Plant Maintenance
User Manual
PLANT MAINTENANCE
SUBMITTED TO
LAFARGE INDIA LTD
Wipro Ltd.
Page 1 of 188
USER MANUAL
Plant Maintenance
TABLE OF CONTENTS
1.
2
3
4
5
Wipro Ltd.
Page 2 of 188
USER MANUAL
Plant Maintenance
6.1.4
6.1.5
6.1.6
6.1.7
1.
2 sap login
Logging On to / Off the Portal
The SAP Logon is a Windows program, which you use to log on to SAP
systems on your Windows PC. It mediates between the SAP system and the
SAP GUI user interface. The SAP Logon displays a list of available SAP
systems.
Wipro Ltd.
Page 3 of 188
USER MANUAL
Plant Maintenance
Double-click the SAP Logon icon on your desktop, SAP Logon Pad will appear
as screen given below:-
After entering Client, User ID, Password select Enter. If the password entered wrongly
for three times, client will be locked. Contact your system administrator for
unlocking.
At a time maximum 6 sessions can be opened, but it is advisable to keep minimum
session open as it affects system performance
Wipro Ltd.
Page 4 of 188
USER MANUAL
Plant Maintenance
Page 5 of 188
USER MANUAL
Plant Maintenance
Via Menus
On screen Create Functional Location: General Data, enter information in the fields as specified in
the table below:
Wipro Ltd.
Page 6 of 188
USER MANUAL
Plant Maintenance
On screen Create Functional Location: Location, enter information in the fields as specified in
the table below:
Wipro Ltd.
Page 7 of 188
USER MANUAL
Plant Maintenance
On screen Create Functional Location: Organization, enter information in the fields as specified
in the table below:
Wipro Ltd.
Page 8 of 188
USER MANUAL
Plant Maintenance
On screen Create Functional Location: Structure, enter information in the fields as specified in
the table below:
Wipro Ltd.
Page 9 of 188
USER MANUAL
Plant Maintenance
Wipro Ltd.
, or Ctrl+S)
Page 10 of 188
USER MANUAL
Plant Maintenance
3.2 Equipment Master
Via Menus
IE01
Wipro Ltd.
Page 11 of 188
USER MANUAL
Plant Maintenance
Wipro Ltd.
Page 12 of 188
USER MANUAL
Plant Maintenance
Wipro Ltd.
Page 13 of 188
USER MANUAL
Plant Maintenance
On screen Create Equipment: Location, enter information in the fields as
specified in the table below:
Wipro Ltd.
Page 14 of 188
USER MANUAL
Plant Maintenance
Page 15 of 188
USER MANUAL
Plant Maintenance
, or Ctrl+S)
3.3 Class
Via Menus
CL02
Wipro Ltd.
Page 16 of 188
USER MANUAL
Plant Maintenance
On screen Class Click on
specified in the table below:
Wipro Ltd.
Page 17 of 188
USER MANUAL
Plant Maintenance
3.4 Characteristics
Via Menus
CT04
Page 18 of 188
USER MANUAL
Plant Maintenance
Click on Yes:
On Create Characteristics: Basic Data Screen:
Wipro Ltd.
Page 19 of 188
USER MANUAL
Plant Maintenance
Enter:
Save the Characteristic. (Click on the save icon, or Ctrl+S)
Step2: Assign Characteristics to Class
Change Class (T.Code: CL02) and click on Char. Tab for assigning characteristics
Wipro Ltd.
Page 20 of 188
USER MANUAL
Plant Maintenance
Step: 3 Assign Class to Specific Equipment and enter the relevant data.
Wipro Ltd.
Page 21 of 188
USER MANUAL
Plant Maintenance
`
Click on Class Overview for assigning the class to Equipment, the screen looks as below.
Wipro Ltd.
Page 22 of 188
USER MANUAL
Plant Maintenance
click on SAVE.
USER MANUAL
Plant Maintenance
On screen Create equipment BOM: Initial Screen, enter information in the fields as
specified in the table below:
Press the enter key or the green check mark to continue to the next screen.
On screen Create equipment BOM: General Item Overview, enter information in the fields on the
tab screens appropriate for the BOM component as specified in the table below:
Wipro Ltd.
Page 24 of 188
USER MANUAL
Plant Maintenance
Save Equipment BOM (Click on the Save Icon or press Ctrl+S).
IK01
Wipro Ltd.
Page 25 of 188
USER MANUAL
Plant Maintenance
Wipro Ltd.
Page 26 of 188
USER MANUAL
Plant Maintenance
IK01
Wipro Ltd.
Page 27 of 188
USER MANUAL
Plant Maintenance
Wipro Ltd.
Page 28 of 188
USER MANUAL
Plant Maintenance
USER MANUAL
Plant Maintenance
On screen Create Measurement Document: initial screen enter information in the
fields as specified in the table below:
Press the enter key or the green check mark to continue to the next screen.
Wipro Ltd.
Page 30 of 188
USER MANUAL
Plant Maintenance
On screen Create Equipment task lists: Initial Screen, enter information in the fields as specified
in the table below:
Wipro Ltd.
Page 31 of 188
USER MANUAL
Plant Maintenance
Press the enter key or the green check mark to continue to the next screen.
Wipro Ltd.
Page 32 of 188
USER MANUAL
Plant Maintenance
On screen Create General Task List: Header General View, enter information in the fields as
specified in the table below:
Wipro Ltd.
Page 33 of 188
USER MANUAL
Plant Maintenance
Press the operation overview button or use the menu path Goto operation overview to continue to
the next screen.
On screen Create Equipment Task List: Operation Overview, enter information in the fields as
specified in the table below:
Wipro Ltd.
Page 34 of 188
USER MANUAL
Plant Maintenance
3.10 Catalogs
Via Menus
Wipro Ltd.
USER MANUAL
Plant Maintenance
On screen Edit catalog: Initial Screen, enter information in the fields as specified in the table
below:
Wipro Ltd.
Page 36 of 188
USER MANUAL
Plant Maintenance
Select a Code Group entry (Select the line) and double click on Codes folder.
Screen Change View Codes: Overview
Wipro Ltd.
Page 37 of 188
USER MANUAL
Plant Maintenance
Page 38 of 188
USER MANUAL
Plant Maintenance
CAUSES (5): Detailed failure reasons / analysis on the equipment
ACTIVITIES-PM (A): List of activities / works performed on the equipment
On screen Create Maintenance Plan: Initial, enter information in the fields as specified in the table
below:
On screen Create Maintenance Plan: enter information in the fields as specified in the table below:
Assigning of task list in Maintenance Plan Strategy
Wipro Ltd.
Page 39 of 188
USER MANUAL
Plant Maintenance
Wipro Ltd.
Page 40 of 188
USER MANUAL
Plant Maintenance
Wipro Ltd.
Page 41 of 188
USER MANUAL
Plant Maintenance
On screen Schedule Maintenance Plan: Initial, enter information in the fields as specified in the table
below:
Wipro Ltd.
Page 42 of 188
USER MANUAL
Plant Maintenance
On screen Schedule Maintenance Plan: Strategy Plan, the information in the fields below will be
displayed once the maintenance plan has been scheduled:
Wipro Ltd.
Page 43 of 188
USER MANUAL
Plant Maintenance
Page 44 of 188
USER MANUAL
Plant Maintenance
Maintenance Plan Additional Data Tab Strip
Displays additional data from the maintenance plan master record. Refer to business process
procedure Display Maintenance Plan for details on this tab.
Schedule the Maintenance Plan
The following buttons are available to start and manipulate the maintenance plan schedule.
Start Button
Starts the maintenance plan at the beginning of the cycles. After selecting this button, the system
will ask for a starting point.
Manual Call Button
Creates an additional call from the maintenance packages, without altering the maintenance plan.
Undo Scheduling Button
Before the maintenance schedule is saved, the schedule can be reset with this button. This is used
for testing the plan to ensure that it is scheduling calls correctly.
Schedule Overview List Button
Displays a complete list of all the calls in the history of this plan and the status of each call.
Release call Button
Releases the call (creates the order, notification). This does NOT release the order that is
generated from the scheduled maintenance plan.
This will not effect the parameters of the plan. This can only be done for the next call in the cycle
that has not yet been generated.
Fix Call Button
Used to modify the planned date of the call (the day in which the work in the call is to be
performed).
This date will not changed based on the effects of the parameters of the plan. This can only be
done for the next call in the cycle that has not yet been generated.
Skip call Button
Used to skip the next call that would have been generated. The plan will not generate a call this
line item if it is skipped.
This will not effect the parameters of the plan. This can only be done for the next call in the cycle
that has not yet been generated.
Update Scheduling Button
Refreshes the screen with the most current scheduling data.
Selection Date Button
Wipro Ltd.
Page 45 of 188
USER MANUAL
Plant Maintenance
Displays the line on the list of calls which is nearest the date entered.
Call Algorithm Button
Displays the variable associated with the calculation of the call dates for the call.
Display Call Object Button
For those plans with calls already generated, this displays the created orders.
Complete Button
Date the order is completed. This date should default in through normal order processing. It
should not need to be entered here.
Save the Maintenance Plan Schedule. (Click the Save icon, or Ctrl + S)
5 Maintenance processing
5.1 Create PM Notification
Via Menus
Via Transaction Code
On screen Create PM Notification: Initial, enter information in the fields as specified in the table
below:
Wipro Ltd.
Page 46 of 188
USER MANUAL
Plant Maintenance
Alternately, click on the green check mark icon or press the notification button.
On screen Create PM Notification: Malfunction report, enter information in the fields as specified
in the table below:
Wipro Ltd.
Page 47 of 188
USER MANUAL
Plant Maintenance
Wipro Ltd.
Page 48 of 188
USER MANUAL
Plant Maintenance
Notification Status showing as OSNO (Outstanding Notification). Save the PM Notification. (Click
the Save icon, or Ctrl + S) PUT IN PROCESS OF NOTIFICATION:
Via Menus
Via Transaction Code
click on
Wipro Ltd.
Page 49 of 188
USER MANUAL
Plant Maintenance
Click on Tasks tab for entering list of checks to be performed
Wipro Ltd.
Page 50 of 188
USER MANUAL
Plant Maintenance
Status: TSRL Task released
Select the Tasks and click on
Wipro Ltd.
Page 51 of 188
USER MANUAL
Plant Maintenance
Wipro Ltd.
Page 52 of 188
USER MANUAL
Plant Maintenance
Items Tab
Overview of all items of the notification. This includes cause codes, damage codes, object codes, free texts
for cause and damage, assembly fields for each item, etc. Any activities performed for each item should
can be entered here.
Tasks Tab
Overview of all the tasks assigned to the notification header.
Activities Tab
Overview of all the activities performed on the notification at the header level. This includes dates and
times of the activities and activity codes and text.
Click on
Wipro Ltd.
Page 53 of 188
USER MANUAL
Plant Maintenance
On screen Create PM Notification: Initial, enter information in the fields as specified in the table
below:
Wipro Ltd.
Page 54 of 188
USER MANUAL
Plant Maintenance
Page 55 of 188
USER MANUAL
Plant Maintenance
Wipro Ltd.
Page 56 of 188
USER MANUAL
Plant Maintenance
Enter the template for Why-Why Analysis in Item tab Causes Sub tab
1.
2.
3.
4.
5.
6.
This template should be filled by the executer after breakdown has been restored to find the root
cause analysis.
icon
Releasing Notification
Via Menus
Via Transaction Code
Wipro Ltd.
USER MANUAL
Plant Maintenance
click on
Wipro Ltd.
Page 58 of 188
USER MANUAL
Plant Maintenance
Default Order Type MM02 will be prompted click enter to create the Breakdown order.
Wipro Ltd.
Page 59 of 188
USER MANUAL
Plant Maintenance
On screen Create Order: Initial Screen, enter information in the fields as specified in the table
below:
Wipro Ltd.
Page 60 of 188
USER MANUAL
Plant Maintenance
Click Components tab or select the particular Operation and click on General (Bottom of the
screen)
On screen Create Maintenance Order: Component Overview, enter information in the fields as
specified in the table below:
Click on
Wipro Ltd.
indicator
Page 61 of 188
USER MANUAL
Plant Maintenance
Reservation
no. for goods
issue
Wipro Ltd.
Page 62 of 188
USER MANUAL
Plant Maintenance
DETERMINE COSTS:
Click on
Wipro Ltd.
Page 63 of 188
USER MANUAL
Plant Maintenance
Click on COSTS tab for viewing the costs
Wipro Ltd.
Page 64 of 188
USER MANUAL
Plant Maintenance
Enter the correct Profit Center, as profit center is a mandatory field for PM Order.
Settlement Rule: For Cement Plants settlement rule need to be created manually, for RMX Plants
settlement rule will be determined by the system (As Cement Plants will not use costcenter field in
their Equipment master)
For creating settlement rule click icon
Wipro Ltd.
Page 65 of 188
USER MANUAL
Plant Maintenance
Create the settlement rule by enter the settlement category as CTR (Cost center) and the relevant
Cost center as the valid settlement receiver.
RELEASING OF ORDER:
Click on
Page 66 of 188
USER MANUAL
Plant Maintenance
External Manpower ACTUAL COST: Whenever Service Entry sheet is accepted, Actual cost will be
updated.
Save the Maintenance Order (Click the Save icon, or Ctrl + S)
On screen Create PM Order Confirmation: Initial Screen, enter information in the fields as
specified in the table below:
Enter the created PM Order Number and click on Enter (Green tick mark) On screen Create PM
Order Confirmation: Operation Overview
Wipro Ltd.
Page 67 of 188
USER MANUAL
Plant Maintenance
Click on
Wipro Ltd.
USER MANUAL
Plant Maintenance
Save PM order Confirmation. (Click on the save icon, or Ctrl+S)
Via Menus
Via Transaction Code
As materials issued by stores Materials actual cost has been updated. Finally click on
Complete (technically) the order.
Wipro Ltd.
for
Page 69 of 188
USER MANUAL
Plant Maintenance
For Breakdown Order Completion which doing TECO System will pop out the above screen. In this
screen Malfunction End date and time need to be filled and Complete Notification check box need to
be un checked (By default this will be checked).
Wipro Ltd.
Page 70 of 188
USER MANUAL
Plant Maintenance
Goto Item tab Causes Sub-tab and file the Why-why Analysis sheet as shown above and then go to
Activities tab and fill the activity template as shown.
After filling up the Why-why analysis sheet, last step would be, Technical completion of Breakdown
Notification.
IW31
On screen Create Order: Initial Screen, enter information in the fields as specified in the table
below:
Wipro Ltd.
Page 71 of 188
USER MANUAL
Plant Maintenance
Wipro Ltd.
Page 72 of 188
USER MANUAL
Plant Maintenance
On screen Create Maintenance Order: Central Header, enter information in the fields as specified
in the table below:
Wipro Ltd.
Page 73 of 188
USER MANUAL
Plant Maintenance
Select the Operation no. and Click on External tab (Bottom of the screen) for entering services.
Enter the Service short text, Quantity, Unit and Gross Price (Gross price is unit price). System
automatically calculates the total price.
DETERMINE COSTS: Click on
for determining / calculating the costs
(Manpower/Materials/Services) Click on COSTS tab for viewing the costs
Wipro Ltd.
Page 74 of 188
USER MANUAL
Plant Maintenance
RELEASING OF ORDER:
Click on
for Releasing the Order.Order status is changed to REL Released.
Services ACTUAL COST: Whenever Service Entry Sheet prepared & accepted against maintenance
order, Actual cost will be updated.
Save the Maintenance Order (Click the Save icon, or Ctrl + S)
CHECKING OF AUTOMATIC CREATION OF SERVICE PURCHASE REQUISITION:
Via Menus
Via Transaction Code
Enter the created Maintenance Order number and click on Operations tab. Select the Operation
and click on Act. Data tab for viewing PURCHASE REQUISITION.
Wipro Ltd.
Page 75 of 188
USER MANUAL
Plant Maintenance
Wipro Ltd.
Page 76 of 188
USER MANUAL
Plant Maintenance
Wipro Ltd.
Page 77 of 188
USER MANUAL
Plant Maintenance
Click on
Wipro Ltd.
Page 78 of 188
USER MANUAL
Plant Maintenance
Save the Maintenance Order
Click on Other Purchase Order for entering the Service Purchase Order No.
Wipro Ltd.
Page 79 of 188
USER MANUAL
Plant Maintenance
Click on
Wipro Ltd.
Page 80 of 188
USER MANUAL
Plant Maintenance
Enter the Short Text and then click on Service Sel. for adopting the values from Purchase Order.
Wipro Ltd.
Page 81 of 188
USER MANUAL
Plant Maintenance
Click on Enter
Wipro Ltd.
Page 82 of 188
USER MANUAL
Plant Maintenance
Service text, Quantity and Amount was copied from Purchase Order. Click on
service entry sheet.
Save the Service Entry Sheet. (Click the Save icon, or Ctrl + S)
Wipro Ltd.
Page 83 of 188
USER MANUAL
Plant Maintenance
Wipro Ltd.
Page 84 of 188
USER MANUAL
Plant Maintenance
Page 85 of 188
USER MANUAL
Plant Maintenance
Press Enter
Wipro Ltd.
Page 86 of 188
USER MANUAL
Plant Maintenance
Wipro Ltd.
Page 87 of 188
USER MANUAL
Plant Maintenance
Press Enter
Wipro Ltd.
Page 88 of 188
USER MANUAL
Plant Maintenance
Press Enter
Wipro Ltd.
Page 89 of 188
USER MANUAL
Plant Maintenance
Wipro Ltd.
Page 90 of 188
USER MANUAL
Plant Maintenance
Wipro Ltd.
Page 91 of 188
USER MANUAL
Plant Maintenance
Click on Catalog
Wipro Ltd.
Page 92 of 188
USER MANUAL
Plant Maintenance
Wipro Ltd.
Page 93 of 188
USER MANUAL
Plant Maintenance
Press Enter
Wipro Ltd.
Page 94 of 188
USER MANUAL
Plant Maintenance
Click on Save
Wipro Ltd.
Page 95 of 188
USER MANUAL
Plant Maintenance
Wipro Ltd.
Page 96 of 188
USER MANUAL
Plant Maintenance
Wipro Ltd.
Page 97 of 188
USER MANUAL
Plant Maintenance
Wipro Ltd.
Page 98 of 188
USER MANUAL
Plant Maintenance
Wipro Ltd.
Page 99 of 188
USER MANUAL
Plant Maintenance
Wipro Ltd.
USER MANUAL
Plant Maintenance
Wipro Ltd.
USER MANUAL
Plant Maintenance
Click on Header
Wipro Ltd.
USER MANUAL
Plant Maintenance
Wipro Ltd.
USER MANUAL
Plant Maintenance
Wipro Ltd.
USER MANUAL
Plant Maintenance
Wipro Ltd.
USER MANUAL
Plant Maintenance
Press Enter
Wipro Ltd.
USER MANUAL
Plant Maintenance
Press Enter
Wipro Ltd.
USER MANUAL
Plant Maintenance
Wipro Ltd.
USER MANUAL
Plant Maintenance
Wipro Ltd.
USER MANUAL
Plant Maintenance
Wipro Ltd.
USER MANUAL
Plant Maintenance
Press Enter
Select All
Wipro Ltd.
USER MANUAL
Plant Maintenance
Press Selected
Wipro Ltd.
USER MANUAL
Plant Maintenance
Press Operations
Wipro Ltd.
USER MANUAL
Plant Maintenance
Release and Save Maintenance Order.Go to IW32 and Give Order No.
Go to Change Order and view the Purchase Requisition No. and Inspection Lot
generated
Press Enter
Wipro Ltd.
USER MANUAL
Plant Maintenance
Wipro Ltd.
USER MANUAL
Plant Maintenance
Save
Wipro Ltd.
USER MANUAL
Plant Maintenance
Save
Release Service PO ME29N and Save
USER MANUAL
Plant Maintenance
Click on Create , enter the short Text and Click on Service Selection
Wipro Ltd.
USER MANUAL
Plant Maintenance
Press Enter
Click on Services
Wipro Ltd.
USER MANUAL
Plant Maintenance
Wipro Ltd.
USER MANUAL
Plant Maintenance
Go to IW32 and Press costs tab to view the actual costs incurred against Order
Wipro Ltd.
USER MANUAL
Plant Maintenance
Wipro Ltd.
USER MANUAL
Plant Maintenance
Execute
Wipro Ltd.
USER MANUAL
Plant Maintenance
Press Enter
Wipro Ltd.
USER MANUAL
Plant Maintenance
For Quality Inspection : Select Result as shown above and Press Choose
Wipro Ltd.
USER MANUAL
Plant Maintenance
Press Enter
Press Enter
Wipro Ltd.
USER MANUAL
Plant Maintenance
Select Close
Wipro Ltd.
USER MANUAL
Plant Maintenance
Save
Press Enter
Wipro Ltd.
USER MANUAL
Plant Maintenance
Wipro Ltd.
USER MANUAL
Plant Maintenance
Wipro Ltd.
USER MANUAL
Plant Maintenance
Save
Wipro Ltd.
USER MANUAL
Plant Maintenance
Press Enter
Wipro Ltd.
USER MANUAL
Plant Maintenance
Save
Wipro Ltd.
USER MANUAL
Plant Maintenance
Technical Completion IW32
Wipro Ltd.
USER MANUAL
Plant Maintenance
Press Enter
IK01
Wipro Ltd.
USER MANUAL
Plant Maintenance
Wipro Ltd.
USER MANUAL
Plant Maintenance
Now create a measuring document with regard to the measuring point created.
Via Menus
USER MANUAL
Plant Maintenance
Wipro Ltd.
USER MANUAL
Plant Maintenance
Enter measurement reading (if the measurement reading is outside range, system will
trigger a Notification)
Wipro Ltd.
USER MANUAL
Plant Maintenance
System creates N4 type Notification with Status OSNO, with equipment no as that of
the measuring point and with a Notification text Measurement Reading Out of
Range
Wipro Ltd.
USER MANUAL
Plant Maintenance
5.8 Modification Process
Creating Notification for Modification
Wipro Ltd.
USER MANUAL
Plant Maintenance
Wipro Ltd.
USER MANUAL
Plant Maintenance
After Saving, Notification goes for approval to concerned person. Once the Notification is approved
and released by clicking
button. Notification attains the status NOPR, which means now the
Notification for Modification can be processed for Modification Order.
Wipro Ltd.
USER MANUAL
Plant Maintenance
Enter the planning data for Modification order like Schedule, Settlement receiver,Operations,
Components, workcenter etc and then release the Order by clicking
Wipro Ltd.
button.
USER MANUAL
Plant Maintenance
Wipro Ltd.
USER MANUAL
Plant Maintenance
After release Order attains the status REL NMAT PRC SETC.
As a result of releasing the order Planned cost will get updated with the material cost and a
reservation for the material will be created.
Wipro Ltd.
USER MANUAL
Plant Maintenance
Wipro Ltd.
USER MANUAL
Plant Maintenance
Goods issue for reserved material will be done against the reservation number.
Wipro Ltd.
USER MANUAL
Plant Maintenance
After goods issue the cost will be updated as Actual cost in the cost tab of the Order.
Wipro Ltd.
USER MANUAL
Plant Maintenance
Wipro Ltd.
for entering actual data for confirmation against each line item.
USER MANUAL
Plant Maintenance
Enter the required data for confirmation as shown above and click on
Wipro Ltd.
to save
USER MANUAL
Plant Maintenance
Technical Completion of Modification Order
After operation confirmation status of Order changes to REL CNF GMPS MANC PRC SETC
Click on
Wipro Ltd.
USER MANUAL
Plant Maintenance
Above message will pop out as the TECO button is clicked asking whether Process for
change management and updation of drawing done or not. All update need to be done
outside SAP system, once done click Yes else No.
Yes will complete the order technically and
No will keep the order in same status, i.e no TECO done and pop out another meassage
asking to update the Process of change Management & drawings.
Wipro Ltd.
USER MANUAL
Plant Maintenance
5.9 Shutdown Process
Create Revision for Shutdown
Transaction Code: OIOB and then click on
Wipro Ltd.
USER MANUAL
Plant Maintenance
Now create Shutdown Order using T-Code IW31
Wipro Ltd.
USER MANUAL
Plant Maintenance
Enter the required data and press enter to create shutdown order.
Wipro Ltd.
USER MANUAL
Plant Maintenance
Now the required planning for Shutdown order like Operation and Components need to be entered
and order need to be processed just like any other order.
Enter the required fields like Industry sector and Industry type in the initial screen of MM01
Wipro Ltd.
USER MANUAL
Plant Maintenance
For refurbishable Materials enter Valuation Type as Z and Appropriate Valuation Class in the
Accounting 1view of Material Master.
After entering the required fields, save the material.
Wipro Ltd.
USER MANUAL
Plant Maintenance
Now we need to extend this Material to different valuation type i.e. New, Repaired & Damaged.
Press Enter and select only Accounting view for extending the material.
Wipro Ltd.
USER MANUAL
Plant Maintenance
System will pop-out the above screen where we need to select for which Valuation type we need to
extend the material.
Enter the Plant & Valuation type and press enter, system will redirect to the following screen.
Wipro Ltd.
USER MANUAL
Plant Maintenance
Enter the Valuation Class (Should be same as that of the Parent material already created) and the
Price Unit for a Particular valuation Type of the material.
After entering the values in the required fields save the material.
As seen in the above message same Material no. has been created again, but for different valuation
type.
Wipro Ltd.
USER MANUAL
Plant Maintenance
Likewise the Same Material no. need to be extended for other two valuation types i.e. Repaired &
Damaged.
After extending the same material no. to all three different Valuation types with different values,
Material will have a following view in Report MM60.
Wipro Ltd.
USER MANUAL
Plant Maintenance
Wipro Ltd.
USER MANUAL
Plant Maintenance
Wipro Ltd.
USER MANUAL
Plant Maintenance
Enter the required data like Cost Center, Main Work Center Planner Grp in organization tab
Wipro Ltd.
USER MANUAL
Plant Maintenance
In the ConstType field enter the Material no that is created against this Equipment.
Wipro Ltd.
USER MANUAL
Plant Maintenance
Now we need to receive stock for the Material already created by PR-PO process.
Once the stock is received MMBE report will show the stock level against the valuation type for
which the Goods receipt has been done.
Wipro Ltd.
USER MANUAL
Plant Maintenance
After receiving stock, next step is to issue the goods against the costcenter of the Equipment via Tcode MIGO
Enter the Costcenter of the Equipment against which the Goods issue will be done.
Wipro Ltd.
USER MANUAL
Plant Maintenance
Issue the goods by clicking on
As an effect of Goods Issue MMBE stock for Material 5000000136 reduces to zero.
Now we will perform the activity of returning the the material back to store from shop floor in a
damaged condition.
Wipro Ltd.
USER MANUAL
Plant Maintenance
Wipro Ltd.
USER MANUAL
Plant Maintenance
Change the Radio Button from 0001 to 0002 i.e. from Equipment Running to Equipment out for
Repair and save.
Now we need to send the Damaged Material back to store with valuation type as Damaged from
where the Material will be sent for External Refurbishment via Subcontracting process in MM
module.
Material is sent back to store, reversing the Material document against which the Material is issued
to Costcenter.
Wipro Ltd.
USER MANUAL
Plant Maintenance
Material documents can be viewed via T-Code MB51
Always we need to consider the latest document against Movement Type 201
In this case it is the document no 4900000527
Now we will reverse document 4900000527 via T-code MIGO
Wipro Ltd.
USER MANUAL
Plant Maintenance
While reversing document 4900000527 we need to change the valuation type to DAMAGE and
post.
Effect of reversing the Material document can be seen in MMBE transaction in the below screen
shot.
Now the Damage Material received in store will be refurbished externally via Sub-contracting
process in MM module.
Wipro Ltd.
USER MANUAL
Plant Maintenance
6 Reports
6.1 Plant Maintenance Information System (PMIS)
6.1.1 MTTR / MTBR Report
Via Menus
Wipro Ltd.
USER MANUAL
Plant Maintenance
For viewing of Notification Number against equipment: Select the Period and click on Choose tab
Wipro Ltd.
USER MANUAL
Plant Maintenance
Wipro Ltd.
USER MANUAL
Plant Maintenance
Via Transaction Code
MCI2
Give the Period (From Month - To Month) to analyze and click on Execute button
Wipro Ltd.
USER MANUAL
Plant Maintenance
Wipro Ltd.
USER MANUAL
Plant Maintenance
Give the Maintenance Plant, Location (From To), Period (From Month - To Month) to analyze,
etc., and click on Execute button
Wipro Ltd.
USER MANUAL
Plant Maintenance
Wipro Ltd.
USER MANUAL
Plant Maintenance
Give the Planning Plant, Planner Group (From To), Period (From Month - To Month) to analyze,
etc., and click on Execute button
Wipro Ltd.
USER MANUAL
Plant Maintenance
Wipro Ltd.
USER MANUAL
Plant Maintenance
Give the Equipment (From To), Period (From Month - To Month) to analyze, etc., and click on
Execute button
Wipro Ltd.
USER MANUAL
Plant Maintenance
Wipro Ltd.
USER MANUAL
Plant Maintenance
Give the Order type, Equipment (From To), Period (From Month - To Month) to analyze, etc., and
click on Execute button
Wipro Ltd.
USER MANUAL
Plant Maintenance
USER MANUAL
Plant Maintenance
Wipro Ltd.
USER MANUAL
Plant Maintenance
Wipro Ltd.