documents.
(i)
(ii)
(iii)
131
AQIS GUIDELINES AND PROCESS HANDBOOK
(iv)
Copies of proceedings.
The University/Institution should submit the documents necessary for release of 1st
installment within 15 days of receipt of the offer letter and document necessary for
release of 2nd installment within 1 month of the conduct of the event.
As per AICTE guidelines the programme should be of two weeks with 20 participants
Newly recruited teachers having less than/up to ten years of experience in areas of
technical education in AICTE approved institutions are eligible to participate.
The council shall sanction a maximum grant of Rs.7.0 lakh to conduct one programme
with maximum expenditure to be incurred on various heads not to exceed the amount
as mentioned below:
% of total amount
sanctioned
40.000
17.500
(i)
(ii)
(iii)
(iv)
0.825
(v)
7.500
(vi)
10.000
9.000
15.175
100.000
132
AQIS GUIDELINES AND PROCESS HANDBOOK
17.2
Details of Institutes
a
Address
Contact details
Application Id
Whether institution is
accredited by NBA
FAX
17.2.2
Telephone
Details of Candidates
a
b
c
d
e
f
g
h
(i)
j
k
l
m
n
o
Name
Designation
Appointment Type
Department
Qualifications
Experience in years
Students guided
Publications
Relevant experience
Number of patents
Research/Consultancy projects done
in the last 3 years
Other information
Cell number
Email
Signature
17.2.3
Date of joining
Scale of Pay
UG
Teaching
UG
National
PG
Industry
PG
International
PhD
Research
PhD
Books
Give any other information that will help in accepting /funding this project
Details of Proposals
Technical Field -
Title of proposal
Abstract
133
AQIS GUIDELINES AND PROCESS HANDBOOK
audience
Project Impact -Expected
outcomeacademic/social/commercial
Programme details
Date
Time
m
n
o
Venue
s
t
u
v
W
Activity
keynote address/Chairing
sessions/speaker/ advisor/ Reviewers/
Sponsorer
p
q
r
Infrastructural
requirements and
availability
Lecture by /
Demonstration /
Industry visit / Poster
presentation/ other
i
j
k
l
Activity
Budget Estimates
Head of
expenditure
Anticipated
expenditure
National /
International
)
Budget by
parent
organizati
on
Remuneration
Stationery,
printing, Pre-event
expenditure etc.
Travel, Stay and
DA
Other
Total
Name of
by
external
body
involved,
if any
External
Sponsors
hips
Grant by
AICTE, Rs.
Title of the
activity
NR
17.2.4
Advance installment
NR
R1
R2
R3
NR+R1+R2+R3
134
AQIS GUIDELINES AND PROCESS HANDBOOK
17.2.5
Name of
the
coordinator
Amt
sanctioned
NR
17.2.6
Sanctioned
letter
details
Funds
Utilization
position as
on today
Utilization Certificate
details/ Reason for nonsubmission of Utilization
Certificate
Abide by all the rules / regulations regarding utilization of amount that may be granted to the
Institute.
17.2.7
Date :
Institute Seal
Important: You need to apply on web portal using your Institute login and password. Select tab AQIS application. Press New to create
new application. Your application is assigned unique application Id. Fill all the details over there. Prepare application in this proforma also.
Attach PDF of it to the application on web portal. Now press submit on web portal to submit application. Pay processing fees on web portal
using appropriate payment option.
135
AQIS GUIDELINES AND PROCESS HANDBOOK
17.3
17.3.1
SCHEME: SWSS
DATE OF MEETING:
PROPOSAL Group
NO.
b
c
(Write details)
(Write details)
Status of co-coordinator
g
h
(Write details)
(Write details)
i
j
k
Permanent
Ad-hoc
(Write details)
(Write details)
Yes
No
If yes, details of the project
AICTE Sanction
Letter No.
Date
Status
(Write details)
(Write
details)
(Write
details)
(Write
details)
(Write details)
(Write details)
17.3.2
Temp.
SELF FINANCING
Criteria/ Parameters
c
d
e
f
PG
Ph.D.
Teaching Experience
Research Experience in years
1
3
3
4
g
h
i
j
Industrial Experience
Publications (National/International)
No(s) of Ph.D. Guided
Membership of the Professional/
Learned bodies/Societies
Patents granted
Other (Awards etc.)
Experience of organizing Seminar/FDP
2
4
3
2
k
l
m
Sub Total
Signature of Expert
(Name of Expert)
MAX.
MARKS
MARKS
AWARDED
REMARKS
1
1
1
25
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
136
AQIS GUIDELINES AND PROCESS HANDBOOK
17.3.3
Type of Institute
d
17.3.4
a
b
c
17.3.5
UG/PG
5
NBA Accreditation of the course
5
for which the proposal is
submitted.
Sub Total
10
Credentials of SUMMER-WINTER-SCHOOL SCHEME
10
Relevance
10
Benefits to Faculty
10
d
e
f
g
Expected outcome
Level of participants
No: and level of guest speakers
Sub Total
10
10
5
55
100
17.3.6
Marks Allotted
0-24
25-49
50-65
66-85
86-100
Grade
Remarks:
Signature of Expert
(Name of Expert)
Recommended
Signature of Expert
(Name of Expert)
Not
Recommended
Signature of Expert
(Name of Expert)
137
AQIS GUIDELINES AND PROCESS HANDBOOK
AMOUNT RECOMMENDED:
Number of Participants approved:
17.3.7
a
TA to outstation participants
17.500
0.825
7.500
10.000
9.000
15.175
Signature of Expert
(Name of Expert)
Actual
Amount
100.000
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
138
AQIS GUIDELINES AND PROCESS HANDBOOK
CHAPTER - 18
18.1.1
objective
a
The objective of the Project Centre will be to provide the students with facilities in a
common place within the university department where the students can have hands-on
experience in various aspects of their learning. These could be in works like fabrication,
interaction amongst the students themselves allowing them to enhance their
understanding in their respective disciplines of study. The project centre will also allow
the final year students to showcase their project. The project centre will also allow the
students to learn in developing and preparing academic projects which will include the
initial stage to the final stage where the students can present their final product.
Eligibility
AICTE approved institutions/ AICTE approved University Departments.
18.1.2
d
e
18.1.3
a
18.1.4
a
18.1.5
a
b
c
d
139
AQIS GUIDELINES AND PROCESS HANDBOOK
18.1.6
a
Processing Methodology:
The proposal shall be assessed by an expert committee constituted as follows:
Three member expert committee not below the rank of Associate Professor.
At least two members among the experts shall be from the concerned stream.
18.1.7
The AICTE shall provide a grant of up to a maximum of Rs. 50.00 lakh, required to set up
the Project Centre, for infrastructure development including purchase of required
equipments / machineries, etc.
b
The centre shall function as a separate entity within the Parent Institution. It should
function as a Central Facility of the entire institution and not as a facility for a particular
Department of the parent institution.
c
The center will function under the guidance and control of the Director/Head of the
Parent Institution.
d
For the centre to function smoothly and to meet its objectives effectively, it is essential
that this centre has adequate man power in the form of dedicated facility and support
staff.
e
The Following activities are expected of the Project Center :
(i) Allow the students with facilities to enhance their technical skill in their respective
disciplines so that they gain hands-down experience in an atmosphere of the practical
learning,
(ii) Organize inter-active sessions with eminent technical personalities and academics, at
regular intervals to update the knowledge of the students, if need arises.
(iii) The centre shall devise a feed-back mechanism to assess the importance of the Project
Centre. The feed-back shall be obtained from each student about the usefulness of the
Project Centre. If need be, the university department can update its curriculum for the
Program Centre
140
AQIS GUIDELINES AND PROCESS HANDBOOK
18.2
Details of Institutes
a
b
c
d
Email
FAX
Telephone
This Id is available on AICTE web portal
Unique application Id as assigned to your application on web portal. See important
note on the last page of this proforma.
a
b
c
d
e
f
g
h
i
j
k
Name
Designation
Appointment Type
Department
Qualifications
Experience in years
Students guided
Publications
Relevant experience
Number of patents
Research/Consultancy projects done
in the last 3 years
Other information
Cell number
Email
Signature
18.2.2
Details of Candidates
l
m
n
o
Date of joining
Scale of Pay
UG
Teaching
UG
National
PG
Industry
PG
International
PhD
Research
PhD
Books
18.2.3
Details of Proposals
a
Technical Field -
b
c
d
Title of proposal
Abstract
Objective and Level of activity
(Regional/National) and target
audience
Project Impact -Expected
outcomeacademic/social/commercial
Students at the Institute
f
g
h
i
j
k
Program*
Acad Yr#
Male
SC
ST
Oth
er
Total
SC
ST
Female
Oth
er
Total
141
AQIS GUIDELINES AND PROCESS HANDBOOK
l
m
Programme Details
No. of Students
Project
Schedul
ed
o
p
Activity
Venue
Lecturer
by/Demonstration/Indust
ry visits/poster
presentation/ other
Similar event organized by the Institute earlier, if any.
Title of the activity
Subject
Date from- to
(Latest first)
q
r
Budget Estimates
Head of expenditure
s
t
Infrastructure
Remuneration to student
project group
Stationery, printing, Preevent expenditure etc.
Travel, Stay and DA
Other
Total
u
v
w
x
18.2.4
Infrastructural
requirement and
availability
Anticipated
expenditure
Level
( Regional /
National /
International
)
Budget by
parent
organizatio
n
Name of
by
external
body
involved,
if any
External
Sponsorshi
ps
Grant
by
AICTE
, Rs.
Title of the
activity
NR
Advance installment
NR
R1
Total (Max 25
Lakh)
R2
R3
NR+R1+R2+R3
18.2.5
142
AQIS GUIDELINES AND PROCESS HANDBOOK
18.2.6
Abide by all the rules / regulations regarding utilization of amount that may be granted to the Institute.
18.2.7
Date :
Institute Seal
Important: You need to apply on web portal using your Institute login and password. Select tab AQIS application. Press New to create
new application. Your application is assigned unique application Id. Fill all the details over there. Prepare application in this proforma also.
Attach PDF of it to the application on web portal. Now press submit on web portal to submit application. Pay processing fees on web portal
using appropriate payment option.
143
AQIS GUIDELINES AND PROCESS HANDBOOK
18.3
EVALUATION SHEET FOR PROPOSALS UNDER THE SCHEME OF Project Centre for Technical Education (PCTE)
18.3.1
DATE OF
MEETING:
SCHEME:
PROPOSAL
NO.
Group
a
b
c
d
(Write details)
Status of Coordinator
Permanent
18.3.2
a
b
Criteria/ Parameters
Temp.
SELF FINANCING
Ad-hoc
(Write details)
(Write details)
1
3
3
g
h
i
j
Industrial Experience
Publications (National/International)
No(s) of Ph.D. Guided
Membership of the Professional/
Learned bodies/Societies
Patents granted
Other (Awards etc.)
Experience of organizing events
2
4
3
2
c
d
e
k
l
m
(Write details)
Sub Total
Signature of Expert
(Name of Expert)
1
1
1
25
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
144
AQIS GUIDELINES AND PROCESS HANDBOOK
18.3.3
3
4
f
g
Diploma/UG/PG
The relevance of AICTE
approved UG/PG courses for
which the project proposal is
submitted.
Sub Total
Credentials of Proposal
a
b
c
h
18.3.4
10
5
5
10
15
Relevance
10
10
10
e
f
100
a
b
18.3.5
10
55
Marks Allotted
b
Grade
0-24
25-49
50-65
66-85
86-100
Remarks:
AMOUNT RECOMMENDED:
Signature of Expert
(Name of Expert)
Recommended
Signature of Expert
(Name of Expert)
Not
Recommended
Signature of Expert
(Name of Expert)
145
AQIS GUIDELINES AND PROCESS HANDBOOK
CHAPTER - 19
19.1.1
objective
a
The broad objectives of the centre shall be to provide opportunity to SC/ST students in the
Institutes to reorient themselves in the light of emerging employment opportunities in
Engineering undergraduate/Diploma students at all level. It is to empower the SC and ST
students by providing special skill trainings apart from regular study. To enhance the skills of
Scheduled Caste (SC) / Scheduled Tribe (ST) candidates with help of modules on
communication, personality development and proficiency in English language. It will boost
the confidence of SC and ST students and provide them with better career opportunities so
that their employability in the industry increases.
Eligibility
The Institute/ University Departments should ample built-up accommodation with proper
infrastructure of its own to start the centre.
The Institute must have more than 150 SC/ST students on roll during last 3 years.
19.1.2
d
19.1.3
19.1.4
Duration of project shall be three year from the date of receipt of funds by the institute.
Limit of Funding
a
19.1.5
a
b
19.1.6
50% of the sanctioned grant shall be released at the initial stage after acceptance of the
proposal.
25% of the sanctioned fund will be released in equal instalments during the next two years,
after receipt of feedback, attendance, Utilisation certificate (UC) and other supporting
documents from the Institute.
Processing Methodology
The proposal shall be assessed by an expert committee constituted as follows:
146
AQIS GUIDELINES AND PROCESS HANDBOOK
Three member expert committee not below the rank of Associate Professor.
At least two members among the experts shall be from the concerned stream.
19.1.7
c
d
e
f
The AICTE shall provide a limited one time financial assistance, up to a maximum of Rs.25.00
lakh, required for infrastructure development, including the purchase of Desktop PC with
Internet facility, fax/modem, back-up, multimedia/OHP, equipment, furniture, audio visual
aids, library books, journals, LCD Projector etc (non-recurring expenditure).
The centre shall function as a separate entity within the Parent Institution. It should function
as a Central Facility of the entire institution and not as a facility for a particular Department
of the parent institution.
The parent institution shall provide adequate building space for setting up of the centre and
also usage of classrooms for conducting the programs for SC/ST students
The center will function under the guidance and control of the Director/Head of the Parent
Institution.
For the centre to function smoothly and to meet its objectives effectively, it is essential that
this centre has adequate man power in the form of dedicated facility and support staff.
The Following activities are expected of the center :
(i)Orientation programmes to enhance proficiency in English language, improve
communication skills, both written and verbal and focus on personality development.
(ii)Organize lectures by inviting eminent personalities and academics, at regular intervals to
update the knowledge of the students.
(iii)Organize open houses/ personality development workshops / competitions among
students, to test the degree of their learning,
(iv)The centre shall devise a feed-back mechanism to assess the importance of the
programme. The feed-back shall be obtained after each programme from each of the SC/ST
students. If need be, the centre can update its curriculum of these programmes.
147
AQIS GUIDELINES AND PROCESS HANDBOOK
19.2.
Skill and Personality Development Program Centre for SC/ST Students (SPDPC)
19.1.1
Details of Institutes
a
b
c
d
e
f
Email
FAX
Telephone
This Id is available on AICTE web portal
Unique application Id as assigned to your application on web portal. See important
note on the last page of this proforma.
19.1.2
Details of Candidates
a
b
c
d
e
f
g
h
i
j
k
l
m
n
o
Name
Designation
Appointment Type
Department
Qualifications
Experience in years
Students guided
Publications
Relevant experience
Number of patents
Research/Consultancy projects done
in the last 3 years
Other information
Cell number
Email
Signature
19.1.3
Date of joining
Scale of Pay
UG
Teaching
UG
National
PG
Industry
PG
International
PhD
Research
PhD
Books
Details of Proposals
a
Technical Field -
Title of proposal
Abstract
148
AQIS GUIDELINES AND PROCESS HANDBOOK
g
h
i
j
k
l
m
Program*
Acad Yr#
Male
SC
Project
Schedul
ed
ST
Oth
er
Female
SC
ST
Total
Activity
Venue
Oth
er
Total
Infrastructural
requirement and
availability
Lecturer
by/Demonstration/Indust
ry visits/poster
presentation/ other
o
19.1.4
a
( Regional /
National /
International
)
Name of
by
external
body
involved,
if any
Grant
by
AICTE
, Rs.
Title of the
activity
b
19.1.5
a
b
c
d
e
f
g
19.1.6
Anticipated
expenditure
Infrastructure
Remuneration to student
project group
Stationery, printing, Preevent expenditure etc.
Travel, Stay and DA
Other
Total
Budget by
parent
organizatio
n
External
Sponsorshi
ps
NR
19.1.7
Budget Estimates
Head of expenditure
Advance installment
NR
R1
Total (Max 25
Lakh)
R2
R3
NR+R1+R2+R3
149
AQIS GUIDELINES AND PROCESS HANDBOOK
19.1.8
19.1.9
Abide by all the rules / regulations regarding utilization of amount that may be granted to the Institute.
Date :
Institute Seal
Important: You need to apply on web portal using your Institute login and password. Select tab AQIS application. Press New to create
new application. Your application is assigned unique application Id. Fill all the details over there. Prepare application in this proforma also.
Attach PDF of it to the application on web portal. Now press submit on web portal to submit application. Pay processing fees on web portal
using appropriate payment option.
150
AQIS GUIDELINES AND PROCESS HANDBOOK
19.3
EVALUATION SHEET FOR PROPOSALS UNDER THE SCHEME OF Skill and Personality Development Program
Centre for SC/ST Students (SPDPC)
Group
19.3.1
SCHEME:
DATE OF
MEETING:
PROPOSA
L NO.
a
b
c
(Write details)
Status of Coordinator
Permanent
19.3.2
(Write details)
on appropriate tab)
Temp.
Ad-hoc
Criteria/ Parameters
MAX.
MARKS
REMARKS
c
d
e
PG
Ph.D.
Teaching Experience
1
3
3
g
h
i
j
Industrial Experience
Publications (National/International)
No(s) of Ph.D. Guided
Membership of the Professional/ Learned
bodies/Societies
Patents granted
Other (Awards etc.)
Experience of organizing events
2
4
3
2
k
l
m
MARKS
AWARDED
Sub Total
Signature of Expert
(Name of Expert)
1
1
1
25
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
151
AQIS GUIDELINES AND PROCESS HANDBOOK
19.3.3
Type of Institute
c
d
e
4
10
f
g
Diploma/UG/PG
Number of AICTE approved UG/PG courses in the institute.
5
5
Sub Total
Credentials of SPDPC
10
a
b
15
15
c
d
e
f
Expected outcome
Other similar initiative by the Institute
Sub Total
10
15
55
100
19.3.4
19.3.5
Marks Allotted
Grade
Remarks:
0-24
25-49
50-65
66-85
86-100
Recommended
Not
Recommended
AMOUNT RECOMMENDED:
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
152
AQIS GUIDELINES AND PROCESS HANDBOOK
CHAPTER - 20
20.1.1
objective
a
The Institute/ University Departments should ample built-up accommodation with proper
infrastructure of its own to start the E-Learning Centre.
20.1.2
20.1.3
20.1.4
Duration of project will be Three year from the date of receipt of funds in the institutes
account
Limit of Funding
a
20.1.5
35% of the funds shall be utilized for non-recurring funds for purchase of items required for
functioning of the E-Learning Centre such of computers and networking hardware.
10% of the total fund could be utilized as an honorarium for support staff engaged and 55%
of the total fund could be utilized for maintenance, subscription towards profession
technical journals and technical books
60% of the sanctioned fund will be released at the initial stage after acceptance of the
proposal.
20% of the sanctioned fund will be released in equal installments during the next two years
after receipt of feedback, attendance, Utilization certificate (UC) and other supporting
153
AQIS GUIDELINES AND PROCESS HANDBOOK
Processing Methodology:
The proposal shall be assessed by an expert committee constituted as follows:
a
Three member expert committee not below the rank of Associate Professor.
At least two members among the experts shall be from the concerned stream.
20.1.7
The E- Learning Centre shall have a Co-ordinator to oversee the functioning of the centre and
shall be responsible for its proper functioning.
The E-Learning centre must have at least one IT qualified faculty for assistance.
The Librarian of the institute / university / college shall provide all assistance to this centre as
an when required
The E-Learning Centre should have carpet area off at least 1500-2500 sq.ft. for installing
adequate number of computer with other peripherals with facility for printing, scanning,
networking.
154
AQIS GUIDELINES AND PROCESS HANDBOOK
20.2
Details of Institutes
a
b
c
d
e
f
Email
FAX
Telephone
This Id is available on AICTE web portal
Unique application Id as assigned to your application on web portal. See important
note on the last page of this proforma.
20.2.2
Details of Candidates
a
b
c
d
e
f
g
h
i
j
k
l
m
n
o
Name
Designation
Appointment Type
Department
Qualifications
Experience in years
Students guided
Publications
Relevant experience
Number of patents
Research/Consultancy projects done
in the last 3 years
Other information
Cell number
Email
Signature
Date of joining
Scale of Pay
UG
Teaching
UG
National
PG
Industry
PG
International
PhD
Research
PhD
Books
20.2.3
Details of Proposals
a
b
c
d
f
g
h
Acad Yr#
Male
SC
ST
Oth
Total
SC
ST
Female
Oth
Total
155
AQIS GUIDELINES AND PROCESS HANDBOOK
er
i
j
k
m
n
Project
Schedul
ed
Activity
Venue
20.2.4
Name of
by
external
body
involved,
if any
Grant
by
AICTE
, Rs.
Title of the
activity
Land area
land Ownership and use details
Plinth area
Total built up area
Total carpet area
Library
Television Hall
Sport Faculty
Location of centre
any other
Budget Estimates
b
c
Level
( Regional /
National /
International
)
20.2.5
Infrastructural
requirement and
availability
Lecturer
by/Demonstration/Indust
ry visits/poster
presentation/ other
(Latest first)
b
c
d
e
f
g
h
i
h
K
er
Head of
expenditure
Infrastructure
Remuneration to
experts, sporting
staff etc
Stationary, printing
pre-event
expenditure,
Anticipated
expenditure
Budget by
parent
organization
External
Assistance
Assistance
requested
from Council
r
Add rows as
required.
Max assistance 200
Lakh
156
AQIS GUIDELINES AND PROCESS HANDBOOK
journals, computers
etc
e
20.2.6
project
R=R1+R2
R2=R/2
R1=R/2
20.2.7
20.2.8
Advance installment
NR
Total (Max 25
Lakh)
R2
R3
NR+R1+R2+R3
R1
20.2.9
a
Abide by all the rules / regulations regarding utilization of amount that may be granted to the Institute.
20.2.10
Date :
Institute Seal
Add rows as required
Important: You need to apply on web portal using your Institute login and password. Select tab AQIS application. Press New to create
new application. Your application is assigned unique application Id. Fill all the details over there. Prepare application in this proforma also.
Attach PDF of it to the application on web portal. Now press submit on web portal to submit application. Pay processing fees on web portal
using appropriate payment option.
157
AQIS GUIDELINES AND PROCESS HANDBOOK
20.3
EVALUATION SHEET FOR PROPOSALS UNDER THE SCHEME OF E-Learning Centre for Technical Education
20.3.1
DATE OF
MEETING:
SCHEME:
PROPOSAL
NO.
Group
a
b
c
d
e
f
g
h
20.3.2
(Write details)
SELF FINANCING
(Write details)
Permanent
on appropriate tab)
Temp.
Ad-hoc
(Write details)
tab)
Approved
approved
(Write details)
on appropriate
Not
a
b
c
d
e
f
PG
Ph.D.
Teaching Experience
Research Experience in years
1
3
3
4
g
h
i
j
Industrial Experience
Publications (National/International)
No(s) of Ph.D. Guided
Membership of the Professional/ Learned
bodies/Societies
Patents granted
Other (Awards etc.)
Experience of organizing events
2
4
3
2
Criteria/ Parameters
k
l
m
n
Sub Total
Signature of Expert
(Name of Expert)
1
1
1
25
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
158
AQIS GUIDELINES AND PROCESS HANDBOOK
20.3.3
Type of Institute
d
20.3.4
a
b
c
20.3.5
UG/PG
Number of AICTE approved UG/PG
courses for which the project proposal
is submitted.
Sub Total
10
5
5
10
Credentials of E-Centre
a
b
c
d
e
f
g
20.3.6
15
10
10
5
15
55
100
Marks Allotted
b
0-24
25-49
50-65
66-85
86-100
Grade
Remarks:
AMOUNT RECOMMENDED:
Signature of Expert
(Name of Expert)
Recommended
Signature of Expert
(Name of Expert)
Not
Recommended
Signature of Expert
(Name of Expert)
159
AQIS GUIDELINES AND PROCESS HANDBOOK
CHAPTER - 21
21.1.1
objective
a
The Scheme of Emeritus Fellowship intends to utilize the services of highly qualified
and experienced superannuated Professors at AICTE approved Institutions / Colleges /
University Departments imparting technical education (excluding MHRD funded
Institutes / Universities i.e., IITs, IISc, IIMs & NITs etc.) in stimulating and achieving
excellence in Technical Education i.e. in Engineering and Technology, Architecture,
Town Planning, Management, Pharmacy, Applied Arts and Crafts and other areas as per
the AICTE Act.
Is aimed at supplementing and providing expertise to teaching / research in those areas in which
host institutions do not have the expertise. Eminent scholars holding the post of Professors shall
be considered for appointment as Visiting Professors.
The main objective of the scheme is to supplement and provide expertise to the teaching /
research in those areas in which the host institution needs the expertise.
21.1.2
Eligibility
a
The duration of the project shall be for a period of two years or till the awardee fellow
attains the age of 70 years whichever is earlier
Limit of Funding
Rs. 50,000/- per annum as travel expenses to DVP for 2 visits to the Institute.
Rs. 50000/- per annum as honorarium to DVP for 2 visits to the Institute.
21.1.3
21.1.4
21.1.5
VISITING PROFESSORSHIP
100% as advance
Rs. 50000/- per annum as travel expenses and Rs. 50000/- per annum as honorarium
(@Rs.3000/- per day of the visits, 6-8 days per semester I.e. 12-16 days per year) to
DVP for 2 visits to the Institution.
Rs. 10000/- per year to the host Institution as contingent expenses.
c
21.1.6
Processing Methodology:
The proposal shall be assessed by an expert committee constituted as follows:
a
Three member expert committee not below the rank of Associate Professor.
At least two members among the experts shall be from the concerned stream.
21.1.7
c
d
e
f
g
h
The DVP shall commence within the time period as stipulated in the offer letter unless
otherwise authorized by AICTE, failing which the fellowship will be treated as
withdrawn.
The DVP Fellow shall help in generation of indigenous learning resource materials,
manuals, state-of-the-art reports, monographs, reference books, handbooks, codes of
practice, standards, and related monographs in respective fields of specialization
particularly in the areas of relevance to the activities of AICTE to meet the
requirements of EDUSAT Programme.
A DVP shall teach at least one course in the Host Institution or to teach a course in one
of the neighboring Institute where there is shortage of faculty.
Proposing, executing, guiding and monitoring of projects in the field of Engineering /
Technology / Pharmacy / Architecture / Town Planning / Management / Applied Arts &
Crafts and for the development of an AICTE approved Technical Institution.
Developing emerging sectors of knowledge/innovative schools of thought in the field of
Technical Education.
As a part of the objectives of the DVP, a DVP Fellow may provide technical consultancy
to a developing institution located in a nearby area of the host institution, where the
Emeritus Fellow can devote a part of his time (20 percent of total time) for giving
impetus to consultancy, research, redesigning of courses, industry-institute-interaction,
formulation for research of those projects for which expertise is not available in the
adopted institution.
The honorarium indicated above will be over and above any superannuation benefits,
the DVP may be in receipt of.
The contingency funds will be used for inputs needed for various developmental
activities undertaken by the DVP in the adopted institution.
161
AQIS GUIDELINES AND PROCESS HANDBOOK
A DVP will be allowed to avail Forty Five (45) days of leave in a year with honorarium.
Leave will be sanctioned by the Host Institution
A feedback shall be submitted by the DVP at the end of first year and at the end of the
tenure.
21.2
VISITING PROFESSORSHIP
21.2.1
Details of Institutes
a
Address
Contact details
Permanent Id of the
Institute
Application Id
Unique application Id as assigned to your application on web portal. See important note on
the last page of this proforma.
21.2.2
FAX
Telephone
m
n
o
p
q
Cell number
Email
Signature
Current status
Field of study / specialization
a
b
c
d
e
f
g
h
i
j
k
project
Working / retired
Add rows as required
162
AQIS GUIDELINES AND PROCESS HANDBOOK
r
s
t
Publications
IPR
PG students guided
Other information
Give any other information that will help in accepting /funding this
project
Cell number
a
b
Technical Field
Title of proposal
PhD students
guided
Email
21.2.3
Details of Proposals
Add rows as required
Add rows as required
Abstract
d
e
f
u
v
w
x
21.2.4
NR
Signature
*In case of working personnel, No Objection Certificate from present organisation is required.
21.2.5
Advance installment
163
AQIS GUIDELINES AND PROCESS HANDBOOK
21.2.6
NR
R1
R2
Name of
the
coordinator
Amt
sanctioned
NR
21.2.7
21.2.8
R3
NR+R1+R2+R3
Sanctioned
letter
details
Funds
Utilization
position as
on today
Utilization Certificate
details/ Reason for nonsubmission of Utilization
Certificate
Abide by all the rules / regulations regarding utilization of amount that may be granted to the
Institute.
Date :
Institute Seal
Important: You need to apply on web portal using your Institute login and password. Select tab AQIS application. Press New to create
new application. Your application is assigned unique application Id. Fill all the details over there. Prepare application in this proforma also.
Attach PDF of it to the application on web portal. Now press submit on web portal to submit application. Pay processing fees on web portal
using appropriate payment option.
164
AQIS GUIDELINES AND PROCESS HANDBOOK
21.3
21.3.1
DATE OF
MEETING
GROUP:
PROPOSAL NO.
(Write details)
d
e
f
g
h
i
j
21.3.2
a
PARAMETER / CRITERIA
Academic credentials of VP
PG Qualification
Ph. D
Research Experience
10
Membership in professional
bodies
Publications/Patents
h
i
j
k
Signature of Expert
(Name of Expert)
MAX.
MARKS
SELF FINANCING
(Write details)
(Write details)
(Write details)
(Write details)
(Write details)
APPROVED
MARKS
AWARDED
NOT APPROVED
REMARKS
10
4
2
Sub Total
40
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
165
AQIS GUIDELINES AND PROCESS HANDBOOK
21.3.3
d
e
f
21.3.4
a
20
Grand Total
100
d
e
Signature of Expert
(Name of Expert)
4
4
4
4
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
166
AQIS GUIDELINES AND PROCESS HANDBOOK
21.3.5
Marks Allotted
Grade
Remarks:
21.3.6
0-24
25-49
50-65
66-85
86-100
Recommended
Not
Recommended
AMOUNT RECOMMENDED
Head
Rs. in Lakh.
st
1 Year
a
2nd Year
Honorarium
Contingency
TOTAL
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
Signature of Expert
(Name of Expert)
167
AQIS GUIDELINES AND PROCESS HANDBOOK
CHAPTER - 22 AICTE-INAE-DVP
22.1.1
objective
a
The Distinguished Visiting Professor will be an eminent scholar/expert in his/her field, working in an
industry/ R&D organization.
22.1.2
Eligibility
a
22.1.3
a
22.1.4
One year
Limit of funding
Rs. 50,000/- per annum as travel expenses to DVP for 2 visits to the institution.
Rs. 50,000/- per annum as honorarium expenses to DVP for 2 visits to the institution.
22.1.5
22.1.6
100% advance
Processing Methodology:
a
22.1.7
168
AQIS GUIDELINES AND PROCESS HANDBOOK
CHAPTER - 23 AICTE-INAE-DVP
23.1.1
objective
a
The Distinguished Visiting Professor will be an eminent scholar/expert in his/her field, working in an
industry/ R&D organization.
(i)
(ii)
Deliver lectures on the state-of-art of Industry, industrial ambience and R&D needs of the industry
to the students and faculty of technical institutions.
Guide student projects/ theses of interest to industry.
(iii)
(iv)
Develop cooperative undergraduate and postgraduate programmes with industry having potential
benefits to faculty, students and Industry.
Take up any other activities for the mutual benefit of engineering institutions and industry
(v)
23.1.2
Eligibility
a
b
23.1.3
a
23.1.4
One year
Limit of funding
Rs. 50,000/- per annum as travel expenses to DVP for 2 visits to the institution.
Rs. 50,000/- per annum as honorarium expenses to DVP for 2 visits to the institution.
23.1.5
a
23.1.6
100% advance.
Processing Methodology:
169
AQIS GUIDELINES AND PROCESS HANDBOOK
23.1.7
170
AQIS GUIDELINES AND PROCESS HANDBOOK
CHAPTER - 24 AICTE-INAE-TG
24.1.1
objective
a
An AICTE-INAE Travel Grant Scheme for Engineering Students to present papers abroad
has been launched for enhancing the quality of engineering education in the country. The
objective of the scheme is to provide partial travel assistance and registration fees to
Bachelors and Masters Level engineering students for presenting a research paper in an
international scientific event (conference/seminar/symposium/workshop/exhibition etc)
in order to encourage engineering students to engage in research. The proposal(s)
received duly completed in all respects will be evaluated by subject experts.
Eligibility
24.1.2
b
24.1.3.
Duration of Project
a
24.1.4
One year
Limit of funding
24.1.5
24.1.6
Processing Methodology:
a
24.1.7
a
b
c
Progress report.
Project completion Report
Receipt and payment A/c
171
AQIS GUIDELINES AND PROCESS HANDBOOK
CHAPTER - 25 AICTE-INAE-TRF
25.1.1
objective
a
25.1.2
AICTE and INAE have launched the AICTE-INAE TEACHERS RESEARCH FELLOWSHIP SCHEME for
Engineering Teachers for Doctoral Research in Central Laboratories in order to promote a research
culture amongst the faculty in AICTE approved engineering institutions. Under this scheme,
engineering teachers in AICTE approved engineering colleges/institutions shall be sponsored to
pursue research in Council of Scientific and Industrial Research (CSIR) and Defense Research and
Development Organization (DRDO) laboratories leading to the award of a PhD degree in the chosen
field of study. The PhD degree will be awarded by the concerned organizations of CSIR and DRDO.
The period of association of the engineering teachers selected under this scheme will be a
maximum of three years. The age of the candidate should be 35 years or below
Eligibility
a
b
25.1.3
a
25.1.4
Three years
Limit of funding
a
25.1.5
Rs. 5.70
Disbursement of the Funds
25.1.6
Processing Methodology
a
25.1.7
172
AQIS GUIDELINES AND PROCESS HANDBOOK
CHAPTER - 26
26.1.1
objective
a
Scholarship Scheme to Girl Child (SSGC) is an endeavour by AICTE provided to promote technical
education (Engg., Architecture, Pharmacy, applied arts etc.) at Degree and Diploma levels to a girl
child. It has been found that at the level of Technical Education, the ratio of girl's student
decreases. The scheme is to support a girl per family. SSGC aim is to contribute towards the
education of academically inclined girl children across India wanting to pursue technical education.
Eligibility
Only one girl candidate per family may apply for the scholarship.
The scheme is applicable to a girl child who has taken admission in regular, full-time 1st year
course in an undergraduate Degree/Diploma course in any AICTE approved Govt. / Govt. Aided
Institutions/University departments imparting technical education.
The applicant must not be receiving any other scholarship/ Tuition fee reimbursement
from another organization.
The applicant must not have been a previous recipient of SSGC scholarship from AICTE.
26.1.2
d
e
Duration of Project
26.1.3
a
Four/ three years as the case may be for Degree/Diploma level courses.
Limit of funding
26.1.4
a
b
Rs. 30000 or Tuition fee at actual, whichever is less for all years of program duration and Rs.
2000/months for 10 months in a year for all the years of program.
4000 scholarships would be awarded to eligible candidates under this scheme per year.
Processing Methodology:
26.1.5
a
The state nodal committee formulated by DTE shall forward a proposal recommending a
consolidated list of girl Childs for consideration for SSGC to the council based on the percentage of
mark/rank scored at entry level qualifying exam.
26.1.6
a
The scholarship shall be fortified in case the student leaves the Institution.
173
AQIS GUIDELINES AND PROCESS HANDBOOK
Council has the right to cancel the scholarship grant without giving any prior notice, if any
discrepancy is reported
Documents to be submitted
List of candidate eligible for scholarship that shall include the following in tabulated form:-
26.1.7
174
AQIS GUIDELINES AND PROCESS HANDBOOK
Attested
photo of
student
b It is also certified that she will not be debarred from accepting any other scholarships
during the tenure of the award of Scholarship for Single Girl Child.
Signature
Name
Date
(Awardee)
Signature
Name
Date
(Head of Deptt.)
Seal of HoD
Signature
Name
Date
(Registrar / Director / Principal)
Seal of Institution / College
175
AQIS GUIDELINES AND PROCESS HANDBOOK
AFFIDAVIT
above affidavit are true and correct to my personal knowledge and belief.
176
AQIS GUIDELINES AND PROCESS HANDBOOK
CHAPTER - 27
27.1.1
Objectives
a
There are many differently- able (DA) students who could not continue their higher studies
due to lack of financial assistance. As supporting hand for these talents the Council has
introduced the scheme Scholarship to Differently- Able (DA) Child to promote technical
education (Engg., Architecture, Pharmacy, applied arts etc.) at Degree and Diploma levels to
these students. The aim is to contribute towards the education of academically inclined DA
child across India wanting to pursue technical education.
Eligibility
Annual income of the parents from all the sources should be less than 4.0 Lakh.
27.1.2
27.1.3
Duration of scholarship
a
27.1.4
Four/ three years as the case may be for Degree/Diploma levels courses.
Limit of scholarship
Rs. 30000 or Tuition fee at actual, whichever is less for all years of program duration and Rs.
2000/months for 10 months in a year for all years of program.
1000 scholarships would be awarded to eligible candidates under this scheme per year.
27.1.5
Processing Methodology
a
The state nodal agency may forward a proposal recommending a consolidated list of DA
student for consideration based on the percentage of mark/rank scored at entry level
qualifying exam.
177
AQIS GUIDELINES AND PROCESS HANDBOOK
27.1.6
a
The scholarship shall be fortified in case the student leaves the Institution.
Council has the right to cancel the scholarship grant without giving any prior notice, if any
discrepancy is reported
27.1.7
Documents to be submitted
a
List of candidate eligible for scholarship that shall include the following in tabulated form:(i) Name of the students
(ii) Name and address of the institute admitted
(iii) District and state
(iv) Entrance examination passed
(v) Course admitted
(vi) Year of admission
(vii) Rank obtained
(viii) Proof of admission to Ist year in the Institute.
(ix) Adhar card linked Bank account of student with Mobile No., e.mail add, Bank account,
IFSC code.
(x) A certificate from the Institute where student have taken admission to first year in
prescribed format.
(xi) An affidavit on Rs. 50/- stamp paper from the parent/student dually attested by the
Gazetted officer in prescribed format.
(xii) Attested photocopy of disabled certificate
178
AQIS GUIDELINES AND PROCESS HANDBOOK
Attested
photo of
student
b It is also certified that he/she will not be debarred from accepting any other scholarships
during the tenure of the award of Scholarship.
Signature
Name
Date
(Awardee)
Signature
Name
Date
(Head of Deptt.)
Seal of HoD
Signature
Name
Date
(Registrar / Director / Principal)
Seal of Institution / College
179
CHAPTER - 28 PG SCHOLARSHIP
28.1
Post graduate scholarship of Rs. 8,000/- per month is awarded by AICTE through its Post
Graduate Scholarship Scheme to full time GATE/GPAT qualified students admitted to
M.Tech/M.Pharm courses in AICTE approved institutions and University Departments
subject to the condition that they do not receive any financial assistance from any other
sources during their course of study in the Institute. The scholarship is tenable for 24
months and is not extended under any circumstances. Continuity of Scholarship will not
be considered under Medical Ground.
(b)
(c)
The Scholarship may be discontinued at any time for any kind of misconduct by the
student, like involving in the act of ragging etc., receiving the same, as judged by a
Disciplinary Committee of the Institution.
(d)
Scholarship should not be given to PG students who have passed the GATE/GPAT
examination during the second year of study.
(e)
The student shall be required to give an undertaking to the effect that he/she would not
leave the course midway.
(f)
During the course of studies, the student shall not receive any emoluments, salary,
stipend, etc. from any other source.
(g)
In no case the scholarship will be continued for a period of more than 24 months.
180
AQIS GUIDELINES AND PROCESS HANDBOOK
(h)
(i)
The students, who are admitted to AICTE approved P.G. Course (ME/M.Tech./Master of
Pharmacy) are only eligible to receive the GATE/GPAT scholarships.
(j)
No salary grant or any other grant eg. Contingencies, Library, Books etc. would be given
to any of the Institute/College/University under this scheme in compliance with the
directions of GOI, Ministry of HRD, Director of Higher Education, Technical Section I
conveyed vide F. No. 9-2/2007-TS.I dated 22nd July, 2008.
(k)
(l)
The AICTE may impose any other conditions as deemed necessary from time to time and
the decision of the AICTE shall be final and binding upon the recipients i.e.
University/Institute/College who are under the ambit of the AICTE for receipt PG
Scholarship.
181
AQIS GUIDELINES AND PROCESS HANDBOOK
CHAPTER - 28 INDEST
28.1.1
OBJECTIVE
a
(c )
28.1.2
AICTE approved Govt. Institutes / AICTE approved University Departments with relevant
PG programs for to be member of INDEST-AICTE consortium.
or
AICTE approved Govt./ Govt. Aided Polytechnic
28.1.3
Processing Methodology:
a
The proposal to be assessed by an expert committee of three members not lower that the
post of Professor.
183
AQIS GUIDELINES AND PROCESS HANDBOOK
Year
1.
2010-11
2.
2011-12
3.
2012-13
Scheme
Amount
sanctioned
Amount
Received
Status of
the
project
Reasons
for delay
2. Status of any other grant received by the Institute before 3 years and the utilization is still pending.
Provide the details.
S.No
Year
Scheme
Amount
sanctioned
Amount
Received
Status of
the
project
Reasons
for delay
1.
2.
3.
This is to certify that the information provided is true to the best of my knowledge.
Place:
Date:
Head of the Institution
(Signature & Seal)
184
AQIS GUIDELINES AND PROCESS HANDBOOK
185
AQIS GUIDELINES AND PROCESS HANDBOOK
186
AQIS GUIDELINES AND PROCESS HANDBOOK