GOVERNMENT OF TELENGANA

ROADS AND BUILDINGS DEPARTMENT


From:
Sri M. Narsimha,
M.E.,
I/c Executive Engineer,
(R&B) District Office,Nalgonda.

To
The Superintendi
(R&B) Regional O
Nalgonda.

Lr.No. EE/R&B/NLG/DB/JTO.5/2016-2017/178

Dated: 05-1-

Sir,

Sub:- (R&B) District Office, Nalgonda-Buildings - Submission of the Upda


of All Buildings partaining to (R&B) Division, Nalgonda for the mon
December -2016-Regarding.
Ref:- 1. CE (R&B) Bldgs. & RR Memo No. TO/DEE-1/MPR/14628/2014,
dt. 28.6.2014
2. SE (R&B) Cle,Nlg. Endt..No. TS/T1/2014-15/888, dt. 21.7.2014.

3. CE (R&B) Bldgs. RR Memo No. TO/DEE1/MPR/14628/2014, dt. 15

4. SE (R&B) Cle,Nlg. Endt..No. TS/T1/2014-15/1714, dt. 31.10.2014

***

Adverting to the references cited above, I submit here wi


Status report of all buildings works in (R&B) Division, Nalgond
month of December- 2016.

Yours faithfully,
Encl: Statement- 1 No.

Executive Engineer,
(R&B) Division, Nalgond

GOVERNMENT OF TELENGANA
OADS AND BUILDINGS DEPARTMENT
To
The Superintending Engineer,
(R&B) Regional Office,
Nalgonda.

Dated: 05-1-2017.

ffice, Nalgonda-Buildings - Submission of the Updated Status


partaining to (R&B) Division, Nalgonda for the month of

6-Regarding.

gs. & RR Memo No. TO/DEE-1/MPR/14628/2014,

Nlg. Endt..No. TS/T1/2014-15/888, dt. 21.7.2014.

gs. RR Memo No. TO/DEE1/MPR/14628/2014, dt. 15.10.2014.

Nlg. Endt..No. TS/T1/2014-15/1714, dt. 31.10.2014.

***

he references cited above, I submit here with the


buildings works in (R&B) Division, Nalgonda for the
er- 2016.

Yours faithfully,

Executive Engineer,
(R&B) Division, Nalgonda.

STATEMENT SHOWING UPDATED STATUS OF ALL BUILDINGS IN (R&B) DIVISION, NALGONDA UP TO END OF DECEMBER - 2016.

Sl.
No.

Name of the work

2
Construction of Four
Court Building
1 Complex at Nalgonda
in Nalgonda District.

Reference to Amount of
Amount of
Administr Technical sanction
Technical
Administrative
ative
Memo No.
sanction
sanction
sanction
3

ECV

TCV

Working
estimate
amount if
any
reference
to sanction

Value of
EOT
Expenditure Expenditure
Date of Date fixed for
work done
up to
completion sanctioned
during this
yet to be
Agreement
31.12.2016 year till date
of work
if any
paid

10

11

12

13

14

G.O.Ms.No.95, LAW
(LA & Home Courts
A1) Dept.
Dt.04.06.2008

460.50

CE (R&B) BLDs &


R.R TS Memo No.
32/2010-11 Dt.
9.08.2010

460.50

350.00

272.60

--

2/6/2011

1/6/2013

31.05.2016

176.90

0.00

Construction of Junior
Civil judge court building G.O Rt No.205 LAW
(LA&J-Home) Dept.
2 at Devarakonda in
Dt.27.09.2013.
Nalgonda District.

440.00

77/2013-14
Dt.30.12.2015.

440.00

273.19

260.19

--

12.04.2014

03.06.2016

--

--

--

15
..

--

G.O.Rt
Providing Additional
No.944LAW(LA&J
Accomdation for Nyaya
Seva Sadan Buildign at Home Courts .D1)
3
Nalgonda in Nalgonda
Dept.
District.

74.00

--

--

--

--

--

---

---

--

--

--

--

41.80

B/2013-14,
Dt.28.01.2014.

41.80

39.15

31.68

--

20.11.2015

19.02.2016

--

--

--

--

Dt.28.05.2011

Construction of
children home building
at Miryalaguda in
Nalgonda Distruict.
4

Comm. WD&CD
Proc.No.7324/A2/12,
Dt.25.09.2013.

Construction of Bell of
Arms in Police Head
G.O.Rt. No. 560, dt.
5 Quarters at Nalgonda
8.5.2014
town

150.00

Construction of Judicial
Guest House at District
ROC. No.619/2012- 40.00
Court Premisses in
DII(B) Dt.12.06.2012 &
6 Nalgonda
& 15.10.2014
10.00
Construction of
permanent Building
class rooms, work shop
etc at Govt ITI at
Haliya, Anumula (M) in
7 Nalgonda (Dist)

Construction of Barracks
over bell of Arms
Buildings in Police Head
8 Quarters at Nalgonda
town.

G.O.Rt.No.219
DT:26/2/2013 of
L&E T & F G.

GO.RT No. 70, dt.


8.5.2014, Dt.
24.03.2014 &
C.No.153/E2/TSBI/2014

Repairs to Sanitary and


E-in-C (R&B) Bldgs
Water supply in the A1
&N.H Memo
type SE (R&B) Quarter at
No.DEE1/AEE4/min
9 prakashambazar in
or works/2014-15,
Nalgonda town.
Dt.05.2.2016.
Internal Colouring to the
E-in-C (R&B) Bldgs
A1 type SE (R&B)
&N.H Memo
Quarter at
No.DEE1/AEE4/min
10 prakashambazar in
or works/2014-15,
Nalgonda town.
Dt.05.2.2016.

CE (R&B) BLDs &


R.R TS Memo No.
17/B/2013-14,
dt. 19.09.2014.

150.00

74.59

77.08

--

--

7/16/2015

42363.00

35.42

SE (R&B) circle Nlg


CR No. /B/201314,
Dt.
05.08.2013

40.00
+10.00

26.17
+6.24

25.56

--

--

--

31.03.2016

16.43

28/13-14
DT:10/6/13

350.00

0.00

0.00

319.62

330.49

-----

2/8/2014

08/07/15

--

102.84

-----

350.00

0.00

103.30

E-in-C Bldgs &


N.H, HYD, Memo
No.173/2015-16,
Dt.11.03.2016.

103.30

65.00

58.36

--

09.11.2016 08.03.2017

--

--

--

--

1.00

EE (R&B) Nlg Dr.


No. Of 2015-16,
Dt.11.02.2016.

1.00

0.95

0.94

--

03.03.2016

2.04.2015

--

0.95

0.95

0.95

1.00

EE (R&B) Nlg Dr.


No. Of 2015-16,
Dt.11.02.2016.

1.00

0.89

0.89

--

03.03.2016

2.04.2015

--

0.89

0.89

0.89

Providing false ceiling in


E-in-C (R&B) Bldgs
the A1 type SE (R&B)
&N.H Memo
Quarter at
No.DEE1/AEE4/min
11 prakashambazar in
or works/2014-15,
Nalgonda town.

0.98

Dt.05.2.2016.

Providing Permanent Guest


House at Deverakonda in
12 Nalgonda District

Go.Rt.No.99
T(R&B)II Dept
Dt:01/03/2016

Repairs to existing Guest


House at Miryalaguda in
13 Nalgonda District

Go.Rt.No.99
T(R&B)II Dept
Dt:01/03/2016

Repairs to District Industries Go.Rt.No.1744, fin


Center at Nalgonda town in
(EBS-Nii) Dept.,
14 Nalgonda District.
Dt.20.05.2016.

G.O.Rt No.254,
TR&B (Buildings)
Dt.30.04.2016.

Construction of MLA
Residence camp office at
Munugode in Nalgonda
District.
16

G.O.Rt No.254,
TR&B (Buildings)
Dt.30.04.2016.

0.98

90.00

0.90

--

120.00

Memo.No.8997/RII
(1)/2015-1
Dt:12/02/16

15.00

SE/R&B/Circle,Nal
gonda CR.No.B/16
Dt:29/02/216

15.00

12.61

9.81

27.00

---

---

---

---

----

100.00

ENC (R&B) Bldgs


TS Approved
No.27,
Nalgonda/MLA
Constituency
Bldg/DEE2/B/AEE-8/2016,
Dt.02.05.2016.

100.00

72.75

75.44

--

100.00

ENC (R&B) Bldgs


TS Approved
No.27,
Nalgonda/MLA
Constituency
Bldg/DEE2/B/AEE-8/2016,
Dt.02.05.2016.

100.00

--

--

--

Construction of MLA
Residence cum camp
office at Nalgonda in
Nalgonda District.
15

EE (R&B) Nlg Dr.


No. Of 2015-16,
Dt.11.02.2016.

03.03.2016

2.04.2015

---125.00

82.40

68.98

5/5/2016

05/10/16

13/04/2016

13/06/16

---

---

--

0.90

0.90

0.90

-----

----

---

---

---

--

0.00

0.00

0.00

--

--

--

----

12.07.2016 11.04.2017

--

--

--

Construction of MLA
Residence camp office at
Nakrekal in Nalgonda
District.
17

Construction of Residence
Cum Camp ofice building or
the Hon'ble M.L.A at
Miryalaguda in Nalgonda
18 District

G.O.Rt No.254,
TR&B (Buildings)
Dt.30.04.2016.

100.00

Go.Rt.No.254
Dt:30/05/2015
T(R&B)Buildings

Construction of Residence
Go.Rt.No.254
Cum Camp ofice building or
Dt:30/05/2015
the Hon'ble M.L.A at
T(R&B) Buildings
19 Deverakonda in Nalgonda
District
Construction of Residence
Go.Rt.No.254
Cum Camp ofice building or
Dt:30/05/2015
the Hon'ble M.L.A at
T(R&B) Buildings
20 Nagarajuna Sagar in
Nalgonda District

ENC (R&B) Bldgs


TS Approved
No.27,
Nalgonda/MLA
Constituency
Bldg/DEE2/B/AEE-8/2016,
Dt.02.05.2016.

100.00

ENC (R&B) Bldgs


& NH TS Memo
No.73/ 2016-17,
Dt.20.06.2016.

100.00

ENC (R&B) Bldgs


& NH TS Memo
No.73/ 2016-17,
Dt.20.06.2016.

100.00

100.00

100.00

100.00

100.00

--

76.47

70.99

70.99

--

--

--

--

----

22.07.2016

21.04.2017

---

22.07.2016

21.04.2017

---

---

----

69.86

60.69

60.79

--

--

--

--

ILDINGS IN (R&B) DIVISION, NALGONDA UP TO END OF DECEMBER - 2016.


(Rs. in lakhs)

Value of
balance
work

Stage of work

Remarks

16

17

18
--

Work is completed and final bill is


paid.
173.10

Agreement concluded, work to be


started. The court building is not vacated
273.19
by the court authorities. Dismantling
work will be commenced after vacating
the building.

--

The estimate is sanctioned for Rs.


74.00 Lakhs but the work could not
be grounded as the existing structure
has to be strengthened for
continuation of additional floors as
per the report given by JNTU,
Hyderabad. Further the Honorable
Principal and District Judge
Nalgonda has instructed to construct
the building in the available space
behind the existing Nyayaseva sadan
building. The revised estimate was
submitted for an amount of
Rs.115.00 lakhs and Administrative
Approval is awaited from the
judicial authorities.

--

31.68

Dismantling work is completed,


Agreement comncluded with new
agency and work to be commenced.
The proposed building will not fit in
to the available site due to
encrochments. New plan submitted
for approvel of Commissioner, WD
& CWD/Hyderabad.

-39.17

Work completed final bill to be


paied.

15.98

Work is completed and final bill to


be paid

227.65

Administrative building BlockA:- Flooring work completed, in side


platering is completed and out side
plastering, flumbing work is in progress.
Block-B:- Plastering work is in
Completed flooring work, flumbing
work is in progress..
Shed:- Platering completed.

103.30

Fabrication of Steel for coloumns is


in progress

0.00

Work is completed final bill to be


paid.

0.00

Work is completed final bill to be


paid.

0.00

Work is completed final bill to be


paid.

-----

comptetent sanitory work to be done.

------

Work completed final bill to be paid

Work to be Started
------

100.00

coloumns completed up to plinth


area bottom

--

Land not alated by the Revenue


Department.

--

Awaited permission for dismantling


of old strctures from the District
Collector Nalgonda.

100.00

Work to be Started

100.00

Coloumns upto slab level completed

Land not handed over till today by


Revenue Department.

Executive Engineer,
(R&B) District Office, Nalgonda.