INDEX

DESCRIPTION

S.NO.

DRG.NO.

PAGE NO.

132 KV TOWER FOUNDATIONS


A.1

Foundation Details of 132K.V.-General Arrangement

132KV-TL-G.A.

P TYPE
A.2.1

Foundation Details of 132 K.V.-"P"Type Tower

A.2.2

Foundation Details of 132 K.V.-"P"Type Tower - DRY

132KV-TL-P-DRY

A.2.3

Foundation Details of 132 K.V.-"P"Type Tower - WET

132KV-TL-P-WET

A.2.4

Foundation Details of 132 K.V.-"P"Type Tower - PS / PBC

132KV-TL-P-P.S.

A.2.5

Foundation Details of 132 K.V.-"P"Type Tower - FS / BC

132KV-TL-P-F.S.

A.2.6

Foundation Details of 132 K.V.-"P"Type Tower - HARD ROCK

132KV-TL-P-H.R.

A.2.7

Foundation Details of 132 K.V.-"P"Type Tower - SOFT ROCK / F&F ROCK

132KV-TL-P-S.R.

2,3

R TYPE
A.3.1

Foundation Details of 132 K.V.-"R"Type Tower

A.3.2

Foundation Details of 132 K.V.-"R"Type Tower - DRY

132KV-TL-R-DRY

12

A.3.3

Foundation Details of 132 K.V.-"R"Type Tower - WET

132KV-TL-R-WET

13

A.3.4

Foundation Details of 132 K.V.-"R"Type Tower - PS / PBC

132KV-TL-R-P.S.

14

A.3.5

Foundation Details of 132 K.V.-"R"Type Tower - FS / BC

132KV-TL-R-F.S.

15

A.3.6

Foundation Details of 132 K.V.-"R"Type Tower - HARD ROCK

132KV-TL-R-H.R.

16

A.3.7

Foundation Details of 132 K.V.-"R"Type Tower - SOFT ROCK / F&F ROCK

132KV-TL-R-S.R.

17

10,11

S TYPE
A.4.1

Foundation Details of 132 K.V.-"S"Type Tower

A.4.2

Foundation Details of 132 K.V.-"S"Type Tower - DRY

132KV-TL-S-DRY

20

A.4.3

Foundation Details of 132 K.V.-"S"Type Tower - WET

132KV-TL-S-WET

21

A.4.4

Foundation Details of 132 K.V.-"S"Type Tower - PS / PBC

132KV-TL-S-P.S.

22

A.4.5

Foundation Details of 132 K.V.-"S"Type Tower - FS / BC

132KV-TL-S-F.S.

23

A.4.6

Foundation Details of 132 K.V.-"S"Type Tower - HARD ROCK

132KV-TL-S-H.R.

24

A.4.7

Foundation Details of 132 K.V.-"S"Type Tower - SOFT ROCK / F&F ROCK

132KV-TL-S-S.R.

25

18,19

INDEX
DESCRIPTION

S.NO.

DRG.NO.

PAGE NO.

220KV-TL-G.A.

26

220KV-TL-A-DRY
220KV-TL-A-WET
220KV-TL-A-P.S.
220KV-TL-A-F.S.
220KV-TL-A-H.R.
220KV-TL-A-S.R.

27,28
29
30
31
32
33
34

220KV-TL-B-DRY
220KV-TL-B-WET
220KV-TL-B-P.S.
220KV-TL-B-F.S.
220KV-TL-B-H.R.
220KV-TL-B-S.R.

35,36
37
38
39
40
41
42

220KV-TL-C-DRY
220KV-TL-C-WET
220KV-TL-C-P.S.
220KV-TL-C-F.S.
220KV-TL-C-H.R.
220KV-TL-C-S.R.

43,44
45
46
47
48
49
50

220KV-TL-D-DRY
220KV-TL-D-WET
220KV-TL-D-WET+9
220KV-TL-D-P.S.
220KV-TL-D-F.S.
220KV-TL-D-H.R.
220KV-TL-D-S.R.

51,52
53
54
55
56
57
58
59

220 KV TOWER FOUNDATIONS


B.1

Foundation Details of 220K.V.-General Arrangement


A TYPE

B.2.1
B.2.2
B.2.3
B.2.4
B.2.5
B.2.6
B.2.7

Foundation Details of 220 K.V.-"A"Type Tower


Foundation Details of 220 K.V.-"A"Type Tower - DRY
Foundation Details of 220 K.V.-"A"Type Tower - WET
Foundation Details of 220 K.V.-"A"Type Tower - PS / PBC
Foundation Details of 220 K.V.-"A"Type Tower - FS / BC
Foundation Details of 220 K.V.-"A"Type Tower - HARD ROCK
Foundation Details of 220 K.V.-"A"Type Tower - SOFT ROCK / F&F ROCK
B TYPE

B.3.1
B.3.2
B.3.3
B.3.4
B.3.5
B.3.6
B.3.7

Foundation Details of 220 K.V.-"B"Type Tower


Foundation Details of 220 K.V.-"B"Type Tower - DRY
Foundation Details of 220 K.V.-"B"Type Tower - WET
Foundation Details of 220 K.V.-"B"Type Tower - PS / PBC
Foundation Details of 220 K.V.-"B"Type Tower - FS / BC
Foundation Details of 220 K.V.-"B"Type Tower - HARD ROCK
Foundation Details of 220 K.V.-"B"Type Tower - SOFT ROCK / F&F ROCK
C TYPE

B.4.1
B.4.2
B.4.3
B.4.4
B.4.5
B.4.6
B.4.7

Foundation Details of 220 K.V.-"C"Type Tower


Foundation Details of 220 K.V.-"C"Type Tower - DRY
Foundation Details of 220 K.V.-"C"Type Tower - WET
Foundation Details of 220 K.V.-"C"Type Tower - PS / PBC
Foundation Details of 220 K.V.-"C"Type Tower - FS / BC
Foundation Details of 220 K.V.-"C"Type Tower - HARD ROCK
Foundation Details of 220 K.V.-"C"Type Tower - SOFT ROCK / F&F ROCK
D TYPE

B.5.1
B.5.2
B.5.3
B.5.4
B.5.5
B.5.6
B.5.7
B.5.8

Foundation Details of 220 K.V.-"D"Type Tower


Foundation Details of 220 K.V.-"D"Type Tower - DRY
Foundation Details of 220 K.V.-"D"Type Tower - WET(+0,+3,+6)
Foundation Details of 220 K.V.-"D"Type Tower - WET(+9)
Foundation Details of 220 K.V.-"D"Type Tower - PS / PBC
Foundation Details of 220 K.V.-"D"Type Tower - FS / BC
Foundation Details of 220 K.V.-"D"Type Tower - HARD ROCK
Foundation Details of 220 K.V.-"D"Type Tower - SOFT ROCK / F&F ROCK

Back

T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004
Stub

x
COPING

75
G.L
EXCAVATION LINE

225

GL

GL

FxF
C

Excavation Line

SECTION
G

W1

CL EAT S

A
D1

EXCAVATION LINE

W2
W3

D2

C.C. 1:2:4

D3
L OF TOWER
C

P.C.C. 1:4:8
Sand Filling

100
150
B/2

250

B/2
B

G
PLAN

NOTE-1 : While classifying foundations of Wet, Partially submerged /


Partially black cotton, Fully submerged / Black cotton foundations
mentioned above, the worst conditions should be considered and not
necessarily the conditions prevailing at the time of inspection. For
instance there are areas where subsoil water raised when canal water is
let out in the field raising subsoil water to a considerable degree.
Similarly the effect of monsoon or when the nearby reservoirs are full
should be considered and not the conditions prevailing in open season or
summer when work is carried out normally.

NOTE-2 : For locations of cut point / angle towers, the classification of tower
foundations shall be at next higher type for ensuring safety of the Transmission
line, which is likely to be subjected to seasonal changes / climatic conditions
from time to time.
NOTE-3 : In case of highly collapsible & loose soils and river crossings, special
design for foundations are to be made by Civil Engineering wing for adoption
on case to case basis.
NOTE-4 : All locations subjected to water logging, particularly in paddy fields,
ponds, marshy areas etc., the chimney of all stubs are to be raised to 600 mm
over the normal chimney being adopted in other cases. This shall be done
after completion of erection of towers as a separate
item for identified locations.

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED


FOUNDATION DETAILS OF

Drg. No.

132KV-TL-G.A.

132 K.V. TYPE TOWER


Scale 1:50

Page

FOUNDATION DETAILS FOR 132 KV "P" TYPE TOWER


Soil
Type

Dry

Wet

P.S.

F.S.

Basic
Tower
Extn.

A
(mm)

B
(mm)

C
(mm)

D
(mm)

F
(mm)

W1
W2
W3

D1
D2
D3

G
(mm)

M
(mm)

K
(mm)

0.00 M

2800

1200

2350

350

300

300
150
0

200
150
0

1700

4607

8919

3.00 M

2800

1200

2350

350

300

1700

5123

9649

6.00 M

2800

1200

2350

350

300

1700

5638

10377

0.00 M

2800

1800

2300

400

450

2300

4607

9768

3.00 M

2800

1800

2300

400

450

2300

5123

10498

6.00 M

2800

1800

2300

400

450

2300

5638

11226

0.00 M

2950

2400

2000

700

450

2900

4607

10617

3.00 M

2950

2400

2000

700

450

2900

5123

11346

6.00 M

2950

2400

2000

700

450

2900

5638

12075

0.00 M

2950

2850

2000

700

450

3350

4607

11253

3.00 M

2950

2850

2000

700

450

3350

5123

11983

6.00 M

2950

2850

2000

700

450

3350

5638

12711

350
325
0

350
325
300

350
325
525

200
200
0

200
200
300

200
200
300

Vol. Of
Excavation
M3

Sand Bed

PCC 1:4:8

Vol. Of
PCC 1:2:4

32.37 Cum

0.00 Cum

0.78 Cum

2.47 Cum

59.25 Cum

0.00 Cum

1.60 Cum

5.76 Cum

99.24 Cum

5.05 Cum

2.70 Cum

12.43 Cum

132.43 Cum

6.73 Cum

3.72 Cum

15.26 Cum

Hard
Rock

F&F
ROCK

140

1200

0.00
M

2700

730

1500

1200

450

730

4607

7548

0.00
M

2700

730

1500

1200

450

730

5123

8277

0.00
M

2700

730

1500

1200

450

730

5638

9006

0.00
M

2700

1200

2200

500

450

1200

4607

8212

0.00
M

2700

1200

2200

500

450

1200

5123

8942

0.00
M

2700

1200

2200

500

450

1200

5638

9670

375

2.56 Cum

0.00 Cum

0.00 Cum

2.80 Cum

15.55 Cum

0.00 Cum

0.00 Cum

4.91 Cum

500

T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004
Scale 1:50
x
COPING
G.L

Stub 100x100x8

75

EXCAVATION LINE

225

GL

GL

300x300

SECTION

Excavation Line

2350

G
2800
G

CL EAT S

300
150

EXCAVATION LINE

200

250

C.C. 1:2:4
P.C.C. 1:4:8

150
100

600

600

L OF TOWER
C

1200
1400
1700

SOIL CLASSIFICATION
Where normal dry cohesive or non-cohesive soils are met.

G
G
PLAN

Released for Construction

CHIEF ENGINEER/CIVIL
Constants
G
M
K
Excavation
+ 0M
4,607 8,919
+ 3M 1700 5,123 9,649 32.37 Cum
+ 6M
5,638 10,377

Volume of
Concrete
P.C.C.

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED


Sand

FOUNDATION DETAILS OF
2.47 Cum

0.78 Cum

0.00 Cum

Drg. No.

132 K.V. - "P" TYPE TOWER

132KV-TL-P-DRY

DRY

Pa g e

T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004
Scale 1:50
x

Stub 100x100x8
COPING

75
G.L

225

GL

EXCAVATION LINE

GL

450x450
Excavation Line
2300

2800

SECTION
CL EAT S

350

G
200

325

200
100

EXCAVATION LINE

C.C. 1:2:4
P.C.C. 1:4:8

900

900
1800
2000
2300

L OF TOWER
C

250

SOIL CLASSIFICATION
a) Where sub soil water is met at 1.5 Mtrs. or more below the ground level in normal
soil. (OR)
b) Where surface water could stand for long period with water penetration not
exceeding 1 Mtr. Below ground level (example : Paddy fields, Sugarcane fields).

G
G
PLAN

Released for Construction

CHIEF ENGINEER/CIVIL
Constants
G
M
K
Excavation
+ 0M
4,607 9,768
+ 3M 2300 5,123 10,498 59.25 Cum
+ 6M
5,638 11,226

Volume of
Concrete
P.C.C.

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED


Sand

FOUNDATION DETAILS OF
5.76 Cum

1.60 Cum

132 K.V. - "P" TYPE TOWER

0.00 Cum

Drg. No.

132KV-TL-P-WET

WET

Pa g e

T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004
x

Scale 1:50

Stub 100x100x8
COPING

75
G.L

225

GL

EXCAVATION LINE

GL

450x450
Excavation Line

2000
M

2950

SECTION
CL EAT S

350
325

200

300

200

C.C. 1:2:4
P.C.C. 1:4:8
Sand Filling

300
100
150

EXCAVATION LINE

1200
L OF TOWER
C

250

1200
2400
2600

2900

G
PLAN

SOIL CLASSIFICATION
a) Where sub soil water is encountered between 0.75 Mtrs. and 1.5 Mtrs. depth
below ground level. (OR)
b) Where top layer of black cotton soil extends up to 50 % of the depth with
normal soil thereafter. (OR)
NOTE : Where soil is clayey type, not necessarily black in colour,
Released for Construction
which shrinks when dry, swells when wet.
CHIEF ENGINEER/CIVIL

Constants
Volume of
G
M
K
Excavation Concrete
P.C.C.
+ 0M
4,607 10,617
+ 3M 2900 5,123 11,346 99.24 Cum 12.43 Cum 2.70 Cum
+ 6M
5,638 12,075

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED


Sand

FOUNDATION DETAILS OF
5.05 Cum

Drg. No.

132KV-TL-P-P.S.

132 K.V. - "P" TYPE TOWER


PS / PBC

Page

Stub 100x100x8

T.O.O. Dir (Tr. & G.O.) M .S. No. 156 Dated 8-10-2004

Scale 1:50

75
x

225

GL

GL

COPING
G.L

450x450
EXCA VATION LINE

Excavation Line

2000
2950
CL E A T S

350

325

200

SECTION

525

200

C.C. 1:2:4

300
100
150

P.C.C. 1:4:8
Sand Filling
1425

1425

EXCA VATION LINE

250

2850
3050
L OF TOW ER
C

8 NOS. 10 TOR SUPPORTING RODS


TOTAL 32 NOS. PER TOW ER

8 TOR @ 300 C/C.

SOIL CLASSIFICATION
10 NOS. 2 W AY (TOTAL 80 NOS. PER TOW ER)
a) W here subsoil water table is within 0.75 Mtrs. depth from ground level. (OR)
b) W here top layer of black cotton soil exceeds 50% and extends up to full depth or is
followed by norm al soil. (OR)
Released for Construction
c) W here top layer is norm al soil up to 50% of the
depth but the lower layer is a black cotton soil.
CHIEF ENGINEER/CIVIL

G
PL A N

Volume of
Constants
M
K
Excavation Concrete
+ 0M
4,607 11,253
+ 3M 3350 5,123 11,983 132.43 Cum 15.26 Cum
+ 6M
5,638 12,711
G

3350

P.C.C.

Sand

3.72 Cum

6.73 Cum

Steel
202.34Kgs

TRANSM ISSION CORPORATION OF ANDHRA PRADESH LIM ITED


FOUNDATION DETAILS OF

Drg. No.

132 K.V. - "P" TYPE TOW ER

132KV-TL-P-F.S.

FS / BC

Page

T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004

COPING

450X450

225

GL

G.L

Scale 1:25

STUB ANGLE
100X100X8

75

GL

EXCAVATION LINE

EARTH OR SOFT ROCK


0 to 1500

2700

SECTION

C.C. 1:2:4

G
1200

EXCAVATION LINE

730
L OF TOWER
C

SOIL CLASSIFICATION
a) Where hard rock is encountered at 1.5 Mtrs. or less below ground level. (OR)
b) Where hard rock is encountered from 1.5 Mtrs. to 2.5 Mtrs. below ground level
though top layer is of normal soil. (OR)
c) Where chiseling, drilling and blasting is required for excavation.

G
PLAN

Released for Construction

CHIEF ENGINEER/CIVIL

G
+ 0M
+3M 730
+6M

M
4,607
5123
5638

K
Excavation
7,548
2.56 to 5.76
8277
CuM
9006

Concrete
2.80 to
4.07CuM

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED


FOUNDATION DETAILS OF

Drg. No.

132 K.V. - "P" TYPE TOWER

132KV-TL-P-H.R.

HARD ROCK

Pa g e

T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004
Scale 1:50
x
75

COPING

GL

G.L

STUB ANGLE
100X100X8

225

GL

EXCAVATION LINE

450X450
2200
2700

SECTION
G
G

500

C.C. 1:2:4

EXCAVATION LINE

1200

L OF TOWER
C

SOIL CLASSIFICATION
a) Where decomposed or fissured rock, hard gravel, kankar, lime stone, laterite
or any other soil of similar nature is met. (OR)
b) Where top layer of normal dry soil extends up to 85% of the depth followed
by fissured rock without presence of water.

G
PLA N

Released for Construction

CHIEF ENGINEER/CIVIL

G
+0 M
+3M
+6M

1200

M
4607
5123
5638

K
Volume of
8212 Excavation Concrete
8942
15.55CuM 4.91CuM
9670

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED


FOUNDATION DETAILS OF

Drg. No.

132KV-TL-P-S.R.

132 K.V. - "P" TYPE TOWER


SOFT ROCK/ F&F ROCK

Page

FOUNDATION DETAILS FOR 132 KV "R" TYPE TOWER


Soil
Type

Dry

Wet

P.S.

F.S.

Basic
Tower
Extn.

A
(mm)

B
(mm)

C
(mm)

D
(mm)

F
(mm)

W1
W2
W3

D1
D2
D3

G
(mm)

M
(mm)

K
(mm)

200
300
0

200
250
0

1850

8192

14202

0.00 M

2960

1350

2410

450

350

3.00 M

2960

1350

2410

450

350

1850

9325

15804

6.00 M

2960

1350

2410

450

350

1850

10453

17399

0.00 M

2960

2300

2430

430

450

2800

8192

15545

3.00 M

2960

2300

2430

430

450

2800

9325

17147

6.00 M

2960

2300

2430

430

450

2800

10453

18743

0.00 M

3110

2900

2130

730

450

3400

8192

16394

3.00 M

3110

2900

2130

730

450

3400

9325

17996

6.00 M

3110

2900

2130

730

450

3400

10453

19591

0.00 M

3110

3300

2130

730

450

3800

8192

16959

3.00 M

3110

3300

2130

730

450

3800

9325

18562

6.00 M

3110

3300

2130

730

450

3800

10453

20157

575
350
0

575
350
300

575
350
500

230
200
0

230
200
300

230
200
300

Vol. Of
Excavation
M3

Sand Bed

PCC 1:4:8

Vol. Of
PCC 1:2:4

40.52 Cum

0.00 Cum

0.96 Cum

3.60 Cum

92.83 Cum

0.00 Cum

2.50 Cum

8.80 Cum

143.81 Cum

6.94 Cum

3.84 Cum

18.65 Cum

179.63 Cum

8.66 Cum

4.90 Cum

21.62 Cum

215

Hard
Rock

2860

880

1460

1400

450

880

8192

12830

3.00 M

2860

880

1460

1400

450

880

9325

14432

6.00 M

2860

880

1460

1400

450

880

10453

16027

650

F&F
ROCK

1400

0.00 M

4.34 Cum

5.76 Cum

35.04 Cum

8.85 Cum

550

0.00 M

2860

1750

2310

550

450

1750

8192

14060

3.00 M

2860

1750

2310

550

450

1750

9325

15662

6.00 M

2860

1750

2310

550

450

1750

10453

17258

T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004
Scale 1:50
x
COPING
G.L

Stub 130x130x10

75

EXCAVATION LINE

225

GL

GL

350x350

SECTION

Excavation Line

2410

G
2960
G

CL EAT S

200
EXCAVATION LINE

300

200
250
100

L OF TOWER
C

675

675

250

C.C. 1:2:4
P.C.C. 1:4:8

1350

1550
1850

SOIL CLASSIFICATION
Where normal dry cohesive or non-cohesive soils are met.
G
PLAN

Released for Construction

CHIEF ENGINEER/CIVIL

Constants
Volume of
G
M
K
Excavation Concrete
P.C.C.
+ 0M
8,192 14,202
+ 3M 1850 9,325 15,804 40.52 Cum 3.60 Cum 0.96 Cum
+ 6M
10,453 17,399

Sand
0.00 Cum

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED


FOUNDATION DETAILS OF

Drg. No.

132KV-TL-R-DRY

132 K.V. - "R" TYPE TOWER


DRY

Pa g e

12

T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004
Scale 1:50
x

Stub 130x130x10
COPING

75
G.L

225

GL

EXCAVATION LINE

GL

450x450
Excavation Line
2430

2960

SECTION
G
575

CL EAT S

350

230
EXCAVATION LINE

C.C. 1:2:4
P.C.C. 1:4:8

200
100
1150

L OF TOWER
C

250

1150
2300
2500

2800

SOIL CLASSIFICATION
a) Where sub soil water is met at 1.5 Mtrs. or more below the ground level in
normal soil. (OR)
b) Where surface water could stand for long period with water penetration
not exceeding 1 Mtr. Below ground level (example : Paddy fields,
Sugarcane fields).

G
G
PLAN

Released for Construction

CHIEF ENGINEER/CIVIL

Constants
Volume of
G
M
K
Excavation Concrete
P.C.C.
+ 0M
8,192 15,545
+ 3M 2800 9,325 17,147 92.83 Cum 8.80 Cum 2.50 Cum
+ 6M
10,453 18,743

Sand
0.00 Cum

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED


FOUNDATION DETAILS OF

Drg. No.

132KV-TL-R-WET

132 K.V. - "R" TYPE TOWER


WET

Pag e

13

T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004
Scale 1:50
x

Stub 130x130x10
COPING

75
G.L

225

GL

EXCAVATION LINE

GL

450x450

2130
M

Excavation Line

SECTION

3110

G
G

CL EAT S

575
350

230

300

250

200
EXCAVATION LINE

C.C. 1:2:4
P.C.C. 1:4:8
Sand Filling

300
100
150
1450

L OF TOWER
C

1450
2900
3100

3400

G
G
PLAN

SOIL CLASSIFICATION
a) Where sub soil water is encountered between 0.75 Mtrs. and 1.5 Mtrs. depth
below ground level. (OR)
b) Where top layer of black cotton soil extends up to 50% of the depth with normal
soil thereafter.
Released for Construction
NOTE : Where soil is clayey type, not necessarily black in colour,
which shrinks when dry, swells when wet.
CHIEF ENGINEER/CIVIL

Constants
Volume of
G
M
K
Excavation Concrete
P.C.C.
+ 0M
8,192 16,394
+ 3M 3400 9,325 17,996 143.81 Cum 18.65 Cum 3.84 Cum
+ 6M
10,453 19,591

Sand
6.94 Cum

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED


FOUNDATION DETAILS OF

Drg. No.

132KV-TL-R-P.S.

132 K.V. - "R" TYPE TOWER


PS / PBC

Pa g e

14

Stub 130x130x10

T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004

Scale 1:50

75
x

225

GL

GL

COPING
G.L

450x450
EXCAVATION LINE

Excavation Line

2130

3110

CL EAT S

575

SECTION

350

230

500

200

C.C. 1:2:4

300
100
150

250

P.C.C. 1:4:8
Sand Filling

EXCAVATION LINE

1650

1650
3300
3500

L OF TOWER
C

3800

8 NOS. 10 TOR SUPPORTING RODS/PIT


TOTAL 32 NOS. /TOWER

K
G

10 TOR @ 400 C/C. (9 NOS. 2 WAY)


G
PLAN

Constants
Volume of
G
M
K Excavation Concrete
P.C.C.
+ 0M
8,192 16,959
+ 3M 3800 9,325 18,562 179.63 Cum 21.62 Cum 4.90 Cum
+ 6M
10,453 20,157

TOTAL 72 NOS. /TOWER


SOIL CLASSIFICATION
a) Where subsoil water table is within 0.75 Mtrs. depth from ground level. (OR)
b) Where top layer of black cotton soil exceeds 50% and extends up to full depth or is
followed by normal soil. (OR)
Released for Construction
c) Where top layer is normal soil up to 50% of the depth
but the lower layer is a black cotton soil.
CHIEF ENGINEER/CIVIL

Sand

Steel

8.66 Cum 336.29 Kgs

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED


FOUNDATION DETAILS OF

Drg. No.

132KV-TL-R-F.S.

132 K.V. - "R" TYPE TOWER


FS / BC

Page

15

T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004

COPING

450X450

225

GL

G.L

Scale 1:25

STUB ANGLE
130X130X10

75

GL

EXCAVATION LINE

EARTH OR SOFT ROCK


0 to
1460

1400 to
2860

SECTION

C.C. 1:2:4

G
1400

EXCAVATION LINE

880
L OF TOWER
C

SOIL CLASSIFICATION
a) Where hard rock is encountered at 1.5 Mtrs. or less below ground
level.(OR)
b) Where hard rock is encountered from 1.5 Mtrs. to 2.5 Mtrs. below ground
level though top layer is of normal soil. (OR)
c) Where chiseling, drilling and blasting is required for excavation.

G
G
PL A N

Released for Construction

CHIEF ENGINEER/CIVIL

G
+0M
+3M 880
+6M

M
8,192
9325
10453

K
12,830
14432
16027

Excavation

Concrete

4.34 to
8.86CuM

4.82 to
5.76CuM

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED


FOUNDATION DETAILS OF

Drg. No.

132 K.V. - "R" TYPE TOWER

132KV-TL-R-H.R.

HARD ROCK

Page

16

T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004
Scale 1:50
x
75

COPING

GL

G.L

STUB ANGLE
130X130X10

225

GL

EXCAVATION LINE

450X450
2310
M

2860

SECTION
G
G

C.C. 1:2:4

550
EXCAVATION LINE

1750
L OF TOWER
C

SOIL CLASSIFICATION
a) Where decomposed or fissured rock, hard gravel, kankar, lime stone, laterite or
any other soil of similar nature is met. (OR)
b) Where top layer of normal dry soil extends up to 85% of the depth followed by
fissured rock without presence of water.

G
G
PLAN

Released for Construction

CHIEF ENGINEER/CIVIL

G
+0 M
+3M
+6M

2860

M
8192
9325
10453

K
Volume of
14060 Excavation Concrete
15662
35.04CuM 8.85 CuM
17258

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED


FOUNDATION DETAILS OF

Drg. No.

132KV-TL-R-S.R.

132 K.V. - "R" TYPE TOWER

SOFT ROCK/ F&F ROCK

Page

17

FOUNDATION DETAILS FOR 132 KV "S" TYPE TOWER


Soil
Type

Dry

Wet

P.S.

F.S.

Basic
Tower
Extn.

A
(mm)

B
(mm)

C
(mm)

D
(mm)

F
(mm)

W1
W2
W3

D1
D2
D3

G
(mm)

M
(mm)

K
(mm)

0.00 M

3300

1800

2400

800

350

200
225
300

250
250
300

2300

8997

15976

3.00 M

3300

1800

2400

800

350

2300

10213

17696

6.00 M

3300

1800

2400

800

350

2300

11428

19414

0.00 M

3300

2700

2380

820

450

3200

8997

17249

3.00 M

3300

2700

2380

820

450

3200

10213

18969

6.00 M

3300

2700

2380

820

450

3200

11428

20687

0.00 M

3450

3600

1950

1250

450

4100

8997

18522

3.00 M

3450

3600

1950

1250

450

4100

10213

20242

6.00 M

3450

3600

1950

1250

450

4100

11428

21960

4350

8997

18876

575
550
0

575
550
450

575
550
575

420
400

420
400
430

420
400
530

0.00 M

3450

3850

1850

1350

450

3.00 M

3450

3850

1850

1350

450

4350

10213

20595

6.00 M

3450

3850

1850

1350

450

4350

11428

22313

Vol. Of
Excavation
M3

Sand Bed

PCC
1:4:8

Vol. Of
PCC 1:2:4

69.83 Cum

0.00 Cum

1.60 Cum

7.21 Cum

135.17 Cum

0.00 Cum

3.36 Cum

18.14 Cum

231.98 Cum

10.09 Cum

5.78 Cum

40.08 Cum

261.13 Cum

11.35 Cum

6.56 Cum

49.13 Cum

340

Hard
Rock

3200

1130

1270

1930

450

1130

8997

14322

3.00 M

3200

1130

1270

1930

450

1130

10213

16041

6.00 M

3200

1130

1270

1930

450

1130

11428

17760

0.00 M

3200

2000

2150

1050

450

2000

8997

15552

3.00 M

3200

2000

2150

1050

450

2000

10213

17272

3.00 M

3200

2000

2150

1050

450

2000

11428

18990

775

F&F
ROCK

1930

0.00 M

9.86 Cum

11.13 Cum

51.20 Cum

18.78 Cum

1050

T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004
Scale 1:50

x
COPING
G.L

Stub 150x150x12

75

EXCAVATION LINE

225

GL

GL

350x350

SECTION
2400

Excavation Line

3300
G
CL EAT S

200

EXCAVATION LINE

225
250

300

250
L OF TOWER
C

C.C. 1:2:4

300
100

P.C.C. 1:4:8
900

250

900
1800
2000

2300

SOIL CLASSIFICATION
Where normal dry cohesive or non-cohesive soils are met.

G
PLAN

Constants
Volume of
G
M
K
Excavation Concrete
P.C.C.
+ 0M
8,997 15,976
+ 3M 2300 10,213 17,696 69.83 Cum 7.21 Cum 1.60 Cum
+ 6M
11,428 19,414

Released for Construction

CHIEF ENGINEER/CIVIL
Sand

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED

0.00 Cum

FOUNDATION DETAILS OF

Drg. No.

132KV-TL-S-DRY

132 K.V. - "S" TYPE TOWER


DRY

Pag e

20

T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004
x

Scale 1:50

Stub 150x150x12
COPING

75
G.L

225

GL

EXCAVATION LINE

GL

450x450
Excavation Line
2380

3300

SECTION
CL EAT S

575
G
420

550

250

EXCAVATION LINE

C.C. 1:2:4

400

P.C.C. 1:4:8

100
L OF TOWER
C

1350

1350
2700

2900
3200

G
G
PLAN

SOIL CLASSIFICATION
a) Where sub soil water is met at 1.5 Mtrs. or more below the ground level in
normal soil. (OR)
b) Where surface water could stand for long period with water penetration not
exceeding 1 Mtr. Below ground level (example : Paddy fields, Sugarcane
Released for Construction
fields).
CHIEF ENGINEER/CIVIL

Constants
Volume of
G
M
K
Excavation Concrete
P.C.C.
+ 0M
8,997 17,249
+ 3M 3200 10,213 18,969 135.17 Cum 18.14 Cum 3.36 Cum
+ 6M
11,428 20,687

Sand
0.00 Cum

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED


FOUNDATION DETAILS OF

Drg. No.

132KV-TL-S-WET

132 K.V. - "S" TYPE TOWER


WET

Page

21

T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004

Stub 150x150x12

Scale 1:50

75

x
COPING

225

GL

GL

G.L

450x450

EXCAVATION LINE

1950

Excavation Line

575

CL EAT S

3450

SECTION

420

550
450

400

250

C.C. 1:2:4

430
EXCAVATION LINE

P.C.C. 1:4:8
Sand Filling

100
150
1800

L OF TOWER
C

1800
3600

3800
4100

G
G
PLAN

SOIL CLASSIFICATION
a) Where sub soil water is encountered between 0.75 Mtrs. and 1.5 Mtrs. depth below
ground level. (OR)
b) Where top layer of black cotton soil extends up to 50% of the depth with normal
soil thereafter.
Released for Construction
NOTE : Where soil is clayey type, not necessarily black in colour,
which shrinks when dry, swells when wet.
CHIEF ENGINEER/CIVIL

Constants
Volume of
G
M
K
Excavation Concrete
P.C.C.
+ 0M
8,997 18,522
+ 3M 4100 10,213 20,242 231.98 Cum 40.08 Cum 5.78 Cum
+ 6M
11,428 21,960

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED


Sand
10.09 Cum

FOUNDATION DETAILS OF

Drg. No.

132KV-TL-S-P.S.

132 K.V. - "S" TYPE TOWER


PS / PBC

Page

22

T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004

Stub 150x150x12

Scale 1:50

75
x
225

GL

COPING

GL

G.L

450x450
1850

Excavation Line

EXCAVATION
LINE

575

CL EAT S

3450
420

SECTION

550

G
575

400

250

C.C. 1:2:4

530
EXCAVATION LINE

P.C.C. 1:4:8
Sand Filling

100
150
1925

L OF TOWER
C

1925
3850
4050
4350

K
8 NOS. 10 TOR SUPPORTING RODS
(32 NOS. /TOWER)

G
G
PLAN

10 TOR @ 375 C/C.


11 NOS. 2 WAY
(TOTAL 88 NOS. /TOWER)

SOIL CLASSIFICATION
a) Where subsoil water table is within 0.75 Mtrs. depth from ground level. (OR)
b) Where top layer of black cotton soil exceeds 50% and extends up to full depth or is
followed by normal soil. (OR)
Released for Construction
c) Where top layer is normal soil up to 50% of the
depth but the lower layer is a black cotton soil.
CHIEF ENGINEER/CIVIL

Constants
Volume of
Steel
M
K Excavation Concrete
P.C.C.
Sand
+ 0M
8,997 18,876
+ 3M 4350 10,213 20,595 261.13 Cum 49.13 Cum 6.56 Cum 11.35 Cum 487.82 Kgs
+ 6M
11,428 22,313

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED

FOUNDATION DETAILS OF

Drg. No.

132KV-TL-S-F.S.

132 K.V. - "S" TYPE TOWER


FS / BC

Pa g e

23

T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004
STUB ANGLE
130X130X10

75

x
COPING

450X450

225

GL

G.L

Scale 1:25
GL

EXCAVATION LINE

EARTH OR SOFT
ROCK
0 to
1270
1930 to
3200

SECTION

C.C. 1:2:4

G
1930

EXCAVATION LINE

1130
L OF TOWER
C

SOIL CLASSIFICATION
a) Where hard rock is encountered at 1.5 Mtrs. or less below ground level.(OR)
b) Where hard rock is encountered from 1.5 Mtrs. to 2.5 Mtrs. below ground
level though top layer is of normal soil.(OR)
c) Where chiseling, drilling and blasting is required for excavation.

G
PLAN

Released for Construction

CHIEF ENGINEER/CIVIL

Constants
Volume of
G
M
K
Excavation Hard Rock Concrete
+ 0M
8,997 14,322
9.86 to
10.10 to
9.86 Cum
+ 3M 1130 10,213 16,041
16.34CuM
11.13 CuM
+ 6M
11,428 17,760

Sand
0.00 Cum

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED


FOUNDATION DETAILS OF

Drg. No.

132 K.V. - "S" TYPE TOWER

132KV-TL-S-H.R.

HARD ROCK

Page

24

T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004
Scale 1:50

x
75

COPING

GL

G.L

STUB ANGLE
150X150X12

225

GL

EXCAVATION LINE

450X450
2150
M
3200

SECTION
G
G

C.C. 1:2:4

1050
EXCAVATION LINE

L OF TOWER
C

2000

SOIL CLASSIFICATION
a) Where decomposed or fissured rock, hard gravel, kankar, lime stone, laterite or any
other soil of similar nature is met. (OR)
b) Where top layer of normal dry soil extends up to 85% of the depth followed by
fissured rock without presence of water.

G
PLAN

Released for Construction

CHIEF ENGINEER/CIVIL

G
+0 M
+3M
+6M

2000

M
8997
10213
11428

Volume of
K
15552 Excavation Concrete
17272
51.20CuM 18.78CuM
18990

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED


FOUNDATION DETAILS OF

Drg. No.

132KV-TL-S-S.R.

132 K.V. - "S" TYPE TOWER


SOFT ROCK/ F&F ROCK

Pag e

25

75

x
COPING

G.L

GL

STUB ANGLE

GL

225

EXCAVATION LINE

FxF
C
J

W1

SECTION
G
A

W2

D1

G
D

W3

D2

250

EXCAVATION LINE

C.C. 1:2:4
P.C.C. 1:4:8

D3
L OF TOWER
C

100
B/2

B/2
B

G
G
PLAN

NOTE-1 : While classifying foundations of Wet, Partially submerged /


Partially black cotton, Fully submerged / Black cotton foundations
mentioned above, the worst conditions should be considered and not
necessarily the conditions prevailing at the time of inspection. For
instance there are areas where subsoil water raised when canal water is
let out in the field raising subsoil water to a considerable degree.
Similarly the effect of monsoon or when the nearby reservoirs are full
should be considered and not the conditions prevailing in open season or
summer when work is carried out normally.

NOTE-2 : For locations of cut point / angle towers, the classification of tower
foundations shall be at next higher type for ensuring safety of the Transmission
line which is likely to be subjected to seasonal changes / climatic conditions
from time to time.
NOTE-3 : In case of highly collapsible & loose soils and river crossings, special
design for foundations are to be made by Civil Engineering wing for adoption on
case to case basis.
NOTE-4 : All locations subjected to water logging, particularly in paddy fields,
ponds, marshy areas etc., the chimney of all stubs are to be raised to 600 mm
over the normal chimney being adopted in other cases. This shall be done after
completion of erection of towers as a separate item for identified locations.

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED


FOUNDATION DETAILS OF 220 K.V. TYPE TOWER (L&T)
Drg. No. 220KV-TL-G.A.
Scale 1:50

Page

26

FOUNDATION DETAILS FOR 220 KV A-TYPE TOWER


Soil
Type

Dry

Wet

P.S.

F.S.

Basic
Tower
Extension

A
(mm)

B
(mm)

C
(mm)

D
(mm)

F
(mm)

X
(mm)

W1
W2
W3

D1
D2
D3

0.00 M

3000

1400

2500

500

300

6251

175
375
0

200
300
0

3.00 M

3000

1400

2500

500

300

6964

6.00 M

3000

1400

2500

500

300

7676

0.00 M

3000

2000

2250

750

450

6251

3.00 M

3000

2000

2250

750

450

6964

6.00 M

3000

2000

2250

750

450

7676

0.00 M

3000

2550

1950

1050

450

6251

3.00 M

3000

2550

1950

1050

450

6964

6.00 M

3000

2550

1950

1050

450

7676

0.00 M

3000

3000

1800

1200

450

6251

3.00 M

3000

3000

1800

1200

450

6964

6.00 M

3000

3000

1800

1200

450

7676

Vol. Of
Excavation
M3

44.76 Cum

325
450
0

1.02
Cum

G
(mm)

1900

1.94
Cum

2500

350
400
300
120.93 Cum

325
450
500

Sand
filling

350
400
0
77.50 Cum

375
375
300

PCC
1:4:8

3.03
Cum

5.58
Cum

3050

350
400
450
159.25 Cum

4.10
Cum

7.35
Cum

3500

J
(mm)

K
(mm)

6872

12405

7585

13414

8297

14421

6815

13173

7528

14182

8240

15189

6750

13859

7463

14868

8175

15875

6679

14395

7392

15404

8104

16411

Vol. Of
PCC M-15
M3

3.70 Cum

10.16 Cum

17.73 Cum

26.00 Cum

275

HardRock

0.00 M

1200

1000

1200

450

6251

3.00 M

1200

1000

1200

450

6964

6.00 M

1200

1000

1200

450

7676

0.00 M

3000

1700

2350

650

450

6251

3.00 M

3000

1700

2350

650

450

6964

6.00 M

3000

1700

2350

650

450

7676

4.80 Cum

625

Soft
Rock

1200

1000

6304

10329

7017

11338

7729

12345

6815

12042

7528

13050

8240

14057

5.04 Cum

650

34.68 Cum

1700

9.66 Cum

T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004
Scale 1:50

x
75

COPING

GL

G.L

STUB ANGLE
100X100X10

225

GL

EXCAVATION LINE

300X300

2500
J

3100

SECTION
G
175

375 250

200

C.C. 1:2:4
P.C.C. 1:4:8

300
100

EXCAVATION LINE

700
L OF TOWER
C

700
1400
1600
1900

SOIL CLASSIFICATION
Where normal dry cohesive or non-cohesive soils are met.

G
G
PLAN

Released for Construction

CHIEF ENGINEER/CIVIL

G
+0 M
+3M
+6M

1900

J
6872
7585
8297

K
Volume of
12405 Excavation Concrete P.C.C.
13414
44.76CuM 3.70CuM 1.02CuM
14421

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED


FOUNDATION DETAILS OF

220 K.V. - "A" TYPE TOWER (L&T)

Drg. No.

220KV-TL-A-DRY

DRY

Page

29

T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004
Scale 1:50

x
75

COPING

GL

G.L

STUB ANGLE
100X100X10

GL

225

EXCAVATION LINE

450X450
2250
J

3100

SECTION
G

325
G

450

350

250

C.C. 1:2:4
P.C.C. 1:4:8

400
EXCAVATION LINE

100
1000

1000
2000

L OF TOWER
C

2200
2500

SOIL CLASSIFICATION
a) Where sub soil water is met at 1.5 Mtrs. or more below the ground level in
normal soil.(OR)
b) Where surface water could stand for long period with water penetration
not exceeding 1 Mtr. Below ground level (example : Paddy fields, Sugarcane
fields).

G
G
PLAN

Released for Construction

CHIEF ENGINEER/CIVIL

G
+0 M
+3M
+6M

2500

J
6815
7528
8240

Volume of
K
13173 Excavation Concrete P.C.C.
14182
77.50CuM 10.16CuM 1.94CuM
15189

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED


FOUNDATION DETAILS OF

220 K.V. - "A" TYPE TOWER (L&T)

Drg. No. 220KV-TL-A-WET

WET

Pa ge

30

T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004
Scale 1:50

x
75

COPING

GL

G.L

STUB ANGLE
100X100X10

GL

225

EXCAVATION LINE

450X450
1950
J

3250
375

SECTION
G

375

350
G

300

400
300
100
150

EXCAVATION LINE

G
PLAN

1275
2550
2750

250

P.C.C. 1:4:8
Sand Filling
1275

L OF TOWER
C

C.C. 1:2:4

3050
SOIL CLASSIFICATION
a) Where sub soil water is encountered between 0.75 Mtrs. and 1.5 Mtrs. depth below
ground level.(OR)
b) Where top layer of black cotton soil extends up to 50 % of the depth with normal soil
thereafter.
NOTE : Where soil is clayey type, not necessarily
black in colour, which shrinks when dry, swells when wet.
Released for Construction

CHIEF ENGINEER/CIVIL

J
K
Volume of
+ 0M
6,750 13,859 Excavation Concrete
P.C.C.
+ 3M 3050 7,463 14,868
120.93 Cum 17.73 Cum 3.03 Cum
+ 6M
8,175 15,875

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED

Sand

FOUNDATION DETAILS OF

220 K.V. - "A" TYPE TOWER (L&T)

5.58 Cum

Drg. No.

220KV-TL-A-P.S.

PS / PBC

Page

31

T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004
Scale 1:50

x
75

COPING

GL

G.L

STUB ANGLE
100X100X10

GL

225

EXCAVATION LINE

450X450
1800

325

3250

SECTION

450

350

G
G

500

400

250

C.C. 1:2:4

450
EXCAVATION LINE

P.C.C. 1:4:8
Sand Filling

100
150
1500
L OF TOWER
C

1500
3000
3200
3500

SOIL CLASSIFICATION
a) Where subsoil water table is within 0.75 Mtrs. depth from ground level. (OR)
b) Where top layer of black cotton soil exceeds 50% and extends up to full depth or is
followed by normal soil. (OR)
c) Where top layer is normal soil up to 50% of the depth but the lower layer is a black
cotton soil.

G
PLAN

Released for Construction

CHIEF ENGINEER/CIVIL

J
K
Volume of
+ 0M
6,679 14,395 Excavation Concrete
P.C.C.
+ 3M 3500 7,392 15,404
159.25 Cum 26.00 Cum 4.10 Cum
+ 6M
8,104 16,411

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED

Sand

FOUNDATION DETAILS OF

220 K.V. - "A" TYPE TOWER (L&T)

7.35 Cum

Drg. No.

220KV-TL-A-F.S.

FS / BC

Pa g e

32

T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004
STUB ANGLE
100X100X10

75

x
COPING

EXCAVATION LINE

450X450

225

GL

G.L

Scale 1:25
GL

As per field conditions


0 to 1800

J
1200

SECTION

C.C. 1:2:4

G
G

EXCAVATION LINE

1000

L OF TOWER
C

SOIL CLASSIFICATION
a) Where hard rock is encountered at 1.5 Mtrs. or less below ground level.(OR)
b) Where hard rock is encountered from 1.5 Mtrs. to 2.5 Mtrs. below ground
level though top layer is of normal soil.(OR)
c) Where chiseling, drilling and blasting is required for excavation.

G
PLAN

Released for Construction

CHIEF ENGINEER/CIVIL

G
+0 M
+3M
+6M

1000

J
6304
7017
7729

Volume of
K
10329 Excavation Concrete
11338
4.8 to
5.04 to
12345 12.00CuM 6.50 CuM

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED


FOUNDATION DETAILS OF

220 K.V. - "A" TYPE TOWER (L&T)

Drg. No.

220KV-TL-A-H.R.

HARD ROCK

Page

33

T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004
Scale 1:50

x
75

COPING

GL

G.L

STUB ANGLE
100X100X10

225

GL

EXCAVATION LINE

450X450
2350
J

3000

SECTION
G
G
650

C.C. 1:2:4

EXCAVATION LINE

1700
L OF TOWER
C

SOIL CLASSIFICATION
a) Where decomposed or fissured rock, hard gravel, kankar, lime stone,
laterite or any other soil of similar nature is met.(OR)
b) Where top layer of normal dry soil extends up to 85% of the depth followed
by fissured rock without presence of water.

G
PLAN

Released for Construction

CHIEF ENGINEER/CIVIL

G
+0 M
+3M
+6M

1700

J
6815
7528
8240

K
Volume of
12042 Excavation Concrete
13050
34.68CuM 9.66CuM
14057

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED


FOUNDATION DETAILS OF

220 K.V. - "A" TYPE TOWER (L&T)

Drg. No.

220KV-TL-A-S.R.

SOFT ROCK/ F&F ROCK

Pa g e

34

FOUNDATION DETAILS FOR 220 KV B-TYPE TOWER


Soil
Type

Basic
Tower

A
(mm)

B
(mm)

C
(mm)

D
(mm)

F
(mm)

X
(mm)

W1
W2
W3

D1
D2
D3

0.00 M

3500

1650

2950

550

350

8300

200
450
0

150
400
0

3.00 M

3500

1650

2950

550

350

9301

6.00 M

3500

1650

2950

550

350

10301

0.00 M

3500

2550

2475

1025

450

8300

3.00 M

3500

2550

2475

1025

450

9301

6.00 M

3500

2550

2475

1025

450

10301

0.00 M

3500

3000

2270

1230

450

8300

3.00 M

3500

3000

2270

1230

450

9301

6.00 M

3500

3000

2270

1230

450

10301

0.00 M

3500

3500

2200

1300

450

8300

Extension

Dry

Wet

P.S.

F.S.

3.00 M

3500

3500

2200

1300

450

9301

6.00 M

3500

3500

2200

1300

450

10301

Vol. Of
Excavation
3
M

66.56 Cum

450
325
275

1.37
Cum

G
(mm)

2150

3.03
Cum

3050

450
300
480
183.75 Cum

525
500
500

Sand
filling

450
300
275
133.96 Cum

450
325
500

PCC
1:4:8

4.10
Cum

7.35
Cum

3500

450
300
550
240.00 Cum

5.48
Cum

9.60
Cum

4000

J
(mm)

K
(mm)

9301

16194

10302

17610

11302

19024

9167

17277

10168

18693

11168

20107

9092

17808

10093

19223

11093

20638

8992

18373

9993

19789

10993

21203

Vol. Of
PCC M-15
M3 with
Steps

6.29 Cum

17.48 Cum

27.44 Cum

40.53 Cum

425

HardRock

0.00 M

1300

1300

1300

450

8300

3.00 M

1300

1300

1300

450

9301

6.00 M

1300

1300

1300

450

10301

8.79 Cum

950

Soft
Rock

0.00 M

3500

2350

2375

1125

450

8300

3.00 M

3500

2350

2375

1125

450

9301

6.00 M

3500

2350

2375

1125

450

10301

1300

1300

8375

13683

9376

15098

10376

16512

9167

16287

10168

17703

11168

19117

9.03 Cum

1125

77.32 Cum

2350

27.02 Cum

T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004
Scale 1:50

x
STUB ANGLE
130X130X10

75

COPING

GL

G.L

GL

225

EXCAVATION LINE

350X350

2950

SECTION
G
3600
G
200
EXCAVATION LINE

450

150

250

C.C. 1:2:4
P.C.C. 1:4:8

400
100

L OF TOWER
C

825

825
1650

1850
2150

SOIL CLASSIFICATION
Where normal dry cohesive or non-cohesive soils are met.
G
PLAN

Released for Construction

CHIEF ENGINEER/CIVIL

G
+0 M
+3M
+6M

2150

J
9301
10302
11302

K
Volume of
16194 Excavation Concrete P.C.C.
17610
66.56CuM 6.29CuM 1.37CuM
19024

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED


FOUNDATION DETAILS OF

220 K.V. - "B" TYPE TOWER (L&T)

Drg. No.

220KV-TL-B-DRY

DRY

Pa g e

37

T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004
Scale 1:50

GL

G.L

STUB ANGLE
130X130X10

75

COPING

GL

225

EXCAVATION LINE

450X450

2475
J

SECTION
G
3600
450

325 275

450

250

EXCAVATION LINE

300

L OF TOWER
C

C.C. 1:2:4
P.C.C. 1:4:8

275
100
1275

1275
2550
2750
3050

G
PLAN

SOIL CLASSIFICATION
a) Where sub soil water is met at 1.5 Mtrs. or more below the ground level in
normal soil.(OR)
b) Where surface water could stand for long period with water penetration
not exceeding 1 Mtr. Below ground level (example : Paddy fields,
Released for Construction
Sugarcane fields).
CHIEF ENGINEER/CIVIL

G
+0 M
+3M
+6M

3050

J
9167
10168
11168

K
Volume of
17277 Excavation Concrete P.C.C.
18693
133.96CuM 17.48CuM 3.03CuM
20107

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED


FOUNDATION DETAILS OF

220 K.V. - "B" TYPE TOWER (L&T)

Drg. No. 220KV-TL-B-WET

WET

Pa g e

38

T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004
GL

Scale 1:50

STUB ANGLE
130X130X10

75

GL

225

x
COPING

G.L

450X450
EXCAVATION LINE

2270

450

3750
J

325

450

SECTION

500

250

G
300
G

C.C. 1:2:4
P.C.C. 1:4:8

480
100
150

EXCAVATION LINE

SAND FILLING
1500

1500
3000

L OF TOWER
C

3200

K
3500

G
G
PLAN

SOIL CLASSIFICATION
a) Where sub soil water is encountered between 0.75 Mtrs. and 1.5 Mtrs. depth
below ground level.(OR)
b) Where top layer of black cotton soil extends up to 50% of the depth with
normal soil thereafter.
NOTE : Where soil is clayey type, not necessarily
Released for Construction
black in colour, which shrinks when dry, swells when wet.
CHIEF ENGINEER/CIVIL

G
+0 M
+3M
+6M

3500

J
9092
10093
11093

K
Volume of
17808 Excavation Concrete P.C.C. Sand filling
19223
183.75CuM 27.44CuM 4.10CuM 7.35CuM
20638

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED


FOUNDATION DETAILS OF

220 K.V. - "B" TYPE TOWER (L&T)

Drg. No.

220KV-TL-B-P.S.

PS /PBC

Pa g e

39

T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004
GL

Scale 1:50

STUB ANGLE
130X130X10

75

GL

225

x
COPING

G.L

450X450
2200

EXCAVATION LINE

525
3750
J

500

450

500

250

SECTION
G
300
G
550

C.C. 1:2:4
P.C.C. 1:4:8

100
150

EXCAVATION LINE

SAND FILLING
1750

L OF TOWER
C

1750
3500
3700

4000
G
G
PLAN

SOIL CLASSIFICATION
a) Where subsoil water table is within 0.75 Mtrs. depth from ground level.(OR)
b) Where top layer of black cotton soil exceeds 50% and extends up to full depth or is
followed by normal soil.(OR)
c) Where top layer is normal soil up to 50% of the
depth but the lower layer is a black cotton soil.
Released for Construction
CHIEF ENGINEER/CIVIL

G
+0 M
+3M
+6M

4000

J
8992
9993
10993

Volume of
K
18373 Excavation Concrete P.C.C. Sand filling
19789
240.00CuM 40.53CuM 5.48CuM 9.60CuM
21203

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED


FOUNDATION DETAILS OF

220 K.V. - "B" TYPE TOWER (L&T)

Drg. No.

220KV-TL-B-F.S.

FS / BC

Page

40

T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004
75

x
COPING

225

GL

G.L

Scale 1:25

STUB ANGLE
130X130X10
450X450

GL

EXCAVATION LINE

As per field conditions


0 to 2200

SECTION

C.C. 1:2:4

G
1300

EXCAVATION LINE

L OF TOWER
C

1300
SOIL CLASSIFICATION
a) Where hard rock is encountered at 1.5 Mtrs. or less below ground level.(OR)
b) Where hard rock is encountered from 1.5 Mtrs. to 2.5 Mtrs. below ground
level though top layer is of normal soil.(OR)
c) Where chiseling, drilling and blasting is required for excavation.

G
PLAN

Released for Construction

CHIEF ENGINEER/CIVIL

G
+0 M
+3M
+6M

1300

J
8375
9376
10376

K
Volume of
13683 Excavation Concrete
15098 8.79 to
9.03 to
16512 23.66 CuM 10.82 CuM

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED


FOUNDATION DETAILS OF

220 K.V. - "B" TYPE TOWER (L&T)

Drg. No.

220KV-TL-B-H.R.

HARD ROCK

Pag e

41

T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004
Scale 1:50

x
75

COPING

GL

G.L

STUB ANGLE
130X130X10

GL

225

EXCAVATION LINE

450X450

2375
J

SECTION

3500

G
G

EXCAVATION LINE

1125

C.C. 1:2:4

L OF TOWER
C

2350

SOIL CLASSIFICATION
a) Where decomposed or fissured rock, hard gravel, kankar, lime stone, laterite or
any other soil of similar nature is met.(OR)
b) Where top layer of normal dry soil extends up to 85% of the depth followed by
fissured rock without presence of water.

G
G
PLAN

Released for Construction

CHIEF ENGINEER/CIVIL

G
+0 M
+3M
+6M

2350

J
9167
10168
11168

K
Volume of
16287 Excavation Concrete
17703
77.32CuM 27.02CuM
19117

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED


FOUNDATION DETAILS OF

220 K.V. - "B" TYPE TOWER (L&T)

Drg. No.

220KV-TL-B-S.R.

SOFT ROCK/ F&F ROCK

Page

42

FOUNDATION DETAILS FOR 220 KV C-TYPE TOWER


Soil
Type

Basic
Tower

A
(mm)

B
(mm)

C
(mm)

D
(mm)

F
(mm)

X
(mm)

0.00 M

3500

2000

2800

700

350

8574

3.00 M

3500

2000

2800

700

350

9574

Extension

W1
W2
W3
475
350
0

D1
D2
D3

Vol. Of
Excavation
3
M

PCC 1:4:8

Sand filling

G
(mm)

450
250
0

Dry

90.00 Cum

J
(mm)

K
(mm)

9533

17017

10533

18431

2500

1.94 Cum

8.56 Cum

6.00 M

3500

2000

2800

700

350

10574

11533

19846

9.00 M

3500

2000

2800

700

350

11524

12533

21260

0.00 M

3500

3000

2400

1100

450

8574

9383

18219

3.00 M

3500

3000

2400

1100

450

9574

10383

19634

275
500
500

250
450
400

176.40
Cum

Wet

3500

4.10 Cum

24.79 Cum

6.00 M

3500

3000

2400

1100

450

10574

11383

21048

9.00 M

3500

3000

2400

1100

450

11574

12345

22408

0.00 M

3500

3500

2350

1150

450

8574

9282

18784

3.00 M

3500

3500

2350

1150

450

9574

10282

20198

P.S.

6.00 M

3500

3500

2350

1150

450

10574

9.00 M

3500

3500

2350

1150

450

12.00 M

3500

3500

2350

1150

450

525
500
500

250
450
450

240.00
Cum

5.48 Cum

9.60 Cum

Vol. Of
PCC M-15
M3 with
Steps

4000

37.70 Cum

11282

21612

11574

12275

23016

12574

13275

24431

0.00 M

3525

4050

2925

500

450

9574

3.00 M

3525

4050

2925

500

450

10574

1075
725

200
300

F.S.

304.33 Cum

7.23 Cum

12.42 Cum

9625

20046

10625

21461

4550

27.70 Cum

6.00 M

3525

4050

2925

500

450

11574

11625

22875

9.00 M

3525

4050

2925

500

450

11574

12625

24289

8649

14070

9649

15484

RCC
0.00 M

1500

1300

1500

450

10574

3.00 M

1500

1300

1500

450

11574

425
0
0

1500
0
0

Hard
Rock

10.14 Cum

1300

10.38 Cum

6.00 M

1500

1300

1500

450

12574

10649

16898

9.00 M

1500

1300

1500

450

11574

12533

17724

0.00 M

3500

2600

2200

1300

450

11574

9383

16947

3.00 M

3500

2600

2200

1300

450

11574

10383

18361

Soft
Rock

1075
0
0

1300
0
0

94.64 Cum

2600

37.18 Cum

6.00 M

3500

2600

2200

1300

450

11574!

11383

19775

9.00 M

3500

2600

2200

1300

450

11574

12345

21135

T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004
Scale 1:50

x
75
225

COPING

GL

G.L

STUB ANGLE
150X150X12

GL

EXCAVATION LINE

350X350

2800

SECTION
G

3600
G
475
EXCAVATION LINE

L OF TOWER
C

450

350 250

C.C. 1:2:4
P.C.C. 1:4:8

250
100
1000

1000
2000

2200
2500

SOIL CLASSIFICATION
Where normal dry cohesive or non-cohesive soils are met.

G
PLAN

Released for Construction

CHIEF ENGINEER/CIVIL

G
+0 M
+3M
+6M
+9M

2500

J
9533
10533
11533
12533

K
Volume of
17017 Excavation Concrete P.C.C.
18431
19846 90.00CuM 8.56CuM 1.94CuM
21260

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED


FOUNDATION DETAILS OF

220 K.V. - "C" TYPE TOWER (L&T)

Drg. No.

220KV-TL-C-DRY

DRY

Page

45

T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004
Scale 1:50
x

GL

G.L

STUB ANGLE
150X150X12

75
225

COPING

GL

EXCAVATION LINE

450X450
2400
J

SECTION
275

3600
G

250

500

500

250

450

EXCAVATION LINE

C.C. 1:2:4
P.C.C. 1:4:8

400
100

L OF TOWER
C

1500

1500
3000

3200
3500

G
G
PLAN

SOIL CLASSIFICATION
a) Where sub soil water is met at 1.5 Mtrs. or more below the ground level in
normal soil.(OR)
b) Where surface water could stand for long period with water penetration not
exceeding 1 Mtr. Below ground level (example : Paddy fields, Sugarcane
fields).

Released for Construction

CHIEF ENGINEER/CIVIL
G
+0 M
+3M
+6M
+9M

3500

J
9383
10383
11383
12345

K
Volume of
18219 Excavation Concrete P.C.C.
19634
21048 176.40CuM 24.79CuM 4.10CuM
22048

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED


FOUNDATION DETAILS OF

220 K.V. - "C" TYPE TOWER (L&T)

Drg. No.

220KV-TL-C-WET

WET

Pa g e

46

T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004

75
225

GL

Scale 1:50

STUB ANGLE
150X150X12

GL

COPING

G.L

450X450
EXCAVATION LINE

2350

3750
525
500

SECTION
G

500

250

250
450

C.C. 1:2:4
P.C.C. 1:4:8

450
EXCAVATION LINE

100
150

SAND FILLING
1750

L OF TOWER
C

G
G

1750
3500
3700
4000

SOIL CLASSIFICATION
a) Where sub soil water is encountered between 0.75 Mtrs. and 1.5 Mtrs. depth
below ground level.(OR)
b) Where top layer of black cotton soil extends up to 50% of the depth with normal
soil thereafter.
NOTE : Where soil is clayey type, not necessarily black in colour, which shrinks when
dry, swells when wet.

PLAN

Released for Construction

CHIEF ENGINEER/CIVIL
G
+0 M
+3M
+6M
+9M
+12M

4000

J
9282
10282
11282
12275
13275

K
Volume of
18784 Excavation Concrete P.C.C.
Sand filling
20198
21612
240.00CuM 37.70CuM 5.48CuM 9.60CuM
23016
24431

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED


FOUNDATION DETAILS OF

220 K.V. - "C" TYPE TOWER (L&T)

Drg. No.

220KV-TL-C-P.S.

PS / PBC

Pa g e

47

T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004
GL

UB ANGL E
65 ST
15 0X15 0X16 L

X
(
C/C
OF
PEDASTAL
)
COPI NG
PL I NT H
FXF

150

EXCAV AT I ON L I NE

450X450
12 mm dia - 8 Nos.
6 mm dia - 200 c/c

2925

R.C.C. M15
D

58
E
22
43

GL

16 # @ 2 00 c / c AT
BOT HWAYS
( C- T YPE F .S. SOI L ) .

LV L

Scale 1:50

STUB ANGLE
150X150X12

75
225

R.C.C. M15

3675
B

43

43

B
R.C.C. 1:2:4
12 mm dia - 170 c/c both ways
16 mm dia - 200 c/c both ways
Alternate bars are cranked
P.C.C. 1:4:8

200
300
100
150

SAND FILLING

2600
J

4050
4250
4550

SOIL CLASSIFICATION
a) Where subsoil water table is within 0.75 Mtrs. depth from ground level.(OR)
b) Where top layer of black cotton soil exceeds 50% and extends up to full depth or is
followed by normal soil.(OR)
c) Where top layer is normal soil up to 50% of the depth but the lower layer is a black
cotton soil.

F
J

Released for Construction

PLAN

CHIEF ENGINEER/CIVIL
G
+0 M
+3M
+6M
+9M

4550

J
9625
10625
11625
12625

K
Steel (Kgs)
Volume of
20046 Excavation Concrete P.C.C.
Sand filling
21461
1974.86
22875 304.33CuM 27.70CuM 7.23CuM 12.42CuM
24289

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED


FOUNDATION DETAILS OF

220 K.V. - "C" TYPE TOWER (L&T)

Drg. No.

220KV-TL-C-F.S.

FS / BC

Pa g e

48

T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004
x

Scale 1:25

STUB ANGLE
150X150X12

75
COPING

225

GL

G.L

450X450

GL

EXCAVATION LINE

As per field conditions


0 to 2000

SECTION

C.C. 1:2:4

G
G
1500
EXCAVATION LINE

L OF TOWER
C

1300

SOIL CLASSIFICATION
a) Where hard rock is encountered at 1.5 Mtrs. or less below ground level.(OR)
b) Where hard rock is encountered from 1.5 Mtrs. to 2.5 Mtrs. below ground level
though top layer is of normal soil.(OR)
c) Where chiseling, drilling and blasting is required for excavation.

G
G
PLAN

Released for Construction

CHIEF ENGINEER/CIVIL
G
+0 M
+3M
+6M
+*9M

1300

J
8649
9649
10649
11649

Volume of
K
14070 Excavation Concrete
15484
10.14 to
10.40 to
16898
23.66CuM 12.04CuM
17724

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED


FOUNDATION DETAILS OF

220 K.V. - "C" TYPE TOWER (L&T)

Drg. No.

220KV-TL-C-H.R.

HARD ROCK

Pa g e

49

T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004
Scale 1:50
x
75
225

COPING

GL

G.L

STUB ANGLE
150X150X12

GL

EXCAVATION LINE

450X450
2200
J

SECTION

3500

G
G

1300

EXCAVATION LINE

C.C. 1:2:4
L OF TOWER
C

2600

SOIL CLASSIFICATION
a) Where decomposed or fissured rock, hard gravel, kankar, lime stone, laterite or
any other soil of similar nature is met.(OR)
b) Where top layer of normal dry soil extends up to 85% of the depth followed by
fissured rock without presence of water.

G
G
PLAN

Released for Construction

CHIEF ENGINEER/CIVIL
G
+0 M
+3M
+6M
+9M

2600

J
9383
10383
11383
12345

K
Volume of
16947 Excavation Concrete
18361
19775 94.64CuM 37.18CuM
21135

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED


FOUNDATION DETAILS OF

220 K.V. - "C" TYPE TOWER (L&T)

Drg. No.

220KV-TL-C-S.R.

SOFT ROCK/ F&F ROCK

Pa g e

50

220 KV TOWERS L&T DESIGN OF FOUNDATION FOR TYPE-D TOWER


Soil
Type

Basic
Tower

A
(mm)

B
(mm)

C
(mm)

D
(mm)

F
(mm)

X
(mm)

0.00 M

3500

2450

2450

1050

450

10734

3.00 M

3500

2450

2450

1050

450

11990

Extension

W1
W2
W3

D1
D2
D3

400
300
300

Vol. Of
Excavation
3
M

PCC
1:4:8

Sand
filling

G
(mm)

450
300
300

Dry

125.32 Cum

J
(mm)

K
(mm)

11833

20906

13093

22688

2950

2.81 Cum

16.35 Cum

6.00 M

3500

2450

2450

1050

450

13250

14353

24470

9.00 M

3500

2450

2450

1050

450

14500

15613

26252

0.00 M

3500

3700

2000

1500

450

10734

11581

22318

3.00 M

3500

3700

2000

1500

450

11990

12841

24100

6.00 M

3500

3700

2000

1500

450

13250

14101

25882

9.00 M

3500

3800

1950

1550

450

11574

15340

27775

0.00 M

3425

4300

2775

550

450

10734

12032

23804

3.00 M

3425

4300

2775

550

450

11990

13292

25586

625
500
500

600
450
450
254.02 Cum

4200

6.08 Cum

Vol. Of
PCC M-15
M3 with
Steps

46.56 Cum

Wet

675
500
500
1150
775
0

P.S.

600
500
450
200
350
0

266.26 Cum

329.47 Cum

6.00 M

3425

4300

2775

550

450

13250

9.00 M

3425

4300

2775

550

450

11574

RCC

4300

6.40 Cum

8.10 Cum

13.82 Cum

4800

51.27 Cum

34.43 Cum

14552

27368

15812

29150

0.00 M

3425

4800

2775

550

450

10734

3.00 M

3425

4800

2775

550

450

11990

1375
800
0

200
350
0

F.S.

401.69 Cum

10.00 Cum

16.85 Cum

12032

24511

13292

26293

5300

42.94 Cum

6.00 M

3425

4800

2775

550

450

13250

14552

28075

9.00 M

3425

4800

2775

550

450

11574

15812

29857

10825

17147

12085

18929

0.00 M

1600

1300

1600

450

10734

3.00 M

1600

1300

1600

450

11990

RCC
425
1600
0
0
0
0

Hard
rock

10.82 Cum

1300

11.06 Cum

6.00 M

1600

1300

1600

450

13250

13345

20711

9.00 M

1600

1300

1600

450

11574

14605

22493

0.00 M

3500

2900

1800

1700

450

10734

11581

20479

3.00 M

3500

2900

1800

1700

450

11990

12841

22261

Soft
rock

1225
0
0

1700
0
0

117.74 Cum

2900

58.89 Cum

6.00 M

3500

2900

1800

1700

450

13250

14101

24043

9.00 M

3500

2900

1800

1700

450

11574

15340

25795

T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004
Scale 1:50

x
75

COPING

GL

G.L

STUB ANGLE
150X150X16

GL

225

EXCAVATION LINE

450X450

2450
J

SECTION
G
3600
400

300

450
EXCAVATION LINE

300

300

L OF TOWER
C

300
100

C.C. 1:2:4
P.C.C. 1:4:8

1225

250

1225
2450
2650

2950

SOIL CLASSIFICATION
Where normal dry cohesive or non-cohesive soils are met.

G
PLAN

Released for Construction

CHIEF ENGINEER/CIVIL
G
+0 M
+3M
+6M
+9M

2950

J
11833
13093
14353
15613

K
Volume of
20906 Excavation Concrete
P.C.C.
22688
24470 125.32CuM 16.35CuM 2.81CuM
26252

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED


FOUNDATION DETAILS OF

220 K.V. - "D" TYPE TOWER (L&T)

Drg. No.

220KV-TL-D-DRY

DRY

Pa ge

53

T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004
75
x

GL

Scale 1:50
STUB ANGLE
150X150X16

GL

225

COPING

G.L
450X450

EXCAVATION LINE

2000

625
J

SECTION

3600
500

600

G
G

500

450

C.C. 1:2:4
P.C.C. 1:4:8

450

EXCAVATION LINE

250

100
1850

1850
3700

L OF TOWER
C

3900

4200

SOIL CLASSIFICATION
a) Where sub soil water is met at 1.5 Mtrs. or more below the ground level in
normal soil.(OR)
b) Where surface water could stand for long period with water penetration not
exceeding 1 Mtr. Below ground level (example : Paddy fields, Sugarcane fields).

G
G
PLAN

Released for Construction

CHIEF ENGINEER/CIVIL
G
+0 M
+3M
+6M

4200

J
11581
12841
14101

Volume of
K
22318 Excavation Concrete
P.C.C.
24100
254.02CuM 46.56CuM 6.08CuM
25882

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED


FOUNDATION DETAILS OF

220 K.V. - "D" TYPE TOWER (L&T)

Drg. No. 220KV-TL-D-WET

WET(+0, +3, +6M)

Pa g e

54

T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004
Scale 1:50
x
75

COPING

GL

G.L

STUB ANGLE
150X150X16

GL

225

EXCAVATION LINE

450X450
1950
J

675

SECTION
G
3600

500

600

G
500

500

250

EXCAVATION LINE

C.C. 1:2:4
P.C.C. 1:4:8

450
100

L OF TOWER
C

1900

1900
3800
4000
4300

G
PLAN

SOIL CLASSIFICATION
a) Where sub soil water is met at 1.5 Mtrs. or more below the ground level in
normal soil.(OR)
b) Where surface water could stand for long period with water penetration not
exceeding 1 Mtr. Below ground level
Released for Construction
(example : Paddy fields, Sugarcane fields).
CHIEF ENGINEER/CIVIL

+0 M
+3M
+6M
+9M

4250

15340

27704

Volume of
Excavation Concrete
P.C.C.

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED


FOUNDATION DETAILS OF

266.26CuM 51.27CuM

220 K.V. - "D" TYPE TOWER (L&T)

6.40CuM

Drg. No. 220KV-TL-D-WET+9

WET (+9M)

Pa g e

55

GL
65

X
( C/C OF PEDASTAL )
STUB ANGL E
15 0X15 0X16 L

STUB ANGLE
150X150X16

75

T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004

GL

225

16 # @ 2 00 c / c AT
BOTHWAYS
( C- TYPE F.S. SOI L ) .

150

COPI NG

PL I NTH

LV L

450X450

FXF
A

Scale 1:50

EXCAV ATI ON L I NE
R.C.C. M15
D

58
E
43
22

R.C.C. M15

12 mm dia - 8 Nos.
6 mm dia - 200 c/c

2875
B

43

43

B
3675

R.C.C. 1:2:4
12 mm dia - 170 c/c both ways
16 mm dia - 175 c/c both ways
Alternate bars are cranked

200

P.C.C. 1:4:8

350
100
150

Sand filling
2750

X
J

X
4300
4500
4800

F
J

PLAN

SOIL CLASSIFICATION
a) Where sub soil water is encountered between 0.75 Mtrs. and 1.5 Mtrs. depth below
ground level.(OR)
b) Where top layer of black cotton soil extends up to 50% of the depth with normal soil
thereafter.
NOTE : Where soil is clayey type, not necessarily black in colour, which shrinks when
dry, swells when wet.
Released for Construction

CHIEF ENGINEER/CIVIL

G
+0 M
+3M
+6M
+9M

4800

J
12032
13292
14552
15812

K
Steel (Kgs)
Volume of
23804 Excavation Concrete P.C.C. Sand filling
25586
2248.13
27368 338.69CuM 34.51CuM 8.10CuM 13.82CuM
29150

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED


FOUNDATION DETAILS OF

220 K.V. - "D" TYPE TOWER (L&T)

Drg. No.

220KV-TL-D-P.S.

PS / PBC

Page

56

T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004
65

GL

X
( C/C OF PEDASTAL )
ST UB ANGL E
15 0X15 0X16 L

STUB ANGLE
150X150X16

75

GL

225

16 # @ 2 00 c / c AT
BOT HWAYS
F .S. SOI L ) .

150( C- T YPE

COPI NG

PL I NT H

LV L

FXF
A

Scale 1:50

450X450
EXCAV AT I ON L I NE

R.C.C. M15
D

58
E
43
22

R.C.C. M15

43

43

12 mm dia - 8 Nos.
6 mm dia - 200 c/c

2875

B
3675

R.C.C. 1:2:4
12 mm dia - 170 c/c both ways

350

16 mm dia - 175 c/c both ways


Alternate bars are cranked
P.C.C. 1:4:8

100
150

Sand filling

200

X
J

3200
4800
5000
5300

F
J

PLAN

SOIL CLASSIFICATION
a) Where subsoil water table is within 0.75 Mtrs. depth from ground level.(OR)
b) Where top layer of black cotton soil exceeds 50% and extends up to full depth or is
followed by normal soil.(OR)
c) Where top layer is normal soil up to 50% of the depth but the lower layer is a black
cotton soil.
Released for Construction

CHIEF ENGINEER/CIVIL
G
+0 M
+3M
+6M
+9M

5300

J
12032
13292
14552
15812

K
Volume of
Steel (Kgs)
24511 Excavation Concrete P.C.C.
Sand filling
26293
2876.45
28075 412.92CuM 43.02CuM 10.00CuM 16.85CuM
29857

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED


FOUNDATION DETAILS OF

220 K.V. - "D" TYPE TOWER (L&T)

Drg. No.

220KV-TL-D-F.S.

FS / BC

Page

57

T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004

COPING

450X450

225

GL

G.L

Scale 1:25

STUB ANGLE
150X150X16

75

GL

EXCAVATION LINE

As per field conditions


0 to 1900

SECTION
G
G
1600

C.C. 1:2:4

EXCAVATION LINE

L OF TOWER
C

K
1300

G
G
PLAN

SOIL CLASSIFICATION
a) Where hard rock is encountered at 1.5 Mtrs. or less below ground level.(OR)
b) Where hard rock is encountered from 1.5 Mtrs. to 2.5 Mtrs. below ground level
though top layer is of normal soil.(OR)
Released for Construction
c) Where chiseling, drilling and blasting is
required for excavation.
CHIEF ENGINEER/CIVIL

G
+0 M
+3M
+6M
+*9M

1300

J
10825
12085
13345
14605

K
Volume of
17147 Excavation Concrete
18929
10.82 to
11.06 to
20711
23.66CuM 12.60CuM
22491

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED


FOUNDATION DETAILS OF

220 K.V. - "D" TYPE TOWER (L&T)

Drg. No.

220KV-TL-D-H.R.

HARD ROCK

Pa g e

58

T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004

Scale 1:50

x
75

COPING

GL

G.L

STUB ANGLE
150X150X16

GL

225

EXCAVATION LINE

450X450
1800

SECTION

3500

G
G
1700
EXCAVATION LINE

C.C. 1:2:4
L OF TOWER
C

2900

SOIL CLASSIFICATION
a) Where decomposed or fissured rock, hard gravel, kankar, lime stone, laterite
or any other soil of similar nature is met.(OR)
b) Where top layer of normal dry soil extends up to 85% of the depth followed by
fissured rock without presence of water.

G
G
PLAN

Released for Construction

CHIEF ENGINEER/CIVIL
G
+0 M
+3M
+6M
+9M

2900

J
11581
12841
14101
15340

K
Volume of
20479 Excavation Concrete
22261
24043 117.74CuM 58.89CuM
25795

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED


FOUNDATION DETAILS OF

220 K.V. - "D" TYPE TOWER (L&T)

Drg. No.

220KV-TL-D-S.R.

SOFT ROCK/ F&F ROCK

Pa g e

59

Das könnte Ihnen auch gefallen