PRELIMINARYMASTER PROGRAMME Rev.

C
Activity ID

Page 1 of 7

Activity Name

TRACKWORK & OVERHEAD LINE SYSTEM INSTALLLATION


ACCESS & COMPLETION
COM
DATES
UP TRACK (TOTAL
(TOT
LENGTH - 1950m)
YAU MA TEI STATION
STAT
(YMT) - WYLIE ROAD ANCILLARY BUDILING (WAB) (CH 10000 - 9370) Approx.630m

28-Jul-14 & 16:07


Finish

340

15-Apr-14

13-Jun-15

411

15-Apr-14

30-May-15

30-May-15

399

15-Apr-14

18-May-15

18-May-15, U

325

15-Apr-14

05-Mar-15

Access Date for Material Delivery (Rails, Preassembled Sleepers,Fasteners etc)

15-Apr-14*

1020.KD.UP.71

Access Date for Track Installation + OHL 1st Fix (CH 10000 - 9370)

30-Jul-14*

1020.KD.UP.121

Completion Date - Degree 1 (Trackwork + OHL 1st Fix )

1020.KD.UP.201

Access for OHL 2nd Fix Works using WORKS TRAIN

1020.KD.UP.241

Completion Date - Degree 2 (OHL 2nd Fix)

0
245

HO MAN TIN CROSSOVER


CRO
(HOM XVR) (CH 8500 - 8300) Approx.200m

2015
April May June July
0
0 2 1 0

Start

1020.KD.UP.1

Approx.630m

2014
ril May June July
2 1
0 2 2

O.D

A
1

O
1

J
1

M
2 1

13-Jun-

05-Mar-15, YAU MA TEI STAT


Access Date for Material Delivery (Rails, Preassembled Sleepers,Fasteners etc)
Access Date for Track Installation + OHL 1st Fix (CH 10000 - 9370)

Approx.6

Completion Date - Degree 1 (Trackwork + OHL 1st Fix )

29-Oct-14

Access for OHL 2nd Fix Works using WOR

01-Jan-15*

Completion Date - Degree 2 (

05-Mar-15
15-Apr-14

15-Dec-14, HO MAN TIN CROSSOVER (HOM

15-Dec-14

1020.KD.UP.11

Completion Date - Degree 2 (OHL 2nd Fix)

15-Apr-14

Completion Date - Degree 2 (OHL 2nd Fix)

1020.KD.UP.21

Completion Date - Degree 1 (Trackwork + OHL 1st Fix )

15-Apr-14

Completion Date - Degree 1 (Trackwork + OHL 1st Fix )

1020.KD.UP.51

1st Access Date for OHL 1st Fix (Preliminary Works) in HOM XVR for C1064 pipe installation

1020.KD.UP.61

Completion Date for OHL 1st Fix (Preliminary Works) in HOM XVR for C1064 pipe installation for 1st Access 0

1020.KD.UP.81

Access Date for Turnout and Rail Delivery (Short Rails - 18m) via HOM Zone B

30-Jul-14*

1020.KD.UP.91

2nd Access Date for OHL 1st Fix (Preliminary Works) in HOM XVR for C1064 pipe installation

15-Aug-14*

1020.KD.UP.101

Completion Date for OHL 1st Fix (Preliminary Works) in HOM XVR for C1064 pipe installation for 2nd Access 0

1020.KD.UP.111

Access Date for Track Installation + OHL 1st Fix (CH 8500 - 8300) Approx. 200m

31-Aug-14*

1020.KD.UP.151

Access Date for Turnout and Rail Delivery (Long Rails - 72m) via HOM Zone B

15-Dec-14*

Access Date for Turnout and Rail Delivery (Long

1020.KD.UP.221

Access for OHL 2nd Fix Works using UNIMOG + WORKS TRAIN

15-Dec-14*

Access for OHL 2nd Fix Works using UNIMOG

42

30-Nov-14

HO MAN TIN CROSSOVER


CRO
(HOM XVR) - END OF UP TRACK (CH 8300 - 8050) Approx.250m

1st Access Date for OHL 1st Fix (Preliminary Works) in HOM XVR for C1064 pipe install

15-Jun-14*
20-Jun-14

Completion Date for OHL 1st Fix (Preliminary Works) in HOM XVR for C1064 pipe inst
Access Date for Turnout and Rail Delivery (Short Rails - 18m) via HOM Zone B
2nd Access Date for OHL 1st Fix (Preliminary Works) in HOM XVR for C10

26-Aug-14

Completion Date for OHL 1st Fix (Preliminary Works) in HOM XVR for C
Access Date for Track Installation + OHL 1st Fix (CH 8500 - 8300) App

10-Jan-15, HO MAN TIN CROSSOVER

10-Jan-15

Access Date for Track Installation + OHL1st Fix (C

1020.KD.UP.131

Access Date for Track Installation + OHL1st Fix (CH 8300 - 8050) Approx.250m

30-Nov-14*

1020.KD.UP.141

Access for OHL 2nd Fix Works using UNIMOG + WORKS TRAIN

15-Dec-14*

1020.KD.UP.161

Completion Date - Degree 1 (Trackwork + OHL 1st Fix ) (CH 8050 - 8530) Approx. 480m

16-Dec-14

Completion Date - Degree 1 (Trackwork + OHL

1020.KD.UP.231

Completion Date - Degree 2 (OHL 2nd Fix)

10-Jan-15*

Completion Date - Degree 2 (OHL 2nd Fix

WYLIE ROAD ANCILLARY


ANC
BUDILING (WAB) - HO MAN TIN (HOM) TUNNELS (CH 9370 - 8700) Approx.670m

351

15-Apr-14

Access for OHL 2nd Fix Works using UNIMOG

31-Mar-15, WYLIE ROA

31-Mar-15
Access for OHL 2nd Fix Works using WORKS TRAIN

1020.KD.UP.31

Access for OHL 2nd Fix Works using WORKS TRAIN

15-Apr-14

1020.KD.UP.171

Access Date for Track Installation + OHL1st Fix (CH 9370 - 8700) Approx.670m

15-Jan-15*

1020.KD.UP.261

Completion Date - Degree 1 (Trackwork + OHL 1st Fix ) (CH 9370 - 8700 ) Approx.670m

27-Mar-15

Completion Date - Degre

1020.KD.UP.41

Completion Date - Degree 2 (OHL 2nd Fix) CH 9370 - 8700) Approx . 670m

31-Mar-15

Completion Date - Degr

18-May-15

18-May-15, H

HO MAN TIN STATION


STAT
(HOM) (CH 8700 - 8500) Approx . 200m

65

15-Mar-15

Access Date for Track Installation + OHL

1020.KD.UP.181

Access Date for Track Installation + OHL 1st Fix (CH 8700 - 8500) Approx.200m

15-Mar-15*

Access Date for Track Insta

1020.KD.UP.211

Access for OHL 2nd Fix Works using WORKS TRAIN

01-Apr-15*

Access for OHL 2nd Fix

1020.KD.UP.191

Completion Date - Degree 1 (Trackwork + OHL 1st Fix ) (CH 8700 - 8500) Approx.200m

15-Apr-15

1020.KD.UP.251

Completion Date - Degree 2 (OHL 2nd Fix)

18-May-15

Completion D

DOWN TRACK (TOTAL LENGTH - 2600m)


YAU MA TEI STATION
STAT
(YMT) - WYLIE ROAD ANCILLARY BUDILING (WAB) (CH 10000 - 9370) Approx.630m

411

15-Apr-14

30-May-15

30-May-15

311

30-Jun-14

06-May-15

06-May-15, YAU

30-Jun-14*

1020.KD.DN.61

Access Date for Track Installation + OHL 1st Fix (CH 10000 - 9370) Approx. 630m

1020.KD.DN.101

Completion Date - Degree 1 (Trackwork + OHL 1st Fix )

Remaining Level of Effort


Actual Work
Remaining Work
Critical Remaining Work
Milestone

Summary

Completion Date - D

Access Date for Track Installation + OHL 1st Fix (CH 10000 - 9370) Approx. 630m

MTRC - KWUN TONG LINE EXTENSION


CONTRACT 1020 - TRACKWORK & OVERHEAD LINE SYSTEM
PreliminaryMaster Programme

Completion Date - Degree 1 (Trackwork + OHL 1st Fix )

06-Oct-14

DATA DATE: 15-Apr-14


Primavera Systems, Inc.

Date
28-May-12
15-Jun-12
26-Jun-12
04-Aug-14

Revision
Rev.0
Rev.A
Rev.B
Rev.C

Checked
TM
TM
TM
TM

Approved
PHH
PHH
PHH
PHH

PRELIMINARYMASTER PROGRAMME Rev.C


Activity ID

1020.KD.DN.31

Page 2 of 7

Activity Name

O.D

Completion Date - Degree 2 (OHL 2nd Fix)

28-Jul-14 & 16:07


Start

0
246

HO MAN TIN CROSSOVER


CRO
(HOM XVR) (CH 8500 - 8300) Approx.200m
1020.KD.DN.21

Completion Date - Degree 2 (OHL 2nd Fix)

1020.KD.DN.71

Access Date for Turnout and Rail Delivery via HOM

1020.KD.DN.81

Completion Date - Tunout and Rail Delivery via HOM

1020.KD.DN.91

Access Date for Turnout & Track Installation + OHL 1st Fix (CH 8500 - 8300) Approx. 200m

1020.KD.DN.121

Completion Date - Degree 1 (Trackwork + OHL 1st Fix )

HO MAN TIN CROSSOVER


CRO
(HOM XVR) - CONTRACT LIMIT 1001/1002 (CH 8300 - 7890) Approx.410m

Finish
06-May-15

15-Apr-14

2014
ril May June July
2 1
0 2 2

A
1

O
1

2015
April May June July
0
0 2 1 0

M
2 1

Completion Dat

Access Date for Turnout and Rail Delivery via HOM


Completion Date - Tunout and Rail Delivery via HOM

14-Aug-14*

Access Date for Turnout & Track Installation + OHL 1st Fix (CH 8500 -

31-Aug-14*

Completion Date - Degree 1 (Trackwork + OHL

16-Dec-14
15-Nov-14

Completion Date - Degree 2 (OHL 2nd Fix)

01-Aug-14*

81

J
1

16-Dec-14, HO MAN TIN CROSSOVER (HOM

16-Dec-14
15-Apr-14

03-Feb-15, HO MAN TIN CROSSOV

03-Feb-15

Access Date for Track Installation + OHL1st Fix (CH 8

1020.KD.DN.111

Access Date for Track Installation + OHL1st Fix (CH 8300 - 7890) Approx.410m

15-Nov-14*

1020.KD.DN.141

Access for OHL 2nd Fix using UNIMOG

15-Dec-14*

1020.KD.DN.151

Completion Date - Degree 1 (Trackwork + OHL 1st Fix )

16-Dec-14

Completion Date - Degree 1 (Trackwork + OHL

1020.KD.DN.211

Completion Date - Degree 2 (OHL 2nd Fix)

03-Feb-15

Completion Date - Degree 2 (OHL 2

06-May-15

06-May-15, WY

WYLIE ROAD ANCILLARY


ANC
BUDILING (WAB) - HO MAN TIN (HOM) TUNNELS (CH 9370 - 8700) Approx.670m

158

30-Nov-14

Access for OHL 2nd Fix using UNIMOG

1020.KD.DN.131

Access Date Track Installation + OHL1st Fix (CH 9370 - 8900) Approx. 470m

30-Nov-14*

Access Date Track Installation + OHL1st Fix (CH 9

1020.KD.DN.161

Access Date Track Installation + OHL1st Fix (CH 8900 - 8700) Approx. 200m

15-Jan-15*

Access Date Track Installation + OHL1st

1020.KD.DN.221

Completion Date - Degree 1 (Trackwork + OHL 1st Fix ) (CH 9370 - 8700 ) Approx . 670m

26-Feb-15

Completion Date - Degree 1 (Tr

1020.KD.DN.41

Completion Date - Degree 2 (OHL 2nd Fix)

06-May-15

Completion Dat

HO MAN TIN STATION


STAT
(HOM) (CH 8700 - 8500) Approx . 200m

46

15-Mar-15
15-Mar-15*

1020.KD.DN.181

Access Date for Track Installation + OHL 1st Fix (CH 8700 - 8500) Approx.200m

1020.KD.DN.1

Completion Date - Degree 1 (Trackwork + OHL 1st Fix ) (CH 8700 - 8500) Approx.200m

WHAMPOA STATION
STATIO (WHA) (CH 7890 - 7400) Approx.490m

29-Apr-15, HO M

29-Apr-15

Access Date for Track Insta


Completion Date

29-Apr-15

126

25-Jan-15

30-May-15

30-May-15

Access Date for Track Installation + OH

1020.KD.DN.171

Access Date for Track Installation + OHL1st Fix (CH 7400 - 7555) Approx.155m

25-Jan-15*

1020.KD.DN.11

Access Date for Track Installation + OHL1st Fix (CH 7835 - 7890) Approx.55m

15-Mar-15*

Access Date for Track Insta

1020.KD.DN.191

Access Date for Track Installation + OHL1st Fix (CH 7555 - 7690) Approx.135m

22-Mar-15*

Access Date for Track Ins

1020.KD.DN.201

Access Date for Track Installation + OHL1st Fix (CH 7690 - 7835) Approx.145m

15-Apr-15*

Access Date for Trac

1020.KD.DN.231

Completion Date - Degree 1 (Trackwork + OHL 1st Fix )

20-May-15

Completion D

1020.KD.DN.51

Completion Date - Degree 2 (OHL 2nd Fix)

30-May-15

Completion

STAGING & ACCESS


AC
AREA
SIU HO WAN DEPOT
DEPO (STAGING AREA)

402

15-Apr-14

22-May-15

22-May-15, S

258

15-Apr-14

29-Dec-14

29-Dec-14, SIU HO WAN DEPOT (STAGING

15-Apr-14

1020.SA.1

Possession Date

1020.SA.41

Vacation Date

GASCOIGNE ROAD
ROA TRACTION SUBSTATION (GAR) (STAGING & ACCESS AREA)

15-Apr-14
15-Apr-14

Posssesion Date

1020.SA.61

Vacation Date

FAT KWONG STREET


STRE
(STAGING & ACCESS AREA)

31-Aug-14
31-Aug-14*

Posssesion Date

1020.SA.31

Vacation Date

FIREMAN ACCESS FOR REFUGE SIDING AT WHA (ACCESS AREA)


1020.SA.51

Posssesion Date
Remaining Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone

Summary

22-May-15, G

22-May-15
Posssesion Date

Vacation Da

22-May-15*

108

1020.SA.21

Vacation Date

29-Dec-14*

402

1020.SA.11

Possession Date

16-Dec-14, FAT KWONG STREET (STAGING

16-Dec-14
Posssesion Date

Vacation Date

16-Dec-14

110

25-Jan-15

25-Jan-15*

MTRC - KWUN TONG LINE EXTENSION


CONTRACT 1020 - TRACKWORK & OVERHEAD LINE SYSTEM
PreliminaryMaster Programme

14-May-15, FI

14-May-15
Posssesion Date

DATA DATE: 15-Apr-14


Primavera Systems, Inc.

Date
28-May-12
15-Jun-12
26-Jun-12
04-Aug-14

Revision
Rev.0
Rev.A
Rev.B
Rev.C

Checked
TM
TM
TM
TM

Approved
PHH
PHH
PHH
PHH

PRELIMINARYMASTER PROGRAMME Rev.C


Activity ID

1020.SA.71

Page 3 of 7

Activity Name

O.D

Vacation Date

28-Jul-14 & 16:07


Start

TRACKWORK & TURNOUT INSTALLATIONS


UP TRACK (CH 10000 - 8050) TOTAL LENGTH - 1950m
RESOURCES

Finish
14-May-15

A
1

O
1

J
1

M
2 1

2015
April May June July
0
0 2 1 0

Vacation Date
20-May-15, T

320

15-Apr-14

20-May-15

282

15-Apr-14

31-Mar-15

31-Mar-15, UP TRACK

198

30-Jul-14

31-Mar-15

31-Mar-15, RESOURCE

1020.TW.UP.21

YMT - WAB

76

30-Jul-14

29-Oct-14

1020.TW.UP.101

HOM XVR - END OF TRACK

14

01-Dec-14

16-Dec-14

1020.TW.UP.141

WAB - HOM Tunnels

44

15-Jan-15

13-Mar-15

1020.TW.UP.221

HOM

14

16-Mar-15

31-Mar-15

160

15-Apr-14

29-Oct-14

YMT - WAB (CH 10000 - 9370) Approx.630m T1

2014
ril May June July
2 1
0 2 2

YMT - WAB
HOM XVR - END OF TRACK
WAB - HOM Tunnels
HOM
29-Oct-14, YMT - WAB (CH 10000 - 9370) Approx.630
Rail Delivery and Stoarge thru Kowloon Bay Depot

1020.TW.UP.1

Rail Delivery and Stoarge thru Kowloon Bay Depot

100

15-Apr-14

16-Aug-14

1020.TW.UP.11

Site Set-Up,Survey,Material Delivery (CH 10000 - CH9370) Approx.630m

40

30-Jul-14

15-Sep-14

1020.TW.UP.31

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc Works) (CH 10000 - 9895) Approx.105m

16-Sep-14

22-Sep-14

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc Works

1020.TW.UP.41

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc Works) (CH 9895 - 9790) Approx.105m

23-Sep-14

29-Sep-14

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc Wor

1020.TW.UP.51

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc Works) (CH 9790 - 9685) Approx.105m

30-Sep-14

08-Oct-14

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc W

1020.TW.UP.61

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc Works) (CH 9685 - 9580) Approx.105m

09-Oct-14

15-Oct-14

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc W

1020.TW.UP.71

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc Works) (CH 9580 - 9475) Approx.105m

16-Oct-14

22-Oct-14

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc

1020.TW.UP.81

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc Works) (CH 9475 - 9370) Approx.105m

23-Oct-14

29-Oct-14

Track Installation (Fmk Fix, Adjust, Level, Concreting & Mi

14

01-Dec-14

16-Dec-14

HOM XVR - END OF


O UP TRACK (CH 8500 - 8050) Approx.250m T1

Site Set-Up,Survey,Material Delivery (CH 10000 - CH9370) Approx

16-Dec-14, HOM XVR - END OF UP TRACK (C

1020.TW.UP.91

Site Set-Up,Survey,Material Delivery (CH 8300 - 8050) Approx.250m

01-Dec-14

02-Dec-14

Site Set-Up,Survey,Material Delivery (CH 8300 - 8

1020.TW.UP.111

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc Works) (CH 8050 - CH 8175) Approx.125m

03-Dec-14

09-Dec-14

Track Installation (Fmk Fix, Adjust, Level, Concre

1020.TW.UP.121

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc Works) (CH 8175 - CH 8300) Approx.125m

10-Dec-14

16-Dec-14

Track Installation (Fmk Fix, Adjust, Level, Conc

44

15-Jan-15

13-Mar-15

WAB - HOM TUNNELS


TUNN
(CH 9370 - 8700) Approx.670m T1

13-Mar-15, WAB - HOM TU

1020.TW.UP.131

Site Set-Up,Survey,Material Delivery Track (CH 9370 - 8700) Approx.670m

15-Jan-15

23-Jan-15

Site Set-Up,Survey,Material Delivery T

1020.TW.UP.151

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc Works) (CH 8700 - 8810) Approx.110m

24-Jan-15

30-Jan-15

Track Installation (Fmk Fix, Adjust, Le

1020.TW.UP.161

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc Works) (CH 8810 - 8920) Approx.110m

31-Jan-15

06-Feb-15

Track Installation (Fmk Fix, Adjust, L

1020.TW.UP.171

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc Works) (CH 8920 - 9030) Approx.110m

07-Feb-15

13-Feb-15

Track Installation (Fmk Fix, Adjust

1020.TW.UP.181

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc Works) (CH 9030 - 9140) Approx.110m

14-Feb-15

27-Feb-15

Track Installation (Fmk Fix, Adj

1020.TW.UP.191

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc Works) (CH 9140 - 9250) Approx.110m

28-Feb-15

06-Mar-15

Track Installation (Fmk Fix, Ad

1020.TW.UP.201

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc Works) (CH 9250 - 9370) Approx.120m

07-Mar-15

13-Mar-15

Track Installation (Fmk Fix,

14

16-Mar-15

31-Mar-15

31-Mar-15, HOM (CH 8

HOM (CH 8700 - 8500)


8
Approx.200m T1
1020.TW.UP.211

Site Set-Up,Survey,Material Delivery (CH 8700 - 8500) Approx.100m

16-Mar-15

19-Mar-15

Site Set-Up,Survey,Materia

1020.TW.UP.231

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc Works) (CH 8700 - 8600) Approx.100m

20-Mar-15

25-Mar-15

Track Installation (Fmk Fi

1020.TW.UP.241

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc Works) (CH 8600 - 8500) Approx.100m

26-Mar-15

31-Mar-15

Track Installation (Fmk F

261

30-Jun-14

20-May-15

20-May-15, D

261

30-Jun-14

20-May-15

20-May-15, R

DOWN TRACK (CH 10000 - 7400) TOTAL LENGTH - 2600m


RESOURCES
1020.TW.DN.11

YMT - WAB

61

30-Jun-14

10-Sep-14

1020.TW.DN.101

HOM XVR - WHA

27

15-Nov-14

16-Dec-14

1020.TW.DN.211

WAB - HOM Tunnels

02-Feb-15

02-Feb-15

1020.TW.DN.241

HOM

18

16-Mar-15

09-Apr-15

Remaining Level of Effort


Actual Work
Remaining Work
Critical Remaining Work
Milestone

Summary

MTRC - KWUN TONG LINE EXTENSION


CONTRACT 1020 - TRACKWORK & OVERHEAD LINE SYSTEM
PreliminaryMaster Programme

YMT - WAB
HOM XVR - WHA
WAB - HOM Tunnels
HOM

DATA DATE: 15-Apr-14


Primavera Systems, Inc.

Date
28-May-12
15-Jun-12
26-Jun-12
04-Aug-14

Revision
Rev.0
Rev.A
Rev.B
Rev.C

Checked
TM
TM
TM
TM

Approved
PHH
PHH
PHH
PHH

PRELIMINARYMASTER PROGRAMME Rev.C


Activity ID

1020.TW.DN.291

Page 4 of 7

Activity Name
WHA

YMT - WAB (CH 10000 - 9370) Approx.630m T1

28-Jul-14 & 16:07

O.D

Start

Finish

30

15-Apr-15

20-May-15

71

30-Jun-14

22-Sep-14

2014
ril May June July
2 1
0 2 2

A
1

O
1

J
1

M
2 1

2015
April May June July
0
0 2 1 0
WHA

22-Sep-14, YMT - WAB (CH 10000 - 9370) Approx.630m T1


Site Set-Up,Survey,Material Delivery Track (CH 10000 - 9370) Approx.630m

1020.TW.DN.1

Site Set-Up,Survey,Material Delivery Track (CH 10000 - 9370) Approx.630m

25

30-Jun-14

29-Jul-14

1020.TW.DN.21

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc Works) (CH 10000 - 9895) Approx.105m

30-Jul-14

05-Aug-14

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc Works) (CH 100

1020.TW.DN.31

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc Works) (CH 9895 - 9790) Approx.105m

06-Aug-14

12-Aug-14

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc Works) (CH 98

1020.TW.DN.41

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc Works) (CH 9790 - 9685) Approx.105m

13-Aug-14

19-Aug-14

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc Works) (CH

1020.TW.DN.51

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc Works) (CH 9685 - 9580) Approx.105m

20-Aug-14

26-Aug-14

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc Works) (CH

1020.TW.DN.61

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc Works) (CH 9580 - 9475) Approx.105m

27-Aug-14

02-Sep-14

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc Works) (C

1020.TW.DN.71

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc Works) (CH 9475 - 9370) Approx.105m

03-Sep-14

10-Sep-14

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc Works)

1020.TW.DN.81

Material Delivery and Storage (Sleepers, FST, Baseplates) for WAB - Ho Man Tin Section (Up & Dn Track) ... 10

11-Sep-14

22-Sep-14

Material Delivery and Storage (Sleepers, FST, Baseplates) for WA

27

15-Nov-14

16-Dec-14

16-Dec-14, HOM XVR - WHA (CH 8300 - 7890

HOM XVR - WHA (CH


(
8300 - 7890) Approx.410m T1
1020.TW.DN.91

Site Set-Up,Survey,Material Delivery Track (CH 8300 - 7890) Approx.410m

15-Nov-14

18-Nov-14

Site Set-Up,Survey,Material Delivery Track (CH 8300

1020.TW.DN.111

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc Works) (CH 7890 - 7990) Approx.100m

19-Nov-14

25-Nov-14

Track Installation (Fmk Fix, Adjust, Level, Concreting

1020.TW.DN.121

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc Works) (CH 7990 - 8090) Approx.100m

26-Nov-14

02-Dec-14

Track Installation (Fmk Fix, Adjust, Level, Concreti

1020.TW.DN.131

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc Works) (CH 8090 - 8190) Approx.100m

03-Dec-14

09-Dec-14

Track Installation (Fmk Fix, Adjust, Level, Concre

1020.TW.DN.141

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc Works) (CH 8190 - 8300) Approx.110m

10-Dec-14

16-Dec-14

Track Installation (Fmk Fix, Adjust, Level, Conc

53

17-Dec-14

26-Feb-15

26-Feb-15, WAB - HO MAN T


Site Set-Up,Survey,Material Delivery for Track

WAB - HO MAN TIN


T TUNNELS (CH 9370 - 8700) Approx.670m T2
1020.TW.DN.151

Site Set-Up,Survey,Material Delivery for Track (CH 9370 - 8900) Approx.470m

17-Dec-14

24-Dec-14

1020.TW.DN.161

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc Works) (CH 9370 - 9250 ) Approx.120m

12

27-Dec-14

10-Jan-15

Track Installation (Fmk Fix, Adjust, Level,

1020.TW.DN.171

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc Works) (CH 9250- 9140 ) Approx.110m

12-Jan-15

17-Jan-15

Track Installation (Fmk Fix, Adjust, Leve

1020.TW.DN.181

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc Works) (CH 9140 - 9030 ) Approx.110m

19-Jan-15

24-Jan-15

Track Installation (Fmk Fix, Adjust, Lev

1020.TW.DN.191

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc Works) (CH 9030 - 8920 ) Approx.110m

26-Jan-15

31-Jan-15

Track Installation (Fmk Fix, Adjust, Le

1020.TW.DN.201

Site Set-Up,Survey,Material Delivery for Track (CH 8900 - 8700 ) Approx.200m

02-Feb-15

05-Feb-15

Site Set-Up,Survey,Material Delivery

1020.TW.DN.221

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc Works) (CH 8920 - 8810 ) Approx.110m

06-Feb-15

12-Feb-15

Track Installation (Fmk Fix, Adjust,

1020.TW.DN.231

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc Works) (CH 8810 - 8700 ) Approx.110m

13-Feb-15

26-Feb-15

Track Installation (Fmk Fix, Adj

18

16-Mar-15

09-Apr-15

09-Apr-15, HOM (CH

HOM (CH 8700 - 8500)


85
Approx.200m T2
1020.TW.DN.251

Site Set-Up,Survey,Material Delivery (CH 8700 - CH8500) Approx.200m

16-Mar-15

21-Mar-15

Site Set-Up,Survey,Materi

1020.TW.DN.261

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc Works) (CH 8500 - 8600) Approx.100m

23-Mar-15

28-Mar-15

Track Installation (Fmk F

1020.TW.DN.271

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc Works) (CH 8600 - 8700) Approx.100m

30-Mar-15

09-Apr-15

Track Installation (Fm

30

15-Apr-15

20-May-15

WHA (CH 7890 - 7400)


7
Approx.490m T2

20-May-15, W

1020.TW.DN.281

Site Set-Up,Survey,Material Delivery for UP & DN Track (CH 7890 - CH 7400 ) Approx. 490m

15-Apr-15

21-Apr-15

Site Set-Up,Survey

1020.TW.DN.301

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc Works) (CH 7890 - 7775) Approx.115m

22-Apr-15

28-Apr-15

Track Installation

1020.TW.DN.311

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc Works) (CH 7775 - 7650) Approx.125m

29-Apr-15

06-May-15

Track Installatio

1020.TW.DN.321

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc Works) (CH 7650 - 7525) Approx.125m

07-May-15

13-May-15

Track Installat

1020.TW.DN.331

Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc Works) ( CH 7525 - 7400) Approx.125m

14-May-15

20-May-15

115

01-Aug-14

16-Dec-14

16-Dec-14, TURNOUT&TRACKFORM (FST IN

85

05-Sep-14

16-Dec-14

16-Dec-14, RESOURCES

TURNOUT&TRACKFORM (FST INSTALLATIONS) [HOM STN - CROSSOVER (CH8500 - 8300)...


TURNOUT&TRA
RESOURCES
1020.T/O.51

Turnout 1 - T 82 - DN Track

16

05-Sep-14

24-Sep-14

1020.T/O.81

Turnout 2 - T 83 - UP Track

20

25-Sep-14

20-Oct-14

Remaining Level of Effort


Actual Work
Remaining Work
Critical Remaining Work
Milestone

Summary

MTRC - KWUN TONG LINE EXTENSION


CONTRACT 1020 - TRACKWORK & OVERHEAD LINE SYSTEM
PreliminaryMaster Programme

Track Installa

Turnout 1 - T 82 - DN Track
Turnout 2 - T 83 - UP Track

DATA DATE: 15-Apr-14


Primavera Systems, Inc.

Date
28-May-12
15-Jun-12
26-Jun-12
04-Aug-14

Revision
Rev.0
Rev.A
Rev.B
Rev.C

Checked
TM
TM
TM
TM

Approved
PHH
PHH
PHH
PHH

PRELIMINARYMASTER PROGRAMME Rev.C


Activity ID

Page 5 of 7

Activity Name

28-Jul-14 & 16:07

O.D

Start

Finish

1020.T/O.121

Diamond Crossing

20

21-Oct-14

12-Nov-14

1020.T/O.151

Turnout 3 - T 84 - DN Track

15

15-Nov-14

02-Dec-14

1020.T/O.181

Turnout 4 - T 81 - UP Track

14

01-Dec-14

16-Dec-14

46

01-Aug-14

24-Sep-14

FST Trackform & Turnout


T
no .1 - (T82 ) - DN Track T2

2014
ril May June July
2 1
0 2 2

A
1

O
1

J
1

Diamond Crossing

M
2 1

2015
April May June July
0
0 2 1 0

Turnout 3 - T 84 - DN Track
Turnout 4 - T 81 - UP Track
24-Sep-14, FST Trackform & Turnout no .1 - (T82 ) - DN Track T2
Rail, Material and Turnout Delivery via HOM by 1001 Hoisting Facility

1020.T/O.1

Rail, Material and Turnout Delivery via HOM by 1001 Hoisting Facility

01-Aug-14

05-Aug-14

1020.T/O.31

FST Type -2 Trackform Installation (Fmk Fix, Adjust, Level, Concreting & Misc Works) (CH 8450 - 8480) A...

01-Sep-14

04-Sep-14

1020.T/O.41

Survey , Assembly,Positioning for Turnout Trackform

05-Sep-14

15-Sep-14

1020.T/O.61

Final Survey , Adjustments , Levelling , Conrceting with Misc Works for Turnout Trackform

16-Sep-14

24-Sep-14

Final Survey , Adjustments , Levelling , Conrceting with Misc Work

62

06-Aug-14

20-Oct-14

20-Oct-14, FST Trackform & Turnout no .2 - (T83 ) - UP Trac

FST Trackform & Turnout


T
no .2 - (T83 ) - UP Track T2
1020.T/O.11

Rail, Material and Turnout Delivery via HOM by 1001 Hoisting Facility

06-Aug-14

09-Aug-14

1020.T/O.71

FST Type - Track Installation (Fmk Fix, Adjust, Level, Concreting & Misc Works) (CH 8460 - 8590) Approx... 4

25-Sep-14

29-Sep-14

1020.T/O.91

Survey , Assembly,Positioning for Turnout Trackform

30-Sep-14

10-Oct-14

1020.T/O.101

Final Survey , Adjustments , Levelling , Conrceting with Misc Works for Turnout Trackform

11-Oct-14

20-Oct-14

78

11-Aug-14

12-Nov-14

Diamond Crossing (DIAMX) T2


1020.T/O.21

Rail, Material and Turnout Delivery via HOM by 1001 Hoisting Facility

11-Aug-14

14-Aug-14

1020.T/O.111

Survey , Assembly,Positioning for DIAM Trackform

10

21-Oct-14

31-Oct-14

1020.T/O.131

Final Survey , Adjustments , Levelling , Conrceting with Misc Works for Turnout Trackform

10

01-Nov-14

12-Nov-14

15

15-Nov-14

02-Dec-14

Turnout no .3 - (T84 ) - DN Track T2

FST Type -2 Trackform Installation (Fmk Fix, Adjust, Level, Concreting


Survey , Assembly,Positioning for Turnout Trackform

Rail, Material and Turnout Delivery via HOM by 1001 Hoisting Facility
FST Type - Track Installation (Fmk Fix, Adjust, Level, Concreting
Survey , Assembly,Positioning for Turnout Trackform
Final Survey , Adjustments , Levelling , Conrceting with Misc
12-Nov-14, Diamond Crossing (DIAMX) T2
Rail, Material and Turnout Delivery via HOM by 1001 Hoisting Facility
Survey , Assembly,Positioning for DIAM Trackform
Final Survey , Adjustments , Levelling , Conrceting with
02-Dec-14, Turnout no .3 - (T84 ) - DN Track T2

1020.T/O.141

Delivery, Survey , Assembly,Positioning for Turnout Trackform

15-Nov-14

18-Nov-14

Delivery, Survey , Assembly,Positioning for Turnout T

1020.T/O.161

Final Survey , Adjustments , Levelling , Conrceting with Misc Works for Turnout Trackform

12

19-Nov-14

02-Dec-14

Final Survey , Adjustments , Levelling , Conrceting

14

01-Dec-14

16-Dec-14

16-Dec-14, Turnout no .4 - (T81 ) - UP Track T

Turnout no .4 - (T81 ) - UP Track T2


1020.T/O.171

Delivery, Survey , Assembly,Positioning for Turnout Trackform

01-Dec-14

02-Dec-14

Delivery, Survey , Assembly,Positioning for Turnou

1020.T/O.191

Final Survey , Adjustments , Levelling , Conrceting with Misc Works for Turnout Trackform

12

03-Dec-14

16-Dec-14

Final Survey , Adjustments , Levelling , Conrcet

293

16-Jun-14

13-Jun-15

13-Jun-

244

16-Jun-14

15-Apr-15

207

30-Jul-14

15-Apr-15

OVERHEAD LINE
LIN (OHL) INSTALLATION WORKS [OVERHEAD RIGID CONDUCTOR RIGID (O...
OHL 1st FIX - UP
U TRACK
RESOURCES
1020.OHL1.UP.31

YMT - WAB

16

30-Jul-14

16-Aug-14

1020.OHL1.UP.61

HOM XVR

12

03-Dec-14

16-Dec-14

1020.OHL1.UP.81

WAB - HOM TUNNELS

12

14-Mar-15

27-Mar-15

1020.OHL1.UP.121

HOM

12

28-Mar-15

15-Apr-15

YMT - WAB (CH 10000 - 9370) Approx.630m

16

30-Jul-14

16-Aug-14

1020.OHL1.UP.21

1st Fix - Survey, Setting out , Drilling, Pull-out tests, Template Check

30-Jul-14

05-Aug-14

1020.OHL1.UP.41

1st Fix - Drop Tube Support Installation

10

06-Aug-14

16-Aug-14

154

16-Jun-14

16-Dec-14

HOM XVR - END OF


O TRACK (CH 8500 - 8050) Approx.450m

15-Apr-15, OHL 1st


15-Apr-15, RESOUR
YMT - WAB
HOM XVR
WAB - HOM TUNNELS
HOM
16-Aug-14, YMT - WAB (CH 10000 - 9370) Approx.630m
1st Fix - Survey, Setting out , Drilling, Pull-out tests, Template Check
1st Fix - Drop Tube Support Installation
16-Dec-14, HOM XVR - END OF TRACK (CH 8

1020.OHL1.UP.1

1st Access Date for OHL 1st Fix (Preliminary Works) in HOM XVR for C1064 pipe installation

16-Jun-14*

20-Jun-14

1st Access Date for OHL 1st Fix (Preliminary Works) in HOM XVR for C1064 pipe instal

1020.OHL1.UP.11

2nd Access Date for OHL 1st Fix (Preliminary Works) in HOM XVR for C1064 pipe installation

10

15-Aug-14

26-Aug-14

2nd Access Date for OHL 1st Fix (Preliminary Works) in HOM XVR for C

1020.OHL1.UP.51

1st Fix - Survey, Setting out , Drilling, Pull-out tests, Template Check

03-Dec-14

09-Dec-14

1020.OHL1.UP.71

1st Fix - Drop Tube Support Installation

10-Dec-14

16-Dec-14

12

14-Mar-15

27-Mar-15

WAB - HOM TUNNELS


TUN
(CH 9370 - 8700) Approx.670m
Remaining Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone

Summary

MTRC - KWUN TONG LINE EXTENSION


CONTRACT 1020 - TRACKWORK & OVERHEAD LINE SYSTEM
PreliminaryMaster Programme

1st Fix - Survey, Setting out , Drilling, Pull-out tes


1st Fix - Drop Tube Support Installation
27-Mar-15, WAB - HOM

DATA DATE: 15-Apr-14


Primavera Systems, Inc.

Date
28-May-12
15-Jun-12
26-Jun-12
04-Aug-14

Revision
Rev.0
Rev.A
Rev.B
Rev.C

Checked
TM
TM
TM
TM

Approved
PHH
PHH
PHH
PHH

PRELIMINARYMASTER PROGRAMME Rev.C


Activity ID

Page 6 of 7

Activity Name

28-Jul-14 & 16:07

O.D

Start

Finish

2014
ril May June July
2 1
0 2 2

A
1

O
1

J
1

M
2 1

2015
April May June July
0
0 2 1 0

1st Fix - Survey, Setting ou

1020.OHL1.UP.91

1st Fix - Survey, Setting out , Drilling, Pull-out tests, Template Check (CH 8900 - 8700) Approx 200m

14-Mar-15

20-Mar-15

1020.OHL1.UP.101

1st Fix - Drop Tube Support Installation (CH 8900 - 8700) Approx 200m

21-Mar-15

27-Mar-15

12

28-Mar-15

15-Apr-15

15-Apr-15, HOM (C

HOM (CH 8700 - 8500)


8
Approx.200m

1st Fix - Drop Tube Supp

1020.OHL1.UP.111

1st Fix - Drop Tube Support Installation

28-Mar-15

08-Apr-15

1st Fix - Drop Tube Su

1020.OHL1.UP.131

1st Fix - Survey, Setting out , Drilling, Pull-out tests, Template Check

09-Apr-15

15-Apr-15

1st Fix - Survey, Set

195

11-Sep-14

14-May-15

14-May-15, O

195

11-Sep-14

14-May-15

14-May-15, RE

OHL 1st FIX - DOWN TRACK


RESOURCES

YMT - WAB

1020.OHL1.DN.11

YMT - WAB

20

11-Sep-14

06-Oct-14

1020.OHL1.DN.41

HOM XVR - CONTRACT LIMIT 1001/1002

12

03-Dec-14

16-Dec-14

HOM XVR - CONTRACT LIMIT 1001/1002

1020.OHL1.DN.71

WAB - HOM TUNNELS

12

15-Jan-15

28-Jan-15

WAB - HOM TUNNELS

1020.OHL1.DN.101

HOM

12

16-Apr-15

29-Apr-15

1020.OHL1.DN.131

WHA

12

30-Apr-15

14-May-15

YMT - WAB (CH 10000 - 9370) Approx.630m

20

11-Sep-14

06-Oct-14

06-Oct-14, YMT - WAB (CH 10000 - 9370) Approx.630m


1st Fix - Survey, Setting out , Drilling, Pull-out tests, Template Che

HOM
WHA

1020.OHL1.DN.1

1st Fix - Survey, Setting out , Drilling, Pull-out tests, Template Check

10

11-Sep-14

22-Sep-14

1020.OHL1.DN.21

1st Fix - Drop Tube Support Installation

10

23-Sep-14

06-Oct-14

HOM XVR - CONTRACT


CONT
LIMIT 1001/1002 (CH 8500 - 7890) Approx.610m

12

03-Dec-14

16-Dec-14

16-Dec-14, HOM XVR - CONTRACT LIMIT 10


1st Fix - Survey, Setting out , Drilling, Pull-out tes

1st Fix - Drop Tube Support Installation

1020.OHL1.DN.31

1st Fix - Survey, Setting out , Drilling, Pull-out tests, Template Check

03-Dec-14

09-Dec-14

1020.OHL1.DN.51

1st Fix - Drop Tube Support Installation

10-Dec-14

16-Dec-14

12

15-Jan-15

28-Jan-15

28-Jan-15, WAB - HOM TUNNELS

WAB - HOM TUNNELS


TUN
(CH 9370 - 8700) Approx.670m

1st Fix - Drop Tube Support Installation

1020.OHL1.DN.61

1st Fix - Survey, Setting out , Drilling, Pull-out tests, Template Check

15-Jan-15

21-Jan-15

1st Fix - Survey, Setting out , Drilling, P

1020.OHL1.DN.81

1st Fix - Drop Tube Support Installation

22-Jan-15

28-Jan-15

1st Fix - Drop Tube Support Installatio

12

16-Apr-15

29-Apr-15

29-Apr-15, HOM

HOM (CH 8700 - 8500)


8
Approx.200m
1020.OHL1.DN.91

1st Fix - Survey, Setting out , Drilling, Pull-out tests, Template Check

16-Apr-15

22-Apr-15

1st Fix - Survey, Se

1020.OHL1.DN.111

1st Fix - Drop Tube Support Installation

23-Apr-15

29-Apr-15

1st Fix - Drop Tub

12

30-Apr-15

14-May-15

14-May-15, W

WHA (CH 7890 - 7400)


7
Approx.490m
1020.OHL1.DN.121

1st Fix - Survey, Setting out , Drilling, Pull-out tests, Template Check

30-Apr-15

07-May-15

1st Fix - Survey

1020.OHL1.DN.141

1st Fix - Drop Tube Support Installation

08-May-15

14-May-15

1st Fix - Drop

140

16-Dec-14

13-Jun-15

118

16-Dec-14

18-May-15

OHL 2nd FIX - UP TRACK


RESOURCES

13-Jun18-May-15, R
END OF TRACK - HOM XVR

1020.OHL2.UP.51

END OF TRACK - HOM XVR

20

16-Dec-14

10-Jan-15

1020.OHL2.UP.61

YMT - WAB

20

04-Feb-15

05-Mar-15

1020.OHL2.UP.11

WAB - HOM TUNNELS

18-Mar-15

18-Mar-15

1020.OHL2.UP.81

HOM

10

07-May-15

18-May-15

20

16-Dec-14

10-Jan-15

10-Jan-15, END OF TRACK - HOM XVR


2nd Fix - Rigid Rail Installation + Unwinding

END OF TRACK - HOM


H
XVR (CH8050 - 8500) Approx. 450m
1020.OHL2.UP.31

2nd Fix - Rigid Rail Installation + Unwinding cables+ Equipment Installation using UNIMOG

10

16-Dec-14*

29-Dec-14

1020.OHL2.UP.91

2nd FIx - Final Adjustment of ORCR + Site T&C

10

30-Dec-14

10-Jan-15

20

04-Feb-15

05-Mar-15

YMT - WAB (CH10000


(CH100 - 9370) Approx. 630m
1020.OHL2.UP.41

2nd Fix - Rigid Rail Installation + Unwinding cables + Equipment Installation by WORKS TRAIN & UNIMOG

10

04-Feb-15*

14-Feb-15

1020.OHL2.UP.101

2nd FIx - Final Adjustment of ORCR + Site T&C

10

16-Feb-15

05-Mar-15

Remaining Level of Effort


Actual Work
Remaining Work
Critical Remaining Work
Milestone

Summary

MTRC - KWUN TONG LINE EXTENSION


CONTRACT 1020 - TRACKWORK & OVERHEAD LINE SYSTEM
PreliminaryMaster Programme

YMT - WAB
WAB - HOM TUNNELS
HOM

2nd FIx - Final Adjustment of ORCR + Site


05-Mar-15, YMT - WAB (CH1
2nd Fix - Rigid Rail Installation + U
2nd FIx - Final Adjustment of

DATA DATE: 15-Apr-14


Primavera Systems, Inc.

Date
28-May-12
15-Jun-12
26-Jun-12
04-Aug-14

Revision
Rev.0
Rev.A
Rev.B
Rev.C

Checked
TM
TM
TM
TM

Approved
PHH
PHH
PHH
PHH

PRELIMINARYMASTER PROGRAMME Rev.C


Activity ID

Page 7 of 7

Activity Name

WAB - HOM TUNNELS


TUN
(CH 9370 - 8700) Approx.670m

28-Jul-14 & 16:07

O.D

Start

Finish

22

06-Mar-15

31-Mar-15

2014
ril May June July
2 1
0 2 2

A
1

O
1

J
1

M
2 1

2015
April May June July
0
0 2 1 0

31-Mar-15, WAB - HO

1020.OHL2.UP.21

2nd Fix - Rigid Rail Installation + Unwinding cables + Equipment Installation by WORKS TRAIN & UNIMOG

10

06-Mar-15*

17-Mar-15

2nd Fix - Rigid Rail Installat

1020.OHL2.UP.1

2nd FIx - Final Adjustment of ORCR + Site T&C

12

18-Mar-15

31-Mar-15

2nd FIx - Final Adjustme

10

07-May-15

18-May-15

18-May-15, H
2nd Fix - Rigid

HOM (CH 8700 - 8500)


8
Approx.200m
1020.OHL2.UP.71

2nd Fix - Rigid Rail Installation + Unwinding cables + Equipment Installation by WORKS TRAIN

07-May-15*

11-May-15

1020.OHL2.UP.111

2nd FIx - Final Adjustment of ORCR + Site T&C

12-May-15

18-May-15

2nd FIx - Fina

08-Jun-15

13-Jun-15

13-Jun-

08-Jun-15

13-Jun-15

Comple

114

12-Jan-15

06-Jun-15

06-Jun-1

108

12-Jan-15

30-May-15

30-May-15

COMPLETE UP TRACK
TR
(CH 10000 - 8050 ) Total Length . 1950m
1020.OHL2.UP.100

Complete Installation of the OHL system

OHL 2nd FIX - DOWN TRACK


RESOURCES
1020.OHL2.DN.71

CONTRACT LIMIT 1001/1002 - HOM XVR

20

12-Jan-15

03-Feb-15

CONTRACT LIMIT 1001/1002 - HO

1020.OHL2.DN.1

YMT - HOM XVR

26

01-Apr-15

06-May-15

YMT - HOM XV

1020.OHL2.DN.41

WHA

10

19-May-15

30-May-15

WHA

20

12-Jan-15

03-Feb-15

03-Feb-15, CONTRACT LIMIT 1001

CONTRACT LIMIT 1001/1002 - HOM XVR (CH 7890 - 8500) Approx . 610m
1020.OHL2.DN.61

2nd Fix - Rigid Rail Installation + Unwinding cables + Equipment Installation using UNIMOG

10

12-Jan-15

22-Jan-15

2nd Fix - Rigid Rail Installation + Unwin

1020.OHL2.DN.81

2nd FIx - Final Adjustment of ORCR + Site T&C

10

23-Jan-15

03-Feb-15

2nd FIx - Final Adjustment of ORCR

26

01-Apr-15

06-May-15

YMT - HOM XVR (CH


(C 10000 - 8500) Approx. 1500m

06-May-15, YMT
2nd Fix - Rigid Rail

1020.OHL2.DN.11

2nd Fix - Rigid Rail Installation + Unwinding cables + Equipment Installation by WORKS TRAIN & UNIMOG

12

01-Apr-15

18-Apr-15

1020.OHL2.DN.21

2nd FIx - Final Adjustment of ORCR + Site T&C

14

20-Apr-15

06-May-15

2nd FIx - Final A

10

19-May-15

30-May-15

30-May-15

WHA (CH 7890 - 7400)


7
Approx.490m
1020.OHL2.DN.31

2nd Fix - Rigid Rail Installation + Unwinding cables + Equipment Installation by WORKS TRAIN

19-May-15

22-May-15

2nd Fix - Rig

1020.OHL2.DN.51

2nd FIx - Final Adjustment of ORCR + Site T&C

23-May-15

30-May-15

2nd FIx - F

01-Jun-15

06-Jun-15

06-Jun-1

01-Jun-15

06-Jun-15

Complete

COMPLETE DN TRACK
TR
(CH 10000 - 7400 ) Total Length . 2600m
1020.OHL2.DN.100

Complete Installation of the OHL system

Remaining Level of Effort


Actual Work
Remaining Work
Critical Remaining Work
Milestone

Summary

MTRC - KWUN TONG LINE EXTENSION


CONTRACT 1020 - TRACKWORK & OVERHEAD LINE SYSTEM
PreliminaryMaster Programme

DATA DATE: 15-Apr-14


Primavera Systems, Inc.

Date
28-May-12
15-Jun-12
26-Jun-12
04-Aug-14

Revision
Rev.0
Rev.A
Rev.B
Rev.C

Checked
TM
TM
TM
TM

Approved
PHH
PHH
PHH
PHH