Sie sind auf Seite 1von 18

Organic Waste Converter

Proposal for treating 5 Tons/day of Organic Waste


(Continuous OWC + windrow curing system)

Presented to:
Mr. Aashish Beergi
Projects Head
Green Planet Waste Management
Mob.: +91-9910477433

Table of Contents
Our Company Profile
Introduction to Organic Waste Converter

Techno Commercial Proposal for 5 Tons/day Plant


Scope of Work
Terms and Conditions
Clients and Credentials

www.excelind.co.in

Company Profile
Company established in 1941 from a kitchen laboratory
TATA Group was a stakeholder in the company for 33 years
from 1964 to 1997
Core Business activities of Chemical including
intermediaries and Specialty Chemicals
Excels Business of Solid Waste Management

Centralized Municipal Solid Waste Composting


Decentralized Solutions for Waste Management
Soil Management
Bio & Renewable Energy
www.excelind.co.in

Company Profile
Excel Group of Companies
Excel Industries Limited
Excel Crop Care Limited
Transpek Industries Limited

www.excelind.co.in

Commitment to Sustainable Development


Solid & Liquid

Watershed
Development

Waste
Management

Organic
Agriculture,
Certification,
Contract Farming

Wasteland
Development

Integrated
Crop
Management

Soil and
Nutrient
Management
www.excelind.co.in

Project Feasibility
Technical Feasibility
Successfully erected and commissioned 10 Tones per day plant at
AMPC Haridwar & Dehradun, Uttarakhand
Successfully erected and commissioned 5 Tones per day plant at AMPC
Roorkee, Kashipur & Rudrapur, Uttarakhand
Successfully erected, commissioned and operating 2 Tons per day
plant at Aundh vegetable market, Pune
Erected and commissioned 20 Tons per day plants at APMCs in
haldwani in Uttarakhand
Successfully operating multiple plants in various Municipal
Corporations in Goa (2 6 MT /day)

Financial Feasibility Proposal herewith


www.excelind.co.in

Proposal for treating 5 Tons/day


of Organic Waste
Continuous OWC + Windrow Curing
System

www.excelind.co.in

www.excelind.co.in

Project Requirements
5 TPD
Nature of Waste

Organic Waste (Vegetables Waste and Garden Waste)

Quantity of Waste

5 Metric Tons per day

Covered Shed Area Reqd

50 x 20 (1000 sq m)

Total Land Area Reqd

70 x 30 (2100 sq m)

Electrical Requirement

3-Phase with neutral 440 V 50 Hz

Water Requirement

2000 Liters per day (includes water required for


cleaning purpose)

www.excelind.co.in

Project Technical Proposal


Sr. no.
1

Composting Machine (Organic Waste Converter)

Horizontal Belt (Segregation)

Conveyor Belt (In-feed)

Conveyor Belt (Out-feed)

Conveyor Belt reverse forward

Screw conveyor for absorbent

Shredder

Standard reputed make skid steer loader or front end loader for Windrow Turning

Automtic Water sprinkling system

10

Organic manure handling trolley

11

Manure sifting machine

12

Stitching M/c.

13

Control Panels

14

Wiring and distribution

15

Piping & plumbing (As required)

16

Water storage tank

1
www.excelind.co.in

Inputs

Labor required: 6 People / shift @ Rs. 7500/ person/ month


AMC Cost @ 4% of equipment cost i.e. Rs. 2.5 Lac => Rs. 21438/ month
Additives:
Bioculum 5 Kg/ day i.e. Rs 650/ day (Rs 130/Kg)
Sanitreat 5Kg/ day i.e. Rs 650/day (Rs 130/Kg)
Sawdust 1000 Kg/ day i.e. Rs 4000/day (Rs 4/Kg)
Daily electricity consumption ~ Rs. 1300/ day

www.excelind.co.in

Project Commercial Proposal


5 Tons/day

Project Machinery and Equipment Cost


(including commissioning charges)

Rs. 81,00,000/-

Organic Manure (production per day)

30% (of input waste)

Covered Shed Area Required

50 x 20 (1000 sq m)

Total Land Required

70 x 30 (2100 sq m)

* Transportation, Taxes and Duties shall be charged extra as applicable

www.excelind.co.in

Scope
Excel shall
Carry out installation and commissioning of the project
Carry out complete electrification within the plant
Provide specifications to clients civil contractor
Implement internal water distribution system within the plant
Client shall
Provide compostable Organic waste delivered to the plant free of cost
Provide Land and Investment required for the project
Provide an approach road and compound wall to the plant
Provide Electrical supply as per specifications to the Plant Control /Panel room
Provide Water supply to the plant.
Provide manpower to carry out operation at the plant.

www.excelind.co.in

Terms and Conditions


Validity The proposal is valid for acceptance within 45 days.
Payment To be paid in advance.

Timeline Civil Construction Work shall be completed within 3 months of


issuance of work order and provision of required land with boundary
walls. Project to be commissioned within 2 months of completion of civil
work.

www.excelind.co.in

Excels Reputed Clientele

Excels Reputed Clientele

www.excelind.co.in

Thank You
ENVIRON & BIOTECH DIVISION
EXCEL INDUSTRIES LIMITED
184-87, S V ROAD, JOGESHWARI WEST
MUMBAI 400 102 INDIA
TEL: +91 22 6646 4200

Devendra Singh Soun


Sr. Executive
Email: devendra.singh@excelind.com
Mobile: +91 9212 11 3211

Nathuram Mundhe
Chief Manager
Email: nathuram.mundhe@excelind.com
Mobile: +91 91677 83626

www.excelind.co.in

Das könnte Ihnen auch gefallen