Sie sind auf Seite 1von 8

NICOLAS A.

DE LOS REYES

Career Objectives:
To seek employment that will enable myself to gain personal growth and
development. To utilize and share my knowledge, skills and capabilities in working in
filed construction.

Position Applied for

PIPE FITTER

PERSONAL DATA
Date of Birth
Place of Birth
Sex
Age
Civil Status
Nationality
Height
Weight
:
Name Of Spouse
Father's Name
Mother's Name
SSS No.
Passport No.
Language Dialect

:
10 September 1965
:
Bo. Balete
:
Male
:
45 Years Old
:
Married
:
Filipino
:
5' 6"
140 Lbs
:
Jocelyn F. Delos Reyes
:
Reymundo Delos Reyes
:
Pelagia Aguila
:
039614493-9
:
EB-2825151
:
English I Tagalog

EDUCATIONAL BACKGROUND
Primary

Balete Elementary School


Bo. Balete, Batangas City
1978

Secondary

Balete Barangay High School


Bo. Balete, Batangas City
1982

EMPLOYEMENT RECORD
Company
Country
Position
Date Employed
Name of Project

:
:
:
:
:

Larsen and Toubro ATCO


Jubail, Saudi Arabia
Piping Foreman
25 Aug. 2011 to Present
Jubail Export Refinary Project 5B /
Saudi Aramco Total Oil Refinary Project

Job Description
Erection of pipe spool and installation like CWS cooling water service line
instrument & service air line boiler feed water line.
Piping support fabrication and installation
Pipe line checking and clearing of punch items
Prepare as-built drawing, with all variation made during actual works, provide
revised data to superior for correct accounting.
Inspect documents, check available assembly material and segregate work to
employees
Control the execution of work to meet standard quality, ensure the operative
programme is complied and check applicable safety standards are observed.
__________________________________________________________________________
Company
Country
Position
Date Employed
Name of Project

:
:
:
:
:

Sirte Oil Company


Libya
Pipe Fitter
16 Oct. 2010to 13 Jan 2011
Sirte Oil Shutdown Project

Job Description
Self-orientation and familiarization of the gas, plant drawings
including equipment location area and safety rules and precautions.
Joined with maintenance supervisor and plant operator in setting up
daily activity plan on specific equipment, valve, vessels and
completion time.
Installed spade blinds on specific and required location to isolate .the
equipment, drums Flores such as test production gas, separators, amine,
absorbers, amine flash drums, surge drums, heater propane compressor,
exchangers, reboilers hydro carbon: drum and condensate flush drums
etc using non spark tools like brass hammer, sparmers, hammer
wrenches, chain blocks and wedges.

Dismantle repair and re-assemble damage stuck up and passing valve


namely ball valve, globe valve, gate valve, check valve and safety
valve and perform hydro testing.
Repair and replaced damaged internal parts of absorbers, regenerators
and separators such as trays, down comers, demister & coil.
Box up and deblinding of vessels and equipment which repaired has
been completed and installed new gasket as to meet requirements and
standard procedures.
__________________________________________________________________________
Company
Country
Position
Date Employed
Name of Project

:
:
:
:
:

Sirte Oil Company


Libya
Pipe Fitter
02 July 2008 to 29 Sept. 2008
Sirte Oil Shutdown Project

Job Description
Remove I clean I service I refit burner unit assembly. Check for
cracked burner manifolds I tubes and replace burner filter as required.
Re-install the four (4) tubes handles and box-up the units. Install new
gasket.
Blind I deblind the systema (2" Blow back Lines).
Remove I service I renew and refit all block I needle valves. Refer to
valve list.
Remove/ service I renew and refit instrumentation- sight glasses,
temperature I pressure gauges, cock valves.
Open I close the 4"-400 # Rf man ways -renew gaskets.
Flush clean the pot internals & drain lines of all sediments. Disconnect
I reconnect drain lines, renew as required.
Back flush cooler banks with water and Navee 42 to remove all sludge
and scales, salt deposits.
Assist the Company in replacing the existing 36" Launcher M.O. V.
1 01 with the brand new valve. Company to transport the valve to the
site, Company to provide the lifting equipment.
Performed installation, modification and replacement of pipe spools.
Cutting and grinding, preparation for fit-up of pipe spools.
Repair works on pipeline located at Kilometer 30.
Performed repair on pipeline which has leaks located at Kilometer 16.
__________________________________________________________________________

Company
Address
Position
Date Employed
Name of Project

:
:
:
:
:

Cape East Philippines Inc.


FTI Complex, South Super Highway, Taguig City
Pipe Fitter / Boiler Maker
September to 18 Oct. 2007
Bayu Undan Shutdown Project

Job Description
Dismantle repair and re-assemble damage stuck up and passing valve
namely ball valve, globe valve, gate valve, check valve and safety
valve and perform hydro testing.
Box up and deblinding of vessels and equipments which repaired has
been completed and installed new gasket as to meet requirements and
standard procedures.
__________________________________________________________________________
Company
Address
Position
Date Employed
Name of Project

:
:
:
:
:

QGM Group LLC


P.O. Box 41834 Sharjah U.A.E.
Pipe Fitter
03 June 2006 to 14 June 2007
Oil RIG Project

Job Description
Perform Fabrication and modification of piping if needed.
Grinding and beveling at pane] tubes end. Installation of pipe spools at
main deck thru engine room and bulk head to bulk head.
Installation of pipe spools at engine room and thru double bottom.
Lay-out and cutting of pipe to be fit-up in work shop.
__________________________________________________________________________
Company
Address
Position
Date Employed
Name of Project

Job Description

:
:
:
:
:

Cape East Philippines Inc.


FTI Complex, South Super Highway, Taguig City
Pipe Fitter / Boiler Maker
27 February 2005 to 28 March 2005
Bayu Undan Shutdown Project

Performed installation, modification and replacement of pipelines,


valves and different valves.
Conduct hydrotesting and commissioning.
Installation of bumper for mercury vessel.
Installation of additional flat form connecting to the existing platform.
__________________________________________________________________________
Company
Address
Position
Date Employed
Name of Project

:
:
:
:
:

Technilink International Ltd.


Sucat, Paranaque City
Pipe Fitter / Boiler Maker
26 June 2003 to 08 January 2004
Bayu Undan Gas Recycle Project.

Job Description
Fabrication and installation of pipe spool.
Fabricating and installation of different kinds of spools like carbon
steel, stainless steel, titanium steel, duplex steel.
Conducted hydrotesting, installation and erection of additional column
and platform for Bayu Undan Gas Recycle Project. Hook-up and
commissioning.
__________________________________________________________________________
Company
Address
Position
Date Employed
Name of Project

:
:
:
:
:

M. AI- Mojil Group


Rastanura, K.S.A.
Pipe Fitter
09 October 2001 to 15 October 2002
Khuff Gas Rastanura Project

Job Description
Performed installation, modification and replacement of pipe spools,
valves and replacement of pipe spools, valves and fittings.
Perform in checking of safety valve, globe valve and other piping
components.
Fit up the fittings like elbow, tee, reducer and other spools.
__________________________________________________________________________
Company
Address

:
:

M. AI- Mojil Group


Jubail, K.S.A.

Position
Date Employed
Name of Project

:
:
:

Pipe Fitter
03 September 1999 to 05 July 2000.
Kemya- OJifens Expansion Project

Job Description
Installation and erection of different size of pipes on the racks.
Engaged also in grinding and fit up.
Fabricating and installation of different kinds of spools like carbon
steel and stainless steel. Work in different kinds of valve, spools and
supports.
__________________________________________________________________________
Company
Address
Position
Date Employed
Name of Project

:
:
:
:
:

M. AI- Mojil Group


Yanbu, K.S.A.
Pipe Fitter
04 June 1998 to 30 July 1999
LINARCO Methanol Project.

Job Description
Piping and piping system, fixture and equipment for steam, hot water,
heating, cooling, lubricating and industrial processing system on basis
of knowledge of system operation and study of building plans and
drawings as well.
Select type and size of pipe and related materials according to job
specification, cut threads, assembles and installed variety of metals
and non metal pipes and fitting; joins piping by means of treaded,
caulked, wiped, soldered, brazed, busud or cemented joints: test piping
system for leaks. Performs other duties.
__________________________________________________________________________
Company
Address
Position
Date Employed
Name of Project

:
:
:
:
:

M. AI- Mojil Group


SAMAREC Riyadh Refinery K.S.A.
Pipe Fitter
04 May 1997 to 20 April 1998
Saudi Aramco Riyadh Refinery.

Job Description
Lay out and cutting of pipes to be fit up at site, cutting and welding.

Installation and erection of different size of pipes on the racks.


Engaged also in grinding and fit up.
Hydro testing of spools and re-instatement works.
__________________________________________________________________________
Company
Address
Position
Date Employed
Name of Project

:
:
:
:
:

M. AI- Mojil Group


Jubail, K.S.A.
Pipe Fitter
16 March 1996 to 30 March 1997
SADAF (M.T.B.E.)

Job Description
Fabrication of industrial spools for both small and large bore. Pipes
return form Y2 or 120 of pipe.
Performed installation, modification and replacement of pipe spools,
valves and replacement of pipe spools, valve and fittings.
Hydro testing and re-instatement work and punch listing.
__________________________________________________________________________
Company
Address
Position
Date Employed
Name of Project
Job Description

:
:
:
:
:

Keppel Shipyard
Bolo, Bauan Batangas, Philippines
Pipe Fitter
15 November 1992 to 25 February 1996
Keppel Dry-Dock

Installation of pipe spools at main deck thru engine room.


Wash out of existing plate on side shell and pipeline and installation of
pipe fire water line.
Repaired existing valves and hydro testing.

ATTITUDE OF EMPLOYEE
The employee must demonstrate a sincere interest and enthusiasm in his
job. The employee must know the positive outlook towards the company its
business operation beliefs and concern. The employee must be able to perform
his job with a positive attitude even while working under stress. This includes
having the quality of initiative responsibility and force sight.

WORK QUALITY
The employee must be able to prove to the satisfaction of the company advance
skills, initiative and competence in the duties and responsibilities details and follow the
contract of employment.

I HEREBY CERTIFY that the foregoing information are true and correct to the
best of my knowledge and belief. I understand that my misrepresentative will be
considered a just cause for the REJECTION of this application.

__________________________
Applicants Signature

Das könnte Ihnen auch gefallen