SCHEDULE FOR WASHING / CLEANING

CUSTOMER : PT. WAVIN DUTA JAYA


ITEM NAME : SILO DRYBLEND Cap. 21 Ton
NO. ORDER : 601.05A.021
No

Description

MIXING JACKET TANK ( Tank No. 1 )

Dec-16
14

15

16

17

18

19

20

21

22

23

Jan-17
24

25

26

27

28

29

30

31

10

11

12

13

14

15

16

17

18

APLIKASI + PACKAGING
APLIKASI + PACKAGING

MIXING JACKET TANK ( Tank No. 2 )

CUCI BAG LUAR


PUTAR + CUCI BAG DALAM

MIXING JACKET TANK ( Tank No. 3 )

APLIKASI + PACKAGING

CUCI BAG LUAR


PUTAR + CUCI BAG DALAM

MIXING JACKET TANK ( Tank No. 4 )

CUCI BAG LUAR


PUTAR + CUCI BAG DALAM

MIXING JACKET TANK ( Tank No. 5 )

APLIKASI + PACKAGING

CUCI BAG LUAR


PUTAR + CUCI BAG DALAM

MIXING JACKET TANK ( Tank No. 6 )

APLIKASI + PACKAGING

CUCI BAG LUAR


PUTAR + CUCI BAG DALAM

MIXING JACKET TANK ( Tank No. 7 )

APLIKASI + PACKAGING

CUCI BAG LUAR


PUTAR + CUCI BAG DALAM

MIXING JACKET TANK ( Tank No. 8 )

APLIKASI + PACKAGING

CUCI BAG LUAR


PUTAR + CUCI BAG DALAM
APLIKASI + PACKAGING

Distr : 1.P.Suwito, 2.QC Dept, 5.Buser, 6.P. Anam , 9.Arsip

Prepared By

Wed 14/12/16

( Workshop Scheduler )

Approved By
( Project Leader )

19

SCHEDULE FOR WASHING / CLEANING


CUSTOMER : PT. WAVIN DUTA JAYA
ITEM NAME : SILO DRYBLEND Cap. 21 Ton
NO. ORDER : 601.05A.021
Description

No

SILO DRYBLEND TANK ( Tank No. 1 )

SILO DRYBLEND TANK ( Tank No. 2 )

SILO DRYBLEND TANK ( Tank No. 3 )

Dec-16
14

15

16

17

18

19

20

21

PUTAR

22

23

Jan-17
24

25

26

27

28

29

30

31

10

11

12

13

14

CUCI BAG LUAR

PUTAR

CUCI BAG LUAR

CUCI BAG DALAM

CUCI BAG LUAR


P
U
T
A
R

Distr : 1.P.Suwito, 2.QC Dept, 5.Buser, 6.P. Anam , 9.Arsip

Prepared By

Wed 14/12/16

( Workshop Scheduler )

Approved By
( Project Leader )

15

16

17

18

TIME SCHEDULE
CUSTOMER : PT. SRIBOGA
ITEM NAME : MULTI HOPPER FLOUR TRANSPORT BULK HOPPER Cap. 40 M3
NO. ORDER :

No

Description

DRAWING

PURCHASING MATERIAL

FLOW SHEET

MARKING & CUTTING COMPONENT

FORMING , MACHINING

FIT-UP SHELL , BOTTOM CONE , SIDE CONE , MANHOLE , CHASIS + TYRE

WELDING

ASSEMBLY LANDING GEAR , KING PIN , MUDGUARD , PLATFORM + RAILLING

WELDING

Nov-16

10 POLISH WELDING LINE ( CWL / LWL ) INSIDE


11 PNEUMATIC TEST PRESS

12 CLEANING

13 DELIVERY
Prepared By

Des - 16

Jan-17

Feb-17

################## 1 3 5 7 9 ################################# 1 3 5 7 9 ################################# 1 3 5

Remark :

10

11

Agus Sukamto

TIME SCHEDULE
CUSTOMER

: PT.

ITEM NAME :
NO. ORDER :

Description

No

August-16
25 26 27 28 29 30 31

September-16
1

October-16

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

ASSEMBLING

FU Flange Bayonet to Shell

Check QC

Welding

Machining Flange

FU Right Dishend to Shell

Check QC

Welding

Slep CWL ins / out + PT

FU Pad for Legs, for Lifting Lug, for Hinge Cover

10 11 12 13 14 15 16 17 18

11
12
13

14 FU Insullation Dishend to Shell Insullation Cover

14

15 Check QC

15

16 Welding

16

17 Slep CWL ins / out + PT

17

18 FU Side Insullation Cover to Tank + Tack weld

18

19 FU Rockwoll + Shell Insullation Cover to Tank

19

20 Welding

20

21 Slep CWL ins / out + PT

21

22 Polish Strip Outside #220

22

23 MK OP FU N1, N2, N3, N4, N5, N7, N10, N11

23

24 MK OP FU Legs + Lifting Lug

24

25 Welding

25

26 MK OP FU N6, N8, N9 + Internal Piping + Internal Plate

26

27 Welding

27

28 FU Support + Hinge Cover to Tank

28

29 FU Flange Bayonet to Left Dishend

29

30 Check QC

30

35 FU Rockwoll + Shell Insullation Cover to Tank

10

13 Full Water Test

34 FU Side Insullation Cover to Tank + Tack weld

12 Polish Machine Inside #220

33 Polish Machine Inside #220

11 Welding

32 Machining Flange

10 Check QC

31 Welding

31
32
33
34
35

36 Welding

36

37 Slep CWL Outside + PT

37

38 MK OP FU Support + Hinge + Handle to Cover Dishend

38

39 Welding

39

40 Finishing & Visual

40

41 FU Cover Dishend to Shell + Pin

41

42 FU Bayonet System

42

43 Welding

43

44 Polish Final Inside #220

44

45 Finishing & Visual

45

46 HYDROTEST Steam Piping 5,2 Kg /cm2

46

47 Vacuum Test

47

48 Check QC

48

49 Final Painting ( SS 400 )

49

50 Delivery

50
Distr : 1.P. Reyno, 2.P.Soebagijono, 3.P.Suwito, 4.QC Dept, 5.Buser, 6.Form. Assy, 7.Form.Welder, 8.Form.Mesin, 9.Arsip

Prepared by,

Checked by,

Central Plan

Project Leader

Approved by,

Mon 25/08/14