CLARIFICATION SHEET

No
I. Input data

Point to Clarify

Piority

Tebodin Clarification

Project
Project No
Client
Doc No
Rev
Control by
Date

: CROWN - BKD
: 63T84247
: Mondelez
: 7141002
: 00
: Steffen
28-Dec-16

Concluded/ replied by Client

(1st time) Tebodin replied

Target date

Replied date

Overdue

II. Design code/ standard


III. Architecture, Civil Structure
IV. Plumbing system
V. Fire fighting system
IV. Electrical System
VI. Process Utility
1
Compressed air
Flowrate / pressure
1.1

Steam
Capacity of existing boiler and steam system

2.1

Please provide the required flowrate/pressure/temperature of steam at each machine of cracker line 1&2,
Yammy Line and simultaneous factor of all user to calculate pipe size header

Margin for steam header to WH 6 transformation

We understood that WH 6 transformation shall install more lines at phase 2. Therefore, steam main line to WH
6 transformation shall be designed to cover phase 2. Client please confirm and provide margin for phase 2

Condensate recovery system

Please confirm whether condensate shall be recovered or not. If yes, is it be connected to existing condensate
header? Please advise

2.3

2.4
3

3.3
4

-2

30-Dec

-2

30-Dec

-2

30-Dec

-2

30-Dec

-2

30-Dec

-2

30-Dec

-2

30-Dec

-2

30-Dec

-2

30-Dec

-2

30-Dec

-2

30-Dec

-2

30-Dec

-2

30-Dec

-2

Please provide required flowrate / pressure and temperature in/out of cold water(for jacketted tank) for each
machine which required cold water in cracker 1&2 line. Is it required to design cover phase 2? If yes, please
provide margin for phase 2

Cold water for process product


flowrate / temperature/pressure

Please provide required flowrate / pressure and temperature in/out of cold water (for process product) for each
machine which required cold water in cracker 1&2 line. Is it required to design cover phase 2? If yes, please
provide margin for phase 2

Scope of Consultant for cold water system

We understood that common cold water system is not available at site. TVN have to design independent cold
water system for WH 6 transformation building. Please confirm

Hot water ( cleaning CIP)


Flowrate / temperature / pressure

Please provide required flowrate / pressure and temperature of hot water for each machine which required hot
water. Is it required to design cover phase 2? If yes, please provide margin for phase 2

Scope of Consultant for hot water system

We understood that common hot water system is not available at site. TVN have to design independent hot
water system for WH 6 transformation building. Please confirm

Domestic water for locker room


Capacity and pump head of existing water system

We understood that domestic water for locker room shall be connected from existing water main line. Client
please confirm capacity and pump head, pipe size of existing main line is sufficent if WH 6 transformation is
added

Number of staff

In order to size domestic water pipe line for locker room, please provide us the number of staff and shifts for
WH 6 transformation building

5.1

5.2

30-Dec

Cold water for jacketted tank

4.1

4.2

-2

Cold Water
flowrate / temperature / pressure

3.2

30-Dec
We understood that steam line for workshop5 shall be connected from existing steam main line. Client please
confirm capacity of boiler and steam existing main line is sufficent if WH 6 transformation is added and the
scope of Tebodin is from the tie-in points with existing main header to inside of WH 6 transformation

Flowrate / temperature / pressure


2.2

3.1

As stated in email dated 22/12/2016, compressor and compressed air main line available at site. Therefore,
compressed air for WH 6 transformation shall be connected to existing header. However, we need required
flowrate/pressure of each machines to calculate pipe size of compressed air line to WH 6 transformation.
Please provide.

Gas (CNG) system


Capacity of existing gas system

We understood that domestic water for locker room shall be connected from existing water main line. Client
please confirm capacity and pump head, pipe size of existing main line is sufficent for WH 6 transformation

Flowrate / pressure

Please provide required flowrate / pressure of gas for each machine which required gas. Is it required to design
piping system cover phase 2? If yes, please provide margin for phase 2

6.1

6.2
VII. HVAC System

Follow up

Status

Das könnte Ihnen auch gefallen