‘Attention: Me. Manish S Jain (Operations Manager)
2. PowerMlach Engineering WLLL.
(CRN, a4)
P.O Box 12202
Doha, State of Qatar
Attention: Me, Mahmood Al Haj (Project Manager)
DearS,
PROJECT: “CONSTRUCTION, COMPLETION AND MAINTENANCE OF MINISTRY OF INTERIOR
HEADQUARTERS AT WADI AL SAIL, DONA, QATAR
SUBJECT: _Kahramaa Approval for 11Ke Switchgear
Wim reference to above mentoned subect and the Kalvanaa inspecion held at aie for 77K
Swichers
‘leas tnd atached herewih the Katramaa approval fr 11hv Swichgoars st: EDIDMSY1 1902018.
ed 267 Je 2018 receive rom CEG Urough eral dated 30" June S016 wich oe ebay
for your atenton and acon,
‘This is for your information, record and necessary action
Thank you
Yours fay,
For and on behalf of WCT Berhad
e_
Project Droctor
Wer Beas (aster Branch) awe
hots eg Bsn nce aster, oe 28
i euaeeacmmy oncomSakti
Subject: We: Lk Swen gear Approval for NOH
‘ataehments: 4-413-2008pat
From: Hesham Ahmed {maltosheshamcee2®vahoo.com)
Sent: Tuesday, lune 30,2015 7:35 AM
‘To: Dominic Voon Fook Leong
Ce: lames Andrew Cha ina Abul Aa; Koh Lek Keo
‘Subject: F114 Switch goar Approval for MOFHO.
nt Felix: Same Yousset
FR
Best Regard,
Hesham Ahmed, PMP
Mob, 55521004
CEG imematona
~~ Forwarded Message ~~
From: Bij Abyaham
“To: "vak10977000(2vahoo co. ;"Heshar Aled (ushameagafBrahoo con)
Wasson “Aahassan@mo.co1aa>
‘Sent: Tuoscay, June 90,2015 619. AM.
‘Subject: 11KV Sitch gear Aoprovel fr MOLHO
Dear Al,
Pease find attached copy of 1 1KV Switch gear Approval for MOI-HO.
Regards,
Bij Abraham
Tel(O}-2367728, (M)-39572522
rom: Malgeontar Op Bakshoa
‘Sen Monday, Juno 29, 2015 138 PM
‘Tor il Aaron
Subject Fv
TIKV Switchgear si oe ily te J yan stys
From: Sui Kandakath [nalto:skandakathln com aa
‘Sent: Monday, June 29,2018 1102 AM
Tot Malgoork Oxo Bakishna
‘Subject: FA
From: Sul Kandskath
Sent: Monday, June 29,2015 10:57 AM
Tor pradoep kanbalur@anabooseh cont
Subjectvant ZF
Letter
Te:
“From: "
Date: 2018/06/28 ¢ 13609908 es
our Ref. tan
Total i
Pages:
‘Approval of indoor Switchgear peek
Manufactured by M/s. SCHNEIDER Fletrc- UK ak
‘Subject: Project Supply to Head Quarters of Ministry of
Interior at Wadi AL Sail_KM SCHEME 6 4-413.2009
Dear Sir,
“Greeting from Qatar General Electricity & Water Comoration (KAHRAMAA)"
\With reference to our Inspection reports (Reports: 1273), please be informed that
Yur Indoor Suitchgears (30n0s) 25KA Genle Evo (fixed type) Manufactured by
Mis. SCHNEIDER Eloctric - UK wore inspected at ste and approved subject to the
falling
‘Schneider shall complete the following =
+ Schneider recommended site tess to be complaed to confiradat cubmiti Ft
to energize crtiate
Note:
‘This approvals vali for one year
Regards,
Eng. NassorMNNaimi
‘Manager, Electricity Distribution Dept.