Sie sind auf Seite 1von 15

POWER GRID COMPANY OF BANGLADESH LIMITED (PGCB )

Issued By
Md. Giasuddin

ABB

Checked By
Kjell K. Andersson

ABB

Approved By

PGCB

DESIGN-BUILD
DESIGN
BUILD AND TURNKEY CONTRACT FOR CONSTRUCTION OF
230/132kV SUBSTATION AT BARAPUKURIA AND EXTENSION OF
132/33kV SUBSTATIONS AT RANGPUR AND SAIDPUR

ABB POWER
TECHNOLOGIES AB,
SWEDEN

TITLE : Design of Transformer


Foundation H1(45/75MVA) at
Barapukuria 230/132kV Substation

DESIGN CALCULATION

Paper
Sheet
Language
Size
No.
A4
Scale :

English

Total
Sheets
15
Revision

Drawn By :
Date
09 April'05

Document No. :
PGCB/B_R_S/Cal/TX.FDN/H1

ABB POWER TECHNOLOGIES AB, SWEDEN


CONTRACT NO. PGCB/SC/01/LOT3
Design of Transformer Foundation ( H1 ) ; Barapukuria 230/132/33kV Sub-station

Contents
1. General

Page No.
03

1.1 Considerations

03

1.2 Soil Data

03

1.3 Material Properties

03

2. Design Data

03

3. Design Calculation

04

3.1 Design of Pit Wall

04

3.1.1 Structural Design

04

3.1.1.a - Vertical Reinforcement

05

3.1.1.b - Horizontal Reinforcement

05

3.2 DESIGN OF TRANSFORMER WALL FOUNDATION

05

3.2.1 Wind load calculation

05

3.2.2 Seismic load calculation

06

3.2.3 Structural Design

06

4. Design of Fire Wall

07

4.1 Structural Design

07

4.1.1 Vertical Reinforcement

07

4.1.2 Distribution Reinforcement

08

5. Design of Base Slab

08

5.1 Design
g data

08

5.2 : Stability Check for Soil Bearing Capacity

09

5.3 Check for Settlement

09

5.4 Check for Punching of the Base

10

5.5 Reinforcement Calculation at the Top of the Pad

10

5.5.a Main Reinforcement Along Long Direction

10

5.5.b Distribution Reinforcement along Short Direction

10

5.6 Reinforcement Calculation at the Bottom of the Pad

11

5.6.a Main Reinforcement Along Long Direction

11

5.6.b Distribution Reinforcement


6. Design of grating
6.1.aCheck for bending stress

11
11
11

6.1.b Check for shear stress

11

6.1.c Check for max deflection

11

6.2 Design of grating supporting channel

12

6.2.aCheck for bending stress

12

6.2.b Check for shear stress

12

6.2.c Check for max deflection

12

7. Design of jacking support

12

7.1 Data

12

7.1.a Reinforcement for the Pedestal

12

7.1.b Reinforcement for the wall


7.2 Design of base slab

13

7.2.a Stability Check Against Soil Bearing

13

13

7.2.b Main Reinforcement for the base Slab

13

7.2.c Distribution Reinforcement

13

8. Design of rail-cum-road

14

9. Design of Corbel on the Top of the blast wall

14

10. Additional Reinforcement to install PI on top of Blast Wall

15

ABB POWER TECHNOLOGIES AB, SWEDEN


CONTRACT NO. PGCB/SC/01/LOT3

Design of Transformer Foundation H1(45/75MVA) ; Barapukuria 230/132/33kV Sub-station


1. General
1.1 Considerations :
a) One raft foundation is considered for three 45/75MVA Transformer.
b)) The bottom of the raft is at a depth
surface.
p of 1.0m from existingg ground
g
c) Two boring have been done for soil investigation , i.e BH-3 & BH-4. Soil bearing capacities at the foundation depth are 103.47 kN/m2at
BH-4 and 118.25 kN/m2 at BH-3. Safe bearing capacity 103.47 is considered for design.
d) The Top of bund wall is 200mm above the finished switchyard surface level.

1.2 Soil Data:


Allowable bearing capacity of soil is considered :
Unit weight of soil :
Frustum angle :
Water Table from EGL :

103.47 kN/sqm
17.94 kN/cum.
15.00
15 00 Deg.
Deg
6.90 m

1.3 Material Properties :


Concrete...fc'=
Reinforcing Steel..fy =
Concrete Clear Cover.=
Unit Weight of Concrete.=

20 N/mm2
415 N/mm2
60 mm
24.0 kN/cum.

2. Design Data :
( Reference Dwg no. 20.97.4-03-3512 and Document no. 1WAU 320452-FH. )
Transformer's Length = 6.85 m
Transformer's Width = 5.70 m
Height of Transformer = 6.30 m
Total Weight of Tx. ( with Oil ) = 71,000 Kg
Weight of Oil = 21,000 Kg
Kg/cum.
Density of Oil = 840 Kg/cum
Total volume of oil = 25.00 Cum
Pit volume reqd. below the stone ( 125% of oil vol. ) = 31.25 Cum
Clearance required between inside face of pit wall and
extreme face of transformer = 0.70 m
Inside length of pit required = 6.85 + 2 x 0.7 = 8.25 m,
Use 8.32 m
Inside width of pit required = 5.7+ 2 x 0.7 = 7.1m, Use 7.10 m
Surface area of the pit = 59.1 sqm.
Width of Tx. Walls Foundation = 0.60 m
Length of Tx. Walls Foundation = 8.32 m
Area of Tx. Walls Foundation = 10.0 sqm.
Net surface area of the pit = 49.1 sqm.
Average Depth required = 0.64 m
Provide Minimum depth below Grating = 0.65 m
Provide Maximum depth below Grating ( with slope in
the floor) =
Thickness of grating =
Thickness of gravel layer on top of grating =
Free height above gravel top =
Max. height of pit wall above base slab =

pared By : Md. Giasuddin

0.75 m
0.05 m
0 225 m
0.225
0.05 m
1.225 m

Page 3 of 15

Date : 07 April'05

ABB POWER TECHNOLOGIES AB, SWEDEN


CONTRACT NO. PGCB/SC/01/LOT3

Design of Transformer Foundation H1(45/75MVA) ; Barapukuria 230/132/33kV Sub-station


3. Design Calculation :
3.1 Design of Pit Wall :
Angle of repose for backfilled soil, =
Coefficient of earth pressure , Ka = ( 1-sin ) / ( 1-sin
)=
Unit weight of soil =
Height of soil at toe side above base =
Height of soil at heel side above slab =
PL above heel side soil =
Thickness of stem
=
Thickness of base slab =
Superimposed live load at heel side =
Applied Loading :

0.00 Deg
1 00
1.00
17.94 kN/cum
0.000 m
0.700 m
0.200 m
0.150 m
0.300 m
10.00 kN/sqm

Unit Weight of Gravel Fill = 16 kN/cum.


Unit Weight of Brick = 19 kN/cum.
Unit Weight of Sand Fill = 15 kN/cum.

Pressure due to Backfill P1= 1/2*Kph2*1.0 = 4.40 kN


Ka = ( 1-Sin )/( 1+Sin ) = 1.0
Pressure due Surcharge load P2 =10.0+ ( 0.175*16+0.075*19+0.075*15)*0.7 =
So Moment about point A = 4.41*0.233+13.75*0.35 = 5.835 kN.m
Factored Moment = 5.838*1.5 = 8.752 kN.m

( Per meter of width )


( For Backfill is considered 0 Degree )
13.75 kN ( Per meter of width )
( Per meter of width )
"

3.1.1 Structural Design :


Let us check with minimum reinforcement. As per ACI code, Ratio of minimum reinforcement ( in SI unit) is given by =1.4/fy
min= 0.003373494

M u =f y bd 2 1-0.59 y ...;Where = 0.9


ff'c

pared By : Md. Giasuddin

Page 4 of 15

Date : 07 April'05

ABB POWER TECHNOLOGIES AB, SWEDEN


CONTRACT NO. PGCB/SC/01/LOT3

Design of Transformer Foundation H1(45/75MVA) ; Barapukuria 230/132/33kV Sub-station


Mu

d=

f y b(1-0.59

f y
fc'

=
)

85 mm

; d Provided =200-60-10/2= 85 mm

; OK

3.1.1.a - Vertical Reinforcement :


Mdes =Mu/0.9 = 9.725 kN.m
Assuming depth of stress block, a = 7.839 mm
Area of steel, As = M*1000000/(0.9*fy*(d-a/2)) = 321.12 mm2
(Ref. -Design of concrete structure, By-Nilson & Winter,Page 83 ,10th Ed.)
Check for a
a = As*fy/(.85*fc'*b) = 7.839 mm
Consideration is OK, So As = 321.12 mm2/m
As per Code Min Rebar Required = 0.0013bt = 195.00 mm2/m
Consider bar Size = 10.0 mm
So Nos. of Bars = 4.09 Nos
Spacing = 244.58 mm
Provide 10mm @ 225mm at both face of the wall.
3.1.1.b - Horizontal Reinforcement :
As per Code Min Rebar Required = 0.0013bt = 195.00 mm2/m
Consider bar Size = 8.0 mm
So Nos. of Bars = 3.88 Nos
Spacing = 1000/5 = 257.77 mm
Provide 8mm @ 250mm at both face of the wall.
Check for shear :
Shear force , V = 18.14 kN
Factored shear , Vu = 27.21 kN
Where, b= 1000 mm
d = 85 mm
So, vc= Vc/bd = 0.320 N/mm2
0.17 f c ' N/mm2; In present case which is coming 0.76 Mpa.
AS per ACI Shear Stress applied to concrete should be less than
This is much greater than applied stress so consideration is quite Ok.
3.2 DESIGN OF TRANSFORMER WALL FOUNDATION :
Data ( ref. - Drawing No. 20.97.4-03-3512 ) :
Transformer Length, L =
Transformer Width, B =
Transformer Height above top of rail, H =
Total weight
g of Transformer ( with oil ) =71*9.81 =
Bearing capacity of soil below 1.0 m below EGL =

6.85 m
5.70 m
6.30 m
696.51 kN
103.470 kN/m2

3.2.1 Wind load calculation - as per BNBC


Maximum wind velocity , Vb =
Height of top of transformer from FSYL =
For exposure B , Cz at Top =
p
B , Cz at Bottom =
For exposure
Velocity to Pressure conversion coefficient, Cc =
Structure Importance Factor =

130.0 km/hr
6.50 m
0.878
0.801
4.72E-05
1.25

q z = cc c I c z v 2 b = 0.875 kN/m2

pared By : Md. Giasuddin

Page 5 of 15

; at Top

Date : 07 April'05

ABB POWER TECHNOLOGIES AB, SWEDEN


CONTRACT NO. PGCB/SC/01/LOT3

Design of Transformer Foundation


H1(45/75MVA) ; Barapukuria 230/132/33kV Sub-station
q z = cc cI cz v 2 b =
= 0.799 kN/m2
L/B =
H/B =
Pressure co-efficient, Cp =
Gust Co-efficient, CG =

1.20
1.11
1.30
1.29

Design Wind Pressure, p z = c G c p q z = 1.468 kN/m2

= 1.339 kN/m2
Average Pressure , Pz = 1.404 kN/m2
Force results from Wind = 1.468*6.85*5.7 = 60.58 kN
; Acting at a height =
6.5/3*(1.339+2*1.468)/(1.339+1.468)-0.2 = 3.10 m
3.2.2 Seismic load calculation - as per BNBC
Design Base Shear is given by :

V =

; at Bottom

; at Top
; at Bottom

; From Wall Top.

ZICW
R

Where, Z = Seismic Zone Co-efficient = 0.15


I = Structure Importance Factor = 1.25
R = Response Modification Coefficient = 6
C = Numerical coefficient system is given by : C =
S = Site coefficient for soil characteristics = 1.5

( for Zone 2 )
( with essential Facilities )
( For RCC wall System )
1.25S
T

T = Fundamental pperiod of vibration is ggiven byy : T = Ct ( hn )

Ct = 0.049

( For all type of non braced


RCC structure )

hn = 6.30 m
0.195 Sec
5.579
696.51 kN
121.43 kN
0
2.36
2 36 m

T=
C=
W = Total Seismic dead load =Transformer Weight =
Design base shear V =
As T is less than 0.7 sec so Ft =
; Acting
Wall
=
A ti att a height
h i ht = 6.3*3/8
6 3*3/8 ; From
F
W ll Top.
T
3.2.3 Structural Design :

Supporting wall thickness =


Wall height above FSYL =
Depth of foundation below FSYL =
Thickness of foundation pad =
Depth of wall = 1.325+0.2-0.3 =
Length of wall =
Weight of Transformer =
C/C Distance of Tx Wheels =
Distributed Tx. Weight per meter
= 710/2/(1.505+2*1.225*TAN45o) =
Weight of wall per meter length =
Total vertical load per meter length =
Moment about Y Produced by Wind Load =
60.58*(3.1+1.225) =
Moment about Y Produced by Seismic Load =
121.43*1.225 =
So Seismic load is critical
Design Moment =286.87*1.5 =
Design Moment per meter length = 438.64/2/8.32 =

pared By : Md. Giasuddin

0.60 m
0.20 m
1.325 m
0.30 m
1.225 m
8 32 m
8.32
696.51 kN
1.505 m
88.05 kN
17.64 kN
105.69 kN
261.99 kN.m
286.87 kN.m
430.30 kN.m
25.86 kN.m/m

Page 6 of 15

Date : 07 April'05

ABB POWER TECHNOLOGIES AB, SWEDEN


CONTRACT NO. PGCB/SC/01/LOT3

Design of Transformer Foundation H1(45/75MVA) ; Barapukuria 230/132/33kV Sub-station

Check for Shear :


Total vertical load per meter length = 105.69 kN
Width considered, b = 1000 mm
d= 600 mm
Clear Cover = 60; so d = 600-60-20 mm = 520 mm
So, vc= Vc/bd = 0.20 N/mm2
0.17 f c ' N/mm2
AS per ACI Shear Stress applied to concrete should be less than
In present case which is coming 0.76 Mpa.
This is much greater than applied stress so consideration is quite Ok. no reinforcement is needed to resist shear.
Vertical Reinforcement to resist Moment about Y :
Design Moment = 25.86 kN.m/m
b = 1000 mm
t= 600 mm
Clear Cover = 60; so d = 600-60-20 mm = 520 mm
Assuming depth of stress block, a = 3.26 mm
Area of steel, As = M*1000000/(0.9*fy*(d-a/2)) =
133.56 mm2
(Ref. -Design of concrete structure, By-Nilson & Winter,Page 83 ,10th Ed.)
Check for stress block,a
a = As*fy/(.85*fc'*b) = 3.26 mm
Consideration is OK, So As = 133.56 mm2
As per Code Min Rebar Required = 0.0013bt = 780.00 mm2
Consider
bar S
Size = 12 mm
C
So Nos. of Bars = 6.90 Nos
Spacing = 1000/10= 145 mm
Say 140mm
Horizontal Reinforcement for temp shrinkage at Top:
b = 600 mm
t= 1225 mm
As per Code Min Rebar Required = 0.0018bt = 955.50 mm2
Consider bar Size = 16 mm
So Nos.
Nos of Bars = 4.75
4 75 Nos
4 DESIGN OF FIRE WALL :
Height of Fire Wall =
Thickness of wall =
Maximum wind velocity , Vb =
Height of fire wall from Tx. Wall Top =
For exposure B , Cz =
Velocity to Pressure conversion coefficient, Cc =
Structure Importance
p
Factor =

q z = cc c I c z v 2 b =
L/B =
H/B =
Pressure co-efficient, Cp =
Gust Co-efficient, CG =

7.725 m
0.25 m
130.0 km/hr
6.50 m
0.93
4.72E-05
1.00
0.742 kN/m2
0.03
0.84
1.40
1.28

Design Wind Pressure, p z = c G c p q z = 1.33 kN/m2


Design Wind Pressure = 1.4*1.33 =
Moment at B ,5.5m From Top of the wall, Mb =
Moment at D Mc =
Moment at base M =

pared By : Md. Giasuddin

1.86 kN/m2
39.32 kN.m/m
62.46 kN.m/m
66.65 kN.m/m

Page 7 of 15

Date : 07 April'05

ABB POWER TECHNOLOGIES AB, SWEDEN


CONTRACT NO. PGCB/SC/01/LOT3

Design of Transformer Foundation H1(45/75MVA) ; Barapukuria 230/132/33kV Sub-station


4.1 Structural Design :
4.1.1 Vertical Reinforcement :
Factored moment at Point B = 1.5*39.32 =
Clear cover =
Dia of reinforcement =
Effective depth, d =
Assuming depth of stress block, a =
Area of steel, As = M*1000000/(0.9*fy*(d-a/2)) =
Check for stress block,a
a = As*fy/(.85*fc'*b) =
Consideration is OK, So As =
Minimum reinforcement = 0.4 % =
Consider bar Size =
So Nos. of Bars =
Consider bar Size =
So Nos. of Bars =
Spacing =
Factored moment at Point C = 1.5*62.46 =
Clear cover =
Dia of reinforcement =
Effective depth, d =
Assuming depth of stress block, a =
Area of steel, As = M*1000000/(0.9*fy*(d-a/2)) =
Check for stress block,a
a = As*fy/(.85*fc'*b) =
Consideration is OK, So As =
Consider bar Size =
So Nos. of Bars =
Spacing =
4.1.2 Distribution Reinforcement :
Minimum reinforcement = 0.18 % =
Consider bar Size =
So Nos. of Bars =
Spacing =
5. DESIGN OF BASE SLAB :
5.1 Design data :
Weight of each Transformer with 15% impact =
Fire Wall height above FSYL =
Depth of Fire wall below FSYL =
W i ht off eachh fire
Weight
fi wall
ll =
Weight of each Transformer supporting wall =
Length of foundation pad =
Width of foundation pad =
Thickness of foundation pad =
Weight of Pad =
Width of Bund Wall =
Total Length of Bund wall =
Height of Bund wall =
Weight of Bund wall =
Total area of the Yard = 22.25*8.72 =
Area of Bund walls =
Area of Fire walls =
Area of Tx. Foundation wall =

pared By : Md. Giasuddin

58.97 kN.m/m
30 mm
12 mm
214 mm
18.84 mm
771.81 mm2
18.84 mm
771.81 mm2
1000.00 mm2/m
10 mm
12.74 Nos
16 mm
4.98 Nos
201 mm

Say 200mm

93.70 kN.m/m
60 mm
20 mm
210 mm
31.53 mm
1291.53 mm2
31.53 mm
1291.53 mm2
20 mm
4.11 Nos
243 mm

Say 225mm

450.00 mm2/m
10 mm
5.73 Nos
174 mm

Say 170mm

800.99 kN
6.700 m
1.025 m
385 63 kN
385.63
146.76 kN
22.350 m
8.720 m
0.300 m
1403.22 kN
0.150 m
61.140 m
1.225 m
269 63 kN
269.63
194.02 m2
9.17 m2
6.24 m2
29.95 m2

Page 8 of 15

Date : 07 April'05

ABB POWER TECHNOLOGIES AB, SWEDEN


CONTRACT NO. PGCB/SC/01/LOT3

Design of Transformer Foundation H1(45/75MVA) ; Barapukuria 230/132/33kV Sub-station


Net area to be filled with gravel = 148.66 m2
Thickness of Gravel = 0.225 m
Weight of gravel = 535.17 kN
Total Vertical Load =3* 800.99+3*385.63+6*146.76+1403.22+269.63+535.17 = 6648.46 kN
Point of action of all vertical loads = X = [ 800.99*(3.825+11.225+18.625)+435.55*(7.525+14.975+22.275)+
146.76*(3.065+4.585+10.465+11.985+17.865+19.385)+(1403.22+269.63+535.17)*22.35*0.5 ]/ [6648.46] =12.189 m
Total Moment at base =3*8.32*66.65+3*261.99 = 2449.61 kN.m
Eccentricity =12.189-22.35/2+2449.61/6648.46 = 1.383 m

5.2 : Stability Check for Soil Bearing Capacity :


Q = Fzb = 5046.49
A = LxB = 194.89
e = el = 1.383
1 383
L /6 = 3.725

kNs
m2
m

>e

Q
6e
So;q max =
(1+
)
A
L
Q
6e
and;q min =
(1)
A
L

qmax = 33.07 kN/m2


Gross allowable soil pressure = 103.7 + sDf = 121.41 kN/m2
5.3 Check for Settlement :
Settlement of a Soil layer is given by :

S =

So it's OK.

cc
p + p
H log10 0
p0
1 + e0

pared By : Md. Giasuddin

Page 9 of 15

Date : 07 April'05

ABB POWER TECHNOLOGIES AB, SWEDEN


CONTRACT NO. PGCB/SC/01/LOT3

Design of Transformer Foundation H1(45/75MVA) ; Barapukuria 230/132/33kV Sub-station


Where, Cc = Compression Index = 0.22

e0 = Initial Void ratio = 0.905


H = Thickness of the Soil Layer = 9.30 m

From soil test report of BH-4.


From soil test report of BH-4.
From soil test report of BH-4.

p0 = The original Soil Pressure at the mid point of the


layer = H/2 = 83.70 kN/m2
= Change
Ch
IIn Pressure
P
Df = 15.13
15 13 kN/m2
kN/ 2
p
= qmax - D

S = 0.0775 ft. = 0.924 inch.

Which is less than 2.0" , so OK.


5.4 Check for Punching of the Base :
Base Thickness, t =
Clear Cover =
Consider Max Bar size =
d = 300-60-20/2 =
Vertical Forces :
From
Bund
F
B d Wall
W ll :
Weight of wall per meter =
Weight of Gravel =535.17/6/8.32 =
Total from Bund Wall =
From Fire Wall :
Weight of wall per meter =
Weight of Gravel =535.17/6/8.32 =
Total from Fire Wall =
From Tx
Tx. Foundation Wall :
Weight of wall per meter =
Weight of Tx. Dispersed on Wall per meter =
Weight of Gravel =535.17/6/8.32 =
Total from Tx. Foundation Wall =

300 mm
60 mm
20 mm
230 mm

32.41 kN/m
10.72 kN/m
43.13 kN/m
46.35 kN/m
10.72 kN/m
57.07 kN/m

17.64 kN/m
88.05 kN
10.72 kN/m
116.41 kN/m

Punching stress developed by fire wall = 57.07*1000/(1000*(250+2*230)) = 0.080 Mpa


Punching stress developed by Tx. wall = 116.41*1000/(1000*(600+2*230)) = 0.110 Mpa
AS per ACI Shear Stress applied to concrete should be less than
0.33 f c ' Mpa
In present case which
hi h is
i coming
i 1.48 Mpa. So OK.

5.5 Reinforcement Calculation at the Top of the Pad :


5.5.a Main Reinforcement Along Long Direction :
C/C distance between Tx. Supp. wall and Fire wall = 2.940 m
Moment at center Mc = wl2/14 = 33.07*2.94^2/14 =
Factored moment Mc*1.5 =
Base Thickness, t =
Clear Cover =
Consider Max Bar size =
d = 300-60-20/2 =
Assuming depth of stress block, a =
Area of steel, As = M*1000000/(0.9*fy*(d-a/2)) =
Check for stress block,a
a = As*fy/(0.85*fc'*b) =
Consideration is OK, So As =
Minimum reinforcement = 0.13 % =
Consider bar Size =
So Nos. of Bars =
Spacing =

pared By : Md. Giasuddin

20.416 kN.m/m
30.624 kN.m/m
300 mm
60 mm
20 mm
230 mm
8.87 mm
363.49 mm2
8.87 mm
363.49 mm2
390.00 mm2/m
10 mm
4.97 Nos
201 mm

Page 10 of 15

Say 200mm

Date : 07 April'05

ABB POWER TECHNOLOGIES AB, SWEDEN


CONTRACT NO. PGCB/SC/01/LOT3

Design of Transformer Foundation H1(45/75MVA) ; Barapukuria 230/132/33kV Sub-station


5.5.b Distribution Reinforcement along Short Direction :
Minimum reinforcement = 0.13 % = 390.00 mm2/m
Consider bar Size = 10 mm
So Nos. of Bars = 4.97 Nos
Spacing = 201 mm

Say 200mm

5.6 Reinforcement Calculation at the Bottom of the Pad :


5.6.a Main Reinforcement Along Long Direction :
C/C distance between wall and Fire wall = 2.940 m
Moment Ends of wall Mends = wl2/10 =
Maximum Concentrated Moment =
Total Moment =
Factored moment Mends*1.5
1.5 =
Base Thickness, t =
Clear Cover =
Consider Max Bar size =
d = 300-60-20/2 =
Assuming depth of stress block, a =
Area of steel, As = M*1000000/(0.9*fy*(d-a/2)) =
Check for stress block,a
a = As*fy/(0.85*fc'*b) =
OK So As =
Consideration is OK,
Minimum reinforcement = 0.13 % =
Consider bar Size =
So Nos. of Bars =
Spacing =
5.6.b Distribution Reinforcement :
Minimum reinforcement = 0.13 % =
Consider bar Size =
So Nos. of Bars =
Spacing =

28.582 kN.m/m
62.464 kN.m/m
91.047 kN.m/m
136.570 kN.m/m
300 mm
60 mm
20 mm
230 mm
42.79 mm
1752.83 mm2
42.79 mm
1752 83 mm2
1752.83
390.00 mm2/m
20 mm
5.58 Nos
179 mm

Say 175mm

390.00 mm2/m
10 mm
4.97 Nos
201 mm

Say 200mm

6 Design of grating :
Steel of Fy 275.0 Mpa shall be used for gratings.
Main bar :
Spacing of main bar :
Secondary bar dia. =
Spacing of secondary bar :
Thickness of ggravel paving
p
g=
Unit weight of gravel =
Max span of main bar =
6.1 Design of main bar :
Self weight of grating :
Self weight of gravel :
Assumed live load :
Total load per unit area =
Uniform Distributed Load per main bar =
6.1.aCheck for bending stress :

50X6 Flat
50 mm c/c
12 mm
100 mm c/c
225 mm
16.00 kN/cum
2.08 m
0.56 kN/sqm
3.60 kN/sqm
2.00 kN/sqm
6.16 kN/sqm
0.308 kN/m

Max bending moment = 0.336*2.082/8 = 0.167kN.m


Zxx of main bar = 6*502/6 = 2500 mm3
Max bending stress = 0.182*10^6/2500 = 66.63 Mpa
Allowable bending stress = 0.6*Fy = 0.6*275 = 165.00 Mpa

pared By : Md. Giasuddin

Page 11 of 15

; So OK.

Date : 07 April'05

ABB POWER TECHNOLOGIES AB, SWEDEN


CONTRACT NO. PGCB/SC/01/LOT3

Design of Transformer Foundation H1(45/75MVA) ; Barapukuria 230/132/33kV Sub-station


6.1.b Check for shear stress :
Max shear force = 0.320 kN
Max shear stress = 1.07 Mpa
Allowable Shear stress = 0.346*Fy = 0.346*275 = 95.15 Mpa
6.1.c Check for max deflection :

; So OK.

Ixx of main bar = 6*50^3/12 = 62500 mm4


Modulus of elasticity of steel = 200000 Mpa
Max central deflection = 5wl4/384EI = 6.01 mm
Allowable Maximum deflection = l/325 = 6.40 mm

; So OK.

6.2 Design of grating supporting channel :


Max span of channel =
Load from grating per channel =6.16*2.08 =
Max bending moment , M =
Max end shear, V =
Provide : ISMC 150
6.2.aCheck for bending stress :
Total depth, D =
Sectional Area, A =
ryy =
Flange thickness, T =
Web thickness, tw =
Zxx =
Ixx =
Leff / ryy = 2490/22.1=
When

703 X 103 Cb
l

Fy
r

2.490 m
12.813 kN/m
9.930kN.m
15.952 kN

200 mm
2094 mm2
22.1 mm
9.00 mm
5.4 mm
104300 mm3
18193000 mm4
112.67

3516 X 103 Cb
Fy

( )

Fy l
2

Fb =
3 10550 X 103 C Fy 0.60 Fy
b

Where C b = 1.75 + 1.05 * ( M 1/ M 2) + 0.3( M 1/ M 2) 2

Consider ends of channel are not to carry any moment so 2nd and 3rd term of the above equation can be ignored.
So Cb = 1.75
Bending Stress = M/Z = 9.93*10^6/104300 = 95.21 Mpa
Fb = 0.535*275 = 147.13 Mpa
> 95.21 Mpa ; So OK.
6.2.b Check for shear stress :
Shear stress = V/A = 15.952*1000/2094 = 7.62 Mpa
Allowable
ll
bl Shear
h stress = 0.346*Fy
* = 0.346*275
*
= 95.15 Mpa

> 7.62 Mpa ; So OK.

6.2.c Check for max deflection :


Max central deflection = 5wl4/384EI = 1.76 mm
Allowable Max. deflection = l/325 =2320/325 = 7.66 mm

; So OK.

7 Design of jacking support :


7.1 Data
Transportation
p
weight
g of transformer =
Weight on each jacking pad =
Column size( Square ), d =
Unsupported length , l =
l/d =

pared By : Md. Giasuddin

370.00 kN
123.33 kN
685 mm
1.23 m
1.79

Page 12 of 15

Date : 07 April'05

ABB POWER TECHNOLOGIES AB, SWEDEN


CONTRACT NO. PGCB/SC/01/LOT3

Design of Transformer Foundation H1(45/75MVA) ; Barapukuria 230/132/33kV Sub-station


Which is less than 3, so it can be considered as pedestal.
Weight Of Column =
Total vertical load, P =
P/A = 133.47*1000/(685*685) =
0.4fc'=0.4*20 = 8.0 Mpa , So OK
7.1.a Reinforcement for the Pedestal :
Minimum reinforcement = 0.4 % =
Consider bar Size =
So Nos. of Bars =
Consider dia of transverse reinforcement = 8 mm
Spacing = 16*16 =256 mm
or 48*8 = 384mm
Least dimension = 685 mm
So Provide Dia. 8mm bar @ 250mm c/c for Stirrup.

10.14 kN
133.47 kN
0.284 Mpa

1876.90 mm2
16 mm
9.34 Nos

Say 12 nos.

890.50 mm2/m
12 mm
7.88 Nos
127 mm

Say 125 mm

7.1.b Reinforcement for the wall :


Minimum reinforcement = 0.13 % =
Consider bar Size =
So Nos. of Bars =
Spacing =
7.2 Design of base slab :
7.2.a Stability Check Against Soil Bearing :
Length of Pad = 4.000 m
Width of Pad = 1.25 m
Thickness of Pad = 0.30 m
Total Load on Pad = 133.47*2+36 = 302.95 kN
Base pressure developed = 60.59 kN/m2
7.2.b Main Reinforcement for the base Slab :
Max moment at center at Top = 61.34*1.25*2.96
2/14 = 47.99
61 34*1 25*2 96^2/14
47 99 kN.m
kN m

Factored moment = 38.39*1.5 =


Base Thickness, t =
Clear Cover =
Consider Max Bar size =
d = 300-60-12/2 =
Assuming depth of stress block, a =
Area of steel, As = M*1000000/(0.9*fy*(d-a/2)) =
Check for stress block,a
a = As*fy/(0.85*fc
As*fy/(0 85*fc'*b)
*b) =
Consideration is OK, So As =
Minimum reinforcement = 0.13 % =
Consider bar Size =
So Nos. of Bars =
Spacing =

16.68
16
68 mm
853.99 mm2
487.50 mm2
12 mm
7.55 Nos
166 mm

Max moment near support = 61.34*1.25*2.96^2/10 =


Factored moment = 38.39*1.5 =
Base Thickness,
Thickness t =
Clear Cover =
Consider Max Bar size =
d = 300-60-12/2 =
Assuming depth of stress block, a =

67.18 kN.m
100.77 kN.m
300 mm
60 mm
12 mm
234 mm
23.72 mm

pared By : Md. Giasuddin

71.98 kN.m
300 mm
60 mm
12 mm
234 mm
16.68 mm
853.99 mm2

Page 13 of 15

Say 150mm

Date : 07 April'05

ABB POWER TECHNOLOGIES AB, SWEDEN


CONTRACT NO. PGCB/SC/01/LOT3

Design of Transformer Foundation H1(45/75MVA) ; Barapukuria 230/132/33kV Sub-station


Area of steel, As = M*1000000/(0.9*fy*(d-a/2)) =
Check for stress block,a
a = As*fy/(0.85*fc'*b) =
Consideration is OK, So As =
Minimum reinforcement = 0.13 % =
Consider bar Size =
So Nos. of Bars =
Spacing =
7.2.c Distribution Reinforcement :
Minimum reinforcement = 0.13 % =
Consider bar Size =
So Nos. of Bars =
Spacing =

1214.54 mm2
23.72 mm
1214.54 mm2
487.50 mm2
16 mm
6.04 Nos
207 mm

Say 200mm

487.50 mm2
10 mm
6.21 Nos
161 mm

Say 150mm

Provide
@ 150c/c
@ 200mm
c/c
P id 12mm
12
150 / att Top
T andd 16mm
16
200
/ att bottom.
b tt
Provide 10mm @ 150c/c at both Top and bottom as distribution bar.
8 Design of rail-cum-road
Transportation weight of transformer =
Minimum length of rail-cum-road =
Minimum width =
Bearing capacity required =

pared By : Md. Giasuddin

370.00 kN
2.50 m
2.50 m
59.2 Mpa

Page 14 of 15

Date : 07 April'05

ABB POWER TECHNOLOGIES AB, SWEDEN


CONTRACT NO. PGCB/SC/01/LOT3

Design of Transformer Foundation H1(45/75MVA) ; Barapukuria 230/132/33kV Sub-station


9 Design of Corbel on the Top of the blast wall :
Equipment to be installed on the top of the Corbel : Post Insulator.
So loads are as follows :
Horizontal Load = 4.53 kN
Moment = 14.98 kN.m
Vertical Load = 2.79 kN

As = Af + An
Af =

Mu
f y ( d a / 2)

An =

N uc
Where N uc = Total Horizontal Tension
f y
An = 4.53*1000/0.9/415 =
Assuming depth of stress block, a =
Af = 14.98*1.5/0.9/415/(520-a/2) =
Check for stress block,a
a = Af*fy/(0.85*fc'*b) =
Consideration is OK, So Af =

12.13 mm2
6.31 mm
116.40 mm2
6.31 mm
116.40 mm2

So As = 116.4+12.13 = 128.53 mm2


But as per ACI Code Minimum As for Corbel is = 0.04*(fc'/fy)bd = 0.04*(20/415)*450*520 = 451.09 mm2
So use 3 nos. 16mm as a main bar for the corbel.
10. Additional Reinforcement Calculation at The bottom of the blast wall :
Additional Moment ( From PI ) at the bottom of the
blast wall = 14.98 + 4.53*(7.5+1.225) = 54.50 kN.m
Factored Moment = 1.5*128.13 = 81.76 kN.m
Width of the section = 450 mm
Clear cover = 30 mm
Dia of reinforcement = 20 mm
Effective depth, d = 210 mm
Assuming depth of stress block, a = 67.34 mm
Area of steel, As = M*1000000/(0.9*fy*(d-a/2)) = 1241.38 mm2
Check for stress block,a
a = As*fy/(.85*fc'*b) = 67.34 mm
Consideration is OK, So As = 1241.38 mm2
Consider bar Size = 20 mm
So Nos. of Bars = 3.95 Nos
Additional Moment ( From PI ) at 5.5m from top of the
blast wall = 14.98 + 4.53*5.5 = 39.895 kN.m
Factored Moment = 1.5*128.13 = 59.84 kN.m
Clear cover = 30 mm
Dia of reinforcement = 20 mm
Effective depth, d = 210 mm
Assuming depth of stress block, a = 46.55 mm
Area of steel, As = M*1000000/(0.9*fy*(d-a/2)) = 858.06 mm2
Check for stress block,a
a = As*fy/(.85*fc'*b) = 46.55 mm
Consideration is OK,, So As = 858.06 mm2
Consider bar Size = 20 mm
So Nos. of Bars = 2.73 Nos
So Provide 4 nos. 20mm extra bar for whole height within width of 450mm. at both face of the wall.

pared By : Md. Giasuddin

Page 15 of 15

Date : 07 April'05