WEDA BAY NICKEL PROJECT - Phase 1
ROAD BETWEEN MAIN SITE AND CONSTRUCTION CAMP
PACKAGE B (ROAD SECTION 2 & ROAD SECTION 3)
1. SUMMARY PRICE SCHEDULE - BASE CASE
Camp, catering and camp operation will be PROVIDED by COMPANY
BASE CASE
Total Direct
Manhours

Designation of Price Shedule Items

Subtotal
(USD)

A. DIRECT COST
1.

SITE PREPARATION

2.

CONCRETE WORKS AND FIREPROOFING

3.

MAIN WORKS COMPLEMENTARY PRICE ITEMS


Total Direct Manhours

(A) Total Direct Cost, D (USD)

B. INDIRECT COST
IUP1

Supervision and indirect labour

IUP2

Temporary Site facilities

IUP3

General field expenses

IUP4

Mobilization and demobilization of construction equipment

IUP5

Health Safety Environmental

IUP6

Water management during construction


Camp including site preparation and utilities & Camp operation
and catering

N/A

IUP9

Design and engineering cost (Not Applicable)

N/A

IUP10

All local levies, duties and taxes (PROVISIONAL SUM)

IUP11

Overheads and profits

IUP12

Fuel Consumption (PROVISIONAL SUM)

IUP7 & IUP8

(B) Total Indirect Cost, I (USD)


(A + B) TOTAL BID PRICE FOR ALTERNATIVE CASE (USD)
342672348.xls

SUM-BASE

Attachment III.1B - Revision 1


WEDA BAY NICKEL PROJECT - Phase 1
ROAD BETWEEN MAIN SITE AND CONSTRUCTION CAMP
PACKAGE B (ROAD SECTION 2 & ROAD SECTION 3)
2. SUMMARY PRICE SCHEDULE - ALTERNATIVE CASE
Camp, catering and camp operation will be SUPPLIED by CONTRACTOR
ALTERNATIVE CASE
Total Direct
Manhours

Designation of Price Shedule Items

Unit Price (USD)

Subtotal
(USD)

A. DIRECT COST
1.

SITE PREPARATION

2.

CONCRETE WORKS AND FIREPROOFING

3.

MAIN WORKS COMPLEMENTARY PRICE ITEMS


Total Direct Manhours

(A) Total Direct Cost, D (USD)

B. INDIRECT COST
IUP1

Supervision and indirect labour

IUP2

Temporary Site facilities

IUP3

General field expenses

IUP4

Mobilization and demobilization of construction equipment

IUP5

Health Safety Environmental

IUP6

Water management during construction

IUP7

Camp including site preparation and utilities

IUP8

Camp operation and catering

IUP9

Design and engineering cost (Not Applicable)

IUP10

All local levies, duties and taxes (PROVISIONAL SUM)

IUP11

Overheads and profits

IUP12

Fuel Consumption (PROVISIONAL SUM)

N/A

(B) Total Indirect Cost, I (USD)


(A + B) TOTAL BID PRICE FOR ALTERNATIVE CASE (USD)
342672348.xls

SUM-ALT

WEDA BAY NICKEL PROJECT

Attachment III.1B
Revision 1

ROAD FROM MAIN SITE TO CONSTRUCTION CAMP


PACKAGE B (ROAD SECTION 2)

2. QUANTITIES AND PRICE SCHEDULES


Designation of price schedule items

Item
Number

Total Manhour

Total Item Price (USD)

0.00

0.00

0.00

0.00

0.00

0.00

CIVIL WORKS DIRECT COST SUMMARY


SITE PREPARATION

1400

GRUBBING, SCRUBBING, SITE PROTECTION AND PREPARATION

1420

EARTHWORKS, TANK PAD, DIKES AND DITCHES

1440

ROAD, YARDS, PAVING

1450

UNDERGROUND PIPING

1470

SUB TOTAL
CONCRETE WORKS
CONCRETE WORKS

1700
1710

SUB TOTAL
MAIN WORKS COMPLEMENTARY PRICE ITEMS
SITE PROTECTION AND PREPARATION

1420

GRUBBING AND SCRUBBING, EARTHWORKS, TANK PAD, DIKES AND DITCHES

1440

ROAD, YARDS, PAVING

1450

CONCRETE WORKS

1710

SUB TOTAL
CONTROLLED EXPENSES
HOURLY LABOUR RATES

1799.10

EQUIPMENT RENTAL RATES (DAY)

1799.20

EQUIPMENT RENTAL RATES (MONTH)

1799.30

GRAND TOTAL

342672348.xls

Section 2

3 / 20

WEDA BAY NICKEL PROJECT

Attachment III.1B
Revision 1

ROAD FROM MAIN SITE TO CONSTRUCTION CAMP


PACKAGE B (ROAD SECTION 2)

2. QUANTITIES AND PRICE SCHEDULES


Designation of price schedule items

SITE PREPARATION AND UNDERGROUND SYSTEMS


WORK CODE 1420 - GRUBBING, SCRUBBING, SITE PROTECTION AND PREPARATION
Site Clearing

Item
Number

Unit

Quantity

99,900

Unit Price
Labour
USD

Unit Price
Equipment
USD

Total Unit
Price
USD

Total Item
Price
USD

Woke
Code

Note
Material Category

Elementary
Man-hours

Total
Man-hours

Unit Price
Supply
USD

Unit Price
Labour
USD

Unit Price
Equipment
USD

Total Unit
Price
USD

Total Item
Price
USD

Woke
Code

Note
Material Category

1420

1420.01.01

sqm

1420.01.03

sqm

99,900

Vegetal soil surface installation (Landscaping)

1420.04.01

sqm

190,100

cum

30,000

unit

Quantity

SUB TOTAL

Unit Price
Supply
USD

1420.01

Surface levelling

Grass, bushes and trees mixed with vegetation soil, transportation to dumping area

Total
Man-hours

1400

Soil grubbing and scrubbing

Transportation to outside dumps

Elementary
Man-hours

1420.11
1420.11.01
1420

Designation of price schedule items

WORK CODE 1440 - EARTHWORKS, TANK PAD, DIKES AND DITCHES

Item
Number
1440

General Earthworks
General excavation by machine

1440.10

General excavation by machine in loose or compact soil

1440.10.01

cum

734,570

Cut Cat. 0.2 to 2

General excavation by machine in hard rock

1440.10.03

cum

47,860

Cut Cat. 3.1

Hard rock general excavation by blasting

1440.11.01

cum

47,860

Cut Cat. 3.1

General fill and embankment with material from excavation

1440.13.01

cum

2,130

Fill Cat. 1 & 2

Sectional/Excavation Earthworks
Section excavations by machine - Trenches (pipes or cables) & Other than typical
foundations

1440.21.0z

Section excavation by machine in earth down to 2m depth

1440.21.01

cum

240

Cut Cat. 1 & 2

Section excavation by machine in earth from 2 to 4m depth

1440.21.02

cum

3,640

Cut Cat. 1 & 2

Backfill with material from excavation

1440.23.01

cum

3,690

Sand for underground pipes, hollow foundation and cable bedding

1440.25.01

cum

450

Soil substitution

1440.50.01

cum

Geo-textile

1440.52.01

sqm

Soil improvement

SUB TOTAL

342672348.xls

Fill Cat. 3.2

490

1440

Section 2

4 / 20

WEDA BAY NICKEL PROJECT

Attachment III.1B
Revision 1

ROAD FROM MAIN SITE TO CONSTRUCTION CAMP


PACKAGE B (ROAD SECTION 2)

2. QUANTITIES AND PRICE SCHEDULES


Designation of price schedule items

Item
Number

WORK CODE 1450 ROADS, YARDS, PAVING

1450

Unit

Quantity

Elementary
Man-hours

Total
Man-hours

Unit Price
Supply
USD

Unit Price
Labour
USD

Unit Price
Equipment
USD

Total Unit
Price
USD

Total Item
Price
USD

Woke
Code

Note
Material Category

Roads and Yards Works


Compaction of sub-grade

1450.01.01

sqm

20,700

Sub-base with material by Contractor

1450.05.01

cum

7,900

Fill Cat. 4.1.1

Base-course with material by Contractor

1450.08.01

cum

5,200

Fill Cat. 4.1.1

Road shoulder made with imported gravel

1450.16.01

cum

7,300

Fill Cat. 3.2

Roads and Yards complementary works


Guard Rail

1450.20.01

lm

900

Road sign-posts

1450.22.01

ea

Earth trapezoidal ditches


Earth ditches depth 300-500 mm

1450.23
1450.23.01

Excavation for Concrete lined trapezoidal ditches

1450.24.0z

Excavation for Concrete lined trapezoidal ditches depth 300-500 mm

1450.24.01

Concrete lined trapezoidal ditches

1450.24.1z

Concrete lined trapezoidal ditches depth 300-500 mm

1450.24.11

SUB TOTAL

cum

390

cum

2,550

cum

850

1450

Designation of price schedule items

WORK CODE 1470 UNDERGROUND PIPING

Item
Number

Unit

Quantity

Elementary
Man-hours

Total
Man-hours

Unit Price
Supply
USD

Unit Price
Labour
USD

Unit Price
Equipment
USD

Total Unit
Price
USD

Total Item
Price
USD

Work
Code

Note
Material Category

1470

Work Code 1473 - Underground concrete piping


Supply and installation of reinforced concrete pipes.

1473.03

Reinforced concrete pipes diameter 800 mm.

1473.03.09

lm

25

Reinforced concrete pipes diameter 1000 mm.

1473.03.11

lm

131

Reinforced concrete pipes diameter 1600 mm.

1473.03.17

lm

79

lm

Work Code 1478 - Underground Plastic piping


PRESSURE NETWORKS
Supply and installation of Heavy Duty
PVC pipes and fittings (Pressure).
Heavy Duty PVC pipes and fittings of diameter 300 & 310 mm. (pressure)
SUB TOTAL

342672348.xls

1478.05
1478.05.05
1470

Section 2

5 / 20

WEDA BAY NICKEL PROJECT

Attachment III.1B
Revision 1

ROAD FROM MAIN SITE TO CONSTRUCTION CAMP


PACKAGE B (ROAD SECTION 2)

2. QUANTITIES AND PRICE SCHEDULES


Designation of price schedule items

WORK CODE 1710 CONCRETE WORKS

Item
Number

Unit

Quantity

Elementary
Man-hours

Total
Man-hours

Unit Price
Supply
USD

Unit Price
Labour
USD

Unit Price
Equipment
USD

Total Unit
Price
USD

Total Item
Price
USD

Work
Code

Note
Material Category

Elementary
Man-hours

Total
Man-hours

Unit Price
Supply
USD

Unit Price
Labour
USD

Unit Price
Equipment
USD

Total Unit
Price
USD

Total Item
Price
USD

Work
Code

Note
Material Category

1710

Work Code 1714


Lean concrete
Lean concrete for U/G pipes bedding

1711.01
1711.03.01

cum

1714.20.01

cum

280

Box Culverts
Concrete for Box Culverts
SUB TOTAL

1710

Designation of price schedule items

Item
Number

Unit

Quantity

1,900

MAIN WORK COMPLEMENTARY PRICE ITEMS


WORK CODE 1420 - SITE PROTECTION AND PREPARATION

SUB TOTAL

342672348.xls

1420

Benches for embankment on slope

1420.20.01

sqm

Water management during construction

1420.30.01

ls

1420

Section 2

6 / 20

WEDA BAY NICKEL PROJECT

Attachment III.1B
Revision 1

ROAD FROM MAIN SITE TO CONSTRUCTION CAMP


PACKAGE B (ROAD SECTION 2)

2. QUANTITIES AND PRICE SCHEDULES


Designation of price schedule items

WORK CODE 1440 - GRUBBING, SCRUBBING, EARTHWORKS, TANK PAD, DIKES, DITCHES

Item
Number

Unit

Quantity

Elementary
Man-hours

Total
Man-hours

Unit Price
Supply
USD

Unit Price
Labour
USD

Unit Price
Equipment
USD

Total Unit
Price
USD

Total Item
Price
USD

Work
Code

Note
Material Category

1440

Structural fill with material from excavation (serpentinite/peridotite)

1440.15.01

cum

42,487

Placement in dump areas including final shaping

1440.20.01

cum

722,800

Soil grubbing and scrubbing

1420.01.01

sqm

Stability dyke for dump site (using material from excavation)

1440.91.01

cum

123,500

Rock wall for dump site

1440.91.02

cum

2,200

Grass, bushes and trees mixed with vegetation soil, transportation to dumping area

1420.11.01

cum

14,500

Soil grubbing and scrubbing

1420.01.01

sqm

Stability dyke for dump site (using material from excavation)

1440.91.01

cum

1,700

Grass, bushes and trees mixed with vegetation soil, transportation to dumping area

1420.11.01

cum

7,900

General fill from granular material

1440.15.02.01

cum

157,200

Fill Cat. 3.1

Structural fill from granular material

1440.15.02.02

cum

8,400

Fill Cat. 3.2

Imported material supply: catagory 3.2

1440.15.03.01

cum

16,500

Import Cat. 3.2

Imported material supply: catagory 3.3

1440.15.03.02

cum

Imported material supply: catagory 4.1.1

1440.15.03.03

cum

13,800

import Cat. 4.1.1

Imported material supply: catagory 4.1.2

1440.15.03.04

cum

5,000

Import Cat. 4.1.2

1440.15.07

cum

168,200

Fill Cat. 2

Preparation of dump area for dump material


48,200
Fill Cat. 1 or 2

Preparation of storage area for topsoil & biomass


26,200
Fill Cat. 1 or 2

GRANULAR IMPORTED MATERIAL (Supplied by Construction Contractor)

Import Cat. 3.3

GRANULAR MATERIAL (DORO MESMESAN QUARRY or equivalent)


Material excavation

SUB TOTAL

342672348.xls

Preloading

1440.50

Preloading

1440.50.02

cum

Erosion Control Structures

1440.82.zz

Gabion

1440.82.01

cum

Rock protection in flooding area

1440.82.02

cum

Riprap

1440.82.03

cum

Silt fence

1440.82.05

lm

Quarry Cat. 3.1

Fill Cat. 1 or 2

3
170
4,340

1440

Section 2

7 / 20

WEDA BAY NICKEL PROJECT

Attachment III.1B
Revision 1

ROAD FROM MAIN SITE TO CONSTRUCTION CAMP


PACKAGE B (ROAD SECTION 2)

2. QUANTITIES AND PRICE SCHEDULES


Designation of price schedule items

WORK CODE 1450 ROADS and YARDS


Aggregate surface-course

Item
Number

Unit

Quantity

Elementary
Man-hours

Total
Man-hours

Unit Price
Supply
USD

Unit Price
Labour
USD

Unit Price
Equipment
USD

Total Unit
Price
USD

Total Item
Price
USD

Work
Code

Note
Material Category

1450
1450.13.1z

Aggregate surface-course with material by Contractor

1450.13.11

cum

4,680

Fill Cat. 4.1.2

Earth safety berm (compacted)

1450.23.02

cum

2,950

Fill Cat. 3.1

Riprap trapezoidal ditches

1450.26.0z

Riprap trapezoidal ditches depth 300-500 mm

1450.26.01

cum

1,350

lm

4,280

lm

20

Riprap triangular ditches

1450.32.0z

Riprap triangular ditches depth 500 mm

1450.32.01

Slope ditches

1450.40.0z

Slope concrete ditch width 500 mm

1450.40.01

Drainage connection facilities

1450.60.0z

Slope ditch outlet

1450.60.02

ea

Connection from pipe to slope ditch

1450.60.03

ea

SUB TOTAL

1450

Designation of price schedule items

WORK CODE 1710 CONCRETE WORKS

Item
Number

Unit

Quantity

Elementary
Man-hours

Total
Man-hours

Unit Price
Supply
USD

Unit Price
Labour
USD

Unit Price
Equipment
USD

Total Unit
Price
USD

Total Item
Price
USD

Work
Code

Note
Material Category

1710

Headwalls
Concrete for culvert headwalls
SUB TOTAL

342672348.xls

1714.20.02

cum

397

1710

Section 2

8 / 20

WEDA BAY NICKEL PROJECT

Attachment III.1B
Revision 1

ROAD FROM MAIN SITE TO CONSTRUCTION CAMP


PACKAGE B (ROAD SECTION 2)

2. QUANTITIES AND PRICE SCHEDULES


Designation of price schedule items

PAY ITEMS FOR CONTROLLED EXPENSES


Hourly labour rates

Item
Number

Unit

Quantity

Elementary
Man-hours

Total
Man-hours

Unit Price
Supply
USD

Unit Price
Labour
USD

Unit Price
Equipment
USD

Total Unit
Price
USD

Total Item
Price
USD

Woke
Code

Note

1799
1799.10

Foreman
Civil works
Buildings finishings
Highly skilled
Carpenter
Rebarman
Concrete Worker
Pipe fiter
Welder
Plaster
Painter
Semi skilled
Carpenter
Rebarman
Concrete Worker
Plaster
Painter
Unskilled
civil worker
piping
Equipment rental rateS (Day)

1799.10.01
1799.10.02

Hour
Hour

1799.10.03
1799.10.04
1799.10.05
1799.10.06
1799.10.07
1799.10.08
1799.10.09

Hour
Hour
Hour
Hour
Hour
Hour
Hour

1799.10.11
1799.10.12
1799.10.13
1799.10.14
1799.10.15

Hour
Hour
Hour
Hour
Hour

1799.10.16
1799.10.17

Hour
Hour

1799.20

Crane
15T
30T
50T
Self-powered equipment
Forklift ... T
Forklift ... T
Pick-up
Flatbed truck 5 tons
Flotbed truck 10t
Truck mounted with hydraulic crave ...T
Water truck ... m3
Generator 60 kVA
Generator 150 kVA
Generator 300 kVA
Diesel driven arc welder 400 A
Electrical powered 400 A

342672348.xls

1799.20.01
1799.20.02
1799.20.03

Day
Day
Day

1799.20.04
1799.20.05
1799.20.06
1799.20.07
1799.20.08
1799.20.09
1799.20.10
1799.20.11
1799.20.12
1799.20.13
1799.20.14
1799.20.15

Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day

Section 2

9 / 20

WEDA BAY NICKEL PROJECT

Attachment III.1B
Revision 1

ROAD FROM MAIN SITE TO CONSTRUCTION CAMP


PACKAGE B (ROAD SECTION 2)

2. QUANTITIES AND PRICE SCHEDULES


Designation of price schedule items

Item
Number

Unit

1799.20.16
1799.20.17
1799.20.18
1799.20.19

Day
Day
Day
Day

1799.20.20
1799.20.21
1799.20.22
1799.20.23
1799.20.24
1799.20.25
1799.20.26
1799.20.27
1799.20.28
1799.20.29
1799.20.30
1799.20.31
1799.20.32
1799.20.33
1799.20.34
1799.20.35
1799.20.36

Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day

1799.20.40
1799.20.41
1799.20.42
1799.20.43

Day
Day
Day
Day

Quantity

Elementary
Man-hours

Total
Man-hours

Unit Price
Supply
USD

Unit Price
Labour
USD

Unit Price
Equipment
USD

Total Unit
Price
USD

Total Item
Price
USD

Woke
Code

Note

Other
Hydrostatic Test Water Fill Pump
Hydrostatic Test Pressure Pump
Sandblasting equipment
Air compressor ... Ncm3
Civil Equipment
Dozer...HP
Scraper..HP
Back Hoe .. ...Cum
Back Hoe . Cum
Grader ... Lm
Excavator ..cum
Excavator .. cum
Payloader cum
Payloader cum
Dump Truck . . Cum
Concrete Pump Car cum/hr
Asphalt Finisher lm
Asphalt distributor lm
Macadam Roller . T
Tandem Roller . T
Tire Roller . T
Plate Compactor kg
Dewatering
Extra cost for additional pump of flow capacity 5 m3/hr
Extra cost for additional pump of flow capacity 15 m3/hr
Extra cost for additional pump of flow capacity 25 m3/hr
Extra cost for additional pump of flow capacity 40 m3/hr

342672348.xls

Section 2

10 / 20

WEDA BAY NICKEL PROJECT

Attachment III.1B
Revision 1

ROAD FROM MAIN SITE TO CONSTRUCTION CAMP


PACKAGE B (ROAD SECTION 2)

2. QUANTITIES AND PRICE SCHEDULES


Designation of price schedule items

Equipment rental rateS (Month)

Item
Number

Unit

Quantity

Elementary
Man-hours

Total
Man-hours

Unit Price
Supply
USD

Unit Price
Labour
USD

Unit Price
Equipment
USD

Total Unit
Price
USD

Total Item
Price
USD

Woke
Code

Note

1799.30

Crane
15T
30T
50T
Self-powered equipment
Forklift ... T
Forklift ... T
Pick-up
Flatbed truck 5 tons
Flotbed truck 10t
Truck mounted with hydraulic crave ...T
Water truck ... m3
Generator 60 kVA
Generator 150 kVA
Generator 300 kVA
Diesel driven arc welder 400 A
Electrical powered 400 A
Other
Hydrostatic Test Water Fill Pump
Hydrostatic Test Pressure Pump
Sandblasting equipment
Air compressor ... Ncm3
Civil Equipment
Dozer...HP
Scraper...HP
Back Hoe ... Cum
Back Hoe ... Cum
Grader . Lm
Excavator ..cum
Excavator ..cum
Payloader ...cum
Payloader ...cum
Dump Truck . cum
Concrete Pump Car cum/hr
Asphalt Finisher lm
Asphalt distributor lm
Macadam Roller . T
Tandem Roller . T
Tire Roller . T
Plate Compactor kg

342672348.xls

1799.30.01
1799.30.02
1799.30.03

Month
Month
Month

1799.30.04
1799.30.05
1799.30.06
1799.30.07
1799.30.08
1799.30.09
1799.30.10
1799.30.11
1799.30.12
1799.30.13
1799.30.14
1799.30.15

Month
Month
Month
Month
Month
Month
Month
Month
Month
Month
Month
Month

1799.30.16
1799.30.17
1799.30.18
1799.30.19

Month
Month
Month
Month

1799.30.20
1799.30.21
1799.30.22
1799.30.23
1799.30.24
1799.30.25
1799.30.26
1799.30.27
1799.30.28
1799.30.29
1799.30.30
1799.30.31
1799.30.32
1799.30.33
1799.30.34
1799.30.35
1799.30.36

Month
Month
Month
Month
Month
Month
Month
Month
Month
Month
Month
Month
Month
Month
Month
Month
Month

Section 2

11 / 20

WEDA BAY NICKEL PROJECT

Attachment III.1B
Revision 1

ROAD FROM MAIN SITE TO CONSTRUCTION CAMP


PACKAGE B (ROAD SECTION 3)

2. QUANTITIES AND PRICE SCHEDULES


Designation of price schedule items

Item
Number

Total Manhour

Total Item Price (USD)

0.00

0.00

0.00

0.00

0.00

0.00

CIVIL WORKS DIRECT COST SUMMARY


SITE PREPARATION

1400

GRUBBING, SCRUBBING, SITE PROTECTION AND PREPARATION

1420

EARTHWORKS, TANK PAD, DIKES AND DITCHES

1440

ROAD, YARDS, PAVING

1450

UNDERGROUND PIPING

1470

SUB TOTAL
CONCRETE WORKS
CONCRETE WORKS

1700
1710

SUB TOTAL
MAIN WORKS COMPLEMENTARY PRICE ITEMS
SITE PROTECTION AND PREPARATION

1420

GRUBBING AND SCRUBBING, EARTHWORKS, TANK PAD, DIKES AND DITCHES

1440

ROAD, YARDS, PAVING

1450

CONCRETE WORKS

1710

SUB TOTAL
CONTROLLED EXPENSES
HOURLY LABOUR RATES

1799.10

EQUIPMENT RENTAL RATES (DAY)

1799.20

EQUIPMENT RENTAL RATES (MONTH)

1799.30

GRAND TOTAL

342672348.xls

Section 3

12 / 20

WEDA BAY NICKEL PROJECT

Attachment III.1B
Revision 1

ROAD FROM MAIN SITE TO CONSTRUCTION CAMP


PACKAGE B (ROAD SECTION 3)

2. QUANTITIES AND PRICE SCHEDULES


Designation of price schedule items
SITE PREPARATION AND UNDERGROUND SYSTEMS
WORK CODE 1420 - GRUBBING, SCRUBBING, SITE PROTECTION AND PREPARATION
Site Clearing

Item
Number

Unit

Quantity

Unit Price
Labour
USD

Unit Price
Equipment
USD

Total Unit
Price
USD

Total Item
Price
USD

Woke
Code

Note
Material Category

Elementary
Man-hours

Total
Man-hours

Unit Price
Supply
USD

Unit Price
Labour
USD

Unit Price
Equipment
USD

Total Unit
Price
USD

Total Item
Price
USD

Woke
Code

Note
Material Category

1420

1420.01.01

sqm

40,000

1420.01.03

sqm

40,000

Vegetal soil surface installation (Landscaping)

1420.04.01

sqm

SUB TOTAL

Unit Price
Supply
USD

1420.01

Surface levelling

Grass, bushes and trees mixed with vegetation soil, transportation to dumping area

Total
Man-hours

1400

Soil grubbing and scrubbing

Transportation to outside dumps

Elementary
Man-hours

1420.11
1420.11.01

cum

13,800

unit

Quantity

1420

Designation of price schedule items


WORK CODE 1440 - EARTHWORKS, TANK PAD, DIKES AND DITCHES

Item
Number
1440

General Earthworks
General excavation by machine

1440.10

General excavation by machine in loose or compact soil

1440.10.01

cum

122

Cut Cat. 0.2 to 2

General excavation by machine in hard rock

1440.10.03

cum

Cut Cat. 3.1

Hard rock general excavation by blasting

1440.11.01

cum

General fill and embankment with material from excavation

1440.13.01

cum

Cut Cat. 3.1

1,280

Fill Cat. 1 & 2

Sectional/Excavation Earthworks
Section excavations by machine - Trenches (pipes or cables) & Other than typical
foundations

1440.21.0z

Section excavation by machine in earth down to 2m depth

1440.21.01

cum

Cut Cat. 1 & 2

Section excavation by machine in earth from 2 to 4m depth

1440.21.02

cum

230

Cut Cat. 1 & 2

Backfill with material from excavation

1440.23.01

cum

750

Sand for underground pipes, hollow foundation and cable bedding

1440.25.01

cum

60

Soil substitution

1440.50.01

cum

Geo-textile

1440.52.01

sqm

120

Soil improvement

SUB TOTAL

342672348.xls

Fill Cat. 3.2

1420

Section 3

13 / 20

WEDA BAY NICKEL PROJECT

Attachment III.1B
Revision 1

ROAD FROM MAIN SITE TO CONSTRUCTION CAMP


PACKAGE B (ROAD SECTION 3)

2. QUANTITIES AND PRICE SCHEDULES


Designation of price schedule items

Item
Number

WORK CODE 1450 ROADS, YARDS, PAVING

1450

Unit

Quantity

Elementary
Man-hours

Total
Man-hours

Unit Price
Supply
USD

Unit Price
Labour
USD

Unit Price
Equipment
USD

Total Unit
Price
USD

Total Item
Price
USD

Woke
Code

Note
Material Category

Roads and Yards Works


Compaction of sub-grade

1450.01.01

sqm

27,800

Sub-base with material by Contractor

1450.05.01

cum

6,500

Fill Cat. 4.1.1

Base-course with material by Contractor

1450.08.01

cum

4,200

Fill Cat. 4.1.1

Road shoulder made with imported gravel

1450.16.01

cum

7,400

Fill Cat. 3.2

Roads and Yards complementary works


Guard Rail

1450.20.01

lm

2,420

Road sign-posts

1450.22.01

ea

Earth trapezoidal ditches


Earth ditches depth 300-500 mm

1450.23
1450.23.01

Excavation for Concrete lined trapezoidal ditches

1450.24.0z

Excavation for Concrete lined trapezoidal ditches depth 300-500 mm

1450.24.01

Concrete lined trapezoidal ditches

1450.24.1z

Concrete lined trapezoidal ditches depth 300-500 mm

1450.24.11

SUB TOTAL

cum

cum

1,930

cum

630

1450

Designation of price schedule items


WORK CODE 1470 UNDERGROUND PIPING

Item
Number

Unit

Quantity

Elementary
Man-hours

Total
Man-hours

Unit Price
Supply
USD

Unit Price
Labour
USD

Unit Price
Equipment
USD

Total Unit
Price
USD

Total Item
Price
USD

Work
Code

Note
Material Category

1470

Work Code 1473 - Underground concrete piping


Supply and installation of reinforced concrete pipes.

1473.03

Reinforced concrete pipes diameter 800 mm.

1473.03.09

lm

Reinforced concrete pipes diameter 1000 mm.

1473.03.11

lm

37

Reinforced concrete pipes diameter 1600 mm.

1473.03.17

lm

lm

Work Code 1478 - Underground Plastic piping


PRESSURE NETWORKS
Supply and installation of Heavy Duty
PVC pipes and fittings (Pressure).
Heavy Duty PVC pipes and fittings of diameter 300 & 310 mm. (pressure)
SUB TOTAL

342672348.xls

1478.05
1478.05.05
1470

Section 3

14 / 20

WEDA BAY NICKEL PROJECT

Attachment III.1B
Revision 1

ROAD FROM MAIN SITE TO CONSTRUCTION CAMP


PACKAGE B (ROAD SECTION 3)

2. QUANTITIES AND PRICE SCHEDULES


Designation of price schedule items
WORK CODE 1710 CONCRETE WORKS

Item
Number

Unit

Quantity

Elementary
Man-hours

Total
Man-hours

Unit Price
Supply
USD

Unit Price
Labour
USD

Unit Price
Equipment
USD

Total Unit
Price
USD

Total Item
Price
USD

Work
Code

Note
Material Category

Elementary
Man-hours

Total
Man-hours

Unit Price
Supply
USD

Unit Price
Labour
USD

Unit Price
Equipment
USD

Total Unit
Price
USD

Total Item
Price
USD

Work
Code

Note
Material Category

1710

Work Code 1714


Lean concrete
Lean concrete for U/G pipes bedding

1711.01
1711.03.01

cum

1714.20.01

cum

Box Culverts
Concrete for Box Culverts
SUB TOTAL

80

1710
Item
Number

Unit

Benches for embankment on slope

1420.20.01

sqm

Water management during construction

1420.30.01

ls

Designation of price schedule items

Quantity

MAIN WORK COMPLEMENTARY PRICE ITEMS


WORK CODE 1420 - SITE PROTECTION AND PREPARATION

SUB TOTAL

342672348.xls

1420

Section 3

15 / 20

WEDA BAY NICKEL PROJECT

Attachment III.1B
Revision 1

ROAD FROM MAIN SITE TO CONSTRUCTION CAMP


PACKAGE B (ROAD SECTION 3)

2. QUANTITIES AND PRICE SCHEDULES


Designation of price schedule items
WORK CODE 1440 - GRUBBING, SCRUBBING, EARTHWORKS, TANK PAD, DIKES, DITCHES

Item
Number

Unit

Quantity

Elementary
Man-hours

Total
Man-hours

Unit Price
Supply
USD

Unit Price
Labour
USD

Unit Price
Equipment
USD

Total Unit
Price
USD

Total Item
Price
USD

Work
Code

Note
Material Category

1440

Structural fill with material from excavation (serpentinite/peridotite)

1440.15.01

cum

63,195

Placement in dump areas including final shaping

1440.20.01

cum

200

Soil grubbing and scrubbing

1420.01.01

sqm

Stability dyke for dump site (using material from excavation)

1440.91.01

cum

36

Rock wall for dump site

1440.91.02

cum

Grass, bushes and trees mixed with vegetation soil, transportation to dumping area

1420.11.01

cum

60

Soil grubbing and scrubbing

1420.01.01

sqm

Stability dyke for dump site (using material from excavation)

1440.91.01

cum

1,000

Grass, bushes and trees mixed with vegetation soil, transportation to dumping area

1420.11.01

cum

2,500

General fill from granular material

1440.15.02.01

cum

39,400

Fill Cat. 3.1

Structural fill from granular material

1440.15.02.02

cum

7,400

Fill Cat. 3.2

Imported material supply: catagory 3.2

1440.15.03.01

cum

15,600

Import Cat. 3.2

Imported material supply: catagory 3.3

1440.15.03.02

cum

Imported material supply: catagory 4.1.1

1440.15.03.03

cum

11,300

import Cat. 4.1.1

Imported material supply: catagory 4.1.2

1440.15.03.04

cum

4,100

Import Cat. 4.1.2

1440.15.07

cum

4,200

Quarry Cat. 3.1

Fill Cat. 2

Preparation of dump area for dump material


200
Fill Cat. 1 or 2

Preparation of storage area for topsoil & biomass


8,200
Fill Cat. 1 or 2

GRANULAR IMPORTED MATERIAL (Supplied by Construction Contractor)

Import Cat. 3.3

GRANULAR MATERIAL (DORO MESMESAN QUARRY or equivalent)


Material excavation

SUB TOTAL

342672348.xls

Preloading

1440.50

Preloading

1440.50.02

cum

Erosion Control Structures

1440.82.zz

Gabion

1440.82.01

cum

Rock protection in flooding area

1440.82.02

cum

3,090

Riprap

1440.82.03

cum

Silt fence

1440.82.05

lm

Fill Cat. 1 or 2

50
3,640

1440

Section 3

16 / 20

WEDA BAY NICKEL PROJECT

Attachment III.1B
Revision 1

ROAD FROM MAIN SITE TO CONSTRUCTION CAMP


PACKAGE B (ROAD SECTION 3)

2. QUANTITIES AND PRICE SCHEDULES


Designation of price schedule items
WORK CODE 1450 ROADS and YARDS
Aggregate surface-course

Item
Number

Unit

Quantity

3,830

Total
Man-hours

Unit Price
Supply
USD

Unit Price
Labour
USD

Unit Price
Equipment
USD

Total Unit
Price
USD

Total Item
Price
USD

Work
Code

Note
Material Category

1450
1450.13.1z

Aggregate surface-course with material by Contractor

1450.13.11

cum

Earth safety berm (compatcted)

1450.23.02

cum

Riprap trapezoidal ditches

1450.26.0z

Riprap trapezoidal ditches depth 300-500 mm

1450.26.01

cum

lm

lm

Riprap triangular ditches

1450.32.0z

Riprap triangular ditches depth 500 mm

1450.32.01

Slope ditches

1450.40.0z

Slope concrete ditch width 500 mm

1450.40.01

Drainage connection facilities

1450.60.0z

Slope ditch outlet

1450.60.02

ea

Connection from pipe to slope ditch

1450.60.03

ea

SUB TOTAL

Elementary
Man-hours

Fill Cat. 4.1.2


Fill Cat. 3.1

1450

Designation of price schedule items

WORK CODE 1710 CONCRETE WORKS

Item
Number

Unit

Quantity

Elementary
Man-hours

Total
Man-hours

Unit Price
Supply
USD

Unit Price
Labour
USD

Unit Price
Equipment
USD

Total Unit
Price
USD

Total Item
Price
USD

Work
Code

Note
Material Category

1710

Headwalls
Concrete for culvert headwalls
SUB TOTAL

342672348.xls

1714.20.02

cum

95

1710

Section 3

17 / 20

WEDA BAY NICKEL PROJECT

Attachment III.1B
Revision 1

ROAD FROM MAIN SITE TO CONSTRUCTION CAMP


PACKAGE B (ROAD SECTION 3)

2. QUANTITIES AND PRICE SCHEDULES


Designation of price schedule items
PAY ITEMS FOR CONTROLLED EXPENSES
Hourly labour rates

Item
Number

Unit

Quantity

Elementary
Man-hours

Total
Man-hours

Unit Price
Supply
USD

Unit Price
Labour
USD

Unit Price
Equipment
USD

Total Unit
Price
USD

Total Item
Price
USD

Woke
Code

Note

1799
1799.10

Foreman
Civil works
Buildings finishings
Highly skilled
Carpenter
Rebarman
Concrete Worker
Pipe fiter
Welder
Plaster
Painter
Semi skilled
Carpenter
Rebarman
Concrete Worker
Plaster
Painter
Unskilled
civil worker
piping
Equipment rental rateS (Day)

1799.10.01
1799.10.02

Hour
Hour

1799.10.03
1799.10.04
1799.10.05
1799.10.06
1799.10.07
1799.10.08
1799.10.09

Hour
Hour
Hour
Hour
Hour
Hour
Hour

1799.10.11
1799.10.12
1799.10.13
1799.10.14
1799.10.15

Hour
Hour
Hour
Hour
Hour

1799.10.16
1799.10.17

Hour
Hour

1799.20

Crane
15T
30T
50T
Self-powered equipment
Forklift ... T
Forklift ... T
Pick-up
Flatbed truck 5 tons
Flotbed truck 10t
Truck mounted with hydraulic crave ...T
Water truck ... m3
Generator 60 kVA
Generator 150 kVA
Generator 300 kVA
Diesel driven arc welder 400 A
Electrical powered 400 A

342672348.xls

1799.20.01
1799.20.02
1799.20.03

Day
Day
Day

1799.20.04
1799.20.05
1799.20.06
1799.20.07
1799.20.08
1799.20.09
1799.20.10
1799.20.11
1799.20.12
1799.20.13
1799.20.14
1799.20.15

Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day

Section 3

18 / 20

WEDA BAY NICKEL PROJECT

Attachment III.1B
Revision 1

ROAD FROM MAIN SITE TO CONSTRUCTION CAMP


PACKAGE B (ROAD SECTION 3)

2. QUANTITIES AND PRICE SCHEDULES


Designation of price schedule items

Item
Number

Unit

1799.20.16
1799.20.17
1799.20.18
1799.20.19

Day
Day
Day
Day

1799.20.20
1799.20.21
1799.20.22
1799.20.23
1799.20.24
1799.20.25
1799.20.26
1799.20.27
1799.20.28
1799.20.29
1799.20.30
1799.20.31
1799.20.32
1799.20.33
1799.20.34
1799.20.35
1799.20.36

Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day

1799.20.40
1799.20.41
1799.20.42
1799.20.43

Day
Day
Day
Day

Quantity

Elementary
Man-hours

Total
Man-hours

Unit Price
Supply
USD

Unit Price
Labour
USD

Unit Price
Equipment
USD

Total Unit
Price
USD

Total Item
Price
USD

Woke
Code

Note

Other
Hydrostatic Test Water Fill Pump
Hydrostatic Test Pressure Pump
Sandblasting equipment
Air compressor ... Ncm3
Civil Equipment
Dozer...HP
Scraper..HP
Back Hoe .. ...Cum
Back Hoe . Cum
Grader ... Lm
Excavator ..cum
Excavator .. cum
Payloader cum
Payloader cum
Dump Truck . . Cum
Concrete Pump Car cum/hr
Asphalt Finisher lm
Asphalt distributor lm
Macadam Roller . T
Tandem Roller . T
Tire Roller . T
Plate Compactor kg
Dewatering
Extra cost for additional pump of flow capacity 5 m3/hr
Extra cost for additional pump of flow capacity 15 m3/hr
Extra cost for additional pump of flow capacity 25 m3/hr
Extra cost for additional pump of flow capacity 40 m3/hr

342672348.xls

Section 3

19 / 20

WEDA BAY NICKEL PROJECT

Attachment III.1B
Revision 1

ROAD FROM MAIN SITE TO CONSTRUCTION CAMP


PACKAGE B (ROAD SECTION 3)

2. QUANTITIES AND PRICE SCHEDULES


Designation of price schedule items

Equipment rental rateS (Month)

Item
Number

Unit

Quantity

Elementary
Man-hours

Total
Man-hours

Unit Price
Supply
USD

Unit Price
Labour
USD

Unit Price
Equipment
USD

Total Unit
Price
USD

Total Item
Price
USD

Woke
Code

Note

1799.30

Crane
15T
30T
50T
Self-powered equipment
Forklift ... T
Forklift ... T
Pick-up
Flatbed truck 5 tons
Flotbed truck 10t
Truck mounted with hydraulic crave ...T
Water truck ... m3
Generator 60 kVA
Generator 150 kVA
Generator 300 kVA
Diesel driven arc welder 400 A
Electrical powered 400 A
Other
Hydrostatic Test Water Fill Pump
Hydrostatic Test Pressure Pump
Sandblasting equipment
Air compressor ... Ncm3
Civil Equipment
Dozer...HP
Scraper...HP
Back Hoe ... Cum
Back Hoe ... Cum
Grader . Lm
Excavator ..cum
Excavator ..cum
Payloader ...cum
Payloader ...cum
Dump Truck . cum
Concrete Pump Car cum/hr
Asphalt Finisher lm
Asphalt distributor lm
Macadam Roller . T
Tandem Roller . T
Tire Roller . T
Plate Compactor kg

342672348.xls

1799.30.01
1799.30.02
1799.30.03

Month
Month
Month

1799.30.04
1799.30.05
1799.30.06
1799.30.07
1799.30.08
1799.30.09
1799.30.10
1799.30.11
1799.30.12
1799.30.13
1799.30.14
1799.30.15

Month
Month
Month
Month
Month
Month
Month
Month
Month
Month
Month
Month

1799.30.16
1799.30.17
1799.30.18
1799.30.19

Month
Month
Month
Month

1799.30.20
1799.30.21
1799.30.22
1799.30.23
1799.30.24
1799.30.25
1799.30.26
1799.30.27
1799.30.28
1799.30.29
1799.30.30
1799.30.31
1799.30.32
1799.30.33
1799.30.34
1799.30.35
1799.30.36

Month
Month
Month
Month
Month
Month
Month
Month
Month
Month
Month
Month
Month
Month
Month
Month
Month