PRE BID QUERY

KOLKATA MUNICIPAL CORPORATION -

Development of Slum near Mayer Bari, Ward 7, Br. I under RAY.

REF.:-N.I.T.NO.- KMC/CMA&TP/01/14-15, DATED 11/10/2014


Query Made By: - M/s IVRCL Ltd.

Sl.
No.
1
2

Section & Clause Ref.


Tender Document Part I/
Article-XIV/Clause-14.2
Tender Document Part I/
Article-XIV/Clause-14.1.8

Page
No.
89

88

Tender Document Part I/


Appendix /Clause- 9

Ref Text

Query

No mobilisation advance of any amount shall


be paid in this contract.
The time period for making payment
(hereinafter also referred to as progress
payment) against Running Account Bills will be
within 21 days from the date of certification of
the bill by the Engineer subject to audit
procedure of KMC.
Minimum value of work for interim certificate :
Not less than 10% of contract value.

We request you to provide us interest


free Mobilisation Advance.
We request you to make the monthly
RA Bill Payments @75% of the Bill
value within 7th day of submission of
the bill and balance within 21 days of
submission of the bill to maintain our
Cash flow.
We request you to provide the
minimum value of work for interim
certificate not less than 5% of contract
value and also request you to impose
no such type of barrier for first four
month and last two month for interim
certificate.
It is requested to provide the
escalation clause for all the works,
since the duration of 24 months
completion period is considerably long
period.

No

It is requested to provide the secured


advance for non perishable materials
brought to site.
We request you to provide us the Area
for Labour Hutment, Site Office,
Batching Plant Store/ Stacking yard
etc. within the Site premises free of
costs.

No

98

Tender Document Part I/


NIT/Clause- 32
12

Tender Document Part I/


NIT/Clause- 7

Escalation of Price on any ground and


consequent cost overrun shall not be
entertained under any circumstances. Rates
should be firm & quoted accordingly.

No secured advance will be allowed.


8

Tender Document Part I/


NIT/Clause- 9
8

Agencies shall have to arrange suitable place


for erection of Plant & Machineries, storing of
materials, labour shed, laboratory etc. at their
own cost and responsibility.

Response to Query

No

No

No

May allowed suitably as


per site condition. Cost of
electricity , water supply &
other services are to be
borne by the tenderer.

Page 1 of 4

Sl.
No.
7

Section & Clause Ref.

Page
No.

Tender Document Part I/


Article -IX/Clause- 9.14

Ref Text

Query

Response to Query

0.25% per day on value of remaining


incomplete Works to be calculated on prorate
basis. Provided that the total amount of
compensation for delay to be paid shall not
exceed 15% of contract value.

We request to recover LD @0.25% of


the balance work value per week of
delay subject to maximum of 5% of
Balance Job value.

Removal of rubbish, earth etc. from the


working site and disposal of the same beyond
the compound, in conformity with the
Municipal/Corporation Rules for such disposal,
loading into truck and cleaning the site in all
respect as per direction of Engineer in charge.
Hire and labour charges for shuttering with
centring and necessary staging upto 4 m.
using approved stout props and thick hard
wood planks of approved thickness with
required bracing for concrete slabs, beams,
columns, lintels curved or straight including
fitting, fixing and striking out after completion
of works:(upto roof of ground floor) ( When
the height of a particular floor is more than
4m. the equivalent floor height shall be taken
as 4m. and extra for works beyond the initial
4m. ht. shall be allowed under 12(e) for every
4m. or part thereof ).
Steel shuttering or 9 to 12 mm thick approved
quality ply board shuttering in any concrete
work.
Extra for works beyond the roof of ground
floor per additional floor. I) Upto 4th (per
floor) and in basement.

We request to provide us the distance


of disposal area .

0.25% per day on value


of remaining incomplete
Works to be calculated on
prorate basis. Provided
that the total amount of
compensation for delay to
be paid shall not exceed
10% of contract value.
Thereafter KMC will have
the liberty
to terminate
the contract and imposed
LD to get the work done by
any other agency with the
risk and cost of the
defaulting tenderer.
As per norms of KMC
rubbish etc. has to dispose
off beyond KMC area.

81 &
82

Tender Document Part I/


Sl. No. - 17
8

Tender Document Part


I/ Sl. No. 36

IVRCL request to confirm whether any


scope of basement construction is in
this project.

No

Page 2 of 4

Sl.
No.
10

Section & Clause Ref.

Page
No.

Tender Document Part I/


Sl. No. - 7

11

Tender Document Part II/


Sl. No. - 312

22

Ref Text

Query

Response to Query

Providing RCC cast in situ bored piles in


position as per specifications in all kinds of soil
except rock of any hardness including cost of
boring using drilling mud to stabilize the bore
and flushing the bore of excess mud with
freshly prepared drilling fluid by using pumps
prior to placing concrete by tremie pipe in one
continuous operation and including the cost of
all materials and labour for placing of concrete
and also including the cost of mobilisation and
hire charges of all equipments necessary for
boring , welding of reinforcement cage as
necessary and lowering of reinforcement cage
and steel liner (if any) preparation and placing
of concrete , complete but excluding the cost
of reinforcement and labour for bending
binding etc but including the cost of concrete.
Work to be executed as per IS:2911 (Part
I/Sec 2). (Cement concrete should have an
ultimate crushing strength of not less than
....kg/cm2 on 15 cm cube after 28 days).
Using tripod, winches & other accessories
including shifting of all machinery from one
bore3 location to another & removal of
excavated earth & lead upto 150m.
Distribution concealed wiring with 2x1.5 sq
mm.( PH &N) single core stranded FR PVC
insulated & unsheathed single core stranded
1.1 KV grade cu. Wire ( finolex) & 1x1.5 sq
mm. (ECC) single core stranded (PH & N) 1.1
K.V grade CU wire finolex and 1x 1.5 sq-mm
single core stranded PVC-Insulated and
unsheathed CU wire (finolex)
used as ECC
in19mm bore, 3mm thick polythene pipe
complete with all accessories embedded in wall
250 volt 5 amp. 3 pin plug point including S
& F 250 volt , 5amp.3 pin flush type plug
socket & piano key type switch ( anchor make)
on existing switch board as mentioned sl. no.
3.

IVRCL request to confirm whether the


cost of concrete is inclusive in this
item.

Cost of concrete will be


paid separately.

Please clarify that distribution wiring


for 250 volt 5 amp 3 pin plug point will
be done by 4x1.5 sq. mm or 3x1.5 sq.
mm wire

The Distribution wiring will


be 3 X 1.5 sq-mm wire.

Page 3 of 4

Sl.
No.
12

13

14

15
16

Section & Clause Ref.

Page
No.

Tender Document Part II/


Sl. No. - 323

22

Tender Document Part II/


Sl. No. - 336

24

Tender Document Part II/


Sl. No. - 337

NIT/(14) Date and Time


Schedule
Tender document - I

24

3
194 215

Ref Text

Query

Supplying of I.I KV grade PVC insulated 16


Sqm x 4 "Core A1 Conductor (AV) cable
Glostar / Havells make . B-3[KMC,Page-13]

Please clarify that the cable will be


armoured or enamoured.

The
cable
armoured.

will

Supplying & fixing 250 Volt A.C. Superior type


Call bell / Buzzer on T.W. board incl. S & F
T.W. board ( Anchor - 8320)
Supplying of I.I KV grade PVC insulated 16
Sqm x 4 "Core A1 Conductor (AV) cable
Glostar / Havells make . B-3[KMC,Page-13]

Please provide abbreviation of T.W.

T.W. stands
Wood.

for

Please clarify that the cable will be


armoured or enamoured.

The
cable
armoured.

will

We are requesting to extend the date


at least by 15 days.
We are requesting you to please
provide softcopy in AUTOCAD format.

The date extended to


25.11.2014
Enlarged version will be
provided.

8 Bid submission closing


11/11/2014, 1:00 PM
Drawings

(on

line)

Response to Query
be

Teak

be

As per decision in the meeting interested agencies should submit the Hard copy of tender document (technical +Financial) with signature in each page by 4-00 p.m.
on 25.11.2014. at CMA & TP dept , 1, Hogg Street , Hogg Building , 3rd Floor , KOl-700087.

Page 4 of 4