Sie sind auf Seite 1von 71

ESTANDAR

DE IDENTIFICACIN Y SEGUIMIENTO
DE EQUIPOS CRITICOS

CODIGO:

GT-ST-008

FECHA E/A:

05/10/2014

VERSION:

TABLA DE CONTENIDO
1.

INTRODUCCIN ........................................................................................................................... 4

2.

OBJETIVOS ................................................................................................................................... 4

3.

ALCANCE ...................................................................................................................................... 4

4.

RESPONSABLES .......................................................................................................................... 4

5.

MANEJO INTEGRO DEL OLEODUCTO ....................................................................................... 5

6.

ESTANDARES REGULATORIOS ................................................................................................. 5

7.

DEFINICIONES: ............................................................................................................................. 5

7.1.

EQUIPO CRTICO DE SEGURIDAD: ............................................................................................ 5

7.2.

EQUIPO CRTICO OPERATIVO: .................................................................................................. 5

7.3.

FILOSOFIA DE LOS EQUIPOS CRITICOS DE SEGURIDAD ...................................................... 6

7.3.1. ESCALA DE RIESGO API 1160 .................................................................................................... 6


7.3.2. EQUIPOS OCENSA ASOCIABLES A LA ESCALA DE RIESGO API 1160 ............................... 6
7.3.3. RIESGO. ................................................................................................................................. 7
7.3.4. PELIGRO ....................................................................................................................................... 8
7.3.5. ASPECTO ...................................................................................................................................... 8
8.

ASPECTO DE LOS EQUIPOS CRITICOS DE SEGURIDAD ....................................................... 9

8.1.

POR DETECCION ......................................................................................................................... 9

8.1.1. DESCRIPCION DEL ELEMENTO ................................................................................................. 9


8.1.2. CALCULO DE LA FRECUENCIA/PROBABILIDAD /POSIBILIDAD DE FALLA DEL
ELEMENTO .......................................................................................................................... 10
8.2.

POR CONTENCION .................................................................................................................... 11

8.2.1. DESCRIPCION DEL ELEMENTO ............................................................................................... 11


8.2.2. CALCULO DE LA FRECUENCIA/PROBABILIDAD /POSIBILIDAD DE FALLA DEL
ELEMENTO..................................................................................................................................... 15
8.3.

POR PROTECCION A LA SOBRE-PRESION ............................................................................ 16

8.3.1. DESCRIPCION DEL ELEMENTO ............................................................................................... 16


8.3.2. CALCULO DE LA FRECUENCIA/PROBABILIDAD /POSIBILIDAD DE FALLA DEL
ELEMENTO..................................................................................................................................... 20
8.4.

POR RESPUESTA DE EMERGENCIA ....................................................................................... 21

8.4.1. DESCRIPCION DEL ELEMENTO ............................................................................................... 21


8.4.2. CALCULO DE LA FRECUENCIA/PROBABILIDAD /POSIBILIDAD DE FALLA DEL
ELEMENTO..................................................................................................................................... 22
8.5.

IMPACTO DE LOS EQUIPOS CRITICOS DE SEGURIDAD ...................................................... 22

8.5.1. DE MUY ALTA CONSECUENCIA .............................................................................................. 24


8.5.2. DE ALTA CONSECUENCIA ........................................................................................................ 24

8.6.

NOTIFICACION Y PLAN DE ACCION: ....................................................................................... 26

8.7.

PRUEBAS DE FUNCIONAMIENTO DE LOS EQUIPOS CRITICOS DE SEGURIDAD ............. 26

9.

EQUIPOS CRITICOS OPERATIVOS .......................................................................................... 27

9.1.

EQUIPOS CRITICOS ................................................................................................................... 27

9.2.

EQUIPOS ESCENCIALES........................................................................................................... 27

9.3.

EQUIPOS NO CRITICOS ............................................................................................................ 27

10.

ANEXOS ..29

10.1. GLOSARIO................................................................................................................................... 29
10.2. MINIMOS REQUERIMIENTOS DE LOS EQUIPOS CRITICOS DE SEGURIDAD: .................... 33
10.3. INDICADORES TIPO DE DESEMPEO PARA LOS EQUIPOS CRITICOS DE SEGURIDAD: 33
10.4. EQUIPOS DE DETECCION /INSTRUMENTOS DEL SISTEMA DE DETECCION DE FUGAS LDS
Y SEGUIMIENTO DE PARCELAS BTS .............................................................................................. 34
Estacin Coveas .................................................................................................................................. 34
10.5. EQUIPOS DE PROTECCION / SOBRE-PRESION/Vlvulas de Seguridad Estacin Cusiana .. 39
Listado- Diagnstico El Porvenir a TLU ................................................................................................. 40
10.6. EQUIPOS DE CONTENCION...................................................................................................... 42
ESTACIONES/ HOVs, CHVs y ESDVs .............................................................................................. 42
10.7. EQUIPOS DE RESPUESTA DE EMERGENCIA / MITIGACION/ ............................................... 43
10.8. EQUIPOS DE CONTINGENCIA .................................................................................................. 47
Estaciones Cusiana y El Porvenir .......................................................................................................... 47
10.9. CALCULO DE LA FRECUENCIA O PROBABILIDAD DE FALLA POR ASPECTO. .................. 50
10.10. SIMULACION DE LA PRESION NORMAL DE OPERACIN ESCENARIO CRUDO 300 cSt (Ver
documento en la Intranet). ..................................................................................................................... 64

Esta pgina es el registro de todas las revisiones del documento identificado arriba con nmero y ttulo. Todas
las versiones anteriores debern sern reemplazadas por la presente y destruidas.
Rev. No.

Fecha

Diseado
por

Revisado por

N Pg.

Borrador A

08-Abr-05

RO

OS

25

Borrador preliminar

Borrador B

19-May-05

RO

OS

45

Revisin preliminar

Borrador B

27-May-05

RO

PS

45

Revisin preliminar

Borrador C

16-Jun-05

RO

GK

47

Revisin preliminar

Borrador D

24-Jun-05

RO

GK

74

Revisin preliminar

Versin 1

15-Nov-2013

Gabriel
Niebles

Mauricio
Sandoval

DESCRIPCION

Revisin preliminar

1. INTRODUCCIN
Siguiendo los lineamientos del Mantenimiento de OCENSA, este documento propone
adoptar de las normas de regulacin internacional un estndar que contenga las
mejores prcticas en cuanto al manejo integro de los Equipos Crticos, consistente y
enmarcado dentro de la filosofa del Manejo Integro de Oleoductos.

2. OBJETIVOS
Definir cules son los Equipos Crticos en OCENSA, considerando todos los
ms importantes estndares que aplican al sector del transporte de
hidrocarburos a travs de oleoducto, de tal manera que nos permita priorizar a
que equipos enfocaremos nuestros esfuerzos del rea de mantenimiento para
garantizar su buen desempeo.
Generar un estndar de mejoramiento continuo y aseguramiento de la
planeacin del mantenimiento, la confiabilidad y la disponibilidad del Equipo
Crtico.
Establecer un Plan de respuesta inmediata y control de atencin de acuerdo con
la Criticidad del equipo segn las cinco (5) prioridades de mantenimiento por
nivel de consecuencia aqu definidas.

3. ALCANCE
Todas las Instalaciones del Sistema Ocensa y ODC que se encuentran en nuestra
custodia, desde los puntos de recibo de crudo en Cupiagua, Cusiana, El Porvenir para
Ocensa y Vasconia para el ODC, pasando por todas las estaciones intermedias del
Oleoducto hasta cada sitio del entrega del sistema, en Vasconia y Coveas.

4. RESPONSABLES
Coordinador de planeacin de Mantenimiento: Es el responsable de definir y
asegurar el cumplimiento de las mejores prcticas para los equipos crticos
definidos en este estndar.
Estaciones y Lnea: Aplicar las prcticas definidas en este documento para el
cumplimiento del estndar.
Director de transporte y activos y Jefe de gestin de mantenimiento: Aprobar el
estndar de equipos crticos EC.

Superintendente de operaciones y oleoducto: Determinar el riesgo operacional


por la salida de un equipo crtico y asegurar la gestin de mantenimiento sobre
estos equipos.

5. MANEJO INTEGRO DEL OLEODUCTO


Este documento est creado con base en el Manejo Integro Del oleoducto el cual se
define como la administracin del oleoducto basada en un proceso, de evaluacin
total y continuada del diseo, la construccin, el mantenimiento y operacin, que
conlleva a asegurar el manejo seguro de la compaa.

6.

ESTANDARES REGULATORIOS
Este documento sintetiza la revisin y anlisis de los ms importantes estndares
de regulacin aplicables a la actividad del transporte de hidrocarburos por el
oleoducto, en un estndar de compaa que se protocolariza en la tabla 4 del
numeral 9 Matriz de Criticidad de Equipos que Aseguran y Mantienen el Manejo
Integro del Oleoducto. A continuacin se relacionan los documentos incluidos
dentro de tal anlisis.

7. DEFINICIONES:
7.1. EQUIPO CRTICO DE SEGURIDAD:
Es todo equipo o dispositivo que directamente previene, detecta, controla y
mitiga la descarga
catastrfica de materiales peligrosos, energa, colapso
estructural, falla en levantamiento de cargas y falla de los sistemas de
proteccin, los cuales podran causar incidentes de diferente magnitud e
incluso con resultados de heridas o fatalidades en las personas. Tambin son
parte de los equipos crticos de seguridad los equipos y dispositivos que
mejoran las capacidades de respuesta de emergencia conocidos como de
contingencia y mitigacin, los cuales reducen el impacto de las fugas en reas
no controladas y/o la ocurrencia de eventos indeseables.
7.2. EQUIPO CRTICO OPERATIVO:
Es todo equipo o dispositivo cuyas consecuencias de los eventos potenciales de
fallos de los sistemas de produccin donde se desempean pueden causar
incidentes a la infraestructura, la operacin o afectar negativamente la imagen
de la compaa.

7.3. FILOSOFIA DE LOS EQUIPOS CRITICOS DE SEGURIDAD


Estos deben ser operados, inspeccionados, probados y mantenidos, en
consistencia con los estndares aceptados para asegurar que se encuentran
permanentemente listos para servir y por lo tanto evitar perder la integridad
estructural y de contencin. Desde su ingeniera y mantenimiento pueden
manejar el riesgo, segn se describe ms adelante.
7.3.1. ESCALA DE RIESGO API 1160
Riesgo

Probabilidad/ Frecuencia de Fallas

Consecuencias/Eventos de Fallas

7.Equipos de Rescate

6.Facilidades de Contencin y Extincin

5.Detectores, alarmas y disparadores


de gas y Fuego
4.Dispositivos de Apagado de Emergencia

3.Aisladores e inhibidores de ignicin ( de trabajo


en caliente y Equipo elctrico de uso seguro)

2.Dispositivos para prevenir lmites de diseo del


equipo (Sobrepresin, sobrevacio y sobrellenado)

1.Instrumentos sensores, de alarma y de disparo

Ingeniera y Mantenimiento de SCEs y/ Dao por


Terceros

Salud y
Seguridad

Ambiental

Capital
Organizacional

GRAFICA 1. ESCALA DE RIESGO API 1160


Adaptacin a equipos, de la existente para tubera dentro de la norma de Manejo Integro en
Oleoductos API 1160.

7.3.2. EQUIPOS OCENSA ASOCIABLES A LA ESCALA DE RIESGO API


1160
Son todos aquellos equipos que controlan y/o atenan los impactos
resultantes dadas las consecuencias del desempeo de los diferentes
aspectos propios de la ingeniera y el mantenimiento de los Equipos y es a
travs de los cuales se afrontan los peligros, manejando el riesgo para
asegurar la integridad del oleoducto. Los Equipos Crticos de Seguridad se
encuentran agrupados en la escala de riesgo:

Riesgo
Probabilidad y/ frecuencia de 1)Descontrol
Contencin hidrocarburos y 2)la inhibicin no
deseada de los equipos y dispositivos de respuesta
de emergencia

Heridas y/
Fatalidades

Derrames
e Incendio

Ruptura,
Explosin y
Fuego

Respiradores autonomos, trajes aislantes, mantas


antifuego, pantallas defletoras, tec..

6.Diques, Barreras, Absorbentes, Bombas, mangueras


Mopas; Monitores, bombas, tanques agua, espuma, mangueras

5.Detectores, alarmas y disparadores de gas,


humo y llama

4.LDS: PLC, RTU, DCS, SCADA, Bateries, Planta de


Emergencia Sistemas hidrulicos y motores de actuadotes.

3.Trabajo en caliente controlado y equipos


elctricos acorde con IEC 60079-10

2.Reguladores de Nitrgeno y oxigeno; Compresor de


aire, Resortes y calibradores de presin y capacidad

1.Instrumentos de Alarma por LSH, PSH, O2&N2LP y disparo


Apagado de Emergencia por LSHH, caida de P, Medidor Flujo e
inicio secuencia de apagado de emergencia a travs de reduccin
de velocidad motores bombas PSHH.

Ingeniera y Mantenimiento de SCEs y/ Dao por


Terceros

Consecuencias/Eventos

GRAFICA 2. EQUIPOS CRITICOS DE SEGURIDAD OCENSA SEGN ESCALA API 1160


Es una adaptacin a equipos, de la existente para tubera dentro de la norma de Manejo Integro en
Oleoductos adaptada a OCENSA & ODC.

Deteccin y Control
Proteccin a la Sobre-presin
Respuesta de Emergencia
Por Contingencia
Por Mitigacin.

7.3.3. RIESGO
Categora en la que se clasifican las posibles consecuencias que puede
tener un peligro para definir si es alto, medio o bajo. Al combinar un
determinado peligro con su probabilidad o posibilidad de ocurrencia arroja
un valor denominado como Riesgo. Cada Equipo Crtico de Seguridad es
asociable a un valor de riesgo, siguiendo la metodologa que en otros

apartes de este documento se plantea (Grafico 2 del numeral 7.3.2 y tabla


3 del numeral 8.5.3).
Los diferentes valores de riesgo agrupados como un todo y vistos en
perspectiva, generan la muy til herramienta de anlisis utilizada para el
manejo de la integridad y la administracin del riesgo del sistema de
gestin de OCENSA y es conocida como la Matriz de Criticidad de
equipos. El valor cuantificable de cada peligro NO es del resorte de este
documento. Este documento plantea la Criticidad basado solamente en la
frecuencia de ocurrencia de la fallas por la potencial o real consecuencia.
7.3.4. PELIGRO
Fuente o situacin con potencial de producir daos a las personas o al
proceso de identificacin y comando oportuno del sistema de deteccin de
fugas. Desde su ingeniera y mantenimiento son dos:
Las pruebas del sistema acorde con los requerimientos del cdigo
adoptado por la compaa.
Los cambios sbitos no esperados ocasionados por terceros sobre el
oleoducto.
7.3.5. ASPECTO
Elemento o Fallo producto de la ingeniera y el mantenimiento de los
equipos crticos de seguridad ECS que puede interactuar con el medio
ambiente. Los Equipos Crticos de Seguridad una vez Identificados y
Ranqueados/Clasificados son Divididos en grupos segn el aspecto
que les asocia, para determinar cuatro Divisiones de Equipos Crticos de
Seguridad:

DETECCION
CONTENCION
PROTECCION
MITIGACION

Si el equipo tiene un(os) modo(s) de fallar que podra(n) resultar en


evento catastrfico deber ser clasificado como equipo crtico
seguridad. En OCENSA y visto con una ptica desde la gestin
integridad, los aspectos y/ o modos de fallo de los Equipos Crticos
Seguridad son cuatro:

un
de
de
de

Prdida del control de la deteccin de derrames o fugas de


hidrocarburos en el oleoducto.
In-operatividad remota de los sistemas de bloqueo y contencin de
hidrocarburos.
Perdida de la proteccin a la sobre presin.

Inhibicin operacional no deseada sobre los equipos y dispositivos de


respuesta de emergencia.

8. ASPECTO DE LOS EQUIPOS CRITICOS DE SEGURIDAD


8.1. POR DETECCION
8.1.1. DESCRIPCION DEL ELEMENTO
La deteccin controla la operacin segura del oleoducto. En OCENSA esta
deteccin se realiza a travs del LDS Sistema de deteccin de
fugas/escapes/derrames y un algoritmo de alerta del operador. Este LDS
es del tipo Internamente Basado, esto quiere decir que se basa en
sensores de campo o instrumentos (Presin, temperatura, viscosidad,
densidad y flujo por ultrasonido) que hacen un monitoreo interno por
balance de masa permanente del crudo en el oleoducto, siguiendo
clculos o parmetros de su modelo hidrulico de operacin, el cual es
predeterminado y ajustado segn los crudos transportados y su programa
de baches.
Esta informacin es adquirida, procesada, calificada y verificada por el
motor de inferencia de decisiones denominado por sus siglas en ingls
SCADA Control Supervisor y Capturador de Datos (Supervisory Control
and Data Adquisition), y es quien detecta y arroja tres alarmas de
consecuencias:
El elemento o fallo de los datos capturados debido a un
problema con el sensor/instrumento y su sistema de control
local (PLC, RTU, DCS) y de telemetra (Fibra ptica, Satlite,
Modem, Transmisor, Cables, Conductos, Tableros y
Conectores), conlleva a falsas alarmas, las cuales deben ser
depuradas y limitadas. Este enlace de comunicacin para el
SCADA/LDS, tambin es usado para operar las vlvulas
remotas que generalmente se encuentran aguas arriba y aguas
debajo de los cuerpos de agua o poblaciones.
Operacin anormal (Cambio de parmetros o falla en un equipo
del oleoducto): Posible escape de producto (Por un sbito o
explosivo cambio de los parmetros en la operacin).
La calidad y tipo de datos medidos y el conocimiento resultante
de las propiedades y localizacin de diferentes baches de
crudos en el oleoducto impone una medida lmite de deteccin,
bajo la cual es indetectable un escape de crudo.

8.1.2. CALCULO DE LA FRECUENCIA/PROBABILIDAD /POSIBILIDAD DE


FALLA DEL ELEMENTO
Desde la Ingeniera y el Mantenimiento de los dispositivos y equipos de
deteccin se maneja el riesgo por medio del mejoramiento de su diseo y
la rutina de mantenimiento aplicada, los cuales afectan el clculo numrico
del tiempo estimado de falla al ao del elemento, conocido tambin por
sus siglas en ingls FDT Failure Death Time. Cada equipo o dispositivo
cuenta con este valor caracterstico, que el fabricante suministra en
unidades de frecuencia de falla por milln de horas para los elementos:

Sensor (Presin, Temperatura, Densidad, Flujo,.etc.)


Transmisor (Presin, Temperatura, Densidad, Flujo,etc.)
Control (DCS, PLC Simplex, PLC Dplex y RTU)
Captura de datos (SCADA)
Motor de Inferencia (LDS)
Motor de Decisin (BTS, PTS)
Fuente Energa (Solar-Bateras, Red Pblica, Disel Generacin)
Conmutacin (Interruptores)
Enlace/Comunicacin (Mdems, antenas, cableado-conexionado,
microondas, satlite)

Estas cifras de frecuencia de falla por milln de horas se encuentran en la


tabla de ratas de falla del estudio de OREDA -92 (Offshore Reliability
Data) que se encuentra como anexo del P&ID FFD/T-3GGG-ICU-001-1/1OVERPRESSURE PROTECTION AT SECTION VALVE LOCATIONSPHASE II DESIGN, al igual que el mtodo de anlisis y clculo de la
probabilidad de falla por
Aspecto/Localizacin funcional o
Equipo/Elemento, el cual sigue la metodologa de rbol de falla dentro
del mismo documento ilustrada y que como valor resultante debe arrojar
por locacin funcional o equipo una frecuencia de fallo por milln de horas
entre el rango medio de 1 x 10^-6 a 1 x 10^-4.
Un ejemplo de utilizacin de este mtodo se sintetiza en el grfico 3 DE
EJEMPLO MODO DE USO DEL ARBOL DE FALLAS, el cual fue el
mtodo adoptado por este documento para determinar el ASPECTO en
trminos de probabilidad de ocurrencia de la INHABILIDAD TOTAL DEL
EQUIPO.
En el anexo 10.6. CALCULO DE LA PROBABILIDAD DE FALLA DE LOS
ELEMENTOS SEGN ASPECTO, se detalla el P&ID por Localizacin
Funcional y las cifras de frecuencia o tiempo perdido de falla por milln de
horas segn la ingeniera y mantenimiento actuales Vs la ingeniera y el
mantenimiento dispuesto por el cdigo mandatario adoptado por filosofa
OCENSA, por Elemento/Falla Funcional/Falla local/Falla Local o
Remota/Falla Total del Equipo.

GRAFICO 3: EJEMPLO DE MODO DE USO DEL ARBOL DE FALLAS


8.2. POR CONTENCION
8.2.1. DESCRIPCION DEL ELEMENTO
En la lnea principal, la habilidad y capacidad de contener recae en las
vlvulas de bloqueo remotas HOV estratgicamente ubicadas
generalmente aguas arriba de los ros junto con las vlvulas cheque
CHV que se encuentran ubicadas aguas abajo de los mismos. Y en las
estaciones las vlvulas de bloqueo de emergencia ESDV.
Estos equipos proveen la barrera fsica de contencin por secciones de
oleoducto al cerrar las vlvulas HOV (Vlvulas Hidrulicas de Control

Remoto), grupo que tambin incluye las vlvulas del PLEM Mltiple Final
de Vlvulas (Pipeline End Manifold) y por aislamiento de estaciones al
cerrar las vlvulas de bloqueo limtrofes ESDVs (Vlvulas de Bloqueo de
Emergencia) principales de entrada y salida en las mismas bajo los
comandos de apagado de emergencia respectivos, en los niveles
mximos de (FFD/T-PLU-AO3 VALVE LOCATION AND PIPELINE LEAK
DETECTION):
i) Aislamiento de Oleoducto: Este es comandado por el operador del
cuarto de control
ii) Apagado de Estacin: Este comando solo puede ser iniciado por el
operador local de la estacin, y cuando es iniciado en simultneo es
enviada una seal al operador del cuarto de control para que a su vez
tome acciones apropiadas en las estaciones adyacentes.
Las Vlvulas Cheque CHV proveen la barrera fsica de contencin del
crudo que se podra drenar por reflujo (Back Flow) en el evento de una
ruptura de oleoducto aguas abajo de un cruce fluvial, y estas vlvulas
requieren ms mantenimiento que las vlvulas de bloqueo (FFD/T-PLUAO3 VALVE LOCATION AND PIPELINE LEAK DETECTION item 4.2.pg 4. last paragraph) y se apoyan para tales rutinas en las Vlvulas de
Bloqueo Electro-Hidrulico Manual de lnea principal MHOV, las cuales
se encuentran instaladas aguas debajo de las CHV. Estas vlvulas no
dependen del LDS, por cuanto su capacidad de retencin cuando es
requerida es positiva.
Las Vlvulas Generales son el grupo constituido por las vlvulas de
servicio situadas aguas arriba y aguas abajo de las vlvulas principales de
bloqueo remotas y manuales, as como tambin las vlvulas de la
distribucin de equipos, utilidades y accesorios ubicada en las estaciones.
Estas se catalogan como de alta posibilidad de consecuencia de eventos
catastrficos.
Su apropiada respuesta de contencin controla la fuga, escape o drenaje
(Fluid Loss) de crudo en el caso de las HOV y el efecto de drenaje por
reflujo (Back Flow) en las vlvulas Cheque, evitando con su ptimo
mantenimiento y desempeo el que se pierdan por una condicin subestndar bien por fallo de la vlvula cheque CHV o de la HOV y fallo en
ambas tanto CHV como HOV, los siguientes volmenes:
CUSIANA PORVENIR: Por una eventual ruptura en los kilmetros
citados, se estima un volumen de prdida en barriles de crudo derramados
por DRENAJE NATURAL de:

TABLA No. 1: ALERTAS DE VOLUMEN POR DRENAJE NATURAL


QUE SE DEBEN MITIGAR Y O PROVISIONAR EN EL
CALCULOOPERATIVO DEL IMPACTO
TRAMO

HOV&CHV=1

0.00 Kms a 7.20 Kms


7.20 Kms a 11.20
Kms
11.20 Kms a 19.90
Kms
19.90 Kms a 25.00
Kms
25.00 Kms a 32.60
Kms

CHV=1
HOV=1

HOV&CHV=0

1,800
4,000

13,000
7,700

23,000
25,000

3,000

16,500

23,500

2,300

16,000

32,400

1,850

10,000

10,000

EL PORVENIR - MIRAFLORES: Por una eventual ruptura en los kilmetros


citados, se estima un volumen de prdida en barriles de crudo derramados de:
TRAMO

HOV&CHV=1

CHV=1
HOV=1

HOV&CHV=0

32.40 Kms a 42.20


20,000
20,000
26,500
Kms
42.20 Kms a 54.00
1,500
16,000
33,500
Kms
54.00 Kms a 64.40
750
20,500
32,000
Kms
64.40 Kms a 69.80
1,000
5,200
10,000
Kms
69.80 Kms a 80.70
2,500
11,500
26,700
Kms
MIRAFLORES EL HATILLO: Por una eventual ruptura en los kilmetros
citados, se estima un volumen de prdida en barriles de crudo derramados de:

TRAMO
80.70 Kms a
Kms
87.00 Kms a
Kms
106.00 Kms a
Kms
121.40 Kms a
Kms

HOV&CHV=1

CHV=1
HOV=1

HOV&CHV=0

87.00

10,500

10,500

25,000

106.00

12,000

25,000

33,500

121.40

22,400

25,600

45,000

142.50

27,000

1,000

28,000

142.50 Kms a 172.50


Kms
172.50 Kms a 190.00
Kms

32,000

23,000

55,000

25,000

39,500

57,000

EL HATILLO - LA BELLEZA: Por una eventual ruptura en los kilmetros citados,


se estima un volumen de prdida en barriles de crudo derramados de:
TRAMO
190.00 Kms 215.00
Kms

HOV&CHV=1

CHV=1
HOV=1

HOV&CHV=0

12,000

12,000

22,200

LA BELLEZA VASCONIA: Por una eventual ruptura en los kilmetros citados,


se estima un volumen de prdida en barriles de crudo derramados de:
TRAMO
215.00 Kms a 238.00
Kms
238.00 Kms a 242.40
Kms
242.40 Kms a 248.00
Kms
248.00
Kms
a
259.00Kms
259.00 Kms a 272.00
Kms
272.00 Kms a 322.00
Kms

HOV&CHV=1

CHV=1
HOV=1

HOV&CHV=0

8,000

39,500

57,000

11,000

37,000

38,500

5,000.00

28,000.00

37,000.00

19,500.00

39,000.00

45,000.00

32,000.00

25,000.00

12,000.00

117,000.00

47,000.00

45,000.00

VASCONIA - CAUCASIA: Por una eventual ruptura en los kilmetros citados, se


estima un volumen de prdida en barriles de crudo derramados de:
TRAMO
322.00 Kms a 376.00
Kms
376.00 Kms a 400,00
Kms
400.00 Kms a 467.00
Kms
467.00
Kms
a
498.00Kms

HOV&CHV=1

CHV=1
HOV&CHV=0
HOV=1
60,000.00
82,000.00
140,000.00
38,000.00

100,000.00

109,000.00

25,000.00

48,000.00

72,000.00

60,000.00

49,000.00

40,000.00

498.00 Kms a 554.00


Kms
554.00 Kms a 594.00
Kms

44,000.00

80,000.00

124,000.00

60,000.00

64,000.00

124,000.00

CAUCASIA - COVEAS: Por una eventual ruptura en los kilmetros citados, se


estima un volumen de prdida en barriles de crudo derramados de:
TRAMO
554.00 Kms a 594.00
Kms
594.00 Kms a 702,00
Kms
702.00 Kms a 782.00
Kms

HOV&CHV=1

CHV=1
HOV&CHV=0
HOV=1
49,000.00
64,000.00
220,000.00
50,000.00

70,000.00

120,000.00

56,000.00

29,000.00

85,000.00

COVEAS-TLU: Por una eventual ruptura de la tubera submarina y las


mangueras se estima un volumen de prdida en barriles de crudo derramados
de:

TUBERIA
PLEM=CIERRE EN CHV=1 o PLEM=CIERRE
DE
SUBAMRINA Y 20 segundos y rata HOV=1
COVEAS ESDV en 3
MANGUERAS
de 60KBblsH
minutos + apagado
bombas
TIEMPO
333
N/A
3000
REACCION
SISTEMA
DE
DETECCION
8.2.2. CALCULO DE LA FRECUENCIA/PROBABILIDAD /POSIBILIDAD DE
FALLA DEL ELEMENTO
Siguiendo la metodologa expuesta en el tem 8.2.1 resumida en el grfico
3 de este documento, se lograron los valores de Frecuencia o Tiempo
Muerto de Falla por milln de horas por Elemento/Falla Funcional/Falla
local/Falla Local o Remota/Falla Total del Equipo, que se relacionan en
este documento en el anexo 5, CALCULO DE LA FRECUENCIA O
PROBABILIDAD DE FALLA POR ASPECTO para los siguientes equipos:

Vlvulas Remotas HOV y ESDV: Las fallas en las vlvulas de


bloqueo principales de lnea y estaciones, tanto en su oportunidad de
cierre por control remoto como en su capacidad de contener, se catalogan

como de muy alta posibilidad de consecuencia de eventos catastrficos y


por ello son consideradas equipos crticos de seguridad.
Vlvulas Cheque CHV: Las fallas en las vlvulas cheque en su
capacidad de contener, se catalogan como de muy alta posibilidad de
consecuencia de eventos catastrficos y por ello son consideradas
equipos crticos de seguridad.

8.3. POR PROTECCION A LA SOBRE-PRESION


8.3.1. DESCRIPCION DEL ELEMENTO
En la lnea principal, las estaciones y las mangueras de despacho a buques en
mar, la habilidad y capacidad de proteger contra la sobre presin como
resultante de sobre flujo, sobre-espesamiento del crudo (P.ejm., por parada
mayor a cinco das con parcela de crudo mezcla pesada 250cSt aguas debajo de
las Estaciones de Miraflores y el Porvenir ), y onda o pulsacin de choque
interno de tipo ariete por cierre repentino de las vlvulas remotas HOV, ESDV y
PLEM que hace actuar los dos grupos de dispositivos de proteccin descritos a
continuacin:
a) El primero es el grupo constituido por las vlvulas de alivio de la sobre
presin PSV, y son del tipo resorte y tipo Danflo, las cuales se encuentra
relacionadas por TAG/FFDT/Cantidad/Funcin/Presin y alivios actuales
disponibles en el ANEXO F para la lnea y las estaciones (Sin incluir
Cupiagua y Cusiana).
b) El segundo es el grupo constituido por los tanques de alivio junto con su
sistema de interruptores de nivel alto y alto alto y los cabezales de alivio
para las prdidas friccinales que respectivamente proporcionan la
capacidad de contener el crudo proveniente de alivio y de controlar la
friccin por sobre-flujo del crudo.
Estos equipos brindan la proteccin real frente a eventos de operacin que
puedan generar una fluctuacin en la presin interna hidrulica de operacin
PIH del oleoducto y/o mangueras, que supere la MAOP Mxima Presin
Admisible de Operacin y la MASP Mxima Presin Admisible de Pulsacin.
PIH est predeterminada por el modelo hidrulico de diseo de la operacin del
oleoducto estipulado en el FFD/26-04P-CASE 1A, el cual ha sido concebido
para operar en condiciones de Flujo bajo Estado Estable y Trascendente (Steady
and Trasient Status) con presiones de operacin PIH que no excedern el 80%
de la presin de hidro-prueba.
La presin de hidro- prueba se realiza, para dar cumplimiento con lo establecido
por ASME B31.4 y DOT 195, que consiste en elevar y sostener durante cuatro
horas a 1.25 veces la presin interna hidrulica de operacin PIH del oleoducto,
lo que prcticamente se logra mediante elevar y sostener durante cuatro horas a
900 PSIG la presin en la estacin de LA BELLEZA y monitorear los

transmisores de presin ubicados la HOV de EL MINERO y la CHV del EL


COBRE.
La presin de alivio a la cual son calibradas las PSV es la MASP respectiva del
segmento de oleoducto. Una condicin sub-estndar de estos dispositivos
ocasiona una alta posibilidad de consecuencia de eventos catastrficos es por
esto que son considerados Equipos Crticos de Seguridad ECR. Es importante
retener los datos crticos de PIH por localizacin de PSVs, considerando las
actuales y futuras inmediatas condiciones de servicio (Tipo de crudo, estado de
flujo y modificaciones) de manera que se asegure el cabal cumplimiento de que
MASP nunca supere MAOP. A continuacin se relacionan los valores de presin
PIH y MASP segn FFD, PIH tericas servicio actual y servicio futuro inmediato
(Anexo E- Memorias de PIH tericas).

TABLA No. 2: ALERTAS A MONITOREAR DE PRESIONES Y TEMPERATURAS FRENTE AL CAMBIO DE ESCENARIO


CON CRUDO 300 cSt @ 30C, BASADAS EN EL MODELO DE SIMULACION DE RE-ARRANQUE CRITICO EN ANEXO
10.8 Y 10.9

Localizacin
PSV Crticas

SALIDA STA
CUSIANA
SALIDA STA
EL
PORVENIR
SALIDA STA
MIRAFLORE
S
LLEGADA LA
BELLEZA
SALIDA LA
BELLEZA
LLEGADA
STA
VASCONIA
HOV LA

Simulacin
Rearranque
crtico con
crudo
mezcla
pesada 300
cSt a 30 C40.2 das de
parada, Psi

Simulacin
Flujo
Normal con
crudo
Mezcla
Pesada 300
cSt a 30 C8.1 das de
parada, Psi

Temperaturas de
alivio al para
caso Crudo
Mezcla Pesada
250 cSt-30C, F

Temperaturas de
alivio Re-arranque
crtico caso curdo
mezcla pesada
250 cSt-30C,

PIHFFDCASE1A
psig

MASP
III
Presin
de
Relevo
psig

MAOP

1851

2210

2160

1956

2220

2160

1156

926

89

50

1794

2160

2160

1842

1989

80.6

48

1606

2050

2089

2512

2512

85.7

53

2160

138

109

85.7

53

2160

2150

2015

79.9

79.9

1680

1437

1289

79.9

84.6

750

+145

PORQUERA
HOV RIO
NECHI
HOV
BIJAGUAL
HOV LA
CATALINA
HOV
ACAPULCO
HOV RIO
CAUCA
STA
CAUCASIA
LLEGADA
COVEAS
MANGUERA
S BOYA

750

+145

1680

1492

1343

78.8

58

885

+145

1680

1394

1246

90.7

66

737

+145

1471

1307

1159

83.2

57

667

+145

1471

1226

1078

85.5

58

671

+145

1519

1260

1112

90.8

58

671

+145

1472

1292

1144

80.3

39

100

+145

1290

698

549

85.1

54

60

+130

250

120

80

90

84.6

Los parmetros de temperaturas al parar y de re-arranque crtico as como las


presiones de re-arranque crtico y las de flujo normal con crudo mezcla pesada
de 250 cSt -30C son obtenidas del modelo de simulacin elaborado con el
programa o tren de baches de inicio transporte crudo mezcla pesada,
considerando tamaos, viscosidades y temperaturas de inyeccin, viajando a
una rata de 14,000 BPD y para un programa de bacheo SEG II de 270 KBD y
SEG III de 170 KBD, como se observa en la tabla a continuacin:
CRUDO
T iny. C
Viscosid
ad, cP
KBbls

CUS/ MEZC CA
CUP
LA
ST
30 /30
27
30
2.7/1. 62.42 250
8
182
58.1
68

MEZC CUS/
LA
CUP
27
35/30
62.42 2.7/1.
8
56
210

MEZC CA
LA
ST
27
30
62.42 250
60

72

MEZCL
A
27
62.42
73

8.3.2. CALCULO DE LA FRECUENCIA/PROBABILIDAD


/POSIBILIDAD DE FALLA DEL ELEMENTO
Siguiendo la metodologa expuesta en el tem 8.2.1 resumida en el grfico
3 de este documento, se lograron los valores de Frecuencia o Tiempo
Muerto de Falla por milln de horas por Elemento/Falla Funcional/Falla
local/Falla Local o Remota/Falla Total del Equipo, que se relacionan
en este documento en el anexo 10.6.CALCULO DE LA FRECUENCIA O
PROBABILIDAD DE FALLA POR ASPECTO, para los siguientes equipos:
a) Vlvulas PSV Danflo y de Resorte: Alivian por sobre-caudal para
velocidades de bombeo superiores a BPH 22,000 y sobre-presin de
crudo segn calibracin y rata de flujo predeterminada por segmento
de lnea y estacin. Por diseo del oleoducto (FFD/T EGGG- 001/2-1)
i. Las vlvulas Danflo ubicadas fuera de costa (Off Shore) requieren
ser probadas, aplicando por el conector de prueba aguas arriba del
cuerpo de la vlvula, la presin de calibracin, cada tres meses.
Igual perodo para la inspeccin y prueba de su instrumentacin y
sistema en paneles de nitrgeno. Para las vlvulas dentro de
costa (On-Shore) localizadas en el segmento 3- Vasconia-Coveas
del oleoducto y las estaciones esta rutina deber ser realizada
cada 6 meses.
ii. Las vlvulas de resorte, por manual de fabricante recomiendan a
diferencia de las anteriores, el que al menos una vez al ao sean
desmontadas, inspeccionadas, servidas y probadas en banco.
Pero para estas aplica el rigor del mismo documento FFD/T
EGGG- 001/2-1 Over Pressure Protection at Main Line Isolating

Valves, luego la rutina des-aseguramiento del sistema por


aplicacin de la presin de prueba y disparo as como la inspeccin
debe ser cada 12 meses.
b) Tanques de Alivio y Cabezales de Alivio de las Prdidas
Friccionales: En las estaciones son los tanques de almacenamiento y
en el segmento 3, es la misma lnea aguas abajo. Los cabezales de
Alivio de las Prdidas Friccionales son requeridos segn diseo del
oleoducto (Report No. MAPS-G-PR-005 Revision 1 January 1998)
para las estaciones de Vasconia y Caucasia exclusivamente, siempre
y cuando el caudal requerido de crudo a transportar sea mayor a MBD
430.
8.4. POR RESPUESTA DE EMERGENCIA
8.4.1. DESCRIPCION DEL ELEMENTO
En la lnea principal y las estaciones la habilidad y capacidad de
respuesta de emergencia se divide en dos:
a) Contingencia: Est habilidad o capacidad de respuesta se encuentra
principalmente en las estaciones y una inhibicin o condicin subestndar de las redes y sistemas de deteccin, alarma, pulsadores
manuales locales, control de apagado de emergencia, controles de
sobre-velocidad de grandes motores elctricos o de combustin
interna, planta y luces de emergencia, redes de auto extincin,
diques, piscinas y trampas API con sus moto disel bombas
automticas de trasiego de crudo vertido junto con las instalaciones,
equipos y dispositivos fijos y mviles de rescate y primeros auxilios,
es considerada como de alta posibilidad de evento catastrfico, es por
ello que se clasifican como Equipos Crticos de Seguridad ECR. El
nivel de operatividad deseable es del 100% con una disponibilidad
durante todo el tiempo. Para garantizar esto en OCENSA se
establecen rutinas quincenales de inspeccin y prueba de estos.

b) Mitigacin: Est capacidad de respuesta se encuentra principalmente


en Tunja y una inhibicin o condicin sub-estndar de las redes y
sistemas de deteccin va RTU/SCADA y alarma junto con los equipos
y dispositivos mviles de planta y luces de emergencia, barreras de
contencin, piscinas, tanques, moto disel bombas automticas de
trasiego de crudo vertido, gras y levantadores de carga, de medicin

de riesgo, comunicacin, rescate y primeros auxilios, es considerada


como de alta posibilidad de evento catastrfico, es por ello que
tambin se clasifican como Equipos Crticos de Seguridad ECR. El
nivel de operatividad requerido por regulaciones es del 100% con una
disponibilidad durante todo el tiempo. Para garantizar esto en
OCENSA se establecen rutinas quincenales de inspeccin y prueba
de estos.
8.4.2. CALCULO DE LA FRECUENCIA/PROBABILIDAD
/POSIBILIDAD DE FALLA DEL ELEMENTO
Siguiendo la metodologa expuesta en el tem 8.2.1resumida en el grfico
3 de este documento, se lograron los valores de Frecuencia o Tiempo
Muerto de Falla por milln de horas por Elemento/Falla Funcional/Falla
local/Falla Local o Remota/Falla Total del Equipo, que se relacionan
en este documento en el anexo 10.5.CALCULO DE LA FRECUENCIA O
PROBABILIDAD DE FALLA POR ASPECTO.
Estos equipos deben considerar una operatividad del 99% y una
capacidad de respuesta de emergencia en equipos mviles y
estacionarios tanto de estacin como lnea del 100% en respuesta de
contingencia y mitigacin necesaria para controlar los volmenes drenaje
natural reseados en la tabla 1 del numeral 8.2. POR CONTENCION
8.2.1.DESCRIPCION DEL ELEMENTO.
Lo mandatario de equipos, es el estar disponibles y con entrenados y
comprobados planes de respuesta de emergencia en todo momento, para
ello se considera apropiada la generalizacin de las rutinas de prueba e
inspeccin quincenal ya en algunos equipos disponible en SAP PM, una
periodicidad de rutina de mantenimiento menor mayor afectar en igual
forma la frecuencia o tiempo muerto de falla calculado.
Desde la Ingeniera y el Mantenimiento los Equipos Crticos de Seguridad
se asocian con un impacto neutro a uno de alto impacto negativo al
exponer el aseguramiento de la integridad del oleoducto.
8.5. IMPACTO DE LOS EQUIPOS CRITICOS DE
SEGURIDAD
Desde el DOMINIO de la ingeniera y mantenimiento de los equipos crticos de
seguridad y dado que igualmente la actividad de ingeniera y mantenimiento no
controla el asunto de la valoracin de las consecuencias pues es resorte de la
autoridad de operaciones del oleoducto, EL IMPACTO es la PROBABILIDAD O
POSIBILIDAD DE CONSECUENCIA y se evala utilizando la tcnica descrita en el

grfico EJEMPLO DEL CALCULO DE FRECUENCIA O PROBABILIDAD DE


FALLA DEL ELEMENTO POR ARBOL DE FALLAS del tem 8.2.1resumida en el
grfico 3 de este documento, para dos peligros:
Las pruebas de deteccin de fugas del sistema de aseguramiento anual de
deteccin de fugas LDS como un todo.
Los incidentes sbitos ocasionados por terceros sobre cualquier parte de la
integridad de la lnea.
Los rboles de fallas producto del anlisis de este numeral, se incluyen en el anexo
7, CALCULO DE LA POSIBILIDAD DE CONSECUENCIA. Los factores
determinantes que se emplean para analizar en 1) Estaciones 2) Lnea y frente a los
dos peligros arriba citados son:

SCADA
LDS SYSTEM
CONTENCION
PROTECCION
APAGADO DE EMERGENCIA
CONTINGENCIA
MITIGACION

Los resultados numricos establecen desde el alcance de la ingeniera y el


mantenimiento de los Equipos Crticos de Seguridad, las cifras con las cuales se
elabora el SAP PM RANKINE que corresponde igualmente a la CRITICIDAD. Los
valores de SAP Ranking se definen segn rangos:
SEGN PROBABILIDAD DE CONSECUENCIA se convierte en SAP RANKINE
CLASIFICACION 1:

Entre -1000 a 50

CLASIFICACION 2:

Entre 51 a 100

CLASIFICACION 3:

Entre

CLASIFICACION 4:

Entre 201 a 300

CLASIFICACION 5:

Entre 301 a infinito

101 a 200

Con base en esta posibilidad de consecuencia los equipos crticos de seguridad de


OCENSA se clasifican en:

8.5.1. DE MUY ALTA CONSECUENCIA


Son los Equipos Crticos de Seguridad que requieren mayor nmero de
inspecciones y pruebas funcionales dentro de un determinado perodo de
tiempo con respecto a sus homlogos, para asegurar y mantener el estndar
adoptado en cuanto al Manejo Integro del Oleoducto y su fall puede producir
eventos de mxima severidad con prdidas y daos en los humanos, el medio
ambiente, el capital organizacional y compromete la imagen corporativa. Su
identificacin en SAP es asociada con el valor de mayor severidad 5.
8.5.2. DE ALTA CONSECUENCIA
Son los Equipos Crticos de Seguridad que requieren un nmero promedio de
inspecciones y pruebas funcionales dentro de un determinado perodo de
tiempo con respecto a sus homlogos, para asegurar y mantener el estndar
adoptado en cuanto al Manejo Integro del Oleoducto y su fall tambin puede
producir eventos de mxima severidad con prdidas y daos en los humanos, el
medio ambiente, el capital organizacional y compromete la imagen corporativa.
La diferencia con los anteriores radica en los intervalos de inspeccin y prueba.
Su identificacin en SAP es asociada con el valor de mayor severidad 4.
A continuacin se muestran los resultados probabilidad de consecuencia o
posibilidad de falla de los equipos crticos de seguridad, los cuales son el nico
grupo para el cual es adoptable esta evaluacin de Criticidad. Los equipos que
tabularon resultados 3, 2 y 1 se denominan equipos crticos operativos, Equipos
Esenciales y equipos No Crticos respectivamente.

TABLA 3: RANKINE EQUIPOS CRITICOS DE SEGURIDAD OCENSA

Cada equipo de OCENSA se ubica dentro de la Escala de Criticidad, de


acuerdo con el valor de riesgo para este determinado, el cual y segn el
valor obtenido, le asocia con un nmero de Ranking SAP PM que por
orden de menor a mayor criticidad le clasifica en 1. NO CRTICO,
2.ESCENCIAL, 3. CRITICO, 4. ALTA CONSECUENCIA, 5 MUY ALTA
CONSECUENCIA.
Ms adelante en este documento se encuentra publicada La tabla
MASTER DE EQUIPOS CRITICOS OCENSA, con el detalle de las
locaciones funcionales, los equipos, los cdigos revisados, el cdigo y
frecuencias de aseguramiento adoptado por OCENSA a travs de este
documento
y
la
clasificacin
SAP
PM
RANKINE
o
CLASIFICACION/ESCALA DE CRITICIDAD.
8.6. NOTIFICACION Y PLAN DE ACCION:
Establecer un Plan de Accin inmediato para asegurar la disponibilidad y
confiabilidad del Equipo Crtico de Seguridad (ECS) y equipos crticos de
operacin (ECO), buscando:

Prevenir fugas de crudo por operacin del sistema, protegiendo a la


comunidad, empleados de la compaa y medio ambiente.
Asegurar una operacin confiable y minimizar consecuencias de
imprevistos no planeados e interrupciones en el negocio.
Preservar los activos de la Compaa conservando su vida remanente.

8.7. PRUEBAS DE FUNCIONAMIENTO DE LOS EQUIPOS CRITICOS DE


SEGURIDAD
Se realizarn pruebas funcionales a todos los sistemas ESD, PSV y
Contraincendios que no tengan pruebas o inspecciones funcionales
documentadas en los ltimos 6 meses, o que hayan reportado fallas en alguna
de sus partes y no se le hayan realizado pruebas funcionales con posterioridad
al mantenimiento del mismo.
Alcance de las pruebas:
Sistemas ESD: Con el coordinador del Cuarto de Control, Programador del
Oleoducto, el Coordinador de Mantenimiento de la estacin o base y el
profesional senior estaciones terceros Ecopetrol Ingeniero de Contratos Mayores
para las estaciones Porvenir, Miraflores y Vasconia se coordinaran pruebas
funcionales durante paros operativos del sistema generando el comando de S/D
desde los sistemas de control que lo tengan configurado para cada estacin del
Oleoducto.

Sistemas de alivio y Niveles de tanques: Coordinador de mantenimiento de


cada estacin y base el ltimo proceso de calibracin y pruebas realizadas a los
sistemas de alivio (Vlvulas Danflo, de Resorte, de Alivio trmico y de choque
del sistema), Switchs de nivel y lgica de accin asociada.
Sistemas Contra incendio: Se deben verificar los tipos de pruebas que hoy en
da se realizan a los sistemas y asegurar el adecuado funcionamiento de los
mismos y la vigencia de su capacidad frente a las instalaciones que manejan.
LDS/BTS: Establecer el estado real de funcionamiento, actualizacin del sistema
y validez de la informacin que lo alimenta con el grado de perturbacin que le
introduzca la falla de los diferentes tipos de seales remotas.
9. EQUIPOS OPERATIVOS
Los equipos de las escalas 1, 2 y 3 no afectan directamente el medio ambiente,
pero si afectan el capital valor de la organizacin, por ello no son Equipos Crticos
de Seguridad. El anlisis que mejor apoya estas clasificaciones es el de la
CLASIFICACION DE CRITICIDAD EQUIPOS OCENSA 2004.

9.1. EQUIPOS CRITICOS


Son los Equipos Crticos de operacin que con su fall tambin eventos |de
prdidas econmicas por el incumplimiento de los acuerdos de transporte con
los clientes. Su identificacin en SAP es asociada con el valor 3.
9.2. EQUIPOS ESCENCIALES
Son los Equipos de mantenimiento de la conservacin y preservacin del
Manejo Integro del Oleoducto y su fall acarrea prdida del valor intrnseco del
oleoducto y sus facilidades. Su identificacin en SAP es asociada con el valor 2.
9.3. EQUIPOS NO CRITICOS
Son los equipos de stock o sobre capacidad instalada y los equipos
decomisionados los cuales su fallo ocasiona igualmente prdida del valor
intrnseco del oleoducto pero en menor impacto en comparacin a los equipos
esenciales. Su identificacin en SAP es asociada con el valor 1.
Los resultados del estudio se resumen en la tabla que se muestra a
continuacin:

TABLA 4. MATRIZ DE CRITICIDAD DE EQUIPOS OCENSA.

10. ANEXOS
10.1.

GLOSARIO

Consecuencias Posibles (Likehood Consequence): Un mtodo de


Identificacin de Riesgos y evaluacin de Consecuencias donde todos los
posibles eventos posteriores se evalan por sus Riesgos. Usado en Escenarios
de Riesgo.
Catstrofe: Un Evento de proporciones inmensas que tiene Consecuencias
severas, frecuentemente con la prdida de vida y de una gran proporcin de los
activos de la organizacin.
Contingencia: Sistema de equipos y dispositivos de control inmediato a un fallo
de deteccin, sobre-presin, contencin y respuesta de emergencia.
Emergencia: Una circunstancia desconocida que origina una llamada de accin
inmediata, tanto para prevenir, controlar, mitigar o de otra forma responder a un
evento catastrfico.
Exposicin al Riesgo: Ocensa administra el enfoque de Evaluacin de
Riesgos desde la perspectiva de las cuatro clases de activos (comunidad y
empleados, ambiental, capital
Evaluacin de Riesgos: La identificacin de riesgos, la medida de riesgos, y el
proceso de clasificar los riesgos en rden de prioridad. Vea Medicin de
Riesgos. Es recomendable que la Evaluacin del riego sea (API 1160-2002,
Parrafo 8.4) :
Estructurado: Que provea completo y abierto anlisis y comprobacin.
Que identifique y use la lgica para determinar como un dato afecta la
posibilidad y la consecuencia de incidentes potenciales.
Recursos Adecuados: Personal adecuado y tiempo para cubrir en detalle
el anlisis.
Basado en la Experiencia: Considerar la frecuencia y severidad de
eventos pasados.
Predictivo: Investiga en naturaleza y bsca identificar previamente
amenazas a la integridad del oleoducto.
Uso Apropiado de los Datos: Tras examinar las decisiones tomadas sobre
los anlisis de riesgos de un sistema revisado, es recomendable que el
nivel de confianza se vea afectado.
Listo en proveer e identificar medios de retroalimentacin: El anlisis de
riegos es un proceso dinmico que mantiene un proceso de validacin
invalidacin de asunciones.

ESDV (Emergency Shut Down Valve) Vlvula de Bloqueo de Emergencia que


se pueden operar remotas pero el comando de cierre por Emergencia se enva
desde el DCS de cada Estacin y la apertura de la vlvula slo se puede hacer
Localmente en campo. Tambin se esperan tiempos de cierre de 3 a 5 minutos
una vez se envi el comando de accionamiento. Son vlvulas de compuerta en
el sistema Ocensa.
Exposicin: Vulnerabilidad a prdidas, la percepcin de Riesgo, o una
Amenaza a un activo o un proceso que produce activos, generalmente
cuantificado en dlares. Una exposicin es la suma de dlares en riesgo sin
considerar la probabilidad de un evento negativo. Tambin es una medida de
importancia.
FFD/T: Full Field Development Project/ Tittle: Documentos de diseo del
oleoducto por Ttulo del Proyecto de Desarrollo Total del Campo para
CUSIANA/CUPIAGUA.
Frecuencia/Posibilidad/Probabilidad: Una medida de incidencia, expresada en
el nmero de incidentes de un Evento en un plazo determinado. Vea tambin
Probabilidad y Posibilidad.
HOV (Hydraulic Operation Valve): Son las vlvulas de control remoto e incluye
en este grupo las ESDV y las PLEM. Estas vlvulas tienen tres formas de
operarlas; con Bomba Hidrulica Manual, con Unidad de Potencia Hidrulica
Porttil "Centralina" y con Motor Elctrico el cual recibe los comandos desde el
Cuarto de Control Bogot o localmente. Tiempo estimado de operacin 3 a 5
minutos (20 segundos Gate Valve MOV 210002 MAPS III-G-PR-005 Rev 1
Jan1998 item 5.7 La Beleza Pressure Reduction Station/ Overpressure
Protection 7th pargraph and 8 to 12 seconds 42 & 24 PLEMs gate valves) al
cierre o a la apertura una vez llegue el comando de accionamiento. Estas son
vlvulas de Compuerta en el sistema Ocensa.
Instrumentos/ Instruments: Dispositivos de medicin, indicacin, registro,
transmisin y control de variables de proceso tales como temperatura, presin
,flujo, densidad, entre otros, a travs de conversin de la variacin de la
capacidad capacitancia en el tiempo de la variable directamente controlada
de una variable de amplificacin que generan energa que se convierte en datos
de control.
FT
=Transmisor medidor de flujo Flow Meter
DT
=Transmisor medidor de Densidad densitmetro Densitometer
TT
=Transmisor de Temperatura Temperatura Meter
PT
=Transmisor de Presin Pressure Meter

FSH =Interruptor de flujo de alivio Oulet Relief Flow switch


FQIT =Transmisor Medidor de Flujo
con Contador(Counter) Flor
delivery flow meter.
MS =Patines de Medicin Standard Conditions Delivery Flor Meter

Interruptores de Alto Nivel y Alta Presin/LSH y PSH, PSHH(Switches): Son


interruptores de control automtico para iniciar accin de atenuacin bien sea y
en cada caso de la variable nivel, flujo, presin, que de continuar el
incremento de tal variable se incia secuencia de apagado de emergencia y si
an persiste el incremento de la variable sobre los lmites de interrupcin anterior
se activa el apagado de emergencia sbito.
MAOP/ Maximun Alloadble Operacional Pressure: Sigla que por sus
abreviaturas en ingles se refiere a Presin de Operacin Mxima Admisible.
MASP/ Maximun Alloadble Surge Pressure: Sigla que por sus abreviaturas
en ingles se refiere a Presin de Fluctuacin Mxima Admisible.
LDS(Leak Detection System: Es un sistema computarizado de monitoreo del
oleoducto que mediante algoritmos de monitoreo mejora las habilidades del
operador en cuarto de control para reconocer anomalas hidrulicas que pueden
indicar una falla en el oleoducto o una descarga de hidrocarburo. Este tambin
es conocido como PLD(Pipeline Leak Detection) Deteccin de Fugas del
Oleoducto CPM(Computacional Pipeline Monitoring) Monitoreo Computarizado
del Oleoducto.
Matriz de Riesgos (Risk Matrix): Una combinacin de Medicin de Riesgos y
Prioritizacin de Riesgos que consiste en el uso de riesgos en el eje horizontal y
componentes de sistema en el eje izquierdo. Ambos ejes se ponen en grupos en
la esquina izquierda (Alto), creando una matriz con cuadrantes de grupos Alto,
Medio y Bajo de componentes y riesgos.
MHOV (Mechanical Hydraulic Operation Valve): Son vlvulas de aislamiento y
cumplen una funcin de escaso aporte en la respuesta requerida como equipo
de crtico de seguridad, en cuanto al propsito principal como vlvula de
contener y retener eficientemente en caso de emergencia. Su funcin es ms de
mantenimiento de las CHV, y apagado de lnea. Algunas son accionadas
manualmente con Volante y otras son accionadas con Unidad de Potencia
Hidrulica Porttil "Centralina"). Tiempos esperados de operacin de 30 a 50
minutos al cierre o a la apertura una vez se llegue al sitio y se conecte la
Centralina. Pueden ser vlvulas de bola o de compuerta. Dado el considerable
tiempo de respuesta para cerrarla y el requerimiento de excavacin y gra estas
vlvulas no son consideradas equipo crtico de seguridad. Criterio basado en

exclusin de anlisis de Mximo Estimado de Derrame FLUOR COLOMBIA LTD


Pg 1. FC-BP-C-102.1-0980- March 1, 1993.
Norma (Standard): Una serie de Criterios o requisitos que son aceptados
generalmente.
PLEM/Pipe Line End Manifold : Conjunto de tres vlvulas de seccionamiento
contencin rpida (8 a 12 segundos) que se encuentran fuera de la costa y
debajo de la TLU, y que cuentan con tamaos de dimetro de 42, y dos de 24.
Probabilidad/Frecuencia de Fallas/Posibilidad: Son las frecuencias
probabilidades de ocurrencia por ao, de las fallas arriba identificadas. Estas
frecuencias se obtienen metodolgicamente a travs del anlisis por arbol de
fallas FTA combinando todas las frecuencias probabilidades de fallo
inherentes al funcionamiento de cada equipo dispositivo crtico de seguridad,
considerando los estandares de ingeniera y mantenimiento regulatorios.
Para el anlisis se asocian por categoras los equipos y/o dispositivos crticos de
seguridad que intervienen, dentro de la Jerarqua de Riesgo que se originan por
las Fallas Identificadas y sus Consecuencias.
Pulsador/ Push Button: Interruptor de accionamiento manual, emplazado para
ser accionado generalmente en sistemas de apagado de emergencia.
Riesgo: Una medida de Incertidumbre de la posibilidad de que un trabajador
un individuo externo a la compaa, el medio ambiente y el capital organizacional
sufra un determinado dao prdida derivada de la ocurrencia de las
consecuencias de fallas de 1) la descarga de hidrocarburos y 2) la inhibicin
operacional no deseada de los equipos y dispositivos de respuesta de
emergencia . Puede consistir en Consecuencias positivas o negativas, aunque la
mayora de los riesgos positivos se llaman Oportunidades y los riesgos negativos
se llaman riesgos.
SCADA(Supervisory Control and Data Adquisicin): Sistema Supervisor del
Control y la Adquisicin de Datos mquina de inferencia basada en sistemas
de computacin y comunicacin que escruta, procesa, presenta y controla los
datos generados por los instrumentos de campo.
TLU/Transffer Line Unit /: Boya que conduce y controla el embarque de crudo
desde el mar.
Valoracin del Riesgo: Es el proceso de combinar la frecuencia y severidad
estimadas para cada consecuencia/evento.

Vlvulas Generales: Son vlvulas que cumple su propsito dentro de la


estacin y en ductos diferentes a la lnea principal de transporte de crudo.
Vlvulas Principales: Son las vlvulas ESDV, HOV, MHOV, PLEM y CHV que
se encuentran instaladas sobre la linea principal de transporte de crudo bien sea
dentro fuera de las estaciones.
Vlvulas de Servicio: Son vlvulas que cumple el propsito de aislar las
vlvulas principales para permitir de manera segura la realizacin de tareas de
mantenimiento sobre estas.

10.2.
MINIMOS REQUERIMIENTOS DE LOS EQUIPOS CRITICOS DE
SEGURIDAD:

Evaluacin de riesgo
Lmites de operacin segura Calibracin (PSI) y capacidad (MBD).
Datos de diseo y planos de construccin, instalacin y commisioning.
Actualizaciones de los planos de P&ID, cartas de seguridad, clasificacin
de reas y registros de las calibraciones de la instrumentacin de
proteccin.
Los instrumentos diseados para prevenir incidentes se recomienda que
tengan una probabilidad funcional sobre demanda del 99% mayor ., por
ejemplo para los de apagado.

10.3.
INDICADORES TIPO DE
CRITICOS DE SEGURIDAD:

DESEMPEO

PARA

LOS

EQUIPOS

Demora en las rdenes del trabajo de inspeccin para los ECS.


Porcentaje de cumplimiento en las inspecciones programadas.
Nmero de escapes desde los ECS incluyendo bridas y juntas
Demora total relacionada con su reparacin
Porcentaje de reparaciones cumpliendo tiempo estimado en notificacin.
Mantenimiento planeado versus el mantenimiento total para los ECS.

10.4.
EQUIPOS DE DETECCION /INSTRUMENTOS DEL SISTEMA DE
DETECCION DE FUGAS LDS Y SEGUIMIENTO DE PARCELAS BTS
Estacin Coveas

Estacin Cusiana

Estacin El Porvenir

Estacin Miraflores

Estaciones La Belleza, Caucasia y la Lnea

Estacin Vasconia

10.5.
EQUIPOS DE PROTECCION
Seguridad Estacin Cusiana

SOBRE-PRESION/Vlvulas

de

Listado- Diagnstico El Porvenir a TLU

10.6.

EQUIPOS DE CONTENCION

ESTACIONES/ HOVs, CHVs y ESDVs

ESTACIONES/ HOVs, CHVs y ESDVs

ESTACIONES CAUCASIA, COVEAS/ HOVs, CHVs y ESDVs

10.7.
EQUIPOS DE RESPUESTA DE EMERGENCIA / MITIGACION/
Contra Incendio Estacin El Porvenir

Contra Incendio Estacin Miraflores

Contra Incendio Estacin Vasconia

Contra Incendio / Equipos SRE Estacin Coveas

10.8.
EQUIPOS DE CONTINGENCIA
Estaciones Cusiana y El Porvenir

Estacin Miraflores

Estacin Vasconia

Cusiana, Tunja, Pto Berrio, El Pollo, Remedios y Caucasia

10.9.
CALCULO DE LA FRECUENCIA O PROBABILIDAD DE FALLA POR
ASPECTO.

10.10. SIMULACION DE LA PRESION NORMAL


ESCENARIO CRUDO 300 cSt (Ver documento Anexo).

DE

OPERACIN

10.11. SIMULACION DEL RE-ARRANQUE ESCENARIO CRUDO 300 cSt (Ver


documento Anexo).

10.12. MASTER DE EQUIPOS CRITICOS OCENSA, CODIGOS,


FRECUENCIAS, CODIGO OCENSA Y SAP RANKINE (Ver documento
Anexo).

11. BIBLIOGRAFIA
DOCUMENTOS LINEA BASE
Estandares:

Departament of Transport /USA


Transportation of Hazardous Liquids by Pipeline DOT 195-06-03-03

American Society of Mechanical Engineers/USA


Pipeline Transportation Systems for Liquid
Hidrocarbons and Other Liquids ASME B31.4-2002

Canadian Standards Association/Canadian National Energy


Bureau. CSA Z662-2003

OnShore Pipeline Regulations


NEB 1999Amd1 20-Jan-03

Off Shore Pipeline Regulations


API 1111 y DOT 195 Capitulo IX

Documentos Ocensa:

OCENSASs Maximun Allowable Pressure Surge


MAPS III-JAN 1998

Valve Location and Pipeline Leak Detection

FFD/T- PLU-AO3

In Line Overpressure Protection


FFD/T-3GGG-ICU-001-1/1

Hose/ Buoy Overpressure Protection


FFD/T-3GGG-ICU-002-1/1

Shutdown Philosophy
FFD/T-PRU-B44.c/C44.c
Documentos Referencia:

Oil & Gas Pipeline Systems


American Petroleum Institute
API 1129
Assurance of Hazardous Liquid Pipeline System Integrity

American Petroleum Institute API 1130


Computational Pipeline Monitoring for Liquid Pipelines

American Petroleum Institute


API 1160
Managing System Integrity for Hazardous Liquid Pipelines

American Petroleum Institute


API 653
Tank Inpection, Alteeration, Repair and Reconstruction

American Petroleum Institute


API 2350
Overfill Protection for Storage Tanks in Petroleum Facilities

Ingenieria de Mantenimiento y fiabilidad aplicada en la gestin de activos,


Carlos Parra Mrquez y Adolfo Crespo Mrquez.

CALCULO DEL TIEMPO DE PARADA CRITICO Y TEMPERATURAS DE RE-ARRANQUE


CRITICO- 300 cSt CASE - JUNIO 22/051.Parametros trmicos
Enfriamiento de Crudo por una tubera
hm.p.=
D=

h promedio que se basa arbitrariamente en la diferencia media aritmtica de temperatura Btu/h(pie2)dif(F)


Dimetro, pie

K=
w=
Cp=
L=

Conductividad trmica, Btu/h/pie2/(gradiente unitario temperatura F/pie)


Gasto de masa del flujo por tubo, lb/h/tubo
Calor especfico a presin constante, Btu/lb/F
Longitud de la superficie de transferencia de calor, pie

=
w=

Viscosidad a la temperatura de la masa, lb/h/pie; es igual 2.42 por el nmero de cP, es igual a 116000 por la viscosidad en (lb fuerza)(s)/pie2
Viscosidad a la temperatura de la pared, lb/h/pie

G=

Velocidad de la masa, igual a w/S, lb/h/pie2 de seccin transversal ocupada por el fluido

S=

Seccin transversal llenada por el fluido, en el plano normal a la direccin del flujo del fluido, pie2
COVEAS

CAUCASIA

RIO CAUCA

ACAPULCO

L.CATALINA

BIJAGAL

NECHI

Vasconia

LA PORQUERA

La Belleza

MIRAFLORES

EL PORVENIR

2.Secuencia de Batches Parcelas:

0.87
Cifras Varias DE
RELAJACION
Trmica C

Temperatura de Inyeccin Batche, C


Temp amb media(epo+cota) km, C
TUNNING MODE Caida estim temp en la seccin/batch batch,C
Viscosidad en cSt, 30C
Velocidad, m/s
Diametro, cm
Peso Espec.,
Total bpd
Tamao Parcelasconsu, Bpd
Long. Parcelas Segregadas Desplazadas, Bbls
epo-cva, BBls
Long batche , pies
Area cilindrica batche ,pies^2
Rata= Bph
GPM
w, lb/h
Dimetro Tubera, Pulgadas
S, pie^2
G, Lb/h/pies^2
Localizacin en m, final parcela ref. EPO
Tw, F= Tamb+5 C, F
5
Tw(epo+cota)= Tamb+5C, F
Temp salida estimada batch=Tiny-2, F
2

Tsal=Tiny-deltaTcaidaC/batch, F

30

30
29

Velocidad, m/s
Diametro, in
Long Parcela, m
Long Parcela crudo, pies
Area long Parcela crudo, pies^2

si Re>2100 =
Grfica MARKS 4.4.3 y L/D>235;
Ecuacin 4.4.10
H m.p., Btu/h(pie2)dif(F)
k acero, Btu/h(pie2)dif(F)
Lacero 3/4",pies
k tierra seca, Btu/h(pie2)dif(F)
Ltierra 1m,pies

32

50

CAST300
30
30
0.0

MZ62.09CUP1.8+AditivoCUS2.7
27
33
30
30
30
30
0.0
0.0
0.0

CAST300
30
30
0.0

MZ62.09CUP1.8+AditivoCUS2.7
27
33
30
30
30
30
0.0
0.0
0.0

MZ62.09
27
30
0.0

CAST300
30
30
0.0

MZ62.09
27
30
0.0

MZ62.09CUP1.8+Aditivo
CUP1.8+Aditivo
27
33
33
30
30
30
0.0
0.0
0.0

CUS2.7
30
30
0.0

CUS2.7
30
30
0.0

MZ62.09
27
30
0.0

CAST300
30
30
0.0

CAST300CUP1.8+Aditivo
CUP1.8+AditivoCUS2.7
30
33
33
30
30
30
30
30
0.0
0.0
0.0
0.0

MZ62.09
27
30
0.0

CAST300
30
27
0.0

MZ62.09
27
30
0.0

MZ62.09
27
27
0.0

MZ62.09 CUP1.8+AditivoCUS2.7
27
33
30
27
27
27
0.0
0.0
0.0

MZ62.09
27
27
0.0

CAST300
30
27
0.0

MZ62.09CUP1.8+AditivoCUS2.7
27
33
30
27
24
23
0.0
0.0
0.0

MZ62.09
27
23
0.0

CAST300
30
24
0.0

MZ62.09CUP1.8+AditivoCUS2.7
27
33
30
29
29
29
0.0
0.0
0.0

MZ62.09
27
29
0.0

CAST300
30
28
0.0

MZ62.09CUP1.8+AditivoCUS2.7
27
33
30
29
27
29
0.0
0.0
0.0

MZ62.09
27
27
0.0

CAST300
30
29
0.0

MZ62.09
27
27
0.0

MZ62.09CUP1.8+AditivoCUS2.7
27
33
30
29
27
22
0.0
0.0
0.0

MZ62.09
27
26
0.0

CAST300
30
22
0.0

CAST300
30
18
0.0

MZ62.09
27
12
0.0

CUP1.8+Aditivo
33
15.0
0.0

CUS2.7
30
9.0
0.0

CUS2.7
30
13.0
0.0

MZ62.09
27
7.0
0.0

CAST300
30
6.0
5.0

MZ62.09
27
13.0
5.0

CUP1.8+Aditivo
33
5.0
11.7

CUP1.8+Aditivo
33
14.0
0.0

CUS2.7
30
13.0
0.0

MZ62.09
27
22.0
0.0

CAST300
30
26.0
0.0

250
62.09
1.35584083 1.355840831
76.2
76.2
0.95
0.85
170,000
170,000
68,000
42,000
2,782,400
2,714,400
2,802,000
2,802,000
77,782
48,042
194,454
120,104
14000
14000
9800
9800
475,577
425,517
30
30
4.9
4.9
96,884
86,685
791,875
768,167
95
95
95
95
81
76

1.8
1.3558408
76.2
0.800
170,000
42,000
2,672,400
2,802,000
48,042
120,104
14000
9800
400,486
30
4.9
81,586
753,524
95
95
86

2.7
1.3558408
76.2
0.801
170,000
18,000
2,630,400
2,802,000
20,589
51,473
14000
9800
400,987
30
4.9
81,688
738,881
95
95
81

62.09
1.3558408
76.2
0.85
170,000
40,000
2,612,400
2,802,000
45,754
114,385
14000
9800
425,517
30
4.9
86,685
732,605
95
95
76

250
62.09
1.35584083 1.35584083
76.2
76.2
0.95
0.85
170,000
170,000
68,000
40,000
2,572,400
2,504,400
2,802,000
2,802,000
77,782
45,754
194,454
114,385
14000
14000
9800
9800
475,577
425,517
30
30
4.9
4.9
96,884
86,685
718,660
694,952
95
95
95
95
81
76

1.8
1.3558408
76.2
0.800
170,000
42,000
2,464,400
2,802,000
48,042
120,104
14000
9800
400,486
30
4.9
81,586
681,006
95
95
86

2.7
1.3558408
76.2
0.801
170,000
18,000
2,422,400
2,802,000
20,589
51,473
14000
9800
400,987
30
4.9
81,688
666,363
95
95
81

62.09
1.3558408
76.2
0.85
170,000
40,000
2,404,400
2,802,000
45,754
114,385
14000
9800
425,517
30
4.9
86,685
660,087
95
95
76

250
62.09
1.35584083 1.35584083
76.2
76.2
0.95
0.85
170,000
170,000
68,000
39,568
2,364,400
2,296,400
2,802,000
2,802,000
77,782
45,260
194,454
113,149
14000
14000
9800
9800
475,577
425,517
30
30
4.9
4.9
96,884
86,685
646,141
622,434
95
95
95
95
81
76

62.09
1.355840831
76.2
0.85
170,000
432
2,256,832
2,802,000
494
1,235
14000
9800
425,517
30
4.9
86,685
608,638
95
95
76

1.8
1.8
1.3558408 1.355840831
76.2
76.2
0.800
0.800
170,000
170,000
14,670
27,330
2,256,400
2,241,730
2,802,000
2,802,000
16,780
31,261
41,951
78,153
14000
14000
9800
9800
400,486
400,486
30
30
4.9
4.9
81,586
81,586
608,488
603,373
95
95
95
95
86
86

2.7
1.355840831
76.2
0.801
170,000
2,880
2,214,400
2,802,000
3,294
8,236
14000
9800
400,987
30
4.9
81,688
593,845
95
95
81

2.7
1.355840831
76.2
0.801
170,000
15,120
2,211,520
2,802,000
17,295
43,237
14000
9800
400,987
30
4.9
81,688
592,841
95
95
81

62.09
1.3558408
76.2
0.85
170,000
40,000
2,196,400
2,802,000
45,754
114,385
14000
9800
425,517
30
4.9
86,685
587,569
95
95
76

250
1.35584083
76.2
0.95
170,000
8,064
2,156,400
2,802,000
9,224
23,060
14000
9800
475,577
30
4.9
96,884
573,623
95
95
81

250
1.355840831
76.2
0.95
170,000
59,936
2,148,336
2,802,000
68,558
171,394
14000
9800
475,577
30
4.9
96,884
570,812
95
95
81

1.8
1.3558408
76.2
0.800
170,000
32,760
2,088,400
2,802,000
37,472
93,681
14000
9800
400,486
30
4.9
81,586
561,337
95
95
86

1.8
1.3558408
76.2
0.800
170,000
9,240
2,055,640
2,802,000
10,569
26,423
14000
9800
400,486
30
4.9
81,586
549,915
95
95
86

2.7
1.3558408
76.2
0.801
170,000
18,000
2,046,400
2,802,000
20,589
51,473
14000
9800
400,987
30
4.9
81,688
546,694
95
95
81

62.09
1.3558408
76.2
0.85
170,000
40,000
2,028,400
2,802,000
45,754
114,385
14000
9800
425,517
30
4.9
86,685
540,418
95
95
76

250
62.09
62.09
1.35584083 1.35584083 1.35584083
76.2
76.2
76.2
0.95
0.85
0.85
170,000
170,000
170,000
68,000
7,390
29,050
1,988,400
1,920,400
1,913,010
2,802,000
2,802,000
2,802,000
77,782
8,453
33,229
194,454
21,133
83,072
14000
14000
14000
9800
9800
9800
475,577
425,517
425,517
30
30
30
4.9
4.9
4.9
96,884
86,685
86,685
540,052
536,601
526,473
89.6
95
89.6
90
95
90
81
76
76

62.09
1.355840831
76.2
0.85
170,000
3,560
1,883,960
2,802,000
4,072
10,180
14000
9800
425,517
30
4.9
86,685
516,344
89.6
90
76

1.8
1.3558408
76.2
0.800
170,000
42,000
1,880,400
2,802,000
48,042
120,104
14000
9800
400,486
30
4.9
81,586
515,103
89.6
90
86

2.7
1.3558408
76.2
0.801
170,000
18,000
1,838,400
2,802,000
20,589
51,473
14000
9800
400,987
30
4.9
81,688
500,460
89.6
90
81

62.09
1.3558408
76.2
0.85
170,000
40,000
1,820,400
2,802,000
45,754
114,385
14000
9800
425,517
30
4.9
86,685
494,185
89.6
90
76

250
62.09
1.35584083 1.35584083
76.2
76.2
0.95
0.85
170,000
170,000
68,000
40,000
1,780,400
1,712,400
2,802,000
2,802,000
77,782
45,754
194,454
114,385
14000
14000
9800
9800
475,577
425,517
30
30
4.9
4.9
96,884
86,685
490,001
480,239
89.6
89.6
90
90
81
76

1.8
1.3558408
76.2
0.800
170,000
42,000
1,672,400
2,802,000
48,042
120,104
14000
9800
400,486
30
4.9
81,586
466,293
84.2
84
86

2.7
1.3558408
76.2
0.801
170,000
18,000
1,630,400
2,802,000
20,589
51,473
14000
9800
400,987
30
4.9
81,688
451,650
82.4
82
81

62.09
1.3558408
76.2
0.85
170,000
40,000
1,612,400
2,802,000
45,754
114,385
14000
9800
425,517
30
4.9
86,685
445,374
82.4
82
76

250
62.09
1.35584083 1.35584083
76.2
76.2
0.95
0.85
170,000
170,000
68,000
42,000
1,572,400
1,504,400
2,802,000
2,802,000
77,782
48,042
194,454
120,104
14000
14000
9800
9800
475,577
425,517
30
30
4.9
4.9
96,884
86,685
440,493
431,429
84.2
93.2
84
93
81
76

1.8
1.3558408
76.2
0.800
170,000
42,000
1,462,400
2,802,000
48,042
120,104
14000
9800
400,486
30
4.9
81,586
416,785
93.2
93
86

2.7
1.3558408
76.2
0.801
170,000
18,000
1,420,400
2,802,000
20,589
51,473
14000
9800
400,987
30
4.9
81,688
402,142
93.2
93
81

62.09
1.3558408
76.2
0.85
170,000
40,000
1,402,400
2,802,000
45,754
114,385
14000
9800
425,517
30
4.9
86,685
395,867
93.2
93
76

250
62.09
1.35584083 1.35584083
76.2
76.2
0.95
0.85
170,000
170,000
68,000
40,000
1,362,400
1,294,400
2,802,000
2,802,000
77,782
45,754
194,454
114,385
14000
14000
9800
9800
475,577
425,517
30
30
4.9
4.9
96,884
86,685
391,683
381,921
91.4
93.2
91
93
81
76

1.8
1.3558408
76.2
0.800
170,000
42,000
1,254,400
2,802,000
48,042
120,104
14000
9800
400,486
30
4.9
81,586
367,975
89.6
90
86

2.7
1.3558408
76.2
0.801
170,000
18,000
1,212,400
2,802,000
20,589
51,473
14000
9800
400,987
30
4.9
81,688
353,332
93.2
93
81

62.09
1.3558408
76.2
0.85
170,000
40,000
1,194,400
2,802,000
45,754
114,385
14000
9800
425,517
30
4.9
86,685
347,057
89.6
90
76

250
62.09
62.09
1.35584083 1.35584083 1.35584083
76.2
76.2
76.2
0.95
0.85
0.85
170,000
170,000
270,000
68,000
40,000
9,300
1,154,400
1,086,400
1,046,400
2,802,000
2,802,000
2,802,000
77,782
45,754
10,638
194,454
114,385
26,594
14000
14000
14000
9800
9800
9800
475,577
425,517
425,517
30
30
30
4.9
4.9
4.9
96,884
86,685
86,685
342,873
333,111
319,165
93.2
89.6
93.2
93
90
93
81
76
76

1.8
1.3558408
76.2
0.800
270,000
147,000
1,037,100
2,802,000
168,146
420,364
14000
9800
400,486
30
4.9
81,586
315,923
89.6
90
86

2.7
1.3558408
76.2
0.801
270,000
63,000
890,100
2,802,000
72,062
180,156
14000
9800
400,987
30
4.9
81,688
264,672
80.6
81
81

62.09
1.3558408
76.2
0.85
270,000
56,000
827,100
2,802,000
64,055
160,139
14000
9800
425,517
30
4.9
86,685
242,707
87.8
88
76

250
1.355840831
76.2
0.95
270,000
32,600
771,100
2,802,000
37,289
93,224
14000
9800
475,577
30
4.9
96,884
231,754
80.6
81
81

250
0.94155613
91.44
0.95
270,000
35,400
738,500
2,802,000
28,120
84,359
14000
9800
475,577
36
7.1
67,280
223,183
73.4
73
81

62.09
0.941556133
91.44
0.85
270,000
56,000
703,100
2,802,000
44,483
133,449
14000
9800
425,517
36
7.1
60,198
214,612
62.6
63
76

1.8
0.941556133
91.44
0.800
270,000
147,000
647,100
2,802,000
116,768
350,303
14000
9800
400,486
36
7.1
56,657
201,054
68
68
86

2.7
0.941556133
91.44
0.801
270,000
44,100
500,100
2,802,000
35,030
105,091
14000
9800
400,987
36
7.1
56,728
165,463
57.2
57
81

2.7
0.941556133
91.44
0.801
270,000
18,900
456,000
2,802,000
15,013
45,039
14000
9800
400,987
36
7.1
56,728
160,887
64.4
64
81

62.08
0.941556133
91.44
0.85
270,000
58,100
437,100
2,802,000
46,151
138,453
14000
9800
425,517
36
7.1
60,198
156,311
53.6
54
76

250
0.941556133
91.44
0.95
270,000
68,000
379,000
2,802,000
54,015
162,045
14000
9800
475,577
36
7.1
67,280
142,244
51.8
52
81

62.08
0.941556133
91.44
0.85
270,000
56,000
311,000
2,802,000
44,483
133,449
14000
9800
425,517
36
7.1
60,198
125,780
64.4
64
76

1.8
0.941556133
91.44
0.8
270,000
107,016
255,000
2,802,000
85,007
255,021
14000
9800
400,486
36
7.1
56,657
112,222
50
50
86

1.8
1.355840831
76.2
0.8
270,000
20,384
147,984
2,802,000
23,316
58,290
14000
9800
400,486
30
4.9
81,586
86,312
66.2
66
86

2.7
1.355840831
76.2
0.801
270,000
54,600
127,600
2,802,000
62,454
156,135
14000
9800
400,987
30
4.9
81,688
79,205
64.4
64
81

62.09
1.355840831
76.2
0.85
270,000
73,000
73,000
2,802,000
83,501
208,752
14000
9800
425,517
30
4.9
86,685
60,169
80.6
81
76

250
1.355840831
76.2
0.95
270,000
0
0
2,802,000
0
0
14000
9800
475,577
30
4.9
96,884
34,718
87.8
88
81

86

81
1.355840831
30
6,833
22,419
56,049

86
81
1.35584083 1.355840831
30
30
23,708
14,643
77,782
48,042
194,454
120,104

91
1.3558408
30
14,643
48,042
120,104

86
1.3558408
30
6,276
20,589
51,473

81
1.3558408
30
13,946
45,754
114,385

86
81
1.35584083 1.35584083
30
30
23,708
13,946
77,782
45,754
194,454
114,385

91
1.3558408
30
14,643
48,042
120,104

86
1.3558408
30
6,276
20,589
51,473

81
1.3558408
30
13,946
45,754
114,385

86
81
1.35584083 1.35584083
30
30
23,708
13,795
77,782
45,260
194,454
113,149

81
1.355840831
30
151
494
1,235

91
91
1.3558408 1.355840831
30
30
5,115
9,528
16,780
31,261
41,951
78,153

86
1.355840831
30
1,004
3,294
8,236

86
1.355840831
30
5,272
17,295
43,237

81
1.3558408
30
13,946
45,754
114,385

86
1.35584083
30
2,811
9,224
23,060

86
1.355840831
30
20,896
68,558
171,394

91
1.3558408
30
11,422
37,472
93,681

91
1.3558408
30
3,221
10,569
26,423

86
1.3558408
30
6,276
20,589
51,473

81
1.3558408
30
13,946
45,754
114,385

86
81
81
1.35584083 1.35584083 1.35584083
30
30
30
23,708
10,128
10,128
77,782
33,229
33,229
194,454
83,072
83,072

81
1.355840831
30
1,241
4,072
10,180

91
1.3558408
30
14,643
48,042
120,104

86
1.3558408
30
6,276
20,589
51,473

81
1.3558408
30
13,946
45,754
114,385

86
81
1.35584083 1.35584083
30
30
23,708
13,946
77,782
45,754
194,454
114,385

91
1.3558408
30
14,643
48,042
120,104

86
1.3558408
30
6,276
20,589
51,473

81
1.3558408
30
13,946
45,754
114,385

86
81
1.35584083 1.35584083
30
30
23,708
14,643
77,782
48,042
194,454
120,104

91
1.3558408
30
14,643
48,042
120,104

86
1.3558408
30
6,276
20,589
51,473

81
1.3558408
30
13,946
45,754
114,385

86
81
1.35584083 1.35584083
30
30
23,708
13,946
77,782
45,754
194,454
114,385

91
1.3558408
30
14,643
48,042
120,104

86
1.3558408
30
6,276
20,589
51,473

81
1.3558408
30
13,946
45,754
114,385

86
81
81
1.35584083 1.35584083 1.35584083
30
30
30
23,708
13,946
3,242
77,782
45,754
10,638
194,454
114,385
26,594

91
1.3558408
30
51,251
168,146
420,364

86
1.3558408
30
21,965
72,062
180,156

81
1.3558408
30
19,524
64,055
160,139

86
1.355840831
30
8,571
28,120
70,299

86
0.94155613
36
8,571
28,120
84,359

81
0.941556133
36
13,558
44,483
133,449

91
0.941556133
36
35,591
116,768
350,303

86
0.941556133
36
4,576
15,013
45,039

86
0.941556133
36
4,576
15,013
45,039

81
0.941556133
36
14,067
46,151
138,453

77
0.941556133
36
16,464
54,015
162,045

72
0.941556133
36
13,558
44,483
133,449

70
0.941556133
36
25,910
85,007
255,021

91
1.355840831
30
7,107
23,316
58,290

86
1.355840831
30
19,036
62,454
156,135

81
1.355840831
30
25,451
83,501
208,752

86
1.355840831
30
0
0
0

68
2.3

76

86

81
2.21
40.22
2.21
2.08

76

86

81
2.21
40.38
2.21
2.08

76

81
2.21
40.03
2.21
2.08

81
2.21
40.39
2.21
2.08

76

81

81

86

86

81
2.21
40.86
2.21
2.08

76

76

86

81
2.21
40.50
2.21
2.13

76

86

81
2.21
40.46
2.21
2.19

76

86

81
2.21
41.03
2.21
2.10

76

86

81
2.21
41.29
2.21
2.10

76

86

81
2.21
39.74
2.21
2.21

76

81

81

76

86

81
2.21
33.68
2.21
2.42

81
2.21
37.46
2.21
2.35

76

81

76

86

86

81
2.21
40.94
2.21
2.35

76

81

1.80
18.42
1.80
1.70

1.80
18.10
1.80
1.70

1.80
22.71
1.80
2.20

1.80
24.06
1.80
2.02

81

76

44
46
2.0

94
320
991

76.31
299.62
76.31
32.41

475
1400
7778
184.66
78.44
0.115
0.1149
0.448
0.4477

2.041195943

81

76

1.80
18.20
1.80
1.70

23
460

0.116
0.115922423
0.43
0.42971243

MZ62.09
27
30
0.0

62.09
1.355840831
76.2
0.85
170,000
19,600
2,802,000
2,802,000
22,419
56,049
14000
9800
425,517
30
4.9
86,685
798,708
95
95
76

######

Valores de
Interpolando Fluencia
cus=cP
cus=cP
cus fluencia=cP
wcus=cP
cup=cP
cup frio=cP
cup fluencia=cP
vwcup=cP
mez=cP
mez frio=cP
mez fluencia=cP
wmez=cP
cast=cP
cast frio=cP
cast fluencia=cP
wcast=cP
,(lb)(h)/pie^2
w, (lb)(h)/pie^2
K=Kcal/m/h/C
K=BTU/lbm/h/F
Cp=Kcal/kgm/C
Cp=BTU/Lbm/F
Re=V*D/v
H m.p., Btu/h(pie2)dif(F)

MZ62.09
27
30
0.0

76

76

1.80
18.29
1.80
1.70

76.31
347.55
76.31
32.41
190.00
1377.06
337.78
190.00
459.80
459.80

81

76.31
348.10
76.31
32.41

184.66
78.44

4.35
4.11

5.34
5.04

184.66
78.44

0.114079212

0.11347961 0.114079212

0.11288

0.1134796

0.458670828
11,509

0.46646561 0.458670828
5,166
11,509

0.4742604
460,315

0.4664656
374,934

0.003CpG/((
0.0039CpG/((Cp/ 0.0028CpG/( 0.0037CpG/(( Cp/k)^(2/3)
k)^(2/3)*(w/)^0. (Cp/k)^(2/3) Cp/k)^(2/3)*( *(w/)^0.1
*(w/)^0.14) w/)^0.14) 4)
14)
2.13
0.83
2.13
16.87
26.20
26.20
26.20
26.20
0.06
0.06
0.06
0.06
0.30
0.30
0.30
0.30
3.28
3.28
3.28
3.28

0.003CpG/((
Cp/k)^(2/3)
*(w/)^0.1
4)
14.70
26.20
0.06
0.30
3.28

76.31
347.71
76.31
32.41
190.00
1383.54
337.78
190.00
459.80
459.80

76.31
349.48
76.31
32.41

184.66
78.44

4.35
4.11

5.34
5.04

184.66
78.44

0.1140792

0.11347961 0.11407921

0.11288

0.1134796

0.4586708
11,509

0.46646561 0.45867083
5,166
11,509

0.4742604
460,315

0.4664656
374,934

0.0037CpG/( 0.003CpG/((
0.0039CpG/
((Cp/k)^(2/ 0.0028CpG/(( (Cp/k)^(2/3) Cp/k)^(2/3)
3)*(w/)^0. Cp/k)^(2/3)* *(w/)^0.14 *(w/)^0.1
4)
14)
(w/)^0.14) )
2.13
0.83
2.13
16.87
26.20
26.20
26.20
26.20
0.06
0.06
0.06
0.06
0.30
0.30
0.30
0.30
3.28
3.28
3.28
3.28

0.003CpG/((
Cp/k)^(2/3)
*(w/)^0.1
4)
14.70
26.20
0.06
0.30
3.28

76.31
348.50
76.31
32.41
190.00
1387.92
337.78
190.00
459.80
459.80

86

86

1.80
17.95
1.80
1.70

1.80
18.03
1.80
1.70

76.31
335.48
76.31
32.41

76.31
349.02
76.31
32.41

76.31
351.46
76.31
32.41

4.35
4.11

5.34
5.04

5.34
5.04

184.66
78.44

0.114079212

0.11288 0.112880014

0.113479613

0.113479613

0.1140792

0.11347961

0.113479613

0.11288

0.11288

0.1134796

0.458670828
11,509

0.4742604 0.474260395
460,315
460,315

0.466465611
374,934

0.466465611
374,934

0.4586708
11,509

0.46646561
5,166

0.466465611
5,166

0.4742604
460,315

0.4742604
460,315

0.4664656
374,934

0.003CpG/((
0.0039CpG/
((Cp/k)^(2/ 0.0028CpG/(( 0.0028CpG/((C Cp/k)^(2/3)
3)*(w/)^0. Cp/k)^(2/3)* p/k)^(2/3)*(w *(w/)^0.1
(w/)^0.14) /)^0.14)
4)
14)
2.13
0.83
0.83
16.87
26.20
26.20
26.20
26.20
0.06
0.06
0.06
0.06
0.30
0.30
0.30
0.30
3.28
3.28
3.28
3.28

0.003CpG/((
Cp/k)^(2/3)
*(w/)^0.1
4)
16.87
26.20
0.06
0.30
3.28

0.003CpG/((
Cp/k)^(2/3)
*(w/)^0.1
4)
14.70
26.20
0.06
0.30
3.28

184.66
78.44

0.1140792

0.11347961 0.11407921

0.4586708
11,509

0.46646561 0.45867083
5,166
11,509

0.0039CpG/
0.0037CpG/(
((Cp/k)^(2/ 0.0028CpG/(( (Cp/k)^(2/3) 0.0037CpG/((
3)*(w/)^0. Cp/k)^(2/3)* *(w/)^0.14 Cp/k)^(2/3)*(
w/)^0.14)
14)
(w/)^0.14) )
2.13
0.83
2.13
2.13
26.20
26.20
26.20
26.20
0.06
0.06
0.06
0.06
0.30
0.30
0.30
0.30
3.28
3.28
3.28
3.28

4.35
4.11

0.003CpG/((
Cp/k)^(2/3) 0.003CpG/((C 0.003CpG/((Cp/k 0.003CpG/((C
*(w/)^0.1 p/k)^(2/3)*( )^(2/3)*(w/)^0.1 p/k)^(2/3)*(
4)
w/)^0.14)
4)
w/)^0.14)
16.87
16.87
14.70
14.70
26.20
26.20
26.20
26.20
0.06
0.06
0.06
0.06
0.30
0.30
0.30
0.30
3.28
3.28
3.28
3.28

76

76

81

76

1.80
18.18
1.80
1.76

190.00
1309.74
337.78
190.00
459.80
459.80

184.66
78.44

81

190.00
1374.07
337.78
190.00
459.80
459.80

4.35
4.11

4.35
4.11

5.34
5.04

184.66
78.44

76.31
345.34
76.31
32.41
247.00
1395.60
337.78
247.00
597.74
597.74

184.66
78.44

76.31
346.46
76.31
44.63

81

76

1.80
18.28
1.80
1.82

76.31
338.57
76.31
44.63

76.31
348.72
76.31
44.63

184.66
108.01

184.66
108.01

4.35
4.26

5.34
5.16

184.66
108.01

0.1140792

0.11347961 0.11407921 0.11407921

0.114079212

0.11288

0.1134796

0.4586708
11,509

0.46646561 0.45867083 0.45867083


3,974
11,509
11,509

0.458670828
11,509

0.4742604
460,315

0.4664656
374,934

0.0037CpG/( 0.0037CpG/(
0.003CpG/(( 0.003CpG/((
0.0039CpG/
((Cp/k)^(2/ 0.0028CpG/(( (Cp/k)^(2/3) (Cp/k)^(2/3) 0.0037CpG/((C Cp/k)^(2/3) Cp/k)^(2/3)
3)*(w/)^0. Cp/k)^(2/3)* *(w/)^0.14 *(w/)^0.14 p/k)^(2/3)*(w *(w/)^0.1 *(w/)^0.1
)
/)^0.14)
4)
4)
14)
(w/)^0.14) )
2.13
0.69
2.13
2.04
2.04
16.79
14.65
26.20
26.20
26.20
26.20
26.20
26.20
26.20
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.30
0.30
0.30
0.30
0.30
0.30
0.30
3.28
3.28
3.28
3.28
3.28
3.28
3.28

76

1.80
18.78
1.80
1.72

76.31
348.11
76.31
44.63
247.00
1394.00
337.78
247.00
597.74
597.74

81

76.31
346.95
76.31
60.92

184.66
108.01

4.35
4.40

5.34
5.31

184.66
147.43

0.1140792

0.11347961 0.11407921

0.11288

0.1134796

0.4586708
11,509

0.46646561 0.45867083
3,974
11,509

0.4742604
460,315

0.4664656
374,934

0.0037CpG/( 0.003CpG/((
0.0039CpG/
((Cp/k)^(2/ 0.0028CpG/(( (Cp/k)^(2/3) Cp/k)^(2/3)
3)*(w/)^0. Cp/k)^(2/3)* *(w/)^0.14 *(w/)^0.1
(w/)^0.14) )
4)
14)
2.04
0.69
2.04
16.71
26.20
26.20
26.20
26.20
0.06
0.06
0.06
0.06
0.30
0.30
0.30
0.30
3.28
3.28
3.28
3.28

0.003CpG/((
Cp/k)^(2/3)
*(w/)^0.1
4)
14.59
26.20
0.06
0.30
3.28

76

76

1.80
18.85
1.80
1.76

76.31
351.09
76.31
36.49
304.00
1396.58
337.78
304.00
735.68
735.68

81

76.31
352.72
76.31
36.49

184.66
88.30

4.35
4.16

5.34
5.08

184.66
88.30

0.1140792

0.11347961 0.11407921

0.11288

0.1134796

0.4586708
11,509

0.46646561 0.45867083
3,229
11,509

0.4742604
460,315

0.4664656
374,934

0.0039CpG/
0.0037CpG/( 0.003CpG/((
((Cp/k)^(2/ 0.0028CpG/(( (Cp/k)^(2/3) Cp/k)^(2/3)
3)*(w/)^0. Cp/k)^(2/3)* *(w/)^0.14 *(w/)^0.1
4)
14)
(w/)^0.14) )
1.95
0.61
2.10
16.84
26.20
26.20
26.20
26.20
0.06
0.06
0.06
0.06
0.30
0.30
0.30
0.30
3.28
3.28
3.28
3.28

0.003CpG/((
Cp/k)^(2/3)
*(w/)^0.1
4)
14.68
26.20
0.06
0.30
3.28

1.80
19.10
1.80
1.76

76.31
352.00
76.31
36.49
228.00
1411.05
337.78
228.00
551.76
551.76

76.31
352.96
76.31
44.63

76.31
352.18
76.31
44.63

76.31
345.25
76.31
36.49

76.31
348.17
76.31
48.70

76.31
327.73
76.31
105.72

76.31
308.48
76.31
126.08

4.35
4.26

5.34
5.35

184.66
117.86

0.1140792

0.11347961 0.11407921 0.11407921

0.11288

0.1134796

0.1140792

0.113479613

0.11347961

0.114079212

0.112880014

0.113479613

0.113479613

0.114079212

0.113479613

0.114079212

0.112880014

0.112880014

0.113479613

0.114079212

0.113479613

0.4586708
11,509

0.46646561 0.45867083 0.45867083


4,696
11,509
11,509

0.4742604
460,315

0.4664656
374,934

0.4586708
11,509

0.466465611
2,906

0.46646561
2,421

0.458670828
9,591

0.474260395
383,596

0.466465611
129,109

0.466465611
129,109

0.458670828
9,591

0.466465611
2,870

0.458670828
9,591

0.474260395
383,596

0.474260395
460,315

0.466465611
154,931

0.458670828
4,756

0.466465611
1,423

0.0039CpG/
0.0037CpG/( 0.0037CpG/(
((Cp/k)^(2/ 0.0028CpG/(( (Cp/k)^(2/3) (Cp/k)^(2/3)
3)*(w/)^0. Cp/k)^(2/3)* *(w/)^0.14 *(w/)^0.14
14)
(w/)^0.14) )
)
2.04
0.78
2.04
2.10
26.20
26.20
26.20
26.20
0.06
0.06
0.06
0.08
0.30
0.30
0.30
0.30
3.28
3.28
3.28
3.28

0.003CpG/((
Cp/k)^(2/3)
*(w/)^0.1
4)
16.79
26.20
0.08
0.30
3.28

0.003CpG/((
Cp/k)^(2/3)
*(w/)^0.1
4)
14.58
26.20
0.08
0.30
3.28

5.34
5.08

184.66
108.01

0.1140792

0.11347961 0.11407921

0.11288

0.1134796

0.4586708
11,509

0.46646561 0.45867083
4,305
11,509

0.4742604
460,315

0.4664656
374,934

0.0039CpG/
0.0037CpG/( 0.003CpG/((
((Cp/k)^(2/ 0.0028CpG/(( (Cp/k)^(2/3) Cp/k)^(2/3)
3)*(w/)^0. Cp/k)^(2/3)* *(w/)^0.14 *(w/)^0.1
14)
(w/)^0.14) )
4)
2.10
0.73
2.10
16.79
26.20
26.20
26.20
26.20
0.06
0.06
0.06
0.06
0.30
0.30
0.30
0.30
3.28
3.28
3.28
3.28

0.003CpG/((
Cp/k)^(2/3)
*(w/)^0.1
4)
14.68
26.20
0.06
0.30
3.28

184.66
108.01

184.66
255.84

4.35
4.84

5.34
5.85

5.34
5.70

76.31
322.18
76.31
64.99

184.66
88.30

4.35
4.26

337.78
1299.94
337.78
418.00
817.42
1,011.56

76.31
360.67
76.31
101.64

337.78
1344.59
337.78
342.00
817.42
827.64

184.66
88.30

209.00
1420.87
337.78
209.00
505.78
505.78

1.80
16.29
1.80
2.00

184.66
305.11

285.00
1453.13
337.78
646.00
689.70
1,563.32

184.66
245.98

4.35
5.32

4.35
4.89

5.34
5.70

184.66
157.28

285.00
2948.61
337.78
266.00
689.70
643.72

0.0039CpG/
0.0032CpG/((Cp
0.0018CpG/(( 0.004CpG/((C
0.003CpG/((Cp 0.003CpG/((Cp 0.004CpG/((Cp/ 0.0022CpG/((Cp/
((Cp/k)^(2/
3)*(w/)^0. 0.0018CpG/((Cp/k Cp/k)^(2/3)* p/k)^(2/3)*( 0.003CpG/((Cp/k)^( /k)^(2/3)*(w/)^ /k)^(2/3)*(w/ k)^(2/3)*(w/)^0. k)^(2/3)*(w/)^0.1 0.0039CpG/((Cp/k)^(2/ 0.003CpG/((Cp/k)^(2/ 0.003CpG/((Cp/k)^(2/3 0.003CpG/((Cp/k)^ 0.0038CpG/((Cp/k)^(2 /k)^(2/3)*(w/)^0
14)
4)
3)*(w/)^0.14)
3)*(w/)^0.14)
)*(w/)^0.14)
(2/3)*(w/)^0.14) /3)*(w/)^0.14)
.14)
14)
)^(2/3)*(w/)^0.14) (w/)^0.14) w/)^0.14)
2/3)*(w/)^0.14)
0.14)
)^0.14)
2.01
0.78
0.78
1.29
11.45
10.00
10.03
1.26
0.54
1.26
11.30
16.47
14.45
1.88
0.87
26.20
26.20
26.20
26.20
26.20
26.20
26.20
26.20
26.20
26.20
26.20
26.20
26.20
26.20
26.20
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
3.28
3.28
3.28
3.28
3.28
3.28
3.28
3.28
3.28
3.28
3.28
3.28
3.28
3.28
3.28

hm agua escurriendo a 100lb/h,


Btu/h(pie2)dif(F)

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

620

U=1/(1/hm.p+Lacero/kacero+Ltierra/k
tierra), Btu/h(pie2)dif(F)

0.0876

0.0823

0.0876

0.0909

0.0908

0.0876

0.0823

0.0876

0.0909

0.0908

0.0876

0.0823

0.0876

0.0876

0.0909

0.0909

0.0908

0.0908

0.0876

0.0823

0.0823

0.0909

0.0909

0.0908

0.0876

0.0808

0.0876

0.0875

0.0875

0.0909

0.0908

0.0875

0.0808

0.0875

0.0909

0.0908

0.0873

0.0794

0.0876

0.0909

0.0908

0.0876

0.0813

0.0876

0.0909

0.0908

0.0875

0.0818

0.0875

0.0876

0.0909

0.0908

0.0874

0.0818

0.0818

0.0853

0.0907

0.0906

0.0906

0.0852

0.0783

0.0852

0.0907

0.0909

0.0908

0.0872

0.0827

f
? hf=fL/D*V^2/2/g, m
Hf,psi

0.032
27
38

0.035
102
146

0.032
58
82

0.014
25
36

0.015
12
17

0.032
55
78

0.035
102
146

0.032
55
78

0.014
25
36

0.015
12
17

0.033
57
81

0.035
102
146

0.032
54
78

0.032
1
1

0.014
9
13

0.014
16
23

0.015
2
3

0.015
10
14

0.032
55
78

0.035
12
17

0.035
90
129

0.014
20
28

0.014
6
8

0.015
12
17

0.032
55
78

0.039
114
163

0.032
40
57

0.032
40
57

0.032
5
7

0.014
25
36

0.015
12
17

0.032
55
78

0.039
114
163

0.032
55
78

0.014
25
36

0.015
12
17

0.032
55
78

0.043
125
179

0.032
58
82

0.014
25
36

0.015
12
17

0.032
55
78

0.039
114
163

0.032
55
78

0.014
25
36

0.015
12
17

0.032
55
78

0.038
111
158

0.032
55
78

0.032
13
18

0.014
88
126

0.015
41
58

0.032
77
110

0.042
44
63

0.026
11
16

0.033
22
32

0.015
26
38

0.018
4
6

0.018
4
6

0.033
23
33

0.043
35
50

0.033
22
32

0.015
19
27

0.014
12
17

0.018
42
60

0.037
116
166

0.045
0
0

Q friccin=(GPM *
? Hf/1714)*746/1.054350000, BTU

155,549

590,252

333,319

145,827

66,961

317,447

590,252

317,447

145,827

66,961

327,367

590,252

314,018

3,428

50,935

94,892

10,714

56,248

317,447

69,997

520,255

113,745

32,082

66,961

317,447

657,710

230,546

230,546

28,253

145,827

66,961

317,447

657,710

317,447

145,827

66,961

317,447

725,167

333,319

145,827

66,961

317,447

657,710

317,447

145,827

66,961

317,447

640,845

317,447

73,806

510,395

234,365

444,425

256,065

64,759

127,907

152,616

23,547

23,547

132,703

202,381

127,907

111,105

70,775

243,740

669,862

Tent=Tinybatchant-Tcaida, F

86

86

81

91

86

81

86

81

91

86

81

86

81

81

91

91

86

86

81

86

86

91

91

86

81

86

81

81

81

91

86

81

86

81

91

86

81

86

81

91

86

81

86

81

91

86

81

86

81

81

91

86

81

86

86

81

91

86

86

81

77

72

70

91

86

81

86

85

83

78

91

86

79

83

79

91

86

79

83

79

81

91

91

86

86

79

86

83

91

91

86

79

83

79

79

80

91

86

79

83

79

92

86

79

83

79

91

86

79

83

79

91

86

79

83

79

80

91

86

78

85

86

82

97

88

87

82

78

72

74

92

87

78

86

Tsalbatch: mCp(tenttsalbatchant)=QfriccinU*A*(Tsalbatchant-Tambiente);
Tsalbatch=(Qfriccin+UA TambientemCpTent)/(UA-mCp),F

80

Gradiente temperatura que se cede


en la long. Ref. a la parcela
Qgradiente= wCp(gradientede
temp),F

0.04

-0.01

-0.19

0.35

-0.02

-0.02

0.19

-0.07

0.49

0.11

0.10

0.32

0.05

0.27

0.25

0.25

0.12

0.19

0.10

0.36

0.24

0.81

0.57

0.51

0.41

0.63

0.37

0.52

0.55

0.61

0.35

0.34

0.58

0.26

1.10

0.50

0.48

0.73

0.36

1.37

0.70

0.66

0.97

0.57

1.70

0.92

0.88

1.21

0.78

1.16

1.39

-0.06

-0.30

1.09

0.74

0.21

2.62

-3.21

-1.45

-1.65

-2.43

-4.72

-3.64

11.08

1.91

-3.96

0.00

7,075

-1,711

-37,149

66,323

-4,008

-3,887

41,365

-13,669

93,926

20,855

20,470

70,479

10,167

51,777

47,539

47,148

23,230

34,909

19,054

80,856

53,682

153,551

108,084

96,306

79,843

139,889

71,357

101,137

107,966

116,609

65,928

65,569

129,230

50,527

208,393

93,637

93,544

161,848

69,876

260,372

131,548

129,425

214,442

111,528

322,321

172,412

171,340

267,939

151,989

226,781

264,033

-10,653

-57,743

241,657

163,652

40,097

498,363

-601,040

-270,425

-322,797

-539,252

-921,528

-692,232

2,104,025

357,693

-772,551

X=Qfriccion+Qgradiente,BTU/h

162,624

588,541

296,170

212,150

62,953

313,560

631,617

303,777

239,753

87,817

347,837

660,731

324,185

55,205

98,474

142,040

33,944

91,157

336,501

150,853

573,938

267,296

140,166

163,267

397,290

797,599

301,902

331,683

136,218

262,436

132,890

383,016

786,940

367,973

354,220

160,598

410,991

887,015

403,195

406,199

198,509

446,872

872,152

428,974

468,148

239,373

488,787

908,785

469,436

300,588

774,428

223,712

386,682

497,722

228,411

168,004

650,979

-577,494

-246,878

-190,094

-336,871

-793,621

-581,127

2,174,800

601,432

-102,689

Tsalbatch: (X+UA TambientemCpTent)/(UA-mCp),F

85.1

83.1

78.7

90.5

85.7

78.6

82.9

78.7

90.4

85.5

78.4

82.8

78.6

80.3

91.0

90.8

85.8

85.5

78.5

85.3

83.2

90.2

90.7

85.1

78.2

82.5

79.0

78.8

79.9

90.6

85.4

78.5

82.6

78.6

90.4

85.4

78.8

82.5

78.2

89.6

85.0

78.0

82.0

78.1

89.4

84.7

78.0

81.7

78.1

79.0

89.0

86.1

78.6

84.2

85.6

81.4

93.8

91.3

88.0

84.0

80.7

76.9

82.9

80.6

85.0

82.1

89.0

3.0
888,510
184.66
78.44

3.0
636,450
4.35
4.11

1.3
80,940
5.34
5.04

2.9
895,885
184.66
78.44

4.9
3,067,855
459.80
459.80

2.9
867,935
184.66
78.44

3.0
719,260
4.35
4.11

1.3
112,907
5.34
5.04

2.9
993,820
184.66
78.44

4.9
3,209,265
459.80
459.80

2.8
916,239
184.66
78.44

0.0
1,703
184.66
78.44

1.0
103,187
4.35
4.11

2.0
277,282
4.35
4.11

0.2
6,983
5.34
5.04

1.1
98,449
5.34
5.04

2.9
961,430
184.66
78.44

0.6
86,891
459.80
459.80

4.3
2,457,109
459.80
459.80

2.3
625,473
4.35
4.11

0.7
92,509
4.35
4.11

1.3
209,915
5.34
5.04

2.9
1,135,114
184.66
78.44

4.9
3,874,051
597.74
597.74

2.1
626,447
184.66
78.44

2.1
688,242
184.66
108.01

0.3
34,638
184.66
108.01

3.0
787,309
4.35
4.26

1.3
170,858
5.34
5.16

2.9
1,094,330
184.66
108.01

4.9
3,822,280
597.74
597.74

2.9
1,051,353
184.66
108.01

3.0
1,062,659
4.35
4.40

1.3
206,483
5.34
5.31

2.9
1,174,259
184.66
147.43

4.9
4,308,357
735.68
735.68

3.0
1,209,584
184.66
88.30

3.0
1,218,598
4.35
4.16

1.3
255,226
5.34
5.08

2.9
1,276,777
184.66
88.30

4.9
4,236,168
551.76
551.76

2.9
1,225,641
184.66
88.30

3.0
1,404,443
4.35
4.26

1.3
307,766
5.34
5.08

2.9
1,396,534
184.66
108.01

4.9
4,414,096
505.78
505.78

2.9
1,341,245
184.66
108.01

0.7
199,676
184.66
88.30

10.5
8,131,489
4.35
4.26

4.5
1,006,703
5.34
5.35

4.0
1,546,730
184.66
117.86

1.8
873,977
817.42
827.64

2.5
577,554
817.42
1011.56

4.0
672,018
184.66
255.84

10.5
6,835,277
4.35
4.84

1.4
-779,617
5.34
5.85

1.4
-333,286
5.34
5.70

4.2
-788,889
184.66
305.11

4.9
-1,636,231
689.70
1563.32

4.0
-3,174,485
184.66
245.98

7.6
-4,442,137
4.35
5.32

1.5
3,166,509
4.35
4.89

3.9
2,345,587
5.34
5.70

5.2
-535,450
184.66
157.28

0.0014
0.0625
26.2
6.56
1.05

0.0015
0.0625
26.2
6.56
1.05

0.0020
0.0625
26.2
6.56
1.05

0.0014
0.0625
26.2
6.56
1.05

0.0014
0.0625
26.2
6.56
1.05

0.0014
0.0625
26.2
6.56
1.05

0.0015
0.0625
26.2
6.56
1.05

0.0020
0.0625
26.2
6.56
1.05

0.0014
0.0625
26.2
6.56
1.05

0.0014
0.0625
26.2
6.56
1.05

0.0014
0.0625
26.2
6.56
1.05

0.0063
0.0625
26.2
6.56
1.05

0.0021
0.0625
26.2
6.56
1.05

0.0017
0.0625
26.2
6.56
1.05

0.0037
0.0625
26.2
6.56
1.05

0.0021
0.0625
26.2
6.56
1.05

0.0014
0.0625
26.2
6.56
1.05

0.0028
0.0625
26.2
6.56
1.05

0.0014
0.0625
26.2
6.56
1.05

0.0016
0.0625
26.2
6.56
1.05

0.0025
0.0625
26.2
6.56
1.05

0.0020
0.0625
26.2
6.56
1.05

0.0014
0.0625
26.2
6.56
1.05

0.0014
0.0625
26.2
6.56
1.05

0.0024
0.0625
26.2
6.56
1.05

0.0016
0.0625
26.2
6.56
1.05

0.0032
0.0625
26.2
6.56
1.05

0.0015
0.0625
26.2
6.56
1.05

0.0020
0.0625
26.2
6.56
1.05

0.0014
0.0625
26.2
6.56
1.05

0.0014
0.0625
26.2
6.56
1.05

0.0014
0.0625
26.2
6.56
1.05

0.0015
0.0625
26.2
6.56
1.05

0.0020
0.0625
26.2
6.56
1.05

0.0015
0.0625
26.2
6.56
1.05

0.0014
0.0625
26.2
6.56
1.05

0.0014
0.0625
26.2
6.56
1.05

0.0015
0.0625
26.2
6.56
1.05

0.0020
0.0625
26.2
6.56
1.05

0.0014
0.0625
26.2
6.56
1.05

0.0014
0.0625
26.2
6.56
1.05

0.0014
0.0625
26.2
6.56
1.05

0.0015
0.0625
26.2
6.56
1.05

0.0020
0.0625
26.2
6.56
1.05

0.0014
0.0625
26.2
6.56
1.05

0.0014
0.0625
26.2
6.56
1.05

0.0014
0.0625
26.2
6.56
1.05

0.0023
0.0625
26.2
6.56
1.05

0.0010
0.0625
26.2
6.56
1.05

0.0013
0.0625
26.2
6.56
1.05

0.0013
0.0625
26.2
6.56
1.05

0.0017
0.0625
26.2
6.56
1.05

0.0015
0.0625
26.2
6.56
1.05

0.0013
0.0625
26.2
6.56
1.05

0.0009
0.0625
26.2
6.56
1.05

0.0013
0.0625
26.2
6.56
1.05

0.0018
0.0625
26.2
6.56
1.05

0.0013
0.0625
26.2
6.56
1.05

0.0014
0.0625
26.2
6.56
1.05

0.0013
0.0625
26.2
6.56
1.05

0.0010
0.0625
26.2
6.56
1.05

0.0020
0.0625
26.2
6.56
1.05

0.0014
0.0625
26.2
6.56
1.05

0.0012
0.0625
26.2
6.56
1.05

46.3

58.1

53.3

46.2

50.5

46.3

58.0

53.1

46.0

50.4

46.2

47.9

58.6

58.4

53.4

53.1

46.1

52.9

50.8

57.8

58.3

52.7

45.8

50.1

46.6

46.4

47.5

58.2

53.0

46.1

50.2

46.2

58.0

53.0

46.4

50.1

45.8

57.2

52.6

45.6

49.6

45.7

57.0

52.3

45.6

49.3

45.7

46.6

56.6

53.7

46.2

51.8

53.2

49.0

61.4

58.9

55.6

51.6

48.3

44.5

50.5

48.2

52.6

49.7

4.Calculo tiempo crtico

Que se
alcanzan
cuando toda
el Plenum
Segmento MRF LBE es de mx. 500 baja a 20C
cSt
de
Tiempo de Shutdown mximo segmento con plenum de M250cSt= hp.m. horas enfriamiento crudo mezcla=
Tiempo de transcurso Mezcla por los 17.3Km,
L/V=
Horas=
1.4
4.9
Q fluido en reposo= BTU
227,674
2,858,628
lb/h/pie=
184.66
459.80
w lb/h/pie=
78.44
459.80
hmconveccin natural
crudo=h=2k/D(wCp/k/L)^(1/3)(w/)^
0.14
0.0018
0.0014
l acero=3/4", pies
0.0625
0.0625
k acero
26.2
26.2
lterra=2 metros, pies
6.56
6.56
ktierra=concreto arena y grava
1.05
1.05
Temperatura RE-ARRANQUE
CRITICO para viscosidad crtica cP
arranque, C
52.7
50.7
Balance Calor Natural en 25.44km=
0=Qtotal-(Tent crud-Tsal
crud)A/((1/hmconvec
natural+(lacero/(kacero)+(ltierra/(ktier
ra))*t
2a Relajacin trmica

Horas Crticas
Re friccin fluencia=V*D*peso esp./
f flrio =..Re<4000;f=64/Re y
Re>4000;f tabla Jhon Crane
hffrio=fL/D*V^2/2/g, m
hffluencia total estacin
H cabeza, m
V^2/2/g + P/peso espc,m=
Cabeza dinmica requerida, pies
Cabeza dinmica maxima bombas
BPC PH1 Y PH 2, pies
Temperatura Crudo Segmento
5.Caida Isotermal para todo el
ducto,Temp C

1046

43.6 dias

Esfuerz
o Visc
Fluenci
a, cP

cus frio=cP
cup fluencia=cP
cup frio=cP
mz fluencia=cP
mz frio=cP
cast fluencia=cP
cast frio=cP
Re critico recalculado
f friccin recalculado
Hf fluencia segmento crudo
arranque;
4*cP*L(m)*12/.3048*V(m/s)*12/.3048
/47.88/144/1000/(D(m)*12/.3048)*10.
29/14.7,m
Hf frio=f*L/D*V^2/2/g frio a
14000bph,m
Hf QUE SE APLICA entre COTA
142.42 Km a CVA
normal=f*L/D*V^2/2/g a
14000bph,m

246,707

4,192

1,463

2,366

-75,952

-9,582

-5,329

7,586

-173,892

-5,450

-8,928

-5,490

7,853

-124,658

-5,317

-8,535

-5,451

-149,290

14,007

9,513

-1,129,362

-135,546

-5,361

-166,931

-10,791

9,740

20,156

-67,050

-5,136

14,106

-17,810

-27,029

-278,597

3,433

12,441

-18,617

13,741

-19,378

2,245

4,949

6,870

3,748

-6,400

6,409

79,143

-6,379

-76,772

-6,480

3,879

112,377

-14,588

-11,074

-15,190

-20,243

1,763

1,777

-155,557

3,555

2,626

1,330

567

1,013

2,368

893

844

1,724

575

2,334

11,509

2,906

11,509

460,315

374,934

11,509

2,906

11,509

460,315

374,934

11,509

2,906

11,509

11,509

460,315

460,315

374,934

374,934

11,509

2,906

2,906

460,315

460,315

374,934

11,509

2,906

11,509

11,509

11,509

460,315

374,934

11,509

2,906

11,509

460,315

374,934

11,509

2,906

11,509

460,315

374,934

11,509

2,906

11,509

460,315

374,934

11,509

2,906

11,509

11,509

460,315

374,934

11,509

2,906

2,421

9,591

383,596

312,445

312,445

801

97

579

1,539

1,634

374,934

11,509

0.03200
27

0.04500
131

0.03200
58

0.01400
25

0.01500
12

0.03200
55

0.04500
131

0.03200
55

0.01400
25

0.01500
12

0.03200
55

0.04500
131

0.03200
54

0.03200
1

0.01400
9

0.01400
16

0.01500
2

0.01500
10

0.03200
55

0.04500
16

0.04500
116

0.01400
20

0.01400
6

0.01500
12

0.03200
55

0.04500
131

0.03200
40

0.03200
40

0.03200
5

0.01400
25

0.01500
12

0.03200
55

0.04500
131

0.05400
93

0.01400
25

0.01500
12

0.03200
55

0.04500
131

0.03200
58

0.01400
25

0.01500
12

0.03200
55

0.04500
131

0.03200
55

0.01400
25

0.01500
12

0.03200
55

0.04500
131

0.03200
55

0.03200
13

0.01400
88

0.01500
41

0.03200
77

0.04500
47

0.02643
11

0.03500
23

0.01500
26

0.01500
3

0.01500
3

0.07986
56

0.66306
540

0.05500
37

0.03500
22

0.03500
15
2,199
1318
1.6
11,593

0.01500
50

0.03500
110

52.75

50.74

46.29

58.14

53.25

46.21

50.53

46.27

57.99

53.12

46.03

50.39

46.16

47.91

58.58

58.43

53.42

53.10

46.09

52.91

50.84

57.78

58.32

52.70

45.76

50.14

46.59

46.43

47.50

58.19

53.01

46.13

50.19

46.21

58.01

53.04

46.37

50.11

45.81

57.17

52.56

45.59

49.64

45.69

57.04

52.33

45.56

49.33

45.66

46.60

56.62

53.67

46.20

51.79

53.23

48.96

61.39

58.88

55.63

51.55

48.28

44.52

50.49

48.20

52.63

49.71

18.00

Temperatura fnal fra de arranque, F

Temperatura fnal fra de arranque, F


cus fluencia=cP

32

50
46

44
460
23
991
320
7778
1400

68

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.40

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

32.4

52.75

50.74

46.29

58.14

53.25
38.02

46.21

50.53

46.27

57.99

53.12
38.35

46.03

50.39

46.16

47.91

58.58

58.43

53.42
37.63

53.10
38.39

46.09

52.91

50.84

57.78

58.32

52.70
39.35

45.76

50.14

46.59

46.43

47.50

58.19

53.01
38.61

46.13

50.19

46.21

58.01

53.04
38.54

46.37

50.11

45.81

57.17

52.56
39.71

45.59

49.64

45.69

57.04

52.33
40.25

45.56

49.33

45.66

46.60

56.62

53.67
37.02

46.20

51.79

53.23

48.96

61.39

58.88
24.40

55.63
32.27

51.55

48.28

44.52

50.49

48.20

52.63
39.53

49.71

40.03

40.39

33.68

37.46

241.65
17.95

245.43
18.03

262.04
18.42

248.26
18.10

447.52
22.71

505.73
24.06

40.22

40.38

252.77
18.20
853.70
299.62

256.70
18.29

1175.49
347.55

1179.18
348.10

1176.55
347.71

1188.41
349.48

1181.82
348.50

1094.46
335.48

40.86

40.50

40.46

251.54
18.18

1185.36
349.02

1201.72
351.46

1160.61
345.34

1168.18
346.46

839.88
338.57

41.03

256.21
18.28
1183.29
348.72

41.29

277.56
18.78

1179.24
348.11

1171.46
346.95

39.74

280.78
18.85

1199.25
351.09

1210.19
352.72

291.66
19.10

1205.38
352.00

1211.76
352.96

1206.55
352.18

1160.05
345.25

1042.39
327.73

0.00
2.16

40.94

170.16
16.29
1179.64
348.17

0.00

913.15
308.48

1.449

1263.58
360.67

1005.18
322.18

57
285

2,931
0.03600

7596.48
1377.06
713
0.08979

2,527
0.03600

45,403
0.01200

20,577
0.01500

2,523
0.03600

7562.18
1383.54
709
0.09022

2,526
0.03600

45,178
0.01200

20,496
0.01500

2,513
0.03600

7619.56
1387.92
707
0.09050

2,520
0.03600

2,618
0.03600

46,055
0.01200

45,831
0.01200

20,674
0.01500

20,487
0.01500

2,516
0.03600

6595.49
1309.74
749
0.08540

7438.15
1374.07
714
0.08960

44,875
0.01200

45,666
0.01200

20,255
0.01500

2,499
0.03600

7720.11
1395.60
703
0.09100

2,543
0.03600

2,535
0.03600

2,594
0.03600

45,475
0.01200

20,432
0.01500

2,518
0.03600

7699.13
1394.00
704
0.09090

2,523
0.03600

45,206
0.01200

20,451
0.01500

2,531
0.03600

7732.98
1396.58
703
0.09107

2,501
0.03600

44,016
0.01200

20,171
0.01500

2,490
0.03600

7922.56
1411.05
696
0.09201

2,495
0.03600

43,842
0.01200

20,043
0.01500

2,488
0.03600

8051.19
1420.87
691
0.09265

2,494
0.03600

2,544
0.03600

43,264
0.01300

20,827
0.01500

2,522
0.03600

7051.95
1344.59
730
0.08768

6467.09
1299.94
629
0.10172

2,233
0.04100

42,276
0.01400

20,476
0.01700

18,412
0.01700

2,372
0.04100

8473.77
1453.13
563
0.11370

2,029
0.03154

30,327
0.02400

34,355
0.02500

20,213
0.01500

2,726
0.03500

3.11

95.98

9.17

1.97

0.13

8.76

95.55

8.74

2.00

0.13

8.83

96.27

8.69

1.46

0.6587

1.2463

0.02

0.11

8.81

9.88

82.84

1.5951

0.4262

0.13

8.93

97.54

6.26

6.31

0.56

1.9630

0.13

8.79

97.28

8.76

1.9994

0.13

8.71

97.71

9.36

2.1661

0.13

8.99

100.10

8.96

2.1912

0.13

9.01

101.73

8.97

2.00

7.9665

0.43

12.27

32.21

24.62

6.28

2.6897

0.05

0.07

5.70

62

0.40

13.63

30

262

65

22

12

62

263

62

22

12

62

264

61

14

10

62

30

230

17

12

62

266

45

45

22

12

62

265

62

22

12

62

266

65

22

12

62

268

62

22

12

62

270

62

14

82

41

87

92

43

27

25

29

93

21

31

22

35

110

20

58

10

22

50

58

50

23

50

58

48

18

51

51

10

58

36

10

58

50

10

58

50

10

58

10

22

48

58

43

22

126

57

132

21

20

53

17

H cabeza esttica Descuelgue final


en Full Packed Line(2927m-1775m),
m
V^2/2/g + P/peso espc,m=

1152
1.6

Cabeza dinmica requerida, pies

4,569

Cabeza dinmica mxima MRF


diponible por las BPC MRF+
NPSH remoto de EPO

7,544

6.Presiones de re-arranque crticoEstandar de Equipos Criticos de


Seguridad

v^2/2g, m
(p1-p2)/pespecific,m
z1-z2,m
Hf,m
Cabeza Dinmica Requerida,m
Cabeza Dinmica Requerida,pies
Cabeza Disponible,pies
NPSHR,psi
cv -700 psi
NPSH REMOTA,psi

0.036862245
0.023529412
30
-446.4
904.6
488.3
1601.9

HPDH inferida,psi

698

MAOP,PSIG
HPDH TOTAL,psi

0.03686224
0.000
23
-0.6
882.13
904.60
2967.8

0.03686224
7.318E-07
27
-3.4
858.47
882.13
2894.1

0.03686224
3.3369E-08
20
-76.5
914.9
858.5
2816.5

0.03686224
-3.3369E-08
-10
-51.1
976.0
914.9
3001.8

0.036862
3.25E-06
12.22
-80.7
1044.4
976
3202

0.0368622 0.03686224
-5.85E-06 -1.4045E-05
74.42
-20.59
-36.2
-487
1006.1
1514
1044
1006
3426.6
3301.0

0.0368622
0.0002312
2835.1242
-1234
1601.6
5255

0.0460459
-2.791E-05
891.12418
-105.6
785.57
2577.33
1122.2

-125

-1100

2288.0

138

2163.0
2150

138.0

0.045231018
-0.421052632
17.5
17.1
56.18

0.093791039
-1.86
1199.5
194.9
1392.64
4569.04
7544.09
1295.42

0.094
-1.86
666.5
144.79
809.52
2655.91
5100.00
2444.09

1989

1156

84.2
1292.3

1260.2

1226.4

1307.1

1394.3

1492.1

1437.3

24.46

2160
1989

INTEGRIDAD DE LOS EQUIPOS CRITICOS DE SEGURIDAD / OCENSAs & ODC/ CLASIFICACION- ABRIL/05
CSA Z 662 06-2003

NEB 06-2004

ESTANDAR
PROPUESTO

RECOMENDACION

RUTINA

Controls and
protective equipment,
including
pressure
limiting
devices,
regulators, controllers, relif valves and
195.428
other safety devices, shall be sujected to
sytematic periodic inspectins and tests, at
least annually.

Shall, at intervals not exceeding 15 months, but at least once each calendar year,
10.6.5.3
inspect and test

The operator must use a suitable device to indicate that pressure has been relieved in
the barrel or must provide a means to prevent insertion or removal of scrapers or
195.426195.428(a) spheres if pressure has not been relieved in the barrel.- Shall, at intervals not exceeding
15 months, but at least once each calendar year, inspect and test

INSTRUMENTOS, SISTEMAS DE
ALIVIO Y BLOQUEO, BARRILES,
CANASTILLAS,
FILTROS,
PANELES DE CONTROL

Must be applied and with 6 months intervals


INSTRUMENTOS,
DANFLOS, MAPS-III-G-PR-005 Revision 1- 2Conclusions-January
funtionlly tested;1)Reducing diesel engines speed
FFD/T-3GGG-ICU-002-1/1
item
7.0
REGULADORES N2, PANELES DE 1998
ii) activation of the shutdown sequency iii) Turn
recommendations
CONTROL
off the engines

TANQUES RELEVO/
SUMIDEROS

TLU/MONOBOYA /PLEM
con sus Vlvulas de Servicio
Down & Up Stream

INSTRUMENTOS,
INTERRUPTORES
SOBRELLENADO, SISTEMA
MONITOREO DE NIVEL SAAB

452.2(a)

Controls and
protective equipment,
including
pressure
limiting
devices,
regulators, controllers, relif valves and
195.420
other safety devices, shall be sujected to
sytematic periodic inspectins and tests, at
least annually.

Inspection every six months withim maximun 7 1/2 months intervals, all the main valves 10.6.5.3

195.432(a)Storagge Vessels (a) including atmospheric 195.444


Overfill Protection shall be in accordance with API
195.402
and pressure tanks shall be periodically
To visual inspection according section 4 of API 653 or section 6 API 2510 in despite of
2350 and by setting outof NFPA 30; Shall be inspected
DE Overpressure protection and 1)FFDT/T-3GGG-ICU-001-Must be applied and with 6 months intervals
4.11.1.5.;10.6.2.5;10.
inspected. (b)Cleanned in accordance with
(c)3 (H)
these both each operator shall , at intervals not exceeding 15 months, but at least once
452.3 - 452.4
periodically and mainteined as necessary to be in
API publ. 2015;- Storage of Combustible
funtionlly tested
DE 1/1-Overpressure Initiating Frequencies (INF) pg9
6.2.7
195.573(d);
accordance with the API 653s design requerimentseach
calendar
year,
inspected
each
in-service
breacout
tank
and
to
cathodic
Materials (Oil or Gasoline storage tanks shall 195.428(c)shall periodically monitor LDS;
be protected in accordance with NFPA 30.
API 25105.1.2

PLEM, SISTEMA HIDRAULICO,


BATERIAS,
RELE
ELECTROVALVULA,
TANQUES
PRESURIZADOS N2, SELLO GALL
THOMPSON

Pipeline block valves shall be inspected


451.8,452.1(a serviced where necessary, and partially
195.420
)
operated at least once each year to asure
proper operating conditions

Inspection every six months withim maximun 7 1/2 months intervals, all the main valves

10.6.6.110.6.6.2;(4.10.3.3.1);(
10.6.1.2.)

ESDV con sus Vlvulas de ESDVs, SISTEMA HIDRAULICO, 1)FFDT/T-3GGG-ICU-001-1/1-Overpressure Initiating Must be applied and each 3 months funtionally
BATERIAS,
RELE
Frequencies (INF) pg9
tested.
Servicio Down & Up Stream ELECTROVALVULA

10.6.6.110.6.6.2;(4.10.3.3.14.10.3.3.4);(10.6.1.2.)
; BUNKERS4.13.3.2;
4.13.4.1

HOV con sus Vlvulas de HOVs, SISTEMA HIDRAULICO,


,
RELE
Servicio Down & Up Stream/ BATERIAS,
ELECTROVALVULA,
BUNKERS
DUCTO
451.8

Pipeline block valves shall be inspected


serviced where necessary, and partially
195.420
operated at least once each year to asure
proper operating conditions

Inspection every six months withim maximun 7 1/2 months intervals, all the main valves

CHV con sus Vlvulas de


CHV, BUNKERS
Servicio Down & Up Stream
11.8.7.

2 y1
AOS

ESTACIONES/DRA

MAPS-III-G-PR-005 Revision 1- pargraf 4.2.8, 4.2.9.,


INSTRUMENTOS,
4.2.10., 4.2.12., 5.5.2,5.9, overpressure protection; ;
INTERRUPTORES
DE
ALTA FFDT/T-3GGG-ICU-001-1/1-Overpressure
Initiating Must be applied and with 6 months intervals
PRESION,
DANFLOS, Frequencies (INF) pg9; MAPS-III-G-PR-005 Revision 1funtionlly tested; Pumpsengines trips instruments 452.2(a)
REGULADORES N2, PCVs, PVs, pargraf 5.5.3 Discharge Pressure Relief Con
are subsequently re-calibrated 3 months intervals
PICs,
PANELES
DE
CONTROL,PSVs y DANFLOs

3 MESES

Shall, at intervals not exceeding 15 months, but at least once each calendar year,
11.8.8.1/2/3
inspect and test

6 MESES y
3 MESES

MANGUERAS

1 AO

INSTRUMENTOS,
TELEMETRIA,BATERIAS,
ALARMAS,
PANELES
DE
CONTROL,
PLCs,
CASCO
Y
RUTINA POR RIESGO

Se establece realizar inspecciones para


evaluar la integridad en perodos que no
Pg 1872-39.Systematic monitoring and survelliance of pigging
excedan
5 aos, de donde aplicando
monitoring for the pipeline protection, the public and the
criterio DOT 195 - OCENSA es dentro de
enviroment -Pg1872-40-40 1. Monitoring Pipeline integrity 195.452 (j)(3)(i)
throug periodic internal inspections whith (ILI)Tools for all steel APPENDIX C
intervalos de dos aos y ODC dentro de
pipelines operating above 30% specified minimun yield
intervalos de un ao. Con antelacin
stress.Pg1874-53 Audits and Inspections records.
suficiente y segn intervalo se deben
MAPS-III-G-PR-005 inspeccionar y mantener los marranos.
Revision
12ConclusionsAudits and Inspections records about
Off-Shore Valves Inspected and tested at least once
January 1998 & Debe ser aplicada y funcionalmente
Pg1874-53
procedures and programs related to
annually
Paragraph 5.3.2.1 probada en intervalos de 3 meses.
maintenance of the SCE
General
Pump
Suction Relief at El
Porvenir
Sta overp
MAPS-III-G-PR-005
Revision 1- pargraf Debe ser aplicada y funcionalmente
Inspecterd if properly installed and protected from dirt
4.2.8,
4.2.9., probada en intervalos de 6 meses; Los
or othres, assessed is adequate from standpoint of
Audits and Inspections records about
4.2.10.,
4.2.12., instrumentos del control de velocidad por
capacity and reliability and tested if it is in good Pg1874-53
procedures and programs related to
5.5.2,5.9,
sobrepresin a la succin y la descarga de
operating condition and setting the function of at the
maintenance of the SCE
overpressure
las bombas debe ser re-calibrado cada 3
correct pressure at least once per calendary year
protection;
; meses
FFDT/T-3GGG-ICU- Debe contar con un dispositivo adecuado
que indique cunado se ha liberado la
presin en los barriles , o en su defecto
debe proveer un medio por el cual se evite
195.426-195.428(a)
la insercin retiro de todo tipo de
marranos si la presin no h sido liberada
del barril. Una vez al ao y en intervalos no
mayores debe inspeccionar y probar.
MAPS-III-G-PR-005
Inspecterd if properly installed and protected from dirt
Revision
1or othres, assessed is adequate from standpoint of
Audits and Inspections records about 2ConclusionsDebe ser aplicada y funcionalmente
capacity and reliability and tested if it is in good Pg1874-53
procedures and programs related to January
1998
probada en intervalos de 6 meses
FFD/T-3GGG-ICUoperating condition and setting the function of at the
maintenance of the SCE
correct pressure at least once per calendary year
002-1/1 item 7.0
recommendations

6 MESES

Assessment intervals. And must stablish intervals not to exceed 5 years; According Risk
assessment
OCENSA/ODC
is
Age
pipeline=10,3/5:Coated=Y/N,1/5:Catthodically
195.452
Protected=Y/N,1/5:Installed at once=Y/N,1/5:Close interval survey=Y,1/1:Internal Inspection tool
(j)(3)(i)
used=Y/N,1/5:Anomailies
found=Y/Y,3/5:Leak
History=N/Y,1/5:Risk
of
Product
APPENDIX transported=High/Medium,5/3:Pipe Size=30"/24",4/3: OCENSAS OVERALL RISK=31 & ODCs
C
OVERALL RISK=42- OCENSAs Monitoring intervals whithim two years and ODC monitoring
intervals whithim= one year.

Controls and
protective equipment,
including
pressure
limiting
devices,
regulators, controllers, relif valves and
195.428
other safety devices, shall be sujected to
sytematic periodic inspectins and tests, at
least annually.

SEG 3

MAPS-III-G-PR-005 Revision 1- 2Conclusions-January


INSTRUMENTOS,
1998 & Paragraph 5.3.2.1 General Pump Suction
INTERRUPTORES
DE
ALTA
Relief at El Porvenir Sta overp protect. 5.9. VAS Sta Must be applied and with 3 months intervals
PRESION,
DANFLOS,
452.2(a)
overpressure protection, item 5.11 VAS to CVA funtionlly tested
REGULADORES, PANELES DE
pipeline overpressure protection, pargraph5 ; FFFDT/TCONTROL,
3GGG-ICU 001-1/1

SISTEMAS DE DESPACHO
Y RECIBO DE MARRANOS

5 AOS

MAPS-III-G-PR-005 Revision 1- 2Conclusions-January Instruments calibrated each 3 months; Must be


1998
FFD/T-3GGG-ICU-002-1/1
item
7.0 applied and with 6 months intervals funtionlly
tested
recommendations

measurement
detection of
conditions - 195.444
least partially

Debe cumplir con API 1130 en lo referente


a operacin, mantenimiento, prueba,
retencin de records y entrenamiento de el
operador del sistema. Debe hacerse una
comprobacin del sistema completo sin
avisar cada 5 aos y comprobaciones por
pruebas de mantenimiento junto con reafinamiento de la precisin en intervalos
mucho menores (Sugeridos de un ao).

1 AO

ESTACIONES

INSTRUMENTOS,
DRA(REDUCIDORES
DE
FRICCION),
TELEMETRIA,
BATERIAS, ALARMAS, CABLES,
CONEXIONES,
PANELES
DE
CONTROL, RTU, PLCs, DCS,
SCADA

452.1(b)452.2(a)

Periodic flow and pressure


shall be provided for
desviations from steady
Annually inspected and at
operated.

10.2.6.1;
10.2.6.2;
10.2.6.3.
It must comply with API1130 in operating, maintaining, testing, record keeping, and
10.2.6.4;
dispatcher training of the system
10.6.1.2;
10.3.4;
11.8.6;

General
Operation
Requirements,
Shall make periodic line balance measurements for
maintain
communication
facilities.;General
Operation
system integrity; Shall periodically review its leak
DOT 195.444Periodically
test
detection methods as it is observed in anneex E-;. Pg1871- 36(a)(b); Requirements,
API1130-6.2.3.instruments and equipment at the
Shall be capable of early detection of leaks-; LDS at Pg1874-53
API1130-2.2.4
pipeline stations.;Audits and Inspections
TLU Shall be calibrated regularly; SDS shall be
calibrated periodically
records about procedures and programs
related to maintenance of SCE

Inspeccin visualde acuerdo con la seccin 4 del

Pg1874-53

DOT195.432(a);195 cdigo API 653 seccin 6 del cdigo API 2510 en


. 444;195.402(c3(H) defecto de estos dos cada operador debe en
Audits and Inspections records about 195.573(d);195.42(c- intervalos n mayores a 15 meses, pero al menos
-2003- una vz por ao calendario inspeccionar cada
procedures and programs related to CSA-Z662
maintenance of the SCE
4.11.1.5.;10.6.2.5;1 tanque de relevo en servicio junto con su proteccin
0.6.2.7- ASME B catdica segn API 651;-Proteccin al sobrellenado
bajo requerimientos NFPA 30 y siguiendo
31.4-452.4 (b)
implementacin API 2350 y sistema inspeccionado

Periodically
test
instruments
and
equipment
whithim
stations.
Clearly
mark
Pg1871NEB-1999 Clasula
open
and
closed
positions
of
any
36(d)(e)(Pg187436 d);Enbridge O&M Ls vlvulas de seccionamiento y
53);Pg1867-12(a) sectionalizing mainlane valve and withim Manual; 195.420
aislamiento en la lnea principal deben
station
valve;
General
Operation
At least once per calendar year inspected and partially
tener claramente marcadas las posiciones
operated at once per calendary year with a maximun
Requirements, clearly mark the o/c
de abierto y cerrado; Las Vlvulas
positions os section line and whithim
interval of 18 months between Inspections and
principales, incluyendo las de tipo remoto,
station line main valve; Audits and
Operations; System shall be operable from at least one
deben ser inspeccionadas al menos dos
Inspections records about procedures
manual push-button i) ii) iii);
veces durante el ao calendario en un
Pg1871and programs related to maintenance of
mximo intervalo de siete meses. En
36(d)(e)Pg1874- the SCE; at stations Containment,
53)
adicin a esto, al menos una vez por ao
handling and disposal of wastes
realizar la operacin remota de apertura y
incidental.
cierre desde el cuarto de control para las
vlvulas
operadas remotmente y esto
At least once per calendar year inspected and partially
debe ser verificado por un trabajador
operated with a maximun interval of 18 months
calificado;
Probando
el
sistema
between Inspections and Operations. System shall be
operable from at least one manual push-button i) ii)
dependiente de la rata de cargue.
iii);Ventilation; Drainage and Waterproofing;
Periodically
test
instruments
and
equipment whithim stations. Clearly mark
open and closed positions of any
sectionalizing mainlane valve and withim
Pg1871station
valve;
General
Operation
36(d)(e)(Pg1874Requirements, clearly mark the o/c
53)
positions of section valves; Audits and
Shall be inspected and serviced whenever necessary
Inspections records about procedures
and valves that, during normal operation, are not
and
programs related to maintenance of CSA-Z662-2003
opened or closed regularly shall be at least partially
11.8.7.
the SCE
operated a minimun of once per calendar year with a
maximun interval of 12 months between operations

Debe ser inspeccionada y servida de ser


necesario y las vlvulas que durante
operacin normal , no son abiertas ni
cerradas regularmente debe al menos ser
parcialmente operadas en un mnimo de
una vez por ao calendario y dentro de un
- intervalo no mayor a 12 meses entre
operaciones.

VALVULAS GENERALES VALVULAS

4
6 MESES

HOVS

SAP RANK

5
6 MESES Y 12 MESES

PROTECCION

DOT 49CR 195 -06-03-03

12 MESES

DETECCION

INSTRUMENTOS,
TELEMETRIA,
BATERIAS, ALARMAS, CABLES,
CONEXIONES,
PANELES
DE
CONTROL, RTU, DCS, SCADA

HERRAMIENTA
INTELIGENTE

CONTENCION

ASME B 31.4- VERSION 2002

MAPS-III-G-PR-005 Revision 1- 2Conclusions-January Instruments calibrated each3 months; Must be


applied and with 3 months intervals funtionlly
1998 - FFD/T-3GGG-ICU-001-1/1
INSTRUMENTOS,
TELEMETRIA,
tested
BATERIAS, ALARMAS, CABLES,
CONEXIONES,
PANELES
DE
CONTROL, PLCs, DCS, SCADA

TLU

HOV

ESTACIONES
(+TANQUES)

PANEL DE CONTROL, PUSH


BUTTON,

Must be applied and each 3 months funtionally


tested.;

FFDT/T-3GGG-ICU-001-1/1-Overpressure
Initiating
PANEL DE CONTROL, PUSH Frequencies (INF) pg9; MAPS-III-G-PR-005 Revision 1BUTTON, SISTEMA DE January 1998- Paragraph 5.5.3 a)When Pressure
ILUMINACION, SPEAKERS Y exceeds a preset value, the pump speed control
GENERADORES DE EMERGENCIA switches from suction presure control to discharge
pressure

452.1(a)

Starting,
operating,
and
shutdown
procedures form all equipment shall be
stablished and the operating company
195.402(a) Procedural manual for operations, maintenance, and emergencies shall prepare and follow
shall take appropiate steps to see that
195.403(a)( for each pipeline system a manual of written procedures for conducting normal operations
these procedures ara followed. These
and maintenance activities and handling abnormal operations and emergencies;
3)(5)
procedures
shall
outline
preventive
measures
and
systems
checks
requirements

System shall be operable from at least one manual


push-button i)Located at the exit gates or emergency
exits ii)no more than150m away of the stations limits
iii)readily visible and accessible; Pump units shall be
started, operated and shutdown in accordance with
procedures established be the operating company and
shall have individual shutdown systems originating Pg18674.10.3.3.1-4.10.3.3.4 from suitable located and manually stations operated.
12(a)(c);Pg1874;4.10.3.6.
The electrical, hydraulic, and pneumatic circuits to the 53
normal shutdown auxiliares shall mainttained

At stations Alternative source of power


by operating emergency shut-down
system c)by maintaining any other
essential service to the personnel and
452.1(a)
public and enviroment safety and
protection; Audits and Inspections
records about procedures and programs
related to maintenance of the SCE.

SOBRE VELOCIDAD
INSTRUMENTOS, PLCs, DCSs,
MOTORES BOMBAS
GOBERNADORES, VARIADORES,
PRINCIPALES Y
PANEL DE CONTROL, PUSH
GENERADORES
BUTTON,

All pumps trips instruments are subsequently recalibrated at 3 month intervals.

4.10.3.6. - 10.6.1.2.

Pump unit prime movers other than electrical induction


or synchronous motors shall have automatic devices to
overspeed shut down the units.

Pg1874-53

Audits and Inspections records about


procedures and programs related to
maintenance of the SCE

CSA Z662-10.6.1.2;
FFDT/T-3GGG-ICU-0011/1-Overpressure Initiating
Frequencies (INF) pg9;
MAPS-III-G-PR-005
Revision 1- January 1998Paragraph 5.5.3 ;

Procedimientos de forma de encendido,


operacin y apagado de todos los
equiposdebe estar establecido y la
compaa debe tomar apropiados pasos
para ver que estos procedimientos son
cumplidos Estos procedimientos deben
resaltar medidas preventivas y sistemas de
chequeos requeridos para asegurar el
apropiado funcionamiento de todo apagado
de emergencia, control y alarma de
equipos.

Los motores de las de las unidades de


bombeo principales as como otros motores
de induccin sincrnicos deben tener
dispositivos automticos de apagado de
emergencia de la unidades; Todas los
interruptores de las bombas seran
subsecuentemente
recalibrados
en
intervalos de tres meses.

4
5

3 MESES

PLEM(TLU)

PANEL DE CONTROL, PUSH


BUTTON,

SAP PM - 2 SEMANAS

SHUTDOWN

AUTO EXTINCION

REDES
AUTOMATICAS
DE
DETECCION Y ALARMAS POR
FUEGO
Y
AUTO-BOMBEO
ESPUMA, PANELES DE CONTROL
Y PUSH BUTTONS

452.1(a)

AUTO CONTENCION
PITO NIEBLA,
TANQUES, DIQUES ,
PISCINA, TRAMPAS
Y SKIMMERS

INTERRUPTORES DE ALTO NIVEL EN


CRUDO Y COMBUSTIBLES, REDES
AUTOMATICAS DE DETECCION DE
DERRAMES Y BOMBAS DE SUCCION
DERRAMES, PANEL DE CONTROL,
PUSH BUTTON,

Starting,
operating,
and
shutdown
procedures form all equipment shall be
stablished and the operating company
shall take appropiate steps to see that
these procedures ara followed. These
procedures
shall
outline
preventive
measures
and
systems
checks 195.402(a)
Procedural manual for operations, maintenance, and emergencies shall prepare and
requirements
195.403(a)(
follow for each pipeline system a manual of written procedures for conducting normal
3)(5)
operations and maintenance activities and handling abnormal operations and
195.430(a)(
emergencies;
The equipments shall be in appropiated operational conditions all time.
c)

Audits and Inspections records about


procedures and programs related to
maintenance of the SCE

Pg1874-53

Pg1874-53;
Pg1867-11.(c)

195.402||(a)
195.403(a)(3)(5)
Audits and Inspections records about 195.430(a)
procedures and programs related to
maintenance of the SCE; at stations
Containment, handling and disposal of
wastes incidental.

DISPOSITIVOS
MOVILES DE
EMERGENCIA

GASIMETROS,
MOTODIESEL
BOMBAS,
RESPIRADORES
AUTOCONTENIDOS,
RADIOTELECOMUNICACIONES,
ETC

452.1(a)

Starting,
operating,
and
shutdown
procedures form all equipment shall be
stablished and the operating company
shall take appropiate steps to see that
these procedures ara followed. These
procedures
shall
outline
preventive
measures
and
systems
checks
requirements,.

Pg1874-53

Audits and Inspections records about


procedures and programs related to
maintenance of the SCE

DISPOSITIVOS
MOVILES DE
CONTENCION

BARRERAS,
MOPAS,
MOTODIESEL
BOMBAS
DE
SUCCION,
TANQUES
DE
RECUPERACION

GROVERS &
LIFTERS

MOTOR, TRACCION Y MANDO,


BLOQUEO,
HIDRAULICO,
MANDOS,
ARBOLADURA,
CABLES, SLINGAS Y ARNESES,
RODAMIENTO Y CARROSERIA

RESCATE &
PRIMEROS
AUXILIOS

Pg1874-53

TRAJES,
DISPOSITIVOS
HERRAMIENTAS,
MOVILES
...ETC

ARNESES,
ACCESORIOS,
452.1(a)

ENFERMERIA,
TRANSPORTE,
DISPOSITIVOS
PANTALLAS
DEFLETORAS,
LOCATIVOS
CORTAFUEGOS Y ETC

Starting,
operating,
and
shutdown
procedures form all equipment shall be
stablished and the operating company
shall take appropiate steps to see that
these procedures ara followed. These
procedures
shall
outline
preventive
measures
and
systems
checks
195.402(a)
requirements
195.403(a)(
3)(5)
195.430(a)

Audits and Inspections records about


procedures and programs related to
maintenance of the SCE

Procedural manual for operations, maintenance, and emergencies shall prepare and
follow for each pipeline system a manual of written procedures for conducting normal
operations and maintenance activities and handling abnormal operations and
emergencies; The equipments shall be in appropiated operational conditions all time.

195.402(a)
195.403(a)(3)(5)
195.430(a)

FIRE FIGHTING
DISPOSITIVOS
MOVILES DE
EMERGENCIA

LINEA

FIRE FIGHTING

UNCONTAINMENT
FIGHTING

MITIGACION

Manual
de
Procedimientos
para
operaciones,
mantenimiento,
y
emergencias debe preparar y seguir para
cada sistema del oleducto un manual
escrito de procedimientos para conducir las
actividades de la conduccin normal de las
operaciones y manejar las operaciones
anormales y las emergencias; Deben existir
adecuadas piscinas de aguas aceitosas;
Una entrenada respuesta de emergencia
sobre todo el equipo y los dispositivos de
contra incendio-TODO EL TIEMPO.

SAP PM - 2 SEMANAS

SISTEMAS DE
ESPUMA

REDES AUTOMATICAS DE DETECCION Y


ALARMAS POR TEMPERATURA, GAS,
HUMO, FUEGO Y AUTO-BOMBEO DE
AGUA, MONITORES Y SPRINKLES,
PANELES DE CONTROL PUSH BUTTONS.
RADIOTELECOMINICACIONES.

GASIMETROS,
MOTODIESEL
BOMBAS,
RESPIRADORES
AUTOCONTENIDOS,
RADIOTELECOMUNICACION, ETC

Manual
de
Procedimientos
para
operaciones,
mantenimiento,
y
emergencias debe preparar y seguir para
cada sistema del oleducto un manual
escrito de procedimientos para conducir las
actividades de la conduccin normal de las
operaciones y manejar las operaciones
anormales y las emergencias; Deben existir
adecuadas piscinas de aguas aceitosas;
Una entrenada respuesta de emergencia
sobre todo el equipo y los dispositivos de
contra incendio-TODO EL TIEMPO.

SAP PM - 2 SEMANAS

CONTINGENCIA
ESTACIONES & TLU

AGUA Y REDES
CONTRAINCENDIO

RESPUESTA DE EMERGENCIA

CRITICOS DE SEGURIDAD Y MANEJO DE LA INTEGRIDAD

FFD/T & MAPS III

EQUIPOS

CONSECUENCIAS

UNCONTAINMENT
FIGHTING
DISPOSITIVOS
MOVILES DE
CONTENCION

DISPOSITIVOS
MOVILES
DE
CONTENCION Y GROVERS &
LIFTERS

Pg1874-53

Audits and Inspections records about


procedures and programs related to
maintenance of the SCE

RESCATE &
PRIMEROS
AUXILIOS
DISPOSITIVOS
MOVILES

TRANSPORTE,
TRAJES,
ARNESES,
HERRAMIENTAS,
ACCESORIOS, ...ETC

PHASE1-BPC

PHASE1-BB

SEPARADORES

3
3
3

MOTORES
DIESEL,
INTERRUPTORES,
INSTRUMENTOS, PANELES DE MAPS III-G-PR-005 REV1 Jannuary 1998-Paraf 4.2.3 El Porvenir System Description
CONTROL, INCREMENTADORES,
UNIDAD DE BOMBEO

3
3

PATIN ALPHA LAVAL

SISTEMA
COMBUSTIBLE Y
TANQUES

TANQUE,
BOMBAS,
DUCTOS,
PANELES
DE
CONTROL
Y
ACCESORIOS LINEAS

LINEAS DE AIRE

COMPRESORES DE
ACCESORIOS LINEAS

TECHO, PISO, CASCO, TIERRA, MAPS III-G-PR-005 REV1 Jannuary 1998-Paraf 2. Conclusions and 4.2.2 Cusiana 4.2.13. Coveas Sta
AGITADORES Y CINTAS DE terminal System Description & Paragrph 5.1 Cusiana Sta overpressure protection item 5.9. Vasconia
Station Overpressure protection
MEDICION

CONTROL
CORROSION

EST. EPO

MRF BOMBAS
BPC41050/80

EST. VAS
EST. CVA
EST. EPO

BOMBAS ODC

VENTILACION,
DRENAJES
IMPERMEABILIZADO

MARRANO
PATINES DE
INHIBIDORES

Manual
de
Procedimientos
para
operaciones,
mantenimiento,
y
emergencias debe preparar y seguir para
cada sistema del oleducto un manual
escrito de procedimientos para conducir las
actividades de la conduccin normal de las
operaciones
y
actividades
de

INTELIGENTE,
INYECCION DE

ANODOS

Should be given to the periodic use of


internal inspections tools to monitor 195.537(c
external pipeline corrosion & By scraping,
pigging, or sphering, dehydation, inhibitors,
or internal coating are used to control ,
coupons shall be examined or other
monitoring technques utilized at intervals
not exceeding 6 months

195.537(c

Manual de Procedimientos para operaciones, mantenimiento, y emergencias debe


Pg 1872-38(1)Shall not perform welding on a liquid-filled
preparar y seguir para cada sistema del oleducto un manual escrito de procedimientos
195.402(a) para conducir las actividades de la conduccin normal de las operaciones y actividades 10.9.1.1. during the replacement of portions- 10.9.1.2 it shall have in pipeline with a carbon equivalent of .50% or greater if
195.402(a)
195.403(a)( de mantenimiento y manejo anormal de operaciones de emergencia. Los equipos deben maintenance manuals the procedures for maintenance welding7.2 a 7.15 not(2) shall treat this as a temporary installation and (3) as
195.403(a)(3)(5)
welding shall be in accordance with these- 10.9.2.2.2 Testing of Fillet and a permanent by supporting and approving by the Board the
3)(5)
estar en condiciones de apropiada operacin todo el tiempo.
195.430(a)
Branch Welds
procedures and specifications.Pg1874-53 Audits and
195.430(a)
Inspections records

MOTOSOLDAROES DIESEL

EQUIPOS POR POSIBILIDAD DE


CONSECUENCIA

FILTROS

MOTORES
DIESEL,
INTERRUPTORES,
INSTRUMENTOS, PANELES DE MAPS III-G-PR-005 REV1 Jannuary 1998-Paraf 4.2.9 VSASta System Description
CONTROL, INCREMENTADORES,
UNIDAD DE BOMBEO

195.402(a)
195.403(a)(3)(5)
195.430(a)

MAPS III-G-PR-005 REV1 Jannuary 1998-Paraf 4.2.10 VSA to CAC pipeline and 4.2.12. CCA to CVA
pipeline description system.

Manual
de
Procedimientos
para
operaciones,
mantenimiento,
y
emergencias debe preparar y seguir para
cada sistema del oleducto un manual
escrito de procedimientos para conducir las
actividades de la conduccin normal de las
operaciones
y
actividades
de
mantenimiento y manejo anormal de
operaciones de emergencia. Los equipos
deben estar en condiciones de apropiada
operacin todo el tiempo.

BOYA, MANGUERAS, SISTEMAS


DETECCION,
CONTENCION
Y
SHUTDOWN, ALMACENAMIENTO, FFD/T-3GGG-ICU-002-1/1 pg4
NAVEGACION
Y
SELLO
GIRATORIO

DIESEL,

INTERRUPTORES,
INSTRUMENTOS, PANELES DE
CONTROL, INCREMENTADORES,
UNIDAD DE BOMBEO

195.402(a)
195.403(a)(3)(5)
195.430(a)

PREFILTROS Y
PATIN ALPHA LAVAL Y FILTROS
SEPARADOR

CLASIFICACION

MOTORES
DIESEL,
INTERRUPTORES,
INSTRUMENTOS, PANELES DE
CONTROL, INCREMENTADORES,
UNIDAD DE BOMBEO

BPC42040/60/70/
MOTORES
80

BB41090/120

Must check at least six times each calendar year, but with intervals not exceeding 2 1/2 9.4.1.5.- According criteria of CGA OCC-2 for controling and CAPP 2002months the rectifiers, reverse current switches, diodes, and the interference bonds which 0013 -9.4.2. for mitigation in sweet gathering systems and 9.4.3 for
Monitoring and 9.5 Records
faulure would jeopardize structural protection.

Ses veces al ao pero en intervalos de


tiempo no mayores a dos meses, se deben
chequear los rectificadores, inversores de
corriente, los diodos y los bonos de
interferencia endonde una falla de estos
puede
precipitar
la
desproteccin
estructural.

MODIFICADOR
PATIN INYECCION QUIMICO
DE FRICCION

TLU 2

BUNKERS shall meet the 4.13.3.2 Ventilation - 4.13.4.1. Drainage and


Waterproofing requirements

Deben ser inspeccionadas y servidas


cuando sea necesario las vlvulas que
CSA Z662 -4.13.3.2. durante la operacin normal no son
regularmente abiertas cerradas. Deben
- CSA Z6624.13.2.1. - CSA ser al menos una vez al ao y dentro de un
11.8.7.
intervalo de tiempo no mayor a los 15
meses entre operaciones, parcialmente
operadas; Los bunkers deben contar con

EN PLEM, HOVs, ESDEV, MHOV,


PSVs, PVs, DANFLOS,TANQUES y
VALVULAS
GENERALES
MOTORIZADAS.

Deben ser inspeccionadas y servidas


cuando sea necesario las vlvulas que
durante la operacin normal no son
regularmente abiertas cerradas. Deben
CSA Z662 -11.8.7
ser al menos una vez al ao y dentro de un
intervalo de tiempo no mayor a los 15
meses entre operaciones, parcialmente
operadas.

Pg1871- 36(d)(e)General Operation Requirements,


11.8.7 Shall be inspected and serviced whenever necessary and valves
clearly mark the o/c positions os sectionalizing mainline
that, during normal operation, are not opened or closed regularly shall be
valves and isolating and blow down valves and others
at least partially operated a minimun of once per calendar year with a
major valves whithim a pipeline station.Pg1874-53 Audits
maximun interval of 12 months between operations
and Inspections records

461.3(i)
462.3(a)

PREFILTROS
FASE2

BOMBEO

451.8

UN AO

BUNKERS

MAPS III-G-PR-005 REV1 Jannuary 1998-Paraf 2. Conclusions and 4.2.4 Porvenir to Miraflores Pipeline
decription nad 4.2.6.Miraflores to la Belleza Pipeline

UN AO

MHOV,

To visual inspection according API 653 and to cathodic protection according API 651

Inspeccin visual de acuerdo con la seccin


4 del cdigo API 653 seccin 6 del cdigo
API 2510 en defecto de estos dos cada
operador debe en intervalos n mayores a
15 meses, pero al menos una vz por ao
calendario inspeccionar cada proteccin de
sobre llenado.

DOS MESES

MHOV

451.5 According NFPA 30

195.444
and
195.402(c)3
(H)
195.573(d)

DOT195-06-03-03
Pg 1868 - 13(a)(b)(c)Storage facilities location
4.11.1.3. Venting according NFPA30 - 4.11.1.5 Overfill Protection - 4.11.1.6 and
195.432(a)-195.444
containment area to prevent
10.6.2.6 Control of Volatile Organic Compound Emissions according CCME-EPC- ,serviceability and
and 195.402(c)3 (H)
87E- 10.6.2.5 Shall be inspected periodically and mainteined as necessary to be release.Pg1874-53 Audits and Inspections records about
195.573(d);
in accordance with the API 653s design requeriments- 10.6.27 shall periodically procedures and programs related to maintenance of the
monitor LDS - 10.6.2.9 Cleaning shall be in accordance with the applicable Mandatory to Operate Equipments included (SCE+ OCE) 195.428(a)(c)(API
2510- 5.1.2 y API
requeriments os API 2015
and NOCE del universo Critical Equipments + SCE + PLM
2350)

UN AO

TRANSFORMADORES,
BREAKERS,
PROTECCIONES,
REDES Y PARARAYOS

PLANTAS TRATAMIENTO AGUA,


HARDWARE DE OFICINAS, AIRE
ACONDICIONADO, PARARAYOS,
CAMARAS DE VIGILANCIA

VALVULAS DE
SERVICIO

LINEA

TORRETA, PLANTA FISICA,


DERECHOS DE VIA,
SISTEMAS DE AGUA
INDUSTRIAL, VIGILANCIA
AREAS POR SENSORES
APROXIMACION

EQUIPOS DE
SOLDADURA

BOMBEO

SAP PM - 2
SEMANAS

ALMACENAMIENTO

PRESERVACION & CONSERVACION

SERVICIO

TANQUES

AIRE

UPSs

SISTEMAS DC,
RECTIFICADORES,
ANODOS Y
CUPONES
CUPONES

STOCK

MOTORES
CAT3512,
GENERADORES, CONEXIONADO,
MANDO, PANELES DE CONTROL

SUBESTACIONES

ESCENCIALES

Manual
de
Procedimientos
para
operaciones,
mantenimiento,
y
emergencias debe preparar y seguir para
cada sistema del oleducto un manual
escrito de procedimientos para conducir las
actividades de la conduccin normal de las
operaciones
y
actividades
de
mantenimiento y manejo anormal de
operaciones de emergencia. Los equipos
deben estar en condiciones de apropiada
operacin todo el tiempo.

GENERADORES

UPSs

ACRITICOS

Manual
de
Procedimientos
para
operaciones,
mantenimiento,
y
emergencias debe preparar y seguir
para cada sistema del oleducto un
195.402(a)
manual escrito de procedimientos para 195.402(a)
195.403(a)(3)(5) conducir
las
actividades
de
la 195.403(a)(3)(5)
conduccin normal de las operaciones y 195.430(a)
195.430(a)
actividades de mantenimiento y manejo
anormal de operaciones de emergencia.
Los equipos deben estar en condiciones
de apropiada operacin todo el tiempo.

SAP PM - 2 SEMANAS

ENERGIA
ESTACIONES

PRODUCCION

CRITICOS

PREFILTROS PHASE
FILTROS
1

ACRITICO

ESCENCIAL

CRITICO

ALTA

MUY ALTA

Manual
de
Procedimientos
para
operaciones,
mantenimiento,
y
emergencias debe preparar y seguir para
cada sistema del oleducto un manual
escrito de procedimientos para conducir las
actividades de la conduccin normal de las
operaciones
y
actividades
de
mantenimiento y manejo anormal de
operaciones de emergencia. Los equipos
deben estar en condiciones de apropiada
operacin todo el tiempo.

SAP PM - 6 MESES

BOMBEO

BOMBAS
TRANSFERENCIA

MOTORES
ELECTRICOS,
INTERRUPTORES,
INSTRUMENTOS, PANELES DE MAPS III-G-PR-005 REV1 Jannuary 1998-Paraf 4.2.2 Cusiana System Description & Paraf 5.1 Cusiana
CONTROL,
VARIADORES, Sta over pressure protection
CONEXIONADO Y FUENTE DE
ENERGIA

SAP PM - 2 SEMANAS

BOOSTERS

1
1
1

PHASE1-BPC

PHASE1-BB

SEPARADORES

3
3
3

MOTORES
DIESEL,
INTERRUPTORES,
INSTRUMENTOS, PANELES DE MAPS III-G-PR-005 REV1 Jannuary 1998-Paraf 4.2.3 El Porvenir System Description
CONTROL, INCREMENTADORES,
UNIDAD DE BOMBEO

3
3

PATIN ALPHA LAVAL

SISTEMA
COMBUSTIBLE Y
TANQUES

TANQUE,
BOMBAS,
DUCTOS,
PANELES
DE
CONTROL
Y
ACCESORIOS LINEAS

LINEAS DE AIRE

COMPRESORES DE
ACCESORIOS LINEAS

TECHO, PISO, CASCO, TIERRA, MAPS III-G-PR-005 REV1 Jannuary 1998-Paraf 2. Conclusions and 4.2.2 Cusiana 4.2.13. Coveas Sta
AGITADORES Y CINTAS DE terminal System Description & Paragrph 5.1 Cusiana Sta overpressure protection item 5.9. Vasconia
Station Overpressure protection
MEDICION

CONTROL
CORROSION

EST. EPO

MRF BOMBAS
BPC41050/80

EST. VAS
EST. CVA
EST. EPO

BOMBAS ODC

VENTILACION,
DRENAJES
IMPERMEABILIZADO

MARRANO
PATINES DE
INHIBIDORES

Manual
de
Procedimientos
para
operaciones,
mantenimiento,
y
emergencias debe preparar y seguir para
cada sistema del oleducto un manual
escrito de procedimientos para conducir las
actividades de la conduccin normal de las
operaciones
y
actividades
de

INTELIGENTE,
INYECCION DE

ANODOS

Should be given to the periodic use of


internal inspections tools to monitor 195.537(c
external pipeline corrosion & By scraping,
pigging, or sphering, dehydation, inhibitors,
or internal coating are used to control ,
coupons shall be examined or other
monitoring technques utilized at intervals
not exceeding 6 months

195.537(c

Manual de Procedimientos para operaciones, mantenimiento, y emergencias debe


Pg 1872-38(1)Shall not perform welding on a liquid-filled
preparar y seguir para cada sistema del oleducto un manual escrito de procedimientos
195.402(a) para conducir las actividades de la conduccin normal de las operaciones y actividades 10.9.1.1. during the replacement of portions- 10.9.1.2 it shall have in pipeline with a carbon equivalent of .50% or greater if
195.402(a)
195.403(a)( de mantenimiento y manejo anormal de operaciones de emergencia. Los equipos deben maintenance manuals the procedures for maintenance welding7.2 a 7.15 not(2) shall treat this as a temporary installation and (3) as
195.403(a)(3)(5)
welding shall be in accordance with these- 10.9.2.2.2 Testing of Fillet and a permanent by supporting and approving by the Board the
3)(5)
estar en condiciones de apropiada operacin todo el tiempo.
195.430(a)
Branch Welds
procedures and specifications.Pg1874-53 Audits and
195.430(a)
Inspections records

MOTOSOLDAROES DIESEL

EQUIPOS POR POSIBILIDAD DE


CONSECUENCIA

FILTROS

MOTORES
DIESEL,
INTERRUPTORES,
INSTRUMENTOS, PANELES DE MAPS III-G-PR-005 REV1 Jannuary 1998-Paraf 4.2.9 VSASta System Description
CONTROL, INCREMENTADORES,
UNIDAD DE BOMBEO

195.402(a)
195.403(a)(3)(5)
195.430(a)

MAPS III-G-PR-005 REV1 Jannuary 1998-Paraf 4.2.10 VSA to CAC pipeline and 4.2.12. CCA to CVA
pipeline description system.

Manual
de
Procedimientos
para
operaciones,
mantenimiento,
y
emergencias debe preparar y seguir para
cada sistema del oleducto un manual
escrito de procedimientos para conducir las
actividades de la conduccin normal de las
operaciones
y
actividades
de
mantenimiento y manejo anormal de
operaciones de emergencia. Los equipos
deben estar en condiciones de apropiada
operacin todo el tiempo.

BOYA, MANGUERAS, SISTEMAS


DETECCION,
CONTENCION
Y
SHUTDOWN, ALMACENAMIENTO, FFD/T-3GGG-ICU-002-1/1 pg4
NAVEGACION
Y
SELLO
GIRATORIO

DIESEL,

INTERRUPTORES,
INSTRUMENTOS, PANELES DE
CONTROL, INCREMENTADORES,
UNIDAD DE BOMBEO

195.402(a)
195.403(a)(3)(5)
195.430(a)

PREFILTROS Y
PATIN ALPHA LAVAL Y FILTROS
SEPARADOR

CLASIFICACION

MOTORES
DIESEL,
INTERRUPTORES,
INSTRUMENTOS, PANELES DE
CONTROL, INCREMENTADORES,
UNIDAD DE BOMBEO

BPC42040/60/70/
MOTORES
80

BB41090/120

Must check at least six times each calendar year, but with intervals not exceeding 2 1/2 9.4.1.5.- According criteria of CGA OCC-2 for controling and CAPP 2002months the rectifiers, reverse current switches, diodes, and the interference bonds which 0013 -9.4.2. for mitigation in sweet gathering systems and 9.4.3 for
Monitoring and 9.5 Records
faulure would jeopardize structural protection.

Ses veces al ao pero en intervalos de


tiempo no mayores a dos meses, se deben
chequear los rectificadores, inversores de
corriente, los diodos y los bonos de
interferencia endonde una falla de estos
puede
precipitar
la
desproteccin
estructural.

MODIFICADOR
PATIN INYECCION QUIMICO
DE FRICCION

TLU 2

BUNKERS shall meet the 4.13.3.2 Ventilation - 4.13.4.1. Drainage and


Waterproofing requirements

Deben ser inspeccionadas y servidas


cuando sea necesario las vlvulas que
CSA Z662 -4.13.3.2. durante la operacin normal no son
regularmente abiertas cerradas. Deben
- CSA Z6624.13.2.1. - CSA ser al menos una vez al ao y dentro de un
11.8.7.
intervalo de tiempo no mayor a los 15
meses entre operaciones, parcialmente
operadas; Los bunkers deben contar con

EN PLEM, HOVs, ESDEV, MHOV,


PSVs, PVs, DANFLOS,TANQUES y
VALVULAS
GENERALES
MOTORIZADAS.

Deben ser inspeccionadas y servidas


cuando sea necesario las vlvulas que
durante la operacin normal no son
regularmente abiertas cerradas. Deben
CSA Z662 -11.8.7
ser al menos una vez al ao y dentro de un
intervalo de tiempo no mayor a los 15
meses entre operaciones, parcialmente
operadas.

Pg1871- 36(d)(e)General Operation Requirements,


11.8.7 Shall be inspected and serviced whenever necessary and valves
clearly mark the o/c positions os sectionalizing mainline
that, during normal operation, are not opened or closed regularly shall be
valves and isolating and blow down valves and others
at least partially operated a minimun of once per calendar year with a
major valves whithim a pipeline station.Pg1874-53 Audits
maximun interval of 12 months between operations
and Inspections records

461.3(i)
462.3(a)

PREFILTROS
FASE2

BOMBEO

451.8

UN AO

BUNKERS

MAPS III-G-PR-005 REV1 Jannuary 1998-Paraf 2. Conclusions and 4.2.4 Porvenir to Miraflores Pipeline
decription nad 4.2.6.Miraflores to la Belleza Pipeline

UN AO

MHOV,

To visual inspection according API 653 and to cathodic protection according API 651

Inspeccin visual de acuerdo con la seccin


4 del cdigo API 653 seccin 6 del cdigo
API 2510 en defecto de estos dos cada
operador debe en intervalos n mayores a
15 meses, pero al menos una vz por ao
calendario inspeccionar cada proteccin de
sobre llenado.

DOS MESES

MHOV

451.5 According NFPA 30

195.444
and
195.402(c)3
(H)
195.573(d)

DOT195-06-03-03
Pg 1868 - 13(a)(b)(c)Storage facilities location
4.11.1.3. Venting according NFPA30 - 4.11.1.5 Overfill Protection - 4.11.1.6 and
195.432(a)-195.444
containment area to prevent
10.6.2.6 Control of Volatile Organic Compound Emissions according CCME-EPC- ,serviceability and
and 195.402(c)3 (H)
87E- 10.6.2.5 Shall be inspected periodically and mainteined as necessary to be release.Pg1874-53 Audits and Inspections records about
195.573(d);
in accordance with the API 653s design requeriments- 10.6.27 shall periodically procedures and programs related to maintenance of the
monitor LDS - 10.6.2.9 Cleaning shall be in accordance with the applicable Mandatory to Operate Equipments included (SCE+ OCE) 195.428(a)(c)(API
2510- 5.1.2 y API
requeriments os API 2015
and NOCE del universo Critical Equipments + SCE + PLM
2350)

UN AO

TRANSFORMADORES,
BREAKERS,
PROTECCIONES,
REDES Y PARARAYOS

PLANTAS TRATAMIENTO AGUA,


HARDWARE DE OFICINAS, AIRE
ACONDICIONADO, PARARAYOS,
CAMARAS DE VIGILANCIA

VALVULAS DE
SERVICIO

LINEA

TORRETA, PLANTA FISICA,


DERECHOS DE VIA,
SISTEMAS DE AGUA
INDUSTRIAL, VIGILANCIA
AREAS POR SENSORES
APROXIMACION

EQUIPOS DE
SOLDADURA

BOMBEO

SAP PM - 2
SEMANAS

ALMACENAMIENTO

PRESERVACION & CONSERVACION

SERVICIO

TANQUES

AIRE

UPSs

SISTEMAS DC,
RECTIFICADORES,
ANODOS Y
CUPONES
CUPONES

STOCK

MOTORES
CAT3512,
GENERADORES, CONEXIONADO,
MANDO, PANELES DE CONTROL

SUBESTACIONES

ESCENCIALES

Manual
de
Procedimientos
para
operaciones,
mantenimiento,
y
emergencias debe preparar y seguir para
cada sistema del oleducto un manual
escrito de procedimientos para conducir las
actividades de la conduccin normal de las
operaciones
y
actividades
de
mantenimiento y manejo anormal de
operaciones de emergencia. Los equipos
deben estar en condiciones de apropiada
operacin todo el tiempo.

GENERADORES

UPSs

ACRITICOS

Manual
de
Procedimientos
para
operaciones,
mantenimiento,
y
emergencias debe preparar y seguir
para cada sistema del oleducto un
195.402(a)
manual escrito de procedimientos para 195.402(a)
195.403(a)(3)(5) conducir
las
actividades
de
la 195.403(a)(3)(5)
conduccin normal de las operaciones y 195.430(a)
195.430(a)
actividades de mantenimiento y manejo
anormal de operaciones de emergencia.
Los equipos deben estar en condiciones
de apropiada operacin todo el tiempo.

SAP PM - 2 SEMANAS

ENERGIA
ESTACIONES

PRODUCCION

CRITICOS

PREFILTROS PHASE
FILTROS
1

ACRITICO

ESCENCIAL

CRITICO

ALTA

MUY ALTA

Manual
de
Procedimientos
para
operaciones,
mantenimiento,
y
emergencias debe preparar y seguir para
cada sistema del oleducto un manual
escrito de procedimientos para conducir las
actividades de la conduccin normal de las
operaciones
y
actividades
de
mantenimiento y manejo anormal de
operaciones de emergencia. Los equipos
deben estar en condiciones de apropiada
operacin todo el tiempo.

SAP PM - 6 MESES

BOMBEO

BOMBAS
TRANSFERENCIA

MOTORES
ELECTRICOS,
INTERRUPTORES,
INSTRUMENTOS, PANELES DE MAPS III-G-PR-005 REV1 Jannuary 1998-Paraf 4.2.2 Cusiana System Description & Paraf 5.1 Cusiana
CONTROL,
VARIADORES, Sta over pressure protection
CONEXIONADO Y FUENTE DE
ENERGIA

SAP PM - 2 SEMANAS

BOOSTERS

1
1
1

PHASE1-BPC

PHASE1-BB

SEPARADORES

3
3
3

MOTORES
DIESEL,
INTERRUPTORES,
INSTRUMENTOS, PANELES DE MAPS III-G-PR-005 REV1 Jannuary 1998-Paraf 4.2.3 El Porvenir System Description
CONTROL, INCREMENTADORES,
UNIDAD DE BOMBEO

3
3

PATIN ALPHA LAVAL

SISTEMA
COMBUSTIBLE Y
TANQUES

TANQUE,
BOMBAS,
DUCTOS,
PANELES
DE
CONTROL
Y
ACCESORIOS LINEAS

LINEAS DE AIRE

COMPRESORES DE
ACCESORIOS LINEAS

TECHO, PISO, CASCO, TIERRA, MAPS III-G-PR-005 REV1 Jannuary 1998-Paraf 2. Conclusions and 4.2.2 Cusiana 4.2.13. Coveas Sta
AGITADORES Y CINTAS DE terminal System Description & Paragrph 5.1 Cusiana Sta overpressure protection item 5.9. Vasconia
Station Overpressure protection
MEDICION

CONTROL
CORROSION

EST. EPO

MRF BOMBAS
BPC41050/80

EST. VAS
EST. CVA
EST. EPO

BOMBAS ODC

VENTILACION,
DRENAJES
IMPERMEABILIZADO

MARRANO
PATINES DE
INHIBIDORES

Manual
de
Procedimientos
para
operaciones,
mantenimiento,
y
emergencias debe preparar y seguir para
cada sistema del oleducto un manual
escrito de procedimientos para conducir las
actividades de la conduccin normal de las
operaciones
y
actividades
de

INTELIGENTE,
INYECCION DE

ANODOS

Should be given to the periodic use of


internal inspections tools to monitor 195.537(c
external pipeline corrosion & By scraping,
pigging, or sphering, dehydation, inhibitors,
or internal coating are used to control ,
coupons shall be examined or other
monitoring technques utilized at intervals
not exceeding 6 months

195.537(c

Manual de Procedimientos para operaciones, mantenimiento, y emergencias debe


Pg 1872-38(1)Shall not perform welding on a liquid-filled
preparar y seguir para cada sistema del oleducto un manual escrito de procedimientos
195.402(a) para conducir las actividades de la conduccin normal de las operaciones y actividades 10.9.1.1. during the replacement of portions- 10.9.1.2 it shall have in pipeline with a carbon equivalent of .50% or greater if
195.402(a)
195.403(a)( de mantenimiento y manejo anormal de operaciones de emergencia. Los equipos deben maintenance manuals the procedures for maintenance welding7.2 a 7.15 not(2) shall treat this as a temporary installation and (3) as
195.403(a)(3)(5)
welding shall be in accordance with these- 10.9.2.2.2 Testing of Fillet and a permanent by supporting and approving by the Board the
3)(5)
estar en condiciones de apropiada operacin todo el tiempo.
195.430(a)
Branch Welds
procedures and specifications.Pg1874-53 Audits and
195.430(a)
Inspections records

MOTOSOLDAROES DIESEL

EQUIPOS POR POSIBILIDAD DE


CONSECUENCIA

FILTROS

MOTORES
DIESEL,
INTERRUPTORES,
INSTRUMENTOS, PANELES DE MAPS III-G-PR-005 REV1 Jannuary 1998-Paraf 4.2.9 VSASta System Description
CONTROL, INCREMENTADORES,
UNIDAD DE BOMBEO

195.402(a)
195.403(a)(3)(5)
195.430(a)

MAPS III-G-PR-005 REV1 Jannuary 1998-Paraf 4.2.10 VSA to CAC pipeline and 4.2.12. CCA to CVA
pipeline description system.

Manual
de
Procedimientos
para
operaciones,
mantenimiento,
y
emergencias debe preparar y seguir para
cada sistema del oleducto un manual
escrito de procedimientos para conducir las
actividades de la conduccin normal de las
operaciones
y
actividades
de
mantenimiento y manejo anormal de
operaciones de emergencia. Los equipos
deben estar en condiciones de apropiada
operacin todo el tiempo.

BOYA, MANGUERAS, SISTEMAS


DETECCION,
CONTENCION
Y
SHUTDOWN, ALMACENAMIENTO, FFD/T-3GGG-ICU-002-1/1 pg4
NAVEGACION
Y
SELLO
GIRATORIO

DIESEL,

INTERRUPTORES,
INSTRUMENTOS, PANELES DE
CONTROL, INCREMENTADORES,
UNIDAD DE BOMBEO

195.402(a)
195.403(a)(3)(5)
195.430(a)

PREFILTROS Y
PATIN ALPHA LAVAL Y FILTROS
SEPARADOR

CLASIFICACION

MOTORES
DIESEL,
INTERRUPTORES,
INSTRUMENTOS, PANELES DE
CONTROL, INCREMENTADORES,
UNIDAD DE BOMBEO

BPC42040/60/70/
MOTORES
80

BB41090/120

Must check at least six times each calendar year, but with intervals not exceeding 2 1/2 9.4.1.5.- According criteria of CGA OCC-2 for controling and CAPP 2002months the rectifiers, reverse current switches, diodes, and the interference bonds which 0013 -9.4.2. for mitigation in sweet gathering systems and 9.4.3 for
Monitoring and 9.5 Records
faulure would jeopardize structural protection.

Ses veces al ao pero en intervalos de


tiempo no mayores a dos meses, se deben
chequear los rectificadores, inversores de
corriente, los diodos y los bonos de
interferencia endonde una falla de estos
puede
precipitar
la
desproteccin
estructural.

MODIFICADOR
PATIN INYECCION QUIMICO
DE FRICCION

TLU 2

BUNKERS shall meet the 4.13.3.2 Ventilation - 4.13.4.1. Drainage and


Waterproofing requirements

Deben ser inspeccionadas y servidas


cuando sea necesario las vlvulas que
CSA Z662 -4.13.3.2. durante la operacin normal no son
regularmente abiertas cerradas. Deben
- CSA Z6624.13.2.1. - CSA ser al menos una vez al ao y dentro de un
11.8.7.
intervalo de tiempo no mayor a los 15
meses entre operaciones, parcialmente
operadas; Los bunkers deben contar con

EN PLEM, HOVs, ESDEV, MHOV,


PSVs, PVs, DANFLOS,TANQUES y
VALVULAS
GENERALES
MOTORIZADAS.

Deben ser inspeccionadas y servidas


cuando sea necesario las vlvulas que
durante la operacin normal no son
regularmente abiertas cerradas. Deben
CSA Z662 -11.8.7
ser al menos una vez al ao y dentro de un
intervalo de tiempo no mayor a los 15
meses entre operaciones, parcialmente
operadas.

Pg1871- 36(d)(e)General Operation Requirements,


11.8.7 Shall be inspected and serviced whenever necessary and valves
clearly mark the o/c positions os sectionalizing mainline
that, during normal operation, are not opened or closed regularly shall be
valves and isolating and blow down valves and others
at least partially operated a minimun of once per calendar year with a
major valves whithim a pipeline station.Pg1874-53 Audits
maximun interval of 12 months between operations
and Inspections records

461.3(i)
462.3(a)

PREFILTROS
FASE2

BOMBEO

451.8

UN AO

BUNKERS

MAPS III-G-PR-005 REV1 Jannuary 1998-Paraf 2. Conclusions and 4.2.4 Porvenir to Miraflores Pipeline
decription nad 4.2.6.Miraflores to la Belleza Pipeline

UN AO

MHOV,

To visual inspection according API 653 and to cathodic protection according API 651

Inspeccin visual de acuerdo con la seccin


4 del cdigo API 653 seccin 6 del cdigo
API 2510 en defecto de estos dos cada
operador debe en intervalos n mayores a
15 meses, pero al menos una vz por ao
calendario inspeccionar cada proteccin de
sobre llenado.

DOS MESES

MHOV

451.5 According NFPA 30

195.444
and
195.402(c)3
(H)
195.573(d)

DOT195-06-03-03
Pg 1868 - 13(a)(b)(c)Storage facilities location
4.11.1.3. Venting according NFPA30 - 4.11.1.5 Overfill Protection - 4.11.1.6 and
195.432(a)-195.444
containment area to prevent
10.6.2.6 Control of Volatile Organic Compound Emissions according CCME-EPC- ,serviceability and
and 195.402(c)3 (H)
87E- 10.6.2.5 Shall be inspected periodically and mainteined as necessary to be release.Pg1874-53 Audits and Inspections records about
195.573(d);
in accordance with the API 653s design requeriments- 10.6.27 shall periodically procedures and programs related to maintenance of the
monitor LDS - 10.6.2.9 Cleaning shall be in accordance with the applicable Mandatory to Operate Equipments included (SCE+ OCE) 195.428(a)(c)(API
2510- 5.1.2 y API
requeriments os API 2015
and NOCE del universo Critical Equipments + SCE + PLM
2350)

UN AO

TRANSFORMADORES,
BREAKERS,
PROTECCIONES,
REDES Y PARARAYOS

PLANTAS TRATAMIENTO AGUA,


HARDWARE DE OFICINAS, AIRE
ACONDICIONADO, PARARAYOS,
CAMARAS DE VIGILANCIA

VALVULAS DE
SERVICIO

LINEA

TORRETA, PLANTA FISICA,


DERECHOS DE VIA,
SISTEMAS DE AGUA
INDUSTRIAL, VIGILANCIA
AREAS POR SENSORES
APROXIMACION

EQUIPOS DE
SOLDADURA

BOMBEO

SAP PM - 2
SEMANAS

ALMACENAMIENTO

PRESERVACION & CONSERVACION

SERVICIO

TANQUES

AIRE

UPSs

SISTEMAS DC,
RECTIFICADORES,
ANODOS Y
CUPONES
CUPONES

STOCK

MOTORES
CAT3512,
GENERADORES, CONEXIONADO,
MANDO, PANELES DE CONTROL

SUBESTACIONES

ESCENCIALES

Manual
de
Procedimientos
para
operaciones,
mantenimiento,
y
emergencias debe preparar y seguir para
cada sistema del oleducto un manual
escrito de procedimientos para conducir las
actividades de la conduccin normal de las
operaciones
y
actividades
de
mantenimiento y manejo anormal de
operaciones de emergencia. Los equipos
deben estar en condiciones de apropiada
operacin todo el tiempo.

GENERADORES

UPSs

ACRITICOS

Manual
de
Procedimientos
para
operaciones,
mantenimiento,
y
emergencias debe preparar y seguir
para cada sistema del oleducto un
195.402(a)
manual escrito de procedimientos para 195.402(a)
195.403(a)(3)(5) conducir
las
actividades
de
la 195.403(a)(3)(5)
conduccin normal de las operaciones y 195.430(a)
195.430(a)
actividades de mantenimiento y manejo
anormal de operaciones de emergencia.
Los equipos deben estar en condiciones
de apropiada operacin todo el tiempo.

SAP PM - 2 SEMANAS

ENERGIA
ESTACIONES

PRODUCCION

CRITICOS

PREFILTROS PHASE
FILTROS
1

ACRITICO

ESCENCIAL

CRITICO

ALTA

MUY ALTA

Manual
de
Procedimientos
para
operaciones,
mantenimiento,
y
emergencias debe preparar y seguir para
cada sistema del oleducto un manual
escrito de procedimientos para conducir las
actividades de la conduccin normal de las
operaciones
y
actividades
de
mantenimiento y manejo anormal de
operaciones de emergencia. Los equipos
deben estar en condiciones de apropiada
operacin todo el tiempo.

SAP PM - 6 MESES

BOMBEO

BOMBAS
TRANSFERENCIA

MOTORES
ELECTRICOS,
INTERRUPTORES,
INSTRUMENTOS, PANELES DE MAPS III-G-PR-005 REV1 Jannuary 1998-Paraf 4.2.2 Cusiana System Description & Paraf 5.1 Cusiana
CONTROL,
VARIADORES, Sta over pressure protection
CONEXIONADO Y FUENTE DE
ENERGIA

SAP PM - 2 SEMANAS

BOOSTERS

1
1
1

8.

CONTROL DE ACTUALIZACIONES
VERSIN
0

FECHA
05/10/2014

Elabor:
ING. DE PLANEACIN DE
MANTENIMIENTO DE EQUIPOS
ESTTICOS Y DINMICOS

DESCRIPCIN

Elaboracin del Documento

Revis:
COORDINADOR DE
PLANEACION DE
MANTENIMIENTO

Aprob:
JEFE DE GESTION DE
MANTENIMIENTO

Este documento es propiedad de Oleoducto Central S.A. Este documento no est destinado para circulacin general y
no debe ser reproducido o distribuido sin la aprobacin escrita de Oleoducto Central S.A., o su representante. Cualquier
copia impresa de este documento se considera como COPIA NO CONTROLADA

Das könnte Ihnen auch gefallen