Beruflich Dokumente
Kultur Dokumente
Calculation
Output
Slab Design
Design of Fourth floor slab panels are illustrated in this report. All slabs
are considered as solid slabs and restrained at supporting beams. Elastic
Analysis was done using the moment coefficients given in the BS 8110.
Panel numbers described here are illustrated in Figure 4.1
BS 8110-I
Cl. 3.3
Table-3.4
Table3.5
= 25mm
= 25mm
Cover =25mm
Panel 2:
BS 8110-I
lx = 3700mm
ly / lx =2.27 2
ly = 8400mm
- Continuous edge
8.4 m
M1
3.7m
M2
M3
Loadings:
Slab thickness as per initial design
= 150mm
= 0.15x24 kN/m2
= 3.6 kN/m2
= 3.5 kN/m2
= 3.6+3.5
= 7.1 kN/m2
Feature
Gk =
Design of slab
7.1 kN/m2
D
H
Q
C
DESIGN UNIT
CONSULTANCY DIVISION
CENTRAL ENGINEERING CONSULTANCY BUREAU (CECB)
Reference
Designed
Checked
Job Code
C-929
Calculation
Output
Qk =
design intent
Date
Date
Page
= 5.0 kN/m2
Design load
= 1.4Gk+1.6Qk
= 1.4 (7.1) +1.6(5.0)
= 17.94 kN/m2
5.0 kN/m2
Design load=
17.94 kN/m2
Similarly ultimate design loads were determined for each panel and
summarized in Figure 4.2
dx
= 150-25-10/2
= 120mm
dy
= 150-25-10-10/2
= 110mm
Moments
Negative moment at continuous edge;
Reynolds
Hand book
Table 26
M1
= wl2
8
= 17.94x3.72
8
= 30.7 kNm/m
M1=
30.7kNm/m
= 0 kNm/m
M3=0 kNm/m
= 9x17.94x3.72
128
= 17.3kNm/m
M2=
17.3kNm/m
= 9wl2
128
M2=17.3
M3=30.7
Values in kNm/m.
DESIGN UNIT
CONSULTANCY DIVISION
CENTRAL ENGINEERING CONSULTANCY BUREAU (CECB)
Reference
Feature
Designed
Checked
Job Code
Calculation
Design of slab
Date
Date
C-929
Page
Output
Shear Force
Shear force at continuous edge;
Reynolds
Hand book
Table 26
Vsx1
= 5wl
8
= 5x17.94x3.7
8
Vsx1=
41.5kN/m
= 41.5kN/m
Shear force at discontinuous edge;
Vsx2
= 3wl
8
= 3x17.94x3.7
8
8.4 m
V1=41.5
3.7m
V2=24.9
Values in kN/m.
24.9kN/m
Vsx2=
24.9kN/m
DESIGN UNIT
CONSULTANCY DIVISION
CENTRAL ENGINEERING CONSULTANCY BUREAU (CECB)
Reference
Feature
Designed
Checked
Job Code
Design of slab
Date
Date
C-929
Page
Calculation
11
Output
Panel 3:
BS 8110-I
lx = 3500mm
ly / lx =2.4
2
ly = 8400mm
- Continuous edge
8.4 m
M1
M2
3.5m
M3
Loadings:
Slab thickness as per initial design
= 150mm
= 0.15x24 kN/m2
= 3.6 kN/m2
= 3.5 kN/m2
= 3.6+3.5
= 7.1 kN/m2
= 5.0 kN/m2
Design load
= 1.4Gk+1.6Qk
= 1.4 (7.1) +1.6(5.0)
= 17.94 kN/m2
dx
= 150-25-10/2
= 120mm
dy
= 150-25-10-10/2
= 110mm
7.1 kN/m2
Qk =
design intent
Gk =
5.0 kN/m2
Design load=
17.94 kN/m2
DESIGN UNIT
CONSULTANCY DIVISION
CENTRAL ENGINEERING CONSULTANCY BUREAU (CECB)
Reference
Calculation
Feature
Designed
Checked
Job Code
Design of slab
Date
Date
C-929
Page
16
Output
Moments
Negative moment at continuous edges;
Reynolds
Hand book
Table 26
M1
= wl2
12
= 17.94x3.52
12
= 18.3 kNm/m
M1=
18.3kNm/m
M3
= wl2
12
= 17.94x3.52
12
= 18.3 kNm/m
M3=
18.3kNm/m
= 17.94x3.52
24
= 9.2kNm
M2=
9.2kNm/m
= wl2
24
3.5m
M3=18.3
Values in kNm/m.
Shear Force
Shear force at continuous edges;
Vsx1
= wl
2
= 17.94x3.5
2
= 31.4 kN/m
Vsx1=
31.4kN/m
Vsx2
= wl
2
= 17.94x3.5
2
Vsx2=
31.4kN/m
= 31.4 kN/m
Project - Defence Head Quarters Complex-Akuregoda
D
H
Q
C
Feature
Designed
Checked
Job Code
DESIGN UNIT
CONSULTANCY DIVISION
CENTRAL ENGINEERING CONSULTANCY BUREAU (CECB)
Reference
Design of slab
Date
Date
C-929
Page
Calculation
17
Output
Values in kN/m.
Panel 8:
BS 8110-I
lx = 3850mm
ly / lx =1.7
ly =6550mm
<2
- Continuous edge
6.55 m
M1
M2
3.85m
M4
M6
M5
M3
= 150mm
h=150 mm
= 0.15x24 kN/m2
= 3.6 kN/m2
= 3.5 kN/m2
= 3.6+3.5
= 7.1 kN/m2
DESIGN UNIT
CONSULTANCY DIVISION
CENTRAL ENGINEERING CONSULTANCY BUREAU (CECB)
Reference
BS 6399
Feature
Designed
Checked
Job Code
7.1kN/m2
Design of slab
Date
Date
C-929
Page
Calculation
Area to be used as AHU room
Therefore imposed load considered
Gk =
18
Output
= 7.5 kN/m2
Qk =
7.5 kN/m2
Design load
dx
BS 8110-I
Cl. 3.5.3.4
= 150-25-10/2
= 120mm
dy
Design load=
21.94 kN/m2
= 150-25-10-10/2
= 110mm
Moments
Msx
Msy
Table 3.15
= 1.4Gk+1.6Qk
= 1.4 (7.1) +1.6(7.5)
= 21.94 kN/m2
=
=
sx. n.lx2
sy. n.lx2
= 0.064
= 0.034
= 21.94 kN/m2
= 3.85 m
= Msx
= 0.085x21.94x3.852
= 27.6 kNm/m
M3=
27.6kNm/m
M5
= Msy
= 0.045x21.94x3.852
= 14.6 kNm/m
M5=
14.6kNm/m
M1
= 0 kNm/m
M1= 0 kNm/m
M4
= 0 kNm/m
M4= 0 kNm/m
= Msx
= 0.064x21.94x3.852
= 20.8 kNm/m
M2=
20.8kNm/m
M6
= Msy
= .034x21.94x3.852
= 11.1 kNm/m
M6=
11.1kNm/m
DESIGN UNIT
CONSULTANCY DIVISION
CENTRAL ENGINEERING CONSULTANCY BUREAU (CECB)
Reference
Feature
Designed
Checked
Job Code
Calculation
Design of slab
Date
Date
C-929
Page
19
Output
M4=0
M6=11.1
M5=14.6
M3=27.6
Values in kNm/m.
BS 8110-I
Cl. 3.5.3.7
Shear Force
Vsx
Vsy
Table 3.16
=
=
vx. n.lx
vy. n.lx
= 0.57
= 0.4
= 0.38
= 0.26
Vsy1
= 0.57x21.94x3.85
= 48.2 kN/m
Vsx1=
= 0.4x21.94x3.85
= 33.8kN/m
Vsy1=
33.8kN/m
48.2 kN/m
= 0.38x21.94x3.85
= 32.1 kN/m
Vsx2=
32.1 kN/m
Vsy2
= 0.26x21.94x3.85
= 22.0 kN/m
Vsy2=
22.0kN/m
DESIGN UNIT
CONSULTANCY DIVISION
CENTRAL ENGINEERING CONSULTANCY BUREAU (CECB)
Reference
Feature
Designed
Checked
Job Code
Design of slab
Date
Date
C-929
Page
Calculation
Output
6.55 m
V1=32.1
3.85m
V4=22.0
V3=33.8
V2=48.2
Values in kN/m.
BS 8110-I
Panel 55:
lx = 4200mm
ly / lx =1.7
ly = 7100mm
<2
- Continuous edge
7.1 m
M2
4.2m
M4
20
M1
M6
M3
M5
h=200 mm
Loadings:
Slab thickness as per initial design
Self weight of slab
=
=
=
=
=
=
For finishes
Total Dead load (Gk)
200mm
0.2x24 kN/m2
4.8 kN/m2
3.5 kN/m2
4.8+3.5
8.3 kN/m2
Gk=
8.3 kN/m2
design intent
= 5.0 kN/m2
DESIGN UNIT
CONSULTANCY DIVISION
CENTRAL ENGINEERING CONSULTANCY BUREAU (CECB)
Reference
dx
21
Output
= 1.4Gk+1.6Qk
= 1.4 (8.3) +1.6(5.0)
= 19.6 kN/m2
= 200-25-10/2
= 170mm
dy
Design load=
19.6 kN/m2
= 200-25-10-10/2
= 160mm
Moments
Msx
Msy
Table 3.15
Design of slab
Date
Date
C-929
Page
Calculation
Design load
BS 8110-I
Cl. 3.5.3.4
Feature
Designed
Checked
Job Code
Qk=
5.0 kN/m2
=
=
sx. n.lx2
sy. n.lx2
= 0.101
= 0.056
= 19.6 kN/m2
= 4.2 m
= Msx
= 0.101x19.6x4.22
= 35.0 kNm/m
M2=
35.0kNm/m
M6
= Msy
= 0.056x19.6x4.22
= 19.4 kNm/m
M6=
19.4kNm/m
M4=0
M5=0
M6=19.4
M3=0
Values in kNm/m.
BS 8110-I
Cl. 3.5.3.7
Shear Force
Vsx
Vsy
=
=
vx. n.lx
vy. n.lx
DESIGN UNIT
CONSULTANCY DIVISION
CENTRAL ENGINEERING CONSULTANCY BUREAU (CECB)
Reference
Table 3.16
Feature
Designed
Checked
Job Code
Design of slab
Date
Date
C-929
Page
Calculation
22
Output
Vsy
= 0.474
= 0.33
= 0.474x19.6x4.2
= 39 kN/m
Vsx=
39 kN/m
= 0.33x19.6x4.2
= 27.2 kN/m
Vsy=
27.2 kN/m
V2=27.2
V1=39
Values in kN/m.
Similarly bending moments and shear forces for all the slab panels
were calculated using co-efficients and shown in following
mentioned Figures
Figure 4.3
Figure 4.4
Figure 4.5
Figure 4.6
Feature
Designed
Checked
Job Code
DESIGN UNIT
CONSULTANCY DIVISION
CENTRAL ENGINEERING CONSULTANCY BUREAU (CECB)
Reference
Design of slab
Date
Date
C-929
Page
Calculation
Output
Moment Distribution :
Consider 1m slab strip along the building longitudinal direction as
shown in the Figure 4.7
BS 8110-I
Cl. 3.5.3.6
30.7
18.3
3.7m
18.3
18.3
3.5m
18.3
3.5m
18.3
3.5m
23
3.5m
= 1
(DF)BA
= 3EI/3.7
(3EI/3.7)+ (4EI/3.5)
= 0.42
(DF)BC
= 1- (DF)BA
= 0.58
(DF)CB
= 4EI/3.5
(4EI/3.5)+ (4EI/3.5)
= 0.5
17.5
17.5
27.6
3.1m
3.85m
(DF)CD
= 1- (DF)CB
= 0.5
(DF)DC
= 4EI/3.5
(4EI/3.5)+ (4EI/3.5)
= 0.5
(DF)DE
= 1- (DF)DC
= 0.5
(DF)ED
= 4EI/3.5
(4EI/3.5)+ (4EI/3.5)
= 0.5
(DF)EF
= 1- (DF)ED
= 0.5
(DF)FE
= 4EI/3.5
(4EI/3.5)+ (4EI/3.1)
= 0.47
(DF)FG
= 1- (DF)FE
= 0.53
(DF)GF
= 4EI/3.1
(4EI/3.1)+ (3EI/3.85)
= 0.62
(DF)GH
= 1- (DF)GF
= 0.38
DESIGN UNIT
CONSULTANCY DIVISION
CENTRAL ENGINEERING CONSULTANCY BUREAU (CECB)
Reference
Feature
Designed
Checked
Job Code
Design of slab
Date
Date
C-929
Page
Calculation
Moment distribution table is shown in the Table 4.1
Calculation of span moments for corrected support moments:
Total bending (Hog.+ Sag.) before = Total bending (Hog.+ Sag.)
distribution
after distribution
Span AB
(0+30.7)/2+17.3
20.1 kNm/m
= a+(0+25.1)/2
= a
18.3+9.2
6.7 kNm
= b+(25.1+16.5)/2
= b
18.3+9.2
9.9 kNm/m
= c+(16.5+18.7)/2
= c
18.3+9.2
8.8 kNm/m
= d+(18.7+18.7)/2
= d
18.3+9.2
9.9 kNm/m
= e+(18.7+16.5)/2
= e
17.5+8.9
6.5 kNm/m
= f+(16.5+23.3)/2
= f
(27.6+0)/2+20.8
= g+(23.3+0)/2
Span BC
Span CD
Span DE
Span EF
Span FG
Span GH
24
Output
23.0 kNm/m
= g
25.1
23.3
18.7
16.5
18.7
6.7
G
6.5
8.8
9.9
16.5
9.9
20.1
23.0
3.7m
3.5m
3.5m
3.5m
3.5m
3.1m
3.85m
DESIGN UNIT
CONSULTANCY DIVISION
CENTRAL ENGINEERING CONSULTANCY BUREAU (CECB)
Reference
Feature
Designed
Checked
Job Code
Design of slab
Date
Date
C-929
Page
Calculation
Design of slabs for moments:
Specimen calculation for slab panel 2 and 8 are illustrated here:
Panel 2
8.4 m
M1=25.1
M2=20.1
3.7m
M3=0
M
bd .fcu
2
26
Output
b = 1000 mm
d = 150-25-5
= 120mm
fcu = 30 N/mm2
k = 20.1x106
(1000) (120)2 x 30
0.046
<
0.156 (k')
M
0.87fy.z
DESIGN UNIT
CONSULTANCY DIVISION
CENTRAL ENGINEERING CONSULTANCY BUREAU (CECB)
Reference
Feature
Designed
Checked
Job Code
Calculation
Design of slab
Date
Date
C-929
Page
29
Output
= 20.1x106
0.87x460x114
= 441mm2/m
BS 8110-I
Table 3.27
= 0.13
= (0.13x1000x150)/100
= 195mm2
No of bars in T12 =
=
Spacing
=
=
441/113.1
3.9
1000/3.9
256 mm
Mid span
bottom main r/f
provide T12 @
200mm
= 0 kNm
= 0.13
= (0.13x1000x150)/100
= 195mm2
= 195/78.54
= 2.48
Spacing
= 1000/2.48
= 403mm
Feature
Designed
Checked
Job Code
DESIGN UNIT
CONSULTANCY DIVISION
CENTRAL ENGINEERING CONSULTANCY BUREAU (CECB)
Reference
Calculation
BS 8110-I
= 25.1 kNm
Cl. 3.5.1
Cl. 3.4.4.4
d = 150-25-(10/5)
= 120mm
fcu
= 30 N/mm2
M
bd .fcu
2
= 25.1x106
(1000 x 1202 x 30)
=
0.058
Design of slab
Date
Date
C-929
Page
30
Output
Mid span
distribution r/f
Provide T10 @
200mm
Select z
As
M
0.87fy.z
= 25.1 x 106
0.87x460x112
= 560 mm2
BS 8110-I
Table 3.27
= 0.13
= (0.13x1000x150)/100
= 195mm2
Support edge
main steel
provide T12 @
200mm
= 0 kNm
DESIGN UNIT
CONSULTANCY DIVISION
CENTRAL ENGINEERING CONSULTANCY BUREAU (CECB)
Reference
BS 8110-I
Table 3.27
Feature
Designed
Checked
Job Code
Design of slab
Date
Date
C-929
Page
Calculation
31
Output
= 0.13
= (0.13x1000x150)/100
= 195mm2
= 195/78.54
= 2.48
Spacing
= 1000/2.48
= 403mm
Support edge
secondary r/f
provide T10 @
200mm
M/bd2
= 20.1x 106
(1000x1202)
1.40
b =
fs = 5fy As req
8 As pro b
= 5x460x441
8x565
= 224.5 N/mm2
Modification factor for tension reinforcement, F1
F1 =
= 0.55+(477-224.5)
120 (0.9+1.4)
=
BS 8110-I
Table 3.12
1.47 <
Actual span
effective depth
= 3700
120
=
30.8
DESIGN UNIT
CONSULTANCY DIVISION
CENTRAL ENGINEERING CONSULTANCY BUREAU (CECB)
Reference
Feature
Designed
Checked
Job Code
Calculation
Allowable span
depth
BS 8110-I
Table 3.10
Basic span
depth
Allowable span
depth
= Basic span x F1 x F2
depth
= (20+26) = 23
2
= 23 x 1.47 x 1
= 33.8
Actual span
depth
<
Allowable span
depth
Design of slab
Date
Date
C-929
Page
32
Output
Vmax = 41.5 kN
vd = V
bd
= 41.5x103
(1000 x 120)
= 0.35N/mm2
BS 8110
Table 3.9
100As
bd
= 100x565
1000x120
= 0.47 < 3
400/d
= 400/120
= 3.33 >
vc =
=
0.79(100As/bd)1/3(400/d)1/4/m
0.79x(0.47)1/3(3.33)1/4/1.25
= 0.66
= 0.66 x (fcu/25)1/3
= 0.70 N/mm2
> vd
Hence, shear check O.K.
DESIGN UNIT
CONSULTANCY DIVISION
CENTRAL ENGINEERING CONSULTANCY BUREAU (CECB)
Reference
Calculation
Panel 8
6.55 m
M1=0
M2=23.0
3.85m
M4=0
M6=16.0
M5=21
M3=23.3
Feature
Designed
Checked
Job Code
Design of slab
Date
Date
C-929
Page
33
Output
M= 23.0kNm
BS 8110
Cl. 3.5.1
Cl. 3.4.4.4
M
bd2.fcu
fcu = 30 N/mm2
d = 150-25-5
= 120mm
k = 23.0x106
(1000) (120)2 x 30
0.053
<
0.156 (k')
M
0.87fy.z
= 23.0x106
0.87x460x113
= 509mm2/m
DESIGN UNIT
CONSULTANCY DIVISION
CENTRAL ENGINEERING CONSULTANCY BUREAU (CECB)
Reference
BS 8110-I
Table 3.27
Feature
Designed
Checked
Job Code
Calculation
Design of slab
Date
Date
C-929
Page
Output
= 0.13
= (0.13x1000x150)/100
= 195mm2
No of bars in T12 =
=
Spacing
=
=
509/113.1
4.5
1000/4.5
222 mm
34
Mid span
BS 8110-I
Cl 3.12.11.2.7 Check for maximum spacing
= 3d or 750 (Which ever lesser)
= 3x120
= 360mm > 200mm
Hence maximum spacing between bars is satisfied.
Long way mid span:
M= 16.0 kNm
BS 8110
Cl. 3.5.1
Cl. 3.4.4.4
M
bd .fcu
2
0.044
<
0.156 (k')
DESIGN UNIT
CONSULTANCY DIVISION
CENTRAL ENGINEERING CONSULTANCY BUREAU (CECB)
Reference
Calculation
Select z
z = 0.95d
= 0.95x110mm
= 104.5mm
As
M
0.87fy.z
Feature
Designed
Checked
Job Code
Design of slab
Date
Date
C-929
Page
35
Output
= 16.0x106
0.87x460x104.5
= 383mm2/m
BS 8110-I
Table 3.27
= 0.13
= (0.13x1000x150)/100
= 195mm2
No of bars in T10 =
=
Spacing
=
=
383/78.54
4.9
1000/4.9
204 mm
Mid span
distribution r/f
provide T10 @
200mm
BS 8110-I
Cl 3.12.11.2.7 Check for maximum spacing
= 3d or 750 (Which ever lesser)
= 3x110
= 330mm > 200mm
Hence maximum spacing between bars is satisfied.
Short way edge:
M
BS 8110-I
= 23.3 kNm
Cl. 3.5.1
Cl. 3.4.4.4
d = 150-25-(10/5)
= 120mm
DESIGN UNIT
CONSULTANCY DIVISION
CENTRAL ENGINEERING CONSULTANCY BUREAU (CECB)
Reference
Calculation
fcu
= 30 N/mm2
= 23.3x106
M
bd2.fcu
Feature
Designed
Checked
Job Code
Design of slab
Date
Date
C-929
Page
36
Output
0.054
Select z
As
M
0.87fy.z
= 23.3 x 106
0.87x460x113
= 515 mm2
BS 8110-I
Table 3.27
= 0.13
= (0.13x1000x150)/100
= 195mm2
Support edge
main steel
provide T12 @
200mm
BS 8110-I
= 21.0 kNm
Cl. 3.5.1
Cl. 3.4.4.4
d = 150-25-(10/5)-10
= 110mm
fcu
= 30 N/mm2
DESIGN UNIT
CONSULTANCY DIVISION
CENTRAL ENGINEERING CONSULTANCY BUREAU (CECB)
Reference
Calculation
k
M
bd .fcu
2
= 21.0x106
Feature
Designed
Checked
Job Code
Design of slab
Date
Date
C-929
Page
37
Output
0.058
Select z
As
M
0.87fy.z
= 21.0 x 106
0.87x460x102
= 514 mm2
BS 8110-I
Table 3.27
= 0.13
= (0.13x1000x150)/100
= 195mm2
DESIGN UNIT
CONSULTANCY DIVISION
CENTRAL ENGINEERING CONSULTANCY BUREAU (CECB)
Reference
Calculation
Check for deflection:
Feature
Designed
Checked
Job Code
Support edge
secondary steel
provide T12 @
200mm
Design of slab
Date
Date
C-929
Page
38
Output
BS 8110
T 3.11
M/bd2
= 23.0x 106
(1000x1202)
1.60
b =
fs = 5fy As req
8 As pro b
= 5x460x509
8x565
= 259 N/mm2
Modification factor for tension reinforcement, F1
F1 =
= 0.55+(477-259)
120 (0.9+1.6)
=
BS 8110-I
Table 3.12
1.28 <
= 3850
120
=
Allowable span
depth
Basic span
depth
Allowable span
depth
32.1
= Basic span x F1 x F2
depth
= 26
= 26 x 1.28x 1
= 33.3
Actual span
depth
<
Allowable span
depth
DESIGN UNIT
CONSULTANCY DIVISION
CENTRAL ENGINEERING CONSULTANCY BUREAU (CECB)
Reference
Calculation
Feature
Designed
Checked
Job Code
Design of slab
Date
Date
C-929
Page
39
Output
= 48.1x103
(1000 x 120)
= 0.40N/mm2
BS 8110
Table 3.9
100Asprov
bd
= 100x565
1000x120
= 0.47 < 3
400/d
= 400/120
= 3.33 >
vc =
=
0.79(100As/bd)1/3(400/d)1/4/m
0.79x(0.47)1/3(3.33)1/4/1.25
= 0.66
= 0.66 x (fcu/25)1/3
= 0.70 N/mm2
> vd
Hence, shear check O.K.
DESIGN UNIT
CONSULTANCY DIVISION
Feature
Designed
Checked
Design of slab
Date
Date
D
H
Q
C
Job Code
C-929
Page
40
Member
AB
COF
BA
BC
CB
CD
DC
DE
ED
EF
FE
FG
GF
GH
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
HG
DF
1.00
0.42
0.58
0.50
0.50
0.50
0.50
0.50
0.50
0.47
0.53
0.62
0.38
1.00
FEM
0.00
30.7
-18.3
18.3
-18.3
18.3
-18.3
18.3
-18.3
18.3
-17.5
17.5
-27.6
0.0
Balance B, F & G
0.00
-5.21
-7.19
-0.38
-0.42
6.26
3.84
0.00
Carry Over
0.00
-3.60
3.20
-0.21
0.00
1.80
Carry Over
0.00
0.00
0.90
0.90
0.05
0.00
-0.38
-0.52
-0.47
-0.47
Carry Over
0.00
-0.26
-0.24
0.00
0.25
0.25
Carry Over
0.00
0.00
0.12
0.00
-0.05
-0.07
Carry Over
0.00
0.00
Carry Over
0.00
-0.19
1.80
0.09
0.00
0.09
-1.50
-1.70
0.10
0.10
0.00
-0.75
0.05
0.05
-0.85
0.37
0.37
-0.05
-0.06
0.51
0.32
0.00
0.18
-0.24
-0.03
0.18
0.26
-0.03
0.00
0.00
-0.09
-0.09
0.13
0.13
-0.21
-0.23
0.02
0.01
0.00
-0.05
0.12
0.07
-0.05
-0.10
0.07
0.01
-0.12
0.02
0.02
-0.10
-0.10
0.07
0.07
-0.04
-0.04
0.07
0.04
0.00
0.01
-0.04
-0.05
0.01
0.04
-0.05
-0.02
0.04
0.04
-0.02
0.00
0.00
-0.01
0.04
0.04
-0.02
-0.02
0.03
0.03
-0.03
-0.04
0.01
0.01
0.00
0.00
0.02
0.00
-0.01
0.02
0.02
-0.01
-0.02
0.02
0.01
-0.02
0.00
0.00
0.00
-0.01
-0.01
0.01
0.01
-0.02
-0.02
0.01
0.01
-0.01
-0.01
0.01
0.01
0.00
Carry Over
0.00
0.00
0.00
0.00
-0.01
0.00
0.00
-0.01
0.00
0.00
0.00
0.00
0.00
0.00
FINAL BM
0.0
25.1
-25.1
16.5
-16.5
18.7
-18.7
18.7
-18.7
16.5
-16.5
23.3
-23.3
0.0
0.00
0.00
27
before
after
17.3
20.1
9.2
6.7
9.2
9.9
9.2
8.8
9.2
9.9
8.9
6.5
20.8
23.0
#REF!
#REF!
JOINT
MOMENT
Joint
Member
COF
DF
FEM
A
AB
B
BA BC
C
CB CD
D
DC DE
E
ED EF
F
FE FG
G
GF GH
OBM
Distribution
Carry Over
FBM
OBM
Distribution
Carry Over
FBM
OBM
Distribution
Carry Over
FBM
OBM
Distribution
Carry Over
FBM
OBM
Distribution
Carry Over
FBM
OBM
Distribution
Carry Over
FBM
OBM
Distribution
Carry Over
FBM
OBM
Distribution
Carry Over
FBM
OBM
Distribution
Carry Over
FBM
OBM
Distribution
Carry Over
FBM
OBM
Distribution
Carry Over
FBM
0
0
0.00
0 0.5
0.42 0.58
30.70 -18.30
0.5 0.5
0.5 0.5
18.30 -18.30
0.5 0.5
0.5 0.5
18.30 -18.30
0.5 0.5
0.5 0.5
18.30 -18.30
0.5 0.5
0.47 0.53
18.30 -17.50
0.5 0
0.62 0.38
17.50 -27.60
0.00
0.00
0.00
12.40
-5.21 -7.19
0.00 0.00
0.00
0.00 0.00
0.00 0.00
0.00
0.00 0.00
0.00 -0.19
0.80
-0.38 -0.42
0.00 3.13
0.00
25.49 -25.49
14.70 -18.30
18.30 -18.30
18.30 -18.49
17.92 -14.79
0.00
0.00
0.00
0.00
0.00 0.00
0.00 0.90
-3.60
1.80 1.80
0.00 0.00
0.00
0.00 0.00
0.90 0.05
-0.19
0.09 0.09
0.00 -0.74
3.13
-1.47 -1.66
0.05 0.07
0.00
25.49 -24.59
16.50 -16.50
19.20 -18.25
18.39 -19.13
16.50 -16.39
0.00
0.00
0.00
0.90
-0.38 -0.52
0.00 0.00
0.00
0.00 0.00
-0.26 -0.24
0.95
-0.47 -0.47
0.00 0.18
-0.74
0.37 0.37
-0.24 -0.03
0.11
-0.05 -0.06
0.18 0.26
0.00
25.11 -25.11
16.24 -16.74
18.73 -18.54
18.53 -18.79
16.63 -16.19
0.00
0.00
0.00
0.00
0.00 0.00
0.00 0.12
-0.50
0.25 0.25
0.00 -0.05
0.18
-0.09 -0.09
0.12 0.07
-0.26
0.13 0.13
-0.05 -0.10
0.44
-0.21 -0.23
0.07 0.01
0.00
25.11 -24.99
16.49 -16.54
18.76 -18.57
18.61 -18.76
16.49 -16.41
0.00
0.00
0.00
0.12
-0.05 -0.07
0.00 0.01
-0.05
0.02 0.02
-0.04 -0.05
0.19
-0.10 -0.10
0.01 0.04
-0.15
0.07 0.07
-0.05 -0.02
0.08
-0.04 -0.04
0.04 0.04
0.00
25.06 -25.05
16.48 -16.56
18.67 -18.63
18.64 -18.70
16.49 -16.42
0.00
0.00
0.00
0.01
0.00 -0.01
0.00 0.02
-0.08
0.04 0.04
0.00 -0.01
0.05
-0.02 -0.02
0.02 0.02
-0.07
0.03 0.03
-0.01 -0.02
0.07
-0.03 -0.04
0.02 0.01
0.00
25.06 -25.04
16.52 -16.53
18.67 -18.63
18.66 -18.69
16.47 -16.45
0.00
0.00
0.00
0.02
-0.01 -0.01
0.00 0.00
-0.02
0.01 0.01
-0.01 -0.01
0.04
-0.02 -0.02
0.00 0.01
-0.03
0.01 0.01
-0.01 -0.01
0.02
-0.01 -0.01
0.01 0.01
0.00
25.05 -25.04
16.52 -16.53
18.66 -18.65
18.66 -18.68
16.47 -16.46
23.29 -23.30
0.00
0.00
0.00
0.00
0.00 0.00
0.00 0.00
-0.02
0.01 0.01
0.00 0.00
0.01
-0.01 -0.01
0.00 0.00
-0.01
0.01 0.01
0.00 0.00
0.01
-0.01 -0.01
0.00 0.00
-0.01
0.00 0.00
0.00 0.00
0.00
25.05 -25.04
16.52 -16.53
18.65 -18.65
18.67 -18.67
16.47 -16.46
23.29 -23.29
0.00
0.00
0.00
0.00
0.00 0.00
0.00 0.00
0.00
0.00 0.00
0.00 0.00
0.01
0.00 0.00
0.00 0.00
-0.01
0.00 0.00
0.00 0.00
0.01
0.00 0.00
0.00 0.00
0.00
0.00 0.00
0.00 0.00
0.00
25.05 -25.04
16.52 -16.53
18.65 -18.65
18.67 -18.67
16.47 -16.46
23.29 -23.29
0.00
0.00
0.00
0.00
0.00 0.00
0.00 0.00
0.00
0.00 0.00
0.00 0.00
0.00
0.00 0.00
0.00 0.00
0.00
0.00 0.00
0.00 0.00
0.00
0.00 0.00
0.00 0.00
0.00
0.00 0.00
0.00 0.00
0.00
25.04 -25.04
16.53 -16.53
18.65 -18.65
18.67 -18.67
16.47 -16.46
23.29 -23.29
0.00
0.00
0.00
0.00
0.00 0.00
0.00 0.00
0.00
0.00 0.00
0.00 0.00
0.00
0.00 0.00
0.00 0.00
0.00
0.00 0.00
0.00 0.00
0.00
0.00 0.00
0.00 0.00
0.00
0.00 0.00
0.00 0.00
0.00
25.04 -25.04
16.53 -16.53
18.65 -18.65
18.67 -18.67
16.46 -16.46
23.29 -23.29
0.00
0.00 0.00
-3.60 0.00
H
HG
-10.10
6.26 3.84
-0.21 0.00
0.00
0.00
0.00
23.55 -23.76
-0.21
0.13 0.08
-0.83 0.00
0.00
0.00
0.00
0.00
22.85 -23.68
-0.83
0.51 0.32
-0.03 0.00
0.00
0.00
0.00
0.00
23.34 -23.37
-0.03
0.02 0.01
-0.12 0.00
0.00
0.00
0.00
0.00
23.24 -23.35
-0.12
0.07 0.04
-0.02 0.00
0.00
0.00
0.00
0.00
23.29 -23.31
-0.02
0.01 0.01
-0.02 0.00
0.00
0.00
0.00
0.00
23.28 -23.30
-0.02
0.01 0.01
-0.01 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
At Spans
Initial Moments
Final Moments
0
0
0.00
17.30
9.20
9.20
9.20
9.20
8.90
20.80
20.13
6.71
9.91
8.84
9.93
6.52
22.95
0.00