Sie sind auf Seite 1von 3

Inspection & Testing Plan For Ductwork

& Accessories
Ref : MAP / ITP- 101 Rev 00
:
For Heirs Khalifa Obaid Saeed Al Muhairby
End User
The Employer : Abu Dhabi Commercial Properties
Engineer
: Golden Planners Consultants
Contractor
:

Project

Discipline :
ITP Ser No. :
Date
:

(Reserved Space for Main


Con Logo)

ADCP Commercial & Residential


Building in Abu Dhabi
HVAC

Prepared by
Approved by
Reviewed by

Date: 26-07-2015
: Winston Garcia/ QA/QC Engr
:
Albert Raj/ MEP Engineer
:
Page : 1 of 1

Responsibility
Item
No

Inspection / Test to be carried out

Frequency of
Test /
Inspection

Acceptance Criteria Applicable


Specification / Standard

Verifying
Documents/Reference

Contractor

Engineer

Third Party

Approval of Air condition & Ventilation Shop Drawings

100%

Project Specification Air


Conditioning& Ventillation- Part 7,
Item 3 General Specifications,
ASHRAE, British Standards

Client stamped & signed


Shop Drawings

Material Approval for Duct Work And Accessories

100%

Project Specification Ventillation &


Air Conditioning- Part7, SMACNA

Material submittal

Material Approval for Ductwork Insulation

100%

Project Specification Ventillation &


Air Conditioning- Part 7

Material submittal

Material approval for Acoustic Insulation(Duct Linear)

100%

Project Specification Ventillation &


Air Conditioning- Part 7

Material submittal

Factory fabricated Ductwork delivered to site

100%

Project Specification Ventillation &


Air Conditioning- Part 7

MIR

Insulation delivered to site

100%

Project Specification Ventillation &


Air Conditioning- Part 7

MIR

Ductwork Accessories (VCD, MVCD, FD, NRD, Sound


Attenuators, etc) delivered to site

100%

Project Specification Ventillation &


Air Conditioning- Part 7

MIR

Installation of Insulated Ductwork and Supports and Hangers

100%

Project Specification Ventillation &


Air Conditioning- Part 7

MIR

Installation of Ductwork Accessories (VCD,MVCD FD,NRD


,Sound Attenuator etc.)

100%

Project Specification Ventillation &


Air Conditioning- Part 7

MIR

10

Air leak testing for Ductwork System

100%

Project Specification Ventillation &


Air Conditioning- Part 7

MIR

11

Identification of Ductwork System

100%

12

Approval of any remedial works carried out.

100%

Legend

H : Hold For Inspection

Project Specification Ventillation &


Air Conditioning- Part 7

W- Witness Inspection

MIR

MIR

S-Surveilance Inspection

R- Review

Inspection & Testing Plan For Ductwork


& Accessories
Ref : MAP / ITP:
End User
The Employer :
Engineer
:
Contractor
:
Item
No

003 Rev 00
Dar Al Shifaa Hospital, Khalifa City, Abu Dhabi

Project

Dar Al Shifaa Hospital LLC


Discipline :
Society Technology House
ITP Ser No. :
Vamed Emirates LLC/ Vamed Engineering Gmbh & Co. KG

Inspection / Test to be carried out

Frequency
of Test /
Inspection

Dar Al Shifaa Hospital


No. 2038

:
HVAC

Acceptance Criteria Applicable Specification /


Standard

Approval Shop Drawings layout for FCUs, AHUs and Fans

100%

Approved for Construction Drawing

Material Approval for FCUs, AHUs and exhaust fans

100%

Specification 15000, 15001, 15002, 15003, 15004

Materials Approval for FCUs, AHUs and exhaust fans


delivered to site.

100%

Approved Material Submittal, Packing List, Delivery


Note, Country Of Origin

Installation of DBs, SMDBs , Construction and testing

100%

Equipment foundation, supports & location as per approved


drawing

Prepared by
Reviewed by
Approved by
Date :

Date: 11/8/2015
: Winston Garcia / QA/QC Engr
: Albert Raj / MEP Engineer
:
Page : 1 of 1

Responsibility
Verifying
Documents/Referen
Contractor
Engineer Third Party
ce
Appropriate
Transmittal Form
Material
Submittal

MAR

Specification 15000, 15001, 15002, 15003,15004


Approved Construction Drawing

ITR

100%

Approved Shop Drawing

ITR

Equipment installation arrangement correct

100%

Approved Shop Drawing

ITR

Earthing Connection and testing carried out

100%

Approved Shop Drawing

ITR

Voltage and current Test check

100%

Approved Shop Drawing/Schematic Diagrams

ITR

Approval of any remedial works carried out.

100%

PM / Consultant Instruction/Comments

ITR

Legend

H : Hold For Inspection

MAPCO LLC

W- Witness Inspection

S-Surveilance Inspection

MAIN CONTRACTOR

Name
:
Signature :
Date
:

Page 3 of 3

R- Review

ENGINEER