3,148,250.00
BILL OF MATERIALS
Item
Description
No.
A MATERIALS
1 Masonry(Column Post, Footing, Beams, Walls,
Conc. Flooring, Plastering,Tiles, etc.)
4" CHB
Washed Sand
Crashed Stone/Bonnel (Passing #1)
Screened Gravel (Passing 1")
Portland Cement 40kgs
Tile Trim
Tile Grout
Diamond Cutter 4"
Water Cluset
Screened Gravel (Passing 2")
Adhesive Cement
Tiles 16" x 16"
Tiles 8" x 8"
Qty
Unit
8700
40
17
7
765
67
58
4
9
24
62
936
1215
pcs
tl
tl
tl
bags
pcs
kgs
pcs
sets
tl
bags
pcs
pcs
8.50
700.00
1,300.00
700.00
235.00
120.00
150.00
400.00
8,000.00
700.00
280.00
65.00
25.00
73,950.00
28,000.00
22,100.00
4,900.00
179,775.00
8,040.00
8,700.00
1,600.00
72,000.00
16,800.00
17,360.00
60,840.00
30,375.00
524,440.00
450
405
755
200
5
15
pcs
pcs
pcs
pcs
rolls
pcs
350.00
200.00
130.00
85.00
2,200.00
85.00
157,500.00
81,000.00
98,150.00
17,000.00
11,000.00
1,275.00
365,925.00
450
515
97
16
35
35
30
6
30
65
75
6
46
6
26
115
7
3
56
pcs
pcs
pcs
kgs
kgs
kgs
kgs
kgs
pcs
pcs
pcs
can
pcs
gal
pcs
pcs
kgs
kgs
pcs
145.00
200.00
360.00
90.00
90.00
90.00
90.00
140.00
170.00
250.00
85.00
150.00
350.00
1,200.00
900.00
65.00
90.00
140.00
380.00
65,250.00
103,000.00
34,920.00
1,440.00
3,150.00
3,150.00
2,700.00
840.00
5,100.00
16,250.00
6,375.00
900.00
16,100.00
7,200.00
23,400.00
7,475.00
630.00
420.00
21,280.00
319,580.00
set
2,700.00
10,800.00
Unit Cost
Total
4
8
8
22
160
34
pcs
pcs
set
pcs
sqm
pairs
9,000.00
200.00
16,000.00
850.00
2,700.00
250.00
36,000.00
1,600.00
128,000.00
18,700.00
432,000.00
8,500.00
635,600.00
292.4
24
23
16
16
295
32
34
6
2000
6
18
21
8
10
4
4
46
68
14
78
22
25
6
2
3
lm
pcs
pcs
pcs
pcs
lm
pcs
pcs
boxes
pcs
lit
tube
kgs
pcs
gal
gal
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pairs
pcs
330.00
380.00
380.00
340.00
350.00
55.00
75.00
285.00
500.00
2.50
550.00
150.00
130.00
85.00
400.00
300.00
75.00
630.00
380.00
250.00
360.00
680.00
280.00
75.00
350.00
25.00
96,492.00
9,120.00
8,740.00
5,440.00
5,600.00
16,225.00
2,400.00
9,690.00
3,000.00
5,000.00
3,300.00
2,700.00
2,730.00
680.00
4,000.00
1,200.00
300.00
28,980.00
25,840.00
3,500.00
28,080.00
14,960.00
7,000.00
450.00
700.00
75.00
286,202.00
8
8
6
4
8
1
6
2
2
7
6
6
3
3
30
4
4
15
20
4
3
10
gal
gal
gal
gal
gal
gal
pcs
pcs
pcs
pcs
pcs
pcs
gal
gal
kgs
can
pcs
lft
lft
lit
lit
rolls
400.00
2,200.00
2,500.00
2,500.00
2,500.00
600.00
140.00
75.00
25.00
35.00
75.00
85.00
300.00
300.00
30.00
250.00
25.00
60.00
55.00
220.00
250.00
35.00
3,200.00
17,600.00
15,000.00
10,000.00
20,000.00
600.00
840.00
150.00
50.00
245.00
450.00
510.00
900.00
900.00
900.00
1,000.00
100.00
900.00
1,100.00
880.00
750.00
350.00
15
15
quart
quart
86.00
95.00
1,290.00
1,425.00
79,140.00
6 Plumbing
2" PVC Black Pipe
2" PVC Black Elbow
2"PVC Black Tee
2" PVC Black P-Trap
3" PVC Orange Series 600
3" PVC Orange Elbow
3" PVC Orange Tee
3" x 2" PVC Orange Tee
3" PVC Orange End Cap
3" PVC Orange Wye
1/2" x 6m GI Pipe Sched. 40 (STD)
1/2" GI Elbow
1/2" GI Coupling
1/2 x 2" GI Nipple
1/2" x 4" GI Nipple
1/2" x 6" GI Nipple
1/2" GI Tee
1/2" Union Patente
1/2" GI Street Elbow
1/2" GI Plug
1/2" Stainless Faucets
1/2" Ball Valve
Shower Valve
1/2" x 1/2" Angle Valve
Teflon Tape
Vulcaseal
Solvent Cement
3" PVC Black Pipe
3" PVC Black Elbow
3" PVC Black Tee
3" x 2" PVC Black Tee
Hacksaw Blade
18
12
9
6
33
35
8
12
8
8
16
56
22
10
12
10
16
6
34
15
10
8
6
6
25
6
8
6
5
4
4
3
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
lit
can
pcs
pcs
pcs
pcs
pcs
180.00
35.00
45.00
75.00
650.00
130.00
165.00
160.00
115.00
165.00
450.00
31.00
35.00
20.00
35.00
45.00
55.00
56.00
35.00
25.00
250.00
230.00
350.00
300.00
15.00
550.00
55.00
250.00
55.00
75.00
85.00
85.00
3,240.00
420.00
405.00
450.00
21,450.00
4,550.00
1,320.00
1,920.00
920.00
1,320.00
7,200.00
1,736.00
770.00
200.00
420.00
450.00
880.00
336.00
1,190.00
375.00
2,500.00
1,840.00
2,100.00
1,800.00
375.00
3,300.00
440.00
1,500.00
275.00
300.00
340.00
255.00
64,577.00
7 Electrical
1" PVC PIPE (ORANGE)
ACU-OUTLET
POSH LAMP
POLL BOX 6 x 6
THHN WIRE 8.0mm(Phelpdodge)
ELECTRICAL TAPE 0.60mm x 19mm x 16m (ARMAK)
MOLDFLEX DIAMETER
PANEL BOARD 14 HOLES (COPPER BUSBAR)
CIRCUIT BREAKER 15A (KOTEN)
CIRCUIT BREAKER 20A (KOTEN)
CIRCUIT BREAKER 100A (KOTEN)
THHN WIRE 2.Omm
THHN WIRE 3.5mm
JUNCTION BOX W/ COVER (PVC ORANGE)
RECEPTACLE 4 X 4 (OMNI)
Energy Saver Bulb 18w, 250v, (Philip)
SWITCH (TOSHIBA)
C-O (TOSHIBA)
SWITCH PLATE 2 GANG (TOSHIBA)
22
2
3
2
50
4
4
3
16
8
2
3
4
22
16
16
11
6
10
pcs
pcs
pc
pc
mtrs
rolls
rolls
set
pcs
pcs
pcs
rolls
rolls
pcs
pcs
pcs
pcs
pcs
pcs
150.00
350.00
200.00
60.00
70.00
100.00
750.00
1,500.00
250.00
570.00
950.00
2,500.00
3,500.00
45.00
55.00
160.00
78.00
78.00
78.00
3,300.00
700.00
600.00
120.00
3,500.00
400.00
3,000.00
4,500.00
4,000.00
4,560.00
1,900.00
7,500.00
14,000.00
990.00
880.00
2,560.00
858.00
468.00
780.00
14
11
pcs
pcs
78.00
78.00
1,092.00
858.00
56,566.00
2,332,030.00
LABOR
816,210.50
35 % of Material Cost
TOTAL COST
816,210.50
3,148,240.50
3,148,250.00
225
275
IMPLEMENTATION SCHEDULE
CONSTRUCTION OF ADDITIONAL RESEVOIR AT CASAMATA PARK
ITEM
NO.
1
2
3
4
5
6
7
8
9
10
11
12
DESCRIPTION
Excavation and Demolition
Construction of Conc. Column Footing
Fabrication and Installation of Trusses
Installation of Reinforcement Bars for
Beams, Footing and Columns
Construction of Perimeter Wall/Concreting of Flooring/
Installation of Tiles/Sink, Labatory, etc.
Plastering/Molding
Electrical Works
Installation of Plumbing Fixtures/Tiles, etc.
Installation of Roofing
Painting Works
Construction & Instalation of Ceiling, Doors, Cabinets,Etc.
MANPOWER
SKILLED UNSKILLED
NO. OF NO.OF
Days
MD
1
2
1
5
4
2
6
6
8
36
36
24
2
2
2
4
4
4
10
10
6
60
60
36
2
2
2
6
4
4
2
24
16
8
1
2
2
2
WORKING DAYS
2 4 6 8 ###################################################
`
##################
. 52 working days