Summary Of Bill Of Quantities For SEPTIC TANKS

Project : Tana belese housing development project


Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works Enterprise
Contractor : Kest Construction
Location:Fendika

Item
No.

Description

Sub total (birr )


Contract
Executed

SEPTIC TANK

3.0
3.1

Excavation & earth work.

236,484.96

257,966.48

3.2

Concrete Work

656,466.20

392,731.98

3.3

Masonry work

846,014.62

676,284.65

3.4

Block work

160,559.23

0.00

3.5

Plastering work

135,841.66

50,966.37

3.6

Pipe Installation work

38,781.60

0.00

pLL U` /Grand Total /

Prepared by:Contractor :-..

Checked by:Implementing Agent.

Consulta

PTIC TANKS
:. -04/475

Contract No.
05

Statement No.
Site Name: Main Town 01
Page no. __

Total / Birr/
Contract

Executed

2,074,148.28

1,377,949.48

Approved by:Consultant

BILL O

Project : Tana belese housing development project


Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works Enterpr

Item No.
3
3.1
3.01
3.02
3.03
3.04

3.05

3.06

3.2.01

3.2.02

3.2.03

3.04

3.2.05

3.2.06

3.3.01

3.4.01

3.5.01

3.6.01
3.6.02

Prepared by:Contractor :-..

BILL OF QUANT

ect : Tana belese housing development project


nt: FDRE Sugare Coorporation
l. Agency:ANRS Construction & Housing Dev. Aegency
sultant:Road And Building Design & Construction Supervision Works Enterprise

Description
Septick Tank
Excavation & Earth Work
Clear and remove top soil to an avarage depth of 200mm.
Pit excavation in ordinary soil to for septic tank to adepth not exceeding 1500mm.
Ditto as item 3.02 but to a depth exceeding 1500mm but not exceeding 3000mm.
Ditto as item 3.02 but to a depth exceeding 3000mm but not exceeding 4500mm.
Pit excavation in weatherd soil for septic tank to a depth not exceeding 1500mm.
Pit excavation in weatherd soil for septic tank to a depth exceeding 1500mm but not
exceeding 3000mm.
Pit excavation in weatherd soil for septic tank to a depth exceeding 3000mm but not
exceeding 4500mm.
Fill around stone masonry retaining wall in non expansive excavated material from the
site well rolled and compacted in layers not exceeding 200mm thick.
Fill around stone masonry retaining wall with imported selected material well rolled and
compacted in layers not exceeding 200 mm thick.

Load and cart away surplus excavated material to an appropriate tip.


Hard core under bottom slab
TOTAL CARRIED TO SUMMARY----------3.2.0 CONCRETE WORK
50mm lean concrete qulity C-5, with minimum cement content of 150kg/m3,of
concrete:
a) Under bottom slab
Reinforced concrete quality C-25,360 kg of cement/m3 filled in to form work and
vibrated around rod reinforcement (Formwork and reinforcement measured
separately)

a) In RC bottom slab
c) Top slab
b) In RC man hole cover
Size : 700 x 700x 80mm
Ribbed slab for suspended top slab made of 60 mm thick RC concrete slab in C-25,
80x120 mm one way concrete girder with c/c spacing of 600mm ,including 220x520
mm hollow concrete ribbed block all according to structural detail drawing.
Pre-cast elements (PB1) to the size of 4200x120x80mm.made of
0.0403m3/beam.Price includes mould,reinforcement bar placed in position and
welded.
(a) Dia 6mm plain bar (2.16pcs )
(b) Dia 10 mm deformed bar ( 0.37pc )
(c) Dia 12 mm deformed bar ( 0.73pc )
to be placed in position.
Provide, cut and fix in position sawn structural wood or steel formwork which ever is
appropriate.
a) In RC bottom slab
b) Top slab
f) In RC man hole cover
Size : 700 x 700x 80mm
Mild steel reinforcement according to structural drawings. Price includes cutting,
bending, placing in position, tying wire and concrete spacers.
a) Dia 6mm diformed bar
b) Dia 8mm diformed bar
c) Dia 10 mm deformed bar
d) Dia 12 mm deformed bar
TOTAL CARRIED TO SUMMARY----------3.3.0 MASONRY WORKS
600mm thick Trychatic or equivalent stone masonry retaining wall below ground level
bedded in cement mortar mix (1:3) and one side left for plastering.
a) For retaining wall
TOTAL CARRIED TO SUMMARY----------3.4.0 BLOCK WORK
250mm thick brick partition wall,bedded in cement mortar (1:3).Price shall inclde
mortar bed.
TOTAL CARRIED TO SUMMARY----------3.5.0 PLASTERING
Apply two coats of plastering in cement mortar (1:3). Price shall include pre-cleaning
and preparation of the surface.

a) To internal Brick wall surfaces.


b) To Internal stone masonry wall surfaces.
TOTAL CARRIED TO SUMMARY----------3.6.0 PIPE WORK
Supply and install
Dia.200mm uPVC elbow
Dia.200mm uPVC Tee
Dia.110mm uPVC vent pipe with vent cap

pared by:tractor :-..

TOTAL CARRIED TO SUMMARY-----------

Checke

OF QUANTITY
Contractor:
Site Name:
Work Type:

Unite

(Amount)

Unit
Rate

Kest Construction
Main Town 01
SEPTIC TANK

(Contract
birr)

Contract

Executed

m2

700.00

411.48

10.47

7329.00

m3

618.00

422.15

58.02

35856.36

m3

618.00

368.95

71.21

44007.78

m3

295.71

97.91

0.00

m3

21.49

100.53

0.00

m3

74.69

143.61

0.00

m3

129.96

287.22

0.00

390.44

16.85

1071.66
0.00
148220.16
0.00
236,484.96

68523.00

m3

63.60

m3
m2

1936.00

1349.85
60.77

217.11
76.56
227.11

m2

700.00

243.08

97.89

m3
m3

82.40

36.46
24.41

2851.77
2851.77

234985.85
0.00

No

30.00

10.00

109.79

3293.80

M2

499.08

0.00

Pcs

978.50

M2

412.00

29.68

135.94

56007.28

408.00

116.23

135.94

55463.52

M2

4.00

2.24

135.94

543.76

kg
kg
Kg
Kg

750.00
5500.00
1200.00

1819.90
1488.52
1599.93

35.47
35.47
35.47
35.47

M3

536.40

428.79

1577.21

846014.62
846,014.62

m2

187.44

856.59

160559.23
160,559.23

0.00
195085.00
42564.00
656,466.20

M2

374.88

786.00

80.00

pcs
pcs
Ml

117.02

43867.00

435.55

117.02

91974.66
135,841.66

0.00
0.00
0.00

484.77
484.77

38781.60
0.00
0.00
38,781.60

Checked by:Implementing Agent.

Approved by:Consultant

struction

Page no. __

(Executed birr)

4308.20
24492.85
26272.57
28953.11
2160.33
10726.14
37328.51
6578.89
0.00
103344.40
13801.47
257,966.48

23795.10

103981.24
69618.84
1097.93

4034.70
15800.31
304.51

0.00
64551.97
52797.98
56749.42
392,731.98

676284.65
676,284.65

0.00
0.00

0.00
50966.37
50,966.37

0.00
0.00
0.00
0.00

onsultant

Project : Tana belese housing development project


Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works Ent

No

Size
(L/W/D)

Quantity

Description

3 SEPTIC TANK
3.1 Excavation & Earth Work
12.60
6.70

3.01. Clear and remove top soil to an avarage depth


84.42 m2 Net total

11.10
5.20

3.02. Pit excavation in ordinary soil to for septic tank


not exceeding 1500mm.

1.50
86.58 m3 Net total

11.10
5.20

3.03. Ditto as item 3.02, but to a depth exceeding 15


not exceeding 3000mm.

1.50
86.58 m3 Net total

11.10
5.20

3.04. Ditto as item 3.02 but to a depth exceeding 30


not exceeding 4500mm.

1.80
103.90 m3 Net total

3.05.Fill around stone masonary retaining wall in non


excavated material from the site well rolled and copa
layers not exceeding 200mm thick

3.05.Fill around stone masonary retaining wall in non


excavated material from the site well rolled and copa
layers not exceeding 200mm thick

Total fill Volume around Retaining masonary wall is the Pit


Minus the Sum Volume of Masonary Wall,Bottom Slab & H
Septic Tank Volume;Vf=Vp-(Vm +Vs h+Vst)
Pit Volume:Vp=L*W*H
11.10

Length L=

5.20

Width W=

4.80

Height H=
277.06 m3

a-Masonary wall Volume:Vm=see result on the ne


83.88
83.88 m3
b-Slab & Hard core Volume:Vsh=L*W*H
10.60

Length L=

4.70

Width W=

0.45

Height H=
22.42 m3
c-Septic tank Volume:Vst=L*W*H

8.60

Length L=

2.70

Width W=

4.35

Height H=
101.01 m3

69.75 m3 Net total

3.07 Load and cart away surplus excavated mate


appropriate tip.
84.42
0.20

From site clearing

16.88 m3
From pit excavation(Pit Volume)
277.06
277.06 m3

293.94 m3 Net total

3.08 250mm thick basaltic stone hardcore well rolled


consolidated and blinded with crushed stone.
10.60

Length L=

4.70

Width W=
49.82 m2

Prepared by:Contractor :-

Project : Tana belese housing development project


Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works Ent
Size
(L/W/D)

No

Quantity

Description
c) In RC grade beam

26.60

Total Length L=

0.20

Width W=
5.32 m2
d) In RC scum board

2.70

Length L=

0.30

Width W=
1.62 m2

2.70

Length L=

0.20

Width W=
0.54 m2

2.16 m2 Net total


e) In RC cross beam

2.70

Length L=

0.05

Width W=
0.27 m2

2.70

Length L=

0.20

Width W=

0.54 m2

0.81 m2 Net total

29.99 m2 Net total to BOQ for top slab

f) In RC manhole cover
0.70
4

0.08

L=0.70m, H=0.08m
2
0.45 m2

3.2.06 Mild steel reinforcement according to structur


a) Dia 8mm deformed bar
382.17 kg
b) Dia 10mm deformed bar
487.63 kg
c) Dia 12mm deformed bar
287.71 kg

3.3.0 MASONRY WORKS


3.3.1 Trychatic or equivalent stone masonry retaining
ground level bedded in cement mortar mix (1:3) an
left for plastering.

Volume of masonary work( V)

V=Volume of Trapezoidal section part + Volume of Quarter Pyrami


corners of the septic tank

Prepared by:
Contractor :-

Takeoff Sheet

g Dev. Aegency
nstruction Supervision Works Enterprise

Description

Size
(L/W/D)

No

3 SEPTIC TANK

on & Earth Work

nd remove top soil to an avarage depth of 200mm.

10.60
1

4.70

vation in ordinary soil to for septic tank to adepth


g 1500mm.

10.60
4.70
0.15

item 3.02, but to a depth exceeding 1500mm but


g 3000mm.

8.40
2.70
0.15

item 3.02 but to a depth exceeding 3000mm but


g 4500mm.

nd stone masonary retaining wall in non expansive


aterial from the site well rolled and copacted in
eeding 200mm thick

0.70
0.70
2

0.15

nd stone masonary retaining wall in non expansive


aterial from the site well rolled and copacted in
eeding 200mm thick

me around Retaining masonary wall is the Pit Volume


Volume of Masonary Wall,Bottom Slab & Hard core and
olume;Vf=Vp-(Vm +Vs h+Vst)

24.20
0.50

Vp=L*W*H

0.20

11.1m =0.25+L+0.25
5.2m =0.25+W+0.25
4.8m =Hm+0.45

3.70
Deduction Volume

wall Volume:Vm=see result on the next page

0.30
1

0.20

rd core Volume:Vsh=L*W*H
10.6m =L

4.70

4.7m =W

0.20

0.45m

0.20

k Volume:Vst=L*W*H
8.6m =A-(0.5+0.5)
2.7m =B-(0.5+0.5)

1.00

4.35m =Hm

and cart away surplus excavated material to an


appropriate tip.

1.00

30.60
1

0.20

cavation(Pit Volume)

8.40
1

2.70

0.70

thick basaltic stone hardcore well rolled,


and blinded with crushed stone.
10.6m =L
4.7m =W

Checked by:Consultant

0.70

Takeoff Sheet

g Dev. Aegency
nstruction Supervision Works Enterprise

Description

Size
(L/W/D)

No

26.6m=2*(A+B))

26.60

0.2m

0.75
4.35
For scum board sides
2.7m =B-(0.5+0.5)

0.50

0.3m

0.50
For scum board bottom

4.35

2.7m =B-(0.5+0.5)
0.2m

1.00
1.00
1/3

4.35

For cross beam sides


2.7m =B-(0.5+0.5)
0.05m

For cross beam bottom

2.70

2.7m =B-(0.5+0.5)

0.50

0.2m

2.50

o BOQ for top slab

2.70
2

2.50

22.60

eel reinforcement according to structural drawing

4.35

eformed bar

deformed bar

0.50
2

2.50

deformed bar

NRY WORKS
c or equivalent stone masonry retaining wall below
bedded in cement mortar mix (1:3) and one side
ring.

W id th :W

1.00
0

1.00

1.00
0

1.00

n part + Volume of Quarter Pyramid at four


s of the septic tank

Checked by:
Consultant

2.00
0

1.00

Contractor: Kest Construction


Site Name: Main Town 01
Work Type: Septic Tank-01
Page no. __

Quantity

Description
3.2 Concrete Work
3.2.1 5cm thick lean concrete,C-5
a) Under bottom slab
Length L= 10.6m =L
Width W= 4.7m =W

49.82 m2
3.2.2 Reinforced concrete quality C-25
a) In RC bottom slab
Length L= 10.6m =L
Width W= 4.7m =W
Thickness t= 0.15m
7.47 m3
b) In RC top slab
Length L= 8.4m =A-(0.5+0.2+0.5)
Width W= 2.7m =B-(0.5+0.5)
Thickness t= 0.15m
3.40 m3
Deduct for manhole
L=0.70m , W=0.70m ,H=0.15m

0.15 m3

3.26 m3 Net total

c) In RC grade beam
Total Length L= 24.2m =2*((A-0.2)+(B-0.5-0.5))
Width W= 0.5m
Thickness t= 0.2m
2.42 m3

d) In RC scum board
Length L= 3.7m=B
Width W= 0.3m
Thickness t= 0.2m
0.22 m3

e) In RC cross beam
Length L= 4.7m=B+0.5+0.5
Width W= 0.2m
Thickness t= 0.2m
0.19 m3

6.09 m3 Net total to BOQ for top slab

f) In RC manhole cover

2.00 pcs
3.25 Provide, cut & fix in position formwork
a)To RC bottom slab
Total Length L= 30.6m =2*(L+W)
Width W= 0.2m
6.12 m2

b) In RC top slab
Length L= 8.4m =A-(0.5+0.2+0.5)
Width W= 2.7m =B-(0.5+0.5)
22.68 m2

Deduct for manhole


L=0.70m , W=0.70m

0.98 m2

21.70 m2 Net total

Approved by:Implementing Agent...

Contractor: Kest Construction


Site Name: Main Town 01
Work Type: Septic Tank-01
Page no. __

Quantity

Description
a) Retaing wall
For trapezoidal section: V=L*Wavg*H
Total Length L= 26.6m=2*(A+B))
Width average Wavg= 0.75m=1/2(0.5+Wm)
Height H= 4.35m

86.78 m3
Deduct for prism: V=L*W*H
Width W=Length L=0.5m
Height H= 4.35m

4.35 m3
For pyramid:V=1/3*L*W*H
Width W=Length L=

1m=2*C

Height H= 4.35m

1.45 m3

83.88 m3 Net total

b) Partition wall:V=L*W*H
Length L= 2.7m =B-(0.5+0.5)
Width W= 0.5m
Height H= 2.5m

3.38 m3

87.26 m3 Net total to BOQ for masonary work

3.5.0 PLASTERING
a) Partition wall surfaces.
Length L= 2.7m =B-(0.5+0.5)
Height H= 2.5m
13.50 m2

b) Internal masonary surface


Total Length L= 22.6m=2*(A-1+B-1)
Height H= 4.35m
98.31 m

Deduct for partition wall


Width W= 0.5m
Height H= 2.5m
2.50

95.81 m2 Net total

109.31 m3 Net total to BOQ for masonary wall plastering

3.6.0 PIPE WORK


Supply and Install

3.6.01 Dia. 200mm uPVC elbow

0.00 pcs

3.6.02 Dia. 200mm uPVC Tee

0.00 pcs

3.6.03 Dia 110mm uPVC Vent Pipe with vent cup

0.00 m

Approved by:
Implementing Agent...

2)+(B-0.5-0.5))

all plastering

Takeoff Sheet

Project : Tana belese housing development project


Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works E
Bar Schedule
Location

Bottom Slab

Top Slab

Grade Beam

Cross Beam

Scum Board Beam

Ref. No.

Dimensions L
&W(m)

Main
Reinforcment: L=

10.55

Main
Reinforcment: W=

4.65

Main
Reinforcment: L=

9.35

Main
Reinforcment: W=

3.65

Deduction for
manhole

0.70

Main
Reinforcment: L=

9.35

Main
Reinforcment: W=

3.65

Stirrup

0.45

Main
Reinforcment: W=

3.65

Stirrup

0.15

Main
Reinforcment: W=

3.65

Stirrup

0.25

Shape

Man hole cover

Main
Reinforcment: L=

0.65

Main
Reinforcment: W=

0.65

Total Length

Weight per m

Total weight, k

Prepared by:Contractor :-.

Checked by:Consultant.

Takeoff Sheet
Contractor:
Site Name:
Work Type:

Supervision Works Enterprise

Dia.
(mm)

Length
(m)

Kest Construction
Main Town 01
Bar Schedule of ST-1

Page no. __

No. of No. of
Bars Mem.

Length for Diameter


8
10
12

10.55

32

337.60

4.65

72

334.80

10

19.04

20

380.80

10

7.64

58

443.12

10

1.40

-4

-33.60

12

18.90

189.00

12

7.50

75.00

1.34

88

12

7.50

0.74

26

12

7.50

0.94

26

235.84

30.00

19.24

30.00

24.44

14

0.65

7.80

0.65

7.80

Total Length

0.00

967.52

790.32

324.00

0.00

Weight per m.

0.222

0.395

0.617

0.888

1.208

Total weight, kg.

0.00

382.17 487.63

287.71

0.00

Approved by:Implementing Agent...

Bar Schedule of ST-1

Remark

Project : Tana belese housing development project


Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works Ent

No

Size
(L/W/D)

Quantity

Description

3 SEPTIC TANK
3.1 Excavation & Earth Work
11.50
6.30

3.01. Clear and remove top soil to an avarage depth


72.45 m2 Net total

10.00
4.80

3.02. Pit excavation in ordinary soil to for septic tank


not exceeding 1500mm.

1.50
72.00 m3 Net total

10.00
4.80

3.03. Ditto as item 3.02, but to a depth exceeding 15


not exceeding 3000mm.

1.50
72.00 m3 Net total

10.00
4.80

3.04. Ditto as item 3.02 but to a depth exceeding 30


not exceeding 4500mm.

1.75
84.00 m3 Net total

3.05.Fill around stone masonary retaining wall in non


excavated material from the site well rolled and copa
layers not exceeding 200mm thick

3.05.Fill around stone masonary retaining wall in non


excavated material from the site well rolled and copa
layers not exceeding 200mm thick

Total fill Volume around Retaining masonary wall is the Pit


Minus the Sum Volume of Masonary Wall,Bottom Slab & H
Septic Tank Volume;Vf=Vp-(Vm +Vs h+Vst)
Pit Volume:Vp=L*W*H
10.00

Length L=

4.80

Width W=

4.75

Height H=
228.00 m3

a-Masonary wall Volume:Vm=see result on the ne


73.24
73.24 m3
b-Slab & Hard core Volume:Vsh=L*W*H
9.50

Length L=

4.30

Width W=

0.45

Height H=
18.38 m3
c-Septic tank Volume:Vst=L*W*H

7.50

Length L=

2.30

Width W=

4.30

Height H=
74.18 m3

62.20 m3 Net total

3.07 Load and cart away surplus excavated mate


appropriate tip.
72.45
0.20

From site clearing

14.49 m3
From pit excavation(Pit Volume)
228.00
228.00 m3

242.49 m3 Net total

3.08 250mm thick basaltic stone hardcore well rolled


consolidated and blinded with crushed stone.
9.50

Length L=

4.30

Width W=
40.85 m2

Prepared by:Contractor :-

Project : Tana belese housing development project


Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works Ent
Size
(L/W/D)

No

Quantity

Description
c) In RC grade beam

23.60

Total Length L=

0.20

Width W=
4.72 m2
d) In RC scum board

2.30

Length L=

0.30

Width W=
1.38 m2

2.30

Length L=

0.20

Width W=
0.46 m2

1.84 m2 Net total


e) In RC cross beam

2.30

Length L=

0.05

Width W=
0.23 m2

2.30

Length L=

0.20

Width W=

0.46 m2

0.69 m2 Net total

23.06 m2 Net total to BOQ for top slab

f) In RC manhole cover
0.70
4

0.08

L=0.70m, H=0.08m
2
0.45 m2

3.2.06 Mild steel reinforcement according to structur


a) Dia 8mm deformed bar
323.42 kg
b) Dia 10mm deformed bar
366.92 kg
c) Dia 12mm deformed bar
255.39 kg

3.3.0 MASONRY WORKS


3.3.1 Trychatic or equivalent stone masonry retaining
ground level bedded in cement mortar mix (1:3) an
left for plastering.

Volume of masonary work( V)

V=Volume of Trapezoidal section part + Volume of Quarter Pyrami


corners of the septic tank

Prepared by:
Contractor :-

Takeoff Sheet

g Dev. Aegency
nstruction Supervision Works Enterprise

Description

Size
(L/W/D)

No

3 SEPTIC TANK

on & Earth Work

nd remove top soil to an avarage depth of 200mm.

9.50
1

4.30

vation in ordinary soil to for septic tank to adepth


g 1500mm.

9.50
4.30
0.15

item 3.02, but to a depth exceeding 1500mm but


g 3000mm.

7.30
2.30
0.15

item 3.02 but to a depth exceeding 3000mm but


g 4500mm.

nd stone masonary retaining wall in non expansive


aterial from the site well rolled and copacted in
eeding 200mm thick

0.70
0.70
2

0.15

nd stone masonary retaining wall in non expansive


aterial from the site well rolled and copacted in
eeding 200mm thick

me around Retaining masonary wall is the Pit Volume


Volume of Masonary Wall,Bottom Slab & Hard core and
olume;Vf=Vp-(Vm +Vs h+Vst)

21.20
0.50

Vp=L*W*H

0.20

10m =0.25+L+0.25
4.8m =0.25+W+0.25
4.75m =Hm+0.45

3.30
Deduction Volume

wall Volume:Vm=see result on the next page

0.30
1

0.20

rd core Volume:Vsh=L*W*H
9.5m =L

4.30

4.3m =W

0.20

0.45m

0.20

k Volume:Vst=L*W*H
7.5m =A-(0.5+0.5)
2.3m =B-(0.5+0.5)

1.00

4.3m =Hm

and cart away surplus excavated material to an


appropriate tip.

1.00

27.60
1

0.20

cavation(Pit Volume)

7.30
1

2.30

0.70

thick basaltic stone hardcore well rolled,


and blinded with crushed stone.
9.5m =L
4.3m =W

Checked by:Consultant

0.70

Takeoff Sheet

g Dev. Aegency
nstruction Supervision Works Enterprise

Description

Size
(L/W/D)

No

23.6m=2*(A+B))

23.60

0.2m

0.75
4.30
For scum board sides
2.3m =B-(0.5+0.5)

0.50

0.3m

0.50
For scum board bottom

4.30

2.3m =B-(0.5+0.5)
0.2m

1.00
1.00
1/3

4.30

For cross beam sides


2.3m =B-(0.5+0.5)
0.05m

For cross beam bottom

2.30

2.3m =B-(0.5+0.5)

0.50

0.2m

2.30

o BOQ for top slab

2.30
2

2.30

19.60

eel reinforcement according to structural drawing

4.30

eformed bar

deformed bar

0.50
2

2.30

deformed bar

NRY WORKS
c or equivalent stone masonry retaining wall below
bedded in cement mortar mix (1:3) and one side
ring.

W id th :W

1.00
0

1.00

1.00
0

1.00

n part + Volume of Quarter Pyramid at four


s of the septic tank

Checked by:
Consultant

2.00
0

1.00

Contractor: Kest Construction


Site Name: Main Town 01
Work Type: Septic Tank-01
Page no. __

Quantity

Description
3.2 Concrete Work
3.2.1 5cm thick lean concrete,C-5
a) Under bottom slab
Length L= 9.5m =L
Width W= 4.3m =W

40.85 m2
3.2.2 Reinforced concrete quality C-25
a) In RC bottom slab
Length L= 9.5m =L
Width W= 4.3m =W
Thickness t= 0.15m
6.13 m3
b) In RC top slab
Length L= 7.3m =A-(0.5+0.2+0.5)
Width W= 2.3m =B-(0.5+0.5)
Thickness t= 0.15m
2.52 m3
Deduct for manhole
L=0.70m , W=0.70m ,H=0.15m

0.15 m3

2.37 m3 Net total

c) In RC grade beam
Total Length L= 21.2m =2*((A-0.2)+(B-0.5-0.5))
Width W= 0.5m
Thickness t= 0.2m
2.12 m3

d) In RC scum board
Length L= 3.3m=B
Width W= 0.3m
Thickness t= 0.2m
0.20 m3

e) In RC cross beam
Length L= 4.3m=B+0.5+0.5
Width W= 0.2m
Thickness t= 0.2m
0.17 m3

4.86 m3 Net total to BOQ for top slab

f) In RC manhole cover

2.00 pcs
3.25 Provide, cut & fix in position formwork
a)To RC bottom slab
Total Length L= 27.6m =2*(L+W)
Width W= 0.2m
5.52 m2

b) In RC top slab
Length L= 7.3m =A-(0.5+0.2+0.5)
Width W= 2.3m =B-(0.5+0.5)
16.79 m2

Deduct for manhole


L=0.70m , W=0.70m

0.98 m2

15.81 m2 Net total

Approved by:Implementing Agent...

Contractor: Kest Construction


Site Name: Main Town 01
Work Type: Septic Tank-01
Page no. __

Quantity

Description
a) Retaing wall
For trapezoidal section: V=L*Wavg*H
Total Length L= 23.6m=2*(A+B))
Width average Wavg= 0.75m=1/2(0.5+Wm)
Height H= 4.3m

76.11 m3
Deduct for prism: V=L*W*H
Width W=Length L=0.5m
Height H= 4.3m

4.30 m3
For pyramid:V=1/3*L*W*H
Width W=Length L=

1m=2*C

Height H= 4.3m

1.43 m3

73.24 m3 Net total

b) Partition wall:V=L*W*H
Length L= 2.3m =B-(0.5+0.5)
Width W= 0.5m
Height H= 2.3m

2.65 m3

75.89 m3 Net total to BOQ for masonary work

3.5.0 PLASTERING
a) Partition wall surfaces.
Length L= 2.3m =B-(0.5+0.5)
Height H= 2.3m
10.58 m2

b) Internal masonary surface


Total Length L= 19.6m=2*(A-1+B-1)
Height H= 4.3m
84.28 m

Deduct for partition wall


Width W= 0.5m
Height H= 2.3m
2.30

81.98 m2 Net total

92.56 m3 Net total to BOQ for masonary wall plastering

3.6.0 PIPE WORK


Supply and Install

3.6.01 Dia. 200mm uPVC elbow

0.00 pcs

3.6.02 Dia. 200mm uPVC Tee

0.00 pcs

3.6.03 Dia 110mm uPVC Vent Pipe with vent cup

0.00 m

Approved by:
Implementing Agent...

2)+(B-0.5-0.5))

all plastering

Takeoff Sheet

Project : Tana belese housing development project


Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works E
Bar Schedule
Location

Bottom Slab

Top Slab

Grade Beam

Cross Beam

Scum Board Beam

Ref. No.

Dimensions L
&W(m)

Main
Reinforcment: L=

9.45

Main
Reinforcment: W=

4.25

Main
Reinforcment: L=

8.25

Main
Reinforcment: W=

3.25

Deduction for
manhole

0.70

Main
Reinforcment: L=

8.25

Main
Reinforcment: W=

3.25

Stirrup

0.45

Main
Reinforcment: W=

3.25

Stirrup

0.15

Main
Reinforcment: W=

3.25

Stirrup

0.25

Shape

Man hole cover

Main
Reinforcment: L=

0.65

Main
Reinforcment: W=

0.65

Total Length

Weight per m

Total weight, k

Prepared by:Contractor :-.

Checked by:Consultant.

Takeoff Sheet
Contractor:
Site Name:
Work Type:

Supervision Works Enterprise

Dia.
(mm)

Length
(m)

Kest Construction
Main Town 01
Bar Schedule of ST-2

Page no. __

No. of No. of
Bars Mem.

Length for Diameter


8
10
12

9.45

30

283.50

4.25

64

272.00

10

16.84

17

286.28

10

6.84

50

342.00

10

1.40

-4

-33.60

12

16.70

167.00

12

6.70

67.00

1.34

78

12

6.70

0.74

23

12

6.70

0.94

23

209.04

26.80

17.02

26.80

21.62

14

0.65

7.80

0.65

7.80

Total Length

0.00

818.78

594.68

287.60

0.00

Weight per m.

0.222

0.395

0.617

0.888

1.208

Total weight, kg.

0.00

323.42 366.92

255.39

0.00

Approved by:Implementing Agent...

Bar Schedule of ST-2

Remark

Project : Tana belese housing development project


Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works Ent

No

Size
(L/W/D)

Quantity

Description

3 SEPTIC TANK
3.1 Excavation & Earth Work
11.50
6.30

3.01. Clear and remove top soil to an avarage depth


72.45 m2 Net total

10.00
4.80

3.02. Pit excavation in ordinary soil to for septic tank


not exceeding 1500mm.

1.50
72.00 m3 Net total

10.00
4.80

3.03. Ditto as item 3.02, but to a depth exceeding 15


not exceeding 3000mm.

1.50
72.00 m3 Net total

10.00
4.80

3.04. Ditto as item 3.02 but to a depth exceeding 30


not exceeding 4500mm.

0.95
45.60 m3 Net total

3.05.Fill around stone masonary retaining wall in non


excavated material from the site well rolled and copa
layers not exceeding 200mm thick

3.05.Fill around stone masonary retaining wall in non


excavated material from the site well rolled and copa
layers not exceeding 200mm thick

Total fill Volume around Retaining masonary wall is the Pit


Minus the Sum Volume of Masonary Wall,Bottom Slab & H
Septic Tank Volume;Vf=Vp-(Vm +Vs h+Vst)
Pit Volume:Vp=L*W*H
10.00

Length L=

4.80

Width W=

3.95

Height H=
189.60 m3

a-Masonary wall Volume:Vm=see result on the ne


59.62
59.62 m3
b-Slab & Hard core Volume:Vsh=L*W*H
9.50

Length L=

4.30

Width W=

0.45

Height H=
18.38 m3
c-Septic tank Volume:Vst=L*W*H

7.50

Length L=

2.30

Width W=

3.50

Height H=
60.38 m3

51.23 m3 Net total

3.07 Load and cart away surplus excavated mate


appropriate tip.
72.45
0.20

From site clearing

14.49 m3
From pit excavation(Pit Volume)
189.60
189.60 m3

204.09 m3 Net total

3.08 250mm thick basaltic stone hardcore well rolled


consolidated and blinded with crushed stone.
9.50

Length L=

4.30

Width W=
40.85 m2

Prepared by:Contractor :-

Project : Tana belese housing development project


Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works Ent
Size
(L/W/D)

No

Quantity

Description
c) In RC grade beam

23.60

Total Length L=

0.20

Width W=
4.72 m2
d) In RC scum board

2.30

Length L=

0.30

Width W=
1.38 m2

2.30

Length L=

0.20

Width W=
0.46 m2

1.84 m2 Net total


e) In RC cross beam

2.30

Length L=

0.05

Width W=
0.23 m2

2.30

Length L=

0.20

Width W=

0.46 m2

0.69 m2 Net total

23.06 m2 Net total to BOQ for top slab

f) In RC manhole cover
0.70
4

0.08

L=0.70m, H=0.08m
2
0.45 m2

3.2.06 Mild steel reinforcement according to structur


a) Dia 8mm deformed bar
323.42 kg
b) Dia 10mm deformed bar
366.92 kg
c) Dia 12mm deformed bar
255.39 kg

3.3.0 MASONRY WORKS


3.3.1 Trychatic or equivalent stone masonry retaining
ground level bedded in cement mortar mix (1:3) an
left for plastering.

Volume of masonary work( V)

V=Volume of Trapezoidal section part + Volume of Quarter Pyrami


corners of the septic tank

Prepared by:
Contractor :-

Takeoff Sheet

g Dev. Aegency
nstruction Supervision Works Enterprise

Description

Size
(L/W/D)

No

3 SEPTIC TANK

on & Earth Work

nd remove top soil to an avarage depth of 200mm.

9.50
1

4.30

vation in ordinary soil to for septic tank to adepth


g 1500mm.

9.50
4.30
0.15

item 3.02, but to a depth exceeding 1500mm but


g 3000mm.

7.30
2.30
0.15

item 3.02 but to a depth exceeding 3000mm but


g 4500mm.

nd stone masonary retaining wall in non expansive


aterial from the site well rolled and copacted in
eeding 200mm thick

0.70
0.70
2

0.15

nd stone masonary retaining wall in non expansive


aterial from the site well rolled and copacted in
eeding 200mm thick

me around Retaining masonary wall is the Pit Volume


Volume of Masonary Wall,Bottom Slab & Hard core and
olume;Vf=Vp-(Vm +Vs h+Vst)

21.20
0.50

Vp=L*W*H

0.20

10m =0.25+L+0.25
4.8m =0.25+W+0.25
3.95m =Hm+0.45

3.30
Deduction Volume

wall Volume:Vm=see result on the next page

0.30
1

0.20

rd core Volume:Vsh=L*W*H
9.5m =L

4.30

4.3m =W

0.20

0.45m

0.20

k Volume:Vst=L*W*H
7.5m =A-(0.5+0.5)
2.3m =B-(0.5+0.5)

1.00

3.5m =Hm

and cart away surplus excavated material to an


appropriate tip.

1.00

27.60
1

0.20

cavation(Pit Volume)

7.30
1

2.30

0.70

thick basaltic stone hardcore well rolled,


and blinded with crushed stone.
9.5m =L
4.3m =W

Checked by:Consultant

0.70

Takeoff Sheet

g Dev. Aegency
nstruction Supervision Works Enterprise

Description

Size
(L/W/D)

No

23.6m=2*(A+B))

23.60

0.2m

0.75
3.50
For scum board sides
2.3m =B-(0.5+0.5)

0.50

0.3m

0.50
For scum board bottom

3.50

2.3m =B-(0.5+0.5)
0.2m

1.00
1.00
1/3

3.50

For cross beam sides


2.3m =B-(0.5+0.5)
0.05m

For cross beam bottom

2.30

2.3m =B-(0.5+0.5)

0.50

0.2m

2.30

o BOQ for top slab

2.30
2

2.30

19.60

eel reinforcement according to structural drawing

3.50

eformed bar

deformed bar

0.50
2

2.30

deformed bar

NRY WORKS
c or equivalent stone masonry retaining wall below
bedded in cement mortar mix (1:3) and one side
ring.

W id th :W

1.00
0

1.00

1.00
0

1.00

n part + Volume of Quarter Pyramid at four


s of the septic tank

Checked by:
Consultant

2.00
0

1.00

Contractor: Kest Construction


Site Name: Main Town 01
Work Type: Septic Tank-01
Page no. __

Quantity

Description
3.2 Concrete Work
3.2.1 5cm thick lean concrete,C-5
a) Under bottom slab
Length L= 9.5m =L
Width W= 4.3m =W

40.85 m2
3.2.2 Reinforced concrete quality C-25
a) In RC bottom slab
Length L= 9.5m =L
Width W= 4.3m =W
Thickness t= 0.15m
6.13 m3
b) In RC top slab
Length L= 7.3m =A-(0.5+0.2+0.5)
Width W= 2.3m =B-(0.5+0.5)
Thickness t= 0.15m
2.52 m3
Deduct for manhole
L=0.70m , W=0.70m ,H=0.15m

0.15 m3

2.37 m3 Net total

c) In RC grade beam
Total Length L= 21.2m =2*((A-0.2)+(B-0.5-0.5))
Width W= 0.5m
Thickness t= 0.2m
2.12 m3

d) In RC scum board
Length L= 3.3m=B
Width W= 0.3m
Thickness t= 0.2m
0.20 m3

e) In RC cross beam
Length L= 4.3m=B+0.5+0.5
Width W= 0.2m
Thickness t= 0.2m
0.17 m3

4.86 m3 Net total to BOQ for top slab

f) In RC manhole cover

2.00 pcs
3.25 Provide, cut & fix in position formwork
a)To RC bottom slab
Total Length L= 27.6m =2*(L+W)
Width W= 0.2m
5.52 m2

b) In RC top slab
Length L= 7.3m =A-(0.5+0.2+0.5)
Width W= 2.3m =B-(0.5+0.5)
16.79 m2

Deduct for manhole


L=0.70m , W=0.70m

0.98 m2

15.81 m2 Net total

Approved by:Implementing Agent...

Contractor: Kest Construction


Site Name: Main Town 01
Work Type: Septic Tank-01
Page no. __

Quantity

Description
a) Retaing wall
For trapezoidal section: V=L*Wavg*H
Total Length L= 23.6m=2*(A+B))
Width average Wavg= 0.75m=1/2(0.5+Wm)
Height H= 3.5m

61.95 m3
Deduct for prism: V=L*W*H
Width W=Length L=0.5m
Height H= 3.5m

3.50 m3
For pyramid:V=1/3*L*W*H
Width W=Length L=

1m=2*C

Height H= 3.5m

1.17 m3

59.62 m3 Net total

b) Partition wall:V=L*W*H
Length L= 2.3m =B-(0.5+0.5)
Width W= 0.5m
Height H= 2.3m

2.65 m3

62.26 m3 Net total to BOQ for masonary work

3.5.0 PLASTERING
a) Partition wall surfaces.
Length L= 2.3m =B-(0.5+0.5)
Height H= 2.3m
10.58 m2

b) Internal masonary surface


Total Length L= 19.6m=2*(A-1+B-1)
Height H= 3.5m
68.60 m

Deduct for partition wall


Width W= 0.5m
Height H= 2.3m
2.30

66.30 m2 Net total

76.88 m3 Net total to BOQ for masonary wall plastering

3.6.0 PIPE WORK


Supply and Install

3.6.01 Dia. 200mm uPVC elbow

0.00 pcs

3.6.02 Dia. 200mm uPVC Tee

0.00 pcs

3.6.03 Dia 110mm uPVC Vent Pipe with vent cup

0.00 m

Approved by:
Implementing Agent...

2)+(B-0.5-0.5))

all plastering

Takeoff Sheet

Project : Tana belese housing development project


Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works E
Bar Schedule
Location

Bottom Slab

Top Slab

Grade Beam

Cross Beam

Scum Board Beam

Ref. No.

Dimensions L
&W(m)

Main
Reinforcment: L=

9.45

Main
Reinforcment: W=

4.25

Main
Reinforcment: L=

8.25

Main
Reinforcment: W=

3.25

Deduction for
manhole

0.70

Main
Reinforcment: L=

8.25

Main
Reinforcment: W=

3.25

Stirrup

0.45

Main
Reinforcment: W=

3.25

Stirrup

0.15

Main
Reinforcment: W=

3.25

Stirrup

0.25

Shape

Man hole cover

Main
Reinforcment: L=

0.65

Main
Reinforcment: W=

0.65

Total Length

Weight per m

Total weight, k

Prepared by:Contractor :-.

Checked by:Consultant.

Takeoff Sheet
Contractor:
Site Name:
Work Type:

Supervision Works Enterprise

Dia.
(mm)

Length
(m)

Kest Construction
Main Town 01
Bar Schedule of ST-3

Page no. __

No. of No. of
Bars Mem.

Length for Diameter


8
10
12

9.45

30

283.50

4.25

64

272.00

10

16.84

17

286.28

10

6.84

50

342.00

10

1.40

-4

-33.60

12

16.70

167.00

12

6.70

67.00

1.34

78

12

6.70

0.74

23

12

6.70

0.94

23

209.04

26.80

17.02

26.80

21.62

14

0.65

7.80

0.65

7.80

Total Length

0.00

818.78

594.68

287.60

0.00

Weight per m.

0.222

0.395

0.617

0.888

1.208

Total weight, kg.

0.00

323.42 366.92

255.39

0.00

Approved by:Implementing Agent...

Bar Schedule of ST-3

Remark

Project : Tana belese housing development project


Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works Ent

No

Size
(L/W/D)

Quantity

Description

3 SEPTIC TANK
3.1 Excavation & Earth Work
12.60
7.40

3.01. Clear and remove top soil to an avarage depth


93.24 m2 Net total

11.10
5.90

3.02. Pit excavation in ordinary soil to for septic tank


not exceeding 1500mm.

1.50
98.24 m3 Net total

11.10
5.90

3.03. Ditto as item 3.02, but to a depth exceeding 15


not exceeding 3000mm.

1.50
98.24 m3 Net total

11.10
5.90

3.04. Ditto as item 3.02 but to a depth exceeding 30


not exceeding 4500mm.

0.95
62.22 m3 Net total

3.05.Fill around stone masonary retaining wall in non


excavated material from the site well rolled and copa
layers not exceeding 200mm thick

3.05.Fill around stone masonary retaining wall in non


excavated material from the site well rolled and copa
layers not exceeding 200mm thick

Total fill Volume around Retaining masonary wall is the Pit


Minus the Sum Volume of Masonary Wall,Bottom Slab & H
Septic Tank Volume;Vf=Vp-(Vm +Vs h+Vst)
Pit Volume:Vp=L*W*H
11.10

Length L=

5.90

Width W=

3.95

Height H=
258.69 m3

a-Masonary wall Volume:Vm=see result on the ne


86.31
86.31 m3
b-Slab & Hard core Volume:Vsh=L*W*H
10.60

Length L=

5.40

Width W=

0.45

Height H=
25.76 m3
c-Septic tank Volume:Vst=L*W*H

7.50

Length L=

2.30

Width W=

3.50

Height H=
60.38 m3

86.24 m3 Net total

3.07 Load and cart away surplus excavated mate


appropriate tip.
93.24
0.20

From site clearing

18.65 m3
From pit excavation(Pit Volume)
258.69
258.69 m3

277.33 m3 Net total

3.08 250mm thick basaltic stone hardcore well rolled


consolidated and blinded with crushed stone.
10.60

Length L=

5.40

Width W=
57.24 m2

Prepared by:Contractor :-

Project : Tana belese housing development project


Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works Ent
Size
(L/W/D)

No

Quantity

Description
c) In RC grade beam

23.60

Total Length L=

0.20

Width W=
4.72 m2
d) In RC scum board

2.30

Length L=

0.30

Width W=
1.38 m2

2.30

Length L=

0.20

Width W=
0.46 m2

1.84 m2 Net total


e) In RC cross beam

2.30

Length L=

0.05

Width W=
0.23 m2

2.30

Length L=

0.20

Width W=

0.46 m2

0.69 m2 Net total

23.06 m2 Net total to BOQ for top slab

f) In RC manhole cover
0.70
4

0.08

L=0.70m, H=0.08m
2
0.45 m2

3.2.06 Mild steel reinforcement according to structur


a) Dia 8mm deformed bar
410.34 kg
b) Dia 10mm deformed bar
0.00 kg
c) Dia 12mm deformed bar
580.50 kg
990.84

3.3.0 MASONRY WORKS


3.3.1 Trychatic or equivalent stone masonry retaining
ground level bedded in cement mortar mix (1:3) an
left for plastering.

Volume of masonary work( V)

V=Volume of Trapezoidal section part + Volume of Quarter Pyrami


corners of the septic tank

Prepared by:
Contractor :-

Takeoff Sheet

g Dev. Aegency
nstruction Supervision Works Enterprise

Description

Size
(L/W/D)

No

3 SEPTIC TANK

on & Earth Work

nd remove top soil to an avarage depth of 200mm.

10.60
1

5.40

vation in ordinary soil to for septic tank to adepth


g 1500mm.

10.60
5.40
0.15

item 3.02, but to a depth exceeding 1500mm but


g 3000mm.

7.30
2.30
0.15

item 3.02 but to a depth exceeding 3000mm but


g 4500mm.

nd stone masonary retaining wall in non expansive


aterial from the site well rolled and copacted in
eeding 200mm thick

0.70
0.70
2

0.15

nd stone masonary retaining wall in non expansive


aterial from the site well rolled and copacted in
eeding 200mm thick

me around Retaining masonary wall is the Pit Volume


Volume of Masonary Wall,Bottom Slab & Hard core and
olume;Vf=Vp-(Vm +Vs h+Vst)

21.20
0.50

Vp=L*W*H

0.20

11.1m =0.25+L+0.25
5.9m =0.25+W+0.25
3.95m =Hm+0.45

3.30
Deduction Volume

wall Volume:Vm=see result on the next page

0.30
1

0.20

rd core Volume:Vsh=L*W*H
10.6m =L

4.30

5.4m =W

0.20

0.45m

0.20

k Volume:Vst=L*W*H
7.5m =A-(0.5+0.5)
2.3m =B-(0.5+0.5)

1.00

3.5m =Hm

and cart away surplus excavated material to an


appropriate tip.

1.00

32.00
1

0.20

cavation(Pit Volume)

7.30
1

2.30

0.70

thick basaltic stone hardcore well rolled,


and blinded with crushed stone.
10.6m =L
5.4m =W

Checked by:Consultant

0.70

Takeoff Sheet

g Dev. Aegency
nstruction Supervision Works Enterprise

Description

Size
(L/W/D)

No

23.6m=2*(A+B))

23.60

0.2m

1.03
3.50
For scum board sides
2.3m =B-(0.5+0.5)

0.50

0.3m

0.50
For scum board bottom

3.50

2.3m =B-(0.5+0.5)
0.2m

2.10
2.10
1/3

3.50

For cross beam sides


2.3m =B-(0.5+0.5)
0.05m

For cross beam bottom

2.30

2.3m =B-(0.5+0.5)

0.50

0.2m

2.30

o BOQ for top slab

2.30
2

2.30

19.60

eel reinforcement according to structural drawing

3.50

eformed bar

deformed bar

0.50
2

2.30

deformed bar

NRY WORKS
c or equivalent stone masonry retaining wall below
bedded in cement mortar mix (1:3) and one side
ring.

W id th :W

1.00
0

1.00

1.00
0

1.00

n part + Volume of Quarter Pyramid at four


s of the septic tank

Checked by:
Consultant

2.00
0

1.00

Contractor: Kest Construction


Site Name: Main Town 01
Work Type: Septic Tank-01
Page no. __

Quantity

Description
3.2 Concrete Work
3.2.1 5cm thick lean concrete,C-5
a) Under bottom slab
Length L= 10.6m =L
Width W= 5.4m =W

57.24 m2
3.2.2 Reinforced concrete quality C-25
a) In RC bottom slab
Length L= 10.6m =L
Width W= 5.4m =W
Thickness t= 0.15m
8.59 m3
b) In RC top slab
Length L= 7.3m =A-(0.5+0.2+0.5)
Width W= 2.3m =B-(0.5+0.5)
Thickness t= 0.15m
2.52 m3
Deduct for manhole
L=0.70m , W=0.70m ,H=0.15m

0.15 m3

2.37 m3 Net total

c) In RC grade beam
Total Length L= 21.2m =2*((A-0.2)+(B-0.5-0.5))
Width W= 0.5m
Thickness t= 0.2m
2.12 m3

d) In RC scum board
Length L= 3.3m=B
Width W= 0.3m
Thickness t= 0.2m
0.20 m3

e) In RC cross beam
Length L= 4.3m=B+0.5+0.5
Width W= 0.2m
Thickness t= 0.2m
0.17 m3

4.86 m3 Net total to BOQ for top slab

f) In RC manhole cover

2.00 pcs
3.25 Provide, cut & fix in position formwork
a)To RC bottom slab
Total Length L= 32m =2*(L+W)
Width W= 0.2m
6.40 m2

b) In RC top slab
Length L= 7.3m =A-(0.5+0.2+0.5)
Width W= 2.3m =B-(0.5+0.5)
16.79 m2

Deduct for manhole


L=0.70m , W=0.70m

0.98 m2

15.81 m2 Net total

Approved by:Implementing Agent...

Contractor: Kest Construction


Site Name: Main Town 01
Work Type: Septic Tank-01
Page no. __

Quantity

Description
a) Retaing wall
For trapezoidal section: V=L*Wavg*H
Total Length L= 23.6m=2*(A+B))
Width average Wavg= 1.025m=1/2(0.5+Wm)
Height H= 3.5m

84.67 m3
Deduct for prism: V=L*W*H
Width W=Length L=0.5m
Height H= 3.5m

3.50 m3
For pyramid:V=1/3*L*W*H
Width W=Length L=

2.1m=2*C

Height H= 3.5m

5.15 m3

86.31 m3 Net total

b) Partition wall:V=L*W*H
Length L= 2.3m =B-(0.5+0.5)
Width W= 0.5m
Height H= 2.3m

2.65 m3

88.96 m3 Net total to BOQ for masonary work

3.5.0 PLASTERING
a) Partition wall surfaces.
Length L= 2.3m =B-(0.5+0.5)
Height H= 2.3m
10.58 m2

b) Internal masonary surface


Total Length L= 19.6m=2*(A-1+B-1)
Height H= 3.5m
68.60 m

Deduct for partition wall


Width W= 0.5m
Height H= 2.3m
2.30

66.30 m2 Net total

76.88 m3 Net total to BOQ for masonary wall plastering

3.6.0 PIPE WORK


Supply and Install

3.6.01 Dia. 200mm uPVC elbow

0.00 pcs

3.6.02 Dia. 200mm uPVC Tee

0.00 pcs

3.6.03 Dia 110mm uPVC Vent Pipe with vent cup

0.00 m

Approved by:
Implementing Agent...

2)+(B-0.5-0.5))

all plastering

Takeoff Sheet

Project : Tana belese housing development project


Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works E
Bar Schedule
Location

Bottom Slab

Top Slab

Grade Beam

Cross Beam

Scum Board Beam

Ref. No.

Dimensions L
&W(m)

Main
Reinforcment: L=

10.55

Main
Reinforcment: W=

5.35

Main
Reinforcment: L=

8.25

Main
Reinforcment: W=

3.25

Deduction for
manhole

0.70

Main
Reinforcment: L=

8.25

Main
Reinforcment: W=

3.25

Stirrup

0.45

Main
Reinforcment: W=

3.25

Stirrup

0.15

Main
Reinforcment: W=

3.25

Stirrup

0.25

Shape

Man hole cover

Main
Reinforcment: L=

0.65

Main
Reinforcment: W=

0.65

Total Length

Weight per m

Total weight, k

Prepared by:Contractor :-.

Checked by:Consultant.

Takeoff Sheet
Contractor:
Site Name:
Work Type:

Supervision Works Enterprise

Dia.
(mm)

Length
(m)

Kest Construction
Main Town 01
Bar Schedule of ST-4

Page no. __

No. of No. of
Bars Mem.

Length for Diameter


8
10
12

10.55

37

390.35

5.35

72

385.20

12

16.84

10

168.40

12

6.84

33

225.72

12

1.40

-4

-28.00

12

16.70

167.00

12

6.70

67.00

1.34

78

12

6.70

0.74

23

12

6.70

0.94

23

209.04

26.80

17.02

26.80

21.62

14

0.65

7.80

0.65

7.80

Total Length

0.00

1,038.83

0.00

653.72

0.00

Weight per m.

0.222

0.395

0.617

0.888

1.208

Total weight, kg.

0.00

410.34

0.00

580.50

0.00

Approved by:Implementing Agent...

Bar Schedule of ST-4

Remark

Project : Tana belese housing development project


Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works Ent

No

Size
(L/W/D)

Quantity

Description

3 SEPTIC TANK
3.1 Excavation & Earth Work
11.70
7.60

3.01. Clear and remove top soil to an avarage depth


88.92 m2 Net total

10.20

7.60

6.10

3.02. Pit excavation in ordinary soil to for septic tank


5.60 not exceeding 1500mm.

1.50

0.00
93.33 m3 Net total

10.20

7.60

6.10

3.03. Ditto as item 3.02, but to a depth exceeding 15


5.60 not exceeding 3000mm.

1.50

1.25
40.13 m3 Net total

10.20

7.60

6.10

3.04. Ditto as item 3.02 but to a depth exceeding 30


5.60 not exceeding 4500mm.

2.05

2.05
0.00 m3 Net total

3.05.Fill around stone masonary retaining wall in non


excavated material from the site well rolled and copa
layers not exceeding 200mm thick

3.05.Fill around stone masonary retaining wall in non


excavated material from the site well rolled and copa
layers not exceeding 200mm thick

Total fill Volume around Retaining masonary wall is the Pit


Minus the Sum Volume of Masonary Wall,Bottom Slab & H
Septic Tank Volume;Vf=Vp-(Vm +Vs h+Vst)
Pit Volume:Vp=L*W*H
10.20

Length L=

6.10

Width W=

5.05

Height H=
314.21 m3

a-Masonary wall Volume:Vm=see result on the ne


112.62
112.62 m3
b-Slab & Hard core Volume:Vsh=L*W*H
9.70

Length L=

5.60

Width W=

0.45

Height H=
24.44 m3
c-Septic tank Volume:Vst=L*W*H

6.10

Length L=

2.00

Width W=

4.60

Height H=
56.12 m3

121.02 m3 Net total

3.07 Load and cart away surplus excavated mate


appropriate tip.
88.92
0.20

From site clearing

17.78 m3
From pit excavation(Pit Volume)
314.21
314.21 m3

332.00 m3 Net total

3.08 250mm thick basaltic stone hardcore well rolled


consolidated and blinded with crushed stone.
9.70

Length L=

5.60

Width W=
54.32 m2

Prepared by:Contractor :-

Project : Tana belese housing development project


Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works Ent
Size
(L/W/D)

No

Quantity

Description
c) In RC grade beam

20.20

Total Length L=

0.20

Width W=
4.04 m2
d) In RC scum board

2.00

Length L=

0.30

Width W=
1.20 m2

2.00

Length L=

0.20

Width W=
0.40 m2

1.60 m2 Net total


e) In RC cross beam

2.00

Length L=

0.05

Width W=
0.20 m2

2.00

Length L=

0.20

Width W=

0.40 m2

0.60 m2 Net total

17.06 m2 Net total to BOQ for top slab

f) In RC manhole cover
0.70
4

0.08

L=0.70m, H=0.08m
2
0.45 m2

3.2.06 Mild steel reinforcement according to structur


a) Dia 8mm deformed bar
380.56 kg
b) Dia 10mm deformed bar
267.06 kg
c) Dia 12mm deformed bar
220.93 kg

3.3.0 MASONRY WORKS


3.3.1 Trychatic or equivalent stone masonry retaining
ground level bedded in cement mortar mix (1:3) an
left for plastering.

Volume of masonary work( V)

V=Volume of Trapezoidal section part + Volume of Quarter Pyrami


corners of the septic tank

Prepared by:
Contractor :-

Takeoff Sheet

g Dev. Aegency
nstruction Supervision Works Enterprise

Description

Size
(L/W/D)

No

3 SEPTIC TANK

on & Earth Work

nd remove top soil to an avarage depth of 200mm.

9.70
1

5.60

vation in ordinary soil to for septic tank to adepth


g 1500mm.

9.70
5.60
0.15

item 3.02, but to a depth exceeding 1500mm but


g 3000mm.
weathered

5.90

53.2

2.00
0.15

item 3.02 but to a depth exceeding 3000mm but


g 4500mm.
weathered

0.70

127.551

0.70

nd stone masonary retaining wall in non expansive


aterial from the site well rolled and copacted in
eeding 200mm thick

0.15

nd stone masonary retaining wall in non expansive


aterial from the site well rolled and copacted in
eeding 200mm thick

me around Retaining masonary wall is the Pit Volume


Volume of Masonary Wall,Bottom Slab & Hard core and
olume;Vf=Vp-(Vm +Vs h+Vst)

17.80
0.50

Vp=L*W*H

0.20

10.2m =0.25+L+0.25
6.1m =0.25+W+0.25
5.05m =Hm+0.45

3.00
Deduction Volume

wall Volume:Vm=see result on the next page

0.30
1

0.20

rd core Volume:Vsh=L*W*H
9.7m =L

4.00

5.6m =W

0.20

0.45m

0.20

k Volume:Vst=L*W*H
6.1m =A-(0.5+0.5)
2m =B-(0.5+0.5)

1.00

4.6m =Hm

and cart away surplus excavated material to an


appropriate tip.

1.00

30.60
1

0.20

cavation(Pit Volume)

5.90
1

2.00

0.70

thick basaltic stone hardcore well rolled,


and blinded with crushed stone.
9.7m =L
5.6m =W

Checked by:Consultant

0.70

Takeoff Sheet

g Dev. Aegency
nstruction Supervision Works Enterprise

Description

Size
(L/W/D)

No

20.2m=2*(A+B))

20.20

0.2m

1.15
4.60
For scum board sides
2m =B-(0.5+0.5)

0.50

0.3m

0.50
For scum board bottom

4.60

2m =B-(0.5+0.5)
0.2m

2.60
2.60
1/3

4.60

For cross beam sides


2m =B-(0.5+0.5)
0.05m

For cross beam bottom

2.00

2m =B-(0.5+0.5)

0.50

0.2m

1.80

o BOQ for top slab

2.00
2

1.80

16.20

eel reinforcement according to structural drawing

4.60

eformed bar

deformed bar

0.50
2

1.80

deformed bar

NRY WORKS
c or equivalent stone masonry retaining wall below
bedded in cement mortar mix (1:3) and one side
ring.

W id th :W

1.00
0

1.00

1.00
0

1.00

n part + Volume of Quarter Pyramid at four


s of the septic tank

Checked by:
Consultant

2.00
0

1.00

Contractor: Kest Construction


Site Name: Main Town 01
Work Type: Septic Tank-06
Page no. __

Quantity

Description
3.2 Concrete Work
3.2.1 5cm thick lean concrete,C-5
a) Under bottom slab
Length L= 9.7m =L
Width W= 5.6m =W

54.32 m2
3.2.2 Reinforced concrete quality C-25
a) In RC bottom slab
Length L= 9.7m =L
Width W= 5.6m =W
Thickness t= 0.15m
8.15 m3
b) In RC top slab
Length L= 5.9m =A-(0.5+0.2+0.5)
Width W= 2m =B-(0.5+0.5)
Thickness t= 0.15m
1.77 m3
Deduct for manhole
L=0.70m , W=0.70m ,H=0.15m

0.15 m3

1.62 m3 Net total

c) In RC grade beam
Total Length L= 17.8m =2*((A-0.2)+(B-0.5-0.5))
Width W= 0.5m
Thickness t= 0.2m
1.78 m3

d) In RC scum board
Length L= 3m=B
Width W= 0.3m
Thickness t= 0.2m
0.18 m3

e) In RC cross beam
Length L= 4m=B+0.5+0.5
Width W= 0.2m
Thickness t= 0.2m
0.16 m3

3.74 m3 Net total to BOQ for top slab

f) In RC manhole cover

2.00 pcs
3.25 Provide, cut & fix in position formwork
a)To RC bottom slab
Total Length L= 30.6m =2*(L+W)
Width W= 0.2m
6.12 m2

b) In RC top slab
Length L= 5.9m =A-(0.5+0.2+0.5)
Width W= 2m =B-(0.5+0.5)
11.80 m2

Deduct for manhole


L=0.70m , W=0.70m

0.98 m2

10.82 m2 Net total

Approved by:Implementing Agent...

Contractor: Kest Construction


Site Name: Main Town 01
Work Type: Septic Tank-06
Page no. __

Quantity

Description
a) Retaing wall
For trapezoidal section: V=L*Wavg*H
Total Length L= 20.2m=2*(A+B))
Width average Wavg= 1.15m=1/2(0.5+Wm)
Height H= 4.6m

106.86 m3
Deduct for prism: V=L*W*H
Width W=Length L=0.5m
Height H= 4.6m

4.60 m3
For pyramid:V=1/3*L*W*H
Width W=Length L=

2.6m=2*C

Height H= 4.6m

10.37 m3

112.62 m3 Net total

b) Partition wall:V=L*W*H
Length L= 2m =B-(0.5+0.5)
Width W= 0.5m
Height H= 1.8m

1.80 m3

114.42 m3 Net total to BOQ for masonary work

3.5.0 PLASTERING
a) Partition wall surfaces.
Length L= 2m =B-(0.5+0.5)
Height H= 1.8m
7.20 m2

b) Internal masonary surface


Total Length L= 16.2m=2*(A-1+B-1)
Height H= 4.6m
74.52 m

Deduct for partition wall


Width W= 0.5m
Height H= 1.8m
1.80

72.72 m2 Net total

79.92 m3 Net total to BOQ for masonary wall plastering

3.6.0 PIPE WORK


Supply and Install

3.6.01 Dia. 200mm uPVC elbow

0.00 pcs

3.6.02 Dia. 200mm uPVC Tee

0.00 pcs

3.6.03 Dia 110mm uPVC Vent Pipe with vent cup

0.00 m

Approved by:
Implementing Agent...

2)+(B-0.5-0.5))

all plastering

Takeoff Sheet

Project : Tana belese housing development project


Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works E
Bar Schedule
Location

Bottom Slab

Top Slab

Grade Beam

Cross Beam

Scum Board Beam

Ref. No.

Dimensions L
&W(m)

Main
Reinforcment: L=

9.65

Main
Reinforcment: W=

5.55

Main
Reinforcment: L=

6.85

Main
Reinforcment: W=

2.95

Deduction for
manhole

0.70

Main
Reinforcment: L=

6.85

Main
Reinforcment: W=

2.95

Stirrup

0.45

Main
Reinforcment: W=

2.95

Stirrup

0.15

Main
Reinforcment: W=

2.95

Stirrup

0.25

Shape

Man hole cover

Main
Reinforcment: L=

0.65

Main
Reinforcment: W=

0.65

Total Length

Weight per m

Total weight, k

Prepared by:Contractor :-.

Checked by:Consultant.

Takeoff Sheet
Contractor:
Site Name:
Work Type:

Supervision Works Enterprise

Dia.
(mm)

Length
(m)

Kest Construction
Main Town 01
Bar Schedule of ST-6

Page no. __

No. of No. of
Bars Mem.

Length for Diameter


8
10
12

9.65

38

366.70

5.55

66

366.30

10

14.04

15

210.60

10

6.24

41

255.84

10

1.40

-4

-33.60

12

13.90

139.00

12

6.10

61.00

1.34

67

12

6.10

0.74

21

12

6.10

0.94

21

179.56

24.40

15.54

24.40

19.74

14

0.65

7.80

0.65

7.80

Total Length

0.00

963.44

432.84

248.80

0.00

Weight per m.

0.222

0.395

0.617

0.888

1.208

Total weight, kg.

0.00

380.56 267.06

220.93

0.00

Approved by:Implementing Agent...

Bar Schedule of ST-6

Remark

Summary Of Bill Of Quantities For SOAK AWAY PITS


Project : Tana belese housing development project
Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works Enterprise
Contracto
Kest Construction
Location:Fendika

Item
No.

Description

Sub total (birr )


Contract
Executed

SOAK AWAY PIT

6.0
6.1

Excavation & earth work.

227,756.76

5,404.52

6.2

Fill

796,842.32

22,835.28

6.3

Cart Away

230,782.46

5,873.23

6.4

Concrete Work

429,815.76

55,540.26

6.5

Form Work

68,296.26

0.00

6.6

Reinforcement

50,012.70

5,641.33

6.7

Masonery work

0.00

20,998.34

418,469.12

0.00

7.0

DRAINAGE ADOUND BUILDING


pLL U` /Grand Total /

Prepared by:Contractor :-..

Checked by:Implementing Agent.

Consultant

AK AWAY PITS
:. -04/475

Contract No.
05

Statement No.
Site Name: Main Town 01
Page no. __

Total / Birr/
Contract

Executed

2,221,975.38

116,292.96

Approved by:Consultant

BILL OF Q

Project : Tana belese housing development project


Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works Enterpris


Item No.
6
6.1.1
6.1.2
6.1.3
6.1.4

6.2.1
6.2.2
6.2.3
6.2.4

6.3.1

6.4.1

6.5.1

6.6.1

6.7.1

7.1.0

7.2

Prepared by:Contractor :-..

BILL OF QUANTIT

ject : Tana belese housing development project


ent: FDRE Sugare Coorporation
pl. Agency:ANRS Construction & Housing Dev. Aegency
nsultant:Road And Building Design & Construction Supervision Works Enterprise

Description
SOAK AWAY PIT
6.1.Excavation &Earth Work
Site Clearing and removing the top 200mm thick soil.
Bulk excavation in ordinary soil to a depth of up to 1500mm from reduced level.
Ditto but exceeding 1500mm not exceeding 3000mm.
Ditto but exceeding 3000mm not exceeding 4000mm.
TOTAL CARRED TO SUMMARY----------6.2.FILL
Silt fill not more than 20cm depth
pure sand fill 75cm depth
Gravel of various size fill 60cm depth
25cm thick basaltic stone fill 150cm depth
TOTAL CARRED TO SUMMARY----------6.3.CART AWAY
Remove surplus excavated materials and diposite to a distance 5km.
TOTAL CARRED TO SUMMARY----------6.4.CONCRETE WORK
Renforced concrete quality C-25 mechanically mixed and filled into form work and
vibrated around rod reinforcement (Reinforcement and form work measured
separetely)use ordinary portland cement(opc)
b) To 20cm thick top cover slab.
TOTAL CARRED TO SUMMARY----------6.5.FORM WORK
Form work shall be timbered or steel or a combination of two, sufficent to contain the
wet concrete without leakage. Enough to support temporary loading and pressure
from placing copaction or vibration without displacement or appreciable deflection.
a) To 20cm thick top cover slab.
TOTAL CARRED TO SUMMARY----------6.6.REINFORCEMENT

Mild steel bar reinforcement according to structural drawings.Reinforcement shall be


free from dirt, oil, grease paint, etc and any other substances which may affect the
reinforcement and concrete bond (price include cutting bending and placing in
position).
b) To 20cm thick top cover slab.
Dia.8 deformed bar
Dia.12 deformed bar
Dia.24 deformed bar
TOTAL CARRED TO SUMMARY----------6.7.MASONRY WORK
600mm thick basaltic or equivalent type stone masonry bedded and jointed in cement
mortar(1:3) mix below ground surface. Price shall include cement mortar bed.
TOTAL CARRED TO SUMMARY----------7. Drainage Around Building
Apply C-15 concrete pavement around the building with a thickness of 80mm,price
shall include 20cm thick hard core and compacting with selected material .
half Dia. 400mm concrete pipe storm water drainge ditch around the
pavement on and including100mm thick red ash or equvalent firm bedding with
proper slop and tightly jointed in cement mortar mix.
TOTAL CARRED TO SUMMARY-----------

pared by:ntractor :-..

Checked

F QUANTITY
Contractor: Awoke Ayana B.C
Site Name: Ayma Village One (V-5)
Work Type:Soak Away Pits
Page no. __

Unite

(Amount)

Contract

Executed

m2

753.60

82.43

m3
m3
m3

1130.40
1130.40
753.60

m3
m3
m3

Unit
Rate

(Contract birr)

(Executed birr)

10.47

7890.19

862.99

28.38
8.30

58.02
71.21
97.91

65585.81
80495.78
73784.98
227,756.76

1707.96
2020.78
812.79
5,404.52

m3

150.72
565.20
452.16
113.04

2.12
3.93
9.32
14.72

245.03
289.94
1138.80
717.60

36930.92
163874.09
514919.81
81117.50
796,842.32

519.34
1138.01
10615.75
10562.18
22,835.28

m3

3014.40

76.71

76.56

230782.46
230,782.46

5873.23
5,873.23

m2

753.60

97.38

570.35

429815.76
429,815.76

55540.26
55,540.26

m2

502.40

135.94

68296.26
68,296.26

0.00
0.00

29.44

kg
kg
kg

1410.00

m3

159.05

35.47
35.47
35.47

50012.70
0.00
0.00
50,012.70

5641.33
0.00
0.00
5,641.33

13.31

1577.21

0.00

20998.34

0.00

20,998.34

1262.82

0.00

0.00

205.84

418469.12

0.00

418,469.12

0.00

M2

Ml

2033.00

Checked by:Implementing Agent.

Approved by:Consultant

Ta

Project : Tana belese housing development project


Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works Enterp
Size
(L/W/D)

No

Quantity

Description
6 SOAK AWAY PIT
6.1 EXCAVATION AND EARTH WORK

4.00

3.14

1/4

6.1.1.Site Clearing and removing the top 200mm thick soil


37.68 m2 Net total

6.1.2.Bulk excavation in ordinary soil to a depth of up to


1500mm from reduced level.
2.00
3

1.50

3.14

1/4
14.13 m3

14.13 m3 Net total

2.00

6.1.3.Ditto but exceeding 1500mm not exceeding 3000mm

6.1.3.Ditto but exceeding 1500mm not exceeding 3000mm


3

1.50

3.14

1/4
14.13 m3 Net total

6.1.4.Ditto but exceeding 3000mm not exceeding 4000mm


2.00
3

0.10

3.14

1/4
0.94 m3 Net total

6.2.FILL
2.00
3

0.00

3.14

1/4

6.2.1 Silt fill not more than 20cm depth

0.00 m3 Net total

2.00
3

0.20

3.14

1/4

6.2.2 Pure sand fill 75cm depth

1.88 m3 Net total

2.00
3

0.50

3.14

1/4

6.2.3 Gravel of various size fill 60cm depth

4.71 m3 Net total

2.00
3

0.50

6.2.4 25cm thick basaltic stone fill 150cm depth

3.14

1/4
4.71 m3 Net total

Prepared by:Contractor :-

Takeoff Sheet
Contractor:
Site Name:
Work Type:
Page no. __

ision Works Enterprise

Size
(L/W/D)

No

Quantity

Description

Y PIT

6.3 CART AWAY

RK

6.3.1.Remove surplus excavated mate


distance 5km.

top 200mm thick soil.


From site clearing
37.68
0.20
7.54 m3

to a depth of up to

ot exceeding 3000mm.

14.13

From pit excavation

14.13
Sum

0.94
29.20 m3

36.74 m3 Net total

6.4 CONCRETE WORK


6.4.1.Reinforced concrete quality C-25
into form work and vibrated around rod
a) To 20cm thick top cover slab
2.00
3

0.10

L=W=

ot exceeding 3000mm.
3.14

1/4

Thickness T=

9.40 m3 Net
9.40
Divide

0.20
46.98 m2 Net total

ot exceeding 4000mm.

6.7 MASONRY WORK

6.7.1.600mm thick basaltic or equivale


bedded and jointed in cement mortar(
surface. Price shall include cement mo
2.00
3

1.20

3.14

1/4
6.03 m3 Net total

6.8 PIPE WORK


Supply and Install
1.00
0

6.8.01 Dia. 200mm uPVC elbow

1.00
0.00 pcs

1.00
0

6.8.02 Dia 110mm uPVC Vent Pipe with v

1.00
0.00 pcs

6.6.1 Mild steel reinforcement accordin

50cm depth
a) Dia 8mm deformed bar

23.70
71.10 kg

Checked by:Consultant

Approved by:Implementing Agent...

Kest Construction
Main Town 01
SAP-1

Description

Y
surplus excavated materials and diposite to a

TE WORK
ed concrete quality C-25,360kg of cement/m3 filled
k and vibrated around rod reinforcement.

m thick top cover slab


2m =L-0.3

0.25m

RY WORK

thick basaltic or equivalent type stone masonry


ointed in cement mortar(1:3) mix below ground
shall include cement mortar bed.

RK

Install

00mm uPVC elbow

0mm uPVC Vent Pipe with vent cup

el reinforcement according to structural drawing

eformed bar

Agent...

Ta

Project : Tana belese housing development project


Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works Enterp
Size
(L/W/D)

No

Quantity

Description
6 SOAK AWAY PIT
6.1 EXCAVATION AND EARTH WORK

3.50

3.14

1/4

6.1.1.Site Clearing and removing the top 200mm thick soil


28.85 m2 Net total

6.1.2.Bulk excavation in ordinary soil to a depth of up to


1500mm from reduced level.
1.50
3

1.50

3.14

1/4
7.95 m3

7.95 m3 Net total

1.50

6.1.3.Ditto but exceeding 1500mm not exceeding 3000mm

6.1.3.Ditto but exceeding 1500mm not exceeding 3000mm


3

1.30

3.14

1/4
6.89 m3 Net total

6.1.4.Ditto but exceeding 3000mm not exceeding 4000mm


1.50
3

0.00

3.14

1/4
0.00 m3 Net total

6.2.FILL
1.50
3

0.40

3.14

1/4

6.2.1 Silt fill not more than 20cm depth

2.12 m3 Net total

1.50
3

0.20

3.14

1/4

6.2.2 Pure sand fill 75cm depth

1.06 m3 Net total

1.50
3

0.50

3.14

1/4

6.2.3 Gravel of various size fill 60cm depth

2.65 m3 Net total

1.50
3

0.50

6.2.4 25cm thick basaltic stone fill 150cm depth

3.14

1/4
2.65 m3 Net total

Prepared by:Contractor :-

Takeoff Sheet
Contractor:
Site Name:
Work Type:
Page no. __

ision Works Enterprise

Size
(L/W/D)

No

Quantity

Description

Y PIT

6.3 CART AWAY

RK

6.3.1.Remove surplus excavated mate


distance 5km.

top 200mm thick soil.


From site clearing
28.85
0.20
5.77 m3

to a depth of up to

ot exceeding 3000mm.

7.95

From pit excavation

6.89
Sum

0.00
14.84 m3

20.61 m3 Net total

6.4 CONCRETE WORK


6.4.1.Reinforced concrete quality C-25
into form work and vibrated around rod
a) To 20cm thick top cover slab
1.50
3

0.20

L=W=

ot exceeding 3000mm.
3.14

1/4

Thickness T=

5.20 m3 Net
5.20
Divide

0.20
26.02 m2 Net total

ot exceeding 4000mm.

6.7 MASONRY WORK

6.7.1.600mm thick basaltic or equivale


bedded and jointed in cement mortar(
surface. Price shall include cement mo
1.50
3

0.70

3.14

1/4
4.14 m3 Net total

6.8 PIPE WORK


Supply and Install
1.00
0

6.8.01 Dia. 200mm uPVC elbow

1.00
0.00 pcs

1.00
0

6.8.02 Dia 110mm uPVC Vent Pipe with v

1.00
0.00 pcs

6.6.1 Mild steel reinforcement accordin

50cm depth
a) Dia 8mm deformed bar

13.04
39.11 kg

Checked by:Consultant

Approved by:Implementing Agent...

Kest Construction
Main Town 01
SAP-2

Description

Y
surplus excavated materials and diposite to a

TE WORK
ed concrete quality C-25,360kg of cement/m3 filled
k and vibrated around rod reinforcement.

m thick top cover slab


1.5m =L-0.3

0.25m

RY WORK

thick basaltic or equivalent type stone masonry


ointed in cement mortar(1:3) mix below ground
shall include cement mortar bed.

RK

Install

00mm uPVC elbow

0mm uPVC Vent Pipe with vent cup

el reinforcement according to structural drawing

eformed bar

Agent...

Ta

Project : Tana belese housing development project


Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works Enterp
Size
(L/W/D)

No

Quantity

Description
6 SOAK AWAY PIT
6.1 EXCAVATION AND EARTH WORK

4.50

3.14

1/4

6.1.1.Site Clearing and removing the top 200mm thick soil


15.90 m2 Net total

6.1.2.Bulk excavation in ordinary soil to a depth of up to


1500mm from reduced level.
2.50
1

1.50

3.14

1/4
7.36 m3

7.36 m3 Net total

2.50

6.1.3.Ditto but exceeding 1500mm not exceeding 3000mm

6.1.3.Ditto but exceeding 1500mm not exceeding 3000mm


1

1.50

3.14

1/4
7.36 m3 Net total

6.1.4.Ditto but exceeding 3000mm not exceeding 4000mm


2.50
1

0.30

3.14

1/4
1.47 m3 Net total

6.2.FILL
2.50
1

0.00

3.14

1/4

6.2.1 Silt fill not more than 20cm depth

0.00 m3 Net total

2.50
1

0.20

3.14

1/4

6.2.2 Pure sand fill 75cm depth

0.98 m3 Net total

2.50
1

0.40

3.14

1/4

6.2.3 Gravel of various size fill 60cm depth

1.96 m3 Net total

2.50
1

1.50

6.2.4 25cm thick basaltic stone fill 150cm depth

3.14

1/4
7.36 m3 Net total

Prepared by:Contractor :-

Takeoff Sheet
Contractor:
Site Name:
Work Type:
Page no. __

ision Works Enterprise

Size
(L/W/D)

No

Quantity

Description

Y PIT

6.3 CART AWAY

RK

6.3.1.Remove surplus excavated mate


distance 5km.

top 200mm thick soil.


From site clearing
15.90
0.20
3.18 m3

to a depth of up to

ot exceeding 3000mm.

7.36

From pit excavation

7.36
Sum

1.47
16.19 m3

19.37 m3 Net total

6.4 CONCRETE WORK


6.4.1.Reinforced concrete quality C-25
into form work and vibrated around rod
a) To 20cm thick top cover slab
2.50
1

0.20

L=W=

ot exceeding 3000mm.
3.14

1/4

Thickness T=

4.87 m3 Net
4.87
Divide

0.20
24.37 m2 Net total

ot exceeding 4000mm.

6.7 MASONRY WORK

6.7.1.600mm thick basaltic or equivale


bedded and jointed in cement mortar(
surface. Price shall include cement mo
2.50
1

1.50

3.14

1/4
3.14 m3 Net total

6.8 PIPE WORK


Supply and Install
1.00
0

6.8.01 Dia. 200mm uPVC elbow

1.00
0.00 pcs

1.00
0

6.8.02 Dia 110mm uPVC Vent Pipe with v

1.00
0.00 pcs

6.6.1 Mild steel reinforcement accordin

50cm depth
a) Dia 8mm deformed bar

48.84
48.84 kg

Checked by:Consultant

Approved by:Implementing Agent...

Kest Construction
Main Town 01
SAP-4

Description

Y
surplus excavated materials and diposite to a

TE WORK
ed concrete quality C-25,360kg of cement/m3 filled
k and vibrated around rod reinforcement.

m thick top cover slab


2.5m =L-0.3

0.25m

RY WORK

thick basaltic or equivalent type stone masonry


ointed in cement mortar(1:3) mix below ground
shall include cement mortar bed.

RK

Install

00mm uPVC elbow

0mm uPVC Vent Pipe with vent cup

el reinforcement according to structural drawing

eformed bar

Agent...

Takeoff Sheet

Project : Tana belese housing development project


Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works E
Bar Schedule
Location

SAP-1

Ref. No.

Dimensions L
&W(m)

Main
Reinforcment: L=

2.00

Main
Reinforcment: W=

2.00

Shape

Total Length

Weight per m

Total weight, k

Prepared by:Contractor :-.

Checked by:Consultant.

Takeoff Sheet
Contractor:
Site Name:
Work Type:

Supervision Works Enterprise

Dia.
(mm)

Length
(m)

Page no. __

No. of No. of
Bars Mem.

Length for Diameter


8
10
12

2.00

15

30.00

2.00

15

30.00

Total Length

Kest Construction
Main Town 01
Bar Schedule of SAP-1

14

0.00

60.00

0.00

0.00

0.00

Weight per m.

0.222

0.395

0.617

0.888

1.208

Total weight, kg.

0.00

23.70

0.00

0.00

0.00

Approved by:Implementing Agent...

Bar Schedule of SAP-1

Remark

Takeoff Sheet

Project : Tana belese housing development project


Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works E
Bar Schedule
Location

SAP-1

Ref. No.

Dimensions L
&W(m)

Main
Reinforcment: L=

1.50

Main
Reinforcment: W=

1.50

Shape

Total Length

Weight per m

Total weight, k

Prepared by:Contractor :-.

Checked by:Consultant.

Takeoff Sheet
Contractor:
Site Name:
Work Type:

Supervision Works Enterprise

Dia.
(mm)

Length
(m)

Page no. __

No. of No. of
Bars Mem.

Length for Diameter


8
10
12

1.50

11

16.50

1.50

11

16.50

Total Length

Kest Construction
Main Town 01
Bar Schedule of SAP-2

14

0.00

33.00

0.00

0.00

0.00

Weight per m.

0.222

0.395

0.617

0.888

1.208

Total weight, kg.

0.00

13.04

0.00

0.00

0.00

Approved by:Implementing Agent...

Bar Schedule of SAP-2

Remark

Takeoff Sheet

Project : Tana belese housing development project


Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works E
Bar Schedule
Location

SAP-1

Ref. No.

Dimensions L
&W(m)

Main
Reinforcment: L=

2.50

Main
Reinforcment: W=

2.50

Shape

Total Length

Weight per m

Total weight, k

Prepared by:Contractor :-.

Checked by:Consultant.

Takeoff Sheet
Contractor:
Site Name:
Work Type:

Supervision Works Enterprise

Dia.
(mm)

Length
(m)

Kest Construction
Main Town 01
Bar Schedule of SAP-4

Page no. __

No. of No. of
Bars Mem.

Length for Diameter


8
10
12

12

2.50

11

27.50

12

2.50

11

27.50

Total Length

14

0.00

0.00

0.00

55.00

0.00

Weight per m.

0.222

0.395

0.617

0.888

1.208

Total weight, kg.

0.00

0.00

0.00

48.84

0.00

Approved by:Implementing Agent...

Bar Schedule of SAP-4

Remark