COMMERCIALOFFICES,LABOUR/STAFFACCOMMODATIONALQOUZTHIRD,DUBAI

SHOPDRAWING(CIVILSTRUCTURAL)
Status: A = Approved,
S.No.

SUBMITTAL NO.

Rev.

B = Approved As Noted,
Document
Document / Drawing #
Preparation Date

3-Apr-2016

16-Apr-16

394DXB/00100/001

03-Apr-16

13-Apr-16

394DXB/00100/002

03-Apr-16

16-Apr-16

394DXB/00100/003

394DXB/00100/004

394DXB/00100/005

Description

Discipline

DRAWING &
CALCULATIONS

STRUCTURAL

DRAWING &
CALCULATIONS

GENERAL

DRAWING

GENERAL

D = Not Required,

TOWER CRANE DETAILS & FOUNDATION LAYOUT PLAN

E = Not Approved

Sub
Cont/Supplier/Mnft
r.

Issued To

JEIKOR

MIMAR

Date Received By
The Consultant

Date Send to
Contractor

05-Apr-16

7-Apr-16

Review Days Reviewed By

JEIKOR

SITE LOGISTIC PLAN

JEIKOR

Remarks

REJECTED

CALCULATION APPROVED

ENG TAREQ
17-Apr-16

SIGN BOARD SHOP DRAWING & CALCULATIONS

Status Key

05-Apr-16

11-Apr-16

14-Apr-16

17-Apr-16

05-Apr-16

11-Apr-16

17-Apr-16

21-Apr-16

MIMAR

RESUBMIT

APPROVED AS NOTED

ENG TAREQ

MIMAR

REJECTED

RESUBMIT

ENG TAREQ

19-Apr-16

16-May-16

28

ENG TAREQ

REJECTED

18-May-16

23-May-16

ENG TAREQ

APPROVED AS
NOTED,RESUBMIT

24-May-16

24-May-16

24-May-16

ENG TAREQ

APPROVED AS NOTED

25-May-16

26-May-16

1-Jun-16

ENG TAREQ

APPROVED AS NOTED

22-Jun-16

22-Jun-16

3-Jul-16

11

ENG TAREQ

REJECTED

13-Jul-16

13-Jul-16

24-Jul-16

11

ENG TAREQ

REJECTED

24-Jul-16

25-Jul-16

ENG TAREQ

REJECTED

19-Apr-16

18-May-16

24-Jul-16

DRAWING

DRAWING

STRUCTURAL

STRUCTURAL

EXCAVATION SHOP DRAWING

JEIKOR

RAFT SLAB BOTTOM & TOP REINFORCEMENT PLAN & SECTIONAL


DETAILS (AS PER OLD REVISION)

JEIKOR

MIMAR

MIMAR

01-Aug-16

05-Aug-16

11-Aug-16

ENG.NAWAR

B+C

2 APPROVED AS NOTED + 2
RESUBMIT

14-Aug-16

15-Aug-16

21-Aug-16

ENG.NAWAR

APPROVED AS NOTED

5-Sep-16

5-Sep-16

06-09-16

ENG.Khalid

APPROVED AS NOTED

26-May-16

REINFORCEMENT SHOP DRAWING FOR UGWT

26-May-16

1-Jun-16

ENG TAREQ

APPROVED

03-Aug-16

REINFORCEMENT SHOP DRAWING FOR UGWT(PLAN & SECTION AS


PER NEW REVISION)

04-Aug-16

11-Aug-16

Eng.Nawar

RESUBMIT

14-Aug-16

REINFORCEMENT SHOP DRAWING FOR UGWT

15-Aug-16

25-0816

11

ENG.NAWAR

B+C

2 APPROVED AS NOTED + 2
RESUBMIT

05-Sep-16

SHOP DRAWING FOR WATER TANK & PUMP ROOM WITH SECTION
DETAILS .

05-Sep-16

06-Sep-16

ENG.Khalid

APPROVED AS NOTED

30-May-16

31-May-16

1-Jun-16

ENG TAREQ

APPROVED

30-May-16

31-May-16

8-Jun-16

ENG TAREQ

APPROVED AS NOTED

22-Jun-16

22-Jun-16

27-Jun-16

ENG TAREQ

REJECTED

394DXB/00100/006

394DXB/00100/007

C = Approved As Noted, Resubmit,

DRAWING

394DXB/00100/008

DRAWING

DRAWING

STRUCTURAL

STRUCTURAL

STRUCTURAL

COLUMN LAYOUT PLAN & DETAILS AT ROOF FLOOR LEVEL

SUB STRUCTURE WATERPROOFING PLAN & SECTION

JEIKOR

JEIKOR

JEIKOR

MIMAR

MIMAR

MIMAR

12Jul16

12Jul16

240716

13

ENG TAREQ

REJECTED

030816

040816

110816

ENG TAREQ

B+C

1 APPROVED AS NOTED + 1
RESUBMIT

30-May-16

31-May-16

5-Jun-16

ENG TAREQ

APPROVED AS NOTED

28-Jun-16

3-Jul-16

ENG TAREQ

REJECTED

394DXB/00100/009

COLUMN LAYOUT PLAN & DETAILS FROM 1ST TO 3RD FLOOR (AS PER
OLD REVISION)
DRAWING

28-Jun-16

STRUCTURAL

JEIKOR
COLUMN LAYOUT PLAN & DETAILS FROM 1ST TO 3RD FLOOR (AS PER
NEW REVISION)

Page1of2

MIMAR

Status: A = Approved,
S.No.

SUBMITTAL NO.

Rev.

0
10

Document
Document / Drawing #
Preparation Date

DRAWING

394DXB/00100/014

COLUMN LAYOUT PLAN & DETAILS AT G.FLOOR WITH CORE


REINFORCEMENT DETAILS

Issued To

JEIKOR

MIMAR

Date Received By
The Consultant

Date Send to
Contractor

31-May-16

5-Jun-16

Review Days Reviewed By

Status Key

Remarks

ENG TAREQ

REJECTED

REINFORCEMENT SHOP DRAWING FOR GF CORE WALL

14-Jun-16

20-06-16

ENG TAREQ

REJECTED

30-May-16

31-May-16

05-Jun-16

ENG TAREQ

REJECTED

14-Jun-16

REINFORCEMENT SHOPDRAWING FOR SUB STRUCTURE CORE WALL &


COLUMNS (AS PER OLD REIVISION)

14-Jun-16

15-Jun-16

ENG TAREQ

APPROVED AS NOTED

26-Jun-16

REINFORCEMENT SHOPDRAWING FOR SUB STRUCTURE CORE WALL &


COLUMNS (AS PER NEW REIVISION)

26-Jun-16

3-Jul-16

ENG TAREQ

REJECTED

17-Jul-16

SUB STRUCTURE REINFORCEMENT SHOP DRAWING FOR NECK


COLUMN

17-Jul-16

24-Jul-16

ENG TAREQ

REJECTED

394DXB/00100/011

14

STRUCTURAL

Description

E = Not Approved

Sub
Cont/Supplier/Mnft
r.

SUBSTRUCTURE REINFORCEMENT (NECK COLUMN0 LAYOUT WITH


SUB STRUCTURE & REINFOREMENT CORE WALL)

394DXB/00100/012

Discipline

D = Not Required,

14-Jun-16

12

C = Approved As Noted, Resubmit,

30-May-16

394DXB/00100/010
1

11

B = Approved As Noted,

DRAWING

STRUCTURAL

JEIKOR

MIMAR

19-Jul-16

SUBSTRUCTURE SHOP DRAWING FOR CORE WALL 1 TO 5 & LIFT WITH


SECTIONS BELOW SLAB ON GRADE

19-Jul-16

24-Jul-16

ENG TAREQ

REJECTED

24-Jul-16

SUB STRUCTURE REINFORCEMENT SHOP DRAWING FOR NECK


COLUMN

24-Jul-16

31-Jul-16

ENG TAREQ

REJECTED

24-Jul-16

SUBSTRUCTURE SHOP DRAWING FOR CORE WALL 1 TO 5 & LIFT WITH


SECTIONS BELOW SLAB ON GRADE

24-Jul-16

31-Jul-16

ENG TAREQ

REJECTED

3-Aug-16

REINFORCEMENT DETAIL SHOP DRAWING FOR CORE WALL & LIFT


AND NECK COLUMNS.

4-Aug-16

11-Aug-16

ENG TAREQ

APROVED

14-Jun-16

JEIKOR

MIMAR

14-Jun-16

15-Jun-16

ENG TAREQ

REJECTED

21-Jul-16

23-Jul-16

24-Jul-16

ENG TAREQ

REJECTED

24-Jul-16

JEIKOR

MIMAR

24-Jul-16

4-Aug-16

12

ENG TAREQ

REJECTED (1 DWNG.APPROVED)

06-Aug-16

07-Aug-16

18-Aug-16

12

ENG.Nawar

B+E
B+C

DRAWING

SRUCTURAL

REINFORCEMENT DETAIL SHOP DRAWING FOR CORE WALL FROM (1


TO 5) @ TYPICAL FLOOR LEVEL.

DRAWING

SRUCTURAL

SHOP DRAWING FOR SLAB ON GRADE PLAN & SECTIONS

2 APPROVED AS NOTED + 1
RESUBMIT
1 APPROVED AS NOTED + 1
RESUBMIT

15

394DXB/00100/015

24-Jul-16

DRAWING

SRUCTURAL

SHOP DRAWING FOR TIE BEAM PLAN & SECTIONS.

JEIKOR

MIMAR

24-Jul-16

11-Aug-16

19

ENG TAREQ

16

394DXB/00100/016

20-Aug-16

DRAWING

SRUCTURAL

LEVEL PLAN FOR GROUND FLOOR

JEIKOR

MIMAR

20-Aug-16

21-Aug-16

ENG.Nawar

APPROVED AS NOTED

17

394DXB/00100/017

03-Sep-16

DRAWING

SRUCTURAL

SHOP DRAWING FOR TIE BEAM WITH ARCHITECTURAL &


STRUCTURAL LEVELS

JEIKOR

MIMAR

03-Sep-16

8-Sep-16

ENG.Nawar

REJECTED

Page2of2