Project:

Client :

Status Code :

Islamic culture park


Architect :

Carlos Marinas & Partners Architecture & Design MADRID SPAIN

Government of Sharjah - Sharjah

Main Consultant :

Art & design Engineering consultants

Main contractor :

Darwish Engineering Emirates

MEP Consultant :

Sarraj electromech. Engineering consultants

MEP contractor :

Al Muhanad Electro Mech. Cont. LLC.

A = Approved

B = Approved as noted

C = Revise and Resubmit

D = Not Approved

SHOP DRAWING TRACKING SHEET


S.N.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

Service
Description

Drainage

Water supply

HVAC

ELECTRICAL

TELEPHONE
FA&FF

Rev-0
Drawing Title

SITE DEVELOPMENT PLAN DRAINAGE LAYOUT


SITE DEVELOPMENT PLAN DRAINAGE LAYOUT DETAIL-A
SITE DEVELOPMENT PLAN DRAINAGE LAYOUT DETAIL-B
CAFETERIA GROUND FLOOR DRAINAGE LAYOUT
DETAILS OF SEPTIC TANK AND SOAK AWAY
CAFETERIA GROUND FLOOR BUILDER WORK LAYOUT
SITE DEVELOPMENT PLAN WATER SUPPLY LAYOUT
SITE DEVELOPMENT PLAN WATER SUPPLY LAYOUT DETAILA
SITE DEVELOPMENT PLAN WATER SUPPLY LAYOUT DETAILB
CAFETERIA GROUND FLOOR WATER SUPPLY LAYOUT
PUMP ROOM DETAILS & SCHEMATIC DIAGRAM WATER
CAFETERIA GROUND FLOOR AIR CONDITIONING LAYOUT
CAFETERIA GROUND FLOOR VENTILATION LAYOUT
CAFETERIA LIGHTING LAYOUT
CAFETERIA POWER LAYOUT
CAFETERIA SINGLE LINE DIAGRAM
LOAD SCHEDULE
CAFETERIA DETAILS-1
CAFETERIA GROUND FLOOR TELEPHONE LAYOUT PLAN
CAFETERIA EMERGENCY LIGHT & FIRE ALARM LAYOUT
CAFETERIA FIRE ALARM SCHEMATIC
CAFETERIA GROUND FLOOR FIRE FIGHTING LAYOUT PLAN

Drawing No.

DR-01
DR-02
DR-03
DR-04
DR-05
BW-00
WS-01
WS-02
WS-03
WS-04
WS-05
AC-01
AC-02
E02
E03
E04
E05
E06
TEL01
F01
F02
FF-01

Date

28.09.2016
28.09.2016
28.09.2016
25.08.2016
28.09.2016
25.08.2016
28.09.2016
28.09.2016
28.09.2016
28.09.2016
28.09.2016

Rev-1
Status

a
a
a
a
a
a

a
a
a

31.08.2016
31.08.2016
31.08.2016
31.08.2016
31.08.2016
28.09.2016
31.08.2016
31.08.2016

Date

28.09.2016
28.09.2016

Rev-2
C

Date

Remarks/Final Status
B

Approved
Submitted
Submitted
Re-Submitted
Approved
Approved as noted
Approved
Approved
Approved
Approved as noted
Approved

Submitted
Submitted
Submitted
Submitted
Submitted
Submitted
Submitted
Submitted

Page 1 of 2

Project:
Client :

Status Code :

Islamic culture park


Architect :

Carlos Marinas & Partners Architecture & Design MADRID SPAIN

Government of Sharjah - Sharjah

Main Consultant :

Art & design Engineering consultants

Main contractor :

Darwish Engineering Emirates

MEP Consultant :

Sarraj electromech. Engineering consultants

MEP contractor :

Al Muhanad Electro Mech. Cont. LLC.

A = Approved

B = Approved as noted

C = Revise and Resubmit

D = Not Approved

MATERIAL TRACKING SHEET


S.N.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33

Service
Description

Rev-0
Material Description

UPVC Pipes & Fittings (Underground)


UPVC Pipes & Fittings(above ground)
HP Pipes & Fittings(above&Uuder ground)
Polypropylene Pipes & Fittings
PEX Pipes & Fittings
Angle Valves
Plumbing
Water Heater
Floor trap covers(316)
Manhole & Gully Trap Covers-Ductile Iron-medium duty
Booster Pump Set-(1D+1S)Vertical+VFD
Sanitary Ware(normal wc wall mounted & curve,handicap
wc one set complete)
Wash basin Mixers, Kitchen Mixers & taps
Package Units
Wall mounted split Unit
G.I. Sheets
Air Outlets & Louvers
Volume Dampers
Fire Dampers
Acoustic Liner
Duct insulation (external and internal)(FIBER GLASS
HVAC
INSULATION)
Adhesive & Coating(30-36)FOSTER
Adhesive & Coating(80-10)GLUE
Flexible Duct
Flexible Duct Connector
Vibration Isolator
Silencer(Sound Attenuator)-35db
Extract Fans
Wires & Cables
PVC Conduits & Accessories
GI Box
ELECTRICAL
Switch & Sockets
Telephone & Data Sockets
Floor Box
MEP
Shop drawing and material Tracking sheet

Manufacturer

Hepworth
Hepworth
Hepworth
AQUAGAS/BORPLUS
Fripex
Grohe
Ariston
Aqua
Mas
Armstrong
General Ceramic
Grohe
Daikin
Daikin
Al Ghurair Iron & Steel
(AGIS)
Beta/Flowtech/ safid
Beta/Flowtech/ safid
Beta/Flowtech/ safid
Kimmko

Date

25.08.2016
25.08.2016
25.08.2016

15.10.2016
15.10.2016
10.10.2016

18.01.2017
18.01.2017

10.10.2016

Kimmko

15.10.2017

Foster(USA)
Foster(USA)
AERO DUCT
Safid(Fire rated)
as per AC supplier
Safid
S&P
Ducab
Clipsal
Rexton
Schneider
Schneider
Any

10.10.2016

Rev-1
Status

a
a
a
a
a
a
a
a
a
a
a
a
a
a
a

Date

Rev-2
C

Date

Status
A

Remarks/Final Status
C

Approved
Approved
Approved
Approved

Submitted
Submitted
Need Re-Submitted

Sample inspection
Submitted
Submitted

a
a
a
a
a

Approved as noted
Submitted
Approved

10.10.2016

Submitted

05.10.2017
05.10.2017
05.10.2017

Submitted
Submitted
Submitted

10.10.2016

Submitted

Page 2 of 2