REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


OFFICE OF THE DISTRICT ENGINEER
MINDORO OCCIDENTAL DISTRICT ENGINEERING OFFICE
MAMBURAO, OCCIDENTAL MINDORO

CONSTRUCTION /UPGRADING/REHABILITATION OF DRAINAGE


ALONG NATIONAL ROAD ALONG TAGBAC-LUBANG-LOOC ROAD
(S00004LB)
LOOC, OCCIDENTAL MINDORO
STATION LIMITS K038+420.40 - K038+452.60
3 BARREL BOX CULVERT X 2.40m X 12.00m

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
MINDORO OCCIDENTAL DISTRICT ENGINEERING OFFICE
MAMBURAO, OCCIDENTAL MINDORO

PROJECT & LOCATION:


CONSTRUCTION /UPGRADING/REHABILITATION OF DRAINAGE
ALONG NATIONAL ROAD ALONG TAGBAC-LUBANG-LOOC ROAD
(S00004LB)
LOOC, OCCIDENTAL MINDORO

SHEET CONTENTS:

PROJECT TITILE AND


DESCRIPTION

DESIGNED & PREPARED BY:

CHECHED BY:

SUBMITTED BY:

RECOMMENDING APPROVAL:

APPROVED BY:

SET NO.:
DPWH

ENGINEER II

ENGINEER II

IZ
OIC-CHIEF, PLANNING AND DESIGN SECTION

CY-2016
OIC-ASST. DISTRICT ENGINEER

DISTRICT ENGINEER

R-IV-B

SHT NO.:

DRAINAGE

14

420.40

452.60

THIS SITE

LOCATION MAP
Scale

NTS

THIS SITE

KM 39

LO

OC

BR
.

LOOC

PART A
A.1
PART B
B.1
PART C
101(2)
103(1)
104(1)b
104(2)

PART D
200
PART E
311(1)a.5

FACILITIES FOR THE ENGINEER


Engineer's Facilities and Others
OTHER GENERAL REQUIREMENTS
Other General Requirement
EARTHWORKS
Removal of Concrete Drainage Structures
Structure Excavation
Embankment from Roadway Excavation
Selected Borrow for Topping, case 1
SUBBASE AND BASE COURSE
Aggregate Sub-base Course
SURFACE COURSE
PCC Pavement (Plain)-Conventional Method, 280mm thk.

BR

L.S.

1.00

To be provided

L.S.

1.00

To be provided

CU.M.
CU.M.
CU.M.
CU.M.

57.61
257.72
61.87
94.99

CU.M.

66.44

To be compacted

SQ.M.

93.80

To be poured

KGS.
CU.M.
CU.M.

16,417.90
160.30
6.60

To be installed
To be poured
To be poured

PART G
505(6)
511(1)
511(3)

DRAINAGE AND SLOPE PROTECTION STRUCTURES


Rubble Concrete
Gabions
Filter Cloth

CU.M.
CU.M.
SQ.M.

41.50
294.46
156.00

To be poured

L.M.
EACH
SQ.M.
L.M.

42.00
8.00
9.66
62.70

To be installed for safety


To be installed for safety
To be installed for safety

L.S.

1.00

To be executed

SPL-I
SPL-II
SPL-II

Construction of Detour Road


MOBILIZATION AND DEMOBILIZATION
Mobilization and Demobilization

PROJECT & LOCATION:


CONSTRUCTION /UPGRADING/REHABILITATION OF DRAINAGE
ALONG NATIONAL ROAD ALONG TAGBAC-LUBANG-LOOC ROAD
(S00004LB)
LOOC, OCCIDENTAL MINDORO

SHEET CONTENTS:
KEY MAP
SUMMARY OF QUANTITIES
LOCATION MAP
VICINITY MAP
TABLE OF CONTENTS

DESIGNED & PREPARED BY:

VICINITY MAP

Scale

To be removed
To be excavated
To be excavated &compacted
To be compacted

BRIDGE CONSTRUCTION
Reinforcing Steel Bar ( Box Culvert)
Structural Concrete Class 'A' (Box Culvert)
Lean Concrete

MISCELLANEOUS STRUCTURES
Metal Guardrails (Metal Beam) including Conc. Post
Metal Guardrails End Piece
Reflectorized Thermoplastic Pavement Markings

ON

NB

PART F
404
405
405(6)

PART H
603(3)a
603(3)b
612(1)

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
MINDORO OCCIDENTAL DISTRICT ENGINEERING OFFICE
MAMBURAO, OCCIDENTAL MINDORO

DESCRIPTION

BO

ITEM NO.

INDEX OF SHEETS:
S-1:
S-2:

S-3:
S-4:
S-5:

To be installed
To be installed

S-6:

* TITLE PAGE
* KEY MAP
* SUMMARY OF QUANTITIES
* LOCATION MAP
* VICINITY MAP
* TABLE OF CONTENT
*LEGENDS AND ABBREVIATION
*GENERAL NOTES
* TYPICAL SECTIONS
* TYPICAL PLAN 2-LANE PAVEMENT
* REFLECTORIZED PAVEMENT MARKINGS

* CONSTRUCTION METHOD
S-7,8&9:
* DETAIL OF BOX CULVERT
S-10:
* DETAIL OF APPROACH SLAB
S-11:
* PLAN AND PROFILE
S-12:
* CROSS SECTION
S-13:
* CROSS SECTION DETOUR ROAD
S-14:
* CROSS SECTION ( FOR GABIONS)

To be constructed

CHECHED BY:

NTS

SUBMITTED BY:

RECOMMENDING APPROVAL:

APPROVED BY:

SET NO.:
DPWH

ENGINEER II

ENGINEER II

IZ

OIC-CHIEF, PLANNING AND DESIGN SECTION

CY-2016
OIC-ASST. DISTRICT ENGINEER

DISTRICT ENGINEER

R-IV-B

SHT NO.:

DRAINAGE

14

2. ABBREVIATIONS

1. STANDARD SPECIFICATION
a.)

ALL WORKS SHALL COMPLY WITH THE DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GENERAL SPECIFICATIONS
FOR BRIDGE AND BRIDGES 2004 SPECIAL PROVISIONS AND SUPPLEMENTAL SPECIFICATIONS PERTAINING TO THIS PROJECT

2. DIMENSIONS
a.)

UNLESS OTHERWISE SPECIFIED ALL DIMENSIONS WHICH INCLUDE STATIONING DISTANCES BETWEEN CONTROL POINTS
AND DIMENSIONS OF PIPES AND Box Culvert ARE MEASURED METERS.

3. STATIONING
a.)
b.)
c.)

THE ROAD STATIONS AND ELEMENTS ARE RELATIVE TO THE ULTIMATE CENTERLINE OF THE ROAD.
EQUATIONS OF STATIONS WHEN USED ( BACK STATION AHEAD STATION) ARE PROVIDED AT THE BEGINNING OR END OF
THE CURVE AND OR FULL STATION.\
THE STATION AT THE BEGINNING OF THE PROJECT WAS ESTABLISHED AND RECKONED FROM THE EXISTING KILOMETER
POST AND HAS NO RELATION WITH INTERSECTING ROAD.

4. HORIZONTAL ALIGNMENT AND GRADE


a.)

THE HORIZONTAL ALIGNMENT SHOWN THIS DRAWING FOLLOWS THE LONGITUDINAL JOINT OF PCCP PAVEMENT ( WHICH
DEFINED AS THE EXISTING CENTERLINE ) WITH MINOR DEVIATION DUE TO MAINLY SOME CONSTRUCTION ERRORS
DURING ORIGINAL CONSTRUCTION STAGE MINOR ADJUSTMENT OF THE HORIZONTAL ALIGNMENT MAY BE MADE AS
DIRECTED BY THE ENGINEER TO SUIT TO THE EXISTING CENTER LINE, PARTICULARLY FOR THE OVERLAY SECTIONS.

5. UNSUITABLE MATERIALS
a.)

UNSUITABLE MATERIALS BELOW THE SUB-GRADE SHALL BE EXCAVATED TO A REQUIRED DEPTH AND WIDTH AS INDICATED
IN THE PLANS OR AS DIRECTED BY THE ENGINEERS, BASED ON THE LABORATORY TEST RESULT AND BE REPLACED WITH
APPROVED MATERIALS.

6. DRAINAGE STRUCTURE
a.)
b.)

EXACT LOCATION, SLOPES, OUTFALLS AND INVERT ELEVATIONS OF DRAINAGE STRUCTURES SHALL BE CHECKED IN THE
FIELD BY THE ENGINEER , MINOR ADJUSTMENT MAY BE MADE WITH THE APPROVAL OF THE ENGINEER TO SUIT FIELD CONDITIONS.
ANY REVISIONS REMOVAL AND/ OR RELAYING DRAINAGE STRUCTURES AS DIRECTED BY THE ENGINEERS TO SUIT EXISTING
FIELD CONDITIONS SHALL BE CONSIDERED AS SUBSIDIARY WORK PERTAINING TO OTHER CONTRACT ITEMS NO DIRECT PAYMENT
SHALL BE MADE FOR THIS WORK UNLESS OTHERWISE SPECIFICALLY IDENTIFIED FOR PAYMENT IN THE SCHEDULE.

7. ROAD CONNECTIONS AND PRIVATE ENTRANCES:


a.)
b.)
c.)

APPROACHES AND ROAD CONNECTIONS SHALL BE CONSTRUCTED BY THE CONTRACTOR SHOWN ON THE PLANS OR AS DIRECTED
BY THE ENGINEERS IN THE SUCH MANNER TO ENSURE SMOOTH CONNECTIONS AND RIDING QUALITY.
DESIGN OF THE ROAD WAS BASED ON THE FINAL HIGHWAY LOCATION SURVEY.
WIDENING ON CURVES SHALL BE DETERMINED BY THE ENGINEER IN-CHARGE TO SUIT EXISTING FIELD CONDITION .

ALL DITCHES SHALL COMPLY WITH THE REQUIRED STANDARDS.


INVERT ELEVATIONS AND EXACT DIMENSIONS 0F SIDE DITCHES MAYBE ADJUSTED IN THE FIELD AS DIRECTED BY ENGINEER .
IN SOME CASES, IN ORDER TO SATISFY , DITCH CHANNEL , INVERT ELEVATIONS OF DRAINAGE SLOPE REQUIREMENT , SIDE SLOPES
OF DITCHES MAY BE MODIFIED AS DIRECTED BY THE ENGINEER.

9. REMOVAL AND MISCELLANEOUS ROADWAY STRUCTURES.


a.)
b.)

AZIMUTH

WIDENING OF CURVE

BM

BENCH MARK

OFL

ORDINARY FLOOD LEVEL

DIST.

DISTANCE

OWL

ORDINARY WATER LEVEL

ELEV.

ELEVATION

INTERSECTION LEVEL

SUPER ELEVATION %

PC

POINT OF CURVATURE

ef

MAXIMUM SUPER ELEVATION

PT

POINT OF TANGENCY

PI

POINT OF ITERSECTION

POT

POINT OF TANGENT

K0

KILOMETER

RP

REFERENCE POINT

DEGREE OF CURVE

RROW

ROAD RIGHT OF WAY

EXTERNAL DISTANCE

TBM

TEMPORARY BENCH MARK

RADIUS

SHLDR

SHOULDER

TANGENT

DESIGN SPEED

LVC

= LENGTH OF VERTICAL CURVE

VPI

VERTICAL POINT OF INTERSECTION

Lc

= LENGTH OF CIRCULAR CURVE

VPC

VERTICAL POINT OF CURVATURE

Lo

= LENGTH OF TRANSITION

VPT

= VERTICAL POINT OF TANGENCY

DHWL

= DESIGN HIGH WATER LEVEL

RCPC

= REINF. CONC.PIPE CULVERT

PCC

= POINT OF COMPOUND CURVE

RCBC

= REINF. CONC. Box Culvert

CL

= CENTER LINE

PRC

= POINT OF REVERSE CURVE

IN PORTIONS WHERE THERE ARE EXISTING DETERIORATED ASPHALT OVERLAY , THIS SHALL BE SCARIFIED TOTALLY BEFORE
PLACING THE REQUIRED OVERLAY TO ENSURE PROPER BOND. THIS WORK SHALL BE CONSIDERED SUBSIDIARY WORK PERTAINING
TO CONTRACT PAY ITEMS.
ANY REMOVAL OF MISCELLANEOUS STRUCTURES THAT MAY BE REQUIRED SHALL BE CONSIDERED SUBSIDIARY WORK PERTAINING
TO OTHER CONTRACT ITEM NO DIRECT PAYMENT SHALL BE MADE FOR THIS WORK EXCEPT FOR SPECIFIC ITEMS EXPLICITLY
IDENTIFIED FOR PAYMENT IN BID SCHEDULE.

10.) PROVISION OF ACCESSIBILITY FOR DISABLED:

ROAD DESIGN PARAMETERS


1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.

CUMULATIVE EQUIVALENT STANDARD AXLE LOAD, CESAL (W18)


DESIGN LIFE
ASSUMED TRAFFIC GROWTH, TGR
REPRESENTATIVE CBR
RESILIENT MODULUS, MR
RELIABILITY, R
ZR
OVERALL STANDARD DEVIATION, So
INITIAL SERVICEABILITY INDEX, Po
TERMINAL SERVICEABILITY INDEX, Pt
PRESENT SERVICEABILITY, PSI
PCCP MODULUS OF ELASTICITY, E'c (4,000 psi at 28 days)
PCCP MODULUS OF RUPTURE, S'c (6,000 psi at 28 days)
DRAINAGE COEFFICIENT, Cd
LOAD TRANSFER COEFFICIENT, J
LOSS OF SUPPORT, Ls
EFFECTIVE MODULUS OF SUBGRADE REACTION, k
REQUIRED PCCP THICKNESS
REQUIRED SUBBASE THICKNESS

=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=

20 YEARS
4.0%
2.49%
3,728.23 PSI
85.00 %
- 1.037
0.35
4.50
2.50
2.00
650 PSI
751.00 PSI
1.00
3.80
2.00
25 PCI
28 CM
15 CM

PSI

3 . LEGEND
BENCH MARK

KILOMETER POST

RICE FIELD

PIPE CULVERT

RAIL TRACK

FOREST

Box Culvert

SCHOOL BUILDING

PROVINCIAL BOUNDARIES

BRIDGES

WOODEN HOUSE

BANANA PLANTATION

RIPRAP

NIPA/BAMBOO HUT

CREEK OR RIVER

DIRECTION OF FLOW

CHURCH OR CHAPEL

MAXIMUM FLOOD LEVEL

CEMETERY

ELECTRIC POLE

CUT SLOPE

CONTOURS

WOODEN/BAMBOO FENCE

CONCRETE HOUSE

ROCK

IRRIGATION CANAL

EMBANKMENT

GUARDRAIL

TREES

SOIL SURVEY / BORE HOLES


TEST PIT NO.

STATION
28+430

LAYER

THICKNESS

CBR TEST RESULT (%)

1
2
1
2

A . PLAN
ROAD CENTER LINE

8. SIDE DITCHES
a.)
b.)
c.)

AZI.

PIPE CULVERTS
Box CulvertS

GUARDRAIL L/R

BENCH MARK

BRIDGES

SIDE DITCH

POINT OF TANGENCY

ROAD RIGHT OF WAY

NEW RCCP INSTALLED

ROAD SIGNS

HIGH EMBANKMENT

STONE MASONRY

POINT OF INTERSECTION

CUT SLOPE

B . PROFILE
PIPE CULVERTS

BRIDGES

POINT OF VERTICAL INTERSECTION

Box CulvertS

LENGTH OF VERTICAL CURVE

SIDE DITCH L/R

THE IMPLEMENTING OFFICE SHALL IDENTIFY THE LOCATIONS OF AND PROVIDE ACCESSIBILITY FACILITIES FOR PERSONS
WITH DISABILITY IN ACCORDANCE WITH D.O. 37, SERIES 2009.

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
MINDORO OCCIDENTAL DISTRICT ENGINEERING OFFICE
MAMBURAO, OCCIDENTAL MINDORO

PROJECT & LOCATION:


CONSTRUCTION /UPGRADING/REHABILITATION OF DRAINAGE
ALONG NATIONAL ROAD ALONG TAGBAC-LUBANG-LOOC ROAD
(S00004LB)
LOOC, OCCIDENTAL MINDORO

SHEET CONTENTS:

LEGENDS AND ABBREVIATION


GENERAL NOTES

DESIGNED & PREPARED BY:

CHECHED BY:

SUBMITTED BY:

RECOMMENDING APPROVAL:

APPROVED BY:

SET NO.:
DPWH

ENGINEER II

ENGINEER II

IZ

OIC-CHIEF, PLANNING AND DESIGN SECTION

CY-2016
OIC-ASST. DISTRICT ENGINEER

DISTRICT ENGINEER

R-IV-B

SHT NO.:

DRAINAGE

14

GENERAL NOTES
1.DISTANCE AND ELEVATIONS ARE IN METERS UNLESS
OTHERWISE INDICATED.
2.GRADE SHOWN IS TOP OF GRAVITY WALL EXCEPT
OTHERWISE SPECIFIED.
3.APPROACHES AND ROAD CONNECTIONS SHALL BE
CONSTRUCTED BY THE CONTRACTOR AT THE
DIRECTIONS OF THE ENGINEER-IN-CHARGE.
4.DESIGN AND QUANTITY ESTIMATE ARE BASED ON THE
SURVEY DATA GATHERED BY THE DISTRICT
SURVEY TEAM.
5.ALIGNMENT, GRADE AND LOCATIONS/INVERT
ELEVATIONS OF DRAINAGE STRUCTURES MAYBE
ADJUSTED TO SUIT EXISTING FIELD CONDITIONS.
6.ALL WORKS SHALL COMPLY WITH THE PROVISIONS OF
THE STANDARD SPECIFICATION PERTAINING TO
THIS PROJECT.

GABIONS 0.50m X 1.0m X 3.0m,


Scour Protection

GABIONS 0.50m X 1.0m X 3.0m,


Scour Protection

TYPICAL SECTION ALONG BOX CULVERT


NOT

TO

2.65 m

3.35 m

SCALE

CL

2.65 m

3.35 m

Metal Beam Guardrail 305mm


1.50 %

2.50 %

1.50 %

Conc. Post (200mmx200mmx1700mm)

2.50 %

HORIZONTAL CONTROL

PCC PAVEMENT 280MM


AGGREGATE SUB BASE COURSE 150MM
NATURAL GROUND
EMBANKMENT
SLOPE PROTECTION GROUTED RIPRAP

RUBBLE
CONCRETE

RUBBLE
CONCRETE

THE AZIMUTH OF THIS PROJECT IS


MAGNETIC.,RECKONED FROM THE BEGINNING OF THE
SURVEY AT STA. 0+000.00 TO PI 2 WITH MAGNETIC
AZIMUTH OF 330-30-34. THEREAFTER THE AZIMUTH OF
THE SUCCEEDING TANGENTS WERE DETERMINED BY
ADDING OR SUBTRACTING THE DEFLECTION ANGLES.

TYPICAL ROADWAY SECTION


NOT

TO

SCALE

0.70

0.53

H=VARIABLE

0.30

Shoulder

1.70

1:
S=

GRAVEL BEDDINGS
50mm dia. PVC WEEPHOLES staggered @ 2.0m interval
NATURAL GROUND
SLOPE PROTECTION RUBBLE CONCRETE, 0.30m thk.

Metal Beam Guardrail 305mm


w/ 5/8"x9" Bolt w/ nut & washer

VERTICAL CONTROL

Aggregate Subbase Course

THE DATUM FOR THIS PROJECT IS AN ASSUMED


ELEVATION WHICH HAS NO REFERENCE TO SEA LEVEL.

0.20

0.80

0.20

0.40

4-16mm RSB w/ 10mm ties as shown

TYPICAL SECTION RUBBLE CONCRETE


NOT

TO

DETAIL OF GUARDRAIL AND CONC. POST


Scale:

NTS.

SCALE

CL

2.50 m

2.50 m

S=

2:1

2:1

S=

AGGREGATE SUB BASE COURSE 150MM


EMBANKMENT

EMBANKMENT

TYPICAL ROADWAY SECT. AT DETOUR ROAD


NOT

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
MINDORO OCCIDENTAL DISTRICT ENGINEERING OFFICE
MAMBURAO, OCCIDENTAL MINDORO

TO

CONSTRUCTION /UPGRADING/REHABILITATION OF DRAINAGE


ALONG NATIONAL ROAD ALONG TAGBAC-LUBANG-LOOC ROAD
(S00004LB)
LOOC, OCCIDENTAL MINDORO

TYPICAL

SCALE

PROJECT & LOCATION:

STRUCTURE EXCAVATION
NATURAL GROUND
GABIONS 0.50m X 1.0m X 3.0m
GABIONS 1.0m X 1.0m X 2.0m
FILTER CLOTH

NOT

SHEET CONTENTS:

DESIGNED & PREPARED BY:

CHECHED BY:

SUBMITTED BY:

SECTION (GABIONS)
TO

SCALE

RECOMMENDING APPROVAL:

APPROVED BY:

SET NO.:
DPWH

TYPICAL SECTIONS
GENERAL NOTES
ENGINEER II

ENGINEER II

IZ

OIC-CHIEF, PLANNING AND DESIGN SECTION

CY-2016
OIC-ASST. DISTRICT ENGINEER

DISTRICT ENGINEER

R-IV-B

SHT NO.:

DRAINAGE

13

SHOULDER
2000

3350

SHOULDER
2000

3350

CARRIAGE WIDTH

Lc

0.1
5

m.

4500

.00

0.1

DEF. TIE BARS


16mm. x 600mm @ 600m.O.C.

PC

SEE DETAIL "B"

PT

40

m.
.00
40

300

REFLECTORIZED THERMOPLASTIC PAVEMENT MARKING ( Yellow )

EDGE OF CONC. PAVEMENT


100
100

600

SEE DETAIL "C"

600

EDGE MARKING (WHITE)


6000

3000

6000

3000

600

4500

150

6700

3000

CENTERLINE
MARKING (WHITE)

100

100

600

SEE DETAIL "A"

EDGE MARKING (WHITE)

600

EDGE OF CONC. PAVEMENT

MIN.1500

SEE DETAIL "D"


SEE DETAIL "E"

150

375
375

375
375

375
375

375
375

REFLECTORIZED THERMOPLASTIC PAVEMENT MARKING ( White )

PLAIN DOWEL BARS


32mm. x 600mm @ 375m.O.C.

375
375

DETAILS OF PAVEMENT MARKING


SCALE :

LANE SHOWING TRANSVERSE


CONST. JOINT AT MIDDLE THIRD
OF NORMAL JOINT INTERVAL

1 : 20m.

LANE SHOWING TRANSVERSE


CONST. JOINT AT LOCATION OF
WEAKENED PLANE JOINT

TRANSVERSE CONST. JOINT

TYP. PLAN OF TWO LANE PAVEMENT


SCALE :

NTS

GENERAL NOTES :

FORMED GROOVE WITH KEYWAYS


FILL WITH POURED JOINT FILLER

PLAIN DOWEL BARS


32mm. x 600mm @ 375m.O.C.

FORMED GROOVE WITH KEYWAYS


FILL WITH POURED JOINT FILLER

SECTION "B"

SAWED GROOVE WITH


POURED JOINT FILLER

FIRST SLAB

SECTION "C"

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
MINDORO OCCIDENTAL DISTRICT ENGINEERING OFFICE
MAMBURAO, OCCIDENTAL MINDORO

PROJECT & LOCATION:


CONSTRUCTION /UPGRADING/REHABILITATION OF DRAINAGE
ALONG NATIONAL ROAD ALONG TAGBAC-LUBANG-LOOC ROAD
(S00004LB)
LOOC, OCCIDENTAL MINDORO

T/3
T/3

1 : 15m.

PLAIN DOWEL BARS


32mm. x 450mm @ 300m.O.C.
ONE HALF OF THE LENGTH
SHALL BE PAINTED WITH APPROVED
RED LEAD & THEN GREASED

50

DETAIL SECTION

SECTION "D"
SAWED GROOVE WITH POURED
JOINT FILLER (0.45m. INTERVAL OR AS
DIRECTED BY THE PROJ. ENGINEER)

T/3
T/3

FIRST SLAB

T/3

T/3

T/3

T/3

SECTION "A"

SCALE :

T/2 T/2

50

SHEET CONTENTS:
TYPICAL PLAN 2-LANE PAVEMENT
REFLECTORIZED PAVEMENT
MARKINGS

T/3

DEF. TIE BARS


16mm. x 600mm @ 600m.O.C.

50

SAWED GROOVE WITH


POURED JOINT FILLER

50

DEF. TIE BARS


16mm. x 600mm @ 600m.O.C.

SECTION "E"

DESIGNED & PREPARED BY:

CHECHED BY:

1- MATERIALS AND WORKMANSHIP SHALL CONFORM WITH THE "DPWH STANDARD SPECIFICATIONS FOR
HIGHWAYS, BRIDGES AND AIRPORTS, 2004".
2- CONSTRUCTION (CONTACT) JOINTS ARE FORMED WHEN CONCRETE ON ONE SIDE OF THE JOINT IS POURED
AHEAD AND ALLOWED TO SET BEFORE POURING ON THE OTHER SIDE.
3- AT CONSTRUCTION JOINTS (LONGITUDINAL OR TRANSVERSE) CARE SHOULD BE TAKEN THAT NO CONCRETE
FROM THE LAST SLAB PLACED OVERHANGS ANY PORTION OF THE FIRST SLAB.
4- TIE BARS SHOULD BE DEFORMED STEEL BARS, ALL DOWEL BARS SHALL BE SMOTH ROUND STEEL BAR FREE
FROM RUST AND OTHER DEFECTS WHICH MIGHT RESTRICT THEIR MOVEMENT.
5- TYPE OF WEAKENED PLANE JOINT TO BE USED SHALL BE AS SPECIFIED IN THE PLANS AND ONLY ONE TYPE
SHALL BE USED FOR THE WHOLE PROJECT.
6- MATERIAL FOR THE METAL SIDE FORM SHALL BE BRAND NEW SHEET METAL GAUGE NO. 18 OF BLACK IRON
FREE FROM RUST AND LINKS.
7- AT LEAST SIX (6) SUCCESSIVE DOWELLED BUTT JOINTS AT NORMAL JOINT SPACING SHALL BE PROVIDED BEFORE
OR AFTER AN EXPANSION JOINT. EXPANSION JOINT SHALL BE PLACED AT EVERY 60.00m. MINIMUM INTERVAL,
UNLESS OTHERWISE DIRECTED BY THE ENGINEER.
8- THE GROOVE FOR CRACK ABOVE JOINTS (LONGITUDINAL OR TRANSVERSE) SHALL BE SEALED WITH 30-50
PENETRATION ASPHALT SEAL OR COLD APPLIED LIQUID RUBBER COMPOUND AFTER THE CONCRETE HAD BEEN
CURED IN SUCH OPENING PAVEMENT TO TRAFFIC. PENETRATION ASPHALT SEAL ON CONCRETE JOINT SHOULD BE
POURED IN SUCH MANNER THAT SPILLING WILL BE ELLIMINATED. THUS PROVIDE A SMOOTH RIDING SURFACE.
9- ALL TRANSVERSE JOINTS, EXCEPT CONSTRUCTION JOINT SHALL BE CONTINOUS FROM EDGE TO EDGE.
10- ALL LONGITUDINAL JOINTS SHALL MEET AT INTERSECTIONS WITH NO GAPS OR OFFSET.
11- ALL DIMENSIONS ARE IN MILLIMETER UNLESS OTHERWISE SPECIFIED.
12- AVOID STOPPAGE OF FORMWORKS ALONG CURVES.
13- DRILLING OF HOLES ON EXISTING PCCP AND OTHER STRUCTURES SHALL BE PERFORMED USING POWER TOOLS,
THE HOLES SHALL BE PROPERLY CLEANED BEFORE GROUT/ EPOXY INJECTION AND INSTALLATION OF DOWELS OR TIE BARS.

SUBMITTED BY:

RECOMMENDING APPROVAL:

APPROVED BY:

SET NO.:
DPWH

ENGINEER II

ENGINEER II

IZ

OIC-CHIEF, PLANNING AND DESIGN SECTION

CY-2016
OIC-ASST. DISTRICT ENGINEER

DISTRICT ENGINEER

R-IV-B

SHT NO.:

DRAINAGE

14

CONSTRUCTION METHOD
IMMEDIATELY AFTER ALL MATERIALS TO BE USED IN THE PROJECT HAVE PASSED THE MINIMUM TESTING
REQUIREMENTS BASED ON THE STANDARD SPECIFICATIONS FOR DPWH, THE MANNER OF OPERATION IN
THIS PARTICULAR PROJECT SHALL HAVE THE FOLLOWING SEQUENCE:
I.

.
II. -

PCC PAVEMENT (PLAIN) 280 mm THK. - THIS ITEM SHALL CONSIST OF PAVEMENT OF
PORTLAND CEMENT CONCRETE, WITH OR WITHOUT REINFORCEMENT, CONSTRUCTED ON
THE PREPARED BASE IN ACCORDANCE WITH THIS SPECIFICATION AND IN CONFORMITY WITH
LINES, GRADES, THICKNESS AND TYPICAL CROSS-SECTION SHOWN ON THE PLANS. ONLY
TYPE I PORTLAND CEMENT SHALL BE USED UNLESS OTHERWISE PROVIDED FOR IN THE
SPECIAL PROVISIONS. DIFFERENT BRANDS OR THE SAME BRANDS FROM DIFFERENT MILLS
SHALL NOT BE MIXED NOR SHALL THEY BE USED ALTERNATELY UNLESS THE MIX IS
APPROVED BY THE ENGINEER. HOWEVER, THE USE OF PORTLAND POZZOLAN CEMENT TYPE
IP MEETING THE REQUIREMENTS OF AASHTO M 240/ASTM C 695, SPECIFICATIONS FOR
BLENDED HYDRAULIC CEMENT SHALL BE ALLOWED, PROVIDED THAT TRIAL MIXES SHALL BE
DONE AND THAT THE MIXES MEET THE CONCRETE STRENGTH REQUIREMENTS, THE
AASHTO/ASTM PROVISIONS PERTINENT TO THE USE OF PORTLAND POZZOLAN TYPE IP SHALL
BE ADOPTED. FINE AGGREGATE SHALL CONSIST OF NATURAL SAND, STONE SCREENINGS OR
OTHER INERT MATERIALS WITH SIMILAR CHARACTERISTICS, OR COMBINATIONS THEREOF,
HAVING HARD, STRONG AND DURABLE PARTICLES. FINE AGGREGATE FROM DIFFERENT
SOURCES OF SUPPLY SHALL NOT BE MIXED OR STORED IN THE SAME PILE NOR USED
ALTERNATELY IN THE SAME CLASS OF CONCRETE WITHOUT THE APPROVAL OF THE
ENGINEER. COARSE AGGREGATE SHALL CONSIST OF CRUSHED STONE, GRAVEL, BLAST
FURNACE SLAG, OR OTHER APPROVED INERT MATERIALS OF SIMILAR CHARACTERISTICS, OR
COMBINATIONS THEREOF, HAVING HARD, STRONG, DURABLE PIECES AND FREE FROM ANY
ADHERENT COATINGS. REINFORCING STEEL SHALL CONFORM TO THE REQUIREMENTS OF
ITEM 404, REINFORCING STEEL. DOWELS AND TIE BARS SHALL CONFORM TO THE
REQUIREMENTS OF AASHTO M 31 OR M 42, EXCEPT THAT RAIL STEEL SHALL NOT BE USED
FOR TIE BARS THAT ARE TO BE BENT AND RESTRAIGHTENED DURING CONSTRUCTION. TIE
BARS SHALL BE DEFORMED BARS. DOWELS SHALL BE PLAIN ROUND BARS. BEFORE
DELIVERY TO THE SITE OF WORK, ONE-HALF OF THE LENGTH OF EACH DOWEL SHALL BE
PAINTED WITH ONE COAT OF APPROVED LEAD OR TAR PAINT. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR THE QUALITY CONTROL OF ALL MATERIALS DURING THE HANDLING,
BLENDING, AND MIXING AND PLACEMENT OPERATIONS. THE CONTRACTOR SHALL FURNISH
THE ENGINEER A QUALITY CONTROL PLAN DETAILING HIS PRODUCTION CONTROL
PROCEDURES AND THE TYPE A FREQUENCY OF SAMPLING AND TESTING TO INSURE THAT
THE CONCRETE PRODUCES COMPLIES WITH THE SPECIFICATIONS. THE ENGINEER SHALL
BE PROVIDED FREE ACCESS TO RECENT PLANT PRODUCTION RECORDS, AND IF REQUESTED,
INFORMATIONAL COPIES OF MIX DESIGN, MATERIALS CERTIFICATIONS AND SAMPLING AND
TESTING REPORTS.

X. -

REINFORCING STEEL-THIS ITEM SHALL CONSIST OF FURNISHING, BENDING, FABRICATING


AND PLACING OF STEEL REINFORCEMENT OF THE TYPE, SIZE, SHAPE AND GRADE REQUIRED
IN ACCORDANCE WITH THIS SPECIFICATION AND IN CONFORMITY WITH THE
REQUIREMENTS SHOWN ON THE PLANS OR AS DIRECTED BY THE ENGINEER .
REINFORCING STEEL SHALL MEET THE REQUIREMENTS OF ITEM 710, REINFORCING STEEL
AND WIRE ROPE. STEEL REINFORCEMENT SHALL BE STORED ABOVE THE SURFACE OF THE
GROUND UPON PLATFORMS, SKIDS, OR OTHER SUPPORTS AND SHALL BE PROTECTED AS
FAR AS PRACTICABLE FROM MECHANICAL INJURY AND SURFACE DETERIORATION
CAUSED BY EXPOSURE TO CONDITIONS PRODUCING RUST. WHEN PLACED IN THE WORK,
REINFORCEMENT SHALL BE FREE FROM DIRT, DETRIMENTAL RUST, LOOSE SCALE, PAINT,
GREASE, OIL, OR OTHER FOREIGN MATERIALS. REINFORCEMENT SHALL BE FREE FROM
INJURIOUS DEFECTS SUCH AS CRACKS AND LAMINATIONS. RUST, SURFACE SEAMS,
SURFACE IRREGULARITIES OR MILL SCALE WILL NOT BE CAUSE FOR REJECTION, PROVIDED
THE MINIMUM DIMENSIONS, CROSS SECTIONAL AREA AND TENSILE PROPERTIES OF A HAND
WIRE BRUSHED SPECIMEN MEETS THE PHYSICAL REQUIREMENTS FOR THE SIZE AND GRADE
OF STEEL SPECIFIED

MOBILIZATION -SHALL CONSIST OF MOBILIZATION OF EQUIPMENT AND MANPOWER,


MATERIALS AND OTHER ITEMS THAT SHALL BE OF USE IN THE IMPLEMENTATION OF THE
PROJECT. ALL CEMENT MATERIALS SHALL BE STORED IMMEDIATELY UPON DELIVERY AT SITE,
IN A WEATHER PROOF BUILDING WHICH WILL PROTECT THE CEMENT FROM DAMPNESS. THE
FLOOR SHALL BE RAISED FROM THE GROUND BY 4 INCHES. ALL SIGNAGES AND PROJECT
BILLBOARDS SHALL BE PLACED AT DESIGNATED LOCATIONS APPROVED BY THE PROJECT
ENGINEER
DEMOBILIZATION FOLLOWS ONLY AFTER THE PROJECT WAS FINALLY ACCEPTED AND THE
SURROUNDINGS ARE PROPERLY CLEANED.

III. -

FACILITIES FOR ENGINEERS -SHALL CONSISTS OF OFFICES AND LABORATORIES FOR


PROJECT ENGINEERS. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN FIELD OFFICES AND
TESTING L;ABORATORIES, INCLUDING THE NECESSARY ELECTRICITY, WATER DRAINAGE AND
TELEPHONE SERVICES FOR THE USE OF THE ENGINEER AND HIS STAFF. THEIR LOCATION
AND FINAL PLAN SHALL REQUIRE THE APPROVAL OF THE PROJECT ENGINEER PRIOR TO THE
START OF CONSTRUCTION. IT IS INTENT THAT THE LOCATION SITE SHOULD BE IN
GOVERNMENT OWNED LOT SO THAT THE USE OF THE GOVERNMENT TO THESE
FACILITIES CAN BE MAXIMIZED.

IV. -

OTHER GENERAL REQUIREMENTS-SHALL BE PROVIDED BY THE CONTRACTOR AND SHALL


MAINTAIN SUCH OFFICES, STORES, WORKSHOPS LATRINES AND MESSING ACCOMODATIONS
AS ARE NECESSARY. THESE SHOULD BE LOCATED IN THE CONTRACTORS COMPOUND,
DISTINCT AND SEPARATE FROM ENGINEER'S COMPOUND. THE DIMENSIONS AND LAYOUT OF
THE BUILDINGS AND PLACES SHALL BE SUBJECT TO THE APPROVAL OF THE PROJECT
ENGINEER. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN THROUGHOUT THE
DURATINOF THE CONTRACT.

V. -

REMOVAL OF CONCRETE DRAINAGE STRUCTURES- ALL EXISTING BRIDGES, CULVERTS AND


OTHER DRAINAGE STRUCTURES IN USE BY TRAFFIC SHALL NOT BE REMOVED UNTIL
SATISFACTORY ARRANGEMENTS HAVE BEEN MADE TO ACCOMMODATE TRAFFIC. ALL
SECTIONS OF STRUCTURES REMOVED WHICH ARE NOT DESIGNATED FOR STOCKPILING OR
RE-LAYING SHALL BECOME THE PROPERTY OF THE GOVERNMENT AND BE REMOVED FROM
THE PROJECT OR DISPOSED OFF IN A MANNER APPROVED BY THE ENGINEER.
UNLESS OTHERWISE DIRECTED, THE SUBSTRUCTURES OF EXISTING STRUCTURES SHALL BE
REMOVED DOWN TO THE NATURAL STREAM BOTTOM AND THOSE PARTS OUTSIDE OF THE
STREAM SHALL BE REMOVED DOWN TO AT LEAST 300 MM (12 INCHES) BELOW NATURAL
GROUND SURFACE. WHERE SUCH PORTIONS OF EXISTING STRUCTURES LIE WHOLLY OR IN
PART WITHIN THE LIMITS FOR A NEW STRUCTURE, THEY SHALL BE REMOVED AS NECESSARY
TO ACCOMMODATE THE CONSTRUCTION OF THE PROPOSED STRUCTURE.

VI. -

IX. -

STRUCTURE EXCAVATION - THIS ITEM SHALL CONSIST OF THE NECESSARY EXCAVATION FOR
FOUNDATION OF BRIDGES, CULVERTS, UNDERDRAINS, AND OTHER STRUCTURES NOT
OTHERWISE PROVIDED FOR IN THE SPECIFICATIONS. EXCEPT AS OTHERWISE PROVIDED
FOR PIPE CULVERTS, THE BACKFILLING OF COMPLETED STRUCTURES AND THE DISPOSAL OF
ALL EXCAVATED SURPLUS MATERIALS, SHALL BE IN ACCORDANCE WITH THESE
SPECIFICATIONS AND IN REASONABLY CLOSE CONFORMITY WITH THE PLANS OR AS
ESTABLISHED BY THE ENGINEER.

VII. -

EMBANKMENT -THIS ITEM SHALL CONSIST OF THE CONSTRUCTION OF EMBANKMENT IN


ACCORDANCE WITH THIS SPECIFICATION AND IN CONFORMITY WITH THE LINES, GRADES AND
DIMENSIONS SHOWN ON THE PLANS OR ESTABLISHED BY THE ENGINEER. SELECTED
BORROW, FOR TOPPING - SOIL OF SUCH GRADATION THAT ALL PARTICLES WILL PASS A SIEVE
WITH 75 MM (3 INCHES) SQUARE OPENINGS AND NOT MORE THAN 15 MASS PERCENT WILL
PASS THE 0.075 MM (NO. 200) SIEVE, AS DETERMINED BY AASHTO T 11. THE MATERIAL SHALL
HAVE A PLASTICITY INDEX OF NOT MORE THAN 6 AS DETERMINED BY ASSHTO T 90 AND A
LIQUID LIMIT OF NOT MORE THAN 30 AS DETERMINED BY AASHTO T 89.EMBANKMENT
CONSTRUCTION SHALL CONSIST OF CONSTRUCTING ROADWAY EMBANKMENTS, INCLUDING
PREPARATION OF THE AREAS UPON WHICH THEY ARE TO BE PLACED; THE CONSTRUCTION
OF DIKES WITHIN OR ADJACENT TO THE ROADWAY; THE PLACING AND COMPACTING OF
APPROVED MATERIAL WITHIN ROADWAY AREAS WHERE UNSUITABLE MATERIAL HAS BEEN
REMOVED; AND THE PLACING AND COMPACTING OF EMBANKMENT MATERIAL IN HOLES, PITS,
AND OTHER DEPRESSIONS WITHIN THE ROADWAY AREA.

VIII. -

AGGREGATE SUBBASE COURSE-THIS ITEM SHALL CONSIST OF FURNISHING, PLACING AND


COMPACTING AN AGGREGATE SUBBASE COURSE ON A PREPARED SUBGRADE IN
ACCORDANCE WITH THIS SPECIFICATION AND THE LINES, GRADES AND CROSS-SECTIONS
SHOWN ON THE PLANS, OR AS DIRECTED BY THE ENGINEER. AGGREGATE FOR SUBBASE
SHALL CONSIST OF HARD, DURABLE PARTICLES OR FRAGMENTS OF CRUSHED STONE,
CRUSHED SLAG, OR CRUSHED OR NATURAL GRAVEL AND FILLER OF NATURAL OR
CRUSHED SAND OR OTHER FINELY DIVIDED MINERAL MATTER. THE COMPOSITE MATERIAL
SHALL BE FREE FROM VEGETABLE MATTER AND LUMPS OR BALLS OF CLAY, AND SHALL BE
OF SUCH NATURE THAT IT CAN BE COMPACTED READILY TO FORM A FIRM, STABLE
SUBBASE.THE AGGREGATE SUBBASE MATERIAL SHALL BE PLACED AT A UNIFORM MIXTURE
ON A PREPARED SUBGRADE IN A QUANTITY WHICH WILL PROVIDE THE REQUIRED
COMPACTED THICKNESS. WHEN MORE THAN ONE LAYER IS REQUIRED, EACH LAYER SHALL
BE SHAPED AND COMPACTED BEFORE THE SUCCEEDING LAYER IS PLACED. COMPACTION OF
EACH LAYER SHALL CONTINUE UNTIL A FIELD DENSITY OF AT LEAST 100 PERCENT OF THE
MAXIMUM DRY DENSITY DETERMINED IN ACCORDANCE WITH AASHTO T 180, METHOD D HAS
BEEN ACHIEVED. IN-PLACE DENSITY DETERMINATION SHALL BE MADE IN ACCORDANCE WITH
AASHTO T 191.

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
MINDORO OCCIDENTAL DISTRICT ENGINEERING OFFICE
MAMBURAO, OCCIDENTAL MINDORO

PROJECT & LOCATION:


CONSTRUCTION /UPGRADING/REHABILITATION OF DRAINAGE
ALONG NATIONAL ROAD ALONG TAGBAC-LUBANG-LOOC ROAD
(S00004LB)
LOOC, OCCIDENTAL MINDORO

XI. -

RUBBLE CONCRETE-THIS ITEM SHALL CONSIST OF THE CONSTRUCTION OF RUBBLE


CONCRETE IN ACCORDANCE WITH THIS SPECIFICATION AND IN CONFORMITY WITH THE
LINES, GRADES, SLOPES AND DIMENSION SHOWN IN THE PLANS OR ESTABLISHED BY THE
ENGINEER. THE STONE SHALL BE CLEANED, HARD, AND DURABLE AND SHALL BE
SUBJECT TO THE ENGINEER'S APPROVAL. ADOBE STONE SHALL NOT BE USED UNLESS
THERWISE SPECIFIED. STONES TO BE USED SHALL BE MORE THAN 0.015 CUBIC METRE IN
VOLUME AND NOT LESS THAN 75 PERCENT OF THE TOTAL VOLUME OF ROCK EMBANKMENT
AND SHALL CONSIST OF STONES 0.03 CUBIC METRE IN VOLUME AS DESCRIBED IN ITEM 506.2.
STONES OBTAINED FROM EXCAVATION PERFORMED UNDER THIS CONTRACT MAY BE
USED.CONCRETE SHALL BE CLASS B IN ACCORDANCE WITH ITEM 405, STRUCTURAL
CONCRETE.FORMWORK USED SHALL BE CONSTRUCTED WITH SUFFICIENT STRENGTH,
RIGIDITY AND SHAPE AS TO LEAVE THE FINISHED WORKS TRUE TO THE DIMENSIONS SHOWN
ON THE PLANS AND WITH THE SURFACE FINISHED AS SPECIFIED.ONE LAYER OF CONCRETE
CLASS B SHALL BE PLACED AT THE PREPARED BED PRIOR TO PLACING OF STONES.
CLEARANCE BETWEEN STONES SHALL NOT BE LESS THAN 2-1/2 INCHES OR THE MAXIMUM
SIZE OF CONCRETE AGGREGATE FOR CLASS B.CONCRETE CLASS B SHALL BE PLACED
AFTER EACH LAYER OF STONE AND SHALL BE THOROUGHLY CONSOLIDATED BY MEANS OF A
VIBRATOR INSERTED IN EACH LAYER OF CONCRETE. IN NO CASE SHALL THE VIBRATOR BE
OPERATED LONGER THAN 10 SECONDS IN ANY LOCATION.WEEPHOLES IT SHALL CONFORM
TO THE REQUIREMENTS OF ITEM 504, RIPRAP AND GROUTED RIPRAP UNDER SUBSECTION
504.3.4, WEEPHOLES.

XII. -

GABIONS -THIS ITEM SHALL CONSIST OF FURNISHING, FORMING WIRE MESH BASKETS, AND
PLACING ROCKS INSTALLED AT THE LOCATIONS DESIGNATED, IN ACCORDANCE WITH THIS
SPECIFICATION AND IN CONFORMITY WITH THE LINES, GRADES, DIMENSIONS, AND
ARRANGEMENTS SHOWN ON THE PLANS OR AS DIRECTED BY THE ENGINEER.GABIONS SHALL
BE CONSTRUCTED OF WIRE MESH AND SHALL BE SUPPLIED IN VARIOUS LENGTHS AND
HEIGHTS. A DOUBLE TWISTED WIRE MESH CONTAINER OF VARIABLE SIZES, UNIFORMLY
PARTITIONED INTO INTERNAL CELLS, INTERCONNECTED WITH OTHER SIMILAR UNITS, AND
FILLED WITH STONES AT THE PROJECT SITE TO FORM FLEXIBLE, PERMEABLE, MONOLITHIC
STRUCTURES SUCH AS RETAINING WALLS, SEA WALLS, CHANNEL LININGS, REVETMENTS AND
WEIRS FOR EROSION CONTROL. THE LENGTHS SHALL BE MULTIPLES OF 2, 3 OR 4 TIMES THE
WIDTH OF THE GABION AND HEIGHTS SHALL BE 0.50 M TO 1.00 M OR AS SHOWN ON THE
PLANS. THE HORIZONTAL WIDTH SHALL NOT BE LESS THAN ONE METER. GABION FURNISHED
SHALL BE OF UNIFORM WIDTH. GABIONS SHALL BE INSTALLED IN A WORKMANLIKE MANNER.
THE GABIONS SHALL BE PLACED ON A SMOOTH FOUNDATION. FINAL LINE AND GRADE
SHALL BE APPROVED BY THE ENGINEER.

SHEET CONTENTS:

DESIGNED & PREPARED BY:

CHECHED BY:

SUBMITTED BY:

XIII. -

STRUCTURAL CONCRETE-THIS ITEM SHALL CONSIST OF FURNISHING, BENDING,


PLACING AND FINISHING CONCRETE IN ALL STRUCTURES EXCEPT PAVEMENTS IN
ACCORDANCE WITH THIS SPECIFICATION AND CONFORMING TO THE LINES, GRADES,
AND DIMENSIONS SHOWN ON THE PLANS. CONCRETE SHALL CONSIST OF A MIXTURE
OF PORTLAND CEMENT, FINE AGGREGATE, COARSE AGGREGATE, ADMIXTURE WHEN
SPECIFIED, AND WATER MIXED IN THE PROPORTIONS SPECIFIED OR APPROVED BY THE
ENGINEER.AS WORK PROGRESSES, AT LEAST ONE (1) SAMPLE CONSISTING OF THREE
(3) CONCRETE CYLINDER TEST SPECIMENS, 150 X 300MM (6 X 12 INCHES), SHALL BE
TAKEN FROM EACH SEVENTY FIVE (75) CUBIC METERS OF EACH CLASS OF CONCRETE
OR FRACTION THEREOF PLACED EACH DAY.THE CONCRETE MATERIALS SHALL BE
PROPORTIONED IN ACCORDANCE WITH THE REQUIREMENTS FOR EACH CLASS OF
CONCRETE AS SPECIFIED IN TABLE 405.2, USING THE ABSOLUTE VOLUME METHOD AS
OUTLINED IN THE AMERICAN CONCRETE INSTITUTE (ACI) STANDARD 211.1.
RECOMMENDED PRACTICE FOR SELECTING PROPORTIONS FOR NORMAL AND
HEAVYWEIGHT CONCRETE. OTHER METHODS OF PROPORTIONING MAY BE
EMPLOYED IN THE MIX DESIGN WITH PRIOR APPROVAL OF THE ENGINEER. THE MIX
SHALL EITHER BE DESIGNED OR APPROVED BY THE ENGINEER. A CHANGE IN THE
SOURCE OF MATERIALS DURING THE PROGRESS OF WORK MAY NECESSITATE A NEW
MIX DESIGN.CONCRETE SHALL HAVE A CONSISTENCY SUCH THAT IT WILL BE WORKABLE
IN THE REQUIRED POSITION. IT SHALL BE OF SUCH A CONSISTENCY THAT IT WILL FLOW
AROUND REINFORCING STEEL BUT INDIVIDUAL PARTICLES OF THE COARSE
AGGREGATE WHEN ISOLATED SHALL SHOW A COATING OF MORTAR CONTAINING ITS
PROPORTIONATE AMOUNT OF SAND. THE CONSISTENCY OF CONCRETE SHALL BE
GAUGED BY THE ABILITY OF THE EQUIPMENT TO PROPERLY PLACE IT AND NOT BY THE
DIFFICULTY IN MIXING AND TRANSPORTING. THE QUANTITY OF MIXING WATER SHALL
BE DETERMINED BY THE ENGINEER AND SHALL NOT BE VARIED WITHOUT HIS
CONSENT. CONCRETE AS DRY AS IT IS PRACTICAL TO PLACE WITH THE EQUIPMENT
SPECIFIED SHALL BE USED.CONCRETE MAY BE MIXED AT THE SITE OF CONSTRUCTION,
AT A CENTRAL POINT OR BY A COMBINATION OF CENTRAL POINT AND TRUCK MIXING OR
BY A COMBINATION OF CENTRAL POINT MIXING AND TRUCK AGITATING. MIXING AND
DELIVERY OF CONCRETE SHALL BE IN ACCORDANCE WITH THE APPROPRIATE
REQUIREMENTS OF AASHTO M 157 EXCEPT AS MODIFIED IN THE FOLLOWING
PARAGRAPHS OF THIS SECTION, FOR TRUCK MIXING OR A COMBINATION OF CENTRAL
POINT AND TRUCK MIXING OR TRUCK AGITATING. DELIVERY OF CONCRETE SHALL BE
REGULATED SO THAT PLACING IS AT A CONTINUOUS RATE UNLESS DELAYED BY THE
PLACING OPERATIONS. THE INTERVALS BETWEEN DELIVERY OF BATCHES SHALL NOT
BE SO GREAT AS TO ALLOW THE CONCRETE INPLACE TO HARDEN PARTIALLY, AND IN
NO CASE SHALL SUCH AN INTERVAL EXCEED 30 MINUTES.

XIV. -

METAL GUARDRAILS-THIS ITEM SHALL CONSIST OF FURNISHING AND CONSTRUCTING


POSTS AND GUARDRAILS OF THE TYPES CALLED FOR IN THE CONTRACT AND IN
ACCORDANCE WITH THIS
SPECIFICATION, AT THE LOCATIONS, AND IN CONFORMITY
WITH THE LINES AND GRADES SHOWN ON THE PLANS, OR AS REQUIRED BY THE
ENGINEER. PRE-CAST REINFORCED CONCRETE POSTS SHALL BE OF A SECTION AND
LENGTH AS SPECIFIED OR AS SHOWN ON THE PLANS. CONCRETE SHALL CONFORM
WITH THE REQUIREMENTS OF ITEM 405, STRUCTURAL CONCRETE, FOR CLASS
SPECIFIED. REINFORCEMENT SHALL CONFORM WITH THE REQUIREMENTS OF AASHTO
M 31 GRADE 60. ALL BARS SHALL BE OF THE DEFORMED TYPE.RAIL ELEMENTS SHALL
BE ERECTED IN A MANNER RESULTING IN A SMOOTH CONTINUOUS INSTALLATION.
ALL BOLTS, EXCEPT ADJUSTMENT BOLTS, SHALL BE DRAWN TIGHT. BOLTS SHALL BE OF
SUFFICIENT LENGTH TO EXTEND BEYOND THE NUTS AT LEAST 5 MM BUT NOT MORE
THAN 10 MM.

XV. -

REFLECTORIZED THERMOPLASTIC PAVEMENT MARKINGS-THIS STANDARD SPECIFIES


THE REQUIREMENT FOR REFLECTORIZED THERMOPLASTIC PAVEMENT STRIPING
MATERIAL CONFORMING TO AASHTO M 249 THAT IS APPLIED TO THE ROAD SURFACE IN
A MOLTEN STATE BY MECHANICAL MEANS WITH SURFACE APPLICATION OF GLASS
BEADS AT A RATE OF NOT LESS THAN 350 G/L OF GLASS BEADS HAVING A SIZE RANGE
OF DROP-IN TYPE AND WILL PRODUCE AN ADHERENT REFLECTORIZED STRIPE OF
SPECIFIED THICKNESS AND WIDTH CAPABLE OF RESISTING DEFORMATION BY TRAFFIC.
CENTER LINES, LANE LINES AND EDGES LINES SHALL BE APPLIED BY
APPROVED MECHANICAL MEANS AND SHALL BE LAID IN REGULAR ALIGNMENT. OTHER
MARKINGS MAY BE APPLIED BY HAND - SCREED, HAND PROPELLED MACHINE OR BY
SELF-PROPELLED MACHINE APPROVED OR DIRECTED BY THE ENGINEER. AFTER
TRANSFER TO THE LAYING APPARATUS THE MATERIALS SHALL BE MAINTAINED WITHIN
THE TEMPERATURE RANGE SPECIFIED BY THE MANUFACTURER AND STIRRED TO
MAINTAIN THE RIGHT CONSISTENCY FOR LAYING THE CONTRACTOR SHALL PROTECT
PEDESTRIANS, VEHICLES AND OTHER TRAFFIC ADJACENT TO THE WORKING AREA
AGAINST DAMAGE OR DISFIGUREMENT BY CONSTRUCTION EQUIPMENT, TOOLS AND
MATERIALS OR BY SPATTERS, SPLASHES AND SMIRCHES OR PAINT OR OTHER
CONSTRUCTION MATERIALS AND DURING THE COURSE OF THE WORK, PROVIDE AND
MAINTAIN ADEQUATE SIGNS AND SIGNALS FOR THE WARNING AND GUIDANCE OF
TRAFFIC. MARKINGS THAT FAIL TO HAVE A UNIFORM, SATISFACTORY APPEARANCE
EITHER BY DAY OR NIGHT, TO THE ENGINEER AND AT NO COST TO THE GOVERNMENT.

RECOMMENDING APPROVAL:

APPROVED BY:

SET NO.:
DPWH

CONSTRUCTION METHOD
ENGINEER II

ENGINEER II

IZ

OIC-CHIEF, PLANNING AND DESIGN SECTION

CY-2016
OIC-ASST. DISTRICT ENGINEER

DISTRICT ENGINEER

R-IV-B

SHT NO.:

DRAINAGE

14

t+s/4-c
8.0593

8 12mm

@ 200

S/4

S/4

(TYPICAL)

(TYPICAL)

@ 300 3

20mm

s/4+c

200

200

9 12mm

@ 250
8 12mm

6 12mm

12mm @ 200 5

3 s/5

@ 250

1/4(t-2c)

@ 200

h+2t-2c

h+2t-2c

12mm @ 200
t+h/4-c

PAVING NOTCH, PROVIDE WHERE


APPROACH SLAB IS REQUIRED

s/2

150

150

5 20mm

250

h/4

250

t-2C

h/4

100

@ 200 4

16mm

100

4a 20mm

250

250

3 16mm
6 12mm

20mm

20mm

@ 170 6

12mm

S/5

250

@ 250

@ 200 1

20mm
6 12mm

@ 250

16mm

9 12mm

250

2 16mm

@ 200

@ 220 2

@ 300
16mm

@ 300 5

20mm
20mm

@ 300

9 12mm

@ 250

1 20mm

@ 300

@ 200 2

4A

BAR BENDING DIAGRAM-SINGLE BARREL


NOT

@ 300 3

TO

SCALE

@ 300 5
CONSTRUCTION JOINT

70mm WEEP HOLES @ 4550


150 ABOVE NORMAL WATER LEVEL

@ 200 3

16mm

12mm

@ 200

CONSTRUCTION JOINT
h/4

@ 300 7
7 16mm

s+2t-2c

@ 250

20mm
1 16mm

12mm
9 12mm

@300

@ 300 1

@ 220

16mm

@ 300 5

250

250

2 12mm

@300

12mm

@ 200

3 20mm
16mm

@300

4a 20mm

@ 300

h/4

70mm WEEP HOLES @ 4550


150 ABOVE NORMAL WATER LEVEL

250

250

3 20mm

@ 300
t+s/4-c

t-2c

t-2c

3 s/5

4-12mm

6 12mm

@ 200 4

16mm

@ 250

4-12mm

12mm

8 12mm

@ 250 9

12mm

@ 200

6 20mm

6 12mm

@ 170

@ 200

@ 200 5
h+2t-2c

1A

h/4+t-c

2A

SECTION - SINGLE BARREL


SCALE:

1:20

h+2t-2c

h+2t-2c

SECTION - DOUBLE BARREL

M.

SCALE:

1:20

s/4+t-c

s/2+1

M.

NOTE: FOR WALL THICKNESS LESS THAN 240


STAGGER HORIZONTAL REINFORCEMENT
BAR AS SHOWN:

3s+4t-2c

t-2c

4b

3s/5

2s+3t-2c

5
8 12mm

20mm

@ 200
6 20mm

S/4

@ 170

4a

@ 300 8

S/4

(TYPICAL)

(TYPICAL)
20mm

8 12mm

@ 170 6

@ 200
200

9 12mm

@ 250
8 12mm

@ 200

9 12mm

5A

@ 250

BAR BENDING DIAGRAM-DOUBLE & TRIPLE BARREL


NOT

TO

SCALE

PAVING NOTCH, PROVIDE WHERE


APPROACH SLAB IS REQUIRED

150

20mm
3 20mm

h/4

@ 300 5

250

@300

100

5 20mm

20mm

S/5

@300

@ 300 4b

20mm

S/5

(TYPICAL)

@ 300 5

(TYPICAL)

CLEAR

250

12mm

250

9 12mm
9 12mm
20mm

16mm

250

9 12mm

@ 250

16mm

@ 300 7

@ 300 1

7 16mm

7 16mm

@ 300

@ 300

12mm

2 16mm

@ 200 2

12mm

@ 250 9

@ 200
20mm

1 20mm

@ 300 5

20mm
20mm

70mm WEEP HOLES @ 4550


150 ABOVE NORMAL WATER LEVEL

h/4

SPAN HEIGHT

@ 250

4b 20mm

@ 300 5

1250

@ 300

@ 300 3

CONSTRUCTION JOINT

@ 300

20mm

1500

@ 300 5
250

3 20mm

@ 300

1800

4-12mm
12mm

@ 250 9

8 12mm

6 12mm

@ 200
6 20mm

3A

@ 170

8 20mm
9 12mm

@ 200

@ 250

2400

SECTION - TRIPLE BARREL


SCALE:

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
MINDORO OCCIDENTAL DISTRICT ENGINEERING OFFICE
MAMBURAO, OCCIDENTAL MINDORO

@ 200

1:20

PROJECT & LOCATION:


CONSTRUCTION /UPGRADING/REHABILITATION OF DRAINAGE
ALONG NATIONAL ROAD ALONG TAGBAC-LUBANG-LOOC ROAD
(S00004LB)
LOOC, OCCIDENTAL MINDORO

3000

M.

SHEET CONTENTS:

DETAIL OF
REINF. BOX CULVERT

PREPARED BY:

1000
1250
1500
1800
1000
1250
1500
1800
1250
1500
1800
2100
1800
2100
2400
2750
2100
2400
2750
3000

CHECHED BY:

SINGLE BARELL BOX CULVERT


t
180
180
180
180
180
180
180
180
200
200
200
200
220
220
220
220
280
280
280
280

BAR 1
SPACING
12 300
12 300
12 300
12 300
16 240
16 240
16 240
16 240
16 260
16 260
16 260
16 260
16 220
16 220
16 220
16 200
16 260
16 260
16 200
16 200

BAR 2
SPACING
12 300
12 300
12 300
12 300
16 300
16 300
16 280
16 280
16 300
16 300
16 280
16 260
16 280
16 260
16 200
16 180
16 260
16 260
16 240
16 220

BAR 3
SPACING
12 300
12 300
12 300
12 300
16 240
16 240
16 240
16 240
16 260
16 260
16 260
16 260
16 220
16 220
16 220
16 260
16 260
16 260
16 220
16 200

BAR 4
SPACING
12 300
12 300
12 300
12 300
16 240
16 240
16 240
16 240
16 260
16 260
16 260
16 260
16 220
16 220
16 200
16 200
16 260
16 260
16 200
16 200

BAR 5
SPACING
12 300
12 300
12 300
12 300
12 300
12 300
12 300
12 300
12 280
12 280
12 280
12 280
12 240
12 240
12 240
12 240
12 200
12 200
12 200
12 200

SUBMITTED BY:

DOUBLE AND TRIPPLE BARELL BOX CULVERT


BAR 6
SPACING
12 250
12 250
12 250
12 250
12 250
12 250
12 250
12 250
12 250
12 250
12 250
12 250
12 250
12 250
12 250
12 250
12 250
12 250
12 250
12 250

t
180
180
180
180
200
200
200
200
250
250
250
250
300
300
300
300
300
300
300
300

BAR 1
SPACING
12 300
12 300
12 300
12 300
16 300
16 300
16 300
16 300
16 300
16 300
16 300
16 300
16 300
16 300
16 300
20 300
20 300
20 300
20 300
20 300

BAR 2
SPACING
16 300
16 300
16 280
16 260
16 300
16 300
16 280
16 260
16 300
16 280
16 280
16 280
16 280
16 280
16 280
16 280
16 280
16 280
16 200
16 200

RECOMMENDING APPROVAL:

BAR 3
SPACING
12 300
12 300
12 300
12 300
16 300
16 300
16 300
16 300
16 300
16 300
16 300
16 300
16 300
16 300
16 300
16 300
20 300
20 300
20 300
20 300

BAR 4
SPACING
12 300
12 300
12 300
12 300
16 300
16 300
16 300
16 300
16 300
16 300
16 300
16 300
16 300
16 300
16 300
16 300
20 300
20 300
20 300
20 300

BAR 5
SPACING
12 300
12 300
12 300
12 300
16 300
16 300
16 300
16 300
16 300
16 300
16 300
16 300
16 300
16 300
16 300
16 300
20 300
20 300
20 300
20 300

BAR 6
SPACING
20 200
20 200
20 200
20 200
20 200
20 200
20 200
20 200
20 190
20 190
20 190
20 190
20 120
20 120
20 120
20 120
25 170
25 170
25 170
25 170

BAR 7
SPACING
12 300
12 300
12 300
12 300
12 300
12 300
12 300
12 300
12 300
12 300
12 300
12 300
12 300
12 300
12 300
12 300
12 300
12 300
16 300
16 300

APPROVED BY:

BAR 8
SPACING
12 300
12 300
12 300
12 300
12 280
12 280
12 280
12 280
12 220
12 220
12 220
12 220
12 200
12 200
12 200
12 200
12 200
12 200
12 200
12 200

BAR 9
SPACING
12 250
12 250
12 250
12 250
12 250
12 250
12 250
12 250
12 250
12 250
12 250
12 250
12 250
12 250
12 250
12 250
12 250
12 250
12 250
12 250

SET NO.:
DPWH

ENGINEER II

ENGINEER II

IZ

OIC-CHIEF, PLANNING AND DESIGN SECTION

CY-2016
OIC-ASST. DISTRICT ENGINEER

DISTRICT ENGINEER

R-IV-B

SHT NO.:

DRAINAGE

14

S = WIDTH OF CULVERT OPENING


O c = SKEW ANGLE

Wp

t1

t1

W = WIDTH OF ROADWAY FORMATION

300

AS REQUIRED
L

300

Wp = WIDTH OF CARRIAGE WAY


h = SLOPE OF CARRIAGE WAY

oC

oC

450'0"

150

L = TOTAL LENGTH OF BARREL

INLET

OUTLET

oC = 90

t1 = SLOPE OF CARRIAGE WAY

CENTER LINE
OF CULVERT

t2 = SLOPE OF SHOULDER

SLOPE

oC

Z = ( h - b - 150 ) tan

b = t2 X + 0.5 t1 Wp

CL OF ROADWAY

H = HEIGHT OF CULVERT OPENING

oC

50 LEAN CONCRETE

1A

t = THICKNESS OF CULVERT WALL OR SLAB

BOTTOM OUTLINE OF
BASE OF WINGWALL

TYPICAL ROAD CROSS SECTION

PART. PLAN ( oC = 90 )

5A1

= ANGEL OF EMBANKMENT SLOPE

NTS.

oC = 90 - SKEW ANGLE (ANGLE BETWEEN CL ROAD AND CL CULVERT

X = WIDTH OF SHOULDER

NTS.

L1, L2 = LENGTH OF WINGWALL


L

L3, L4 = PARALLEL PROJECTION OF WINGWALL LENGTH

SKEW
ANGLE
o
c

= ANGLE BETWEEN CL CULVART AND CL WINGWALL

W + 2 (Z + 0.300)

L=

30

C = PERPENDICULAR PROJECTIONO OF WING WALL LENGTH FROM FACE OF HEADWALL

1.1547 [W + 2(Z + 0.300)]

(m)

USE SAME SIZE BARS AND


SPACING AS REGULAR DECK

200

TOP STEEL COVERING

OF ROADWAY

ER
LV
CU

IN
RL

TE

N
CE

100

CL

F
EO

oC = 60

C1 = PERPENDICULAR PROJECTION OF WINGWALL END FACE

1.4142 [W+2 (Z + 0.300)]

45

450'0"

100

IRE

QU

AS

RE

150'0"

200

SL

PE

4A

DETAIL

t + 300

30

50

C-418

O
SL
PE

NOTE:

PLACE 10mm EXPANSION


JOINT WHEN H+ t EXCEEDS 2400

WHEN HEIGHT OF FILL ( h ) = 0


THE CONCRETE COVER OVER THE
SLAB SHALL BE INCREASED BY
30 mm. MINIMUM. CONCRETE COVER
SHALL BE 50 CLEAR

H+1

1000

50 LEAN CONCRETE

600

4A1
C1

DETAIL

3A

PART. PLAN ( oC = 60 )

5A2

NTS.

C-418

800

DETAIL

NTS.

300

PART SECTION ALONG CL OF CULVERT

100
600'0"

200

100

NTS.
12mm @ 200 O.C. STIRRUPS

oC = 45

150

2A

EN

R
TE

LI

ER
LV

200

BARREL REINFORCEMENT
t + 300

600

12mm @ 300 E.W.


BOTTOM OF SLAB

AS

EQ

IR

ED

150

USE SAME SIZE BARS AND


SPACING AS REGULAR DECK

50 LEAN CONCRETE

5-12mm CONTINUOUS BARS

1
1

1000

ROUND TO APPROX.150 RADIUS


(FOR INLET PORTION ONLY)

600

12mm
12mm @ 200

3A

4A

DETAIL OF APRON

5A

DETAIL OF BARREL EDGE

RCBC REINFORCEMENT ARRANGEMENTS

NTS.

NTS.

200

NTS.

NOTE : ALL DIMENSIONS ARE ALL IN MILIMETERS UNLESS OTHERWISE NOTED.


t

TYPICAL BOX CULVERT DETAILS

5A3

NTS.

NTS.

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
MINDORO OCCIDENTAL DISTRICT ENGINEERING OFFICE
MAMBURAO, OCCIDENTAL MINDORO

PROJECT & LOCATION:


CONSTRUCTION /UPGRADING/REHABILITATION OF DRAINAGE
ALONG NATIONAL ROAD ALONG TAGBAC-LUBANG-LOOC ROAD
(S00004LB)
LOOC, OCCIDENTAL MINDORO

SHEET CONTENTS:

PART. PLAN ( oC = 45 )

DESIGNED & PREPARED BY:

CHECHED BY:

SUBMITTED BY:

RECOMMENDING APPROVAL:

APPROVED BY:

SET NO.

DPWH

DETAIL OF
REINF. BOX CULVERT
ENGINEER II

ENGINEER II

IZ

OIC-CHIEF, PLANNING AND DESIGN SECTION

CY-2016
OIC-ASST. DISTRICT ENGINEER

DISTRICT ENGINEER

R-IV-B

SHEET NO.

DRAINAGE

14

250
CHAMFER, 19mm.

3A

GENERAL NOTES

BATTER, 12mm IN EVERY 300


WHEN h + l IS 2400 OR MORE
MAKE FACE VERTICAL WHEN
h + l IS LESS THAN 2400

BATTER

SPECIFICATIONS:
a

DESIGN 1977 AASHTO SPECIFICATION FOR HIGHWAYS AND BRIDGES.

CONCRETE:

12mm.

ALL CONCRETE SHALL, HAVE A MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS (fc = 3000 PSI).
ALL EXPOSED CORNERS TO BE CHAMFERED 0.019 m. NO CONSTRUCTION JOINT AREA TO BE
MADE EXCEPT WHERE SHOWN WHEN BOTTOM SLAB IS SUBJECT TO ABRASION, ADD 0.025m.
TO BOTTOM SLABAA TO INCREASE COVERAGE ON STEEL.

TEMP. BARS @ 300 o.c.

0
50
12mm.

,B,or

@ 300 o.c.

STEEL REINFORCEMENT:

12 mm

h+l

ALL REINFORCING STEEL TO BE INTERMEDIATE GRADE (GRADE 40), ASTM A 615 WITH DEFORMATION
CONFIRMING TO ASTM A - 305 - 49 (fy = 40000 PSI).

GENERAL:
IN STATING CULVERT SIZE, GIVE WIDTH BY HEIGHT ( WIDTH FIRST) PLACE 12 mm. EXPANSION JOINTS
WITH PRE-MOULDED FILLER N WALLS AND TOP SLAB OF BOX CULVERT AT 12200mm INTERVALS.
WHEN HEIGHT OF FILL, H=0, THE TOP OF SURFACE OF THE UPPER SLAB SHALL FOLLOW THE CROWN
OF FINISHED ROADWAY. THE BOX CULVERT SHALL BE CONSTRUCTED ON A BLINDING LAYER OF LEAN
CONCRETE 50mm. MINIMUM THICKNESS.

CONSTRUCTION JOINT

LIVE LOAD DISTRIBUTION REINFORCEMENT:


WHEN THERE IS LESS THAN 600 mm. OF FILL ABOVE TOP SLAB OF CULVERT ADDITIONAL
REINFORCEMENT TRANSVERSE TO THE MAIN REINFORCEMENT IS ADDED TO THE BOTTOM OF
THE TOP SLAB IN ACCORDANCE WITH AASHTO 1.3.2.E.

FOR TOP BARS OF FOOTING


USE 12mm. SPACED AS
SHOWN ON PLAN

250

HEIGHT OF FILL:
12 mm

@150

12 mm

@200

12 mm

MAXIMUM HEIGHT OF FILL IS 3000 mm. ABOVE TOP SLAB FOR HEIGHT OF FILL GREATER THAN
3000 mm. SPECIAL DESIGN OF BOX CULVERT SHOULD BE DONE.

@250

L 1 or L 2 (SEE TABLE)
5-12 mm.

1A

BARS

WINGWALL PLAN
NOT

TO

SCALE

1000-1200

SECTION

3A

NOT

12 mm

@ 300 o.c.

h + l
600

1500

1800

1000

2400

12 mm

@ 200

12 mm

@ 250

QTY. PER METER OF


BARREL (SINGLE)
CONC.
REINF.
(cu.m.)
(kg.m.)

1000
1250
1500
1800
1000
1250
1500
1800
1250
1500
1800
2100
1800
2100
2400
2750
2100
2400
2750
3000

1250

@ 150

SCALE

QUANTITIES FOR STANDARD BOX CULVERTS & WINGWALLS


CLEAR
SPAN
HEIGHT
s
h

12 mm

TO

3000

0.94
1.03
1.12
1.23
1.03
1.12
1.21
1.32
1.38
1.48
1.60
1.72
2.04
2.17
2.51
2.46
3.17
3.34
3.53
3.67

98.20
105.40
113.50
122.90
165.90
177.10
189.60
202.50
189.20
199.90
214.80
239.60
272.70
288.50
314.10
356.70
308.70
321.30
374.40
413.50

QTY. PER METER OF


BARREL (DOUBLE)
CONC.
REINF.
(cu.m.)
(kg.)

1.63
1.77
1.90
2.07
2.04
2.19
2.34
2.52
3.11
3.30
3.53
3.75
6.04
5.31
5.58
5.90
6.03
6.30
6.62
6.84

181.30
178.70
201.10
216.20
253.90
256.00
279.60
296.50
312.50
326.10
342.80
357.50
431.80
447.30
461.80
478.60
635.70
652.00
705.60
721.60

QTY. PER METER OF


BARREL (TRIPLE)
CONC.
REINF.
(cu.m.)
(kg.)

2.33
2.51
2.69
2.91
2.92
3.12
3.32
3.56
4.45
4.70
5.00
5.30
7.20
7.56
7.92
8.34
8.64
9.00
9.42
9.72

256.60
270.70
286.30
305.10
354.80
270.20
387.10
407.10
437.00
454.00
475.20
494.40
419.10
637.10
656.40
677.70
899.70
919.00
895.00
1015.40

L 1 or L 2 (SEE TABLE)

QUANTITY PER WINGWALL AND APRON SLAB

M
(meter)
1.37
1.75
2.12
2.57
1.37
1.75
2.12
2.57
1.76
2.15
2.60
3.05
2.63
3.08
3.53
4.06
3.17
3.62
4.15
4.52

h+t
L
(meter) (meter)
1.18
1.28
1.43
1.76
1.68
2.29
1.98
2.93
1.18
1.23
1.43
1.76
1.68
2.29
1.98
2.93
1.45
1.80
1.70
2.33
2.00
2.97
2.30
3.61
2.02
3.01
2.32
3.65
2.62
4.28
2.97
5.03
2.38
3.78
2.68
4.41
3.03
5.15
3.28
5.68

SINGLE BARREL
CONC.
REINF.
(cu.m.)
(kg.)
2.41
130
3.48
190
4.66
260
6.22
350
2.50
140
3.69
210
4.78
270
6.35
350
3.81
210
5.03
280
6.48
360
8.37
460
7.08
390
9.28
510
11.42
630
14.17
780
10.08
560
12.30
680
15.15
840
17.34
960

DOUBLE BARREL
CONC.
REINF.
(cu.m.)
(kg.)
2.94
160
4.08
230
5.36
300
7.01
390
3.26
180
4.42
250
5.73
3.20
7.42
410
4.96
280
6.33
350
8.09
450
10.00
550
9.14
500
11.61
640
13.98
770
17.90
990
12.38
680
14.83
820
17.94
990
20.33
1120

TRIPLE BARREL
CONC. REINF.
(cu.m.)
(kg.)
3.46
1.90
4.72
260
6.00
340
7.80
430
3.82
220
5.16
290
6.56
360
8.37
460
5.90
330
7.36
400
9.26
510
11.31
620
10.71
590
13.37
740
15.92
880
19.15
1050
14.55
800
17.19
940
20.57
1130
23.15
1270

WHERE :
HORIZONTAL skew

LENGTH OF WINGWALLS
a = 0.300 - b
b = 0.25 SIN
= 1.5 (h + t - 0.600) FOR SLOPE 3:2
= 2 (h + t - 0.600) FOR SLOPE 2:1
x = 0.250 - t
SIN
SIN.C

= L 2 = 1.414 c
1 = 1.414 c , L 2 = 1.103 c
1

2A

SECTIONAL ELEVATION
NOT

TO

SCALE

STANDARD RCBC WINGWALL DETAIL


NOT

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
MINDORO OCCIDENTAL DISTRICT ENGINEERING OFFICE
MAMBURAO, OCCIDENTAL MINDORO

PROJECT & LOCATION:


CONSTRUCTION /UPGRADING/REHABILITATION OF DRAINAGE
ALONG NATIONAL ROAD ALONG TAGBAC-LUBANG-LOOC ROAD
(S00004LB)
LOOC, OCCIDENTAL MINDORO

SHEET CONTENTS:

DESIGNED & PREPARED BY:

TO

CHECHED BY:

SCALE

SUBMITTED BY:

RECOMMENDING APPROVAL:

APPROVED BY:

SET NO.:
DPWH

DETAIL OF
REINF. BOX CULVERT
ENGINEER II

ENGINEER II

IZ

OIC-CHIEF, PLANNING AND DESIGN SECTION

CY-2016
OIC-ASST. DISTRICT ENGINEER

DISTRICT ENGINEER

R-IV-B

SHT NO.:

DRAINAGE

14

4000

4000

50

4000

50
50 CLEAR

50 CLEAR

75

300
75

300

13 SPACES@ 300=3900

1110

30 SPACE @ 130=3900

3660

3660

1110

DETAILS OF APPROACH SLAB

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
MINDORO OCCIDENTAL DISTRICT ENGINEERING OFFICE
MAMBURAO, OCCIDENTAL MINDORO

PROJECT & LOCATION:


CONSTRUCTION /UPGRADING/REHABILITATION OF DRAINAGE
ALONG NATIONAL ROAD ALONG TAGBAC-LUBANG-LOOC ROAD
(S00004LB)
LOOC, OCCIDENTAL MINDORO

SHEET CONTENTS:

DESIGNED & PREPARED BY:

CHECHED BY:

SUBMITTED BY:

RECOMMENDING APPROVAL:

APPROVED BY:

SET NO.:
DPWH

DETAIL OF APPROACH SLAB


ENGINEER II

ENGINEER II

IZ

OIC-CHIEF, PLANNING AND DESIGN SECTION

CY-2016
OIC-ASST. DISTRICT ENGINEER

DISTRICT ENGINEER

R-IV-B

SHT NO.:

DRAINAGE

10 14

GABIONS

420.40

452.60

EXISTING BOX CULVERT 3-BARREL X 9.80m, 3.30m Width


REPLACE 3-BARREL X 10.20m, Width 12.0m

P L A N
SCALE:

1:100 MTS.

PROFILE
SCALE:

HOR.1:1000 MTS.

E L E V A T I O N

VER. 1:100 MTS

25.00

INSTALL BOX CULVERT 3-BARREL X 12.00m

20.00

DETOUR ROAD
19.26

19.21

19.46

19.81
19.93

18.23

17.60

18.00

19.50
19.93

0+000
19.95
19.74

38+500

19.95
18.33

+452.60

20.12
20.10
20.08
17.67
20.09
20.08

+443.60

20.12
17.67

+433.40
20.12
20.11

EXISTING GROUND ELEVATION

20.12

18.65

18.70

18.70

FINISHED GRADE ELEVATION

20.12

38+400

STATION

+420.40

INSTALL 3-1.20 M dia. RCPC

WIDENING

SUPERELEVATION

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
MINDORO OCCIDENTAL DISTRICT ENGINEERING OFFICE
MAMBURAO, OCCIDENTAL MINDORO

PROJECT & LOCATION:


CONSTRUCTION /UPGRADING/REHABILITATION OF DRAINAGE
ALONG NATIONAL ROAD ALONG TAGBAC-LUBANG-LOOC ROAD
(S00004LB)
LOOC, OCCIDENTAL MINDORO

SHEET CONTENTS:

DESIGNED & PREPARED BY:

CHECHED BY:

SUBMITTED BY:

RECOMMENDING APPROVAL:

APPROVED BY:

SET NO.:
DPWH

PLAN& PROFILE
(STA. 38+420.40 - STA. 38+452.60)
ENGINEER II

ENGINEER II

IZ

OIC-CHIEF, PLANNING AND DESIGN SECTION

CY-2016
OIC-ASST. DISTRICT ENGINEER

DISTRICT ENGINEER

R-IV-B

SHT NO.:

DRAINAGE

11 14

FG=20.12

18.60

STA.38+443.60

Ac= 1.40
Af= 23.23
Arc= 2.93
A200= 3.02

FG=20.12

FG=20.08

20.08

STA.38+452.60
End of Concrete
18.60

STA.38+433.40

Ac= 4.71
Af= 0.30
Arc= 2.13
A200= 3.02

Ac= 1.40
Af= 23.23
Arc= 2.93
A200= 3.02

FG=20.12

20.11

STA.38+427.40
Ac= 4.35
Af= 1.90
Arc= 2.01
A200= 3.02

FG=20.10

20.09

STA.38+448.60

Ac= 3.35
Af= 2.99
Arc= 2.23
A200= 3.02

FG=20.12

20.12

STA.38+420.40
Beg. of Concrete
Ac= 4.82
Af= 0.77
Arc= 1.98
A200= 3.02

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
MINDORO OCCIDENTAL DISTRICT ENGINEERING OFFICE
MAMBURAO, OCCIDENTAL MINDORO

PROJECT & LOCATION:

SHEET CONTENTS:

DESIGNED & PREPARED BY:

CHECHED BY:

SUBMITTED BY:

RECOMMENDING APPROVAL:

APPROVED BY:

SET NO.:
DPWH

CROSS SECTION
(STA. 38+420.40 - STA. 38+452.60)
ENGINEER II

ENGINEER II

IZ

OIC-CHIEF, PLANNING AND DESIGN SECTION

CY-2016
OIC-ASST. DISTRICT ENGINEER

DISTRICT ENGINEER

R-IV-B

SHT NO.:

DRAINAGE

12 14

19.21

INSTALL 3-1.20 M dia. RCPC

Af= 10.76
A200= 0.78

19.93

17.60

STA.0+040
A200= 0.78

19.93

STA.0+062.70

19.26

Af= 5.43
A200= 0.78

18.23

19.81

STA.0+020

Af= 0.66
A200= 0.78

19.50

STA.0+060
19.74

Af= 7.40
A200= 0.78

18.33

STA.0+005

19.46

Af= 9.20
A200= 0.78

19.95
18.00

STA.0+050

19.95

STA.0+00
DETOUR ROAD

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
MINDORO OCCIDENTAL DISTRICT ENGINEERING OFFICE
MAMBURAO, OCCIDENTAL MINDORO

PROJECT & LOCATION:


CONSTRUCTION /UPGRADING/REHABILITATION OF DRAINAGE
ALONG NATIONAL ROAD ALONG TAGBAC-LUBANG-LOOC ROAD
(S00004LB)
LOOC, OCCIDENTAL MINDORO

SHEET CONTENTS:

Af= 5.04
A200= 0.40

DESIGNED & PREPARED BY:

CHECHED BY:

SUBMITTED BY:

RECOMMENDING APPROVAL:

APPROVED BY:

SET NO.:
DPWH

CROSS SECTION
(DETOUR ROAD)
ENGINEER II

ENGINEER II

IZ

OIC-CHIEF, PLANNING AND DESIGN SECTION

CY-2016
OIC-ASST. DISTRICT ENGINEER

DISTRICT ENGINEER

R-IV-B

SHT NO.:

DRAINAGE

13 14

DFL

NGL

17.72

STA.0+034

Ac= 7.60
Af= 7.12

Ac= 9.91
Af= 4.86

Ac= 13.78
Af= 0.22

Ac= 8.12
Af= 4.47

18.66

STA.0+020

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
MINDORO OCCIDENTAL DISTRICT ENGINEERING OFFICE
MAMBURAO, OCCIDENTAL MINDORO

PROJECT & LOCATION:


CONSTRUCTION /UPGRADING/REHABILITATION OF DRAINAGE
ALONG NATIONAL ROAD ALONG TAGBAC-LUBANG-LOOC ROAD
(S00004LB)
LOOC, OCCIDENTAL MINDORO

SHEET CONTENTS:

DESIGNED & PREPARED BY:

CHECHED BY:

SUBMITTED BY:

RECOMMENDING APPROVAL:

APPROVED BY:

SET NO.:
DPWH

CROSS SECTION
(FOR GABIONS)
ENGINEER II

ENGINEER II

IZ

OIC-CHIEF, PLANNING AND DESIGN SECTION

CY-2016
OIC-ASST. DISTRICT ENGINEER

DISTRICT ENGINEER

R-IV-B

SHT NO.:

DRAINAGE

14 14