THAI BINH HAM RONG GAS DISTRIBUTION AND

GATHERING SYSTEM PROJECT, BLOCK 102&106 PHASE 1

TURN DOWN RATIO STUDY REPORT

Document Number
135355-01-REP-06-012

Project No.: 135355

00

19-05-14

Issued for Review

VHN

NVP

NTS

Rev

Date

Purpose of Issue

Prepared
By

Checked
By

PVE

PTSC

APPROVED

PVGAS
Approval

THAI BINH HAM RONG GAS DISTRIBUTION AND GATHERING


SYSTEM PROJECT, BLOCK 102 & 106 PHASE 1
TURN DOWN RATIO STUDY REPORT

TABLE OF CONTENTS
1.0

INTRODUCTION ............................................................................................................... 3

1.1

PROJECT DISCRIPTION .................................................................................................... 3

1.2

PURPOSE OF DOCUMENT ................................................................................................ 5

2.0

GENERAL INFORMATION AND REQUIREMENT ................................................... 5

2.1

LANGUAGE AND UNITS OF MEASUREMENT ............................................................. 5

2.2

ABBREVIATION AND DEFINITION ................................................................................ 5

2.2.1 Definition............................................................................................................................... 5
2.2.2 Abbreviations ........................................................................................................................ 6
3.0

BASIS AND ASSUMPTION .............................................................................................. 6

3.1

THERMO-DYNAMIC AND SIMULATION PACKAGE .................................................. 7

4.0

TURN DOWN & AVERAGE TEMPERATURE SIMULATION CASE SCHEME ... 8

5.0

TURN DOWN RATIO RESULTS AND CONCLUSION ............................................... 8

6.0

REFERENCE DOCUMENT............................................................................................ 12

7.0

APPENDICES ................................................................................................................... 12

Document No.: 135355-01-REP-06-012 Rev. 00


Page No.: 2 of 12

THAI BINH HAM RONG GAS DISTRIBUTION AND GATHERING


SYSTEM PROJECT, BLOCK 102 & 106 PHASE 1
TURN DOWN RATIO STUDY REPORT

1.0

INTRODUCTION

1.1

PROJECT DISCRIPTION
Thai Binh gas field was discovered in 2006 through Thai Binh-1X exploration well which
discovered gas accumulation in two separate sand packages of Middle Miocene U220 (4
distinctly separate intervals, interval 1 to 4) and Lower Miocene U250 (2 distinctly separate
intervals, interval 5 and 6). Total Thai Binh Gas Initially In Place (TB GIIP) of 139.8 Bscf
was approved in Thai Binh - Reserves Assessment Report (RAR) 2010. However, due to the
lack of evidence on the fault seal between the main area with the northern portion of interval
5, an upside potential of 30 Bscf remains to be unlocked during development phase. Thai
Binh field development will focus mainly on the central area with a proven connected
volume of 97Bscf in interval 3 and 5. In the event the northern portion is found to be
isolated by a sealing fault, an additional long reach well might be required in the 11th year
to sustain the 20 mmscfd required gas sale volume.
Thai Binh development plan consists of a Wellhead platform (WHP) with minimum
facilities. The gas will be sold ex-platform as full well stream (FWS) to shore via a 25 km
pipeline. Thai Binh development is expected to deliver its peak gas production of 20
mmscfd from 2 wells. Individual well capacity can deliver the gas production up to 20
mmscfd. Thai Binh Field Development can be summarized as follows:
-

To commit with Gas Sale Agreement (GSA) of 20 mmscfd for a period of 8 + 2


years on a commercially acceptable gas price.

To drill 2 wells to develop 74 Bscf of gas recovery from main sand of Miocene
reservoirs (interval 3 & 5), and to prove up the northern area connectivity of 30 Bscf
in interval 5.

Installation of a 3 legged well head platform with 4 slots.

Minor reservoirs to be developed later as behind casing opportunities i.e. add


perforation or through infill drilling

Petro Vietnam Gas Joint Stock Corporation (PVGas) is responsible for the development of
Thai Binh - Ham Rong Gas Distribution and Gathering System Project to transport gas from
Ham Rong field (Block 106), Thai Binh field (Block 102) and Other fields (Hong Long,
Sapa Nam, Hong Ha- Block 103 & 107) to industrial zones in Thai Binh and neighboring
provinces in the North of Vietnam.
Phase 1 of the Project includes facilities on Thai Binh Platform, Gas Distribution Center
(GDC) and gas transport pipeline connecting Thai Binh field to GDC as followings:
-

Platform topside facilities include Pig launcher and Corrosion Inhibitor skid.

Spool is installed for connections from Ham Rong field, other fields

Tie-in point for LNG exports FPSO in the future.

Document No.: 135355-01-REP-06-012 Rev. 00


Page No.: 3 of 12

THAI BINH HAM RONG GAS DISTRIBUTION AND GATHERING


SYSTEM PROJECT, BLOCK 102 & 106 PHASE 1
TURN DOWN RATIO STUDY REPORT

The pipeline from Thai Binh Platform to GDC shall be designed with additional
capacity to service other platforms 106, 103 & 107. It shall include:
Approximately 13.1 km from TBDP-A to LFP at Con Thu
islet.
Approximately 5.28 km from LFP to LFS.
Approximately 5.8 km from LFS to onshore GDC.

In Tien Hai GDC, the 3 phase separator and filter/separator will be expected to install in
order to separate water, flit solid object, take condensate and sale gas. Condensates will be
stored and send out by truck loading system. Sales gas will be supplied to industrial
customers via pipeline or by CNG trailers.
According to the approved Field Development Plan (FDP), the First gas schedule is targeted
on 15th June 2014. However, the above schedule will be updated according to the First gas
schedule of Petronas Overseas SDN. BHD (PCOSB), expected to complete on Q2, 2015

Document No.: 135355-01-REP-06-012 Rev. 00


Page No.: 4 of 12

THAI BINH HAM RONG GAS DISTRIBUTION AND GATHERING


SYSTEM PROJECT, BLOCK 102 & 106 PHASE 1
TURN DOWN RATIO STUDY REPORT

Figure 2 Onshore facilities


1.2

PURPOSE OF DOCUMENT
The objective of this document is to propose turn down ratio about flowrate and duty of
Equipments / Level control valves, Pressure control valves based on simulating cases of the
Thai Binh - Ham Rong Gas Distribution and Gathering Project to ensure consistency and
safety in operating equipment.

2.0

GENERAL INFORMATION AND REQUIREMENT

2.1

LANGUAGE AND UNITS OF MEASUREMENT


The content, references, attachments and any supplementary information for all engineering
documents shall be in English.
Units of measurement for all engineering documents shall be in the System International
(SI).

2.2

ABBREVIATION AND DEFINITION

2.2.1 Definition
COMPANY

Petro Vietnam Gas Project Management Company


(PVGAS-PMC)

CONTRACT

The EPC contract between COMPANY and


CONTRACTOR for execution of the EPC works of

Document No.: 135355-01-REP-06-012 Rev. 00


Page No.: 5 of 12

THAI BINH HAM RONG GAS DISTRIBUTION AND GATHERING


SYSTEM PROJECT, BLOCK 102 & 106 PHASE 1
TURN DOWN RATIO STUDY REPORT

PROJECT
EPC
CONTRACTOR/
CLIENT

PETROVIETNAM
TECHNICAL
CORPORATION (PTSC)

SERVICES

PROJECT

Thai Binh Ham Rong Gas Distribution And Gathering


System Project, Block 102 & 106 Phase 1

PURCHASER

As defined in the PO

PVE

PV Engineering J.S.C - An entity subcontracted by


PTSC to perform the detailed engineering design.

VENDOR

The supplier of the materials, plant or equipment as


determined by this Specification and other associated
documents as attached to the Material Requisition

2.2.2 Abbreviations

3.0

GDC

Gas Distribution Center

LFS

Land Fall Station

LFP

Land Fall Point

API

American Petroleum Institute

ASTM

American Society for Testing and Material

BCV

Building Code of Vietnam

ISO

International Organization for Standardization

TCVN

Vietnamese Codes and Standards

TD(R)

Turn down (Ratio)

BASIS AND ASSUMPTION


The following data, information and assumption are used to basic on modeling and showing
the equipment turn down ratio at turn down condition as well as other condition.
The selection and consideration case SS-4D in Flow Assuarance Report as turn down case
with following condition:

Document No.: 135355-01-REP-06-012 Rev. 00


Page No.: 6 of 12

THAI BINH HAM RONG GAS DISTRIBUTION AND GATHERING


SYSTEM PROJECT, BLOCK 102 & 106 PHASE 1
TURN DOWN RATIO STUDY REPORT

AMB.
Temp.

CASE

TURNDOWN
CASE

SS-4D

OTHER
CASEs

SS-1C/D/K; SS-2C/C1/G
SS-3C/C1/G

Min

Total
Flowrate,
Mmscfd

10

Inlet
Temp. @
TBWHP
oC

38.38

Pressure, Barg

Temp, oC

TB

LFS

GDC

LFS

GDC

15.8

14.4

14

14.6

4.07

The detail results showns in Process Simulation Report 135355-01-REP-06-001

The Production specification and requirement to be kept same concept with all simulation
cases
The following provisions for pressure drop is considered in various equipments (these
pressure drops to be updated after have final data from Equipments Vendors)
Table 3.1: Pressure Drop in Various Equipments
Pressure Drop
Equipment

3.1

(kPa)

(psi)

Separator (Vessel)

20

2.900

Filter Separator

30

4.351

Heat exchanger

30

4.351

Heater

50

7.252

Metering

50

7.252

Pump

50

7.252

THERMO-DYNAMIC AND SIMULATION PACKAGE


The process simulation models are built using the HYSYS Process Simulation Program,
(Version v8.0).
The Peng Robinson (PR) equation of state (EOS) has been selected as the fluid property
package to generate process simulation.
Design Compositions and flow rates to be used for this simulation are provided in the
following sections, these dates are taken from document: 135355-01-BOD-04001_Process and Utility Basis of Design

Document No.: 135355-01-REP-06-012 Rev. 00


Page No.: 7 of 12

THAI BINH HAM RONG GAS DISTRIBUTION AND GATHERING


SYSTEM PROJECT, BLOCK 102 & 106 PHASE 1
TURN DOWN RATIO STUDY REPORT

4.0

TURN DOWN SIMULATION CASE SCHEME

5.0

TURN DOWN RATIO RESULTS AND CONCLUSION


The following results based on simulation cases thence taken turndown ratio for each of
equipment / valve about flowrare as well as duty at corresponding units. The detailed result
is tabulation below:

Document No.: 135355-01-REP-06-012 Rev. 00


Page No.: 8 of 12

THAI BINH HAM RONG GAS DISTRIBUTION AND GATHERING


SYSTEM PROJECT, BLOCK 102 & 106 PHASE 1
TURN DOWN RATIO STUDY REPORT

Table 5.1: The Turndown ratio result of Equipment /Valves in Thai Binh Ham Rong Project

Unit

Desciption

GDC
pressure
control valve

Tag no.

PCV435

HP Separator
LCV420A
liquid outlet

Level control
valve at
LCV420B
upstream LP
Separator
LP level
control valve

LCV413A

Document No.: 135355-01-REP-06-012 Rev. 00


Page No.: 9 of 12

Required TDR

Actually TDR

(Min / Max)

(Min / Max)

Cases

Cvs
Opening

Cvs Opening
Flowrate
(Am3/h)

Valves Cv

Remark

(Calculation)

(from
FA)

Valves Cv

4D/3C

64.6/3480

10/90

712/4206

222.4/1308

19/55

Selection Requied Cv & Opening


Following catalog Fishers Valve.

0.08/13.6

10/100

15 (*)

12.12

90

- Min Q (continuous) = 0.107 m3/h

(%)

(%)

- Max Q (surge liquid volume) =


15m3/h

4D
0.08/13.6

10/100

0.11/7.5

0.09/6.2

5/80

4D/3G

0.24/27.2

10/100

1.37/5.63

0.56/1.9

10/30

1C/3G

0.24/27.2

10/100

0.67/5.63

0.5/1.9

10/30

0.02/4.8

10/100

1.44

3.23

82

- Volume (LAH-LAL) = 93.56 m3

Selection Requied Cv & Opening


Following catalog Fishers Valve
Selection Requied Cv & Opening
Following catalog Fishers Valve

THAI BINH HAM RONG GAS DISTRIBUTION AND GATHERING


SYSTEM PROJECT, BLOCK 102 & 106 PHASE 1
TURN DOWN RATIO STUDY REPORT

Unit

Desciption

Tag no.

Cases
(in FA)

Required TDR

Actually TDR

(Min / Max)

(Min / Max)

Flowrate
(Am3/h)

Duty
(kW)

Remark

Duty

Flowrate
(Am3/h)

(kW)

0.53/3

7.86/170

- Converted Ratio Q: 17.3/100

Condensate Heater
1C

- Converted Ratio Pow: 4.6/100

1/100
H401
(**)
4D

- Converted Ratio Q: 19/100


0.57/3

21.5/170
- Converted Ratio Pow: 12.6/100

LP Condensate
Pumps

- Converted Ratio Q: 15/100


P402AB

4D

10/100

0.39/3

0.04/0.31

- Converted Ratio Pow: 12.9/100


- Volume working: 0.58 m3

Document No.: 135355-01-REP-06-012 Rev. 00


Page No.: 10 of 12

THAI BINH HAM RONG GAS DISTRIBUTION AND GATHERING


SYSTEM PROJECT, BLOCK 102 & 106 PHASE 1
TURN DOWN RATIO STUDY REPORT

Notes:
General recommendation:
The minimum flowrate of Pumps & Valves is shown based on the worst simulation cases at
continuous condition.
The maximum flowrate is calculated in on-specification condition in worst case such that
covering system.
Selection Requied Valves Cv as well as Opening follow catalog Fishers Valve. (See
detailed in Appendix 2)
Selection Requied Electric Heaters duty follow catalog Vulcanics Vendor (Thyristor) and
Chromalox. (See detailed in Appendix 3)
The controlling concept will base on actual condition to have corrected suitable pump duty
as well as opening percent of valve to ensure consistency and stabilization processing
operating.
These information shown on table as referency and the Selection Requied Cv & Opening
percent of Valves will be finally confirmed and advise by Valve Vendor.
Recommendation for valves LCV-420A/B (*):
LCV-420A:
In case of flowrate at 15 m3/h (maximum) and turndown flowrate at 0.11 m3/h required
large range of valve opening. Therefor, consider to install a LCV line for normal operation
case.
LCV-420B:
In case of volume flowrate at turndown condition is reducing more than max fowrate. The
operator will supervised and considered valves opening percent suitable with actual
condition to maintain gas / condensated level is consistency at NLL.
About the range of valve opening level (%) will be clarified after had Vendors supply
confirmed.
Recommendation for valves LCV-413A (*):
This valve will be operated at on-off stated corresponding with LAH-NLL (0.36 m3) in 15
minutes. The flowrate is used to size for this valve of 1.44 m3/h and will be confirmed by
Valve Vendor when LP Separators dimension be available.
Recommendation for Heater H-401 (**):
The range of electric heater duty (%) will be clarified after had Vendors supply confirmed

Document No.: 135355-01-REP-06-012 Rev. 00


Page No.: 11 of 12

THAI BINH HAM RONG GAS DISTRIBUTION AND GATHERING


SYSTEM PROJECT, BLOCK 102 & 106 PHASE 1
TURN DOWN RATIO STUDY REPORT

Recommendation for Pumps P-401A/B (***):


Pump will operator at continuous condition to always maintain fluid to temperature
exchange with condensate fluid. In case of turn down, the flowrate will be reducing
appreciable. Considering install a bypass line with a LCV / globe valve to adjust back flow
based on liquid arrival during operation modes to Heat exchange equipment to ensure
steadily operating process.
6.0

7.0

REFERENCE DOCUMENT
1. 135355-01-REP-06-004

Flow Assurance Study Report

2. 135355-01-REP-06-001

Process Simulation Report

APPENDICES
1. THE SCHEME OF SIMULATION CASE 1C,3C,3G,4D
2. VENDOR CATALOG FOR SELECTING LEVEL CONTROL VALVE
3. VENDOR CATALOG FOR SELECTING ELECTRIC HEATERs DUTY
4. P&IDs

Document No.: 135355-01-REP-06-012 Rev. 00


Page No.: 12 of 12

THAI BINH HAM RONG GAS DISTRIBUTION AND GATHERING


SYSTEM PROJECT, BLOCK 102 &106 PHASE 1
TURN DOWN RATIO STUDY REPORT

APPENDIX 1 THE SCHEME OF SIMULATION CASE


1C, 3C, 3G, 4D
(05 Page including this cover)

Document No. : 135355-01-REP-06-012 APPENDIX 1_Rev. 00


Page No.: 1 of 1

THAI BINH HAM RONG GAS DISTRIBUTION AND GATHERING SYSTEM PROJECT
CASE SIMULATION : CASE 1 BASE CASE - MAX GAS (CASE 1C IN FA)
Gas Sources: TB 2013 : 20
MMSCFD
Min Pressure @ GDC : 14
barg
Temperature @ WHP : 38.38
oC
Max Ambient Temperature

Fuel Gas Heater


DUTY

0.2692

Feed Temperature

kW

36.36

Product Temperature 51.49

SPRDSHT-1

3-Gas From Filter

A1: HCDew 28.53

Temperature 36.36

Pressure

1471

kPa

Molar Flow

19.76

MMSCFD

A
Q_FG

op-102

1-To HP Separator
Temperature 36.52

Pressure

1501

kPa

Molar Flow

20.00

MMSCFD

3-Gas
From
Filter

TB
WHP
2013

To Fuel
Gas
System

TEE-100

Filter
Separator
F-401

BAL-3

Temperature 38.38

Pressure

1866

kPa

Molar Flow

20.00

MMSCFD

2-Gas
To
Filter

1-To HP
Separator

FG
To
PCV

Fuel
Gas
Heater

To
TEG

Liquid
From
Filter

Metering

Water
in Oil

Water

TEE-102

Duty 3.508

W2

Oil in Water (ppm) 2000

13-Condensate
From Heat
Exchanger

kW

8-Fluid To Heater
MIX-101

Actual Volume Flow

0.5285

m3/h

9-Fluid From Heater


Actual Volume Flow

VLV-100

To Closed Drain
Temperature

37.17

Pressure

131.3

kPa

Molar Flow

0.1781

MMSCFD

S
SET-1

0.6718

m3/h

Pressure

kPa

151.3

8-Fluid
To
Heater

9-Fluid
Heater From
Heater

10-Fluid
To LP
Separator

LP
Separator
PCV

DUTY

7.863

14-Condensate
To Tank

LP
Separator
V-402

Heater

Pressure
Drop

kW

20-To Oily
Water
Treatment

Condensate
Tank TK-401

TVP @ 38 oC

64.54

kPa

TVP @ 45 oC

73.40

kPa

Water (% Volume) 0.3408

BAL-6

15-Condensate
Product

Condensate
Specification

TVP at
38_degC

P-101

11-Condesate
From LP
Separator

18-Off
Gas to
Flare

17-Vent

Closed
Drain
Vessel
Water to
Treatment
System

1.000

Q_Heater

Gas
to
Flare

To
Closed
Drain

MIX-102

2.358

Vapour Fraction @ 250 barg 4oC

Temperature 75.00

BAL-5
6-Water
from HP
Separator

50.00

Mol composition (CO2+N2)

10-Fluid To LP Separator
Q_Pump

Oil in
Water

Water in Oil (%vol) 1.000

0.0000

Water content (mg/SCM)

P-100

Cond PreHeater

ADJ-2

Oil and Water Separation

Calorific Value (LHV MMBTU/SCM) 3.537e-002

12-Condensate
To Heat
Exchanger

Cond
PreHeater

ADJ-1
Prod
Header

Calorific Value (HHV MMBTU/SCM) 3.914e-002

Sales Gas
Properties

7-Liquid
From HP
MIX-100 Separator

Sales Gas
Specification

Sulfur Content (ppm)

L1
TEE-101

MMSCFD

GP

Water
from
TEG

Liquid
HP
Separator
V-401

kPa

3.057e-002

250barg_4oC

ADJ-4

WHP
Production

801.3

BAL-4

5-Sales
Gas

TEG

48.53

Pressure
Molar Flow

19-Fuel
Gas

FG
PCV

Temperature

4-Gas To
Metering
Skid

B
TB WHP 2013

19-Fuel Gas

GP

ADJ-3

TVP at
45_degC

16-Oily
Water
From LP
Separator

BASE CASE-MAX GAS-TEG.HSC

THAI BINH HAM RONG GAS DISTRIBUTION AND GATHERING SYSTEM PROJECT
CASE SIMULATION : CASE 7 MAX CASE - MAX GAS (CASE 3C IN FA)
Gas Sources: TB 2013+HR+Other Fields :
53.4 MMSCFD
Min Pressure @ GDC : 14 barg
Temperature @ WHP : 28.6 oC
Max Ambient Temperature

SPRDSHT-1
A1: HCDew

20.90

A
GP

ADJ-3
Temperature

28.60

Temperature

29.01

Pressure

3525

kPa

Pressure

1501

kPa

Molar Flow

20.00

MMSCFD

Actual Volume Flow

4206

m3/h

3-Gas
From
Filter

TEE-100

HR
from
WHP

BAL-3

2-Gas
To
Filter

1-To HP
Separator

28.60

Pressure

3525

kPa

Liquid
HP
Separator
V-401

MMSCFD
Other
from
WHP

7-Liquid
From HP
MIX-100 Separator

A
Water
in Oil

Water

Temperature

28.60

Water in Oil (%vol)

1.000

Pressure

3525

kPa

Oil in Water (ppm)

2000

Molar Flow

28.00

MMSCFD

VLV-100

ADJ-2

3.930e-002

Calorific Value (LHV MMBTU/SCM)

3.554e-002

Duty

6.220

kW

Sales
Gas
Properties

12-Condensate
To Heat
Exchanger

Q_Pump
13-Condensate
From Heat
Exchanger

Temperature

75.00

Pressure

151.3

kPa

Q_Heater

8-Fluid
To
Heater

9-Fluid
Heater From
Heater

Pressure
Drop

Heater
DUTY

17.10

Condensate
Tank
TK-401

11-Condesate
From LP
Separator

18-Off
Gas to
Flare
10-Fluid
To LP
Separator

LP
Separator
PCV

kW

LP
Separator
V-402

B
TVP at
38_degC

15-Condensate
Product

Condensate
Specification
TVP @ 38 oC

59.63

kPa

TVP @ 45 oC

69.27

kPa

Water (% Volume)

BAL-6

14-Condensate
To Tank
20-To
Oily
Water
Treatment

0.0000

Vapour Fraction @ 250 barg 4oC

BAL-5

P-101

3.309

Mol composition (CO2+N2)

Water to
Treatment
System

50.00

Water content (mg/SCM)

17-Vent

Closed
Drain
Vessel

0.0000

Sulfur Content (ppm)

GP

Gas
to
Flare

To
Closed
Drain

SET-1

Cond PreHeater

MIX-101

1
MIX-102

Calorific Value (HHV MMBTU/SCM)

P-100

Oil in
Water
W2

250barg_4oC

Cond
PreHeater

TEE-102
Oil and Water Separation

BAL-4

10-Fluid To LP Separator

ADJ-1
Prod
Header

Other from WHP

6-Water
from HP
Separator

TEE-101

Metering

5-Sales
Gas

ADJ-4
Water
from
TEG
L1

Temperature

Sales Gas
Specification

TEG

Liquid
From
Filter

19-Fuel
Gas

FG
PCV

4-Gas
To
Metering
Skid

WHP
Production

HR from WHP

op-102

FG
To
PCV

Fuel
Gas
Heater

To
TEG

5.400

To Fuel
Gas
System

Filter
Separator
F-401

TB
WHP
2013

Molar Flow

Q_FG

1-To HP Separator

TB WHP 2013

0.3344

TVP at
45_degC

16-Oily
Water
From LP
Separator

MAX CASE-MAX GAS-TEG.HSC

THAI BINH HAM RONG GAS DISTRIBUTION AND GATHERING SYSTEM PROJECT
CASE SIMULATION : CASE 9 MAX CASE - MAX WATER (CASE 3G IN FA)
Gas Sources: TB 2019+HR+Other Fields : 53.4 MMSCFD
Max Pressure @ WHP : 35 barg
Temperature @ WHP : 28.6 oC
Min Ambient Temperature

SPRDSHT-1
A1: HCDew

-3.482

19-Fuel Gas

ADJ-3

Q_FG

TB WHP 2019
Temperature

28.60

Pressure

3601

kPa

Molar Flow

20.00

MMSCFD

3-Gas
From
Filter

TEE-100

Filter
Separator
F-401

TB
WHP
2019

HR
from
WHP

BAL-3

2-Gas
To
Filter

1-To HP
Separator

Temperature

16.52

op-102

Pressure

801.3

kPa

L1
Liquid

Temperature 28.60

Pressure

3601

kPa

Molar Flow

28.00

MMSCFD

HP
Separator
V-401

TEE-101

Other
from
WHP

Water
in Oil

Water
TEE-102

Water in Oil (%vol)

1.000

Oil in Water (ppm)

2000

ADJ-4

Sales Gas
Properties

Q_Pump
13-Condensate
From Heat
Exchanger

Cond PreHeater
Duty

15.93

MIX-101

kW

8-Fluid
To
Heater

9-Fluid From Heater


Temperature

114.8

Pressure

1801

kPa

A
VLV-100

m3/h

5.540

Pressure

1881

kPa

Molar Flow

1.900

MMSCFD

Actual Liquid Flow

1.671

m3/h

1.000

11-Condesate
From LP
Separator

Pressure

kPa

151.3

Q_Heater

9-Fluid
Heater From
Heater

DUTY

88.64

kW

To
Closed
Drain

18-Off
Gas
to
Flare

10-Fluid
To LP
Separator

LP
Separator
PCV

LP
Separator
V-402

17-Vent

Condensate
Specification

TVP at
38_degC

TVP @ 38 oC

63.65

kPa

TVP @ 45 oC

74.99

kPa

Water (% Volume)

6-Water from HP Separator


Temperature

3.603

Vapour Fraction @ 250 barg 4oC

Heater
Pressure
Drop

Gas
to
Flare

1
MIX-102

50.00

Mol composition (CO2+N2)

Temperature 75.00

BAL-5

ADJ-5

0.0000

Water content (mg/SCM)

P-100

Actual Volume Flow 5.626

6-Water
from HP
Separator

3.442e-002

12-Condensate
To Heat
Exchanger

Oil in
Water
W2

3.810e-002

Calorific Value (LHV MMBTU/SCM)


Sulfur Content (ppm)

GP

Cond
PreHeater

ADJ-2

Oil and Water Separation

250barg_4oC

Calorific Value (HHV MMBTU/SCM)

10-Fluid To LP Separator

ADJ-1
Prod
Header

BAL-4

5-Sales
Gas

Metering

Copy 4 at
20mmscfd

7-Liquid
From HP
MIX-100 Separator

Sales Gas
Specification

Water
from
TEG

MMSCFD

TEG

Liquid
From
Filter

3.057e-002

19-Fuel
Gas

FG
PCV

4-Gas
To
Metering
Skid

WHP
Production

Other from WHP

FG
To
PCV

Fuel
Gas
Heater

To
TEG

GP

Molar Flow
To Fuel
Gas
System

S
SET-1

14-Condensate
To Tank

Closed
Drain
Vessel
P-101

Water to
Treatment
System

20-To Oily
Water
Treatment

0.1762

BAL-6

Condensate
Tank
TK-401

15-Condensate
Product

TVP at
45_degC

Q
16-Oily
Water
From LP
Separator

9 MAX CASE-MAX WATER-TE

THAI BINH HAM RONG GAS DISTRIBUTION AND GATHERING SYSTEM PROJECT
CASE SIMULATION : CASE 10 TURNDOWN CASE - MIN GAS (CASE 4D IN FA)
Gas Sources: TB 2013 : 10 MMSCFD
Min Pressure @ GDC : 14 barg
Temperature @ WHP : 4.07 oC
Max Ambient Temperature

Fuel Gas Heater


0.2940

DUTY

kW

3.879

Product Temperature 21.01

Feed Temperature

SPRDSHT-1

3-Gas From Filter

A1: HCDew -2.574

Temperature 3.879

Pressure

1471

kPa

Molar Flow

9.801

MMSCFD

Q_FG

op-102

1-To HP Separator
Temperature

4.070

Pressure

1501

Actual Volume Flow 711.5

C
kPa

3-Gas
From
Filter

m3/h

TB
WHP
2013

To
Fuel
Gas
System

TEE-100

Filter
Separator
F-401

BAL-3

Temperature 38.38
Pressure
Molar Flow

1681
10.00

2-Gas
To
Filter

1-To HP
Separator

To
TEG

4-Gas
To
Metering
Skid

Metering

MMSCFD

TEE-101

TEE-102
Oil and Water Separation

3.011

W2

2000

kW

m3/h

8-Fluid
To
Heater

m3/h

Pressure
Drop

8-Fluid To Heater
MIX-101

Actual Volume Flow 0.5709


9-Fluid From Heater

GTF used
in PRV
datasheet
6-Water
from HP
Separator

VLV-100

Gas
to
Flare

To
Closed
Drain

MIX-102

To Closed Drain
4.372

Pressure

131.3

kPa

Actual Volume Flow 0.1115

Actual Volume Flow 1.365

Temperature

4.372

Pressure

131.3

kPa

SET-1

P-101
Q

0.3936

Temperature 75.00

Pressure

kPa

21.50

2.366

kW

Vapour Fraction @ 250 barg 4oC

1.000

m3/h

LP
Separator
V-402

kW

B
TVP at
38_degC

15-Condensate
Product

Condensate
Specification
TVP @ 38 oC

61.81

kPa

TVP @ 45 oC

72.68

kPa

Water (% Volume) 0.2217

BAL-6

Condensate
Tank
TK-401

Mol composition (CO2+N2)

18-Off
Gas
to
Flare

10-Fluid
To LP
Separator

LP
Separator
PCV

m3/h

20-To
Oily Water
Treatment

151.3

Heater
DUTY

50.00

rpm

11-Condesate
From LP
Separator

Q_Heater

9-Fluid
Heater From
Heater

Water content (mg/SCM)

10-Fluid To LP Separator

14-Condensate
To Tank
Water to
Treatment
System

2.187e-002

BAL-5

Closed
Drain
Vessel

m3/h

Power

17-Vent

Water to Treatment System

Actual Volume Flow 0.1071

Temperature

Speed
Capacity(Actual Vol. Flow)

13-Condensate
From Heat
Exchanger

Oil in
Water

Water in Oil (%vol) 1.000


Oil in Water (ppm)

Duty

0.0000

Sulfur Content (ppm)


P-100

Q_Pump

Cond PreHeater

ADJ-2

Calorific Value (LHV MMBTU/SCM) 3.488e-002

P-100

Cond
PreHeater

Calorific Value (HHV MMBTU/SCM) 3.861e-002


250barg_4oC

BAL-4

12-Condensate
To Heat
Exchanger

7-Liquid
From HP
MIX-100 Separator

A
Water
in Oil

Water

MMSCFD
Sales Gas
Specification

Sales Gas
Properties

Water
from
TEG

ADJ-1
Prod
Header

5-Sales
Gas

ADJ-4

Liquid
HP
Separator
V-401

kPa

3.057e-002

GP

L1

kPa

801.3

Molar Flow

19-Fuel
Gas

FG
PCV

17.43

Pressure

TEG

Liquid
From
Filter

WHP
Production

Fuel
Gas
Heater

416AB
in

Temperature

B
TB WHP 2013

19-Fuel Gas

GP

ADJ-3

TVP at
45_degC
P-102150

1515
16-Oily
Water
From LP
Separator
413A

CASE 10 TURNDOWN CASE-TEG.

THAI BINH HAM RONG GAS DISTRIBUTION AND GATHERING


SYSTEM PROJECT, BLOCK 102 &106 PHASE 1
TURN DOWN RATIO STUDY REPORT

APPENDIX 2 VENDOR CATALOG FOR SELECTING LEVEL


CONTROL VALVE
(03 Page including this cover)

Document No.: 135355-01-REP-06-012 -APPENDIX 2 _Rev. 00


Page No.: 1 of 1

THAI BINH HAM RONG GAS DISTRIBUTION AND GATHERING


SYSTEM PROJECT, BLOCK 102 &106 PHASE 1
TURN DOWN RATIO STUDY REPORT

APPENDIX 3 VENDOR CATALOG FOR SELECTING


ELECTRIC HEATERs DUTY
(05 Page including this cover)

Document No.: 135355-01-REP-06-012 -APPENDIX 3 _Rev. 00


Page No.: 1 of 1

DATA SHEET FOR POWER CONTROL PANEL

500KW/400V/50Hz/Single Stage
Main Incoming Rated @ 900 Amps

The power control panel is installed in safe area, indoor condition.


FEATURES :

Type of electrical panel


o
o
o
o
o
o
o

Material
o
o
o

Floor Mounted
Fitted with mounting plinth 100mm
Approximate overall dimensions: High = 2000 mm, Width = 1800 mm, Depth = 500 mm
Weight : 650 kG Approximate
Single tier enclosure.
Lifting rings for handling and transportation.
Protection class: min. IP 42.

Mild steel
Colour manufacturers standard RAL 7035
Thickness of the panel:1.5 mm

Min/Max ambient temperature: 5C/35C.


Cooling:
o Fan with filter (+5C/+35C)

ELECTRICAL CONNECTIONS :

The panel is provided with a removable, undrilled and non-magnetic gland plate for the contractor cables.

Electrical supply: Bottom entry directly onto copper bars.


Power outlets: Bottom entry directly onto copper bars.
Auxiliaries and Sensors: Bottom entry onto terminals.
Cable glands: Excluded.

CONTROL PANEL FUNCTION:

Rev
1

To control the power and monitor the temperature of one number 500 kW heater Tag No. TBC.

MODIFICATIONS

DATE

Made

Initial Enquiry

23/12/2013

BH

Made by : BH
Date : 23/12/2013
Checked by: VE
Date :

Chkd

Rev

MODIFICATIONS

DATA SHEET FOR POWER CONTROL


PANEL
500kW Control Panel

DATE

Made

N 202643-CPDS

Page

Chkd

Rev 1
1

/5

DATA SHEET FOR POWER CONTROL PANEL

TEMPERATURE REGULATION DEVICE CARRIED OUT BY :

Heater power will be controlled to achieve a preset outlet temperature.


In Remote - Electrical power controlled by hardwired, proportional 4-20mA control signal with remote
set point from DCS.
In Local Power to the heater would be controlled from panel mounted potentiometer with manual set
point adjustment.

POWER CONTROL DESCRIPTION :

Power control:
Power fed to the heater would be modulated from 1% to 100% as controlled by the 4-20mA control
signal. Power regulation would achieved by thyristor ..

Power control device :


The heater will be fully Thyristor controlled as follows:o

o
o
o
o

Thyristor

The thyristor will be provided with high-speed fuse protection, and will have the following
specification:o
o

Rev

1% - 100%

Rated at 849 Amps


Control technique: Burst or Single cycle zero crossover firing.
The thyristors are cycled on for a period, and then off. By varying the length of the on period
relative to the off period the power to the load may be controlled.
Thyristor to modulate power in two of the three phases.
Total Harmonic Distortion < 5%.
Single Harmonic < 3%.
Thyristor failure to include.
Fuse failure.
Over temperature detection on thyristors

MODIFICATIONS

DATE

Made

Initial Enquiry

23/12/2013

BH

Made by : BH
Date : 23/12/2013
Checked by: VE
Date :

Chkd

Rev

MODIFICATIONS

DATA SHEET FOR POWER CONTROL


PANEL
500kW Control Panel

DATE

Made

N 202643-CPDS

Page

Chkd

Rev 1
2

/5

THAI BINH HAM RONG GAS DISTRIBUTION AND GATHERING


SYSTEM PROJECT, BLOCK 102 &106 PHASE 1
TURN DOWN RATIO STUDY REPORT

APPENDIX 4 P&IDs
(03 Page including this cover)

Document No.: 135355-01-REP-06-012 -APPENDIX 4 _Rev. 00


Page No.: 1 of 1