AMEXURE-2

PUNCH POINTS
SR.NO.
4
5
6
7
8
9
10

PARTICULAR
SPACE FOR EQUIPMENT
Floor
Door
Id ladder
lighting
earthing system
earthing bus bar

11
12

PIU/ACDB
mains incomer

13

DC power availality

14
15
16
17
18
19
21
22
24
26
28
30
32

DG
Air-conditioning
WFT
tower
type
cable ladder
lighting protection
aviation light
antenna mount
GSM aantenna mount hts (exiting)
MW antenna mount ht.(exiting)
GSM aantenna azimuth (as per TND)
MW antenna azimuth (as pr TND)

AMEXURE-2
PUNCH POINTS
PUNCH POINTS
Space is not available for BTS and TRSM rack
not lavelled and no aaantistatic mat
no sealing and no proper locking
no space on exiting ladder
no operational and no p sockets operational
no earthpits are interconnected
not EBG under feeder entry
not connect to body earthpit
PIU/ACDB are not installed and commissoned
mains is not available
not energy meter installed
not dc power available
no mcb available for bts and TRSM
DG is not installed and commissioned
AC is not installed and commissined
opening are not properly sealed
no tower painting and no platformof tower
square
verticle cable tray is not installed
la not connected to earthing pit
not installed and commissioned
GSM antenna mount not installed
not as per TND
not as per TND
not as per TND
not as per TND

REMARKS