Sie sind auf Seite 1von 1

NOTES:

1.
2.

TBM EXCAVATION - STRAIGHT TUNNEL SECTION


TYPICAL CROSS SECTION

+5.44

SPACE FOR VENTILATION

LIGHTING

SS

NE
K
C
HI

G
IN
D
OR
C
AC

OR
P
P
SU

TO

S
AS
L
T C TH

TBM EXCAVATION - CURVED TUNNEL SECTION


TYPICAL CROSS SECTION
IC
KN

ES

SA

CC
OR
DI
NG

3.00
TO

SU

SPACE FOR VENTILATION


PP

OR
TC

LEGEND:

CONSTRUCTION AND MAINTENANCE LANE

LA

SS

3.00
CONSTRUCTION AND MAINTENANCE LANE

0.0

3.90

CABLE TRAYS

REGULATING SHOTCRETE AS
REQUIRED
FUTURE
60" PIPE

TOP OF ROAD AT CURVED


TUNNEL SECTION
+1.00

60" PIPE

+1.24 SPRING LINE

1.39

SPRING LINE +1.24

+5.44

LIGHTING

CABLE TRAYS

ALL DIMENSIONS ARE IN METERS


IN THE CURVED TUNNEL SECTION BOTH 60" PIPES SHALL BE PLACED UNDER
THE ROADWAY DURING THIS CONSTRUCTION PHASE

SUPPORT SHOTCRETE LINING


CONCRETE FOUNDATION
ROADWAY

60" PIPE

0.5

2.52

DRAINAGE CHANNEL
REINFORCED CONCRETE BELOW PIPE SUPPORTS /
COMPACTED BACKFILL IN SECTIONS BETWEEN SUPPORTS

-2.96

-2.96

CLEANING AND REVISION


SHAFT EVERY 100 m
TUNNEL DRAINAGE DN 300 mm
PERVIOUS CONCRETE

2.52
8.40

-1.16

60" PIPE

1.00
8.40

REFERENCE DRAWINGS

SH

3.00
CONSTRUCTION AND MAINTENANCE LANE

CABLE TRAYS

SPRING LINE +1.24

ET

0m
NC

.2
m

LE

RA

S4

TO

DIU

N
IO
UL
AT

TB
M

MA
NI
P
M
TB
0m

R
FO

0.1

CONSTRUCTION AND MAINTENANCE LANE

C
EL

VE
N
O

NN

TU

ING

RE

C
OT

ENGINEER'S STAMP

0
0.2

CONTRACTOR'S STAMP

IN
EL

SH
CABLE TRAYS

60" PIPE

FUTURE
60" PIPE

R
TC

ING

LIGHTING

CE

EN
G
R

SPACE FOR VENTILATION

TOP OF ROAD AT CURVED


TUNNEL SECTION
+1.00

REGULATING SHOTCRETE AS
REQUIRED

3.90

0.1

IN
EL

0.2

0m

0.25

MA
M
0m

R
FO

TU

+5.84

TB

LIGHTING

ER
V
N

3.00

RA

TO
LE
R
N
UL
AT
IO

LC
E
N

NI
P

TB
M

+5.84

NC
E
G

DRAWING TITLE

0.1

m
0.1
0
AN

CE

.2
m
S4
RA

DIU

SPACE FOR VENTILATION

DRAWING No.:

CONVENTIONAL EXCAVATION - CURVED TUNNEL SECTION


TYPICAL CROSS SECTION

+1.24 SPRING LINE


0

ISSUE FOR TENDER DOCUMENTS

JIRICNY

SABATA

25.03.2016

DESCRIPTION

DRAWN

CHECKED

DATE

1.39

REV

SALINE WATER CONVERSION CORPORATION


KINGDOM OF SAUDI ARABIA

SUPPORT SHOTCRETE LINING


CONCRETE FOUNDATION
ROADWAY

60" PIPE

60" PIPE

2.52

2.52
9.20

CLEANING AND REVISION


SHAFT EVERY 100 m
TUNNEL DRAINAGE DN 300 mm
PERVIOUS CONCRETE

ILF - TECON & PARTNERS


ENGINEERING PSC

DRAINAGE CHANNEL
REINFORCED CONCRETE BELOW PIPE SUPPORTS /
COMPACTED BACKFILL IN SECTIONS BETWEEN SUPPORTS

-3.26

ARAFAT - TAIF
WATER TRANSMISSION SYSTEM

-1.16

0.7

2016 p:\project\h projects\h140 rabigh_makkah_taif wts\ilfp-ad\ad-0019 issue for tender documents\qp-q-6410-000 pipeline tunnel - typical cross sections.dwg

CONVENTIONAL EXCAVATION - STRAIGHT TUNNEL SECTION


TYPICAL CROSS SECTION

-3.26

ARAFAT - TAIF PIPELINE SYSTEM

1.00
LOCATION:

9.20

DRAWING TITLE:

PIPELINE TUNNEL
TYPICAL CROSS SECTIONS

M 1 : 50
1m

1m

5m

DRAWING No.:

SCALE:

1:50

QP10-Q-6410

SHEET

REV.

Das könnte Ihnen auch gefallen