Content
General information
Specifications
Installation process
1.
General information
Polymeric foaming
Polymer rigid skin
Metal/Film(optional)
1.
General information
1.
General Information
1.3 Comparison of main parameters between wood floor and PVC floor panel
Item
Water absorption
45%
1%
Surface quality
Uneven
Smooth
>600
> 800
Service life
2 years
10 years+
Weathering type
Flame retardant
V-2
V-0
Machinability
Environmental protection
Tensile strength
15Mpa
15Mpa
Flexural strength
17.2MPa
20Mpa
Shore hard
45D
60D
2.
Specifications
2440*1220mm
Thickness
120.3mm
Diagonal
3mm
Apparent density
600kg/m
Shore hardness(D)
55
Pulled strength
10MPa
Elongation at break
10%
12KJ/
70
2%
1%
Bending strength
20MPa
Screw holding
800N
Combustion performance
2.
Specifications
Click
to zoom
2.
Specifications
Click
to zoom
2.
Specifications
1220*2440mm
Thickness
150.3mm
Diagonal
3mm
Apparent density
600kg/m
Shore hardness(D)
55
Pulled strength
10MPa
Elongation at break
10%
20KJ/
70
2%
1%
Bending strength
20MPa
Screw holding
800N
Combustion performance
2.
Specifications
Click
to zoom
2.
Specifications
Click
to zoom
2.
Specifications
1220*2440mm
Thickness
180.3mm
Diagonal
3mm
Apparent density
600kg/m
Shore hardness(D)
75
Pulled strength
10MPa
Elongation at break
11%
25KJ/
70
2%
1%
Bending strength
20MPa
Screw holding
800N
Combustion performance
3.
Installation
PVC floor panel need to be installed after the bus painting process.
3.
Installation
3.
Installation
3.3 Apply PVC Sealant (replacement of SIKA) onto the bus skeleton
Procedure
Slowly open the PVC Sealant.
Apply the PVC Sealant onto all beams and stringer.
The PVC Sealant should be evenly coated.
Gently press the PVC Sealant with your hand to
bond it firmly to the metal.
3.
Installation
3.
Installation
Attention
Panels must be installed smoothly.
3.
Installation
3.5 Riveting
Procedure
To put rivets after punching at the crossbeam position of the
frame.
After the floor is finished, make the bottom hole according to
the dimension and position in photo(Dimension of bottom
hole is according to the condition).
To use self-tapping lock screw to fix the panels.
Attention
Floor splicing gap leaves 1-2mm.
Splicing screw gap of about 150-300mm.
Non-splicing screw gap of about 300-400mm.
The shortest distance of screw to the edge of the floor can not
be less than 10mm.
Screw fixed, the installed floor surface should be done the
surface batch ash treatment.
Panels hould not be into the drying room, the engine
compartment site should be added insulation layer board and
cotton insulation.
3.
Installation
Notion
One Shop,All Parts
Tel+86021 56323510
Fax+86021 56323520
E-mail:rosario1508@163.com