Lab Report on Power Plant Design (63007-63012) KEC
2
Lab Report on Power Plant Design (63007-63012) KEC
Lab No. 2
Roll
No.
Power
Plant
Catchment
2
Area (km )
300
07-12
Mean
Monsoon
Precipitation
(mm)
2400
Gross
Head
(m)
Transmission
Line Voltage
(kV)
Transmission
Line Length
(km)
Line
Conductor
150
132
10
Bear
Given:
Catchment area
Mean monsoon precipitation
Region
300
Km2
2400
mm
central
Mean monthly flow using Medium Hydropower Study Project (NEA 1997) Method have been
tabulated as follows along with MHSP prediction equation constants for mean flow:
1. MEAN MONTHLY
FLOW ANALYSIS
Month
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
A1
A2
4.31
m /s
27.17957
January
0.03117
0.8644
0.0000
3.56
m /s
22.67998
February
0.02417
0.8752
0.0000
3.29
m3/s
21.25394
March
0.02053
0.8902
0.0000
4.16
m /s
10.02837
April
0.01783
0.9558
0.0000
2.94
m /s
7.714353
May
0.01193
0.9657
0.0000
16.28
m3/s
4.836179
June
0.01135
0.9466
0.2402
49.27
m /s
3.123251
July
0.01641
0.9216
0.3534
57.87
m /s
2.383934
August
0.02592
0.9095
0.3242
44.80
m /s
2.157111
September
0.02206
0.8963
0.3217
20.55
m /s
1.951496
October
0.01504
0.8772
0.2848
9.88
m /s
1.787168
November
0.00792
0.8804
0.2707
6.38
1.51682
December
0.00538
0.8890
0.2580
m /s
Sample calculation:
For all the months values of constants are shown in above tables. Now for January we can obtain
mean monthly flow as below,
Q jan
Hydrograph
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
0.03
25.26
8.33
4.32
2.84
1.98
0.58
m3/s
m3/s
m3/s
m3/s
m3/s
m3/s
m3/s
4
Lab Report on Power Plant Design (63007-63012) KEC
30
25
20
Series1
15
10
5
0
1
10
11
12
5
Lab Report on Power Plant Design (63007-63012) KEC
2. Calculate design discharge from the discharge of Q45% ,allowing the riparian
release(10% of long term mean monthly flow of the driest month).
Discharge taking Q45 = 8.33 m3/sec
From the Hydrograph, the driest month is May with Q =2.94m3/s
3.
Determine
Two units are selected each of 5MW due to following reasons:1. In dry season when there will be limited water discharge we can operate one unit thus
losses are minimized.
2. If we increase number of units more than two (i.e. 3 for example) space requirement will
increase by factor 1.5 and cost will increase because of more auxiliaries requirement.
3. Higher number of units means more maintenance and more losses so more running cost.
4. If one unit gets damaged or requires maintenance a part of power demand can be fulfilled
by another unit.
5. Maintenance: - The design discharge is available for 6 months and during dry season one
of the units can be maintained.
5. TABULATION OF MONTHLY ENERGY GENERATION (MWh) and the annual energy
generation(GWh).
Months
Jan
Feb
Mar
Apr
May
Jun
July
Aug
Sep
Oct
Nov
Dec
Total
Discharge
Design
Discharge
4.31
4.016
3.56
3.266
3.29
2.996
4.16
3.866
2.94
2.646
16.28
15.986
49.27
48.976
57.87
57.576
44.8
44.506
20.55
20.256
9.88
9.586
6.38
6.086
Electrical output
power(MW)
4.80305871
3.906073144
3.58315834
4.623661597
3.164565076
19.11894834
58.57435343
68.85978792
53.22831946
24.22578616
11.46467151
7.278738872
262.8311226
Monthly Energy
Generation(GWh)
3.458202271
2.812372664
2.579874005
3.32903635
2.278486855
13.76564281
42.17353447
49.5790473
38.32439001
17.44256604
8.254563489
5.240691988
189.2384083
Table:-2
The monthly energy generation (MWh) and the annual energy generation (GWh) have been
tabulated in Table-2 above. The sample calculation for monthly energy generation for May is:7
Lab Report on Power Plant Design (63007-63012) KEC
=
=
= 0.318
The plant factor also known as plant use factor or capacity ffactor
actor generally varies between 0.25
to 0.75 for hydro-electric plant.
7. TURBINE SELECTION CRITERIA
The type, geometry and dimensions of the turbine will be fundamentally conditioned by
following cases.
a. Net Head
The net head of the site provided to us is 142.5m.. From the table given below, we have
four choices namely, Fransis, Pelton, Michell-Banki
Banki and Turgo. So we go for next criterion for
the selection of turbine that is discharge.
8
Lab Report on Power Plant Design (63007-63012)
63012) KEC
b. Discharge
The rated flow and net head determines the set of turbine type applicable to the site.
Suitable turbines are those for which the given rated flow and net head plot within the
operational envelopes. It should be remembered that the envelopes vary from the operational
manufacturer. The ALSTOM Turbine selection chart is given below.
9
Lab Report on Power Plant Design (63007-63012) KEC
Moreover, the Francis turbine must be operated above 40% of the nominal load. So Pelton
turbine is selected for our project
d. Cavitation Problem
In turbine, only reaction turbines are subjected to cavitation. In reaction turbines the
cavitation may occour at the outlet of the runner or at the inlet of the draft tube where the
pressure is considerably reduced. Due to cavitation, the metal of the runner vanes, draft tubes is
gradually eaten away, which result in lowering the efficiency. There will not be any problem of
cavitation if we use impulse turbine i.e. Pelton turbine.
e. Specific Speed
The specific speed constitutes a reliable criterion for the selection of the turbine without
any doubt more precise then the conventional enveloping curves mentioned above. It is defined
as the speed through which the model runner turns with a head of 1m and a discharge Q such that
the generator power is 1KW and is given by:ns = n
/
10
Lab Report on Power Plant Design (63007-63012) KEC
In small hydro power schemes standard generators should be installed when possible, so in the
selection it must be borne that the turbine, either coupled directly or through a speed increaser
should reach the synchronous speed as shown in the table. Here in our design our turbine is
directly coupled with the synchronous generator. Following graph was used to determine specific
speed for Pelton turbine:-
From the graph, for Pelton turbine, at net head of 142.5m, specific speed;
ns =28 rpm,
P=5000KW
Therefore, Synchronizing speed, n= (28*142.51.25) / (5000)1/2 = 195 rpm
Runner
Pelton
Francis
Kaplan
Slow
4-15
60-150
300-450
.From this table we found that Pelton turbines suit our data.
11
Lab Report on Power Plant Design (63007-63012)
63012) KEC
Lab No. 3
1. Sketch a Single Line Diagram (SLD) of the power plant on the basis of data provided in
Lab 2. Show all the basic structure of the power plants: Generators, Generator Neutral
Grounding Method, Generator Leads, Medium Voltage Bus Bar, Generator Circuit Breakers,
High Voltage Bus Bar, Transformer Connection, Station Supply Connection, Head Works
Supply, Low Voltage Distribution System, HV Switchyard etc.
2. Prepare an AUTOCAD drawing and submit the drawing in A4 paper size.
The following attachment consists of the single line diagram of the power plant showing all
the basic structure of it like generator, Generator Neutral Grounding Method, Generator Leads,
Medium Voltage Bus Bar, Generator Circuit Breakers, High Voltage Bus Bar, Transformer
Connection, Station Supply Connection, HV Switchyard.
GENERATOR :
Almost all the hydraulic turbine-driven generators used are synchronous alternating current
machines, which produce electrical energy by the transformation of the rotational mechanical
energy. The electrical and mechanical design of each generator must confirm to the electrical
requirements of the power distribution system to which it will be connected, and also to the
hydraulic requirements of its specific plant. The electrical characteristics of the generator depend
on the following factors:
a)
b)
c)
d)
e)
f)
g)
h)
i)
The generators used in our design are synchronous generator: 2 units of 5.88 MVA each,
11kv, 50 hz at power factor .85 and having 28 poles.
12
Lab Report on Power Plant Design (63007-63012) KEC
.
= 2756
We preferred to select the resistance grounding method. Its value is selected such that the value
of Xcg >> Rn or Xcg/Rn>>1. We select the ratio equal to 1. So, Xcg = Rn So, Rn = 2756
If we take the transformer of ratio 11/3:0.24KV. then the ratio(n) = 26.461
13
Lab Report on Power Plant Design (63007-63012) KEC
Illustrative Example
Let us suppose we have selected the value of R =3.94 in secondary side.
If the used transformer is a dry type step down transformer i.e 11/0.24KV
Now Rp(resistance relative to primary side)
11000 2
=3.94*
240
= 8.276 K
GENERATOR LEADS :
Generator leads means the circuit between the generator terminals and the unit
transformer. The equipment selected depends upon the distance between the generator
and transformer , the capacity of the generator, types of generator breaker employed
,the economics of installation. There are three types of generator leads:
i) Non segregated
ii) Segregated
iii) Isolated
14
Lab Report on Power Plant Design (63007-63012) KEC
We have,
Generator output = 5 MW
Generated Voltage =11KV
I=
P
v * cos
.
=926.23 A
Both non segregates or segregates bus bar arrangement can be used for the rating up
to 4000A in medium voltage switchgear application (according to US army corps
manual) in consideration to fault we prefer segregated bus because it is less prone to
line to line faults then non segregated .Although the most reliable one is isolated-phase
bus bar it is expensive and complex connecting mechanism so we dont use it.
LOW VOLTAGE DISTRIBUTION SYSTEM:
15
Lab Report on Power Plant Design (63007-63012) KEC
Low Voltage distribution system includes a 400v distribution system which is shown
above. It includes a 400v bus bar which receives power from both units and there is
also diesel generator for black start. This scheme consists of three full capacity
redundant power source. For example if unit one is out the Low Voltage Bus Bar gets
power from unit two and vice versa and if both units are out DG(Diesel Generator)
comes in operation for Black Start.
MEDIUM VOLTAGE BUS BAR (GENERATOR BUS )
It is a 11KV bus bar which receives power from both the unit and supplies to the low
voltage bus bar and local distribution via a 11/11KV isolation transformer.
HIGH VOLTAGE BUS BAR
High Voltage Bus scheme used in the plant is explained in the later part of the report on
the next lab report.
16
Lab Report on Power Plant Design (63007-63012) KEC
EXCITATION SYSTEM
The excitation system used in the plant is brushless DC excitation system since to avoid
the cost of regular maintenance of brush replacement and since our unit is small there
is no stability concern. It consists of dry type transformer. A solid state rectifier rotates
with the shaft converting the AC output from the generator into the DC which is the
supplied to the rotating field coils of the main generator without the need of brushes. It
consists of following components:
1. Dry type transformer
2. A solid state rectifier
3. An ac exciter
4. Rotating diode Circuit
The field of the exciter which is at stator, is fed by the DC output of rectifier and ac
output induced in the rotor if rectified by the rotating diode and fed to the main
generator field windings. The excitation is controlled by controlling the supply to the
stator field of exciter.
17
Lab Report on Power Plant Design (63007-63012) KEC
TRANSFORMER CONNECTION
Here the transformer connected is delta
delta-star
star three phase transformer connected
to Generator through CB as shown in fig.
18
Lab Report on Power Plant Design (63007-63012)
63012) KEC
19
Lab Report on Power Plant Design (63007-63012)
63012) KEC
LAB-4
1. On the basis of previous power plant data (Lab II), determine the type of transmission
line circuit (i.e. single or double circuit) for power evacuation. Select the High Voltage
Bus Bar Scheme for your power plant on the basis of reliability, cost, simplicity in
operation and protection simplicity. Sketch the Single Line Diagram of the selected
High Voltage Bus Bar Scheme in AUTOCAD and explain its various modes of
operation.
We have,
Total capacity of the plant = 11.76MVA
PF =0.85
11KV/132KV system
Line Current = (11.76MVA)/ (0.85 * 3 *132KV) = 60.5 A
Line Conductor =Bear
Current carrying capacity (A) of a Bear conductor ; For a temperature rise of 40C =595A
For a temperature rise of 45C = 552 A
We choose double circuit transmission line so that half of the total current will flow through each
line. Though the use of the double line circuit increases the cost of the project but it becomes
more reliable than single circuit line and also its capacity to evacuate the power increases. It
becomes more reliable during repair and maintenance.
ix) Not convenient for Supervising Control & Data Acquisition (SCADA) control.
x) High cost.
xi) Loss of supply of corresponding feeder during maintenance of that feeder.
Bus-2
12
10
11
CB-5
Bus
coupler
6
5
Bus-1
CB-1
CB-2
CB-3
Load
Source-1
CB-4
Load
Source-2
Modes of Operation:
Let us suppose initially Bus-1 is charged.
In this case DS-3, DS-4, DS-6, DS-7 is operating whereas DS-5 is open.
Also Bus-2 is in dead condition during this time.
Now if there occurs any problem in bus bar 1 and needs to be maintained immediately then this
type of scheme helps to be more effective. Then at first DS-5 and DS-10 is switched on. Then
Bus coupler CB-5 is closed to make the two buses equipotential. Then after this DS-8, DS-9, DS11, DS-12 is switched on and correspondingly DS-3, DS-4, DS-6, DS-7 is switched off. This
brings bus-1 in dead condition which helps in maintaining it. Similar process occurs if any
problem occurs in bus-2.
2. Calculate the fault current (kA) and fault level (MVA) at medium voltage bus and high
voltage bus. Determine the breaking and making current capacity (interrupting
capacity) of all the circuit breakers used in the power plant that has been designed.
Tabulate the result and display it graphically as well. (Note: Making current is 2.5 times
the breaking current for Circuit Breakers)
22
Lab Report on Power Plant Design (63007-63012) KEC
From above graph XG = 0.24 pu (for base 5.88MVA, 132KV for High Voltage.)
Similarly, transformer impedance can be obtained from the below given table.
Since our system has the nominal voltage 132KV, from the above table XTr. = 9.6 %
We approximate
XTr = 9.6 %
= 0.096 pu (for base 5.88 MVA and 132KV)
23
Lab Report on Power Plant Design (63007-63012) KEC
L=0.97mH/km
!" new
!" old
25
Lab Report on Power Plant Design (63007-63012) KEC
26
Lab Report on Power Plant Design (63007-63012) KEC
27
Lab Report on Power Plant Design (63007-63012) KEC
28
Lab Report on Power Plant Design (63007-63012) KEC
29
Lab Report on Power Plant Design (63007-63012) KEC
31
Lab Report on Power Plant Design (63007-63012) KEC
Breaking current(KA)
Making current(KA)
Fault MVA
CB-1,CB-2
3.201
8.0025
61.224
CB-3,CB-4
50.178
125.445
11472.264
CB-5,CB-6
25.27
63.175
5777.52
Breaker Ratings
Calculation of In for Medium Voltage Circuit Breaker
We have,
P= 5MW
Vl-l= 11KV
In=
(5 * 1000 * 1000)
0.85 * 11 * 1000 * 3
=308.74 A
Breaking Current = 3.2KA
32
Lab Report on Power Plant Design (63007-63012) KEC
33
Lab Report on Power Plant Design (63007-63012) KEC
(5 * 1000 * 1000)
0.85 * 132 * 1000 * 3
=25.728A
34
Lab Report on Power Plant Design (63007-63012) KEC
Conclusion
Hence by the end of the report we designed the 10MW Hydropower Project on the basis of
Small Hydropower Project (NEA 1997) Method. In this report we also calculated the
catchments area, head, the discharge and output of the plant. This report also include turbine
selection on the basis of various criteria ,SLD using different bus bar, neural grounding,
excitation schemes used in various power plants existing in Nepal Report include fault current
calculation at different bus bar and circuit breaker ratings.
35