KAMPUNG TUAN SEH BAGI FASA 1, FASA 2A, FASA 2B, DI ATAS LOT 5909-6031, LOT 6083-6106, DAN
LOT 5914-6117, MUKIM SEDILI BESAR, DAERAH KOTA TINGGI, JOHOR DARUL TAKZIM
Summary
Item
Description
Amount (RM)
20,000.00
31,600.00
60,100.00
34,478.00
15,000.00
611,000.00
6,500.00
Total
772,178.00
PEMBINAAN TANGKI AIR DI ATAS LOT PTD 6109 UNTUK PEMBANGUNAN PERUMAHAN TERSUSUN
KAMPUNG TUAN SEH BAGI FASA 1, FASA 2A, FASA 2B, DI ATAS LOT 5909-6031, LOT 6083-6106, DAN
LOT 5914-6117, MUKIM SEDILI BESAR, DAERAH KOTA TINGGI, JOHOR DARUL TAKZIM
Unit
lot
RM9,000.00
lot
RM15,000.00
B
1
Discharge pipework
To supply and install 125 mm MS discharge
pipework connecting Pump to Elevated Reservoir
c/w excavation works, trust block, duct foot,
valve, bracket, hangers, support, painting,
valves,reducer and all necessary accessories
from pumps discharge outlet to Main Pipe as per
SAJ specifications.
PUMP
To supply and install Horizontal Split Casing
pump with system utilising microcomputer
controller c/w hydro pneumatic tank, air
compressor, control panel, mimic diagram,
strainer, non return valves, Motorised gate
valves system, conduit cabling, control
wiring between switchboard and various
equipment as required by SAJ
lot
###
lot
RM20,000.00
Lot
###
Total
###
PEMBINAAN TANGKI AIR DI ATAS LOT PTD 6109 UNTUK PEMBANGUNAN PERUMAHAN TERSUSUN
KAMPUNG TUAN SEH BAGI FASA 1, FASA 2A, FASA 2B, DI ATAS LOT 5909-6031, LOT 6083-6106, DAN
LOT 5914-6117, MUKIM SEDILI BESAR, DAERAH KOTA TINGGI, JOHOR DARUL TAKZIM
Item
E
Description
Unit Quantity
Rate (RM)
Amount (RM)
RM40,000
RM52,000
Telemetry System
Supply ad install Supervisory Control and Data
Acquisition (SCADA) system c/w lighting surge
protection unit as per drawing and SAJ
specification.
Lot
RM45,000
Earthing system
Lot
Supply and install Uquipotential Earth Busbar for
all system as per drawing and SAJ specification.
RM55,000
Lot
RM5,000.00
Lot
RM10,000.00
Lot
RM70,000.00
PEMBINAAN TANGKI AIR DI ATAS LOT PTD 6109 UNTUK PEMBANGUNAN PERUMAHAN TERSUSUN
KAMPUNG TUAN SEH BAGI FASA 1, FASA 2A, FASA 2B, DI ATAS LOT 5909-6031, LOT 6083-6106, DAN
LOT 5914-6117, MUKIM SEDILI BESAR, DAERAH KOTA TINGGI, JOHOR DARUL TAKZIM
Total
###
PEMBINAAN TANGKI AIR DI ATAS LOT PTD 6109 UNTUK PEMBANGUNAN PERUMAHAN TERSUSUN
KAMPUNG TUAN SEH BAGI FASA 1, FASA 2A, FASA 2B, DI ATAS LOT 5909-6031, LOT 6083-6106, DAN
LOT 5914-6117, MUKIM SEDILI BESAR, DAERAH KOTA TINGGI, JOHOR DARUL TAKZIM
Description
Unit Qty
Rate
Amount
Total
Lump Lum
Sum
p
Sum
###
###
PEMBINAAN TANGKI AIR DI ATAS LOT PTD 6109 UNTUK PEMBANGUNAN PERUMAHAN TERSUSUN
KAMPUNG TUAN SEH BAGI FASA 1, FASA 2A, FASA 2B, DI ATAS LOT 5909-6031, LOT 6083-6106, DAN
LOT 5914-6117, MUKIM SEDILI BESAR, DAERAH KOTA TINGGI, JOHOR DARUL TAKZIM
Work Description
Unit Quantity
Rate
Amount
No.
5,000.00
5,000.00
500.00
500.00
200
600.00
2,400.00
Nos.
150.00
900.00
Nos.
800.00
4,800.00
90.00
###
###
PEMBINAAN TANGKI AIR DI ATAS LOT PTD 6109 UNTUK PEMBANGUNAN PERUMAHAN TERSUSUN
KAMPUNG TUAN SEH BAGI FASA 1, FASA 2A, FASA 2B, DI ATAS LOT 5909-6031, LOT 6083-6106, DAN
LOT 5914-6117, MUKIM SEDILI BESAR, DAERAH KOTA TINGGI, JOHOR DARUL TAKZIM
Work Description
No.
1,000.00
1,000.00
2,500.00
2,500.00
Unit Qty
No.
mete 100
r
Rate
###
250.00
80.00
200.00
Amount
###
###
1,600.00
###
###
PEMBINAAN TANGKI AIR DI ATAS LOT PTD 6109 UNTUK PEMBANGUNAN PERUMAHAN TERSUSUN
KAMPUNG TUAN SEH BAGI FASA 1, FASA 2A, FASA 2B, DI ATAS LOT 5909-6031, LOT 6083-6106, DAN
LOT 5914-6117, MUKIM SEDILI BESAR, DAERAH KOTA TINGGI, JOHOR DARUL TAKZIM
Work Description
Unit Qty
Lighting Point using 2 x 1.5mm2 PVC and 1.5 mm2 PVC Nos
earth wire c/w 10A 1 way SP flush ivory switch.
14
Rate
Amount
100.00 1,400.00
a. Emergency luminance
b. Keluar Sign
Nos
Nos
3
1
80.00
80.00
240.00
80.00
Nos
100.00
100.00
Nos
Nos
4
1
120.00
120.00
480.00
120.00
a. 1 gang
Nos
400.00
400.00
No.
100.00
100.00
No.
400.00
800.00
Electrical Fittings
Nos.
14
150.00
450.00
150.00
150.00
b. 2 gang
5
No.
72.00 1,008.00
150.00
150.00
PEMBINAAN TANGKI AIR DI ATAS LOT PTD 6109 UNTUK PEMBANGUNAN PERUMAHAN TERSUSUN
KAMPUNG TUAN SEH BAGI FASA 1, FASA 2A, FASA 2B, DI ATAS LOT 5909-6031, LOT 6083-6106, DAN
LOT 5914-6117, MUKIM SEDILI BESAR, DAERAH KOTA TINGGI, JOHOR DARUL TAKZIM
Item
C Earthing
Total
Work Description
Unit Qty
LOT
Gantry Cranes
L/S
Rate
###
Amount
5,000.00 5,000.00
###
###
Capacity : 1 ton
E
No
1,000.00 4,000.00
PEMBINAAN TANGKI AIR DI ATAS LOT PTD 6109 UNTUK PEMBANGUNAN PERUMAHAN TERSUSUN
KAMPUNG TUAN SEH BAGI FASA 1, FASA 2A, FASA 2B, DI ATAS LOT 5909-6031, LOT 6083-6106, DAN
LOT 5914-6117, MUKIM SEDILI BESAR, DAERAH KOTA TINGGI, JOHOR DARUL TAKZIM
Total
###
PEMBINAAN TANGKI AIR DI ATAS LOT PTD 6109 UNTUK PEMBANGUNAN PERUMAHAN TERSUSUN
KAMPUNG TUAN SEH BAGI FASA 1, FASA 2A, FASA 2B, DI ATAS LOT 5909-6031, LOT 6083-6106, DAN
LOT 5914-6117, MUKIM SEDILI BESAR, DAERAH KOTA TINGGI, JOHOR DARUL TAKZIM
Work Description
Unit Qty
Rate
###
Amount
###
PEMBINAAN TANGKI AIR DI ATAS LOT PTD 6109 UNTUK PEMBANGUNAN PERUMAHAN TERSUSUN
KAMPUNG TUAN SEH BAGI FASA 1, FASA 2A, FASA 2B, DI ATAS LOT 5909-6031, LOT 6083-6106, DAN
LOT 5914-6117, MUKIM SEDILI BESAR, DAERAH KOTA TINGGI, JOHOR DARUL TAKZIM
Grand Total
###
PEMBINAAN TANGKI AIR DI ATAS LOT PTD 6109 UNTUK PEMBANGUNAN PERUMAHAN TERSUSUN
KAMPUNG TUAN SEH BAGI FASA 1, FASA 2A, FASA 2B, DI ATAS LOT 5909-6031, LOT 6083-6106, DAN
LOT 5914-6117, MUKIM SEDILI BESAR, DAERAH KOTA TINGGI, JOHOR DARUL TAKZIM
Work Description
Unit Qty
Rate
Amount
nos
1,000.00
1,000.00
32mm HDPE PN12.5 to water tank c/w SAJ water meter stand
2.1 and all acessories
Lot
500.00
500.00
Lot
100.00
100.00
Lot
500.00
500.00
nos
450.00
900.00
Lot
1,000.00
1,000.00
Lot
1,500.00
1,500.00
Lot
1,000.00
1,000.00
PEMBINAAN TANGKI AIR DI ATAS LOT PTD 6109 UNTUK PEMBANGUNAN PERUMAHAN TERSUSUN
KAMPUNG TUAN SEH BAGI FASA 1, FASA 2A, FASA 2B, DI ATAS LOT 5909-6031, LOT 6083-6106, DAN
LOT 5914-6117, MUKIM SEDILI BESAR, DAERAH KOTA TINGGI, JOHOR DARUL TAKZIM
Grand Total
6,500.00