Unit No.

# 1
Tutorial Sheet # 1
Question 1. What is a process chart and what are the symbols used in it?
Question 2. Explain and give the procedures for making man machine chart, Left-hand RightHand chart, SIMO chart with an example.
Question 2. What is ergonomics and mention the areas of application of ergonomics? Write the
ergonomics principles in equipment design. What is the effect of noise, light,
heat and humidity on human beings?

Unit No. # 2
Tutorial Sheet # 2
Question 1. Define time study. State its advantages and limitations. What do you understand by
The term Rating in time study? What are the various methods used for rating?
Describe them. Explain the various allowances added to normal time to find
Standerd time.
Question 2. The total observed time for an application i.e. assembling of a switch is 2.00min. If
The rating is 120%, find normal time. If total allowed is 10% for that job, determine
The standard time.
Rest and personal allowances may be taken as 12% of the normal time. Find the
Standard time.
Question 2. Define predetermine motion time system (PMTS).What are the various systems in
Use of Predetermine Motion Time Standards? Explain one most popular amongst
Them. What factors would you consider while selecting particular PMTS for use in
Your company?

Tutorial Sheet # 3
Question 1. What is work sampling and how is it work? What are the advantages and
Disadvantages of work sampling over time study?
Question 2. A work sampling study was conducted for 100 hours in the machine shop in order
To estimate the standard time. The total numbers of observations recorded were
2500. No working activity could be noticed for 400 observations. The ratio
Between manual and machine elements was 2:1. Average rating factor was
Estimated as 1.15 and the total numbers of articles produced during the study
Period were 6000.
Question 3. A work sampling study showed that 20% of a work week of 48 hours was
Consumed by avoidable delays. If each times a work sampling observation was
made the operator was rated and the average of such ratings was 110%. If 100 units
Were produced by the operator in that period, calculate standard time.

Unit No. # 3
Tutorial Sheet # 4
Question1. Explain ABC analysis talking suitable example.
Question2. What is Inventory control? Describe various function of Inventory control.
Question3. Define the term EOQ. Also explain the costs associated with inventory. Derive the
relation for economic order quantity when there is shortage and zero lead time . Also
Find optimum value of maximum inventory. List the assumptions made.

Tutorial Sheet # 5
Question1. The rate of particular raw material from stores is 20 units/year . The cost of placing
and receiving an order is Rs 100 . The of carrying inventory in percent/ year is 0.16
and it depends on the average stock . Determine:
i.
ii.

The economic ordering quality


If the lead time is 3 months, calculate order point.

Question 2. A factory uses two pieces per day of a rod 6mm dia. and150 mm length in one of
their manufacturing processes . The rod costs Rs3 each and the total expenses
Involved in purchasing and receiving them are Rs 50 per order. The annual
Inventory carrying cost per item is Rs 1. The procurement period is 3 days
And minimum stock kept is 8 pieces. Find out:
i.
ii.
iii.

Standard ordering quality


Reorder point and
Maximum stock

Tutorial Sheet # 6

Question 1. Explain the meaning , objectives and importance of material management and
Different functions of material management department.
Question 2. What is the concept of productivity? Enlist the tools of productivity. Discuss how it
can be improved. Explain the importance of productivity.
Question 3. Describe the objectives and & function of production planning & control.
Question 4. Explain the methodology of value engineering.

Unit No. # 4
Tutorial Sheet # 7
Question 1. What do you understand by unbounded solution in linear programming problem?
Impose the condition for minimization and maximization case with suitable
Example.
Question 2. A firm uses lathes , milling machines and grinding machines to produce two
machine part.Following table represents the machining times required for each
part, the machining times available on different machines and the profit on each
machine part.
Type of machine

Machining time required


For the machine part (minutes)
I
II

Maximum time
available per
Week (minutes)

Lathes
12
6
3000
Milling machines
4
10
2000
Grinding machines
2
3
900
Profit per unit
Rs. 40
Rs. 100
Find the number of parts I and II to be manufactured per week to maximize the profit by
Graphically.
Question 3. A firm manufactures two products A & B on which the profits earned per unit are
Rs. 3 & Rs. 4, respectively. Each product is processed on two machines M1 and M2.
Product A requires one minute of processing time on M1 and two minute on M2,
While B requires one minute on M1 and one minute on M2. Machine M1 is available
for not more than 7 hours 30 minutes while machine M2 is available for 10 hours
During any working day. Find the number of units of products A and B need to be
Manufactured to get maximum profit. Formulate the above as a LPP and solve by
graphical method.
Question 4. A factory has two bottling plants located at A and B respectively. Each plant

produces three drinks- whisky, beer and fruit juices named P, Q, R respectively.
The numbers of bottles produced per day are as follows:

Plant at

Whisky
Beer
Fruit juices

P
Q
R

A
1500
3000
2000

B
1500
1000
5000

In a particular month ,there will be demand of 20000 bottles of whisky, 40000


bottles of beer and 44000 bottles of fruit juices. The operating cost per day at A and
B are 600 and 400 monetary units. For minimizing the production cost , for how
many days each plant be run still meeting the market demand by the graphical
methods.

Das könnte Ihnen auch gefallen