The Definitive Guide To


tm

Windows
Software Deployment

Chris Long

Introduction
By Sean Daily, Series Editor
Welcome to The Definitive Guide to Windows 2000 Software Deployment!
The book you are about to read is not only the definitive technical resource for information on
Windows 2000 software deployment, but represents an entirely new modality of book
publishing. The founding concept behind Realtimepublishers.com is the idea of providing
readers with high-quality books on todays most critical IT topicsat no cost to the reader.
Although this may sound like a somewhat impossible feat, it is made possible through the vision
and generosity of corporate sponsors such as New Boundary Technologies (formerly
Lanovation), who agree to foot the production expenses for the book and host it on their website
for the benefit of their website visitors.
It should be pointed out that the free nature of these books does not in any way diminish their
quality. Without reservation, I can tell you that this book is the equivalent of any similar printed
book you might find at your local bookstore (with the notable exception that it wont cost you
$30 to $80). In addition to the free nature of the books, this publishing model provides other
significant benefits. For example, the electronic nature of this eBook makes events such as
chapter updates and additions, or the release of a new edition of the book possible to achieve in a
far shorter timeframe than is possible with printed books. Because we publish our titles in realtimethat is, as chapters are written or revised by the authoryou benefit from receiving the
information immediately rather than having to wait months or years to receive a complete
product.
Finally, Id like to note that although it is true that New Boundary Technologies Web site is the
exclusive online location of the book, this book is by no means a paid advertisement for them.
Realtimepublishers.com is an independent publishing company and maintains, by written
agreement with the sponsor, 100% editorial control over the content of our titles. However, by
hosting this information, New Boundary Technologies has set themselves apart from their
competitors by providing real value to their customers and transforming their site into a true
technical resource librarynot just a place to learn about their company and products. It is my
opinion that this system of content delivery is not only of immeasurable value to readers, but
represents the future of book publishing.
As series editor for the Windows IT series at Realtimepublishers, it is my raison dtre to locate
and work only with the industrys leading authors and editors, and publish books that help IT
personnel, IT managers, and users to do their everyday jobs. To that end, I encourage and
welcome your feedback on this or any other book in the Realtimepublishers.com series. If you
would like to submit a comment, question, or suggestion, please do so by sending an e-mail to
feedback@realtimepublishers.com, leaving feedback on our website at
www.realtimepublishers.com, or calling us at (707) 539-5280.
Thanks for reading, and enjoy!
Sean Daily
Series Editor

Introduction...................................................................................................................................... i
By Sean Daily, Series Editor ................................................................................... i
Chapter 1: The Foundation of Software Deployment......................................................................1
Getting to the Point ..........................................................................................................................1
What Is Software?............................................................................................................................2
Software Is a Collection of Software ...................................................................................3
Software Connects to Software............................................................................................4
Linking.....................................................................................................................4
Software Breaks Software....................................................................................................6
DLL Hell..................................................................................................................7
Software Evolves .................................................................................................................9
Introducing Software Producers and Consumers.............................................................................9
Motivations and Responsibilities.........................................................................................9
Software Producers ................................................................................................10
Software Consumers ..............................................................................................10
Installing Software .........................................................................................................................10
File Transfer.......................................................................................................................11
Configuration .....................................................................................................................11
Autoexec.bat and Config.sys Configuration..........................................................12
System.ini and Win.ini Configuration ...................................................................12
The Advent of Windows....................................................................................................12
Windows GUI.......................................................................................................12
Shared Files............................................................................................................13
The System Registry ..............................................................................................13
Uninstalls ...............................................................................................................14
Beyond the Install ..........................................................................................................................14
The Evolution of Software Deployment ............................................................................15
Repackaging...........................................................................................................16
The Growth of Software Deployment................................................................................17
Large-scale Deployment ....................................................................................................17
Conformance Testing.............................................................................................18
Licensing................................................................................................................19

ii

Distribution ............................................................................................................19
Support...................................................................................................................19
The Software-Deployment Life Cycle...........................................................................................19
Release ...............................................................................................................................20
Retire..................................................................................................................................21
Install..................................................................................................................................21
Uninstall.............................................................................................................................21
Update ................................................................................................................................21
Adapt..................................................................................................................................21
Activate ..............................................................................................................................21
De-activate .........................................................................................................................22
Summary ........................................................................................................................................22
Chapter 2: Conformance Evaluation..............................................................................................23
Acquisition.....................................................................................................................................24
Evaluation ..........................................................................................................................24
Determine Whether the Software is Necessary .....................................................24
Calculate the ROI...................................................................................................25
Determine Who Will Require the Software...........................................................25
Develop a Plan Based on Operating System..........................................................26
Compatibility Testing ........................................................................................................26
Create a Reproducible Test Environment ..............................................................28
DLLs and Shared Resources..................................................................................28
Software-Automation Tools...................................................................................29
The Results.............................................................................................................29
Standardization ..................................................................................................................30
Range of Standardization.......................................................................................30
Enforcing Standards...............................................................................................30
Conflict Resolution ............................................................................................................31
Tooling...............................................................................................................................32
Repackaging.......................................................................................................................33
Create an Install Program from Scratch.................................................................33
Lab Testing ............................................................................................................33
Distribution ....................................................................................................................................34

iii

Image Delivery...................................................................................................................34
Push Delivery.....................................................................................................................35
Assigning ...............................................................................................................35
Publishing ..............................................................................................................36
Pull Delivery ......................................................................................................................36
Pilot Rollouts .....................................................................................................................36
Software Management .......................................................................................................37
Inventory ................................................................................................................37
Delivery..................................................................................................................38
Licensing................................................................................................................38
Reporting................................................................................................................38
Warehousing ..........................................................................................................38
Policy Management ...............................................................................................38
Manage Components .............................................................................................39
Support...........................................................................................................................................39
Software Repair .................................................................................................................40
License Conformance ........................................................................................................41
System Recovery ...............................................................................................................41
Decommissioning Software ...............................................................................................42
Summary ........................................................................................................................................42
Chapter 3: Repackaging.................................................................................................................43
Repackaging Background ..............................................................................................................44
Repackaging Process .....................................................................................................................44
The Test Computer ............................................................................................................45
Creating a Clean State............................................................................................46
Creating a Good Image ..........................................................................................47
Creating a Baseline State .......................................................................................50
Ask Questions ................................................................................................................................51
Document.......................................................................................................................................54
Preparation .....................................................................................................................................54
Research the Existing Application Media..........................................................................54
Script Solutions......................................................................................................55
Creating a Working State.......................................................................................56

iv

Snapshot Software Options................................................................................................58


Strictly Snapshot Tools ..........................................................................................58
Snapshot-to-Project Tools......................................................................................59
Snapshot.........................................................................................................................................60
Package Evaluation............................................................................................................61
UI ...........................................................................................................................63
System Files ...........................................................................................................64
Internal Logic.........................................................................................................64
Conflict Resolution ............................................................................................................65
Getting a Profile.................................................................................................................65
Test.................................................................................................................................................68
Repackaging Is Easy, Right? .........................................................................................................69
A Repackaging Example: Macromedia ColdFusion 5...................................................................69
Clean Requirements ...........................................................................................................69
Baseline Requirements.......................................................................................................69
Preparing to Create the Package ........................................................................................70
Normal Install ........................................................................................................74
Snapshot Process....................................................................................................78
Package Modifications...........................................................................................80
Comments on the Final Package........................................................................................81
Summary ........................................................................................................................................81
Chapter 4: Methods for Deploying Software.................................................................................82
History............................................................................................................................................82
The Parts of a Deployment Methodology..........................................................................83
Choosing a Deployment Method ...................................................................................................84
Sneakernet..........................................................................................................................84
Sneakernet Recommendation.................................................................................85
Simple Scripting Methods..................................................................................................85
Scripts Recommendation .......................................................................................89
Email ..................................................................................................................................89
An Example Email Deployment ............................................................................91
Email Recommendation.........................................................................................93
Web ....................................................................................................................................93

Web Recommendation...........................................................................................95
Image Inclusion..................................................................................................................95
Image Inclusion Recommendation ........................................................................97
Third-Party Solutions.........................................................................................................97
Push........................................................................................................................99
Pull .........................................................................................................................99
Combination...........................................................................................................99
Standalone..............................................................................................................99
Suite .......................................................................................................................99
Prism Deploy .......................................................................................................101
Marimba Desktop Management...........................................................................105
Third-Party Tools Recommendation....................................................................107
Microsoft..........................................................................................................................107
SMS......................................................................................................................107
IntelliMirror .........................................................................................................109
Microsoft Recommendation.................................................................................110
Rollouts ........................................................................................................................................110
Pilot Users........................................................................................................................112
Errors Are FoundDo You Continue to Roll Out? ........................................................113
Ensuring the Deployment Worked...............................................................................................113
Some Tools to Confirm the Deployment Went Out ........................................................114
The Human Error Factor..............................................................................................................115
Summary ......................................................................................................................................115
Chapter 5 Deploying to Remote Users ........................................................................................116
Generic Remote Issues.................................................................................................................116
Types of Remote Users................................................................................................................118
Common Issues................................................................................................................119
Scheduling............................................................................................................119
Network Transmission .........................................................................................121
Deployment Status Reporting ..............................................................................122
Connectivity Durations ........................................................................................122
Security ................................................................................................................126
User Impact..........................................................................................................129

vi

Remote Hardwired ...........................................................................................................131


Remote Stationary............................................................................................................131
Roaming Users and Machines .........................................................................................132
Rarely Connected.............................................................................................................135
A Real World Example....................................................................................................136
Summary ......................................................................................................................................137
Chapter 6: Deploying in the Enterprise .......................................................................................138
Does Size Really Matter?.............................................................................................................138
Documentation.................................................................................................................139
Package Documentation.......................................................................................140
Distribution Documentation.................................................................................146
Distribution Sheet ........................................................................................................................147
Change Management .......................................................................................................148
Change-Management Request Forms ..................................................................150
The Change Management Coordinator................................................................151
An Example Change-Management Process.........................................................153
Where is the Source? .......................................................................................................155
Read-Only User ID ..............................................................................................156
Mirroring..............................................................................................................158
Verification ..........................................................................................................159
Hardware Thoughts..........................................................................................................160
Repeatable Processes .......................................................................................................161
Software Metering ...........................................................................................................161
Summary ......................................................................................................................................163
Chapter 7: Installation Tool Alternatives.....................................................................................164
Windows Installer ............................................................................................................164
Overview..............................................................................................................165
Windows Installer Transforms.........................................................................................169
Windows Installer Patches...............................................................................................177
Fixing Damaged Applications .........................................................................................177
Windows Installer Elevated Privileges ............................................................................178
Creating a Windows Installer File ...................................................................................178
Running an Installer File......................................................................................181

vii

Resource Kits ...................................................................................................................181


Summary ......................................................................................................................................189
Appendix......................................................................................................................................190
Chapter Summaries......................................................................................................................190
Chapter 1: The Foundation of Software Deployment......................................................190
Chapter 2: Conformance Evaluation................................................................................190
Chapter 3: Repackaging...................................................................................................191
Chapter 4: Methods for Deploying Software...................................................................192
Chapter 5: Deploying to Remote Users ...........................................................................192
Chapter 6: Deploying in the Enterprise ...........................................................................193
Chapter 7: Installation Tool Alternatives.........................................................................193
MSI Commands ...........................................................................................................................194
Deployment Tools........................................................................................................................196
Web Resources.............................................................................................................................197
Glossary .......................................................................................................................................199

viii

Copyright Statement
2001 Realtimepublishers.com, Inc. All rights reserved. This site contains materials that
have been created, developed, or commissioned by, and published with the permission
of, Realtimepublishers.com, Inc. (the Materials) and this site and any such Materials are
protected by international copyright and trademark laws.
THE MATERIALS ARE PROVIDED AS IS WITHOUT WARRANTY OF ANY KIND,
EITHER EXPRESS OR IMPLIED, INCLUDING BUT NOT LIMITED TO, THE IMPLIED
WARRANTIES OF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE,
TITLE AND NON-INFRINGEMENT. The Materials are subject to change without notice
and do not represent a commitment on the part of Realtimepublishers.com, Inc or its web
site sponsors. In no event shall Realtimepublishers.com, Inc. or its web site sponsors be
held liable for technical or editorial errors or omissions contained in the Materials,
including without limitation, for any direct, indirect, incidental, special, exemplary or
consequential damages whatsoever resulting from the use of any information contained
in the Materials.
The Materials (including but not limited to the text, images, audio, and/or video) may not
be copied, reproduced, republished, uploaded, posted, transmitted, or distributed in any
way, in whole or in part, except that one copy may be downloaded for your personal, noncommercial use on a single computer. In connection with such use, you may not modify
or obscure any copyright or other proprietary notice.
The Materials may contain trademarks, services marks and logos that are the property of
third parties. You are not permitted to use these trademarks, services marks or logos
without prior written consent of such third parties.
If you have any questions about these terms, or if you would like information about
licensing materials from Realtimepublishers.com, please contact us via e-mail at
info@realtimepublishers.com

ix

Chapter 1

Chapter 1: The Foundation of Software Deployment


Spouses of auto mechanics are the first to admit they have the least maintained cars. Often this
isn't an idle complaintits true. What they mean more than anything else is that their car isnt
maintained as well as it should be considering there's an auto mechanic in the family.
I would imagine the same holds true for plumbers, carpenters, lawn maintenance professionals,
and software developers. Hah! Caught you off guard didn't I? I admit the last one may be
localized to only my household, but it's an example I can share with you. Often, when someone
is good at something and they do it for a living, they don't have the time to spare or the
inclination to apply that talent within their own lives. Call it human nature. After banging on a
computer all day, I'm not eager to jump on the computer when I'm at home.
Last year my wife and I purchased a nice computer. Given all the computer books and computer
training classes available, I've been impressed with the computer abilities of an eight-year old
and his six-year old brother who have no access to these resources.
With minimal guidance, they've managed to enter my email address into every conceivable
online contest, download cartoon screensavers, install desktop themes (usually involving
spaceships and aliens), browse the Internet, play online games, and even let me know how much
gaming systems are going for on eBay.
The obvious result of all of this tweaking is that user interface design has certainly improved
over the past 10 years. These boys also managed to cripple the printer (repeated paper jams) and
generate inconsistent hardware errors (the recordable CD drive is no longer reliable). Not to
mention all the disk space these activities consume. Amidst the grumbling, I'm trying desperately
to rationalize why my own home computer is in such a mess.
Typically, none of these problems have been big enough to disrupt my weekend. After all, I do
most of my work in the office. Only when the family computer comes grinding to a near halt
does maintaining the home computer escalate to the A1 (with a bullet) priority on my To Do
list. The squeaky wheel gets the attention and all of that.
After a few months of listening to these complaints, I am eager to reduce the impact on my
weekend. Ive since created separate logon accounts for the boys, the printer became off limits
for all activities except printing, downloading software became an On Approval only action,
and the recordable CD drive was replaced with a newer model. Sure I havent solved all of all
the problems, but the ones I have fixed certainly reduced my workload and I now have more time
to enjoy the new DVD player.

Getting to the Point


What does all of this have to do with software deployment? Good question and I'm glad you've
stuck with me. Like my attitude toward the home computer, anything to do with getting an
application onto the user's computer has historically been an afterthought. It's the leaky brake
line to our successful automobile repair shop. It's the crabgrass in our own yard to our wildly
growing lawn-mowing business (sorry, I couldn't resist).

Chapter 1
For software manufacturers, software deployment is a necessary evil to reach the ultimate goal of
creating software. After all, software deployment has nothing to do with the problems the
software was originally written to solve. It's a by-product of creating the software. It's a
customer's need for convenience. Ah, therein lies the rub.
Software manufacturers lives arent made easier by software deploymentit makes customers
lives easier. In fact, software deployment is the one aspect of software creation that is completely
driven by the customer. While each revision to a software application stems from competitive
market analysis, internal feature set creation, and customer feedback; software-deployment
improvements are motivated by customer pressure. Typically, customers reduce the cost of
deployment by pushing back on the software manufacturer. The software manufacturer in turn,
puts in extra effort to make its application easy to deploy.
What then is software deployment? The answer to this excellent question conveniently serves as
a great introduction to this book. A software program is first formulated as a result of a needa
potential customer need. From there, the program is pitched to a companys senior staff. If
approved, the idea is sent to marketing to verify basic assumptions such as; will enough people
purchase this software to make the development costs worthwhile?
If marketing finds that a need exists, the idea is sent to the product team to create a software
specification. Development and quality assurance (QA) folks use this document to create and test
the software. An install program is created, boxes are made, shrink-wrap is applied, and the
software hits the streets. Software deployment encompasses everything the customer goes
through to disseminate the software after it has been purchased. By defining what software
deployment is not, weve defined what it is.
This description is important and the way its described is also important. Software
manufacturers know what the customer will do with their software; but they dont know how the
customer will arrive to the state in which they can use the software. How the customer gets to
that point is software deployment. Later in this chapter well come up with a more realistic
model, but for now this is the path were going down.

What Is Software?
Dont groan, but an important part of discussing software deployment is making sure that our
definitions are well understood. For this reason, I want to sidetrack a bit and define software. The
definition were going to derive is pretty much what you and I think software is. The only
addition is were going to define software in terms that are convenient for a software-deployment
discussion.
Originally, software was monolithic. By that, I mean the executable was self-contained: It used
few, if any, external resources and no executable cared whether any other executable existed.
A lot has happened over the past 20 years to change that definition: More people are using
computers than ever before. More non-technical people are using the computer. The software
market is more competitive than ever before.
In fact, the sheer number of people using the computer today for the bulk of their work has
created a whole new economic classification: The use of the computer has increased worker
productivity to the point that it impacts the nations economy. Thats simply amazing.

Chapter 1
But this productivity wouldnt have developed as quickly if software manufacturers hadnt
improved the software-creation process. In addition, we certainly couldnt have become this
productive without a high-level of connectivity. These two culpritsrapid development and
higher connectivityare the primary generators of the software-deployment issues we face
today.
Rapid development is a term that spawned from a significant change in software development.
Instead of a monolithic executable, software today is a collection of software. Third-party
vendors contribute a great deal to the software-creation process. This collaborative effort is a
strange paradox: On one hand, this effort lets software manufacturers plug in functionality that
would be prohibitive to create internally. On the other hand, as a result of this collaborative
effort, third-party software that should have reached the end of its life is still shipped and active
because a third-party software manufacturer can retract or modify its software only through the
applications creator.
Higher connectivity plays a role in software deployment by bringing a higher level of
conformance from user-to-user. With a larger exchange of data, software applications share a
larger amount of how data is processed. This idea ties into componentized software. Why should
I reinvent how to access a specific database if I know someones software component can do it
for me?
Software Is a Collection of Software
The phrase software is a collection of software is a euphemism for componentized software.
Through published interfaces and a construction cleverly called dynamic linking, any library can
talk to any other library. In fact, a strong argument could be made that todays software
development efforts are primarily spent gluing components together rather than creating new
components.
An excellent example for this argument is the Windows operating system.. With the advent of
the Windows application programming interface (API) set, developers could leverage common
code. This common code is provided by a core set of dynamic-link libraries (DLLs) that ship
with Windows. These DLLs make Windows-centric tasks, such as re-sizing, moving, opening,
and closing windows convenient. These DLLs arent limited to graphical functionalityvirtually
anything done in a Windows application has to go through this core set of libraries.
At the same time Microsoft released Windows, the company was pushing new technologies and
new functionality. These upgrades were also made available through a collection of libraries.
Since these libraries didnt ship with the original operating system release, they were termed
redistributables, and software vendors were allowed to ship these redistributables with their
software applications.
Today, bundling redistributables with the install program of software applications is expected.
Open Database Connectivity (ODBC), Microsoft Data Access Components (MDAC), Visual
Basic Runtime, and Microsoft Common Controls are just some of the redistributables available
today. The current list of Microsoft redistributable files numbers in the high hundreds. Thirdparty software vendors are also in on the act. In fact, install programs commonly include thirdparty redistributable software. For example, Adobe Acrobat and Macromedia Flash are two
widely installed software redistributables.

Chapter 1
Software Connects to Software
The linking of a Windows application to its underlying libraries is complex. Figure 1.1 illustrates
just how complicated things can get. This figure shows how libraries provided by different
vendors rely on the presence of other libraries for correct loading. A missing library generates a
system error message. An incorrect version of a library can lead to subtle runtime errors.
Contrast this figure to the days of DOS, when an application sat directly on top of the operating
system.

Figure 1.1: Through library linking, applications strongly depend on the operating system and support files.

In addition to redistributables, there are always updates to the operating system. These updates
consist of hotfixes, maintenance releases, and service packs. These updates usually update the
underlying Windows core DLLs.
Just to keep things relatively sane, each DLL was usually accompanied by a numerical version
(for example, 4.1.23.6). This version number is usually accurate; however, editing the version
resource is the responsibility of the developer. This version number is used during the update
process to make sure newer files arent overwritten. Did you catch the two usuallys in the
previous sentences? Well, when these tasks arent done, things get really messy.
Linking
The software manufacturer divides the development effort into a variety of tasks. This division
of labor is done not only from an architectural point of view but also for a nice division of
resources. Lisa and Donna can create the computing engine, while Jason and Jesse can develop
the database query system. In each case, the functionality results in multiple support libraries.
The separate libraries come in handy when theres a spin-off project that also needs a computing
engine or a database query system.

Chapter 1
The arrows in Figure 1.1 illustrate the reliance the entire application has on external resources.
Of course, software deployment would be fairly straightforward if we could always guarantee the
correct library is available when its needed. Unfortunately, such isnt always the case.
The first problem is that determining the complete list of libraries required by an application is
an extremely difficult task. The reason this task is so difficult lies within the application itself.
An executable can use a function provided by one of these DLLs in two ways. The first is to
actually embed the function inside the executable. This is called static linking.
Static linking is much like bringing your own bed on your vacation. Sure, its comforting to
know that its there, but youre taking on a lot of overhead. If you know there is a bed where
youre going, you could take the leap of faith and leave yours at home. Alternatively, if you
apply the bed analogy to dynamic linking, youll wait until you need to sleep, then youll expect
the bed to be underneath you when you lie down. Therein lies the problemsometimes there is
no bed and sometimes its not the bed you expected (a bed of nails versus goose down).
From a software-deployment point of view, things get even a little bit trickier. Not only is there
dynamic linking, but there are two types: implicit and explicit. Implicit linking means that a list
of libraries an executable requires to run is located within the header of the executable. This
arrangement is useful because when the executable loads into system memory, the operating
system will track down the necessary libraries. Explicit linking means the application will
attempt to load the library when the application needs the file.
The error that occurs as a result of a missing library depends on the type of linking. If an
implicitly linked library is missing, the error will be immediately obvious because the operating
system wont allow the application to launch. I imagine youve seen the error before, but Ive
provided Figure 1.2 to jog your memory.

Figure 1.2: The infamous Unable to Locate DLL error message.

There are very good reasons to statically link versus dynamically link to a library. While static
linking guarantees the correct API call for the exact versionafter all its embedded within the
executable, dynamic linking reduces the physical size of the executable. A key reason for
componentized software, and thus dynamic linking, is so software applications can benefit from
updated components. For software deployment, understanding the tradeoffs of static and
dynamic linking is important.
There are pros and cons to implicit and explicit links. For example, Im using Microsoft Word to
write this chapter. On a whim, I loaded Word into a profiling utility. Because almost all
Windows applications dynamically link at some level, I was curious about the extent of implicit
versus explicit linking. Table 1.1 shows the number of implicitly linked versus explicitly linked
DLLs.

Chapter 1

Implicitly Linked
MSPANDB.DLL
KERNEL32.DLL
ADVAPI32.DLL
COMCTL32.DLL
GDI32.DLL
MSO9.DLL
NTDLL.DLL
OLE32.DLL
RPCRT4.DLL
SHELL32.DLL
SHLWAPI.DLL
USER32.DLL
WINSPOOL.DRV
WINWORD.EXE
ACTIVEDS.DLL
ADSLDPC.DLL
CRYPT32.DLL
MSASN1.DLL
MSLS31.DLL
OLEPRO32.DLL
USP10.DLL
W32TOPL.DLL

Explicitly Linked
AGENTMPX.DLL
ATL.DLL
BLNMGRPS.DLL
CLBCATQ.DLL
CSCDLL.DLL
CSCUI.DLL
DNSAPI.DLL
LINKINFO.DLL
LXATSTRN.DLL
LXATUI.DLL
LZ32.DLL
MPR.DLL
MSGR2EN.DLL
MSI.DLL
MSSPELL3.DLL
MSVCRT.DLL
NETAPI32.DLL
NETRAP.DLL
NETUI0.DLL
NETUI1.DLL
NTDSAPI.DLL

NTLANMAN.DLL
NTMARTA.DLL
NTSHRUI.DLL
OBALLOON.DLL
OLEAUT32.DLL
RICHED20.DLL
SAMLIB.DLL
SECUR32.DLL
SYNTPFCS.DLL
VERSION.DLL
WDMAUD.DRV
WINMM.DLL
WLDAP32.DLL
WS2_32.DLL
WS2HELP.DLL
WSOCK32.DLL
MSO9INTL.DLL
WW9INTL.DLL

Table 1.1: Implicitly linked versus explicitly linked libraries.

If youve followed my discussion to this point, you know that the implicit linked entries are
complete; however, since I didnt test every bit of Words capability, the explicitly linked
column is probably incomplete. In this example, there are about twice as many explicit as
implicit linked libraries. Ill provide more information about implicit versus explicit files in later
chapters.
You can download Dependency Walker, excellent profiling tool, from
http://www.dependencywalker.com. This utility is freeware made available by Steve Miller, a Microsoft
developer who has devoted an enormous amount of time to keeping this utility up-to-date with the
latest Microsoft operating system releases. A version of this software ships with Microsoft Developer
Studio.

Software Breaks Software


Microsoft has always stored its core libraries within the system folder under the primary
Windows folder. Microsoft has attempted to maintain this folder as a repository for the operating
systems files; however, nothing prevents software manufacturers from using this folder. In fact,
manufacturers place their applications shared files into this folder because the operating system
automatically searches the Windows and Windows system folders when an application needs a
library.

Chapter 1
This functionality has added responsibility for an applications install process. In addition to file
transfer, the install program must configure the application to sit on the operating system. I
compare this responsibility to a matchmaker. The install program must take two unacquainted
entities and introduce them in such a way that they take an instant liking to one another. As in
real life, things can get complicated.
The operating system goes through a well-known search order t to find all the libraries needed by
an application. Lets say my application starts from a unique location. It makes a request for a
Microsoft Common Control. In this case, lets say the library is ComCtl32.dll. This file usually
resides in the Windows system folder and contains some common Windows controls, such as the
spin box control and IP address control. (Ive selected this control because of its widespread use
in Windows applications.) In response to my applications request for ComCtl32.dll, ideally, the
operating system finds this file within the Windows system folder, loads the library, and its
ready for my use. During this process, a couple of things can go wrong. First, what if the library
isnt in the Windows system folder? The operating system then peruses the rest of the search
order. If its not found through this process, a system dialog box will be displayed saying the
system file could not be found.
Second, what if the operating system finds the file, but its not the right version of the file? There
are a couple of options at this point. The file may work just fine if the functionality my
application requires is contained in the library. If its not, any number of errors could occur
depending on what is in the library and what my application intended to do with the library.
The biggest question is how could the library be the wrong version? Lets assume a best-case
scenario: The install program made sure the correct version of the file resided on the system
when it installed the application. Then, another install program came along and overwrote the
existing ComCtl32.dll with an older version. My application is definitely broken.
But there are other ways things could go wrong. What if the existing ComCtl32.dll was
overwritten with a newer one that wasnt completely backward compatible or wasnt compatible
with the functionality my application needed? My application is still definitely broken. What if a
second ComCtl32.dll was installed in a different location, but closer in the system search path?
Same thing. The wrong version would be loaded before the one my application needs and my
application would be broken.
DLL Hell
As you can see, there are a number of ways these shared DLLs can be manipulated to create
havoc for Windows applications, thus the term DLL Hell. A classic example of DLL Hell goes
back a few years and involved a file named WinSock.dll. This file, while a standard name, was
implemented in drastically different ways by TCP/IP stack vendors. (This example takes place in
the days before the WinSock.dll came bundled with the operating system.) For an install
developer, a physical search of the hard disk was required before a new stack could be laid
down. Any chance that a different WinSock.dll could be found had to be removed. Extraneous
WinSock.dlls had to be renamed to avoid a collision. These requirements prevented problems
from the install side, but nothing prevented another install program from laying down a different
and incompatible library.

Chapter 1
DLL hell is the primary reason that locked-down systems exist. In fact, large corporations
commonly have rather draconian processes in place to keep the operating system shared libraries
at a consistent version. These processes range from limiting what the end user can install to
physically relaying the Windows system folder when the computer boots.
There are trade-offs with this approach. The more locked-down or standardized the computer,
the less flexible it becomes for the user. Then again, the more flexible the computer is for the
user, the more likely that version conflicts will occur. It costs money when things break. How
much a company is willing to spend is a function of the corporations motivations. Figure 1.3
graphs these tradeoffs.

Figure 1.3: The tradeoffs between restrictive behavior and freedom to modify.

At some point, a happy medium exists. Most corporations recognize that the computer user
requires some latitude. This balance is different for each environment, so the tradeoffs arent
always the same. In other words, the point at which user freedom matches administrative and
support costs moves horizontally in this figure.
As a result of DLL Hell and the behaviors of some rogue install packages, a gradual state of system
decay occurs after the first application has been installed. In todays world, computers will eventually
lose functionality without careful monitoring. This decline is primarily a result of the difficulty in
tracking and resolving conflict libraries.

Chapter 1
Software Evolves
Microsoft provides two mechanisms to help reduce the impact of DLL hell: Windows File
Protection (WFP) and side-by-side sharing of libraries. Both features are completely functional
in Windows 2000 (Win2K) or later.
WFP ensures that core operating system files arent inadvertently overwritten. This functionality
is accomplished through the operating system. WFP monitors a select group of files in the
Windows system folder. If any of the prescribed files are overwritten, theyre replaced with the
originals on the next reboot. This feature requires a DLL cache location where the original files
are stored.
Side-by-side sharing allows applications to use a specific version of a file even if a different
version resides in the Windows system folder. This functionality is accomplished by installing
the application-specific version of the file locally with the application. A data file indicates that
the local copy of the system file should be used.

Introducing Software Producers and Consumers


Up to this point, Ive been calling the people who make software the software manufacturers.
This terminology is a bit cumbersome and not entirely accurate because not everyone who
provides software is the creator of the software. Along those same lines, manufacturer has
some connotations that implicate more niche responsibility. By going up a level, and using the
term producer well certainly capture all guilty parties.
A software producer governs the creation of the core software system.

The same holds true for the computer user. This term is a bit too specific to be useful in many of
our discussions. In some cases, it implies the user directly purchased the software or directly
deployed the software to the computer. By using the term consumer, we can capture the
responsible audience.
A software consumer governs the purchase and deployment of the software.

Motivations and Responsibilities


In one of my favorite movies, the hero is being chased across a barren planet by a rock monster.
The hero is in communication with the ship and asks for help to outwit the monster. The calm
response, Whats his (the monsters) motivation? Of course, its funnier in the context of the
movie, but the question is useful to this discussion.
If we understand the motivations of the software producers and consumers, well come closer to
not only understanding software deployment but also the problems that litter the current
software-deployment landscape. After we truly understand the problems, we can begin to look
for solutions.

Chapter 1
Software Producers
Lets begin with the software producers. Theyve got to ship software while schedules and
resources are tight. If the software doesnt ship soon, the window of opportunity is lost and
market share shrinks. Between product requirements and feature creep (the continuous addition
of last minute must have functionality), just getting the software built, let alone tested, is an
almost insurmountable task.
This daunting task is further complicated by a reliance on third-party components. Will the latest
release of their software be compatible? Will they ever fix that one last outstanding bug? Were
they being completely honest with respect to bandwidth limitations? Has the legal department
finally signed that agreement? These are just a few of the questions that software producers deal
with on the race to release.
After the software is released, the motivation of the software producer turns to its true goal
making money. One way to not make money is to release software that generates a lot of support
calls. In fact, the ideal software release involves many sales calls, no support calls, and a lot of
happy customers. The closer a software release gets to this ideal, the more profitable it will
become. Just producing the software isnt sufficient for the software producer to be successful. A
successful software producer must be motivated to lower the cost of supporting their software.
Software Consumers
The software consumer wants software that is easy to deploy and requires little maintenance
overtime. In the eyes of the software consumer, keeping the software up to date through
maintenance releases, hotfixes, or some other producer-initiated update process is the producers
responsibility.
The consumer is well aware of the cost of owning software, which isnt simply the initial
purchase cost. This expense consists of all the additional costs associated with owning the
software, including the cost to invest in better hardware to run the software, the cost associated
with the loss of productivity when the software doesnt work according to expectations, the
expense of additional training required on non-intuitive software, and the cost of negotiating
license or site agreements.

Installing Software
Crucial to a software producers success at lowering support costs is the ease of the softwares
install process. This point is an important aspect of software deployment. After all, the early
models of software deployment were predominately installing the software.
A deployable software package contains the physical application files and the embedded
knowledge to not only transfer those files to the users computer but also configure the computer
such that the application is usable. Ideally, the file transfer and configuration is done in such a
manner that all other applications still work.

10

Chapter 1

File Transfer
File transfer is the cornerstone of software deployment. If the deployment process cant handle
getting the application binaries from the media to the users computer, all hope is lost.
In the early to mid 1980s, most applications were typically on the order of a handful of diskettes.
As applications grew larger, the size of physical media also increased. Early versions of
Microsoft C shipped on less than five diskettes. Later versions (in the early 1990s) took 24
diskettes. Unfortunately this number of diskettes fell within the disk-failure rate and generated a
substantial number of support calls related to failed media. Dont forget that phone support was
free at that time.
Compression and joining algorithms were the hot commodities. Typically the application resided
in a single folder structure. Compressing this folder and splitting the compressed file across the
diskette media was the media-creation process. The application was extracted into a single folder
on the users computer. From almost the beginning, some file-integrity checking was performed.
All reasonable efforts were taken to reduce the number of diskettes. After all, shipping on one
less diskette lowered the overhead and provided one less reason for media failure. In those days,
the install program was little more than decompressing and joining software.
Often the ReadMe.txt file that accompanied the first diskette gave directions about any additional
configuration. Usually, this configuration process involved a manual edit of the autoexec.bat and
config.sys files. The end user would reboot the system manually.
During this period, large-scale distribution entailed little more than placing the image on the
network. End users launched the image from the network to install locally. For smaller
distributions, the system administrator had to visit each computer and install the software
directly, especially if the install required any changes to system files.
The file-transfer process today has experienced little change. Most install packages compress the
application files into a single image. Although this image can be split across physical media, this
process isnt often used because the space required by the distribution image is well within the
space available on a CD-ROM. In addition, compression algorithms are more efficient and
provide better file-integrity checks.
File transfer usually encompasses removal of the application. In the pre-Windows days,
uninstalls were virtually non-existent. Only within the past 5 years has removal of application
files become commonplace and within the past several years that a true application uninstall has
been around.
Configuration
Configuration is the other half of the application-install process. After all, weve long ago left the
days when simply transferring the files to the users system was the only action necessary for the
software to be usable.

11

Chapter 1

Autoexec.bat and Config.sys Configuration


When the install software had the smarts to edit files directly, autoexec.bat and config.sys were
the first files to benefit. The first several releases of Windows didnt impact the install process
substantially because most applications at the time were DOS based. The ability to edit these
files gave the install program more responsibility over the install process. As Windows grew in
popularity, file editing became a requirement.
And with this added responsibility of file editing came opportunities to fail. Because the
operating system provided little more than reference documentation about the install process,
software manufacturers were left up to their own devices when the time came to create the install
program. Although there were a few dominant install tool providers, the install programs
themselves ran the range from excellent to downright dangerous. For example, the PATH
environment variable commonly exceeded its allotted length or for system drivers to be replaced
without the users knowledge. Discovering these shortcomings was all part of the learning curve
for install developers.
System.ini and Win.ini Configuration
Like modifying autoexec.bat and config.sys, editing the initialization files for the Windows layer
was commonplace in the Windows 3.x days. Although editing of config.sys and autoexec.bat
required a system reboot, editing Windows initialization files required a restart of Windows
itself. Today its hard to remember back when Windows was distinct from the operating system.
Today these files are no longer used in the operating system. As the Windows layer permeated
the operating system, the system registry replaced these files.
The Advent of Windows
With the discussion weve had so far, you can see the distinct line between pre-Windows and
post-Windows software deployment. That line occurs with the introduction of a graphical user
interface (GUI), which in turn coincides with the widespread acceptance of Windows 3.1x. The
Windows GUI has driven the current software-deployment trends, so Ill delve into this area a
bit deeper.
Windows GUI
The large-scale acceptance of Windows 3.1 was the turning point for software deployment.
Windows 3.1 made the computer easier to use for non-DOS users. The graphical interface was
made easier to navigate with the addition of the mouse.
The Windows interface opened new possibilities for developers. File extensions could be linked
to applications. Double-clicking on a file could launch an associated application. Drag-and-drop
functionality supported embedding of application objects. Graphics could be added directly into
documents. What you see is what you get (WYSIWYG) became the buzzwords of software.

12

Chapter 1
The graphical nature of Windows drove the graphical interface of the install process. This fact
may seem trivial at first, but it opened doors to an entirely new user: the novice. The novice user
rapidly accepted working on a Windows platform using a Windows application. The graphical
nature was typically non-threatening. Designed correctly, the software install program provided
safe default choices. Configuration changes, which historically had been left up to the systems
administrator, were now handled automatically.
Shared Files
All those shared components that a software application requires are lumped under the generic
title of shared files. Not only do these files have to be updated based on version number, but (on
Windows) the installation of these files requires an update to an internal shared DLLs count.
The concept of shared files and the internal counter is a construct that first appeared in Windows
95. This functionality was an important step in maintaining system state. Previously, shared files
were always left on the users computer.
If youve ever seen the Windows system folder of a Windows 3.1 system, you know what Im
getting at. Literally hundreds of files were left orphaned on the computer with absolutely no way
to determine whether they were actually still in use. Adding to this frustration was the fact that
disk space was a fairly expensive commodity.
While the Shared DLLs count is a big step forward, its not a complete solution. Because the
install process updates this counter, the count can easily become inaccurate. In the worst-case
scenario, a shared file could be removed prematurely.
The System Registry
The system registry truly came to life in Windows NT. Although a variation existed in Windows
3.1, it didnt exhibit the depth of system reliance that NT and later versions of Windows 9x
exhibited. The system registry is the repository for hardware and software configurationsfor
individual user accounts and for the computer itself.
The vast amount of energy in deployment is expended on updating the system registry,
especially for computers with multiple user accounts. The registry maintains a profile for each
local account, so any software that requires initialization of specific user profiles has to be
installed multiple timesonce for each logged-in user account. This requirement is true even if
the files go to the same physical location. The reason is the users registry data needs to be
instantiated.
Current trends in application design attempt to make this process easier by relying on the
software application to populate the user registry data on first launch. In this case, not only are
all user accounts taken into consideration, but all future users are as well.
The system registry is centralized storage for ActiveX controls. Each ActiveX control creates a
series of CLSID registry entries during a process called self-registration. By invoking selfregistration, the ActiveX server registers each of its controls. Amongst these registry entries is
the location of the ActiveX library or executable.

13

Chapter 1
Uninstalls
As Windows grew in acceptance, users developed some demands of their own. Key among them
was the ability to uninstall an application. As a result, uninstalls gradually became commonplace
(granted, it took 5 years). They even became quite good; however, it took some work.
Completely uninstalling an application from a computer is not an easy task. Its not simply a
matter of removing the application and its configurationits a matter of returning the
computer to a known working state without the application or its configuration present.

Beyond the Install


Not surprisingly, the install process alone doesnt completely define software deployment. To be
truly representative, software deployment takes a bigger view. Lets take a stab at a preliminary
definition of software deployment. After the discussion so far, Id go with something like the
following: Software deployment is the integration, installation, and support of software in a
known environment. This definition includes how the media is shipped, the mechanism used to
distribute the image, the conformance testing that occurs before large-scale distribution, the
process by which adequate license counts are maintained, the decision of who gets the
application and which parts, how the product will be supported internally, and so on.
The audience is a strong function of software deployment. Clearly, deploying software in a large
corporation is different than in a small company. Technology is also a function of software
deployment. A company that uses a software-management system is better suited for deploying
software than one that doesnt. A company that can support the latest deployment features is one
step ahead of one that cant.
Software deployment relies heavily on experience. Success relies on not repeating mistakes
made by others as well as knowledge of the operating system. Success in software deployment
requires an understanding of how Windows applications interact.
Figure 1.4 illustrates the role software deployment takes in the software-creation process. The
user assumes the process and expense of software deployment. However, software manufacturers
can make this process less painful.

14

Chapter 1

Figure 1.4: Portion of development cycle that encompasses software deployment.

The Evolution of Software Deployment


As this figures shows, software deployment is a big area. But this hasn't always been the case.
Given the Windows timeline, software deployment for the bulk of Windows history has been
concerned with simply installing the software. Only over the past few years has the area of
software deployment matured. Originally, getting your software to work on a user's system was
the biggest goal. After you got that to work, the goal became getting your software to work with
existing applications. Once we were happy with that process, the issue became removing your
software. And of course that was followed with removing your software without destroying
anyone elses software. The rest of the software-deployment areas were picked up along the way.
Initially, software deployment was little more than getting a single executable onto the computer.
Those were the early days of DOS, and most users were either technically savvy or had direct
access to systems administrators. There was no GUI to the operating system, and applications
were launched from a DOS prompt. The install process was fairly straightforward. It involved
decompressing files from a removable media to the user's hard disk. To put you into the right
mindset, these were the days of 5.25-inch floppies (300Kb and 700Kb!). Any configuration was
handled through a ReadMe.txt file. Most users were technically knowledgeable to make changes
to autoexec.bat and their config.sys files. For the most part, that's all that was required of
software deployment.

15

Chapter 1
A DOS-based delivery mechanism was more or less predominant through the late 1980s. The
advantage was its simplicity. The primary disadvantage was its limited functionalitythere
aren't many things you can do from within a batch file. In addition, a DOS batch file didnt lend
itself to mass distribution.
Within the past 5 years, software deployment has made great strides. Todays large-scale
distributions involve thousands of computersall administrated remotely. Management software
can remotely deliver virtually any standard software package to a client. Remote administration
is a foregone conclusion.
Repackaging
An excellent example of the importance of software deployment is the growth of repackaging.
For about every three to five install programs written from scratch, there's a corporation
repackaging of the same software. Why? Because the companys software-deployment
requirements demand it, and repackaging someone elses software is cheaper then using the
existing install program. There are strong advantages to repackaging software: additional
software can be bundled, components can be removed, the user interface can be suppressed, and
file conflicts can be tuned to the clients environment. By repackaging the software, these users
can exert fine control over the deployment process. In some cases, repackaging leads to better
integration with their software-management tool.
The evolution of software development closely mimics my situation at home with the computer.
Initially, software was thrown to the end user with very little forethought. As the Windows
operating system matured and penetrated more of the corporate environment, how software was
installed, accounted for, and maintained became a concern for the software companies.
Those within the software industry know all too well that the critical gate to shipping software is
the install program. Typically, it's the last on the list and sits on the back burner until shortly
before the ship date. Seasoned developers have been known to run when the topic of the install
program is broached. To be honest, this reaction is understandable. There's not much glamour in
writing an install program. If you're successful and the install program is perfect, you won't get
any kudos. After all, that's what it's supposed to do. However, if the install program is buggy or
exceeds the allotted time to complete, the world crumbles, schedules slip, and project managers
camp outside your office.
There is a distinct lack of enthusiasm when it comes to writing the install program. This lack of
eagerness may be due to the high profile that comes with taking on the task. In moderately sized
project teams, most software developers are assigned key areas of responsibility. Most have
limited impact on the user interface of the application. If bugs are generated, testing can continue
around the affected area. Rarely is the entire application crippled. The install program, however,
is critical. One bug can cause the software not to install, and a bad bug can cause the user's
system to be corrupted. Given those scenarios, which end of the software do you want to work
on?
Figure 1.5 illustrates the explosion of software-deployment functionality within the past decade.
For the bulk of the 1980s, a simple file transfer would do the trick. Within the past 10 years,
customers have been much more demanding about how software gets onto their computers and
what happens while the software is on their computers.

16

Chapter 1

Figure 1.5: A timeline of software deployments evolution.

The Growth of Software Deployment


Software deployment started out as little more than install development. As I previously
mentioned, the install-development process was primarily compressing the application, splitting
it across physical media, and transferring the files correctly to the users computer.
As the operating system grew and customers demanded more, the install-development process
matured. As the number of Windows computers grew within corporate environments,
distributing software internally added more requirements to the install process.
This trend continues today. The advent of system-management software to oversee the
distribution process has saved corporations money.
Large-scale Deployment
The entire discussion to this point culminates in large-scale deployment. Starting from such
humble beginnings as DOS batch files, through the GUI, including the bells and whistles of
Windows 9x and NT configuration, we arrive at the landscape of todaylarge-scale deployment.
The true test of software support for software deployment is large-scale deployment. Rolling out
software to thousands of client computers is not a trivial task. Sure, clicking Next through a

17

Chapter 1
single install seems easy enough, but no one wants to repeat an attended install for thousands of
computerseven a handful can be a test in persistence.
Beyond the annoying aspects of attended installations, systems administrators are concerned with
what the install process will do to the existing and working computers. Is the install process
going to break the stuff that is already working? Is the software application going to require a
system update? Is the system update going to break working software?
For a large number of installations, systems administrators want to be able to roll out the
software in a way that minimally impacts their day. They would prefer an install package that
supports an unattended mode, can be remotely installed, and works with their systemmanagement software.
Software deployment has come a long way since its DOS roots. The fact that most software
applications can be deployed through system-management software is testament to this
evolution.
The process of deploying to a large number of computers is separated into four tasks:
1. Conformance TestingVerifying the software application will play nicely with existing

software.
2. LicensingEnsuring there are sufficient licenses for the expected user base.
3. DistributionGetting the application out to all applicable users.
4. SupportDealing with the inevitable.

Conformance Testing
Left to their own devices, new applications will interfere with existing applications. A process to
eliminate, or at least substantially reduce, this interference is required in a productive
environment. This process costs money. In fact, there are cases in which the cost of
implementing a software release is prohibitively expensive.
When productivity gains exceed the costs associated with implementing the software, the
software consumer is seeing a positive Return on Investment (ROI). Consumers need to be
assured of a positive ROI before updating to new software is even considered. A large part of
that assurance is conformance testing in which the new software is tested in small rollouts to
detect incompatibilities. An investigation into incompatibilities determines how the software will
be deployed. The likelihood for incompatibilities is largest when shared files are encountered. In
many cases, the original install delivery method isnt the one used internally. There are a couple
of reasons for performing conformance testing, but the main reason is to adapt the existing
corporate computers environment to accept the new software.
This adaptation process is primarily spent updating libraries or configuring the system to reduce
the amount of file sharing. Deriving the conformance testing is the most time-consuming task.
Commonly, conformance testing of one version of a software package wraps up just as the next
release hits the streets.

18

Chapter 1

Licensing
A large concern for software producers is ensuring each copy of their software is legitimate.
Anti-piracy measures are easier to enforce within corporate environments than for individual
consumers. Current deployment schemes usually include some method of accounting for license
schemes.
Licensing implementations vary from the restrictive to liberal. A restrictive licensing scheme
usually involves some method of verification before the application is usable. This verification
might be as simple as a hardware-software handshake along the lines of parallel port dongles to
client-server verification.
An example of a liberal licensing scheme is a site license. In this model, a software producer
grants unlimited use of an application within a corporation.
Of course, there are licensing schemes that fall between these two extremes. Rolling licenses
allow a fixed number of software users at one time. This implementation requires metering
software to maintain a user count. When the number of users matches the license count,
additional users are restricted.
Distribution
The true test of software deployment is distribution. After conformance and licensing issues have
been worked out, the last big hurdle to jump is getting the software onto the users computer.
Typically, this process involves an investment of resources to design and repackage the software
application.
Repackaging is done for a number of reasons:

Provide a silent or unattended install method

Move to a supported distribution scheme (for example, IntelliMirror)

Remove conflicting shared files or resources

Add or remove optional parts of the software application

Bundle other software packages or augment the software application with internal
components

Support
Support in the case of software deployment is largely concerned with implementing updates to
existing software. Certainly software training is part of the investment that a corporation makes
when rolling out new software, but its not strictly part of the software-deployment cycle.

The Software-Deployment Life Cycle


Up to this point, weve seen that software exists on the users computer almost as a living
organism. There is growth and there is reduction. Adding software and removing software
changes the environment for existing software.

19

Chapter 1
Figure 1.6 illustrates the possible paths of software deployment. Well be using this life cycle
flow throughout the remainder of this book. Its important to understand that true software
deployment must embrace each aspect of the life cycle.

Figure 1.6: The complete software-deployment life cycle.

As Figure 1.6 shows, software deployment isnt just installing software. Its the transactional
relationship between different software states.
Release
As the figure illustrates, the release stage is a producer concern. Its also the connection between
software development and software deployment. The successfully released package embodies
not only the requisite application files but also the embedded knowledge of the install and
configuration process.
A release occurs for any change in the original package. Changes include maintenance releases,
hotfixes, and any other change from the original software state.

20

Chapter 1
Retire
Much like release, retiring software is a producer concern. When software is retired, its no
longer available for further deployment. More than likely, its still maintained at many locations,
but the producer would ideally like to stop it from propagating further.
Install
Weve talked about the install process, but now we can see its role in the software-deployment
life cycle. The definition of the install process remains the same as earlier. It embodies the
knowledge of instantiating the software application on the computer. Part of this knowledge is
evaluation. The other part is configuration. An interesting way to think of the install process is as
an upgrade when the application doesnt exist.
Uninstall
When the software is no longer needed, uninstall provides the mechanism for removing the
software from the system. In our model, well assume that uninstall is a complete and calculated
task. After uninstalling the software, the remaining applications must retain their current state.
Uninstalling should remove the application files and any resources that are no longer shared.
Along these lines, an effective uninstall examines the current state of software dependencies and
constraints and removes the targeted software in such a way as to not violate the state of
dependencies and constraints. In our model, an install isnt a simple matter of undoing
everything that was done during the installation phase. Uninstall may first require a de-activate
process.
Update
The update process modifies software that has been previously installed. By its nature, an update
isnt as complex as the installit involves a subset of the original install process.
In our model, the complete update requires a de-activate process, then the update occurs, and
finally the application is re-activated. This set of steps may not be required and, depending on the
software, may even be a hindrance.
Adapt
A crucial process to software deployment is the adapt process. During this process the system
undergoes a new configuration by modifying the current state of one or more software
applications.
Distinguishing an adapt from an update is important. An update modifies a specific software
application, whereas, an adapt process modifies any number of existing applications. Normally,
an adapt is a corrective measure.
Activate
The activate process is the connection between the dormant and active application. Its the
mechanism used to indicate the applications functionality is required.

21

Chapter 1
De-activate
The de-activate process is the connection between the active and the dormant application. Yes,
you could say its the opposite of activate. And youd be correct. A de-activate request initiates
the shutting down process of the application. This process would be required prior to an uninstall
and may be necessary as part of an update.

Summary
In this chapter, we took a walk through the history of software development. The evolution of
software design played a large part in the maturing of software deployment. In fact, the evolution
of software development was a precursor to the current software-deployment life cycle.
Certainly, software deployment has matured with the proliferation of the Windows operating
system. In turn, large corporations are highly motivated to trim costs of distributing software
within their organizations. There are also other issues at play. As well see in the upcoming
chapters, current trends in software design, such as multi-platform support and distributed
computing, make understanding the software-deployment life cycle critical to the success of the
software industry.
Many of the issues weve discussed have risen from pressure corporations have placed onto
software manufacturers to make their software easier to distribute and maintain. We can see this
situation by understanding the motivations of both software producers and consumers.
In Chapter 2, well take an in-depth look at the questions large-distribution consumers must
answer in the process of deploying software. The answers to these questions drive which
software applications are selected for internal use and how the deployment process is
implemented.

22

Chapter 2

Chapter 2: Conformance Evaluation


Whew! Conformance evaluation are big words for such a simple concept: How willing are you
to install or upgrade software? For you and I as individual software users, the answer to this
question revolves around cost, need, and expectations. Companies releasing software internally
must ask the same kind of questions on a much larger stage.
If we're interested in a software package and its minimum requirements exceed those of our 3year old home computer, how likely are we to upgrade our computer to use the software
package? Odds are not good if the need for the software package is half-hearted. We're more
likely to upgrade a personal computer to move to the latest version of Microsoft Office than to
Wing Commander. But its a function of disposable income and other non-related priorities.
If you spend a few minutes thinking about the software youve purchased, youll probably
realize that you invested more than the simple cost of purchase. Youve spent the time installing
the software onto your computer. This process may have involved clearing up some disk space
and removing some older software. The install program may have involved tinkering with your
system to get the install program to workinstalling an updated Internet browser for example.
More than likely, you also spent some time learning the softwareeither through the manuals or
online Help. We can safely say that youve developed a type of relationship with your new
software.
If we look at an investment of time, energy, and money into our software as a relationship,
conformance evaluation is the courting phase. Its the period of time you spend thinking,
evaluating, and price shopping before you purchase software. In this chapter, well address the
issues of distribution and support of the software.
As individual software users, we have it relatively easy. Software consumers that represent large
volumes of usersin the order of thousandshave a very difficult task. The process is pretty
much the same, but the scale of investment is several orders of magnitude greater and the costs
of success and failure are also a lot larger. This task is what the task that were going to focus on
in this chapter. Even though the quantity of software packages is larger, the concerns of largescale software consumers are identical to those of individual users.
Large-volume software consumers start by determining the level of need for the software
package. They need to understand if the applicable computers meet the minimum requirements
for the software. They also need to demonstrate that the investment of time and energy to
distribute the software will lead to a cost savings. These factors and more need to be considered,
evaluated, and answered before the software-deployment process can start.
In the remainder of this chapter, well follow the trail of software deployment. Well look at
everything from evaluation to installation to support. This trail will lead us through the following
phases:

AcquisitionIncorporates the process of verifying whether the software is necessary and


achieving a plan of deployment.

DistributionIncludes delivery, maintenance, and reporting of the software packages.

SupportEncompasses the responsibility of maintaining the existing software in a


productive state for the end user.

23

Chapter 2
The remaining sections deal with these phases in much more detail. After reading this chapter,
youll have a complete idea of the software-deployment process. More importantly, youll know
which questions and tasks need to be resolved before beginning the task of deploying software.

Acquisition
The process of acquiring software isnt as simple as youd first think. Not only is there a fair
amount of work to do before the software is purchased, but there is also an awful lot of work that
must be done after the software is inhouse. In any event, the results of the acquisition phase of
software deployment determine not only if the software rollout will occur but also, generally,
how the rollout will occur.
Lets start at the beginning. Acquiring software is a three-step process that involves an
evaluation of need, testing for conformance to standards, and finally a retooling of the delivery
mechanism:

EvaluationDetermines whether the software is necessary in the working environment.

TestingInvolves testing for hardware and software compatibility.

ToolingIncorporates reworking the existing deployment package.

Evaluation
The goal of evaluation is to determine whether the software is necessary and to estimate the cost
of implementing the software-deployment process as well as the Return on Investment (ROI). At
a minimum, the cost of implementing the software should be offset by its usefulness. In many
cases, the actual deployment infrastructure (how the software packages will be distributed) will
already be in place. Work done at the evaluation level determines whether the software is
worthwhile and how deployment should proceed by answering the questions that Figure 2.1
presents.

Figure 2.1: Check list of questions for the evaluation process.

Determine Whether the Software is Necessary


The first step is to verify the usefulness of the software. Do you have preexisting software that
can do the same job? How about upgrades or extensions to pre-existing software? After all, if
youve already got something on the computer that can suffice, the process of deploying
software wouldnt be necessary, and a software extension or upgrade would be less complicated.

24

Chapter 2
The need for the software is based on the problems its expected to resolve. In some cases, the
software may be a requirement, for example, to view or edit proprietary files. In other cases, the
software may automate tasks that were previously handled by a time-consuming process. The list
could go on, but the central point is that the end goal of deploying the software should be clearly
defined.
Calculate the ROI
If current software cant meet the current need, and the need is imperative to accomplishing a
corporate goal, the next step involves calculating the cost of deployment. The cost of the
software plus the complete cost of deployment (installation, configuration, training, and support)
is the investment cost. The money saved by using the new software is the benefit cost. Initially,
the investment cost of the software will exceed the benefit cost of owning the software. Over
timethe life of the softwarethe benefit cost should exceed the investment cost.

Figure 2.2: The point at which the software deployment effort is financially worthwhile.

In Figure 2.2, the ROI is met at some point after the software has been successfully deployed. In
this figure, the complete investment cost is spread out over a period of time. As time goes by, the
benefit costs offset the investment cost. While this is a simplistic model, it upholds the basic
tenet of software deployment: Deploy only the software that will exceed its ROI. Conversely,
dont replace software before it ROI is reached. If the need or the longevity of the software is
uncertain, a careful reexamination of the software need is warranted.
Determine Who Will Require the Software
Once a positive ROI has been calculated, the next step is to determine who requires the software.
This number may be fixed initially, but as teams grow or the need becomes more widespread,
additional copies of the software may be necessary. At this point, a worthwhile task is to
associate the software with specific groups or departments. Some deployment methodologies
make deploying across a group of users substantially easier than deploying to specific users.

25

Chapter 2
Some corporate environments structure their system user groups specifically by software
requirements. Although this structure covers the majority of cases, keep in mind that there will
undoubtedly be exceptions. Deciding how to cover the exceptions should be part of the overall
software-deployment strategy.
Develop a Plan Based on Operating System
Now that the need and users have been identified, the next step is to determine the computer
system that these users have. All computer systems can be separated into two broad groups: nonWindows and Windows, as Figure 2.3 shows. This separation has as much to do as market share
as anything else. Clearly in your work environment one operating system will dominate. Within
the non-Windows group there are two distinct types: Apple OS and UNIX variationsalthough
with the latest release of the MacOS, which embeds a FreeBSD variant of UNIX, even these
types are becoming blurred.

Figure 2.3: Classification of operating systems.

With the exception of software-management systems, there is no best-case solution that deploys
to all operating systems. Typically, youll find yourself having to come up with similar strategies
with different implementations to support a heterogeneous platform base.
Well get to software-management systems later on, but for large software deployments systemmanagement systems offer a cost-effective way to transparently cope with software deployment
on heterogeneous systems.
Compatibility Testing
Now that we know the software is required and its cost effective to deploy the software, the real
work begins. Making sure the new software plays nice with the existing software is an important
part of software evaluation. Without thorough compatibility testing, introducing new software
could be disastrous with effects ranging from intermittent software anomalies to complete
operating system failure.

In some cases, compatibility testing extends to the hardware. A complete test would include a
range of computer types. Not only would this testing cover brand-to-brand systems but also
client computers, server computers, and laptops. If the software has stringent video requirements,
for example, testing the software with a large range of video cards and monitors may be in order.
If the software has large memory requirements, testing the software on typical corporate systems
with a large range of memory capacities would be worthwhile. Figure 2.4 provides a list of
questions for you to answer during the testing process.

26

Chapter 2

Figure 2.4: Check list of questions for the testing process.

Compatibility testing starts by defining the typical user computer configuration. In cases in
which computers are heavily standardized, this process can be straightforward. In environments
in which computers are freely modified, this process is not only complicated but also impossible
to test for complete compatibility.
The typical configuration should include standard hardware and software combinations. The
boundaries of the configuration definition should be realistic. After all, a theoretical matrix of
testing could yield hundreds of test scenarios when in reality there might be 20 or 30. The
constraints of the configuration definition should be based on the group of users for whom this
software is targeted. After all, it doesnt make sense to include those computers that arent
applicable for the software deployment. When setting up the initial test scenario, be sure to use
the most constrained security settings most likely encountered. This setup will force
incompatibility issues between security settings and the examined software. You might need to
revisit the exact security settings for the application to work effectively. An example is access to
the specific registry keys on a Windows system or read/write privileges to data files.
Table 3.1 illustrates a sample matrix, which can help to ensure all possible configurations have
been thoroughly tested. Its also an excellent reference document for the support folks. Replicate
this table for each OS as appropriate and compile a similar table for the hardware requirements.
Existing Software

Test 1

Microsoft Office

Test 2

Test 3
U

Corel Suite

WordPerfect
Netscape Navigator 5.0

Netscape Navigator 6.0


Internet Explorer (IE) 5.0

U
U

IE 5.5

IE 6.0
MDAC 2.1

U
U

MDAC 2.5
NT Service Pack 3 (SP3)

Test 4

NT SP4

U
U

NT SP5

NT SP6
Status (Success/Failed):
Table 2.1: Sample configuration-testing matrix.

27

Chapter 2

Not shown in this table, but just as important, are the variations introduced by notebooks and
laptops versus desktop computers. While less of a factor today, older models may have more of a
discrepancy. Older models of notebooks and laptops have distinct hardwaredifferent video,
smaller hard drives, and less memorywhich may not be compatible with the testing software.
Create a Reproducible Test Environment

In practical terms, configuration testing starts by creating a reproducible test environment. At a


minimum, this environment would be a single computer whose hardware could be reconfigured
to match the results of the hardware-matrix table. In addition, the operating system itself could
be reinstalled multiple timeseven for multiple operating systems.
The importance of reproducibility cannot be overstated. The ability to quickly and accurately
reproduce any single test scenario is imperative. Although hardware changes would require
physically adding or removing components, software changes could be instantiated through
replication software. There are a number of software packages that capture a systems binary
state and store it to a data file for later use. For a range of configurations, these system image
files may require large amounts of disk space, although burning the image to a CD-ROM is
certainly an option for smaller test scenarios.
A well-known imaging software package is Symantecs Ghost. You can find this software at
http://www.symantec.com.

Some failures in reproducibility are a result of subtle differences in hardware. Just because two
computers have the same model number and external case doesnt mean theyre identical. Some
hardware manufactures will substitute similar internal devices when original sources become
scarce. Opening up the computer and logging its exact hardware contents may be worthwhile.
The reproducibility of tests is important for a number of reasons. First, as a sanity check,
reproducible tests are useful to verify issues or validate later assumptions. Second, for software
support, theyre ideal to quickly reproduce a clients configuration locally even though the actual
problem computer may be hundreds of miles away.
Once a test environment is created, the process is quite simple. Set up the hardware and software
for each of the individual matrix checks. Install the to-be-deployed software, and test. After a
single matrix test, youll quickly see why this phase of software deployment is the most time
consuming.
DLLs and Shared Resources

Remember the discussion about static and dynamic linking of libraries from the Chapter 1? Well,
bad news. From that discussion youll see why the entire functionality of the new software must
be exercised. In addition, the entire functionality of the pre-existing software (from the software
matrix table) must also be fully exercised. To avoid DLL Hell, which I also discussed in Chapter
1, you can rely on a sufficiently thorough software matrix to uncover any version
incompatibilities.

28

Chapter 2

In addition to these two very important items, there are other things to consider. The bulk of
these considerations have to do with shared resources. Shared resources include file extensions,
user-document workspace, ActiveX controls (through self-registration), ODBC databases and
drivers, fonts, shortcuts, and so on.
A classic example of a shared resource is file extensions. In a Windowsoperatingsystem
environment, applications can be linked to specific document types. The document type is
identified by the file extension. On most systems, the extension .txt is associated with
Notepad.exe. This association means that double-clicking a document called Readme.txt will
launch Notepad with the selected document active. Although this association isnt usually an
issue, when two applications vie for the same extension or any shared resource for that matter,
youll have to make a decision about which one wins.
A classic example is Web browsers. When installed, Internet Explorer and Netscape want to be
associated with .htm and .html extensions. However, only one application can be associated with
an extension at a time. Another example, are common picture extensions such as .gif, .jpg, and
.bmp. These extensions are usually associated with the same viewing software. The same holds
true for video data files with extensions .avi and .mpg.
Another often-forgotten test point is uninstalling applications. Im not specifically talking about
the new softwareany software will do. Sometimes a resource that is shared is inadvertently
removed during the uninstall process. This removal has the nasty tendency to break the software
that is staying behind. This kind of event should be noted for latter conflict resolution.
Software-Automation Tools

For some companies, investing the time and energy into software-automation testing tools may
be worthwhile. Although these tools can be expensive and time consuming, they compensate by
being reusable. In this case, you create an initial automation test script to verify compatibility of
the new application. You run the new automation test in tandem with all the existing tests. After
the application is accepted and deployed, its automated test is saved and used for compatibility
tests for future software. Over time, the savings in test time and resources will be substantial.
The Results

Are you going to be able to achieve 100 percent test coverage? Absolutely not. But the closer
you get, the better youll be able to predict the success of the software-distribution process; not
to mention the reduced number of support issues, which should be enough incentive to gain as
much test coverage as possible.
If youve created a thorough hardware and software matrix, most of the work is done. Any issues
should be adequately documented for later conflict resolution. The testing and verification phase
is time consuming and tedious, but its in no way challenging.
The results of compatibility testing determine the configuration steps necessary to use the
software. What youll end up with is a hefty document that specifies all the detected conflicts.
The next step is to gain sufficient resolution on each of the conflicts to proceed with the
deployment effort.
Now that youve seen what compatibility testing entails, you may be interested in hearing more
about standardization. After all, the closer all computers are in pre-existing hardware and

29

Chapter 2

software, the easier compatibility testing will be. The smaller we can make the hardware and
software matrix tables, the less compatibility testing needs to be performed.
Standardization
As we saw in the previous chapter, there is a way to reduce the amount of work required during
the evaluation phase. You could simply lock down users computers. Restricting what users can
change on their computers drastically reduces the differences between systems. And, because
compatibility testing is a function of standardization, testing for compatible software is easier.

The basic premise is simple: the effectiveness of software deployment is largely dependent on
having an accurate picture of the target platform. In fact, follow me closely here, software
deployment is a cost-reducing benefit that is directly related to the cost-reducing functionality of
computer standardization. Although that fits nicely in the sentence, it may leave you scratching
your head.
At the extreme level of standardization everyone has the exact same computerhardware and
software included. Keep in mind that this discussion is completely theoretical. If you can buy
that premise, you can easily see that deploying software in this kind of environment is very
simple. By completely removing the matrix table, compatibility testing is limited to a single
computer! Before you roll your eyes, this description is exactly the scenario for the home
consumerthats you and me. The only luxury the home consumer doesnt have is testing the
software before installing it.
Range of Standardization

Standardization doesnt even have to be so clear-cut. There is a full range from completely open
systems to locked-down environments.
For starters, computers can follow a platform standard. In this case, each computer abides by
defined standards. These standards limit the computer to a list of available operating systems,
client computers, laptops, servers, and network communication devices.
Computers may be required to follow specific application standards. In this case, each computer
abides by defined software standards. Typically this standard is a list of version-specific, vendorspecific applications with standards established for specific users and user groups. Application
standardization includes setting up purchasing policies and procedures as well as monitoring and
managing application distribution, installs, and updates to assure that compliance is maintained.
Enforcing Standards

Enforcing standards is accomplished in a couple of ways: managed environments or lockeddown environments. A managed environment keeps users from making changes to their systems,
such as introducing unauthorized software or changing settings that may cause conflict with
other system resources. In addition, a managed environment controls the ease of use of the
desktop, providing a common set of applications and access for groups of users or individuals. In
this manner, users are presented with only the tools they have been trained on and need for the
job. This environment assures that changes are managed.
A locked user environment is a limited version of the managed user environment. It precludes
users from changing settings and installing unauthorized software. It is different than a managed
30

Chapter 2

user environment in that it is machine specific and is local to the device. It is not typically
managed or synchronized with a server profile. The primary reason for a locked user
environment is that it makes a predictable target for software distribution.
Conflict Resolution
Okay, after a couple of months of testing, weve got a stack of incompatibilities. They could
range from the serious to the trivial, but we still must sort them out and arrive at workable
solutions. In every case, additional work is required to discover the exact cause of the conflict.
Maybe an existing application breaks when the new software updates to MDAC 2.6. Does the
new software absolutely require MDAC 2.6? We dont know and well have to investigate
further.

For each incompatibility, well have to attribute the incompatibility to a piece of software. From
there, well need to clearly define the exact problemhaving imaging software helps greatly in
reproducing the problem. Then a couple different solutions will have to be applied and retested.
During this process, youll benefit from playing with each of the software packages in different
configurations. You may discover the incompatibility is caused by an optional component of the
software. Removing that component removes the problem and resolves the conflict. However,
every incompatibility may not be so easy to resolve.
Lets take a deeper look at some of the standard issues. The most common incompatibility is
versions of system files. This incompatibility usually involves a software package installing a
new core component. This new core component may or may not be required. Depending on how
the install program was written, a developer may have just grabbed the latest and greatest from
Microsofts Web site and slapped it into the install package.
The conflict-resolution process involves a series of tests. First, replace the new core component
with the oldest possible component for your environment. Once again, test each software
application for complete functionality. Chances are youll replace one incompatibility for
another. Keep updating the core componentperhaps while the original core component wasnt
sufficient, a version in between resolves the incompatibility.
Part of the conflict resolution may require retooling the install package. This requirement is
especially necessary for some incompatibilities: If you remove shared resources during an install,
retooling the install package is the only solution.
If the incompatibility is less serious, a simple runtime script run before or after the install
program may be a remedy. Of course, this solution would imply that the existing install program
meets all other requirements.
When the work is done, youll have documented each conflict resolution with an applicable fix.
Starting the compatibility testing again with the documented conflict resolutions is an excellent
way to verify the software-distribution process. The results of the conflict-resolution phase
determine the configuration steps necessary to use the software. Additional lab testing verifies
the fixes. This testing is where the imaging process from compatibility testing will come in
handy.
In the cases in which nothing works, a reevaluation of the software need may be warranted. It
may be simply that existing software must be removed for the newer software to be installed.
The complete documentation set should be made available for the support team.

31

Chapter 2
Tooling
In virtually every case of conflict resolution, changes must occur within the software-install
process. Because the software application typically already has an install wrapper, retooling or
recreating the install program is a necessary part of software deployment.

The conflict-resolution process may all come down to the simple fact that the install package
doesnt conform to the deployment objectives. In this case, an install program that conforms to
those objectives must replace the existing install program. Figure 2.5 illustrates the questions to
answer during the retooling process.

Figure 2.5: Check list of questions for the tooling process.

Dont get me wrong; retooling a software application isnt limited to conflict resolution. The
following list provides several other just as important reasons to retool:

To resolve incompatibilities and conflicts

To bundle additional software

To add or remove components within the distributed software

To eliminate or customize the user interface

To facilitate a proprietary software-distribution mechanism

To provide additional install configuration

Although resolving conflicts and removing the user interface are the most common reasons to
retool, it may also be a way of bundling additional software. This bundling could include other
software applications or simply proprietary extensions to the software. Instead of using three
separate installs, you could retool them all into a single package.
For example, suppose that youre delivering Microsofts PowerPoint. By creating your own
install package, you can include corporate templates and sample presentations. You could also
choose to remove unnecessary PowerPoint components and create corporate-specific shortcuts.
The useful thing about retooling is that you seldom have the same constraints that the original
software manufacturer did. When the original install program was created, the range of
supported computer configurations was quite large. Retooling for your own environment is
usually a more manageable task. For example, although the original software may have
supported all flavors of the Windows operating system, your inhouse requirements may be just to
support Win2K.
There are two methods of retooling: repackaging and creating an install program from scratch.
Although creating an install from scratch is functionally the same as repackaging, the term repackage
is associated with a specific install-package creation process. Thus, well stick with that usage here.

32

Chapter 2
Repackaging
Repackaging is the process of extracting an application from one delivery vehicle and inserting it
into another. Repackaging involves capturing the changes made to the computer while the
original install program is running. (Although this functionality is what is advertised for the sake
of simplicity, every repackaging tool on the market compares the changes before and after an
install is performed to generate a package and doesnt actually capture the changes made to the
computer while the install is running. I elaborate this point in Chapter 3.) There are specific
software packages that provide this functionality for you automatically. Some even go so far as
to recreate the install package automatically. Of course, youll want to get into the package to
make your modifications.

A classic use of repackaging is to remove the user interface from the install program. In this
case, perhaps the original install program didnt provide an unattended or silent install. By
tooling our own install program by repackaging the software, we can create a suitable solution.
There are limitations to repackaging: Repackaging software detects and replicates only changes
to the system. Thus, if a file is already on the machine on which the repackaging task is being
performed, the file will not have changed during installation and wont be included in the
repackage. Therefore, the file will be missing if pushed to a machine that doesnt already have
the file installed.
In addition, there are some technologies that the repackaging system is not familiar withon
Windows systems, configuring Internet Information Server (IIS) for a virtual directory or Web
server is a common limitation.
For the most part, the fundamental limitation to repackaging is that it doesnt capture the logical
evaluation process of the original install. Some repackaging software provides more options to
you than other repackaging softwareshopping around and comparing features will help you
greatly. The next chapter deals exclusively with repackaging.
Create an Install Program from Scratch

Alternatively, you can write the install program from scratcha much bigger task than
repackaging. In fact, if at all possible, repackaging is the preferred option. Writing an install
program from scratch, although giving you greater flexibility, incurs the most responsibility.
A very rough time estimate comparison makes repackaging the quicker option. In fact, a typical
repackaging process may take the most part of a week, including testing. Creating an install
package from scratch on a moderately difficult application may take the bulk of a month. That
estimate also includes testing. Creating an install program from scratch is discussed in detail in
Chapter 5.
Lab Testing

After retooling the software install package, thorough testing will have to be done to ensure
proper installation and configuration. After all, you dont want to introduce new problems in the
process of resolving existing ones. Theres nothing like success, and lab testing is a way of
determining how close your newly tooled package is to success.

33

Chapter 2

Distribution
Now weve done it. Weve determined that the software application is important. Weve
resolved all outstanding software conflicts. Weve even retooled the install package for the
softwaremaking install-specific changes along the way. The next step is to derive a strategy to
get the install package to run on users computers.
There are a number of ways to accomplish this goal. They range from making the install image
accessible on a networked drive to administering the install process through a softwaremanagement framework. Which method you select is a function of cost and your final objectives.
In this section, well spend a little bit of time talking about each one. Along the way Ill point out
the pros and cons of each method. Figure 2.6 outlines the key questions you should answer for
the distribution process.

Figure 2.6: Check list of questions for the distribution process.

There are some key components to the distribution process that are secondary to the physical
distribution of the software:

Provide warehousing support (catalog and store the package for delivery)

Verify software-package integrity

Report success and failure status of distribution attempts

Within this section, well also touch upon the topic of software-management environments.
These are prepackaged software bundles that automate much of the software-deployment
process. Im introducing the topic here because this software is a must-have solution for large
corporations. Chapters 6 and 7 go into much more detail.
Image Delivery
Delivering a software image can be done in a number of ways. The image could be a physical
CD-ROM that is passed around the office. A link could be made on an Intranet Web site. The
software could be installed directly to the computer without user intervention. Or an email could
be sent to each user identifying the software location and requesting that the user install the
software.

There are pros and cons with each delivery method. In this section, well talk about some of
these tradeoffs. You should be able to get a general idea of the software-distribution mechanism
appropriate for your environment.
The primary factor in determining your distribution method is the method thats currently in
place. The second important fact is the number of computers that require the software. While my

34

Chapter 2

prioritizing doesnt do the right solution any benefit, Im assuming that the implementation
youre dealing with is correct for your environment.
If a distribution mechanism is already in place and working effectively, theres not much else to
consider. Software-management systems are expensive and time consuming to implement. If
your company has made such a selection, there were very good reasons for its selection. Theres
not much else to do but learn how the environment works. However, distributing software in a
fresh environment is primarily a function of the number of computers that require the software.
Independent of how you choose to deliver the install package to users computers, there are
primarily two delivery modes: push and pull. A push install delivery mode is one in which the
server drives the delivery, whereas a pull delivery mode is one in which the user (or client
software) initiates the install action.
Push Delivery
By far push delivery is the preferred method of choice. It ensures that the distribution process is
started for the targeted system and can usually record a success or failed status. A push delivery
can also make sure that a valid license exists for the targeted computer and keep track of the
complete license use of the software.

There are many remote options available. In general, the targeted computer must be powered on
(although most system-management software and hardware options provide a remote boot
option). Usually, push installs are accomplished at night when most users arent active on the
computer and network traffic is minimal.
In addition to the standard mode of delivery, a push install can also advertise the availability of
the software application. In this model, the initial advertisement is pushed to the computer, but
the actual installation of the corresponding software is done through a pull install. Advertisement
is supported natively in Win2K and Windows XP; however, the mechanism for implementation
is well documented and could be extended for use with other operating systems. There are two
forms of advertisement: assigning and publishing.
Assigning

Assigning the availability of an application gives the appearance that the application is
completely instantiated on the users computer. All shortcuts are present, all self-registered
actions are present, and all file extensions exist. Basically, everything exists but the application
itself.
Assigning is useful when an application isnt required by a user, but is available when needed.
The strength of assigning is that it doesnt consume disk space until some request for
functionality is made.
When a request for use is made, the operating system makes a request to the Windows Installer
service. The Windows Installer service tracks down the source media image and initiates the
installation of software files. Note that this process occurs silently behind the scenes. To the user,
there is a delay between the selection of an advertised application and the actual launch of the
application. During the delay, a status dialog is displayed to show activity.

35

Chapter 2
Publishing

Publishing is a subset of assigning. In this case, the software isnt directly available through the
user interface. Instead installation is triggered when other software makes a request for the
software. Similar to assigning, when a request is made, the operating system makes a request to
the Windows Installer service and the install proceeds as the previous section describes.
Pull Delivery
A pull software install is the easiest to implement. Its also the least expensive. It typically makes
a network, URL, or intranet location available to the user and relies on the user to trigger the
install process. This process has the drawback that its difficult to force the user to install the
software. A much needed security patch may languish because the user fails to trigger the
installation. In addition to not being able to enforce installation and configuration management, a
major reason for not implementing pull software installations is security. By default, users often
dont have sufficient rights to perform software installation.

A variation of the pull install is to create an entry in the boot process. In a Windows
environment, you could create an entry in the boot process through the RunOnce registry subkey,
a logon script, or the Startup folder. The next time the computer boots up, the install process is
kicked off. While the original entry in the boot sequence was made remotely, the fact that its
still client-initiated (in this case by the reboot action) makes this method a pull delivery. This
method suffers from the usual pull delivery drawbacks.
Pilot Rollouts
An important facet of distributing the software is testing the distribution methodology on a
representative sample group. The point of the pilot rollout is to test our assumptions about the
target systems, the install package, the bandwidth, and so on. Not to mention that recovering
from disaster is easier when it affects a small number of computers.

The first requirement of the pilot rollout is to find a good variety of target computers, groups,
and users. This variety allows the rollout process to be exposed to the largest number of
distribution circumstances. If remote and mobile users are a concern, they should be included in
the pilot rollout.
If a pilot rollout detects a substantial drain on network resources, distribution to intermediate
deployment servers may be in order. A deployment server has the effect of offloading network
traffic through different connection points. In software-management terminology, these servers
are known as software distribution points (SDPs). Another alternative is to stagger the software
distribution so that different parts of the company receive the software at different times.
Any modifications that need to occur as a result of the pilot rollout should be documented and
included with compatibility-testing and conflict-resolution documentation. The support process
requires this kind of documentation to resolve issues after the final distribution.
A final part of the pilot rollout is to test accessibility of all groups to the software package. This
testing includes distributions that occur through firewalls, virtual private networks (VPNs), and
dial-up connections.

36

Chapter 2
Software Management
A good software-management tool distributes and installs software. It compliments these
functions with a sweeping range of support modules. These may include reporting, license
monitoring, and network monitoring to name but a few. The clear advantage to using softwaremanagement tools is the automation and black box approach to software distributionI mean
distributing a software package to a user may be a simple click-and-drag actionthe
underpinning of what is really happening is not apparent.

Software-management software comes in several forms. It can be a focused software-deployment


solution or it can be bundled within a larger enterprise-management framework. The distinction
is that software deployment is a subset of the enterprise-management frameworktypically a
plug-in module. The larger enterprise-management framework includes many functions in
addition to software deployment. Well go over the details in later chapters. This section
introduces the terms and concepts commonly associated with the software-deployment side of
software management.
At a basic level, the role of software-management software encompasses the following areas:

InventoryKeeps a record of what is currently installed and by which user

DeliveryProvides a means of getting the install package to users computers

LicensingKeeps a record of in-use versus available licenses

ReportingCreates a variety of status reports

WarehousingPhysically provides storage space for the distribution images

Managing componentsPerforms a limited automated support role for the distributed


software

The primary goal with this type of software is to provide a centrally managed location for the
bulk of software-distribution tasks. Centrally managed implies ease of administration and clearly
defined status of installed software and pending software releases.
Inventory

A software inventory is an up-to-date listing, preferably electronic, that contains detailed


information about the client, network, and server software installed within an organization.
Inventory information is used for troubleshooting, license compliance, and strategic planning.
Ideally, the information should also be automatically collected, updated, and maintained. An
ideal inventory would include license terms and conditions, date of acquisition, user names and
location, system installation details, maintenance agreements, usage monitoring, history, and
other relevant data.
Without a software-management tool, software inventory would be limited to keeping track of
purchased software. For small companies, this inventory could be a spreadsheet or hard copy. In
this case, the inventory is manually updated and contains minimal information about the
software. The objective is to meet minimum requirements to avoid breach of license challenges,
and provide upgrade proof and volume purchase leverage.

37

Chapter 2

A more advanced software inventory includes regular inventory of software from purchasing
through distribution. At this level of detail, the inventory process would be used with assettracking and system-discovery tools.
Delivery

Of course the delivery aspect is the most crucial to our focus. In this case, software-management
tools typically provide their own version of user and group profiling. This functionality allows
software to be deployed based on policy management.
By creating a new user and associating the user with a specific computer and appropriate user
groups, the corresponding software is automatically deployed. The software delivery vehicle in
most cases is an unattended push installation to the client machines. Because of the extensive
reporting, success or failure is often automatically indicated to the administrator.
My personal favorite is the ability of these tools to automatically schedule software deployments
based on network traffic. When network traffic falls below an administrator-specified amount,
software distribution is kicked off. If for whatever reason, network traffic picks up to a point that
exceeds the administrator-specified threshold, software distribution is temporarily halted. This
ability to monitor the network and automatically schedule software releases is truly impressive.
Licensing

Licensing is a key component of software distribution. The bulk of software-deployment tools


support some form of integration with licensing mechanisms. The advantage to having licensing
centrally managed is that the software-distribution administrator has immediate record of license
status. Typically license status is part of the built-in reporting process. Licensing functionality
includes software metering to manage the use and control the number of licenses. Many
solutions also support the dynamic balancing of licenses across licensing servers.
Reporting

With built-in reporting, systems administrators have immediate access to the success and failure
of software rollout. Additional reporting functions include auditing and management reports as
well as network status and loads over time.
Warehousing

Warehousing is the physical storage of distributable software images. It usually incorporates the
added benefit of license integration. In this case, not only does the software store the softwaremedia image but also lets you know how many licenses are currently used and how many
remain.
Policy Management

Policy management allows administrators to assign individual users to specific groups. Simply
by belonging to a managed group, the user has access to job-appropriate software. Users can
become members of multiple groups if their job function overlaps or to make software
distribution simpler.

38

Chapter 2
Manage Components

The manage components feature of a software-management tool provide automatic self-healing


of distributed packages and catastrophic system recovery. Self-healing is usually provided by
monitoring the client systems and keeping a record of the install status. A significant change in
the client computer status would trigger a redeployment of the affected software.
Catastrophic system recovery is similar but on a larger scale. In the case of software failure, the
recovery entails a reimage of the system followed by redeploying all subscribed software
applications.
The manage components feature additionally tracks and manages software compliance according
to specific rules. Events that fall outside these rules trigger a report to the systems administrator.
Finally, all managed software is included in regular reports. These reports usually include such
details as software type, revision, user name, user number by software title, and a record of valid
software installs versus failed installs.

Support
After a software application is installed to users computers, there is an inherent responsibility to
monitor the software to make sure it continues to function correctly. Added to this responsibility
is that of educating the user about the software.
In addition to these two important tasks, support is the central repository for the process history
of the software. The results of compatibility testing and any conflict-resolution processes should
be documented and made accessible to the support team. This kind of information goes a long
way to quickly resolving implementation issues as they arise.
The support facet of software deployment encompasses the following roles:

Ensure software and computer integrity through file management.

Manage the software-licensing schema.

Resolve software issues through the documented deployment process.

Serve as a repository for hotfixes, maintenance packs, and upgrades.

Manage deactivation and decommissioning of out-of-date software.

Figure 2.7 provides a check list of questions for the support process.

Figure 2.7: Check list of questions for the support process.

39

Chapter 2
Software Repair
An interesting aspect of software support is repairing software that becomes damaged. The key is
how to implement the check and subsequent repair before the damage resource is encountered by
the application. In a locked-down scenario, a record of acceptable system files is compared
against those on users computers. Using a bit-pattern detection scheme, the files are compared
on a case-by-case basis. When an invalid file is encountered, its acceptable equivalent is pulled
from a central repository.

With Windows 2000 and XP, the operating system itself protects system files through Windows
File Protection. Whenever the operating system detects an attempt to replace any of these special
system files, a corresponding restore sequence is initiated to restore the system to its acceptable
state.
While this process works fine for system files, it doesnt help the application binaries out too
much. Here again the Windows operating system is on the forefront. Through runtime resiliency,
the Windows Installer service can detect missing, corrupt, or the wrong version of key files or
other installable resources. When corruption is detected, the Windows Installer service restores
the appropriate component (technically this component may entail far more than an individual
file; especially if repackaged, the entire application may be seen by the Windows Installer
service as one big component)and associated installable resources from the originating source
image.
Short of operating system intervention, there are limited avenues to incorporate true runtime
software repair. In this case, repair amounts to warehousing the installable media images from
which the user can initiate the repair process through the application install. This process works
because the newer Windows install programs mark the system as the application is installed. On
a subsequent running of the install program, maintenance mode is triggered in which case the
user can elect to modify the current application status, repair the application by reinstalling the
application files and configuring the system, or to simply remove the application.
The process has become fairly standard on the Windows operating system. A typical sample of
the maintenance mode detection is shown in Figure 2.8.

40

Chapter 2
Figure 2.8: Sample maintenance mode dialog box with Repair option selected.

License Conformance
Just because weve created an implementation process for our software, doesnt mean we can
freely distribute it. After all, there may be a fixed number of licenses allotted and all are
assigned. In this case, either software must be removed to make a license available or additional
licenses must be purchased.

A key aspect to support in the software-deployment process is to ensure that the company
maintains license conformance. As soon as all licenses are consumed, an alert should be
triggered to investigate the softwares status.
In some cases, license metering may be in affect. For this unusual situation, a fixed number of
applications can be in use at a specific time. As soon as that limit is reached, any other instances
of the software cant be run. Usually, the user will be asked if he or she wants to wait for a
license to become available or to try again later. A job within the support team may be to
automate the availability of these licenses.
The type of software license has a lot to do with how much flexibility is available. Some
software is licensed per user. Thus, the software can be installed any number of times; however,
only the assigned user can use the software. Other software is licensed per computer. This
licensing scheme means that the software can be installed on only one computerno matter who
is actually using it. Another form of software license is a site-license. This license method is the
most flexible arrangement and allows any number of installations as long as each user is within
the same company.
Understanding the scope of the licensing arrangement is imperative to staying within
conformance. It may also provide latitude in distributing the software.
A few years ago, I ran into a global company that circulated its licenses from time zone to time zone.
When the employees in New York were done for the day, they would uninstall the software
application. At the beginning of the day, those in the Belgium office would install the software
thereby consuming the licenses made available by the uninstalled software in New York. This
process would continue around the globe, eventually leading back to the New York office. Keep in
mind that this practice may be expressly forbidden by some software licenses.

System Recovery
Although system recovery isnt typically part of software deployment, its worth mentioning
here. Because the support mechanism already houses the distribution images, taking on the role
of system recovery makes sense.

System recovery is slightly different than software repair because system recovery is the singular
case of catastrophic software repair. In this case, the operating system as well as the computer
applications has become inaccessible.
Ideally, system recovery is accomplished by storing a base image of the computer. Here again
standardization becomes an important component. If there were a fixed (and hopefully small)
number of standard systems, the system-recovery mechanism would have to warehouse a few
images.

41

Chapter 2

Based on the base computer image and the group that the user is a member of, all software
(including the operating system) could be distributed through the standard software distribution
channel. Excluding hardware failure, this process would quickly restore the computer to a
working state. In conjunction with regular system backups, a minimal amount (if any) of user
data would be lost.
Decommissioning Software
In much the same way that the software can be pushed onto a computer, it can also be removed.
This removal is often done when upgrading existing software or simply removing software that
is no longer useful. Software could also be removed because a specific licensing scheme has
expired. In this case, instead of remotely pushing the software, a remote uninstall is performed.
As I previously mentioned, potentially, trouble can arise when removing software. Shared
components or software that relies on the software being removed are common reasons not to
remove softwareor at least to do so very carefully.

Summary
Through this chapter, weve defined the fundamental basis of software deployment. With this
information, you should feel comfortable starting a deployment effort. Perhaps youve even
managed to put together a list of questions to present to the management and the deployment
teams. Keep in mind that a thorough evaluation of the software and the distribution process goes
a long way to ensuring an effective deployment strategy.

42

Chapter 3

Chapter 3: Repackaging
In the first two chapters, we discussed the general background of software deployment, how to
justify getting software, and methods of distributing the software. If youre reading this book
with the thought that it will show you the one single method of getting your application packaged
and delivered, this chapter will start to dispel those thoughts rather quickly. Very simply put, the
best method of deployment depends on several factors:

OS

Size of the deployment

Required timelines

Your preference, skill level, and comfort zone with a deployment method

The needs of the application to be deployed

Security considerations

This chapter is going to focus on packaging (or repackaging) an application for deployment. In
addition, Ill give you a list of best practices that includes testing your package and lightly touch
on the deployment mechanisms you can use. Chapter 4 will cover the deployment methods in
greater detail. For this chapter, the term repackaging refers to the process of getting a software
application prepared for deploying to your environment. How to handle MSI, Wise Installer, and
InstallShield-type applications will be explained in a later chapter.
Why delve into the details of packaging before you finalize the deployment methods? Although
this process might seem a little backwards, if you are familiar with the methods and requirements
of packaging software, deciding on the deployment method is easier. To determine which
deployment product or method to use to get the job done, you need to understand how the new
deployment mechanisms work with packages.
Are you new to software deployment? Reading this chapter might cause you to wonder whether
anyone could do this task. Bear with me while we go through the details. Take a second and
think back on how you became a Windows technical expert instead of just a Windows user. Most
likely, your interest in the OS got you digging deeper than the average point-and-click user. By
learning the details, you were able to fix things most folks couldnt, and you could troubleshoot
problems because you understood what was happening under the GUI front end. You dont
always think about the details and most likely dont use that knowledge when you do normal
tasks. When was the last time you thought about all that was actually happening when you
installed the OS on a new system? When a problem occurs, such as when the NIC fails to
initialize, your knowledge of the details help you determine whether the Could Not Connect error
message is because of a bad password, a hardware-level error, or a security restriction. The same
holds true for software deployment. You need to understand what is going on behind the scenes
to understand what the front end might (or might not) be doing.
Thoroughly confused and worried now? By the end of the chapter, you will find the whole
process to be fairly logical and, with the newer deployment packages available in the market
today, you might find the process enjoyable. OK, if not enjoyable, at least tolerable.

43

Chapter 3

Repackaging Background
In the early days of software deployment (before 1990), you basically were a developer who
focused on distributions. To ensure the application was deployed properly, you needed to know
the details of every file and setting on the application, the interaction of the file(s) with the target
OS and with other applications, and how to recover from any condition met along the installation
path. As software applications increased in installation complexity, packaging an application for
distribution took longer and longer. Current software-deployment software has made great
strides in easing repackaging, and you dont have to be a software developer to perform the
repackaging task. Of course, if you dont use one of the commercial deployment packages and
opt for your own methods (spray scripts, clock-activated batch files, email, and so on), you will
need to perform all the functions the commercial software does for you.
Do you need to repackage all applications? To some degree, you most likely will. The answer
depends on how much adjustment the basic package needs so that it will fit in your environment.
Remember what the core issue is: You are taking a piece of software that was (most likely)
created to be installed on one PC at a time with the user of the system providing input along the
way and distributing that piece of software out to your entire target population in a manner that
supports your standards (hopefully, while providing a means for you to remotely administer the
software).
No matter which method you use, there are basic steps that you need to follow. Your deployment
method might skip through a step or two, but knowing the functions will help you understand the
process better.
These are suggested best practices. If time, money, personnel, and resources were not an issue,
these steps would prevent distribution-related problems (leaving only unforeseen application
problems). Tailor the steps and processes to fit your environment and needs.

Repackaging Process
A note before we get started: Do you know what is in your environment? Having a detailed
understanding of your environment is critical to ensuring that the applications are rolled out
properly. I dont mean that you need to have an inventory of every single machine, but you do
need to know the environment you are dealing with. The level of detail of your documentation is
up to you. At a minimum, you should know:

OS version(s)

Service pack(s)

Browser version(s)

Major production applications already installed (for example, which version of Office is
installed)

Hardware (for example, which CPU, how much memory, hard drives)

44

Chapter 3

Be sure to tailor your repackaging efforts toward what you have in your environment. Regularly
updating your environment list (inventory) is a good idea. The update schedule depends on how often
your environment changes.

The following steps provide an overview of the process that were going to follow:
1. Ensure that your test environment is ready and will fit the needs of the rollout.
2. Talk to the rollout team (defined later in this chapter) to define their expectations.
3. Create a specification that clearly defines the project goals and seeks to resolve any

outstanding issues.
4. Access a computer whose sole function is to create and verify the repackage process.
5. Create a repackage image.
6. Verify that the package meets the objectives of the rollout team.
7. Ensure that the final rollout specification documents the target environment, defines the

boundary conditions, and provides assumptions about the rollout process.


Each of these steps is discussed in more detail in the sections that follow.
The Test Computer
No matter which deployment method or packaging process you decide to go with, the most
important aspect of the repackaging process is your test computer. Lets spend a few minutes
talking about what it is and what its not.

A key contributor to your success is the test computer, which is simply a computer at your
disposal for testing. Because of its special natureits one that you can actually damage with
little downsideit shouldnt be used for any other purpose. The test computer is not a
development platform, and its not the computer you use for email or administrative work.
The test computer doesnt necessarily have to be fast, and it doesnt necessarily have to be new.
It must, however, be within the hardware requirement constraints for the deploying package and
be representative of your installed hardware base. The test computer is the fundamental
verification step for the repackaging effort.
This test computer will go through several states during the repackaging verification process:
clean, baseline, and working. Each of these states is fairly simple to understand. From the clean
computer, well build the baseline computer state. From the baseline computer state, well build
the working computer state. Each is a state progression in the repackaging process.
How many test computers do you need? Can you do the entire process properly with only one
test machine? If you re-image and start from a clean machine each time, a single machine will
work. However, the process would be easier if you have one machine that is used to create the
deployment package and one (or more) systems to test the deployment process. That way, if you
see issues with the package, you can go back to the system used for creating the package, make
adjustments, then send the package back out to the other test machines. However if your budget
and resources are limited, you may need to work with only one machine.

45

Chapter 3

A clean test computer is one that has the core OS installed, all drivers are present, and any required
general network settings have been made.

Starting with a clean test computer gives you a lowest-common denominator to work with and
build from. Consider it the cornerstone platform of your testing, as it will give you the ultimate
testing flexibility to start with.
A baseline test computer is built on a clean computer and has had service packs and any required
patches applied and user accounts, group policies, and any other existing applications installed that
you are likely to see in the end-user environment. Consider the baseline system a clean system with
the updates applied to meet your environment needs.

A baseline test system is built on the clean system and should be representative of your
environment. At this level, you will begin your testing. By applying different baselines, you can
configure your clean test system to conform to various end-user needs. Although we all fight for
standardization across the company, reality is another matter. The baseline computer from
Accounting is not the same as the baseline computer for the Warehouse group even though they
may be the same computer hardware.
A working test computer has the software application installed and functioning properly. It is the final
and desired state of the testing process.

When you end up with a working computer after your test deployment, give yourself a pat on the
back and enjoy lunch! Once the test environment is established, the next repackaging project is
easier as you have the test environment set up already. The first time you create the test
system(s) and the repeatable testing stages may require an investment of time that will see
payoffs immediately. The best practice is to do initial tests against a system that you have no
regrets about wiping out.
Creating a Clean State

In its clean state, the test computer is pristine and untouched by any extensions other than those
provided by the OS install program. The clean machine in its initial state will be the starting
point of every software-deployment effort.
The clean computer is the one with the oldest version of the targeted OS installed, and that OS is
the only thing installed. If youre supporting multiple OSs, the clean computer will have to be
reset for each OS. At this point, a reasonable question is Why use the oldest version of an OS?
Its a very good question.
By oldest OS, I am talking about the oldest version for the level of OS that you will be deploying
to. Dont develop or test against a Windows 95 system if your target systems are going to be
solely Windows NT. If your target OS is Win98, and you have Win98 and Win98SE in your
environment, you would target the Win98 version to ensure that your application will work for
all versions. Be sure to confirm that the application works against both versions of Win98 (as it
keeps the surprises down), but the initial target should be the older Win98.
The purpose of repackaging is to replicate the same final goal as the original install program
deliver and configure a working instance of the target software application. From our discussion
46

Chapter 3

in Chapter 1, we know that the software application has a hefty number of dependencies on the
OS. By targeting the oldest version of the OS, were forcing the install program to maximize its
file transfer (by delivering more updated system files) and exercising the most post-install
configuration.
A quick example illustrates this point. Imagine that we build our clean machine with the latest
version of the OS and all the latest service packs. We then create our software repackage. The
package weve just created will assume that every system it touches is going to have the same
system files and settings as our clean machine. Because we cant guarantee such is the case, the
package will undoubtedly fail because every system wont necessarily have the latest service
packs installed. The purpose of the test computer is to repackage for the worse case scenario.
Many of the newer snapshot products take into consideration potentially missing files and modify the
install package accordingly. Thus, effectively ensuring you get all the files you need no matter what
was on the initial packaging system. As a matter of best practices, a good habit is to use the older OS
to test against.

If you haven't done so already, plan on gearing up your test computer. Make sure you format the
disk and reinstall the entire OS from scratch. Be sure to use your companys standards for the
configuration or use the typical installation of the OS. Spend an extra few minutes to make sure
the system is completely functional and representative.
If you havent already done so, here is a chance to document a new workstation build process.
Include in the document the steps, options, parameters, and settings used to create the image, and
you will have a repeatable process documented for later use by you or others.

Once the OS is installed, the next step is to install the minimal set of drivers to get the computer
in a useable state in your environment. Once all the necessary drivers are in place, the next step
is to complete all network and Web browser settings. Be sure to update your Web browser to
your environments minimum level. Make sure that you reach any external locations that are
representative of your environment.
I advise against making any custom settings at this point. The reason for this advice will be
clearer soon, but for now dont make any mapped drives or set any other user preferences. Once
the computer is in its clean state, reboot, and verify that everything is working correctly.
Creating a Good Image

Once the clean computer is set up and working, youve overcome a major hurdle. In fact, you
might agree that this process isnt something youre too eager to repeat. And we dont have to.
There is software that can capture the current state or image of the computer. Typically, this
image is stored as either a duplicate image or a data file. This image can be recalled to reset the
computer to the desired state. Thats exactly what we need to do with our clean computer.
If we can store its state, we can get back to this clean computer state quickly, easily, and reliably.
Depending on how many applications or environments we need to repackage, we might have to
return to this state quite often.
There are several imaging software applications available. A little bit of research on the Internet
should get you up to speed quickly on the various features and how the different imaging

47

Chapter 3

applications compare. Two common imaging software products are Symantecs Ghost and
PowerQuests Drive Image. Both are excellent packages and are well suited for our needs.
A good place to start your search for imaging software is http://appdeploy.com/tools/imaging.shtml.
The AppDeploy Web site has collected the names of popular imaging software packages. A
comparison of these packages can be seen at
http://appdeploy.com/comparisons/imaging/index.shtml. Keep in mind that you should follow up with
the software providers themselves for the latest features and changes.

Regardless of the imaging software you choose, the software performs the same task: storing the
current state of the computer so that you can restore it later. Create a bootable CD-ROM with
this data file, and you can quickly reset a computer back to its original binary status. Simply
amazing and a must-have for installation testing!
Typically, the imaging application is launched, and you proceed through a series of menus to
start saving the image. Figure 3.1 shows the menu sequence to begin saving the current disk
image. The current image can be stored to a previous image (similar to drive cloning) or to a data
file. The data file can be stored on a variety of media types. Usually, a network drive or CDROM is preferred.

Figure 3.1: The initial menu sequence in Ghost.

When were ready, we can use a boot disk to restore the disk image back to its clean state. Figure
3.2 shows the image selection from within Ghost. Note that multiple images have been collected
and that the images use a .gho extension.

48

Chapter 3

Figure 3.2: The restore selection in Ghost.

No matter which imaging software you use, keep in mind that the image is unique to a specific
hardware configurationdown to model numbers, versions of video cards, amount of memory,
and so on. The odds are good that the image will not work on a radically different computer
configuration.
One utility that I havent yet mentioned is the Microsoft Sysprep utility. Sysprep takes into account
some hardware variances and adjusts accordingly. Check out
http://www.microsoft.com/WINDOWS2000/techinfo/reskit/en/Deploy/dgcb_ins_izyl.htm for the
specifics.

In my office, I have a series of clean machines with ghosted CD-ROMs for each OS. You can
typically reinstall an entire OS in less than 30 minutes. Images range in size from less than
60MB (for an NT client) to more than 250MB (for Win98). Your image sizes may vary
significantly based on OS and selected options.
For my personal use, I opted to print out a complete file listing from the contents of the Windows and
Windows System folders. Key data included with this file list includes version number, time and date
stamps, and file size. Storing this information in a spreadsheet can be invaluable when you are
tracking the origination of a specific system file.

49

Chapter 3

Some imaging software can also be used to deploy applications or provide other advance
deployment functions. Check with the software manufacture to obtain exact features and
behaviors.
Creating a Baseline State

The baseline state of your computer gets its name from the fact that it represents basic system
requirements for your environment and the software application. The baseline state is different
from the clean system because what youve added may have different requirements from other
software that youre packaging. By having the two states, we can always go back to the clean
computer (through the imaging software), and build a different baseline for a different software
application.
We get to the baseline by adding software most like the configuration of the targeted users. If
you know the application has software prerequisites, make sure that they are also installed and
functional. These prerequisites may include software such as Internet Explorer (IE), service
packs, and so on. Also make sure that the system settings suit your needs.
The first place to start is to gather all the associated executables. Grab your environments most
up-to-date binaries. Although the temptation is always there to use the latest and greatest of all
the executables, if they are not in general use in your environment, you are only asking for
problems. Why test your application on NT 4.0 with Service Pack 6a (SP6a) when all your users
are still on SP4? Of course, if the application will be deployed after your user base has upgraded
to another service pack, test on the new service pack. Many large IT shops keep a depository of
all their in-use executables to help ensure everyone stays at the same revision level of software.
For OS service packs and security patches, go to Microsofts Web site and get copies. Catalog all
the executables and document the installation orderthis documentation is especially important
for hotfixes and security patches. Some hotfixes and security patches depend on being installed
in a specific sequence due to dependencies. Having the installation order documented will
prevent those annoying dependency errors.
Once weve gathered all the executables in a single location, we have several options to consider.
We could install all the executables onto our clean computer and re-image the disk. This process
would give us a second image completely prepared to the baseline level. Clearly this option is
convenient. The downside is that extracting a specific executable or replacing one executable
with another may be difficult, depending on the tools available to you.
Alternatively, we could create a batch or script file to sequence the appropriate executables onto
the machine. Another option would be to combine the executables into deployable packages.
These options have the same downside as the first option. However, if youre certain that some
executables will always go together, this option becomes a little more convenient, although it
adds time to the imaging process. Finally, we could use snapshot software such as Prism from
New Boundary Technologies (formerly Lanovation) to create snapshots and restore the baseline
image as needed.
As you can see, the method needed to create the baselines on a recurring basis is up to you.
Decide based on how fast you need to get back to your baseline, which modifications might be
needed, and which option you feel the most comfortable with.
The next step is targeted toward the user settings. These should include joining the proper
domain, network settings, user permissions, group policies, and so on. In a way, this step is very
50

Chapter 3

much like setting up the computer for a new employee. Be sure to include any mapped drives
that are either available on the typical user computer or are convenient for repackaging. This
process can be achieved by creating a series of scripts. These scripts should be well documented
and easily located.
You may also want to make sure the system settings are usefulset the Windows Explorer shell
to display file details and clear the Hide files of known extensions check box. Don't forget to map
any drives you may need to access. You can also perform these steps through scripts. If so, they
should be well documented and easily located. Remember that the settings will be enforced for
the specific user ID that you are using (or setting them for).
However you decide to implement the automation of arriving at the baseline computer, make
sure that the process is well documented and that the source executables are easy to locate. You
should be able to return to the baseline as quickly and painlessly as possible. More than likely,
the baseline definition will change regularly. You should plan on this change, and make it easily
supported in the automation process. This step is where your documentation detail and choices of
applying hotfixes, drivers, service packs, and updates will come into play.
If you are in a time or resource crunch, at the minimum, create a clean image and a fully loaded
baseline image using disk imaging software (such as Ghost or Drive Image). This image will
allow you to get to a testable state quickly and easily.
The combination of clean computer and baseline means that we also have instant repeatability,
which is important if you're chasing odd behaviors and transient problems. If your package
works on the baseline computer, and your user computers are very close to this configuration,
you'll have most of the bases covered.
The final package will be a combination of a well-defined computer platform, the OS(s), system
packages (service packs, hotfixes, security patches), well-defined partner applications, the
distribution package, and possibly custom scripts for miscellaneous customizations. This process is
intrinsically linked to each step in between. Aim for reproducibility at every step of the way by carefully
documenting what was done and why it was done.

Ask Questions
Now that you have the test environment set up, you can start on the actual package to be
deployed. Before you send out the next solve-all software package, you need to understand what
is expected of you and the package. To that end, identify the rollout team. Although you may be
the only person doing the actual work, you need to identify members of the rollout team. The
members can be active participants or just contacts that you can send questions. Some suggested
members include

The developer or vendor

Project sponsor

A representative of the target end users

Any technical staff required to reconcile company procedural issues

A technical writer/documenter (if you are lucky enough to have someone else do the
work)
51

Chapter 3

In some cases, the team may consist of only you and maybe one other person. Or the team may
become an entity by itself. The size of the team depends on the culture of your company and the
project needs. The point is that you need to have the contacts in the right departments to ensure
that the distribution is done properly based on the negotiated expectations of the project owners.
Notice the word negotiated in the previous sentence. Part of your job is to set the appropriate
expectations.
Believe it or not, initially, every member of the rollout team will have different expectations
about the repackaging process and what the final package can and will do. They may also have
varying views about how difficult the repackaging process will be. Some will picture the new
package as doing lots of neat stuff. Others may see it as a necessary evil. Your first task is to
capture each team member's expectation and generate a common view. Then you need to share
that view with the team in a manner that balances schedule with deliverables and functionality
with realism. This process is the team interview.
The team interview is best accomplished by starting with a brief questionnaire. The questionnaire
isn't meant to merely gather information; it also alerts the remainder of the team to important
issues early in the development cycle. Too often the repackaging process isn't given the
consideration that it should have early enough. The questionnaire obtains preliminary
information from the project team and, by virtue of the questions raised, informs the rest of the
team.
Common questions contained within the install questionnaire range from the simple (who are the
decision makers) to the complex (additions, subtractions, and package modifications). In some
cases, the questions are to officially position the package-creation process. In others, the
questions are relevant to how the package works. The following questions and descriptions,
which Table 3.1 lists, are a standard set of topics that you may want to consider using.
Question

Information Application

Whos on the rollout team?

Identifying the names and levels of accountability is


an important first step.

When is the package required?

If youre working against a tight schedule, some


customizations might be dropped for the initial
rollout.

What are the objectives?

Is the objective to simply remove the UI? Is it to


restrict user selections? The objectives should
clearly state the end users expectations.

What should be removed?

Are there pieces of the software application that


should not be included in the final package?

What should be modified?

Are there modifications that need to be made? This


answer may cover topics such as customizing Start
menu entries or adding a link on the desktop.

What should be added?

Is there additional software that should be added to


the final package? Is this package going to bundle
several distinct software applications into a single
package?

Are there any target computer hardware


requirements?

Is the application a simple batch file or is the


process a complex installation that requires a
minimum hardware level to be dealt with? If it is
complex, the standard computer platform should be
clearly specified. This specification should include
52

Chapter 3
processor types, available system memory, name
and model of video cards, and so on as needed.
What are the target computer OS requirements?

Typically, a package isnt deployed to just any OS.


Each OS can have wildly varying modifications
from maintenance packs, hotfixes, and core
components (MDAC, Visual Basic runtimes, and so
on) to security patches. These should be included
within the rollout specification.

What are the coexisting applications?

Unless youre deploying a single application to a


brand new installation of the OS, youll need to
know exactly what software should be expected to
work with your package. The list should include the
release version of the software as well as any
updates.

What is the deployment method?

Because youre packaging the application, you


might have to take into account how the final
package will be deployed to its final destinations.
Some deployment software suites have additional
requirements. Additionally, some packages can be
further optimized.

Table 3.1: Questions for your rollout questionnaire.

To see how the questionnaire will benefit you, picture the following scenario: You have the
envious job of rolling out a complex office productivity package (such as Microsoft Office XP).
The goal of the distribution is to send it to the entire company, and because you use the product
all the time, you know what to customize and how to make it do things properly. Why bother
with questioning the rollout team?
You want to be thorough, so you get the rollout team together and discuss the distribution. In the
course of this meeting, you learn that

The folks in Garage Maintenance dont want the Presentation application.

The Accounting group wants additional templates added to the Spreadsheet portions.

Half the Sales folks are still running on laptops with only 64MB of RAM.

Every department has different storage locations for saved files, and they want their default
locations to appear automatically.

The Technical Lab needs a special dictionary.

Suddenly the rollout isnt so simple. To provide the functionality required for each department,
you need to devise the rollout process. Thus the need for repackaging the application has been
determined by the questioning process.
The questioning process can take only a few minutes or it might take weeks, depending on the
size and culture of your environment. Dont skip this part of the process. Always get the basics
answered or you will find yourself doing the job again after the first deployment. Keep track of
your questions, and develop your own question chart for future use.

53

Chapter 3

Document
Once you've got the results of the rollout questionnaire, youre ready to compile the first pass of
the rollout specification. You'll be updating this document throughout the course of the packagecreation and deployment process, so youll benefit from being as thorough and descriptive as
possible. For the first release, you should turn the results of the questionnaire into prose. Simply
write down the view of the package goals as described by the team members. Be sure to resolve
any outstanding conflicts or at least make a note within the specification to point out these
contradictions. You might even want to create an outstanding issues list to keep track of any
issues needing resolution.
Your specification should contain a conversational discussion about the package. Describe what
the package does and how the package does it. You should also provide a list of files (with
versioning information), registry edits, and file changes. After all is done, not only will this
specification be a handy reference for future changes but also an invaluable tool for training the
folks in phone support. The beauty of most recent software packaging applications is their ability
to provide the file and registry detail information to you in an automated format, saving you
hours (or sometimes days).
The level of documentation will depend on your working environment. Documentation is a step
that is normally avoided or skipped if you can get away with it. Be careful, dont skip it
completely. If you are the sole deployment design engineer, distribution tech, application
support, Help desk worker, and chief bottle washer, your documentation may be a few
paragraphs saved to a central location. If your organization hands off each step to other people,
the documentation becomes more important. In either case, get your ducks (and data) all in a row
before you get rolling.

Preparation
Historically, taking the time to prepare to meet your goals is time well spent. Preparation ensures
that youve thought of all the possible scenarios, youve bounced ideas off other people, and in
general, had a chance for the right solution to stand on its own. If youve reached that level of
clarity, chances are youre ready to go. If you havent quite arrived, this section should help you.
Well look at the different angles of tackling this distribution model.
Research the Existing Application Media
Once the document has a consensus of approval, look at the installation image created by the
software company (the source CD-ROM, for example). Document what the image contains, the
format and type of the existing install package, and the contents of each subfolder. Try to assign
a reasonable purpose to each file and folder. In many ways, the key to repackaging starts by fully
understanding what youre starting with.

A good reason for this extra work is that many common install packages ship with an internal
mechanism for reducing the UI. Some go so far as to ship with full support for reduced or
unattended installations. Install programs that can be malleable are typically referred to as
original equipment manufacturer (OEM) packages. Checking with the original software
manufacturer could save you lots of work, and your company could save a lot of time and
resources by simply using the already-provided OEM interface.

54

Chapter 3

There is a long-time standard set of install-development providers. The primary among these are
InstallShield and Wise Solutions. Although both companies produce proprietary schemes for
installation packages, they also provide development environments for Microsoft Windows Installer.

If the install package is a single file, its probably a self-extracting, self-starting package.
Launching the file causes the internal image to be extractedoften to the system temporary
folder. Once the install program gets to the Welcome dialog box, navigate to your temporary
folder, and look around. Cleaning out the temporary folder first may help.
Getting familiar with the basic application image now will help you out later during the testing
and troubleshooting phase. Remember Murphys Law: If something can go wrong, it will, and at
the worst possible time. No repackage effort will run perfectly the first time, and if the errors
reference a file name, it would be best to understand if that file is part of the basic application, a
system file, or a file that was replaced by the application install.
For example, if the target modifications to the software application are the addition or removal of
files, and the application is using InstallShield for the native install, using InstallShields tools
may be a quick and easy solution. If youve determined that the media image includes an
InstallShield package, you stand a reasonable chance of having the package deploy silently.
InstallShield is not the only media packager to allow silent installs. An option to perform silent
installs is quickly becoming a de facto standard in the software industry. Most of Microsofts
major applications provide some method of silent install, as do most applications installed using
Wise Installer.
As with any repackaged distribution package, the unattended installation should be tested on a
number of different computer configurations. An unattended install that works on one system
may not work on another. A major weakness of InstallShields unattended install is that the
dialog box sequence must occur identically on all computers. Something as normal as a reboot
request on one system causes the unattended install to abort when running on a computer that
doesnt prompt for a reboot.
In the next chapter, well go through these deployment tools in much more detail. Until then, if youre
interested in more information, InstallShield, Microsoft, and Wise Solutions all provide additional
content on their Web sites. As most Web site content changes regularly, your best bet is to aim your
browser at each vendors home page and follow the relevant links. InstallShields Web site is located
at http://www.InstallShield.com. Wise Solutions Web site is located at http://www.WiseSolutions.com.
Technical information about Windows Installer can be found at http://msdn.Microsoft.com (search for
Windows Installer).

Script Solutions

In some cases, you might find that while the unattended installation works, there are still some
smaller tasks that need to be accomplished. Maybe some added customizations need to be done,
a notification flag needs to be set on a remote server, or possibly added security needs to be set.
Creating a script file may be just the right addition. Scripts can be as simple as a DOS batch
filealthough some DOS batch files are by no means simpleor as complex as a full-fledged
VBScript or JavaScript.

55

Chapter 3

Alternative scripting languages are available. Most of these are suit-to-taste options. Each
scripting language has its own strengths and weaknesses. When it comes to selecting a script
language, pick one that will efficiently do the job and still be maintainable, extensible, and
more than anything elseeasily reusable.
A key factor in deciding on a scripting language is the availability of support and freeware
scripts. For popular scripting languages such as VBScript, many common distribution solutions
already exist. The following is a list of the most common scripting languages: Perl, JavaScript,
WinBatch, KiXtart, Python, VBScript, DOS, ScriptIt, Tcl/Tk, and Rexx. Keep in mind that many
of these scripting languages require a runtime environment that must pre-exist on the users
computer. Solutions such as VBScript and JavaScript that are built into Microsofts Windows
Script Host (WSH) are popular solutions because the runtime environment already exists on a
substantial number of computers.
Additional information about scripting languages is available on the Internet. A simple search for
scripting or the name of the scripting language in which youre interested will turn up many useful
sites. There are a number of sites that cater to scripting. I suggest you try some of my favorites to get
started (these are in no special order):
http://www.desktopengineer.com
http://www.appdeploy.com
http://www.winscriptingsolutions.com
http://www.microsoft.com/scripting (redirects to MSDN location)
http://cwashington.netreach.net

Creating a Working State

As you can see, just to get to the point at which you can start the real work of creating the new
package takes a lot of effort. Thats why I pointed out earlier that you should really understand
the goals of the repackage process. Being able to definitively state why a repackage is necessary
is also important. By the time you get to this point, both should be perfectly clear.
Weve got the test computer in its baseline state. The next step is watching the native install
program and capturing all of its actions. That is, we need software that records what the install
program installs in a way that is useful to create the final distributable install package. That is a
carefully worded sentence. There are several implications. First, some of what the snapshot
software observes as newly installed may not be relevant to the application-install process.
Second, some of what the install program updates or installs may not be relevant across all OSs
or computer environments. Finally, other events that arent performed by the install program
may need to be added to our repackage.
Before there were system snapshot tools, much of the system detection was done by comparing
the differences between files. For example, if I wanted to observe what happened on a specific
Windows computer, I would perform a DOS dir command on the root disk. The results of this
command would be placed in a simple text file. This listing is a very small part of the complete
file and folder dump.
By using regedit (part of the Windows-included utilities), I could do the same thing in the system
registry by selecting the root of the registry and selecting Export Registry File from the Registry

56

Chapter 3

menu. This action prompts me for a filename and a location to store the exported registry
settings. By the way, this file format is the same file format that can be double-clicked to merge
the contents back into the registry.
Double clicking the .REG file will cause the system to import the file into your registry. In the best
scenario, this action imports only data that you already have. However if the .REG file is from another
computer, you could see disastrous effects. Even to the point of wiping out your system registry
settings and making your system think it is another computer entirely (not that Ive ever done that, you
understand). Disconnect the .REG association or rename the exported file to a .txt extension and
save yourself potential pain.

Realistically, Ive covered a large percentage of the snapshot territory with these two actions. If I
now repeat the two actions after installing the application, Ill have four files: before and after
snapshots of the file and folder structure along with before and after snapshots of the system
registry.
Using any kind of utility that can compare two files, I can view the changes to my system
between the previous events. And thats exactly what Ive done. As Figure 3.3 shows, I used the
WinDiff tool that ships with Microsoft Developer Studio (it is also available in the NT resource
kit). The changes are highlighted so that they are easy to spot, which is especially important
when comparing the differences between large files.
The difference in text files revealed that I had saved my document and that Words AutoSave
feature updated the cached image of my document. There were some adjustments to temporary
files and the snapshot files themselves showed up.

Figure 3.3: The snapshot process made simplethe results of the file comparison.

For the registry, I intentionally added a registry key, as Figure 3.4 shows. The OS seems to
always be up to something unless you want to catch it doing something. Be aware that WinDiff
works with ASCI files. Attempting to compare Unicode files will continually generate a
Different in blanks only message.

57

Chapter 3

Figure 3.4: The snapshot process made simplethe results of the registry comparison.

This exercise has been rather light, but I wanted to demonstrate that there are very easy ways that
you can detect changes to your computer. The example process was elemental but important. It
was also time consuming. You werent here, but waiting for WinDiff to capture the differences
between two 34MB files was quite the yawner. Fortunately, there are several tools available to
not only automate this process but also to generate a redeployable package.
Snapshot Software Options
Before we get started on the nuts and bolts of repackaging, lets take a look at the different types
of snapshot software. There are two basic groups:

Strictly snapshot tools

Snapshot tools that create an install project

Strictly Snapshot Tools

This first category of snapshot tools simply observes and reports the changes that occurred on the
system since the last time the tool was run. This functionality is very much on the same order as
what we did earlier. Of course, anytime software can compare and present the differences for us,
so much the better.
Two tools that fall into this category are both commonly available and free! One is a tool called
InCtrl5. It can be run in two-phase mode, which means you launch it to take the first snapshot,
then launch it again after changes have been made to the computer for the final snapshot and
comparison. Or you can run it in standard mode. In standard mode, you specify the install
program to launch and monitor.
InCtrl5 has been around for several years. This is a PC Magazine program written by Neil J.
Rubenking. As of this writing, youll find a downloadable version at http://www.zdnet.com/downloads/.

Another strictly snapshot tool is part of a larger software package. Its called VeriTest-Rational
Install Analyzer, provided by Rational Software and VeriTest. The Install Analyzer is a small
part of a larger tool that tests software applications in a distributed setting. Whats especially
encouraging about the Install Analyzer is that VeriTest uses it to qualify Windows applications
for the Microsoft product logo.
58

Chapter 3

Install Analyzer is an excellent snapshot utility. Unfortunately, it runs on only Win2K. Its part (actually
a very small part) of Rational Softwares TestFoundation for Win2K. As of this writing, youll find a
downloadable version at http://www.rational.com/products/testfoundation/index.jsp.

Whereas InCtrl5 limited a snapshot to the immediate before and after images, Install Analyzer
allows you to compare any number of snapshots. For example, you could create a snapshot from
the base OS, followed by a second snapshot of the installation of IE, followed by a third snapshot
of the installation of RealNetworks RealPlayer. With these snapshots you could compare the
first and the third, the second and the third, and so on. The ease and flexibility in comparisons
can be incredibly useful.
The tool is very easy to use and generates very readable output. The output is slanted toward
Microsoft logo compliance, and I think that is a good thing. For example, it will identify installed
files that dont have registered file extensions.
The Install Analyzer watches seven critical areas of software configuration and provides
comments on any violations. Most of these critical areas are Microsoft-recommended best
practices and can be considered violations of logo compliance guidelines:
1. Install to Program Files by default, do not attempt to install files protected by System File

Protection on Win2K, and ensure correct uninstall support.


2. Provide 32-bit components.
3. Do not read from or write to Win.ini, System.ini, Autoexec.bat, or Config.sys on any

Windows OS based on NT technology.


4. Ensure non-hidden files have associated file types, and all file types have associated

icons, descriptions, and actions.


5. Classify and store application data correctly.
6. Do not place shortcuts to documents, Help, or uninstall in the Start menu.
7. Kernel-mode drivers must pass verification testing on Win2K.

Although these tools are useful, they dont take us all the way to a deployable package and have
their limitations. Lets take a look at some tools that do take us to a deployable-ready package.
Snapshot-to-Project Tools

These tools follow the snapshot process with the creation of a deployment project. A project is
an editable version of the final package. Normally, the project is opened within the repackaging
software. This project can be customized and altered before you create the final distribution
package. Typically, the customization will deal with file placement, file removal, path variables,
and so on. As of this writing, the heavy hitters in this department are

Prism Deploy by New Boundary Technologies

AdminStudio by InstallShield

Wise Package Studio by Wise Solutions (creates a Wise Scripting project)

Wise for Windows Installer by Wise Solutions (creates a Wise Windows Installer project)

59

Chapter 3

The questions to ask yourself as youre going over the feature lists are the basics: What is the
final format of the deployable package? Does it have the option to create a Windows Installer
database file? How can I deploy the package? Is additional software required on the end users
computer to support package deployment? Does the installation of the snapshot software have a
small and unobtrusive footprint? How much control is allowed over the package creation? Can
the package be customized once it is created? Can the package be uninstalled in an easy manner
if necessary?
These tools provide the ultimate in flexibility. Well take a look at these tools as well as several
others in the next chapter.
A rather lengthy list of distribution packages exists on the AppDeploy Web site. For more information
about a complete list of tools refer to http://appdeploy.com/tools/distribution.shtml. Make sure to
check with the manufacturers for the latest features and availability.

Snapshot
After reviewing the tools and selecting the one appropriate for our environment, were almost
ready to go. We have the clean computer set up and a baseline has been installed. The next step
is to take a snapshot of the installation of the targeted software application and review the
package results. This process is actually fairly simple, as Figure 3.5 illustrates. The hard part is
making sense of the final package to ensure its complete and doesnt contain any spurious
system changes.

Figure 3.5: The snapshot process is a before-and-after record of the original install.

60

Chapter 3

The first step is to install the snapshot software onto the test computer. The one thing you may
want to make sure of at this point is that the snapshot software doesnt contaminate the system.
Updating any system file or setting should be considered poor form in the snapshot business.
After all, the objective is to capture the contents of the original install package without changing
the environment itself. The better snapshot software will remove references to itself in the final
report and prevent that contamination issue from being replicated.
Once the snapshot software is installed, close any unnecessary applications and shut down any
unnecessary processes and NT services. Depending on the function of the target system, standard
NT services that may be safely shut down are World Wide Web Publishing services, IIS Admin
service, and FTP Publisher. Getting the system to a truly inactive state reduces the inclusions of
unrelated system modifications into the snapshot package.
When youre ready, fire up the snapshot software and install the targeted software application.
Once youre done, you need to first make sure that the application is working, then evaluate the
newly created package contents. Dont be too surprised if you need to tweak the computer a bit
to get the application to work. Make sure these post snapshot changes are reflected in the
package itself. The changes should be picked up in the second snapshot.
Dont fall into the assumption that the native install program is going to do everything correctly or
even do everything that needs to be done to get the application to work. You may be pleasantly
surprised to find that sometimes your repackage is better than the original install program.

Don't proceed to the final snapshot until the application is working as expected. If the application
doesn't work yet (don't laugh, it happens), don't finish the snapshot process. You need a fully
working application for this step to be worthwhile. Ask around for help. It all must work because
that's what you're going to repackage. If the application is broken in the snapshot, it will more
than likely be installed that way. Expect to spend some time on this step. Be sure to document as
much of the process as possible. You may have to do it again.
Once the application is working, the last step is to take the final snapshot. The difference
between the first and last snapshot is what your package will replicate. The tricky bit is figuring
out how to do it. Most OSs have a lot of stuff going on behind the scenes. Your snapshot will
invariably capture some of it. You should have the system as quiet as possible. Also, keep in
mind that the more the system was mucked with to get the application working, the more noise
you'll have in the snapshot. You'll need to spot the difference.
As we'll see, sifting through the snapshot data is an important part of the design process.
Including the wrong files or not including the right ones is only part of the concern. Making sure
the configuration process is correctly performed is the other part.
Package Evaluation
Okay, now we've taken a snapshot of the system to see how the application is installed. What do
we do with all of this information? We need to verify that the results should be part of our
package. Keep in mind that although these snapshot tools are many times better than they used to
be, they are only tracking system changes and incorporating them into a deployable package.

There is much black magic in this process. Rarely will you get a snapshot that is noise free. Let's
spend a few minutes talking about some of the stuff that you'll see and what it means. Or in some
cases, what it doesn't mean.
61

Chapter 3

First, the golden rule of viewing snapshot results is Just because it shows up in the snapshot
doesn't mean you created it. This rule is closely followed by the silver rule of viewing snapshot
results: Just because it shows up in the snapshot doesn't mean it needs to be there. These rules
will go a long way to helping you sort out the snapshot contents. Let me explain.
The snapshot gives you the end result of changes to the system. It doesn't tell you how the
changes were made or who made them. You'll need to do some research to figure out the
differences. Let me give you a simple exampleself-registration. In the snapshot output, you
might see a ton of registry entries that look something like the following example:
[HKEY_CLASSES_ROOT\
CLSID\
{EAB841A0-9550-11CF-8C16-00805F1408F3}\
InprocServer32]
Value Name: (Default)
Value Data: C:\\WINNT\\System32\\thumbvw.dll
Value Name: ThreadingModel
Value Data: Apartment

Youre looking at the end results of a DllRegisterServer call from a self-registering file. You do
not create these registry entries; you simply need to make sure that the appropriate file is marked
as a self-registering file when you link it to your install project. Most good snapshot tools will
capture and identify these files for you. When you see a bunch of registry keys like the ones in
the example, simply look for the value data associated with the InprocServer32 key. This value
data will give you the name of the self-registering file.
Unfortunately there are more examples of snapshot data that are created as a by-product of some
other event. You may have to do some homework to figure out the differences. Table 3.2 shows
some other examples that are not created manually but through a transient process.
Example

Description

Temporary files

There is a system path referred to as a Temp


folder. Many applications create files as temporary
storage within this folder. You can normally exclude
any files that are created in this area.

Type libraries

Very similar to the CLSID key example except that


type libraries will have a TYPELIB string in the
registry key. Registering a type library file creates
these entries.

ODBC drivers and Data Source Names (DSNs)

These are registry entries that are created through


a SQL Windows API callnamely to instantiate the
driver if it doesn't exist and to create or modify the
DSN, including a reference count on the drivers
themselves.

NT services

These also show up in the registry, but are created


or started through the Service Control Manager
(SCM) Windows API calls.

Fonts

Fonts are copied to the Fonts folder (a well-known


path), then added to the system through an
AddFontResource Windows API call.

Table 3.2: Examples of snapshot data created by a by-product event.

62

Chapter 3

There are plenty of others that behave the same way. Carefully sift through the registry snapshot
data looking for more. The snapshot software you are using may take into consideration most of
the transient issues for you, a careful review will show if any slipped past..
Next are file edits. These can also be by-products of other events, particularly if the file resides
within the Windows or Windows System folder. There are a number of Control Panel applets
that still rely on the settings of system initialization files for their settings. Depending on the
snapshot tool that you're using, you may not capture the file change or what was changed. You
may have to run several snapshots to detect content changes within files. A good example is an
internal file modification of INI or text files. Unless youve explicitly identified a specific file to
be monitored, the original snapshot would miss the internal change. All that you would know is
that the file was changed. On a second snapshot, the file can be explicitly monitored and the
specific change could be captured. Knowing that an INI or text file has been updated with, say
the local time zone variables, will help in troubleshooting and configurations for different
regions.
Finally, there are files that are added to the computer or simply updated. You'll first need to
distinguish between files that are created versus files that are installed. Clearly, if it's a binary
file, the odds are good that the file was installed. Text files and initialization files may be created
based on configuration data detected on the computer. While this possibility may be rare, it's
worth keeping in mind. One example would be the ATL.DLL. There are two versions of this file:
an ANSI version for Win9x and a Unicode version for NT and Win2K. You'll need to make sure
that you get the right one. There may be other files that fall into this category. Thus we have a
need for a snapshot on each target OS. Be aware that some applications place numerous files on
a system. For example, tracking the entire file list for an Office 2000 install will be difficult. The
snapshot software you use will assist this effort by providing the list of files installed.
If you're not sure whether your application needs a specific file or uses it, don't include it. Make
a note of your decision by updating the specification. The reason is simple. The install will go
through a testing phase. During this testing cycle, the install program will hit a large number of
system variations. If one of those test scenarios uncovers the need for the file, then include it.
Detecting a missing file is easier than detecting an unnecessary file. Sometimes shipping an
unnecessary file can cause problems on the end users machine. You'll have enough problems;
you don't need to create any more. However, snapshot tools such as Prism Deploy can
automatically handle changes to INI and other special text files, so if youre using these tools,
you dont need to know whether a file was created or updated. Some tools go so far as to merge
the changes to, for example, INI files on target systems. Lets go through a list of the more
common gotchas.
UI

One of the common problems in creating a deployable package from snapshot software is that
the information prompted for on the install dialog boxes is now hard-coded into the package. A
good snapshot tool will provide a way around this problem. Many vendors provide a mechanism
for replacing paths and hard-coded values with runtime equivalents.
For example, software applications commonly ask for a serial number. Unless youve obtained a
generic one-size-fits-all serial number, youll be hard-pressed to get unique serial numbers into a
single package. The same is true for passwords, user information, and destination paths.

63

Chapter 3

Another interesting point is the license agreement dialog box. There are legal ramifications to not
showing this agreement in the deployment process. Has the legal department signed the
documents that confirm this process?
Capturing each dialog box in a screenshot and adding it to the rollout document is a very good
idea. Every user-provided piece of information should be accounted for within the deployed
package.
To create a completely silent install process (one in which the user is not required to provide any
interaction), solving the serial number issue is one example of where added scripts or runtime
variables could be used.
System Files

Almost every install program bundles at least a few system files. Although the snapshot tool will
capture upgraded files, it may not automatically know which version replaced the file. Here
again, you get what you pay for. Good snapshot utilities will allow you to modify the
deployment package to account for overwrite-by-version file replacements.
With good snapshot utilities, you dont need to track down the DLL versions as the software will
provide some variation of that ability for you. Knowing how to do the research is important.
Remember Murphys Law? Inevitably, you will be doing an emergency distribution at 3 A.M.
and have a problem with one file that will need to be researched.
Additionally, some install programs dont follow the Microsoft guidelines for redistributing files.
Heres your chance to go one better. Identify each executable, DLL, and ActiveX control (.ocx)
file by its manufacturer. Whenever possible, track the file to its associated redistribution
agreement. From this agreement, youll know how the file was meant to be distributed. There are
a significant number of Microsoft files, for example, that cannot be redistributed in the raw. They
are part of a bigger package that should be installed as a layeror all at once.
For Microsoft files, there is another method of tracking down where the system files come
fromthe Microsoft DLL Help database. This database is a searchable repository for all
Microsofts system files. Its a very handy way to track down the versioning history of a specific
Microsoft file. As of this writing, you can find the database at
http://support.microsoft.com/servicedesks/fileversion/dllinfo.asp?fr=0&sd=msdn. If this link
doesnt work, go to http://msdn.Microsoft.com and search for DLL Help.
Although this part of the process sounds like a lot of work (and it is), remember one goal of this
chapter is to show the best practices in an unlimited-resource world. Reality will make the
decision for you as to how deep you will need to go to check files.
Internal Logic

This gotcha is the big one. The snapshot software has no way of knowing why the install
program made the changes that it did. The snapshot software cant hear the install program
thinking; the software only sees what the install program does. As a result, snapshot software
wont see the evaluation for disk space or the check for system prerequisites such as SNMP and
file and printer sharing. Other things that trigger different actions are a pre-existing version of the
same application, competitive upgrades, or the presence of specific hardware.

64

Chapter 3

In these cases, youll need to be very careful about how you deploy the package. Remember that
the package assumes every computer it encounters will look very similar to the test computer. If
the repackaging of the install program prevents those checks from running, using a pre-install
script or, if the deployment package allows it, some form of variable checking can be done to
ensure that the package install logic is followed.
Does that mean that if your target machines are slightly different from your test machine you
wont be able to run the package? Not really. If your test environment is close to your target
deployment machines, good third-party tools will be able to handle heterogeneous environments.
Prism Deploy and Microsofts Sysprep are two examples of tools that will make allowances for
system differences. The point to remember is to keep test-system and package-creation processes
as close to your target environment as possible so that the original package install logic will
install all the proper components.
Conflict Resolution
Often youll have two packages that require different versions of the same file. In some cases the
file conflict may be severeeach application needs its own specific version of the same file.
Other times, a little bit of testing is all you need to determine which version of a file needs to be
shipped. A common misconception is that you should always ship the latest version. Resist this
temptation; Ill explain why.

The goal of an install program is to place the application on the OS with minimal problems.
Thus, we don't want to change anything that already exists if we don't have to. Lots of
applications rely on core components. The odds are good that a number of machines that your
install will encounter will already have some version of the conflicting core component. They
just may not have the latest version. But hang on a second. If your application is completely
functional with the older version, should you even ship the latest? Especially when you consider
that the latest version may break pre-existing applications that are also getting along fine with the
older version. The answer is a resounding No! You should ship the version of the conflicting
core component that your application will work with that is already out in your production world.
If the core component already exists on the target system, you're golden. It's already there, so the
install program doesnt install it. And if it's not installed, the odds of breaking anything are
reduced.
So once you know a conflicting core component must be shipped, spend some time tracking
down the exact version required. You'll save yourself and the support team some headaches.
You'll save your company some money. Several companies are looking into the conflictresolution issue and are working to solve it for us. Well cover them in more detail in a later
chapter.
Getting a Profile
Did you know that there is an indispensable tool to determine all the files that are required by an
application? By all the files, I mean statically linked and dynamically called. What are these you
may ask? Well, let me take a few minutes to explain.

The Windows OSs are composed of a collection of DLLs. It's this collection of DLLs that
comprise the Windows API set. The complete list of files runs into the hundreds. This list
includes files such as KERNEL32.DLL, GUI32.DLL, SYSTEM32.DLL, and so on. These are
the very files that make the OS what it is. Naturally, a great number of applications take
65

Chapter 3

advantage of these libraries. Some applications may require these files to be located before the
application even loads. At other times, the applications are loosely coupled to these same system
files. The applications will load but become unstable when they go to use the library, and it's no
longer there. The first example is called statically linked. This functionality is accomplished by
linking to the library file when the application is compiled. Another way of linking to the file is
at runtime. This linking is often referred to as dynamically linked. The application loads the
system file while the application is running and makes a call to an exported routine.
Not only does your application link to files, but the files the application links to may link to other
files. This process of a library calling another library calling another library is referred to as
chaining. Figure 3.6 illustrates just how complicated this process can become. You may be
surprised that a fairly small inhouse application (6 to 10 files) may require a support structure of
other libraries totaling close to a hundred. (Weve seen this figure in Chapter 1, but Id like to
show it again.) Take a look at the figure for a general idea of what Im talking about.

Figure 3.6: Each Windows or application library has a heavy dependency on other files.

In this figure, you can see by the arrows that all the libraries are related. The application files
require support files and perhaps third-party files. In turn, the support files may require the thirdparty files. At this level, all may require specific core components. Sooner or later, every file
requires functionality exposed by the OS libraries. It truly is a messy world.
You may be asking yourself why this dependency matters. Well, it does in an interesting way. In
the process of creating the package, we'd like to know the complete list of files that an
application may needat any time. While there are a number of tools that can determine which
files are statically linked, determining which files the application loads as it is running is quite a
different matter.
To make this determination, the application must be launched and watched. Once the application
is loaded, it must be thoroughly exercised. Every bit of functionality must be used to monitor all
the files that the application requires. This process is called profiling. There are a number of tools

66

Chapter 3

that will profile for you, and you may even find that youre packaging software is one of them. A
publicly available tool called Dependency Walker provides a list of all linked filesdynamically
(implicit and explicit) or statically linked.
Dependency Walker is publicly available from http://www.dependencywalker.com. Steve Miller
provides this tool.

Keep in mind that the results are only as good as the amount of functionality exposed by running
and operating the application. You may find that the software test team is better at getting
complete results than you are. In fact, because they are continually running and testing the
application, they'll be able to create and maintain a more complete list than you can.
Once you've successfully profiled the application, you'll have a huge list of files. You'll need to
sort this list into something meaningful. The files listed can be split into two broad groups: ones
you can redistribute and ones you can't. Your first task is to sort out which ones are which.
Redistributable files include

Inhouse files (the original software creator creates and builds)

Microsoft core components (ODBC, ADO, RDO, IIS, OLE DB, MFC, VB, and so on)

Third-party files (SQL Anywhere, Java Runtime EnginesJRE, JRun, Crystal Reports,
and so on)

Non-redistributable files include

System files (part of the OS)

Debugging files

There are a number of ways to filter out these files. Let's take a look at a couple of tricks that you
can use. The first is to extract the company name from the resource of each file. The easiest way
to do so is to right-click the filename and select Properties from the secondary menu. From the
subsequent tabbed dialog box, select the Version tab. On this tab, you'll find a number of
informational parameters about the file. If it says Microsoft Corporation for Company Name, the
file is either part of a Microsoft core component (redistributable), a Microsoft non-redistributable
file, or a Microsoft system file. Not much help, but we can delve deeper. If the Company Name
refers to anyone else, you'll need to explore the redistribution agreement provided with the
software documentation. For large numbers of files, writing a VBScript is a quick and easy way
to perform this task.
Let's explore the Microsoft files a bit further. The easiest way to sort out the files is to put the
Microsoft Developer Network (MSDN) to work. For the past couple of years, Microsoft has
provided a DLL Help database that provides versioning information about all the Microsoft files.
This reference is located at http://msdn.microsoft.com. Once there, select Support from the righthand vertical menu, then select DLL Help Database from the drop-down menu. As of this
writing, you can find the database at
http://support.microsoft.com/servicedesks/fileversion/dllinfo.asp?fr=0&sd=msdn.
Enter the name of the file in question, and you'll get a list of all versions of that file. For a
particular file, select more information to see which Microsoft product shipped the specified file.
Unless you've had some experience working with these files, determining which files are
redistributable and which ones are not is still difficult. The general clue is the core component
67

Chapter 3

string. In this context, this core component is not the same as the component we've been talking
about. If you see this string associated with a file several times, you may suspect that it's part of
the OS. The surefire way to know is to search the MSDN library and knowledge base for more
information. After poring over a couple of developer articles, you should get the general idea in a
hurry.
The following list summarizes some of the basic rules of redistributing conflicting core
components:

Install the oldest supported versions of core componentsdont ship the latest and
greatest if your application doesn't require it.

Take a snapshot of the oldest supported minimum requirements for the system (hardware
and software).

Keep core components on the user's systemmake sure they are excluded from the
uninstall. Well cover this rule in the next chapter.

Install core components only if they are required and not just to be safe.

Use the specified redistribution mechanism suggested by the developer of the core
component. The specified method might provide an easier means of updating the
component.

Place third-party redistributables in recommended locations. Check the application


documentation, your install notes, or the applications Web site for help in determining
the recommended location.

New Boundary Technologies Dependency Walker is a useful tool if you have the time and desire to
learn the ins and outs of each file within the software youre deploying. If youre time constrained and
have some critical software, such as a security update, that you need to quickly deploy, you can rely
on a good snapshot tool and you wont need to concern yourself with these details.

Test
Testing your final package is the catchall for problem packages. Initially, a test may be as simple
as resetting the test computer back to its baseline status and deploying the package. Once youre
comfortable with this environment, pick one or two likely candidates. These initial candidates
should not be critical computers or contain irreplaceable data. If the package deploys
satisfactorily and the pre-existing software applications are not adversely affected, you can
expand the test.
The first real test of the deployable package is the pilot rollout. The point of the pilot rollout is to
test the assumptions about the target systems, the install package, the bandwidth, and so on. Pick
a good representative group for the rolloutdifferent computers, groups, and users. Make sure
the representative group has the normal access rights you expect users to have; dont do a pilot
rollout to administrators that have full access to the local system or servers, or you may not
discover a lurking permissions problem. Take the extra effort to make sure that these are
applicable users. Using a group that has little if any interest in the application doesnt make
sense. A little bit of variety is good for the pilot rollout. Try to test a little bit at a time. As you
gain confidence with packages, you can expand the variety. If remote and mobile users are a
68

Chapter 3

concern, you may want to include a few in the pilot rollout. If the testing or pilot rollout process
uncovers any modifications, they should be documented and included with compatibility-testing
and conflict-resolution documentation.

Repackaging Is Easy, Right?


Weve covered a lot of information in this chapter and you may be feeling rather intimidated by
the process. Think back to the beginning of the chapter where we talked about getting you
familiar with the process even though you may not use it all. For most cases, the actual
repackaging process has become easier.
Many of the steps we discussed are full of details you may not use on a common repackaging
effort. Its when you hit those trouble spots that the added data will come into play. Take for
example the section on profiling. It covered great detail about how to review conflicts and decide
about core files. Do you need to do that for each package? No. Software is available to review
the conflicts (for example, New Boundary Technologies Prism Conflict Checker) and can ease
the burden, resolving many of the issues for you. Knowing what an automated process is doing
will help you in confirming the results.
With the current level of repackaging software, many of the details we covered in this chapter
are handled automatically, and the results are presented in various formats. Knowing what to do
with that information can be the difference between success and failure in getting your package
out. As you will see in the following example, getting a package out is a logical procession of
steps.

A Repackaging Example: Macromedia ColdFusion 5


Lets take some time to go through a real-world example of creating a deployable package. Ive
selected Macromedia ColdFusion 5 as the application to be packaged. It is by no means a simple
application and serves to test the boundaries of our snapshot software.
The native install program for ColdFusion 5 was written with InstallShield 6.2. What makes this
example even more applicable is that it does not use the InstallShield silent install (.iss) option.
For our example needs, this process will show us all the modifications the install program will
do.
Clean Requirements
The clean requirements for ColdFusion 5 are a 32-bit Windows OS, excluding Win95, Win98,
and Windows ME. Ive elected to go with NT 4.0 Server. Fortunately I have a test computer with
an image of the required OS. Im also using Symantecs Ghost 2001 for imaging software.
Baseline Requirements
The baseline requirements for ColdFusion 5 are a Web server, IE 5.0 or later, and the latest IIS
security patches. Because Ill be using IIS, the security patches are especially important.

69

Chapter 3
Preparing to Create the Package
For this exercise, Ive elected to use New Boundary Technologies Prism Deploy. This package
does everything that Ill need for my package. It provides a snapshot environment with all the
right smarts. I can edit the package after it has been created, and within Prism Deploy is a
deployment environment. (We wont get to the deployment environment in this chapter, but
well certainly be using it in Chapter 4.)

To this end, Ive installed Prism Deploy onto my test system. I used InCtrl5 to watch where the
application files ended up and to ensure that no system files or registry changes occurred that
could contaminate my image. Because the vendor has taken the existence of the repackaging
software on the system into account, it has been specifically designed to place all files into its
own folder and does not update or install any shared or system files.
Once installed, the first thing to examine is the rules.ini file. This file defines the boundaries for
the snapshot process. By editing this file, we can limit which registry keys are examined, which
folders are excluded from the snapshot, and so on. A complete list of the default parameters
defined by the rules.ini file follows.
Ignored folders:

%RECENT%

%TEMP%

%WINSYSDIR%\CONFIG

%WINSYSDIR%\NtmsData

TEMPORARY INTERNET FILES

\RECYCLED

\RECYCLER

\_RESTORE

%WINDIR%\Security

%WINDIR%\Debug

Ignored registry keys:

Software\LANovation

Explorer\RecentDocs

Explorer\StreamMRU

Explorer\Streams

Explorer\DesktopStreamMRU

Explorer\DesktopStreams

UuidPersistentData

HKEY_LOCAL_MACHINE\SYSTEM\ControlSet

HKEY_LOCAL_MACHINE\SYSTEM\Clone
70

Chapter 3

HKEY_LOCAL_MACHINE\Clone

HKEY_LOCAL_MACHINE\SYSTEM\CurrentControlSet\Control\Session
Manager\PendingFileRenameOperations

HKEY_LOCAL_MACHINE\SAM

HKEY_LOCAL_MACHINE\SECURITY

HKEY_LOCAL_MACHINE\SOFTWARE\Microsoft\Cryptography

HKEY_LOCAL_MACHINE\HARDWARE\ResourceMap\PNPManager

HKEY_LOCAL_MACHINE\SYSTEM\CurrentControlSet\Enum\*\*\*\Control

HKEY_CURRENT_USER\SOFTWARE\Microsoft\Windows\CurrentVersion\Explorer

Ignored files:

386SPART.PAR

PAGEFILE.SYS

WIN386.SWP

SYSTEM.DA

USER.DA

NTUSER.DA

AVCONSOL.INI

NTUSER.DAT.LOG

SYSTEM.DAT.LOG

WININIT.INI

CLASSES.DAT

SHELLICONCACHE

SCHEDLGU.TXT

PICTAKER.LOG

METABASE.BIN

*.SFTCH

Ignored file types:

(Default setting)

Hidden Files (No)

System Files (No)

Read-only Files (No)

Temporary Files (Yes)

71

Chapter 3

Compressed Files (No)

Registry keys as counters:

HKEY_LOCAL_MACHINE\SOFTWARE\Microsoft\Windows\CurrentVersion\Shared
DLLs

Registry keys whose contents are merged:

HKEY_LOCAL_MACHINE\SYSTEM\CurrentControlSet\
Session Manager\Environment,Os2LibPath
Control\Session Manager\Environment,Path
Control\Session Manager\Environment,PATHEXT

HKEY_CURRENT_USER\Environment,
Os2LibPath
Path
PATHEXT

HKEY_LOCAL_MACHINE\SYSTEM\CurrentControlSet\
Services\Eventlog\Application,Sources
VirtualDeviceDrivers,VDD
Control\ServiceGroupOrder,List

HKEY_LOCAL_MACHINE\SOFTWARE\Microsoft\WindowsNT\CurrentVersion\Net
workCards\*\NetRules\Block

HKEY_LOCAL_MACHINE\SYSTEM\CurrentControlSet\Services\*\
Linkage,Bind
Linkage,Export
Linkage,Route

The rules.ini file is editable, so these values can be modified or appended. Youll find the
rules.ini file directly from the Start menu, within the Prism Deploy shortcut folder. In this
example, Ive decided to go with the default settings. Launching Prism Deploy Editor starts the
process, as Figure 3.7 shows. Prism Deploy uses a series of wizard dialog boxes to gather the
initial information.

72

Chapter 3

Figure 3.7: Introduction to the Prism Deploy wizard.

The first dialog box is an introduction to the snapshot process. I elected to continue through the
wizard expert. The next dialog box shows a progress gauge as the initial snapshot is performed,
as Figure 3.8 illustrates.

Figure 3.8: The initial snapshot is performed while this dialog box is displayed.

The registry, computer folders and files, as well as some file changes are all stored for a later
comparison with the second snapshot. After the initial snapshot is finished, you can exit Prism
Deploy or leave it running. In this case, as Figure 3.9 shows, Ive elected to exit Prism Deploy.

73

Chapter 3

Figure 3.9: At this point, we can exit the snapshot process and start the target install program.

Upon exiting, a prompt confirms our selection to save the detected information. Figure 3.10
shows this prompt. This snapshot will be saved and used to analyze changes by comparing the
second snapshot.

Figure 3.10: While exiting the wizard expert, we elect to have the detected information saved.

Once the first snapshot is finished, the ColdFusion 5 install can be started
Normal Install

The ColdFusion 5 install is initiated from a CD-ROM. The first dialog box, which Figure 3.11
illustrates, displays the system status as a number of system prerequisites with checks. Although
not shown in this figure, the ColdFusion 5 install program detected older versions of MDAC and
the MFC runtimes.

74

Chapter 3

Figure 3.11: The ColdFusion 5 install program queries for a group of application requirements.

In each case, the appropriate redistributable was installed and the computer rebooted. By looking
on the CD-ROM image, you can see that ColdFusion 5 ships with the appropriate installs for the
prerequisites. After two reboots, the baseline system meets the minimum application
requirements and the ColdFusion 5 install continues.
Select Next through the standard welcome and license dialog boxes. The next dialog box in the
sequence that is worth looking at prompts us for customer information, as Figure 3.12 shows.

Figure 3.12: A customer information dialog box prompts for, among other things, a serial number.

75

Chapter 3

The information in the previous dialog box represents some of the issues to resolve in the
package. The user and company name can be resolved by replacing them with generic values.
More than likely, the individual serial number will have to be replaced with an OEM equivalent.
The most common solution is to use a corporate-wide serial number for all installs. If this option
isnt available, an alternative will have to be pursued. If the serial number is stored directly in the
system registry (for example, if the application is an upgrade), you could write a script to update
this value on a per-user system. In the case of our example tool, Prism Deploy allows you to
substitute a variable for the hard-coded serial number. The variable can read a specified registry
value and write the value during the package installation without requiring any additional
scripting. As Figure 3.13 shows, the ColdFusion 5 install program queries for existing Web
servers.

Figure 3.13: Multiple Web servers were detected by the install program.

In this case, Microsoft IIS and Netscape iPlanet were detected. In our distribution model, we are
more than likely expecting to find a single standard Web server. Making the appropriate
selection is important to a consistent rollout.
The ColdFusion 5 application installs files not only to the application destination but also to a
location accessible by the Web server. On the dialog box that Figure 3.14 shows, both paths must
be provided. The Webroot directory is unique to the Web server that was detected.

76

Chapter 3

Figure 3.14: Two path locations are requested.

The ColdFusion 5 application server requires a password for the ColdFusion Administrator. A
second password is required for the ColdFusion client tool, ColdFusion Studio. The dialog box
that Figure 3.15 shows gathers both passwords.

Figure 3.15: The ColdFusion Administrator requires the user to provide a password.

A key issue to resolve for almost all install programs is which components should be installed.
More than likely, this question will be resolved from the rollout team and will be included in the
rollout document. Figure 3.16 shows the dialog box in which you must make this selection.

77

Chapter 3

Figure 3.16: Component selection is a key dialog box that almost all install programs provide.

After the remaining dialog boxes (Confirm Selections, File Transfer, and Finish), the application
is installed. The ColdFusion 5 install required a reboot. After the reboot, I launched ColdFusion
5 to verify that it was installed correctly and that all is well.
Snapshot Process

After the install is finished, I launched Prism Deploy again. It automatically detects that its in
the middle of a system snapshot, and were prompted to continue. After selecting Next, the final
snapshot is performed and a comparison is made. Afterward, the comparison is used to create the
ColdFusion 5 package
As Figure 3.17 shows, an opportunity is given to edit the package. At the same time, we can save
the snapshot results as a ColdFusion 5 baseline. Ive elected to edit the package.

Figure 3.17: After the snapshot comparison is done, were given the opportunity to modify the package.

78

Chapter 3

This selection launches the Prism Deploy Editor. From within this application, I can evaluate,
change, and fine-tune my ColdFusion 5 package. Before we begin that process, however, lets
take a look at what was captured in the snapshot comparison. Figure 3.18 shows the Prism
Deploy Editor with the ColdFusion 5 package snapshot comparison. The package is separated
into a number of sections, as shown in the left pane. The horizontal toolbar provides quick access
to a number of useful features.

Figure 3.18: The Prism Deploy Editor is where well perform the modifications to our package.

From the Prism Deploy Editor, elements in the package can be removed, added, or modified. As
we go through each of the package subtrees (in the left pane), as Figure 3.19 shows, a decision
can be made on which values should stay and which should go. If any values are unknown or
unclear, you should research them to fully understand where they came from.

Figure 3.19: This list of deleted items shows up in our package.

79

Chapter 3

There is a fair amount of noise in the everyday operation of the OS. The snapshot comparison
will invariably determine that some of this noise is relevant system changes. A key task in
creating the package is removing the unnecessary (and potentially damaging) system changes.
Package Modifications

To modify the package, Prism Deploy offers some very nice features, such as adding folders and
files and abstracting certain hard-coded values as more malleable variables. This feature allows
us to distribute the package and fine-tune certain values based on the target computer. Figure
3.20 demonstrates turning the installation directory into a variable. This feature is especially
useful when you are upgrading software but youre unsure where the software is installed on
each target PC. Prism Deploy can scan an existing registry value and change all embedded paths
within the package to reflect each machines installation directory. This feature enables one
package to work for new installations as well as upgrades. A Prism Deploy package changes
itself for a diverse environment all with little or no scripting.

Figure 3.20: Turning an installation directory into a variable.

80

Chapter 3

After removing the extraneous changes, Prism Deploy gives you the option of adding
functionality. For instance, you can specify how to replace files that already exist on target
systems, you can make Prism Deploy as loud or silent as you like (you can add before, after, and
during prompts that display to end users), you can set reboot properties, you can define
prerequisites (such as OS and disk space checks), and you can substitute Prism Deploy variables
to define areas such as the serial number inclusion, user environment data, and system details.
The package is now ready to test.
Comments on the Final Package
With Prism Deploy, an accurate distribution package was created. Some minor modifications
were necessary to the package, such as the serial number issue identified earlier. Because the
changes generated by the MDAC and MFC runtime installer were picked up, separate installable
packages could be created.

Summary
Repackaging is a big process. The intention of this chapter was to provide you with adequate
background information so that you would understand the scope of the work. Much of this
chapter was spent looking at simply preparing the test computer for the package process. We also
looked at a number of tools to help you get started. The key is to understand the process and
become familiar with the available tools.
Dont forget to keep the install specification up-to-dateespecially through this crucial stage.
You'll face a number of people asking questions about what the package does or doesn't do.
Having a complete and accurate specification at the ready demonstrates your commitment and
knowledge of the package process. As an appendix item, you may want to include the entire
snapshot and profiling data. When problems arise, you'll find them a handy reference.
The final step is iterative testing. I recommend verifying core logical pieces as they are
implemented. Package, Debug, Test, Repackage, Debug, Test is a good mantra and will save
you time. The list below summarizes the steps we've gone through to get to this point. Your
mileage may vary, but I believe you'll find it a solid starting point:
1. Create a base rollout specification.
2. Run the native install program and incorporate the results into the specification.
3. Interview team members and submit the first pass of the rollout specification.
4. Take a snapshot of the application on a clean machine (for each OS) with the required

baseline.
5. Profile the application for linked libraries.
6. Process the snapshot and profiling results into the distribution package.
7. Update the rollout specification.
8. Test and iterate.

81

Chapter 4

Chapter 4: Methods for Deploying Software


You now have a package ready to deploy. Your application is tested and installs on all your test
machines; its functionality works just as you planned and there are no incompatibility problems
with the multitude of applications on your test machines. The job is done, right? Oh, wait. You
have to get the packaged application deployed somehow.
Like everything else about computers, there is a multitude of ways to ensure your workstations
get the application. The choice is yours. This chapter will discuss various methods of
deployment, the pros and cons of each method, and provide some practical tips.
Choosing the method of deployment is just as important as the actual deployment. Although you
might usually send out all your applications using a commercial deployment-software
application such as New Boundary Technologies Prism Deploy or Microsofts SMS,
circumstances for a particular deployment might require using an entirely different method. For
example, if you need to load a small application on only two workstations that are right next to
you, manually deploying the application is easier than any other method.
Having a regular method established lets you package your applications to a known set of
policies and standards. Understanding the needs of the deployment can assist you in making the
proper choice of methods. Do you follow the company standard or is the manual method the way
to go this time? The answer has to be evaluated for each application deployment.

History
In the early stages of modern computing, the Big Iron (mainframe) world used a form of basic
software deployment. All the processing ran on the mainframe, and the terminals only had to
deal with the input and output. Everything was centralized and the only processing that was done
on the terminals was simple presentation. As the Little Plastic (PC) world came into the business
environment, the mainframe world began to offload some of the processing onto the smart
terminals. As PCs came into greater use and were accepted by the mainframe staff, application
installs were all done on a one-by-one basis with the original media. There were administrators
in the IT shop that did nothing but run from location to location with a bag of 5 floppy disks
and install the requested applications. As the PC world evolved into a larger distributed
environment, the expense of doing manual installations mandated that an alternative solution be
found to drive those costs down.
One method was to rely on the users to do the install work. With a desktop OS such as Windows
3.1 and a networking solution such as Novell in place, the users could connect to the network,
map a drive to a single server location, and follow written procedures to install a package that
resided on the network. As the applications evolved in complexity past VisiCalc (remember that
one?), the level of computer knowledge needed to install applications quickly surpassed what
users were willing to become skilled at. Before the installers in use today were around, installing
applications often required making manual adjustments such as customizing INI filesnot
exactly the user-friendly method we have come to expect from software installs. Network
administrators started looking for other ways of getting the software out to the end users in a
reliable manner.

82

Chapter 4

Network administrators began creating scripts and repackaging the applications into various
methods they were familiar with. This method was met with varying degrees of success,
depending on the skill of the packager, the deployment environment, and the software
application. There were few commercial deployment methods in wide use in those days, so
deployment styles in one company were rarely compatible with other companiesstyles. Without
the standards, a common practice was to develop a custom way to deploy applications. This
situation created a nightmare for software companies as they started looking at how to write their
applications to be network aware.
Early attempts by software companies focused on sending only a few files or executables to the
workstation and running the application on the server. The PC world was trying to emulate the
Big Iron mainframe environment by centralizing everything and sending a minimum of the
application to the workstation. As network use and application complexity increased, the world
of 8088 and 286 machines quickly flooded the Token Ring 4-megabit network. A solution had to
be found.
One of the first companies to work on solving that issue was New Boundary Technologies with
its LAN Escort product. The product was one of the first successful commercial deployment
packages to focus on enterprise environments.
The Parts of a Deployment Methodology
By deployment methodology or deployment software, Im talking about the process of taking the
packaged application, getting it out to your target machines on schedule (if there is one), and
confirming that it installed properly on the target systems. Lets break this process down into
basic parts, some of which are review at this stage:
1. Prepare the package for deployment (which we discussed in Chapter 3).
2. Identify the targets (the machines that will receive the deployment) and the method of

grouping the targets (User-based and machine-based are two examples of grouping.)
3. Identify any target-impacting requirements. Reboots or user authority are a few common

issues that can impact the user.


4. Identify any deployment time requirements. Does the application have to be there NOW,

by the start of business in the morning, or simply made available for users to get when
they want it? Can the application only be installed within a dark window (a time of
opportunity that does not impact the users)?
5. Determine online/offline status of the targets. How will the target machines get the

application if they are offline?


6. Communicate to users. Is the application going to be visible to end users? If so, they need

to know about it.


7. Review the deployment status. Did the software get to the targets you wanted? Did it get

on the machines properly without issues?

83

Chapter 4

Choosing a Deployment Method


Lets get started with a discussion by looking at the various deployment methods available.
Well talk about using Sneakernet, scripting, email, Web, image inclusion, and third-party
solutions, including Prism Deploy, SMS, and IntelliMirror.
Sneakernet
Sneakernet is a tongue-in-cheek term for a manual deployment. The name came from a
description of the primary transport mechanism of the data: your sneakers. You grab your install
CD-ROM or floppy disk, your glasses, and the caffeine drink of your choice, then put on a good
pair of sneakers, walk to the target machine, and manually install the software application one
machine at a time. Anymore, this method is mostly used for machines that are not reachable from
a network or for an installation of a standalone package to one or two machines. Obviously, this
method is not the most economical nor does it lend itself to much consistency in the install
method, as mistakes (called finger-checks) are common.

Paying an administrator to sit at a machine while an install process chugs away on the CD-ROM
is expensive. If the install program for the application requires input or choices to be made, the
process will need to be detailed out in a document so that each install is done properly, not at the
whim of the installer. Even with a document in hand that speculates every single option, the
administrator will make normal finger-checks or will find a better configuration method, and
suddenly the target machine installation is not the same as other machines. This inconsistency
may require a revisit to the machine(s) for adjustment of the application settings, which only
adds to the overall expense.
Carrying a copy of the application around with you might be the preferred Sneakernet method
because CD-ROMs are hard to damage if you take reasonable care in their use, but damage does
occur. In addition, there are instances that might prevent their use. If the target machine does not
have a CD-ROM drive or it fails during your install, the cost of Sneakernet just went up.
Assuming you do not have network bandwidth issues, mount the CD-ROM on a share point and
read the CD-ROM from another machine. The less the source media is moved around, the longer
it will survive.
As with normal packaging, be sure to put the source media in a safe location. A drawback of
Sneakernet is that if you lose the one CD-ROM you have for an application, you must buy
another copy to reinstall on a single workstation if you are forced to reimage the machine.
The main advantages of Sneakernet are the ease of the install and the potential low level of skill
needed to perform the install. You could basically take a beginning IT person, hand them the
Office XP CD-ROM, give them a document to follow, a list of workstations to visit, and set them
off to the task. Assuming the person does not make mistakes and works steadily, and the
machines are close to each other, four or five machines could be installed every hour. Of course,
with a mass deployment method, several hundred machines (or more) could be installed with the
Office XP application in the same time frame.
A positive aspect of Sneakernet that can not be replicated by any mass deployment method is the
face-to-face interaction you can have with the end user. The communication possibilities offered
while the software churns its way onto the workstation goes a long way to removing the Faceless
IT image we all fight. Talking to the user, explaining what is happening, doing some training,

84

Chapter 4

addressing a few of the users computer issues, getting feedback, finding out how he or she uses
your systems, or just sharing a joke or two is often worth the time to do a Sneakernet install.
However, this interaction comes at the cost of removing users from their workstations while
youre performing a Sneakernet install. While the install is going on, users are not able to do
their work. So to help reduce that impact, the installer tries to schedule a convenient time that
does not impact the user as much. Maybe the install is done during lunch, scheduled breaks, or
outside the normal work hours. This translates to the installer having to work longer hours or
adjusted hours, and eliminates the interaction benefit I previously mentioned.
Will you ever use a Sneaker distribution? Sure. For example, if your CEO wants the latest
version of Quake installed on his or her machine, creating a deployment package and sending it
out with your standard mass deployment methods would take a lot longer than if you walked
over to the CEOs machine with the CD-ROM and did the install. If 20 or 30 users were
suddenly asking for the latest Quake version so that they could play with the CEO, Sneakernet is
no longer the method to use. Table 4.1 compares the pros and cons of Sneakernet.
Pros of Sneakernet

Cons of Sneakernet

Quick to install and does not require repackaging.

Using the application install may not conform to


your standards and could cause conflicts with other
applications

Good method for one-off installs to local machines


that you can physically access.

Remote silent deployments are not possible.

Possibly cost effective for a very small number of


installs.

Even with detailed install documentation,


differences in the install between machines are
common, possibly resulting in different application
configurations.

Provides user-interaction opportunities.

Losing the source media (CD-ROM or floppy) may


prevent re-installs.

Usually requires minimal training of the technical


staff for the installation task.

Very labor intensive for more than a handful of


installs. Expensive when viewed from a cost of
labor point of view.
Support issues may result if a repair is needed.
Remote repair is obviously not available.

Table 4.1: Pros and cons of Sneakernet.

Sneakernet Recommendation

As you can see in Table 4.1, Sneakernet is best used in one-off situations in which support and
repeatable distribution are not issues. Sneakernet is not a recommended method for mass
deployments.
Simple Scripting Methods
Scripts work. Scripts are great. Scripts are a pain to maintain. Scripts are the next step up the
evolutionary ladder from Sneakernet. For the remainder of this chapter, the term scripts is
defined in a generic way: WSH, C##, VB, or other programming languages are all lumped into
this category. For this discussion, we are defining scripts as anything that you write in the
scripting or programming language of your choice to facilitate a deployment.

85

Chapter 4

Those who have been in the IT industry for several years remember when scripts were the only
alternative to Sneakernet. Distribution scripts were created in the language most preferred by the
script creator. The script would do one particular deployment, and rarely were the scripts generic
enough to do complete rollouts of other applications. As many administrators faced the fact that
Sneakernet would not be the best way to support a growing distributed environment of PCs,
scripts became popular.
Scripting deployments is not a dead practice. For some businesses, scripting is their only option
as a result of budgets or size of the deployments. Some form of scripting might also be used to
enhance aspects of deployment if you use mass deployment software. Using scripting as the sole
deployment method requires you to provide all the mechanisms to a deployment:

Sending a package over the network.

Triggering the workstation install (not to be confused with packaging).

Providing a confirmation of delivery and install.

Reporting on the deployment success or failure.

If we assume that only scripting is used to deploy an application, the process normally becomes
very specific and not easily transferred to other applications without editing or modifications.
Those edits and modifications can take as long or as much work as it took to build the original
script. The process might also have a heavy dependency on other components and utilities, so the
script might require copying a requisite utility to the target machine. This requirement will cause
the install to expand in size. Starting to see why scripting is not always the best method?
The success (or failure) of scripts depends on your skill with programming. If API calls, CLSID,
and DLL registrations are all familiar to you, scripting the deployment will be within your
abilities. Admittedly, those are extreme examples of scripting and not all deployments will be
that involved, if the install package is done properly and the source files are available to the
target. When you script for deployments, remember to take into consideration some of the issues
discussed in Chapter 3 about repackaging:

Drive differencesis the directory on the C or D drive?

File location variations

How to reach offline machines when they come back online

Any potential OS variances such as service pack levels

User permissions for the installthe user might not have authority to install the
application

File version conflicts

Is there a way to make sure certain files that are in the package you are deploying merge
changes into files on targets (like INIs) without replacing them?

Is there a means to back out of a failed deployment without breaking other software?

By using quality deployment software, these issues mentioned are taken care of for you.

86

Chapter 4

One common use of scripting is to include the deployment mechanism in the logon process. By
updating the NETLOGON directory and having the logon.bat file call the application, it is
possible to have users install a simple application when they log on. Although this option sounds
like an easy solution, it has major pitfalls for large applications:

The user might be delayed in signing on until the install completes.

The size of the install might be too large to download at logon. You should assume the
worst case scenario and plan on a large number of your users hitting the NETLOGON
directory at the same time. The impact to your network could be detrimental to the
bandwidth, which would lengthen the install time, causing a longer impact than you
originally planned for.

Network bandwidth is not controllable with the logon method.

If the application requires reboots, users are impacted. Their systems will take longer to
become stable, which will delay them from beginning their day.

Will users have the permissions required to complete the install? As an example, if a
registry entry needs to be added or modified, and the user has restricted permissions to
the local system, the user security context might prevent the application from fully
installing.

The user might decide not to wait for the logon process to finish and power off the
machine (which is a common action). In frustration, the user might move to another
machine and try again. If you use the logon method, communicate to users what is going
to happen and how long to wait.

If you need to adjust a registry entry or map a common static drive letter or reconfigure a printer
setting, NETLOGON scripting is effective. Just dont use this method for large applications such
as Office XP.
A primary principle in programming is to document the program in such a way that anyone can
go back later, read the documentation, and be able to follow the logic flow. Every programming
or scripting how-to manual you read states the same principle. Scripts are programs and should
be documented either externally to the script or with enough remarks internally to explain the
logic flow. Ideally, if a deployment script were fully documented, it could be cut into modules
and used in other deployments. In reality, often the script will be pieced together to solve the
deployment project of the moment, not documented properly, and even the writer will have
difficulty a year later trying to remember exactly what happens inside the script. If the script
writer no longer works for the company, another person will have to put in the time to get up to
speed on any complex deployment processes the script is doing.
Could a script be created generically enough to launch packaged applications without
customization? Sure. Will it work in all cases? That will be up to the skill of the scripter.
The types of utilities that can be included in your scripts to assist in the deployment are nearly
limitless and growing in number on a daily basis. Cruise the Web and look for shareware or
freeware utilities. If you are sharp at programming, creating your own utilities should not a
problem.

87

Chapter 4

To help you find specific function utilities, check out the following Web sites:
http://download.cnet.com/, http://www.zdnet.com/downloads/, and http://appdeploy.com/downloads/.

The scripting abilities inherit within the Windows OS can provide you with a simple deployment
utility. Using the Browser data available on your network, a few IF statements and the resource
kit utility RCMD.EXE, you can send out a simple spray script that will run a command on a
target workstation in the security context of your user ID. I can already hear all the comments
about how other utilities or methods are better. These comments might be truethis instance is
shown as an example about how to script a simple deployment method.
Listing 4.1 shows a script with functions that are pretty basic. The resource kit Help file will give
you the details about RCMD, but you should know that RCMD requires a service to be installed
and running on the remote machine, and it is quirky in how it handles itself. Use it for simple
things.
@echo off
net view /domain:%1 | findstr \\wrk > %1.txt
for /f tokens=1 %%i in (%1.txt) do DeployIt.bat %%|
Listing 4.1: StartIt.bat

StartIt.bat, which Listing 4.1 shows, is a spray script that scans a domain and searches for any
machine starting with \\WRK. The results are handed off to the batch file that Figure 4.1 shows.

Figure 4.1: DeployIt, which is called by StartIt.bat from Listing 4.1, does the actual work.

88

Chapter 4

Table 4.2 compares the pros and cons of scripting as a deployment method.
Pros of Scripts

Cons of Scripts

Highly customizable method of deployment.

Not easily transportable to other application


deliveries.

Depending on the skill of the script creator, may be


quick to create.

Which programming language is used is


determined by the script creator and might not be
supported by others.

Provides one method to reach workstations that do


not have other deployment methods installed on
them.

Maintenance of the script might be difficult


depending on creators documentation of the
process and the complexity of the script.

Can utilize other utilities to perform functions.

Might depend on other utilities that might not be on


the workstation.

The logon process can trigger actions for you.

If used at logon, the startup time could be


expanded and might require a reboot (or two)
before the user can start to work.

Table 4.2: Pros and Cons of Scripting.

Scripts Recommendation

Scripting has its place and should be used if needed. It can be used to enhance the deployment
process, but should not be used in large-scale deployments of moderate-to-complex software
applications. Keep the focus of scripting a deployment method to solving small issues or
enhancing the more enhanced versions.
Email
Email deployments are pretty simple. Once the package is created, you either send out an email
telling the users where to get the application or you send it to them as an executable type of file.
Many of the newer deployment packages provide a link method for inclusion for using email as a
means of sending the packaged application. Alternatively, you can use the manual email method,
which is used as a quick and dirty means to get things out without using more enhanced methods.
The following steps show one method of doing a manual email deployment:
1. The application is packaged and prepared as previously discussed.
2. A central location that the end users have access to is chosen as a distribution point for

the package. The location can be a Web page or a Uniform Naming Convention (UNC)
location (the \\servername\sharename format).
3. An email is sent to the targeted users with instructions about where to get the installation.

Any configuration actions that the user needs to perform are detailed in the email.
4. The user connects to the detailed location, and either downloads or triggers the install.
5. The application is installed.

There are other variations to email deployments, depending on the inhouse programming skill in
your organization. Some examples that work rather well include

89

Chapter 4

Using Microsoft Outlook, the deployment email can also trigger a Web page that does the
install for the user automatically. With this method, the email notification acts just like a
virus (gasp) to download the new application.

An executable is sent in an email message to install an application. If you are rolling out a
new deployment software client and have disconnected machines to reach, this method
works great. By sending the deployment client executable to the user of the remote
machine (such as a laptop), the user installs the client. There after, you can use the
deployment software to reach the client. So you use one method to activate another
method that is more reliable.

Sounds simple, right? Everyone is on email, so why not use it all the time? The deployment
mechanism is already on the targeted machines. All that is needed is for the user to click on a
UNC and run the install. So what is the big problem? The primary point of disruption in the
deployment are the users. They are required to do something. Thus, the deployment success is at
the whim of the users. If they have the time, understand the instructions, do not experience
difficulty, and have the security context to run the install, they might do the install when they get
the email.
With all the virus problems email clients have been experiencing in recent years, the message
from the IT world has been how bad attachment executables are. We are constantly telling the
users not to click on executables. Email and anti-virus programs are beginning to automatically
quarantine attachmentssometimes the user never sees the attachment or the email. Some users
havent gotten the message yet, but most are following the safety procedures.
Now along comes a deployment from the IT shop with an email that says their attachment is OK
and that the users need to execute it immediately. If the users follow the mantra that has been oft
repeated in recent years, they will call the sender (you or me) and ask if we really sent the email
and if the attachment is really safe. If only one user out of four contacts you, that is still a large
number of calls. Figure maybe 10 to 20 percent of the users will just flush the email and not read
it. Suddenly the distribution method is getting low on the success rate.
Success rate is determined by the number of users that get the application within a determined
time period. If you are sending out a new company logo in .JPG format, getting it to all the users
in the next week or two is acceptable. If you are updating a virus definition file during an
emergency, nothing less than 100 percent of your targets need to have the file installed within the
next hour.
Most email programs have a read-receipt option that sends a notice back to the sender when the
email has been read. Short of doing a scan to every targeted machine, a read receipt is one
method to confirm that the user got the distribution email. That is, if the user sends the read
receipt back to you (Outlook XP gives you the option to not send it).
You could have the installation program send a notice back to you that it installed. Either to a
tracking file somewhere or through an email to a collection email box. Either way, you need to
do some comparing of the return statements and the target list to see where the holes are. For
large deployments, confirming the distribution could take as long as installing the application
takes. Well cover distribution confirmation later in this chapter.
Now consider support: How do you perform repairs or fixes or updates to the deployed
application? Most likely, you and the user will spend time (hours or days) on the phone working
through any problems. Fixing a problem might require giving users Administrative access to
90

Chapter 4

areas you prefer to keep locked down or having them deal with system file issues without the
source files. See the problems that can be generated? If you choose to use an email deployment
method, very carefully weigh the support issues and costs and decide if they are worth it to you.
When is email distribution a good method to use? Some examples include

If the end target is not on any other distribution method.

If the distribution needs to take place in a small shop (and some large ones, sadly) in
which the budget is not available to purchase a more robust distribution method and the
users are geographically dispersed.

If you need to send an installation to a small group of users. (Think of email distribution
as an electronic Sneakernet.)

If you are rolling out new deployment software and need to install a client piece on workstations
but have no other method of getting the client piece out there, email distributions might be an
answer to your problem.
An Example Email Deployment

Lets step through how to set up a simple email deployment. The requirements of the deployment
include

The application installation is considered optional for the user. The users can choose to
install the application or not. This setup makes it easy on you when it comes to
verification.

The application is fairly small in size, so network-bandwidth utilization is not an issue,


meaning the install can be done during the busiest part of the business day by multiple
users without negatively impacting the performance of the network.

The application does not require user interaction during the install (a silent install), and
does not require customization afterward.

The application can be installed without requiring elevated user authority. If your
workstations are locked down and most of your users do not have Administrative access
to the local machine (or the domain), you want to ensure any distributions you perform
can be done under the restrictive access rights of the user.

Youve packaged the application, tested it, and are satisfied that it can be deployed without issue
using the email method. Lets use the UNC method. Decide on a central location for the users to
obtain the install executableone that can handle the expected worst-case load and that
everyone has access to. By worst case, assume that all the users that get the email will activate
the install immediately in the middle of the busiest part of the business day.
If your environment has multiple domains, make sure someone in the other domain(s) are not
restricted by trust relationships to the server you are using. If your domains do not trust each
other and you dont have a common access location, you will have to set up the distribution to be
pulled from each domain, then detail the different locations in your email.

91

Chapter 4

Create a directory and a share for the users to connect directly to. Remember to take into
consideration any OS restrictions in the names you use. You want the share name to be short and
simple without a lot of special characters. The directory name itself can be a little more
descriptive, but dont get carried away.
Because this share will be accessed by everyone, the share permissions will be left at the default
level of Everyone: Full. The directory permissions will be used to safely protect the application
data. By leaving the share permission to Everyone: Full, you can ensure that all the users will be
able to connect to the data. In addition, leaving the share permissions to Everyone: Full
eliminates a possible problem: If this deployment was only going to a particular group,
restricting the share to only that group in addition to using the directory-level permissions would
help to keep others out.
To prevent accidental modifications of the data by anyone who doesnt have Administrative
access, the directory will be set to Everyone: Read Only. This setting will allow the end user to
grab the data without someone accidentally overwriting or deleting a file. Dont laugh, it
happens.
Now it is time to craft the email for your users. The email should be simple, direct, and provide
enough information to prevent a flood of support calls. Remember that most people like it
simple, follow the KISS principleKeep It Short and Simple. If the email is too detailed or
wordy, the email might get stuffed into that do-it-later file and never get acted on. Put the
details into a separate file or location so that those users who want that level of information can
get it.
Because users have access rights to the directory, all they have to do is click the link in the email
and they are sent to the location where the install begins to run. Table 4.3 shows the pros and
cons of the email deployment method.
Pros of Email

Cons of Email

Simple to implement.

Depends on the user to activate the deployment


and is unreliable for time-critical implementations.

Utilizes the existing email infrastructure in your


environment.

Security concerns are high.

Can be used to deploy client software for a better


deployment management system.

Attachments might be hidden by the email or virusprotection program. Outlook XP has a setting that
hides potentially dangerous file extensions (.EXE,
.BAT, .CMD, and so on) and might interfere with
the user seeing the attachment.

Is an improved version of Sneakernet.

Tracking the install requires added programming.


No native support within the deployment method.
Requires additional utilities or human interaction.
No network-bandwidth control options.
Requires added utilities for management of the
deployment (remote control, tracking, error
corrections, and so on).
Attachments might have mailbox size limitations.

Table 4.3: Pros and cons of the email deployment method.

92

Chapter 4
Email Recommendation

Email deployments are one step above Sneakernet methods and inherit the same limitations. If
you are faced with budget issues that prevent the purchase of a true deployment system, this
method is better than Sneakernet, although only by a slim margin. Email deployment is versatile
for clients that are not online all the time. With the virus concerns about attachments, notifying
your users ahead of time will be critical.
Ive gone into some added detail in explaining the email method. Although the discussion fell into the
email section, the same principle and issues apply to any of the manual deployment methods:
scripting, email, and Web. There is a lot of work that needs to be done with each deployment and not
all of the work can be easily transferred to future deployments.

Web
Another alternative to having a UNC central location is to post an application to a Web page and
allow the users to obtain the applications from the HTML link. Using a Web page offers several
advantages over a simple UNC location deployment:

Using the browser and Web security features, you can provide added security to the
application install. This security can ensure that only approved people install the
applications.

Applications can be displayed in groups. Arranging the displays according to business


unit or functionality might make it easier for the user to locate the desired application if
you have a large list to choose from.

Installation auditing can be enhanced. You can track who is obtaining the applications,
when they did so, and which computer and IP address they were sitting at.

Additional logic can be applied to the installation process. For example, when the user
clicks on the Web link, instead of just firing off the installation process, a Web screen
could ask for the cost center to charge the licensing fee to and send an email to the
manager of the cost center for approval. With the proper back-end programming, the
Web-based process could even insert the accounting data into your accounting program
automatically.

Some level of network bandwidth control is provided by the browser and Web server. A
direct file copy (or UNC trigger) does not allow for retries on poor connections. Most
browsers will retry bad connections for missed packages and dont have the sending
timeout problems that a direct UNC pull would experience.

You can hide the true location of the filesnot only to keep the knowledge secret (which
you may want to do), but also to provide an easy method for moving the source files to
another location if you need to. Changing the pointer on a Web link is easier than having
to send out emails and notification to everyone explaining that the source location has
moved.

93

Chapter 4

With proper security applied, the Web page can be made available outside of the
corporate firewall so that users can grab the data from the Internet without having to
become authenticated to the corporate infrastructure. If your user community cannot get
to your corporate LAN, they could most likely get to the Internet and reach a Web
address. This setup is obviously dangerous, so be sure about your security before you turn
out the page to the outside world.

Added text can be displayed. UNC locations are only directory and file names. A Web
page can explain any company procedures associated with the install and provide a
description of the application. If users need to do other configuration tasks, those can be
shown at the same location. All this information can be provided in a nicely displayed
page instead of relying on a README file the user may not see or open.

Using a Web deployment is similar to the email method we discussed earlier. A central Web
location for installs will become quickly known and eventually be a part of the common
corporate knowledge. This knowledge makes it easier for you, as the users will automatically go
to the central page for any installs they want. This setup translates to fewer calls to you.
Depending on your knowledge of Web design and security, you can get very fancy with the
installation pages. Some front-end enhancements Ive seen include conducting an automatic
inventory on the workstation, confirming phone numbers and locations of users, sending
confirmation emails, and updating a central database if the application needs it. Figure 4.2 was
created using the Web Expert in Prism Deploy Editor.

Figure 4.2: A sample Web page with links to application installs.

94

Chapter 4

Table 4.4 compares the pros and cons of the Web deployment method.
Pros of Web

Cons of Web

A central location can be established that becomes


part of the company common knowledge for
where to grab software.

The installation normally requires some initial


action by the end user. Thus, it is user dependent
to complete the installation.

Software can be segmented by any categories you


want: departments, software category, project
needs, and so on.

Web programming knowledge is required.

Front-end scripts can be applied to the Web page


to assist in tracking, license issues, and cost.

The success of the deployment depends not only


on the skills of the application packager, but also
on the skills of the Web page designer.

The install location could be opened to users


outside of the firewall.

Anything exposed to the Internet is a potential


security risk and must be monitored.

Many commercial deployment software solutions


are beginning to provide a Web-based method.
The Web browser or server can provide an added
layer of security.
Moving the install source location can be done
behind the scenes without impacting users.
Table 4.4: Pros and cons of using Web deployments.

Web Recommendation

Web-based deployments are a step up the evolutionary ladder. The controls, tracking, increased
ease through deployment agents, and Internet access makes it a versatile method. If an existing
intranet infrastructure is in place with internal Web sites, adding a deployment location keeps the
costs low. Although not as full scoped as the more sophisticated deployment methods (which we
will discuss shortly), this method is the better of the types weve discussed so far because of the
increased flexibility and functionality of the Web front end.
Image Inclusion
Image inclusion deployment is a great method to ensure that everything on the target
workstations will function without issues. For this discussion, image refers to the snapshot of a
workstation that includes the OS, drivers, service packs, and applications needed to take a
machine from out-of-the-box dumb to fully functional on your network. So image inclusion is
the deployment method of taking a new application and adding it to the workstation build.
Anyone that uses the updated image will have the new application on the target workstation. This
method is destructive to any workstation the method is applied to. The overview of the steps for
an image inclusion deployment includes:
1. Creating an image of a workstation that includes the OS and drivers.
2. Reformatting the hard drive on the target workstation.
3. Loading the new image.
4. Making the normal minor user adjustments.
5. Marking your install as complete.

95

Chapter 4

Many IT shops use this type of method to some degree. All the applications work together
properly, the workstation has the latest drivers and service packs, the user gets a freshly imaged
machine without fragmentation of the hard drive, and you know the software level of the
workstation. The process offers great benefits to the network administrator and the integrity of
the infrastructure.
The actual process of the install is easynot the creation or the processes involved in the
deployment, but the install. Because of the pre-work involved in an image-inclusion method,
deployments are normally bundled up to include several applications or updates, then rolled out
at one time. Due to the effort involved in creating the image, the wipe and load, and the impact to
the end user, such a deployment on an enterprise-wide scale is normally done only a few times a
year.
An added advantage is the removal of any non-approved software that the end users may have
loaded on their workstations. Because the image process will completely wipe out the hard drive
and reinstall everything, any application the user may have loaded that could conflict with the
approved software you are rolling out will be gone.
The negatives also need to be considered. The biggest drawback is the impact to the end users.
Their machines are being cleaned out and new applications are being loaded. No matter how
carefully you plan on saving the multitude of user customization parameters, the end user will
have some parameters that arent saved or a critical document will be lost. Not to mention the
potential hassle of learning new versions of their favorite software and learning to work with
new applications, all at the same time.
Because adding a new application requires updating images and the roll-out process, application
deployment is subsequently slow. Getting a new application out will take more coordination and
work than any of the methods weve discussed so far. With all the effort involved, new installs or
updates will be held until there are enough to justify the work.
One other issue you will need to address is support for the applications. How do you remotely
fix, repair, or reinstall an application when the user manages to damage it beyond simple
patches? Do you have to re-image the users workstation because most of Microsoft Excel was
deleted by accident? Or is the Sneakernet method applied for the situation? How do you handle
remote users? Each shop has to arrive at a solution to these questions. Many solve the problem
by

Creating a remote install for the software. This could mean there is double the work
involved in getting an application ready for deployment because you have two methods
to plan for.

Using the Sneakernet fix.

Sending the machine to another location for repair, if the machine is remote from the
administrative support staff.

Using a remote control product such as Netopias Timbuktu or Symantecs pcAnywhere


could be used to take control of the workstation and run the repairs.

Should you even consider image inclusion? Take the scenario of an OS upgrade that includes
new versions of several applications along with one or two entirely new applications. Creating an
image with the new OS, new drivers, all the applications, and any other customizations is a good
method of getting everything out there at one time.
96

Chapter 4

If your company installs (or re-installs) workstations regularly, image inclusion might be a good
solution. Including the applications that everyone uses in the base image would ensure that
newly imaged machines are setup to go. Assuming that you use a mixed deployment
environment, you could utilize your standard deployment methods to install the rest of the
applications. Deciding whether this method is feasible for your environment will depend on the
flexibility of your standard deployment method. If you use Web-based deployments, for
example, using a combined method might work depending on the mix of image inclusion and
after-image installs and who has to click on the Web site to download the applications. If your
standard methods include a pull-type deployment that automatically loads applications based on
group membership, image inclusion might be overkill. As with all decisions, testing in your
environment is needed to help you decide.
Recent years have seen advances in the process of creating and deploying images. Multi-cast,
PXE, Symanctecs Norton Ghost, CD-ROM, and other methods are becoming common.
Although the pain of deploying the image is easing, the end-user impact and the potential for lost
data is still a major issue. Use imaging with caution. Table 4.5 compares the pros and cons of
image inclusion.
Pros of Image Inclusion

Cons of Image Inclusion

Easy to get several applications rolled out at one


time.

It is difficult to provide fix or repair support for


individual applications unless another method for
installing applications is available.

A known status of the workstations is in the


environment.

Any customizations made by the user as well as


critical files might be lost. Third-party imaging
products are evolving to address this issue.

The potential for conflicts with unknown


applications is removed because only approved
software is included in the image.

The process is time consuming.

Creating the deployment process, scheduling with


the impacted users, and after-imaging support can
be labor intensive.
Table 4.5: Pros and cons of image inclusion.

Image Inclusion Recommendation

Using image inclusion as a means of deploying software is primarily effective for providing a
starting point for new workstations (or re-imaged ones). Using it as the sole method is costly,
support restrictive, and slow. It is best used in combination with other methods.
Third-Party Solutions
OK, now we get into the meaty deployment methods. Remember that deployments consist of
getting the package created, getting it out to both online and offline users, and ensuring that the
package properly got to your targets. There are tools out there that give you more and more
control on all aspects, giving you one-tool-for-all type functionality. Except for the imageinclusion method, using any other deployment methodology that weve discussed so far requires
some or all of the following:

97

Chapter 4

Inclusion of utilities to do controlled transfers, data compression, or other actions.

Batch scripting or programming to ensure the installation gets the proper data.

A custom reporting method of some sort that will report on the success or failure of the
installation.

Custom front ends (such as a Web page).

End-user participation to activate the process.

The beauty of most third-party tools is the ability of the product to provide these functions
automatically without additional work on your part. This area is where the cost of the
deployment software starts to pay offthe reduced labor costs in getting an application rolled
out the first time, and the ability to reuse the same methods for subsequent deployments.
For the Web, scripting, and email methods we talked about so far, the labor cost does not end
with the initial deployment. Your labor costs are still very high for each subsequent deployment.
Although the infrastructure is in place, the deployment preparation and the manual requirements
to trigger the installation are always there. Add the support issues each method incurs when
attempting to resolve problems and you can see where the startup costs for the previous methods
might be low but the upkeep and support costs are high. And remember that each of the previous
methods require end-user participation to make it work.
Commercially available deployment packages are just the opposite. Their startup costs might not
be the lowest when compared with the scripting methods startup costs. However, their
subsequent costs drastically decline. The deployment software usually provides means for
support while individual applications can be rolled out easily and quickly. Methods for dealing
with online and offline machines are usually taken into consideration. The major cost savings
come in the labor, support, speed, and reduced end-user interaction.
Lets get the major hurdle addressed right off the bat. Third-party tools cost more than any of the
options weve discussed so far in terms of startup. Scripting and email deployment methods
might not have any startup costs, as the required infrastructure is already in place in your
company. The primary advantage to commercially available products is the cost savings they
provide after the first deployment (if not during). Many third-party products can recover the
startup costs of obtaining the software within a few mass deployments once the deployment
mechanism is up and functional.
Some of the deployment systems are very complex and require support from vendors and
consultants to be installed. While your staff is learning the ins and outs of the new deployment
software, vendor consultants might be involved (onsite or online) to assist in the first few
deployments. Of course, none of these support options are cheap. And consultants presence
doesnt guarantee that the first few rollouts will go smoothly. Remember that when you are
deciding on purchasing software, you need to figure in all the labor costs of the alternative
methods for each deployment, not just the setup.
Go to http://www.appdeploy.com/ for the purchase price of many deployment applications. Use that
data as an estimate; the actual costs for your company might be different.

Deployment software uses three main methods, push, pull, and a combination of the two. Lets
explore each method.
98

Chapter 4
Push

Push technology refers to the deployment process being instigated at the server and moving to
the client. The client is just a receiver, and the server decides when the client gets the software. If
most of your clients are online all the time, a push-type deployment will work for you, as the
client will be available when the server sends out the instruction package.
Pull

The client instigates the deployment process and the server acts as a storage depot in the pull
method. If your target machines are not always online, this method works as it allows users to
gather the needed applications when they are online. If the client is not online when the server
sends out the application, the client might not get it. If your clients move around a lot and need
their applications to be installed at the new workstation, a pull method allows the client piece to
obtain the software on demand and not require a manual trigger action from a server. This setup
translates to easier support for you.
Combination

A combination deployment method uses the best of both worlds. It allows you to send out
deployments from a central location and ensures that remote or moving clients get the
application(s) when they come online.
Trying to determine which method a deployment software uses can be difficult. In all cases, the
server portion has to define the package properties and make the data available to the clients. The
client needs to determine from the server where to grab the instruction information. The
instruction information tells the client what to do with the package: install, remove, update,
repair, make it available to install, or make it mandatory to install. Check how the install is
handled when the client is offline and which piece instigates the deployment to give you an
indication of the method used. Additionally, deployment software can be split into two general
categories: standalone and suite.
Standalone

Standalone deployment software does primarily that: deployment. It may or may not include
other utilities such as inventory, programming interaction, or packaging functionality. Its primary
function is getting the software application out there.
Suite

These are the big deployment packages. They include lots of other functionality in addition to
deployment capabilities. As a result of the complexity of the suite type, their initial setup may be
more involved than standalone types and may require a steeper learning curve to get a good
understanding of all the bells and whistles.
Suite software is generally more expensive than standalone software and may require the
addition of other hardware to support the infrastructure. If you want to deploy your applications
and you are not interested in additional functionality such as inventory, there is no need to pay
the additional costs of a suite.

99

Chapter 4

Deployment software takes care of the basics that you had to deal with using any of the
previously mentioned methods: Network bandwidth considerations, scheduling a deployment
time, back outs (or roll backs), and insuring the application arrived are all dealt with by the
product. Suddenly, your job just got easier! Every vendor has different thoughts about and
designs for how to get your applications out. Most are GUI-based and have some sort of
command-line options so that you can script the process. With a command-line trigger, you can
use the deployment software with a Web-link trigger. By using the central Web page method we
discussed earlier, a user clicks the application link and fire up a pull trigger that starts the
deployment software running. Such a combination can give you the benefits of both
methodologies: a Web front end to do any added functions and the standard deployment process
so that you dont have to redesign what is all ready out there.
Deployment software needs to have some method of identifying the target workstations. A
manually created machine list, a separate database entry, AD connectors, user group
membership, or machine group membership are common methods of creating a target list for the
deployment. The more the software interacts with your existing environment, the easier it will be
for you to get your applications out.
Situations in which departments move around a lot and their machines stay can pose a problem
for distributions. You will need to keep up on the changes somehow. With Win2K, you can use
AD to keep track by moving machines into the proper resource group. Then your distributions
could be machine-based to the resource group. If your distribution method allows dynamic
distributions and is connected to AD, new machines will get the applications as they move into
the resource group. When machines are moved out, the application could be removed or left
active if you choose.
If you dont use AD or LDAP-type databases, a common method to identify target machines is to
use a machine.txt file. The file contains the targets to be addressed in a format that the software
wants. The deployment software reads the file into itself and uses that data as the UNC locators
for the targets. Once the targets are identified, the deployment software can include the list in an
internal database of some sort.
In much the same way, the deployment software should be able to read the contents of the NT
account database or AD to some degree. This ability allows for some form of group-based
subscription. Each vendor will have a specific method for how it obtains the data. Lets step
through a user ID-based process. For this example, all members of the Accounts Receivable
(AR) group will get Excel on their workstation (client):
1. You set up groups within NT for all domain members.
2. Within the deployment software, you define the application to send out and who it goes

to. Anyone in the AR group will get Excel.


3. When a member of the group logs on, the client piece (workstation) of the distribution

software contacts the controlling server and identifies the NT groups the client resides in.
This process can happen from the client end (Userid: Joe; Groups: AR) or from the
server. If from the server, the client would send up Userid: Joe, and the server would
query the NT account database for what groups Joe resides in.
4. The controlling server then instructs the client piece where to find the Excel application.
5. The client workstation identifies that Excel is not loaded, then contacts the location

specified by the controlling server. Excel is then loaded to the workstation.


100

Chapter 4

As you see, the distribution piece finds the user groups and tells the client workstation where to
obtain the needed application. This scenario is an example of the pull method because the
installation is controlled by the client.
Well deal with enterprise-wide distribution issues in Chapter 6. For now, assume that the
deployment software has a method of obtaining the targets and uses that information to send out
the applications.
Lets look at two third-party deployment software offerings: New Boundary Technologies
Prism Deploy and Marimbas Desktop/Mobile Management.
Prism Deploy

Prism Deploy is a standalone deployment system. Once the target workstation has loaded the
client piece, the clients subscribe to tasks to obtain the software you want to deploy. When the
client subscribes, the client begins to process the data as you have designed (update, remove,
install, and so on). The application-installation package is termed a task. The combination of the
deployment targets and tasks is called a distribution channel or channel.
Prism Deploy includes utilities for packaging as well as the deployment process. The packaging
process was detailed in Chapter 3. With the Prism Deploy Console, you can effectively ship out
your packaged applications to your targets. The true power of the product is the integration
between the packaging, conflict checking, and deployment features. Before a client can
participate in a channel, the client program needs to be installed. Prism Deploy Console can
directly attach to any NT, Win2K, or Windows XP client that you have administrative access to
and install the bits. For Win9x clients or machines that are not on the network, the install can be
packaged into an executable file that will run on the local machine. That executable can be
delivered through methods such as AD group membership, logon scripts, email, Web links, or
Sneakernet. Prisms client installs the PrismXL Service, which has the ability to elevate install
privileges so that you can automate deployments in locked down environments.
Once the client piece is loaded, the target machine will contact a server that you have specified
as the distribution point and perform the action you have packaged into the task. Using a very
efficient compression and delivery method, the makers of Prism Deploy have found that the need
for a check point restart for even the largest files is not really necessary with their product.
Checkpoint restarts help ensure a file continues from the interrupted point instead of starting at
the beginning all over again. In New Boundary Technologies tests, Office 2000 was
downloaded over a 56k dialup line in approximately 17 minutes with their transfer method.
Given that level of efficiency and compression with such a large application, normal tasks can be
downloaded to the client within expected normal connection times. So the remote user that only
connects to your corporate network a couple minutes a day to check email will get the tasks in
that time frame.
Installing Prism Deploy is a simple matter. Once you identify a system as the deployment server,
insert the CD-ROM and follow the prompts. A few minutes later, the Prism Deploy Console is
ready to go, and the wizards pop up to step you through the initial processes. No other
infrastructure is needed to begin the deployment of your tasks. Once your package is created and
defined as a task, you define the target computer or group and set the time for the installation.
After the clients are installed, they contact the proper channel and activate the task.

101

Chapter 4

Just how easy is the process? I was very skeptical to say the least. As a test, I asked an entrylevel systems administrator to install the software and send out a simple batch file to my test
computer. The batch file did a net send to the computer it was on that said Hi. Nothing fancy
or complicated in the package as the test was focused on the deployment software functionality.
Less than 2 hours later, with only one request for a reboot on the targeted machine, a pop up
message arrived. I was impressed. Using only the manuals and CD-ROM that comes with the
application, the junior systems administrator was able to set up the infrastructure on his test
system, create a Prism Deploy install file, create a task, add my test computer, remotely install
the client on my test system, and distribute the batch file in less than 2 hours. Of course, that
overall time would be extended depending on the complexity of the package to be installed and
the customization that would be needed. As evidenced by the example of my junior
administrator, the issues of costly integration and consulting that I talked about earlier, will most
likely not be a consideration with Prism Deploy.
One principle with Prism Deploy is that it does not need to conduct any kind of inventory of the
target systems prior to deployment. Because Prism Deploy can perform some prerequisite
checking on target systems, including resolving hard-coded path statements and other variables,
you dont need to determine what software is resident on the targets nor do you need to create a
complicated backend database. Some other deployment solutions place this step into the setup
process, which can add complexity and time to rollouts.
Administration is done from the Prism Deploy Console. It presents an overview of the channel
with the computer targets, assignments, and tasks displayed in a concise method. The channel
functions are available on the menu and the toolbar.
As you can see in Figure 4.3, the Target window shows the individual computers that were added
to the channel, the group called Test Deploy, and the two group member computers (beartest and
L_98TEST). A simple Add was done to insert the computers, using both the Direct and File
methods of installing the clients. Creating the group was as simple as clicking the group icon (the
icon of three computers). Populating the group was done by dragging the name of the computer
to the group name.

Figure 4.3: A screenshot of the Prism Deploy Console showing populated Targets and Tasks.

102

Chapter 4

A test deployment package had been previously created and was added to the Tasks list. Figure
4.4 shows the window in which the Task is created. From here, you can install, reinstall, or
uninstall tasks. The default scheduling is to send it out ASAP, but you can adjust that as needed.
After a task is scheduled, it appears in the Deploy Console (which Figure 4.3 shows).

Figure 4.4: Setting the properties for the Task.

After the task is defined, checking the properties from the Prism Deploy Console brings up the
window that Figure 4.5 shows. This window gives you the opportunity to check the parameters
and assignments. A Prism task represents a package (created with Prisms editor), a command,
which can launch a program outside of Prism, or a Prism Script. A Prism Script can, for
example, string together a series of Prism packages or be used to perform other checks on targets
systems.

Figure 4.5: The properties of a scheduled Task.

103

Chapter 4

Getting a status report is a snap. You can access the Deployment Reports, which Figure 4.6
shows, from the console. Clicking the tabs presents a different view as needed. In the figure, the
Quick View shows that the Task is assigned to two targets; there is one error and one pending
deployment.

Figure 4.6: The Deployment Reports window.

Clicking the Summary tab shows a little more detail about the Task. Figure 4.7 shows beartest
experienced an error and L_98TEST is pending the deployment. In just a couple of mouse clicks
from a single console, the deployment status is available.

Figure 4.7: The Summary tab displays a little more detail about the deployment status.

Prism Deploy emphasizes ease of use without sacrificing power. With a few mouse clicks and a
couple of drag and drops, a deployment was created and the status was available. In fact, for the
test deployment, the entire process was done from a laptop running Windows XP and the source
files were located on a Win2K server.
Prism Deploy does not require a complicated infrastructurethe clients can be offline or online
and can obtain packages from HTTP, FTP, or UNC locations. This functionality combined with
the products ease of use make Prism Deploy a good standalone package.

104

Chapter 4

You can download an evaluation copy of Prism Deploy at


http://www.newboundaries.com/download/prismdeploy/_prismdeploy_down.htm.

Marimba Desktop Management

Now we step up the complexity a bit. Marimba Desktop/Mobile Management used to be called
Marimba Castanet. If you come across any documentation referencing Marimba Castanet instead
of Desktop/Mobile Management, they are talking about the same product, just different versions.
Marimba Desktop/Mobile Management is a pull-type deployment suite that uses a Java-based
client. Applications are packaged as channels, copied to the Master Transmitter, which sends the
data to Repeater Transmitters for delivery to the tuners on the clients. Inventory data is stored in
an Oracle or Microsoft SQL Server database. Targets are defined by a machines.txt file, a
connector to the NT account database, AD connectors, or LDAP inclusion. Administration is
done through GUI-based utilities or command lines.
A Master Transmitter is the primary server. It connects to the database, provides all the
administrative functions, houses the source files of the channels (applications), and is the
connection point for the Windows or directory-services connectors. The Master Transmitter can
service the clients but is happiest letting a Repeater do that duty.
A Repeater Transmitter or simply Repeater is a mirror of the Master Transmitter and acts as a
distribution point. The Repeater hands all decisions and data up to the Master Transmitter for
processing and only services the clients after the clients contact them.
Tuners are the client piece that is installed on the targets. The tuner provides the interface to the
service on the client and handles the channels depending on the individual specifications of the
channel. Every client that is part of the Desktop/Mobile Management complex needs a tuner or it
cannot participate. The tuner can be installed from an executable file that is delivered through
any normal delivery method: Group Policy Object (GPO), CD-ROM, Sneakernet, Web link, or
email.
Channels are the packaged application and instruction file. A channel is HTTP-based and will be
referenced by the URL name of the Master Transmitter. If, for example, your channel sends out
WinZip from the Utilities directory and the Master Transmitter is called TopServer, the URL
will look like http://TopServer:5282/Utilities/WinZip. Because the client tuners will get the data
from a Repeater, instead of having the URL change for each Repeater, the same URL will apply.
The Repeaters dont impact the URL name and will act as a mirror of the Master Transmitter for
the channels. This makes it easier to handle.

Marimba Desktop/Mobile Management is HTTP based so NT security does not play a large a
role in deployments. Users can go across domains that they normally would not have access to
due to the HTTP capabilities. Notice in the URL in the previous paragraph that a port number
(5282) is used. As long as the proper ports are open to the client across any network firewalls,
the client can get the channel. Marimba Desktop/Mobile Management incorporates HTTP
security and some security of its own to ensure only proper access is granted.
One piece of trivia. The standard port number used by Marimba Desktop/Mobile Management is 5282
to access the channels. If you look at a phone keypad, 5282 spells out JAVA.

105

Chapter 4

Marimba Desktop/Mobile Management uses checksum verification for file transfers. When you
package a channel, you always package a full channel as if it had never been sent out. The clients
that will only be getting an update to the channel get only the checksum differences not the entire
file. So a fresh install might get 10MB and an update might get only 1MB. With the checkpoint
restart, if a file download fails at the 8.99MB mark of a10MB file, when a Tuner reconnects, it
picks up at the 8.99MB point and continues instead of starting all over again. This feature is
helpful for users that are only online for a short time each day on a slow link. It might take
several days, but they eventually would receive the entire channel. Only after the channel is fully
downloaded and the checksum verified is it installed.
Being a suite, other utilities are offered in the software. Inventory, packaging, and subscription
are some of the offered modules within the product. Each module requires a license to function.
Administration is done from an Administrator Tuner that connects to each client.
You can get a demo CD-ROM for Marimba Desktop/Mobile Management by going to
http://www.marimba.com/products/change_management/literature-product_demos.html

Marimba Desktop/Mobile Management requires resources to properly set up the infrastructure.


The pull product works well for remote users and the Repeater infrastructure is good for a large
number of users in a dispersed environment. Evaluate it carefully to determine whether the
product will fit your needs. Table 4.6 compares the pros and cons of the third-party tool
deployment method.
Pros of Third-Party Tools

Cons of Third-Party Tools

Automates many of the details of delivery that were


manually created in other deployment methods
(such as scripting, Web, or email).

More expensive than email- or Web-based


methods. Start up costs may be outside the reach
of your budget.

Utilities within the deployment tool can ease your


packaging and verification woes.

The quality of support is vendor specific.

The vendor is there to support you if you


experience problems or have questions.

The deployment software might be strong in one


area and weak in another. This imbalance might
force you to supplement the software with added
utilities or create your own.

The startup costs are quickly recouped on each


delivery when compared with manual deployment
methods that require designing the process each
time a deployment is setup.

There is a learning curve involved in learning the


new software.

There might be a delay in vendor support to


changes in an OS, such as service pack updates or
new Windows revisions.
The implementation time frame might take several
months before it is fully functional. The
requirements for extensive vendor support and
consulting needs to be reviewed.
Table 4.6: Pros and cons of third-party solutions.

106

Chapter 4
Third-Party Tools Recommendation

Overall, third-party deployment software is highly effective. The days of scripting all your own
deployments is quickly fading as the advantages that are packaged into the commercially
available deployment methods are far better and are constantly improving. Whether third-party
deployment software is better than what Microsoft can offer is a decision that you will need to
evaluate. I strongly recommend that you switch from the manual methods and into the proper
vendor-supported method.
Microsoft
For those folks that dont like to use third-party applications for major systems functions, you
can always use the Microsoft solutions: SMS or IntelliMirror. With the exception of SMS, all the
other Microsoft options come on the Win2K Server CD-ROMs.
There are other ways to create MSI packages other than using Microsoft utilities. VERITAS
WinInstall LE is just one third-party tool that works well to create the MSI-needed format.

SMS

SMS was one of the early suite utilities that tried to do it all. It has gone through several
revisions with the current release at SMS 2.0. A newer version code named Topaz is expected
in early to mid 2002.
SMS 2.0 is primarily a combination technology that utilizes a central server (a primary site
server) and secondary site servers as distribution points for the clients. The primary site server is
the SMS equivalent to a Primary Domain Controller (PDC). It houses the connections to the SQL
Server database, ensures the SMS domain is intact, handles communications between the
secondary site servers and the SQL Server database, and is the communication focus location for
all the SMS administrative tools.
The secondary site server acts as the client access point (CAP) and the distribution point for the
packages. The clients contact a secondary site server for the SMS information they need, and if
the secondary site server is configured as the distribution point, the clients will obtain the
packages from it. A primary site server can act as a secondary site server but a secondary site
server can NOT act as the primary site server (due to the SQL Server connection issues). The
secondary site server can act as the CAP, distribution point, and logon server. Or these services
can be offloaded to other servers.
In previous versions of SMS, the site servers needed to be on domain controllers. At the time,
this method ensured the SMS servers obtained the proper data for authentication needs. SMS
allows the ability to relocate many of the site server functions to other non domain-controller
servers to help ease the workload, but most installations kept the services all on one site server,
at least initially. You can guess the problems that would develop: the domain controllers
became overloaded very quickly with all the SMS functions, the NT domain duties, and possibly
home and profile duties. SMS 2.0 site servers can be installed on any type of server: PDC, BDC,
or member server (sometimes called a standalone server). This provides much needed flexibility.
There are several tools within the SMS suite: Inventory, software metering, remote control, and
network diagnostic tools. None of the tools are second rate, often approaching or exceeding the

107

Chapter 4

level of standalone quality tools. The Network tool is one of the better non-dedicated diagnostics
tools, providing great sniffer capabilities. The Inventory utility is detailedproviding system
information as a list of executables it finds on the target machineand keeps this information up
to date automatically. The discovery of the executables is dynamic without the need for a central
rules file to compare against. The display of the software titles is by company, making it easy to
locate unauthorized software.
All the SMS data resides on SQL Server 6.5 Service Pack 4 (SP4or later), either on the same
server or on another server. There are always discussions about which method is better: Move
SQL Server to a separate server or keep it resident on the SMS primary site server. Depending on
your environment, budget, and the size of the server (and memory) you could go either way.
Real world experience shows that several thousand clients and secondary site servers can be part
of an SMS domain in which the primary site server houses a combined SMS and SQL
environment.
The canned reports and functions within the SMS/SQL complex are OK to get started with. Your
skills with SQL can be used to create added reports through Crystal Reports. Microsoft stresses
that you should not do any modifications to the SQL data without using the SMS API methods;
otherwise the company might not be able to assist you with database problems.
SMS works, as you would expect, with the Win2K infrastructure. SMS lets you advertise
applications, works with MSI, comes with an aptly named installer called SMS Installer, and has
the ability to elevate the install privileges in case the user does not have the authority level
needed. The SMS Installer falls into the category of scripting tools discussed earlier. The client
piece is a 32-bit application that gives you the ability to do mandatory installs or set up the
application as an optional component for the end user to decide on. SMS also provides functions
such as inventory and software metering.
With all that SMS gives you, it is a complex solution. This is not a product that you can install
and get running fully in a few hours. Aside from the setup issues of the server infrastructure and
learning the packaging requirements, understanding how to trace the flow will keep you busy for
awhile.
When you trigger a job (a package) for deployment, SMS converts the instructions into different
file types and moves the data from one directory to another, often changing the names of the files
and the file types in the process. These actions are all done on the primary site server. Once the
package is sent to the secondary site servers, the same process happens while the package
instructions and data are moved to the proper directories. The clients check into special files to
obtain any instructions they need to act on, then go to other directories (or possibly other servers)
to obtain the data. Remember that the packages are all compressed and need to be uncompressed
at each destination, so you need to allocate room for the decompression. SMS is poll-based for
each event, meaning that it triggers actions according to a clock tick. SMS 2.0 has improved
greatly the time delays from the pre-2.0 days, but it is not an immediate trigger, and you still
have to wait for the clock to tick. Those clock delays are variable depending on how you
customize the SMS infrastructure. Remember to take them into consideration when you plan
deployments.
Understanding the job flow, data conversion, and possible break points are where SMS expertise
is needed. Anyone can set up a packaged job for deployment using the MMC interface. Getting
the package set up properly and being able to troubleshoot where problems may have occurred
are the true tests of an SMS administrators skill.
108

Chapter 4

SMS 2.0 has received mixed reviewsadministrators either hate it or love it. Talk to anyone that
has used any version of SMS and there will be horror stories that can easily turn you off the
product. In all fairness, listen carefully to the stories. Is the core issue truly the fault of SMS or
the fault of the package, end users, or any other number of circumstances outside the control of
SMS? As with any software tool, SMS has issues and problems. Just keep an open mind about
what you hear.
There are a number of Web sites and news groups that talk about SMS. As a starting point, try
http://www.microsoft.com/smsmgmt/default.asp
http://appdeploy.com/tools/sms2
http://www.myitforum.com
On your newsgroup server, check for microsoft.public.sms.* for several different groups.

If you are considering SMS, download the SMS 2.0 Reviewers Guide at
http://www.microsoft.com/smsmgmt/exec/revguide.asp. Microsoft has a nice online demo that gives a
quick overview, including how to activate a job for distribution at
http://www.microsoft.com/windows2000/demos/mod03.htm.

Table 4.7 compares the pros and cons of SMS.


Pros of SMS

Cons of SMS

Created by Microsoft, support issues between the


OS and SMS are easier to address.

Complex and potentially labor intensive to


administer and support.

Several utilities come with the suite.

The expense of the startup is not only for the


software but the hardware needed for the site
servers.

Supports most common packaging formats.


Table 4.7: Pros and cons of SMS.

IntelliMirror

In a Win2K environment, you have the option to use IntelliMirror for deployments. IntelliMirror
provides three primary functions:

User data management

Software deployment

User settings management

Although all three functions are important, the area we are interested in is software deployment.
The main premise behind IntelliMirror is the ability to have applications follow a user around to
different desktops. Although MSI is the preferred format of the installer files, normal
SETUP.EXE-type installs will work under most Group Policy distributions. With IntelliMirror,
applications are either published or assigned.
A published application is available to the user to install. It is not automatically installed when
the user signs on. If the application is needed, the user goes to the Add/Remove Programs applet
109

Chapter 4

in Control Panel and clicks the name of the application. If a file is opened that needs a specific
published application, a form of installation called document invocation takes over and installs
the application. Getting the published data to the user requires you to set up a GPO. To do so,
you must have AD and Win2K or Windows XP rolled out to all computers and servers.
An assigned application is available to the user in the Start menu, but is not installed. It is merely
an icon for the application. After the icon is clicked, it activates a background service called
Windows Installer that processes the request and performs the MSI installation. Although the
overall process sounds simple, there is some background work that needs to be done to enable
the features properly. After the initial design work is done, setting up future deployments through
IntelliMirror is easier. Table 4.8 shows the pros and cons of using IntelliMirror for deployments.
Go to the Microsoft Web page and download the IntelliMirror scenarios MSI file. It contains six
scenarios and a good white paper that details exactly how to set things up, plus it provides batch files
to assist in setting up GPOs on your domain so that you can test the processes outlined.
Pros of IntelliMirror deployments

Cons of IntelliMirror deployments

Deployments are principally done by Group


Policies.

The just in time method of install can cause a


delay to the user that may be unacceptable
depending on the situation, line speed, and
hardware platforms.

Applications have the ability to follow the user to


different workstations.

Requires the Windows Installer service to be


running.

Repairs are available if properly setup through MSI


installations.

Requires that you roll out Win2K or Windows XP to


all workstations and servers and that AD be rolled
out to all users.
Offers no reporting mechanism to ensure
deployments were successful.

Table 4.8: Pros and cons of IntelliMirror deployments.

As you would expect, Microsoft has a lot of data available on its Web page regarding IntelliMirror
(http://www.microsoft.com/windows2000/techinfo/howitworks/management/intellimirror.asp).

Microsoft Recommendation

Microsoft products are well known. The primary advantages with using them are the close tie-ins
with the OS and the large number of other administrators using the products. The Microsoft label
does not mean that the products are better or worse than others. SMS and IntelliMirror work.
Will the costs of the startup and the functionality they provide be the proper choice for your
environment? You will need to evaluate and compare against the other offerings.

Rollouts
Youve packaged, tested, decided on your deployment method, and are ready to roll out the
package. Now it is time to decide on the rollout process. Will you phase it in controlled steps or
mass deploy and trust that your package wont cause issues? I recommend that if the application
allows it, always go with a phased approach until you are comfortable that everything is right.
110

Chapter 4

Being naturally paranoid of causing wide-scale problems that will keep me slaving over a hot
keyboard for hours (or days), Id rather discover that an application causes an unexpected
problem with a small group of machines or users instead of the entire company. Something about
having my name prefaced with negative sounding adjectives by everyone in the company does
not really appeal to my sense of well being. However, if a dozen or so users are complaining
about an application blowing up, well, those are the breaks of being on the cutting edge of
applications within the company. Surprisingly, Ive gotten people to volunteer by making it seem
like a special perk to get an application first. It tickles the ego to get something before anyone
else does.
Next time youre with a group of techies that deal with software distribution, stir up the
conversation a little by saying something like I believe the ONLY way to rollout applications is
to use the phased method. Or claim the mass deployment method is better. Then watch the
discussion heat up. The point is that there is no one single way to do it in all cases. Table 4.9
provides discussion points for the different perspectives.
Phased Approach

Mass Deployment

Takes longer to roll out applications.

The roll out is completed quickly.

There is more overhead in tracking who has an


application and who does not.

Everyone gets an application at the same time so


there is no added deployment tracking.

Errors, unknown interactions, and problems can be


found and resolved before they impact numerous
systems.

If any negative issues are discovered, they impact


the entire deployment groupa serious situation if
the problem prevents the company from making
money.

Post deployment clean up is normally smaller by


the time the final phases are run, as any clean up
processes are discovered during the smaller
phases.

Post deployment can be labor and time intensive,


depending on the severity and degree of clean up
due to the size of the roll out and learning curve.

A roll out can be halted at anytime, stopping the


application from reaching everyone.

Once you pull the trigger, the application is going


out and may be difficult to halt or roll back.

Support calls are manageable due to smaller


volume.

Support calls may inundate your Help desk due to


the magnitude of the rollout.

For simple rollouts, a phased approach is usually


not needed.

For simple rollouts, a mass deployment might be


the most effective method.

Some applications may have tie-ins with other


processes or back-end systems that prevent a
phased approach from working.

A mass deployment may be the only option if the


back-end processes or systems cant be
segmented.

Table 4.9: Discussion points for using a phased approach or a mass deployment method.

For mass deployments, scheduling the rollout is easy. Everyone gets the application by your
deployment method at the same time. You dont need to deal with which groups are getting it
and when; you follow your normal deployment processes and send the application out. Are you
shipping out a new True Type font package? Mass deployment would be the method of choice to
ease your burden and get the package out to the enterprise. A phased approach requires that you
take several steps to roll out the application. How many steps are needed depends on:

The complexity of the package.

The number of targets in the rollout.

111

Chapter 4

Any added processes, configurations, or back-end modifications that must be made after
the rollout has reached the targets.

Your comfort with the rollout.

For most rollouts, using a three-phased approach works effectively. The first phase is sometimes
called the pilot group because it is small, maybe 5 percent of the total target distribution. The
second phase is a little larger, maybe 10 to 25 percent of the total. And the third phase would be
the remainder of the rollout targets, assuming you are comfortable and have not found problems.
The number of phases is adjustable. For the majority of your rollouts, using three phases will
work. For complex deployments such as rolling out Office XP, increasing the phases to have a
smaller number of users in each phase would be best. Adjust the number of phases as you see fit
for the situation.
I keep mentioning the phrase if you are comfortable. Im referring to the level of success in the
smaller rollouts and your impressions of how that rate will translate to larger rollouts. It is an
educated guess on your part in assuring the impact to the end users will be positive. The users
may be severely impacted as in the case of a service pack update or new word processing
package, but they should not experience a failed system to the level that a reinstall of the OS is
the only resolution. If your smaller phases are successful and you forecast the same level of
success in the wider scale, your comfort level is high. If you dont like the package, have to work
late off hours and weekends to apply back-end processes and need to cancel your long-planned
vacation to ensure the critical rollout will work from the end users point of view, your comfort
level is less than comfortable. Sadly, personal comfort does not come into play in the software
distribution world. If the same conditions apply but the package fails in the initial phases, your
comfort level is low, and the deployment needs to be questioned.
Pilot Users
The first phase of a rollout is sometimes termed a pilot phase. The first phase is a small group
and is used to confirm that all your testing, planning, and designs are going to function as you
wanted. There are surprises at times, no matter how hard you try to prevent it. For this reason, it
is good to select your pilot users carefully.

The pilot group should be representative of the eventual rollout group. Dont rollout to your
other network administrators that always sign on with their administrator accounts if the
application is going to the mailroom that has restricted access rights on their accounts. You
wont find the problems until they hit the mailroom.
Talk to the pilot users beforehand. They may or may not have volunteered for the phase, but they
should still be made aware of what is happening. If you can, a face-to-face meeting or phone call
to the group is a nice touch and goes a long way toward ensuring you get good information back.
Let the pilot group know exactly what they will get and when, what to expect, what might
happen if it goes wrong, what you expect them to do, and what to do if they see something
strange.
When I rollout applications, I see the act of talking with that pilot group as a critical step for the
success of the rollout. If the application is eventually going out to a large group, one small ego
stroke you can give the pilot users is knowing that they not only get the application before
anyone else but that their input is critical in helping to confirm the application should go out as
planned. Letting them know how important their feedback is will get you that needed data.
112

Chapter 4

Giving the pilot users the chance to become an expert on a new application before anyone else
sees it is usually payment enough for dealing with any possible issues. People like to feel
important and feel that they know a little more about something than anyone else does. Play up
to that desire a little and it will make your deployments that much better.
There have been instances in the past in which a poorly created piece of software was rolled out
to the pilot users and their input adjusted the rollout. In some cases, it cancelled the project. More
commonly, it sent the project back for adjustments so that the software worked in the real world
instead of the software designers development lab. When it happens, make sure the pilot users
know that their input had an impact. It will keep them on your side and wanting to do more.
Errors Are FoundDo You Continue to Roll Out?
Your pilot phase found some errors that were unexpected. As the deployment administrator, you
must decide if the rollout is to continue or be delayed. I cant provide a solid answer to this
question for you; there are too many variables (from political to technical) to deal with. I can
offer up some points for you to ponder:

How damaging to the system is the error?

Is the error in the packaging, deployment, or software?

What impact would the user or system experience if the error were not fixed right away?

How hot is the project for the company? (What kind of pressure is there to get it rolled
out?)

If a delay in the rollout is needed, what are the procedures to follow in your company?
Do you have the authority to call a halt?

If the error is going to severely impact the system(s) or negatively impact the users in completing
their job duties, the only real option would be to halt the rollout until the error can be repaired or
patched.

Ensuring the Deployment Worked


Getting the software out is one thing. Ensuring it reached the workstation targets and installed
properly is another. Most commercially available deployment software has some form of
delivery confirmation. It can tell you whether an application was delivered to the targets.
Ensuring that the application installed properly is a little more difficult.
In an ideal world, every time an application was installed on a workstation, all the functions and
features of the application would be tested to their fullest and confirmed that they work with all
the other applications on the workstation. Obviously this scenario is not an option in the world
that we are dealing in. In our hurry to get it done, we often forget, or opt to ignore, the need to
confirm the deployment went as we desired. Instead we rely on the testing, which is why it is
done, to find the road bumps. A lot of times the classic logic is used: If the phone is not ringing,
the deployment went well.
In all deployments, you will find a small percentage (less than 1 percent) of errors that can only
be assigned to the category labeled what the heck? Some simple steps can be used to reduce that
number even further by proactively reviewing the deployment.

113

Chapter 4

Review the rollout status in your deployment software. Investigate any targets that dont show a
good completion status. Remember that depending on the software, you may be seeing the
delivery status, not the status of the installation. If the installation failed to update the registry
properly, the delivery status might show as a success because the install process completed and
returned control back to the deployment software. The user sees the application as not functional,
but your delivery mechanism shows it as good. You may find that some machines are constantly
coming up with failures. These systems are good candidates for some proactive investigation to
determine why they are having problems.
Prism Deploy deployment reports include both deployment status and errors such as incorrect
OS, user cancelled the operation, and error writing to the registry. These reports indicate that an
installation had a problem.
If your deployment software has an inventory option, use it to confirm the deployment. Trigger it
to gather data on selected files that are critical to the application. Inventory the primary
executable, the existence of a directory, a particular registry entry, or a flag file that you set.
You could also make use of the temp directory on the workstations. Create a C:\TEMP\Logs
directory and set the applications to echo their install logs to the location. Have your installation
process create a flag file that is only present if the installation went to the end. The flag file can
be empty or have a short message or the date. It does not matter what is in the flag file, it needs
to exist only so that your inventory modules can note the existence of it. The same function could
be done by creating a registry entry.
Once your inventory module has gathered the data you are looking for, run a report to see which
machines have the reference points you set. If you know what the targets were, a simple compare
should show any that are missing.
Some Tools to Confirm the Deployment Went Out
Aside from using your deployment software and the tools that come with it, you can do some
simple scripting with free utilities to determine whether the deployment reached its targets. Here
are a few recommendations:

Nearly any scripting language will provide some means for checking files and getting
some data from the registry. Languages such as Perl, C++, and VB6 provide various
methods. Choose the language you are most familiar with and use the hooks available.

The Microsoft resource kits have some nifty utilities such as REGDMP, SCANREG,
REGFIND, ROBOCOPY, and WINDIFF. Use these utilities to compare file dates,
registry entries, or the existence of files. Check the Help screen that comes with each one
to see the format.

The Windows OSs contain different built-in utilities such as REG, DIR, IF statements (if
exist \\machinename\c$\ntdetect.com set test=true), and the like. If you are not familiar
with the choices, from a CMD prompt, enter HELP.

114

Chapter 4

The Human Error Factor


Many deployment issues can usually be attributed to some kind of human error, but the problem
is reported back as the deployment software caused my system to blue screen. Issues with the
package creation, damaged workstations, improper user interactions, machines turned off, or
interaction with unknown software on the workstation are very common. Deployment software
cannot resolve all those issues, no matter how good the software is. The deployment application
depends on the intelligence of the administrator and the packager to resolve issues.
As an example, one of my favorite end-user complaints is the user that claims the deployment
software rebooted his or her workstation in the middle of the day. When you research it, you find
that a major application was rolled out that required a reboot. For example, a service pack update
was sent out on Friday night with the intention that it would install over the weekend when no
one was around. You get the complaint the next Thursday and find the user had the reboot on
Monday. Checking into the logs you discover that the user had turned the machine off on Friday
even after repeated emails telling everyone to leave their computers on. So, yes, the deployment
software did install a piece of software that caused the reboot on Monday. Of course the issue of
the user turning the machine off on Friday doesnt surface in the complaints. The error is the
fault of the deployment software and it starts to get a bad name. The first statements that upper
management folks hear are the original complaints.
It is also common for an error, or perceived error, to give the deployment team a bad name
causing them to be skeptical of every system problem that follows. Taking care early on and
avoiding this kind of reputation is well worth the extra time. True, if the application was
packaged to check for delivery times and only run during certain hours, the previous scenario
could be avoided. The point is that the problem is not the fault of the delivery mechanism.
Software deployment is not 100 percent about the technical aspects. You need to talk to your
managers and make sure that they know what is happening and that the word gets sent up the
ladder.
Remember that any deployment software is just thata way to deploy software. Its primary job is to
get the packaged application to a destination and trigger the installation. It is NOT a system that can
correct faults or problems with applications, installs, or human errors in deployment targets. Never
accept at face value the excuse that problems on a target machine were caused by the deployment
software.

Summary
There are as many methods for deploying software as there are target environments. Once you
find a solution that fits your budget, client needs, infrastructure, and corporate culture, you
should set it as the standard. Any applications coming in should be packaged with the idea that
your standard method will be the mechanism for distribution. But stay flexible. Blindly
following a process without looking at the desired results can be burdensome. Maybe adding a
central Web page for optional installs that tie in to your standard process is the best method for
your organization. Keep an open mind and look for the opportunity to improve your methods; it
will make your life easier. In Chapter 5, the issue of deploying to the remote user will be
discussed.
115

Chapter 5

Chapter 5 Deploying to Remote Users


The thought of getting a deployment out to a remote user can bring even a strong network
administrator to the edge of a panic attackespecially for that first company-wide deployment
when the project has a white hot spotlight of attention on it. However, this task does not need to
be a difficult endeavor. Just like the slogan says No Fearyouve already got the information
and as an administrator, youve got the attitude, all you need is the experience. For a remote
administration, the principles that weve talked about in previous chapters still apply:

A package is delivered to the target machine

The install process is started

Physical distance is not a large issue. A target machine can be sitting next to you or half a world
away, and the deployment method is basically the same. That is, unless you try to Sneakernet the
install. Im sure the company travel department and your finance administrator will have
something to say about all the travel.
To clarify for the purpose of this chapter, the term remote user will be any user or workstation
that is not within the immediate vicinity of the network administrator. The user in the next
building is considered a remote user because the need to send applications to the user has the
same hurdles as a user in a building 2000 miles away. Where the fun begins is dealing with
machines, such as laptops, that move often or are not directly attached to the corporate
LAN/WAN. Deployments to those systems are where this chapter is heading. As the laptop is on
the extreme side of the remote user scale, Ill use them as examples in this chapter. After you get
the laptop deployment issues resolved, the rest of the machines will be a snap. Grab a box of
your favorite chocolate chip cookies, a couple of caffeinated beverages, and read on.

Generic Remote Issues


Focusing on the laptop issue (remember they are used as the extreme example), there are a
couple of generic issues you must account for:

Line speed

Connectivity duration

Windows security (domains, ACLs, and the like)

When a laptop user is on the physical premises for a full day and connects to the hardwired
LAN, the laptop is running at your normal LAN speed and can be considered a local connection.
No problems at this point. However, laptops spell mobility to the user, and these systems can
also connect to your network at other speeds. Connections can range from a phone line running
on a 56Kbps (or slower) modem to a DSL line running at 256Kbps+. Often, laptop users will
connect with various methods in a single day. Take my own laptop connections as an example.
Depending on where I am, the connection styles will vary greatly. It is not uncommon for my
connection day to cycle from a Gigabit Ethernet hardwire to a 56Kbps dial up in a single day.
Direct connect, VPN by way of the Internet, password access, and token security access are
methods added to the mix. If your deployment method uses fixed network timing as a means of
triggering an event, you can see how identifying the proper connection timing would be difficult.

116

Chapter 5

If your deployment method has the ability to disconnect users after a fixed clock time, be sure to set
the time parameter long enough to support the remote user who is dialing in. This setting will prevent
premature cancellation.

The following scenario is common: There is a requirement to get an application out to all your
machines ASAP if not sooner. Of course, the application is not simple, and the package is a
15MB file. Dealing with the remote user who only signs on through a phone connection long
enough to transfer his or her email and get email messages makes it difficult to get a large
application loaded. If your deployment methods do not take such a case into consideration, your
support will be viewed as poor by the users. To ensure the application deployment completes,
you could force the user to stay online, have the user come in to a central location, or use any of
the other methods we talked about in earlier chapters. Most commercially available deployment
software will provide a good means to solve this issue for you. Transmission compression
algorithms, checkpoint restarts, or smaller files all combine to get the data to the target in a quick
and workable manner.
Administering applications for the remote user can be just as difficult. How do you determine
whether an application is resident on a system if you cant run a report when you need to because
the system is not online? Your packaged application includes reporting, so you will need to look
at the archived data. Although this information isnt real time, it is reliable as of the report date.
Any reports you create stating success rates should always include a disclaimer line stating the as-ofreport date. Not the date of the report creation, but the date the data was recorded. Status reports are
only a snapshot of a time period.

Another challenge, domain security can prevent an application from loading. Laptops dont
always have domain residency. Configuring them to a workgroup status is common (as is
domain residency, true), which will provide added hurdles in getting your applications deployed.
Windows security and domain issues will be discussed a little later in this chapter.
The primary needs of the remote user are the same as the local user that is hardwired to your
LAN:

Applications need to be deployed in a timely manner

A report on the deployment status will be needed

Application deployment needs to be administered

There are added issues involving the remote user that need to be considered in the solution
formula. Obviously, not all issues apply to your environment and there may be additional issues
unique to your situation:

Remote users do not consistently log on to an NT domain or AD. They may only log on
locally to the workstation that is either a resident of a workgroup, uses cached credentials,
or changes domains often. Relying on domain resident logon scripts or GPO enforcement
would not be effective in this case, as the security context and availability of the source
location cannot be 100 percent guaranteed. Even locally attached machines cant be 100
percent guaranteed because users still have the annoying habit of turning off their
computers.

117

Chapter 5

A department, office, or other business location may never hard-connect to the corporate
network. They may rely on dialup connections (soft-connect) or a VPN solution via the
Internet. VPN security and download times are a concern. Stuffing large files down the
56Kbps or 128Kbps pipe during business hours is not advisable if the users need the
connection to make money. Bandwidth control that uses a percentage of the available
bandwidth and adjusts itself is one solution. Just be careful that the bandwidth control
does not extend the download time too much. Scheduling downloads for off hours is a
common solution; just ensure that the targets stay online or you have a caching system at
the target end of the pipe.

The remote machine is at home. The system is used at home along with the kids typing
tutor program, the family book-keeping program, several different games, and an email
program that is not on the corporate approved software list. The machine connects
infrequently to the corporate network, and any application install could have difficulty
with any of the other applications installed on the system. Your packaging process should
address this issue for file and version conflicts. In this case, your enforcement of
installing applications should be reviewed; do you really need to get applications to this
user? If all you are concerned about is virus protection, it is easier to focus on protecting
incoming data from the server side. Of course, you could also make it a corporate policy
for only corporate assets to be used in connecting and any non-standard applications will
be disabled or removed (if found).

A user will only sign on for a few minutes at a time. The connection could be abruptly
terminated at any time. Any download that is in progress may be interrupted.

Mobile targets are hard to hit. For the machine that moves from one site to another,
forcing the user to obtain all the data from the home site may be prohibitive due to line
speed, a firewall, or other network restrictions. You will need to either wait for the target
machine to come back to the home site or have a method to automatically change the
source location on the fly.

Types of Remote Users


All remote machines or users are not the same. For my own sanity, I tend to split remote
distribution targets into five main groups:
1. Common issues
2. Remotely hardwired machines
3. Remotely stationary machines
4. Roaming machines
5. Rarely connected

The common grouping handles most situations. Aim your overall deployment strategy planning
at this group. As the target list becomes defined for a deployment, issues regarding deploying to
the other groups (2 through 5) will come to light. Fine tune the distribution if needed to ensure
the package is delivered smoothly to the entire target list. Ill focus the remainder of this
discussion on the five groupings.

118

Chapter 5
Common Issues
This grouping covers the issues common to all remote deployments. In the early stages of
planning a software deployment when all the specifics are not known, plan to support this
grouping. If the deployment can satisfy the common issues, chances are that the unique
opportunities (a positive way of saying problems) of the individual targets can be resolved.
Whether you are going the custom delivery route or will use commercially available distribution
software, you need to address the same concerns:

Scheduling considerations

Network transmission

Deployment status reporting

Connectivity

Security

User impact

Commercially available deployment software can provide most of the answers for you. Because
the software vendor is in the business of software deployment to make money, they have a strong
interest in addressing common problems and conduct testing to work out the bugs. At least that is
the law of supply and demand. If they didnt address the issues, you wouldnt have purchased
their software.
Scheduling

Scheduling is more than determining how soon the application gets out to the workstations. You
also need to consider the end users and the business impact. Some of these issues were brought
up in Chapter 4, and I will review them as well as some new concerns in the following section.
Is there a dark window when the user is not on the system and applications can be delivered as
needed without interrupting the user? A dark window is a time frame agreed upon by all parties
involved. All parties agree on this time as being a safe period. For example, the IT department
and the business unit(s) agree every night between 2:00 AM and 4:00 AM and all day Sunday
are periods when the computer folks can do anything to the computers (and infrastructure)
without negative impact. This timeframe is when you do such tasks as forcing reboots,
performing service pack updates, updating network drivers, doing backups (which may impact
the network bandwidth), and update applications that the business unit uses heavily during the
day. If a user is active during the dark window, the IT department is not held responsible if a
reboot wipes out the unsaved report the user was working on for the past 5 hours. Be sure to
remind users of the dark window on a regular basis so that everyone stays aware of the agreed
upon time. Additionally, consider activating the logon time parameters in Windows; this feature
helps to ensure that users are off during the dark window times.
Are there times when the workstation is doing critical functions and cant be mucked with? This
timeframe is not a dark window situation. You need to know which times are critical to the end
users and ensure that those times are not impacted. Because we are talking about doing things
remotely, you cant see the target machines in person and may not be aware of what the user is
doing at that point in time. Depending on the application and its user impact, your distributions
can occur at all times of the day and night. You may choose to stage a large file to the
119

Chapter 5

workstations and activate the actual install at a later time. If the download takes over the
available bandwidth during times when the business unit is heavily using the network, problems
may ensue. Common times of concern are the beginning of the business day, heavy customer
service hours, or defined account close-out times. You know the computing needs of your
clients; make sure the deployment does not conflict with those critical times.
How do you trigger the start time of the application? The delivery mechanism will get the
application to the target. Your deployment could kick off the package immediately upon
transmission completion or it could wait for a scheduled update time. The start time needs to be
addressed either by the packaging or the client portion of your delivery strategy. For machines
that only connect for short periods of time, delivery may be done hours or days before the safe
install time. Your trigger must take into consideration the variances to be met. This process
works great if the target machines are online and turned on at the activation time. You also need
to deal with machines (such as laptops) that could be offline or powered off at the activation
time.
For example, suppose a cashiering application ties into a database server in your data center. The
database server is undergoing an upgrade to a new version and a new ODBC on the client is
required. The old clients will error out if they try to work with the new structure. Aside from
having to deploy the update to hardwired machines that are online and powered up, you need to
get the update out to your roaming laptop users who only connect to your network once or twice
a week. To prevent needless problems, you stage the deployment to the target machines a few
days in advance and set a trigger within the commercially available deployment software to
perform the install on Friday at midnight. Thus, you get the data out to the users early but dont
trigger anything until later. If you dont have commercially available deployment software, you
can use the AT command (or JT from the Win2K resource kit) to schedule the activation of the
client update.
Within the packaging, you also take into account the issues of late delivery. For the previous
example, you would need to ensure the package kicks off the install if the trigger time has
passed. As part of the initial package, you also worked to close the application if it was running,
thus the reason for the midnight install. Applications can be closed remotely either through a
command line specific to the application; using the NET STOP command for any NT, Win2K, or
XP services; or through a combination of the TLIST and KILL commands, as Listing 5.1 shows.
net stop TestService
c:\util\kill TestService.exe
Listing 5.1:Simple application- stopping commands. The Kill command will stop all instances of
TestService.exe.

TLIST.EXE and KILL.EXE are available in the Microsoft resource kits.

For those late installs, you can prevent the user from starting up the application after you stop it
by renaming the primary executable. After the install has completed, rename the key executable
back to the original name. Although this process might seem like overkill for a midnight update,
you need to plan for the late installs that might occur when the user powers up their machine on
Monday morning. Remember the earlier discussions about setting the end time or do-notactivate-after time? This is where it comes into play. Weve all seen the fast-click users who start
clicking applications or who set up their own startup scripts to launch applications fast. The
120

Chapter 5

timing between a startup and your package installation could be enough to have the user startup
the application and mess up your install.
Another option for the late execution issue is to use the
HKEY_LOCAL_MACHINE\SOFTWARE\Microsoft\Windows\CurrentVersion\RunOnce
registry key to start up the trigger. Commands placed in the RunOnce registry key will execute
once upon startup of the OS and clear out the key of entries. Remember the RunOnce command
will activate the commands in the security context of the logged on user. Should you need higher
authority levels, you will need to plan accordingly.
Dont confuse the
HKEY_LOCAL_MACHINE\SOFTWARE\Microsoft\Windows\CurrentVersion\RunOnce key with the
HKEY_LOCAL_MACHINE\SOFTWARE\Microsoft\Windows\CurrentVersion\Run key. The Run key
will cause the entered program to run each time the OS is booted.

This process prevents a never-ending loop of installs down the road. If your install depends on
other tasks or functions happening prior to a particular time, use caution to not start the
application early. Have the RunOnce key activate the trigger script only. The trigger script then
compares the current time to the scheduled install time. If current time is after the scheduled
time, the install runs. If the current time is less than the scheduled time, the trigger reinserts the
RunOnce registry entry and terminates. This way, you are ensured to run the critical application
prior to the user starting anything. Listing 5.2 and 5.3 show the commands for this process.
@echo off
regini runonce.ini
Listing 5.2: This line will call runonce.ini, which will insert the timer trigger into the RunOnce registry key.

hkey_local_machine\SOFTWARE\Microsoft\Windows\CurrentVersion\RunOnce
test = c:\temp\TestTrigger.cmd
Listing 5.3: The registry format to insert the timer trigger into the RunOnce registry key.

Weve now defined dark windows, start times, and business critical times. You need to make
sure the installation does not creep into those critical times. Can you force an application to stop
installing or stop processing at certain times? That is rather tricky. It is more of a timing issue on
the startup. Looking at the issue backwards is the method to use. As we discussed in the last
chapters, you should have a good idea of the time it takes for a package to install. Add a fudge
factor of 10 percent or so, subtract the total time from the must-end-by time, and set the install
drop dead time accordingly.
For example, if your application takes 30 minutes to install, and your dark window is from 2:00
AM to 4:00 AM, you want to ensure the installation does not exceed the 4:00 AM cut off time. A
10 percent flex factor is only 3 minutes, so round it to 5 minutes. All the clients are on fast
connections, and the package is not large enough to worry about transmission delays. So at worst
case, your application needs to be running by 3:25 AM to make the must-complete-by time.
Network Transmission

If the application is only going to remote users who are hardwired and online to the network at
all times (such as call centers or corporate buildings), your primary concerns about the network
121

Chapter 5

will be the bandwidth considerations and the scheduling time of the deployment. However, if
your deployment will go to remote users, be sure to identify the worst case transmission line to
be dealt with. I dont mean to figure out the exact worst data line, general assumptions are good
enough at this stage. Sending a distribution to a branch office at night through a dedicated
128Kbps link will ease the concerns into the same as the hardwired scenario. If it is to remote
user dialing in, you need to understand the size of the files, the delivery method (compressed,
checkpoint restart, or bandwidth controlled), and how to handle interrupted transmissions.
Always plan on a transmission experiencing an early termination or a dirty phone line so that
youre prepared when it happens. Commercially available deployment software confirms the
transmitted file is intact prior to acting on the package. If you are scripting your own, at least do
a simple compare of the file size between the original source and the file on the target. Checksum
comparing is best in these cases.
You can find checksum utilities from any good utility site. Search for checksum at
http://Download.cnet.com or http://zdnet.com.

Windows Installer also supports a checksum confirmation using the /f switch.

For the most part, the transmission concerns are out of your hands. You really dont have much
control over what the local telephone company does with their lines. You can, however, plan
how to handle the common file interruptions that are bound to happen. Comparing the file
checksums, checking on segment completions, sending email to users about the deployment, and
making the deployment a manual pull could assist in ensuring that the download completes.
Deployment Status Reporting

Deployment status reporting doesnt need much explanation. The primary issue is ensuring you
get a status ASAP, hopefully while the user is still online. If not, you need the report on the next
connection. Yes, most commercially available deployment software resolves this issue for you. If
the collection point doesnt report back right away, a status is sent the next time the software
client can talk to your collection point. If you are scripting your own deployment package, you
need to get the data yourself.
The biggest determination is the level of reporting you require. Do you want simple success and
failure codes? Or are you looking for confirmation-specific files or verification that registry
entries have been properly inserted? If your software does not present the data you need, attach
some logic to the process to pull the data and report it in a format you like. This format is up to
you, and the possibilities are endless on how to create the report data.
Connectivity Durations

There are two types of connectivity durations: too short and long enough. Many users only
connect to your corporate network long enough to transfer whatever data they are responsible
for. Sales spreadsheets, timesheets, email, review of the corporate Web site, budget data, and
maybe the latest joke .wav file or two. Then they log off and go about their business. The entire
session could be completed in 10 minutes or so. In a day or so, they repeat the cycle. With short
connections, it can be difficult to transfer application packages if they are large.
122

Chapter 5

The long enough connections are a blessing. These users log on and stay online for hours
(sometimes days) at a time. This timeframe gives you time to do all the automated administration
tasks you would like to perform in much the same fashion as the hardwired remote user is dealt
with. You have to deal with a dropped connection or two, but you know that the next session will
be long enough to recover and continue. Obviously, the long enough connections are not a major
concern. It is the too short connection folks that are your challenge. What you do to support the
too short connection crowd easily translates to the long enough connection crowd, so Ill focus
on the short crowd.
The delivery process will depend on your standard delivery mechanism. With the numerous and
varied methods of deployments available, the answer is going to be just as varied. So the answers
and examples Im going to present to you are only suggestions, there are numerous other
methods that will work just as well. Your choice depends on your environment and structures.
If your commercially available deployment software handles remote users, the task is not so bad.
The client piece on the machine will have a trigger method of some sort: a timer that checks for a
connection to a destination address every few minutes, a listener that waits for a broadcast poll
from a server, or maybe a script to start up the commercially available deployment software
client when the user activates the dial-up script. No matter the trigger, the end result is that the
client piece talks to the deployment software and begins processing your instructions or the
updates as you have scheduled. Installation then follows your normal processes. This easy
method is another good reason to pick up good deployment software.
If your distribution is done through scripts, you will need to get creative. The final solution will
depend on how your users contact the corporate network:

If your users dial directly into the network using a modem-to-modem connection (not via
the Internet), you can set up a trigger from either end of the connection.

From the client side, you could set up a scheduled time for the computer to dial, connect
to your network, poll for any updates, and disconnect. This option works best for the
remote stationary client who is connected to a phone line at all times.

If your users are contacting the corporate network via the Internet, you can tie in to the
security application the users activate. A VPN or token synchronization appliance are two
examples. In those cases, you can activate the deployment method from either end,
though triggering it from the client might be easiest, depending on the host methods you
are using.

Looking at the modem-to-modem connection, your triggering processes will either be keyed
from the client side or the server (or corporate) side. In either case, an event will occur to
indicate a connection has been established and the deployment process can begin.
Other alternatives include having a polling process run at a regular interval or including a service
or executable that always runs and monitors various API calls or processes within the OS. If you
dont use commercially available deployment software or your deployment software does not
have a trigger method, Ive listed a couple of simple methods that can perform the functions for
you without much of a problem.
Because users will be calling in via a modem, having a script for them to use is the easiest
method. Include an after-dial script to run a process calling your custom distribution client. The
client should do a check for connectivity to a known point within the corporate network. A ping

123

Chapter 5

against a static IP, a server name, or a flag file on a server are all easy items to check for in a
loop process. After the connection is made and the known end point is confirmed as reachable,
the client piece can proceed with any downloads you have. The advantage to this method in a
manually activated dial-up situation is the automated check and response the deployment process
has. It does not depend on a polling interval that might miss a short connection window, and it
does not rely on the end user to activate a second process. It is basically all-inclusive and
functional. One downfall is the ease of editing scripts. Scripts are subject to modification by
anyone who can do modem script edits, and your deployment client might be edited out.
Although I mentioned that the dial-in script could call another batch file, it could just as easily
start a deployment service. If your client piece is configured as an executable and installed as a
service on the target machine, it can be activated by the dial script. By leaving the service
stopped until the dial up is completed, the service does not try to connect when there is no open
channel. In short, it keeps the computer from burning cycles on a process that will never succeed
in contacting the server. There are a number of methods to convert an executable into a service;
the NT Server 3.51 and 4.0 and Win2K Server resource kits all contain two utilities,
SRVANY.EXE and SC.EXE, that you can use.
SRVANY.EXE and SC.EXE are available in the resource kits. Use the documentation in the resource
kits for the syntax. Check out the following Microsoft Web sites for more help
http://www.microsoft.com/technet/treeview/default.asp?url=/TechNet/prodtechnol/winxppro/proddocs/
sc.asp and http://support.microsoft.com/directory/article.asp?ID=KB;EN-US;Q137890&.

Client pieces that rely solely on timed polling events need to be carefully adjusted and
monitored. In a timed polling process, the system periodically checks for access to a known
location. Either a ping or a query to an HTTP location is used. Obviously, if the machine is not
online, the polling process will fail. If the machine is online but not connected to the company
network, the process still fails. Setting the polling time too short could place a burden on the
client system. Setting the polling time too long might miss the connection window. When the
polling process is a service that activates on boot up, the initial queries will fail if the system
needs to dial in first.
Take the case of a remotely located laptop user with a polling service set to poll at system startup
and then every 30 minutes afterward. The first poll will meet with failure as the laptop has not
connected yet to the company network. The user dials in, gets authenticated to the corporate
network, does the normal email transfer, and disconnects from the network. 10 minutes later, the
polling service queries again and meets failure. It just missed an opportunity to connect. The
solution to this problem, assuming the polling service does not create burdensome overhead, is to
set the service to poll every 1 to 2 minutes. Leaving it to poll at startup is a good idea as the
machine may be hardwired to the LAN at a company building once in a while.
If the polling service could be activated by a dial-in script, the short polling period issues would
not be a concern. Connecting the service to the startup of the email application is another way to
catch when users are online.
On the corporate side, we will assume the users are calling into a central modem pool or a
monitored location. Im naturally paranoid about unauthorized access to the business network
and have a problem with the general user population being given the ability to dial in to private
modems. If they dial in to a central modem pool, monitoring is easier and you can prevent the

124

Chapter 5

common snooper from gaining access to your systems. (For a brief reminder about security, see
the sidebar Modem Security.)
Modem Security
One side step from the connectivity subject: modem security. If a user is calling in to your network, make
sure it is the right user! Have some sort of securitydont leave things wide open. Password access (with
a password that changes regularly), call back to a specific number, or token access are all easy to
implement and not really intrusive to the user. Be sure to monitor the logs daily. Daily monitoring of who
called in to your network is a requirement so that you know when someone has hit your network.

OK, back to the subject. Ill take the point of view that all your users call into a central modem
pool. Or maybe several geographically based modem pools. Either way, access is limited to
getting in via a monitored and controlled method.

If the dial-in security is call-back controlled, the deployment trigger script is activated
when the call back is completed. After-dial scripts are common, so this part should be
documented with the modem software you are using. After the connection is made, your
deployment method can investigate the client machine and perform your selected actions.

If the modem pool relies on password or token registration, once the access port is open
to the client, a polling script can be used to query the status of any mandatory software
updates. You would want to query against the opened port. Scanning the logs for
successful activations can trigger the call against the user ID or the machine name.
Details will depend on the security method and program you are using. Check the
documentation for methods to use.

The question of infrequent connections has been answered: You need to have a trigger activated
depending on your deployment standards and connection method. This will get the package
download started.
What about the short connection time? Now the fun starts. You need to really know your users to
decide on the proper method. How long is the average connection time? What about the average
connection speed? If all your users are coming in via cable modem or DSL and the application is
only 500Kb, chances are you wont have to worry about short connection times. The download
will happen quickly, and the user wont even know it. Problems start popping up as the package
size increases and the connection time slows. If you use commercially available deployment
software, the issue of dropping a connection during a download is addressed.
Deployment software offers two common methods of transmission support: Prism Deploy has a
unique delivery scheme that is able to download files across a 56Kbps line in a short time.
According to New Boundary Technologies, the schema is successful enough that the company
doesnt bother with check point restarts or parsing out files into multiple segments. The file
either gets downloaded completely or it does not. (I discussed the specs from New Boundary
Technologies in Chapter 4.) For most application installs, this issue wont be a problem for the
users that are online for 10 or 15 minutes at a time. Marimba uses a WinZip type of compression
and relies on checkpoint restart with checksum verification for resolving interrupted
transmissions. This method means a user can sign on for a few minutes at a time and will get a
little more of the application each time until they get the complete download.
If you are doing your own downloads, you have to deal with the problems of interrupted
downloads yourself. Some suggestions to aid in the process:

125

Chapter 5

Break up the large files into smaller chunks and assemble them on the target system after
they all arrive.

Use a compression method that squeezes the data into the smallest foot print possible.
The WinZip and PKZIP utilities are commonly used.

Send a wrapper process down first to monitor the download of the individual segments.
The wrapper would be activated by the deployment trigger and would be the one to call
the individual sections. On each connection, the wrapper would check to see what has
been downloaded, then call the next section in line. After the wrapper detects that all the
pieces have arrived, it can decompress everything and activate the installer.

Your package could be designed to transmit set files. When the package starts up, it
checks for the existence and size of the defined files before it begins the install process.

Stale or out-dated data is one big problem with infrequently connecting machines. The machine
may not connect long enough to ever fully download the package or checks in so infrequently the
data share point has changed content. If you split your packages into segments, be careful not to
overwrite older segment names with new data, otherwise a system could end up with segments
from two or three (or more) versions. Then you have the issue of remote support for a highly
confused application.
Again, the issue of stale data due to partial downloads is usually addressed by commercially
available deployment software. The processes from the vendors either reconfirm the partial
downloads or restart the download from the beginning. Either way, the vendors remove the
headache of data validity for you.
For machines that dial in but remain online for long periods of time, life is easier than for those
in the previous scenarios. You still have the concerns of the trigger piece, using commercially
available deployment software or custom created methods, and activation of the package on the
machine. The entire scenario takes on the tone of the hardwired remote user. The long connect
clients are available and can be accessed; they just take a little longer to get the data due to the
smaller connection pipe.
Small remote satellite offices or work-at-home users fall into this category. They generally
contact the corporate network often and remain online for longer periods of time (hours or days).
Their desktop machines dont travel much (hopefully), and the administration is simpler. The
primary concern has to deal with the slower line.
In all cases, ensure your deployment method has a reporting structure to report when the machine
completes the install. Because the machines dont stay online all the time, they need to report
immediately to a collection location. Trying to gather installation statistics when a machine is not
online will add extra overhead to your already busy day.
Security

Security for software deployments is an area not to be over looked. Deployment security is
concerned with network and Windows security. If you work in an organization in which the IT
responsibilities are split to different departments, staying friendly with your network staff will
pay off. If they make changes to the firewall access list and accidentally block a needed
Windows port (say the server side TCP 135 RPC port) or block a port range above port 5000

126

Chapter 5

after you have set your remote clients to use RPC calls above 5000, your remote users may
suddenly have difficulties ranging from not connecting at all to package delivery failures.
You could easily spend days investigating the distribution failures. When only one router access
list is changed, it will complicate the issue even further, causing you to experience gaps in your
hair growth as you slowly pull out the individual strands. Stay in the loop on changes to anything
in the network that could impact your data flows. Ask the network folks to include you on any
network change notifications they send out. Simply review any changes for potential impacts and
save yourself wasted life cycles in troubleshooting preventable problems.
The other primary concern is Windows security. File permissions, domain trusts, transient trusts,
and a host of other Windows security features can present unique problems to your distribution
efforts. For stationary or static machines, your only concern is the user ID permissions: can the
user access the source files or can the commercially available deployment software client contact
the proper server? For roaming machines such as laptops, your concerns multiply.
How complex is the domain structure of your environment? If your company works with one
domain, domain security aspects are not as much of a concern. When you add another domain
and populate it with users and machines, you have complicated your delivery process. The
juggling act between accessibility and install speed are two more bowling balls you get to keep
in the air when sending out distributions. As if you needed any more to deal with.
As Figure 5.1 illustrates, in the simplest form, if Laptop is part of Domain A, and the
applications source is in Domain B on a machine called Server, you need to ensure Laptop has
access to Server or the trusts between Domain A and Domain B allow machines to talk to each
other. Otherwise, the application install will fail due to Access Denied errors.

Figure 5.1: How domain trust affects deployments.

127

Chapter 5

Another solution to the same problem is to place the files on a standalone server to provide
access to the group Everyone from both domains. HTTP is becoming a popular method for
distributing files. Many commercially available deployment software products are moving
toward that direction. Either the entire deployment software process is HTTP based or it utilizes
the ability to pull the source files from a Web server. This process can provide an easier method
for complex security issues as the Web server connection can be configured independently of the
Windows domain/file security structure.
To expand a little more on the example, assume the following scenario, which Figure 5.2 shows:
Laptop is still a member of Domain A, which resides in San Diego. The distribution method
points Laptop to Server A in Domain A to obtain all the applications. Laptop travels to the
Daytona office for a long-term visit. The Daytona office is part of Domain B. All the machines
in Domain B get their applications from Server B. To make it a little easier, assume there is a
trust setup between the two domains and there is a slow link connecting the two domains
(128Kpbs or so). Are you still with me? Do you let Laptop pull its applications from Server A in
San Diego over a slow link or do you move Laptop into Domain B in Daytona to obtain the
applications faster without impacting the slow network link? Leaving Laptop in the Domain A
would be best if the Daytona visit is a short one. If Laptop will remain in Daytona for several
weeks, moving it into Domain B would be the best method.

Figure 5.2: Showing the distance Laptop must travel to get data from Domain A Server A.

As you can see, the remote user presents you with added security concerns. If your applications
are pulled from a Web server, do you require all users to connect to the corporate network to
reach the server? Or do you place the server in a DMZ and grant restricted access from the
Internet? Having the users authenticate to your network will provide a level of security for the
Web server and is highly recommended.
A word of caution about opening a distribution server to the Internet for application installs. Be very
certain your security is tight. You dont want the entire Internet using your server to download licensed
applications. The legal ramifications can be painful.

128

Chapter 5

If you opt to send applications to remote users on a CD-ROM for them to load, you now have
another facet of the security issue. Aside from the obvious issue of the CD-ROM getting lost at
the airport and someone else installing Office XP using your corporate license number, you need
to be concerned about any corporate data present on the CD-ROM. Weigh the potential of a lost
or stolen media against the importance of having sensitive corporate data available on the easily
transferred medium. Users tend to realize rather quickly they have lost their laptop with all the
data and connection ability at the airport. You can take steps to prevent the laptop from accessing
your network and begin changing any passwords that may be compromised. A lost or misplaced
CD-ROM can go unnoticed for a long time and present an open window to your company
without you knowing of it.
If you send out media with sensitive data on it, encrypt the data and keep all the passwords off
the media. Send the activation codes in an email or letter or phone call. An encrypted CD-ROM
without the activation code is useless to 99 percent of the world that might find it. Hard-core
hackers can still break into it if they find it and want to put in the effort. The issue then becomes
theft and not just a lost media situation.
The credit card industry is a great example to follow. You get a new card in the mail but it is
useless until you call in and activate it. The credit card company requires you to call in from your
home phone so the caller ID can be verified. Or they talk to you and ask for specific data to
prove you are you. The PIN is sent in a separate mailing, usually in a plain envelope with no
account data associated with it. If it works for them and the millions of users they deal with, it
can also work for you when shipping an encrypted CD-ROM of your company payroll
information to remote pay clerks.
To repeat a concept from Chapter 3, when a package is installing, it needs to have the proper
authority level. In a locked-down environment, users generally dont have the authority context
to adjust the registry. The package would need to run under a higher authority level of some
method. Security is a large issue that often comes in conflict with distribution methods. Locking
down a user ID to prevent the user or unknown users from getting access to your system(s) can
also prevent the distributions of approved packages. Windows Installer from Microsoft provides
the ability to install the packages under an administrative context. Test your installs under a
users context to ensure it works. When you are doing remote distribution to clients who will be
contacting a source location from various end points, test all the possible versions you can to
ensure the security platform is not a hindrance to the install.
User Impact

The user will be impacted no matter what you do. However, you can limit the impact as much as
possible. Your packages should take into consideration the normal distribution issues to be dealt
with as we discussed in past chapters. Remote users place an emphasis on delivery and timing.
In the section about scheduling, the issue of timing was discussed. Dark windows, cut off times,
and system critical use times were reviewed. Those are issues of user impact that can cause
problems. You dont want the package to be installed and force a reboot during the business day.
Remember if the target machine is not being used to make money for the company, your budget
cant buy all the neat toys you want.
If your distributions have any chance of causing an impact to the user, make sure the user is
aware of what is happening. Pop up message boxes, email notifications, or phone calls can be

129

Chapter 5

used to ensure that the user is aware of distributions. How much you use these methods (and
others) are up to you and how much you want the user to know of the distributions.
Lets talk about pop-up message boxes. These are wonderful items if used properly. In principle,
when a package is being installed, a pop-up box would appear indicating the status of the install,
a progress bar of the download and of the install, and any informational data the user might need.
The user then knows what is happening on his or her system and can adjust accordingly. Im
bringing this up in the chapter about remote users to emphasize the point of communicating with
the targets so that they help you out.
If a package has the potential of negatively impacting the user (causing a reboot or a termination
of a program), decision pop-up boxes would be appreciated by the users. Having the option to
defer a package keeps the users happy as you show consideration for their needs. I would
strongly suggest you limit the deferrals to once or twice and clearly state it in the pop-up box.
Otherwise, the user might never allow the application to install or reboot the system.
For large downloads that will take a while on a slow line, pop-up boxes with a download status
bar help the user. Assuming downloads are silent, the user may not know when the download is
complete, and either terminate the connection too soon or keep the connection up longer than
needed.
One option is to present a deferral option to the user with a pre-defined delay time. If they click
Later, a second box appears stating the package will activate at a specific time (such as 4:00 or
5:00 in the afternoon) or within an hour. The second box states very clearly there will not be a
second chance for a deferral. This option gives the user plenty of time to contact you if there are
issues or to plan for the impacting action. Either way, the user is generally appreciative of having
an option to install the mandatory application at a time a little more convenient to them.
If you do use deferral boxes for a package that does reboots, place a little logic into the package.
Assuming the package has done the install and only needs to reboot and the user defers the
reboot to later, your countdown timer needs to identify if a reboot was done earlier than the
program scheduled it for. The RunOnce registry key can be used to clear out the countdown
timer if a reboot happens. Otherwise, your attempt at good will is negated by the user doing a
reboot and you forcing another one later.
Pop-up boxes, while great, can be annoying if they interfere with actions. Youve experienced
the annoyance. You are in the middle of doing some complicated action and a message box
appears, taking the focus away from your active window and interfering with your work. A
minor annoyance, but one you need to be aware of. Use of pop-up boxes is good if done within
reason.
Keep in mind how you handle pop-up boxes on your own systems. When a message comes up,
do you always read the lengthy ones or just click OK or hit ENTER and take the default? The
users you are dealing with are even less likely to read and react to messages than you are. Make
the messages short and clear. If a default action could cause a problem, have a confirmation popup box verify the action.

130

Chapter 5

Remote Hardwired
Lets address the easy remote machine first. This machine is

Connected to your LAN/WAN

Physically located a distance from your location

This type of machine is in the corporate environment but located in a different location from
where you are. These machines generally stay online most of the time, have a good fast network
connection, and dont move around much. They classify as a remote machine due to the
geographically different location. The major consideration is getting the package to the machine.
Of all the remote machines you need to deal with, this machine is the easiest. Why? Your
standard deployment process can get the application to the machine (we covered this in the last
chapter) without any unusual considerations.
The common issues I discussed earlier apply to this class of machine. Take particular care about
the security aspects. Normal Windows security will apply if the target is in a different domain
from you or your package source location. Your testing should have covered the delivery process
and the application install, proving there were no problems.
Evaluate the packages. If there are reboots or major interruptions to the system that could cause
issues with the end user, be sure to take into consideration any difficulties that might be
encountered. Your delivery mechanism or the package can also deal with the common problem
of leaving a floppy disk in the drive (by turning off the floppy drive search or setting the search
order differently) if your application performs reboots. With regard to the floppy search order,
you will need to check your hardware specs, some vendors provide methods to turn it off.
Remote Stationary
This type of machine:

Does not move around much. It stays within one geographical location.

Is not part of the hardwire LAN/WAN. It depends on a connection method that is not
always on. Dial-up, cable modem, and DSL are examples of the connections used.

The main difference between the remote hardwired and the remote stationary machine is the
connection. Unlike a laptop, which is meant to move easily, the remote stationary machine is a
desktop unit meant to stay in one location most of the time. Picture the desktop units that are
taken home for remote users to work out of their homes. Or a small office with desktop units that
only connect via a modem. The issue of variable connection speeds is not a major concern
because the machines will use the same method each time. What makes this class of machine
difficult to administer is the fluctuating online status.
More of the challenges we discussed in the Common Issues section start coming into play with
the remote stationary machine:

Multiple user IDs

Questionable domain or workgroup membership

Controls on local security are not as strong or may have been comprised

Uncertain levels of software due to users having a higher level of access on their IDs
131

Chapter 5

Compared with the roaming machine, this machine group is the easier to work with. Most
machines are in a known state when they leave your imaging process, and you know how the
machine will connect to the network.
The concerns will center more on when the user connects. On each side of the extreme scale,
there is the system used at home on one end and a business unit system that stays connected via a
phone line on the other. While both pose unique issues with packaging and implementation, they
are not any different than what was covered in earlier chapters. The concern is how to get the
application data to the machine.
Im going to stereotype the two extremes for a minute. The business system is going to remain
online for long periods of time and have a good quality network connection. You will be able to
reach the machine during known connection times, say during normal business hours. Package
deliveries can be scheduled around the known connection times and easily worked with.
The home office type of machines is more of an unknown. The network line is a lower
transmission level, probably depending on dial up via a 56Kbps modem. Connection times will
not be as consistent as the business unit system, although the durations will be long enough to
support distributions. The home office side of the scale will be connecting for more than 10 or 15
minutes a day.
This class of machine begins to loosen up the controls on the system (or the controls are forced
open by the user), and your packages may begin to experience difficulties with conflicting and
unknown applications. Given security on the machine is not as tight as a hardwired machine
located in your corporate world, your packages will need to clearly define connections and
security concerns.
The transmission issues outlined in the Common Issues section will play a large role in your
distributions. Transmission interruptions will begin to occur more often than in the hardwired
machines. Calls to a central repository that has been locked down may begin to fail if your
packages dont explicitly define the access right for the connection. Pay closer attention to the
packaging and access rights needed to install the applications. Your transmission integrity will
begin to be tested but wont be as challenged as it will by the next class of machine.
Roaming Users and Machines
Roaming users and machines create their own unique issues. Ill discuss users that roam from
machine to machine in the next chapter. For this chapter, the focus will be on roaming machines.
In other words, laptops. Laptops are difficult to administer. When administrators are talking
about laptop administration, colorful adjectives often preface the description of the task. Laptops
present many challenges:

Connecting to the corporate network may rarely occur. If ever.

Laptop users may have a higher authority level than a non-laptop user. Given the users
need for flexibility in installing applications, the laptop user is given added access rights.
Maybe not full Admin level, but Power User group membership (which is nearly
Administrator) for the machine.

132

Chapter 5

Passing a laptop from one user to another is common. A laptop pool to share the
expensive asset solves many equipment purchase budget issues although it increases the
level of administrative overhead for you. Some organizations re-image a laptop every
time it comes back into the pool to reduce the influence of the previous user (and remove
the various programs that might have been installed). If the shared laptop is not reimaged each time it changes hands, the system integrity tends to diminish with each
favorite game install or customization applied.

Domain or workgroup residency may change.

The logged on user may only authenticate to the laptop and not to an NT domain or AD
structure. If the user logs on to the disconnected laptop with the domain or AD account,
the credentials are cached. This behavior can cause issues if you rely on the logon process
to apply dynamic changes to the machine. If the user logs on first, then dials in, the logon
process wont be restarted. Yes, you can force the user to log on via the dial-up process,
but be aware that most users quickly figure out how to get around this limitation.

Connection speeds vary all over the map depending on the needs and line speed at the
moment. Thus, relying on a set network timing parameter for a laptop delivery can be
difficult.

In the ideal world, the machine name would identify the laptop from a desktop unit. In
the real world, it is often difficult to identify a roaming laptop from a stationary desktop
machine. The delivery mechanism needs to have a means for identifying the machines. If
the commercially available deployment software has the machines grouped accordingly,
any checks you put in are for those non-standard imaged machines. For applications
targeted to a laptop rather than to the desktop machines, you need a fool proof method to
determine the difference. A corporate standard stating all laptops are from Compaq and
all desktops are from Dell (for an exaggerated example) would make your job easier. Any
inventory you get will identify the differences immediately. Your packages/delivery
methods could also check for vendor-specific drivers for video or network cards. For
systems created with your standard image process, a common practice is to create custom
company keys in the registry or add environment variables to identify the system as a
laptop.

To help positively identify laptops, check for the existence of unique laptop registry keys such as
HKEY_LOCAL_MACHINE\SYSTEM\CurrentControlSet\Enum\Root\COMPOSITE_BATTERY.

The roaming machine will stress your delivery process. Connection times are uncertain, the
quality of the connection will be unknown, the duration of the connection will vary, and the
process of calling source locations can be confusing. Remember the example of Laptop in
Domain A when it visited Daytona in Domain B? The machine was roaming between the two
domains but was generally static in each domain for a period of time. Keeping the laptop updated
with data and applications was a matter of sending the laptop to the proper domain location after
evaluating speed and security. What happens if Laptop travels between Daytona and San Diego a
couple of times a week? And if a large chunk of your workforce are roaming machines?
The emphasis now moves to the infrastructure instead of just the machine. Your data source
locations will need to be configured for the best access from various domains and connection
styles. Centralizing all the data in San Diego, for example, may be fine for the folks on the West
133

Chapter 5

Coast, but the employees on the other side of the country will not have the same speed. Running
the fastest dedicated network line you can afford between the Daytona and San Diego offices
will help the speed issues, as Figure 5.3 illustrates. Have the roaming machines dial in to the
closest office and connect via the infrastructure that way. Your central data store can stay central
and the users will have a good connection.

Figure 5.3: Remote users call into the nearest access area. Distributions can be based upon which access
point they call into so that the closest server is used.

For the roaming machines that have data sources statically defined and that go from company
location to company location, you still must face the trade off between speed and ease of
administration. If your company uses DHCP, one solution is to compare the IP address of the
current connection to the previous connection. By creating a master list of the IP subnets for each
location, you can redirect the source locations for each machine on a dynamic basis. If the IP is
the same, the machine can grab its data from the previous defined sources. If the IP address
changes, a script would locate the new source server and direct the machine there. The subnet
change process could be a part of the commercially available deployment software or your
custom solution. Including it in the logon process has been done. Keep the subnet source list
central so that you can update it without replication worries.
Yes, it takes a bit of time to set up. Large companies with numerous subnets will take a while to
configure the initial setup process. You wouldnt have to check each octet of the address, only to
the level your network is subnetted. If all your West Coast machines are part of at 10.x.x.x
network and your East Coast machines are part of 192.x.x.x, you only need to check the first
octet. Some commercially available deployment software products do this check for you in their
structure. For dial-up situations in which the calling machine uses the ISP defined IP, you could
either ignore the changes, which would force the machine to the last defined source location, or
you could define a default location. The speed issue would become moot at this point due to the
possibility of numerous masking schemes you would need to detect.

134

Chapter 5

Another variation to the IP checking scheme is to have all the source locations hidden behind a
URL pointer. The calling application installer or wrapper would contact the initial source
location and offer the IP address. The initial source location wrapper would determine the closest
source to use based on the IP, and send the information back to the calling program. The calling
program then contacts the defined source system and begins the install.
Sorry, no easy answers for this one. The call is yours to make, depending on your environment
needs and the needs of the users. Commercially available deployment software can provide the
answers for you in a defined process, or you can create the added details if you are creating your
own distribution method. Personally, if I were involved with a company that had the issues of
speed over location, the costs of obtaining a deployment software compared with the
administrative factor of the custom solution would help justify the deployment software
purchase.
Rarely Connected
These machines will provide all the encouragement you need to make your vocabulary more
colorful. This category includes both desktops and laptops, in your corporate buildings and at
home sites, and connecting via the hardwire LAN or the worst dial-up connection possible. The
commonality is the lack of connection. These machines rarely connect to your network. When
they do, it is with the intention of grabbing one or two pieces of data only.

Rarely connected machines may connect once a week or once a year. With few exceptions, the
machines are not directly involved in generating revenue but deal with functions such as word
processing. My experience has mainly been with personal home machines being used to dial in
and get email or a document for a user who is sick at home. I will not even begin to discuss the
security risks and the connection issues for these users. Those are pretty obvious.
For software distribution, you can assume these machines dont have recent versions of any
applications used within the company. The client software for your distribution method may not
exist on the machine. The domain residency is also in doubt.
In many cases, it is easier to manually find the needed data for the machine and send it down
after it connects. For those production-related machines that need to be updated with your
distribution method, your challenges are many. The following list provides my recommendations
to support this class of machine:

Use status boxes for downloads. Providing data to the user will aid them in determining
when they can disconnect from the network and will help prevent early termination
errors.

Ensure your packages do validity checking of the download. Otherwise, you may have
several parts of distributions spreading over several versions. Trying to install the entire
version spread will cause errors and generate support calls.

Use a pull-type technology for the software distribution client. When the client connects
and contacts the distribution points, the client piece will help sort out which packages
need to be delivered. Relying solely on a push technology may cause problems, as the
advertisements on the push server can age and terminate before the machine contacts the
server. Although this problem can happen with pull processes, it tends not to happen as
often.

135

Chapter 5

Be sure your packages are all-inclusive and not incremental in nature. Let the client
determine how much to install each time. Incremental packages work best for clients that
contact the network on a regular basis. Rare connection machines could miss several
increments, causing the package to be missing critical files. If the data being sent is
application data in nature and some increments are missed, there could be aged data
deleted in some of the missed versions. The result is unreliable data.

Many companies have set policies on vacant connection durations. If a machine does not contact
the core network in 1 or 2 months, it is not allowed on the network. With the advent of portable
token access methods (thumb prints, synchronized RNGs, and so on) and Internet front ends, it is
becoming more and more common for a user to be on a borrowed machine when they contact
your network. User may never be on a machine again, but they expect the connection to function
as if they were on their machines. Well cover the roaming user in the next chapter, stay tuned
for that one. In the mean time, be aware users can call in for assistance on machines that do not
properly belong on your network and are not configured for your methods.
Your machine access policy needs to consider how to handle the rare connection. Do you require
a known registry key or file as part of the validation process? If so, try to make your software
distribution method the key to be used. If your deployment methods are not on the machine, the
machine should not be allowed into the network. If machines are allowed on the network, do
they need to load your commercially available deployment software? The answer will be in the
expectations of the user to obtain packages and distribution data.
Setting up a common Web page that contains the packages for such users will ease the issue. The
user can then obtain needed packages in one-off situations by going to the Web page and
activating the packages manually. You can also include the distribution client on the page (or
have it as the only item there) so that the users can install the client themselves, then let the
automation take over for the package delivery. The main issue with the rare connection machine
is its unknown status. It may be a part of the domain at one time and associated with the right
groups to activate automatic deployment of any distribution clients you have. GPO and logon
enforcement methods will ensure the machine obtains the client. If the machine is removed from
the domain or AD due to lack of use and is allowed back on the network at a later time, it may
not be properly added back to the domain or AD structure. The machine may still show
residency in Domain A, but the SID is not in the accounts database, so the machine is not getting
the security tokens passed properly. Unless an administrator adds the machine back in properly.
See the problems? If you rely on a human process to get a machine included in all the right
groups to ensure the mandatory deployments are done (such as anti-virus software updates),
humans will find a method to side-step the process because they do not have time to wait.
The best you can do is to provide a number of methods to resolve this situation. Set company
policy properly, communicate to everyone on a regular basis how to ensure the rare connect
machine can be included in the software-deployment process, check your logs, and set up options
for others to easily activate the process for you (Web pages, email archives, or known source
locations).
A Real World Example
Dealing with remote users is only as difficult as you want to make it. By insuring your
application package has distribution intelligence and accounts for your worst case remote
scenario, your distributions will work well. The basic distribution system needs a client piece and
136

Chapter 5

a server location. Whether you are using commercially available deployment software or a
process you create, the distribution system needs to know when the connection is available.
In the fairly closed environment of the business world, your targets and network are of a known
quality. Thus, your distributions are going to a known quality. As an extreme case of distribution
flexibility, imagine sending your distributions out to a world-wide audience. The number of
machines are unknown, the type of systems are generically known but not the specifics, the
contents of the target systems are unknown, and the connection methods include every known
method available. Your package must be available to do client data updates on a 724 basis as
the clients call for it. The reporting process is as-of-report-date and updates a live database with
the latest information at all times. Dreaming, you say?
Check out the SETI project. This project was the first world-wide computing effort that strives to
take advantage of spare CPU processing cycles on Internet-connected computers to search for
extraterrestrial intelligence (hence, the acronym). In short, a radio telescope records data signals
from outer space, and sends the recorded bits to the University of Berkeley. Anyone wishing to
participate in the effort downloads the client piece for their particular type of computer and OS.
The client piece contacts the servers at Berkeley and downloads a chunk of the recorded data.
Processing is done on the local computer. After the chunk of data is analyzed on the local
computer, the client contacts the Berkeley servers, uploads the results, reports on the status of the
processing, downloads another work unit, and continues the processing.
If the computer contacts the Internet via modem, the client piece has options to dial out. Control
is given to dial at certain times and to disconnect after downloading the work units. For systems
that use an always-on method, the client contacts the Berkeley server as needed. Proxy
capabilities are included in the client so that firewall situations are resolvable.
This process is an example of all the discussed extremes. The program handles the reporting, the
distribution to multiple clients, the automated download when a connection is made, and the
updates to the central database with the latest data. Over 3.5 million users are registered in the
database as of this typing. The total user count is not the actual number of computers running the
client. A single registered user can run the client on multiple computers simultaneously. That
makes SETI one of the largest software distribution projects ever!
If you havent come in contact with the SETI@home project, check it out at
http://setiathome.ssl.berkeley.edu/.

Summary
Deploying to remote users is much the same as deploying using methods that we have discussed
in previous chapters. About the only deployment method that does not work for remote users is
Sneakernet. CD-ROM, email, Web, commercially available deployment software, and custom
methods all work. The main concerns are the connection methods and the length of the
connection. Make sure that your deployment strategy has a method to deal with interrupted
transmissions.
The next chapter will focus on deploying software in the enterprise. The topics will include
roaming users, metering, and management in both small and large enterprises.

137

Chapter 6

Chapter 6: Deploying in the Enterprise


Ive talked so far about creating a package, how to get the package out, and how to handle
deployment to remote users and machines. The focus so far has been from the application point
of view. Its all been about the mechanics of the process and how to make the deployment do
what you want. Ive talked about testing methodologies and about some of the different
technologies for delivery and packaging. Now along comes this chapter about deploying in the
enterprise, and youre probably wondering Hasnt this topic been discussed? Well, sort of.
The discussion up to this point has been centered on the technical aspects of getting the first
package out. The goal of the early stages of the book was to provide enough data to get your
packages up and out that first time. Although there have been casual mentions of doing
deployments in repetitive forms or multiple deployments, the main theme has been on just one
package at a time. Software deployment is not a one time function nor does it entail only the
technical details. Windows software deployment is an entire process that must be repeatable in
both the technical and procedural arenas, and the process must show a reduction in effort (and
basic expense) as the numbers of deployments continue.
In this chapter, Im going to delve into the area that all technologists dream about: Process,
procedures, and documentation. To make it sound a little more technical, Ill refer to this topic as
PP&D.
PP&D is just as critical to software deployments as the actual creation of the package.
Remember that the deployment system you use within your enterprise must be repeatable by
others, not just by you. The steps to create a package, the standards to use, the SLAs, and the
methods to use must all be known to the technical staff responsible for the work. Management
must be aware of the process as well as informed about the work youve already done. Because
you most likely enjoy taking a day off here and there and dream of an actual vacation that is not
interrupted by work calls, documenting everything to the level that others can follow is critical.
Its all about making your life just a little easier.
Before I get too deep into the chapter, lets define a few terms that Ill use frequently:

EnterpriseThis term has come back into vogue in recent years. For this chapter, it will
be interchangeable with business unit, company, division, department section, or any
other term you like that describes a group focused on making the business run. Its a good
generic term, as it can cover the large company as well as the mom-and-pop shop.

ShopsThe IT department. It can be one person that does everything or several thousand
specialists. Adjust the term to fit your situation.

Does Size Really Matter?


Does size really matter? Sure it does. When you are talking about motorcycles, bench pressing,
monitor viewing sizes, CPU speed, and RAM. When you are dealing with software distributions,
the logic and methods applied to a distribution is the same whether you apply it to 20,000
machines or 200. True, the time factor, distribution points, and network issues are increased as
the number of end points increase, but the basic structure and process remain the same.

138

Chapter 6

As a recap, remember that in smaller shops in which distributions are to a few machines (say a
couple dozen), getting things done is generally faster. Notice I didnt say betterjust faster. You
have one person that does the packaging and testing and distribution. If something happens to the
distribution, everyone in the enterprise knows where to go for resolution. With only a few
machines, the packaging may be skipped in favor of the old faithful shrink-wrapped Sneakernet
distribution with manual adjustments at each point.
In larger shops, the same distribution that takes only a day or two in a smaller shop may take
longer. The length of time depends on the processes, procedures, number of people involved, and
the companys political environment. If something happens to the distribution, the solution may
take a little longer as different groups will be involved in finding a solution. However, the entire
process becomes cost and labor effective when there are multiple remote client end points.
As technicians, chances are you have a stronger interest in the bits and bytes of the distribution
than the political side. Left to your own devices, the distribution would roll out without issues
and be done rather quickly. The larger the enterprise, the more others need to be involved in the
distributionit is in these situations that things start getting sticky. Change management, version
control, distribution notifications, corporate communication, business unit negotiations, Help
desk staff, and support technicians all want a piece of the distribution knowledge. Rightly so,
because they will all be impacted in some form. Of course, each of those departments will want
documentation in a specific form about what is going to happen and how to support it.
Documentation
No matter the size of the enterprise, your distributions should involve some form of
documentation. I can hear the common statements being muttered already: My shop supports 15
machines and Im the only one in IT, so documentation is a waste of my time. Besides, real techs
dont need documents or manuals.

Sorry to burst your bubble, but RTFM (Read the Flipping Manual) does come in handy at times.
Small shops share the same problem as large shopsturnover. You may opt at a later date to
move on to other opportunities with other companies, but someone has to support what you are
doing today. As large as the computer field is, the community itself is small. You will run into
the same people time and again at some point. You may not have met the tech that was in your
position before you, but you know who it was. Thus, after you leave your current position, the
next person will know about you. All those complaints and problems you have because the
distributions and packages were not documented can be corrected by doing some simple
documentation as you perform the rollout.
Even if you dont leave your company, a wise old techie once told me that if no one else can do
your job, you will stagnate and never move from that job. I had a great time doing DOS/VSE
(mainframe stuff) in the early 80s, and at the time, could not imagine doing anything else. Its a
little hard finding those kinds of jobs now. Make sure someone can cover you so that you can
move on to other technologies as they come out. PP&D can help. OK, enough of Career 101.
Documentation is the backbone of computers. However, not many people like to write itthe
developers dont have the time, nobody likes the way someone else wrote it, and the documents
never have the data you need to solve your problem. Look at how many books and manuals and
magazines and Internet articles are available for any major OS. Everyone has a better method of
creating the documentation and solving a problem. So how do you create a document about a
rollout so it appeases everyone? You dont. Dont even try.
139

Chapter 6

Not exactly the response you were expecting, is it? Documentation is important. It has to be
done. The larger the enterprise and the more groups that are involved, the more important the
document becomes. In the first part of this book, some samples were discussed that showed the
importance of documenting everything about a rollout. If you follow those guidelines, chances
are that the necessary answers will be available when someone needs them. However, if you are
a small shop, you may not have the time to devote to a detailed documentation endeavor. So
where do you draw the line? How much documentation is needed and how much is too much?
Look at documentation as way of preventing interruptions in your non-work life. Vacations are
only vacations if you dont really need to check in everyday to solve problems. If your company
has standards already, you only need to fill out the necessary forms. If you are creating the
standards, create documentation based on what you would like to see about a deployment you
had nothing to do with. If you satisfy your thirst for deployment details in the document, the
document is correct. Just dont assume that all facts are known to everyone. There are two
general types of documentation you will need to provide: package and distribution.
Package Documentation

There is a point in documenting a package at which more time is spent than what is needed. You
can judge a rollout by the size of the supporting documentationthe thicker it is, the hairier the
rollout. Of course, you need to decide what you want in your application documentation. I
suggest a cover sheet, conflict data, and content details.
The application cover sheet should cover these basic categories:

OverviewThe overview is a short one or two paragraph description of the application,


where it goes, and what it does. Aim this description at the non-technical level so that
everyone understands what the application does.

ContactThis information explains who to call for problems or questions about the
application and package. If the application is a custom piece supplied by a vendor, you
should provide the vendor contact data, including any contract items, costs, or phone
numbers. Be sure to specify if an internal escalation path should be used first; otherwise,
you might find your allocated incidents being used to answer questions on how to change
the desktop wallpaper.

PrerequisitesWhat is needed on the target systems to get the application? Are there any
customizations to be done to the application or package prior to distribution?

Detailed StepsDetail in short and concise sentences what needs to be done and when.
No fluff, no explanation, simple step by step instructions. If the application is set to
follow standards and is silent, say so. Screen shots are a good idea, within reason. Dont
provide shots of the Welcome screen, only the pertinent shots of decision points or where
data needs to be included. Remember that the document will be used in the heat of battle,
so clear and concise information is ideal.

Post TasksIdentify anything that needs to be done after the application is installed. Use
the step-by-step method again.

140

Chapter 6

TroubleshootingIn this section, list where to go to find solutions. If your package


creates logs, list where they are located and what each log will do for the troubleshooter.
If you know of any other places to look for help, write them down. Anything to help the
troubleshooter. You notes during testing should help write this section. Its okay if this
section is blank because you dont have any information.

Process OverviewIf you created a home-grown process, detail it here. What does each
step of the script or .exe file do?

Known Issues and ErrorsSometimes an application is rolled out with known bugs. List
them here.

Optional ItemsDetail a checklist of steps to follow and provide script listings.

Figure 6.1 shows a sample cover sheet for a deployment of Adobe Reader 5.0. As you can see,
the document is short and simple and provides basic information. It assumes that the reader
knows the standard distribution process. This document could be expanded by listing the various
scripts in detail or providing any additional requirements needed for the rollout. Because Adobe
Reader 5.0 is free from Adobe, the vendor data was not listed. The point is that the overview
document is a good spot to start with and provides the cover data for the application rollout.
Corporate use of Adobe Reader may require licensing or other legal considerations. Be sure to
contact Adobe (http://www.adobe.com) for details. This application was used as an example only.

Adobe Reader 5.0 Install


Overview
The Adobe Reader version 5.0 is used to read PDF files available in
various applications. The install on the workstation will ensure the
documents are readable without user intervention or the need to
manually activate a separate program.

Contacts
Help Desk
Chris Long

888-123-4567
123-456-7890 (Work) 602-555-1234 (Home) 602-555-9876 (cell)

Prerequisites
1) Ensure target system is online and corporate operating system image
is v.1.342 or greater.
2) Run the pre-scan against the target machine for the Problem
Definition Forms application. If the PDF application is resident on the
workstation, ensure the workstation name is appended to the Association
Fix script. The AF script will be called after the Adobe application is
installed to confirm the AF fix has been applied.

Detailed Steps
1) The application has been packaged for use with the standard
corporate distribution method.
2) Deployment targets will be identified by the Project Manager.
3) Schedule the distribution for after hours deployment

141

Chapter 6
4) The installation is silent; no added functionality required by the
user or deployment staff.

Post Tasks
1) Confirm the pre-scan collection of workstation with the Problem
Definition Forms application have had the Association Fix applied.
2) Check the Central Reporting Server under \\CRS\Reports\Adobe\AF to
confirm.

Troubleshooting
1) Installation logs are located at C:\Temp\Install\Adobe50
Shows installation steps and time of execution. Return codes are
included.
2) Application logs have been modified to reside in
C:\Temp\Apps\Adobe50
Any application created messages not available in the Event Viewer
should reside here. Application specific.
3) http://www.adobe.com/support/readguide.html
Knowledge base for Adobe Reader
4) www.microsoft.com
Review the knowledge base for operating system generated errors.

Process Overview
The installation will create the Adobe Reader application and insert it
into the Default User hive. Installation is silent

Known Issues
1) If the association to the *.PDF file extension is disabled, the
application will not be called up. Recreate the association for the
impacted user.
2) Conflicts between standard Adobe PDF extension and the custom
created Problem Definition Forms application may cause conflicts to
some users with both applications on their system. Manual startup of
the Adobe files is recommended.
Figure 6.1: A sample deployment documentation cover sheet.

Automated methods of creating the supporting application documents are another good reason
for a commercial application distribution system. Such a system can provide some of the data for
you. Save the conflict-resolution details in a DOC folder that goes with the application data. Any
logs that are generated during the package creation should be saved and stored with the
application source files. This information gives you a reference to visually review when
troubleshooting problems months lateror to hand off to someone else.

142

Chapter 6

Listing 6.1 shows a copy of the file generated by Conflict Checker Professional (included in New
Boundary Technologies Prism Deploy product). Any conflicts listed would be investigated
during testing to ensure no problems occur on the workstation images. Including this file in the
application package provides added data for troubleshooting. The generation of the conflict file
took less than a minute to create on the test system. Add another couple of minutes to save the
file off to the application directory, and inside of 5 minutes (for this example) you have a record
that will be with the package for the life of the application in your organization. Five minutes
invested during the package creation that would take much longer to recreate months down the
road.
System File Conflicts
--------------------C:\deploy\AdobeFiveO_1.PWC
AceLite.dll
397312,04/16/2001 04:39:02 PM,1.2.0.1,"C:\Program Files\Adobe\Acrobat
5.0\Reader","C:\deploy\AdobeFiveO_1.PWC"
397312,04/16/2001 04:39:02 PM,1.2.0.1,"System\Adobe\SVG
Viewer","C:\deploy\AdobeFiveO_1.PWC"
Agm.dll
1138688,09/05/2001 02:10:34 PM,4.4.26.1,"C:\Program
Files\Adobe\Acrobat 5.0\Reader","C:\deploy\AdobeFiveO_1.PWC"
1138688,09/05/2001 02:10:34 PM,4.4.26.1,"System\Adobe\SVG
Viewer","C:\deploy\AdobeFiveO_1.PWC"
Bib.dll
147456,04/16/2001 04:39:02 PM,1.0.20.1,"C:\Program
Files\Adobe\Acrobat 5.0\Reader","C:\deploy\AdobeFiveO_1.PWC"
147456,04/16/2001 04:39:02 PM,1.0.20.1,"System\Adobe\SVG
Viewer","C:\deploy\AdobeFiveO_1.PWC"
CoolType.dll
1441792,07/24/2001 08:02:54 AM,4.4.26.1,"C:\Program
Files\Adobe\Acrobat 5.0\Reader","C:\deploy\AdobeFiveO_1.PWC"
1441792,07/24/2001 08:02:54 AM,4.4.26.1,"System\Adobe\SVG
Viewer","C:\deploy\AdobeFiveO_1.PWC"
nppdf32.dll
103344,09/10/2001 03:47:38 AM,5.0.5.452,"C:\Program
Files\Adobe\Acrobat 5.0\Reader\Browser","C:\deploy\AdobeFiveO_1.PWC"
103344,09/10/2001 03:47:38 AM,5.0.5.452,"C:\Program Files\Internet
Explorer\PLUGINS","C:\deploy\AdobeFiveO_1.PWC"
Program File Conflicts
---------------------C:\deploy\AdobeFiveO_1.PWC
No conflicts found
Registry Setting Conflicts
-------------------------C:\deploy\AdobeFiveO_1.PWC
No conflicts found
Listing 6.1: An example conflict report file that you should include in documentation for later
troubleshooting.

143

Chapter 6

In addition to the conflict report file, having a detailed listing of what the application does to the
workstation is invaluable further down the road. Again, a commercial application distribution
system can provide this data for you. Listing 6.2 shows an edited file from Prism Deploy. (I
edited the sample to save space, but it shows the different sections of information from the
original file.)
You can see the type of file and registry modifications captured in the package. By including the
data now when the package is being created, you have a viewable file to reference if you are
caught in a troubleshooting session. If you had to recreate the file later, it would take time from
your troubleshooting and delay the resolution of the issue.
CONTENTS
C:\deploy\AdobeFiveO_1.PWC
C:
Documents and Settings
Admin
Application Data
Adobe
Acrobat
Whapi
CreatePDFWinColor.ico
04/16/2001
CreatePDFWinGray.ico
04/16/2001
SearchPDFWinColor.ico
04/16/2001
SearchPDFWinGray.ico
04/16/2001
WHAppList.xml
08/17/2001
All Users
Desktop
Acrobat Reader 5.0.lnk
03/23/2002
|
|
|
|
Program Files
Adobe
Acrobat 5.0
Help
ENU
ACROBAT.PDF
09/10/2001
DocBox.pdf
08/01/2001
MiniReader.pdf
09/10/2001
Reader
AceLite.dll
04/16/2001

2KB

Icon

2KB

Icon

2KB

Icon

2KB

Icon

16KB

1KB

XML Document

Shortcut

28KB

Adobe Acroba...

82KB

Adobe Acroba...

76KB

Adobe Acroba...

388KB

Application ...

144

Chapter 6
ACROFX32.DLL
04/16/2001

52KB

Application ...

|
|
|
|
HKEY_LOCAL_MACHINE
SOFTWARE
Adobe
Acrobat Reader
5.0
AdobeViewer
EULA = 01 00 00 00
TrustedMode = 00 00 00 00
InstallPath
(Default) = "C:\Program Files\Adobe\Acrobat 5.0\Reader"
Language
current
(Default) = "acrord32.exe"
next
(Default) = "acrord32.exe"
Adobe SVG Viewer
2.0
dir = "%WINSYSDIR%\Adobe\SVG Viewer\"
path = "%WINSYSDIR%\Adobe\SVG Viewer\SVGControl.dll"
Listing 6.2: A sample of a detailed listing of what the application does to the workstation.

I keep stressing to have a copy of the data in a text-readable format in a central location for a
reason. Speed to resolution in problem solving. For instance, several months and many
applications after deploying Adobe Reader 5.0, you discover a custom application is having a
problem with a DLL called SVGControl.dll. All you see in the pop-up screen is the DLL name,
but no path or reference to where the DLL is being created. As Figure 6.2 shows, on your
Windows XP system, you pull up the Search wizard, tell it to search the application source
location and look for any entries that contain the string SVGControl.dll. The search pulls up the
detailed file listing for Adobe Reader 5.0. You are now well along the path to resolving your
problem.
A strong suggestion: If possible, keep the document readable via Notepad or WordPad. Complex
documents needing Word look nice but are difficult to read on systems that dont have Word on
them. You would need to move to another machine to read the document, a machine that may
not be resident to your work location. You need to balance the level of detail with the ease of
reading.

145

Chapter 6

Figure 6.2: The results of your search for troubleshooting information.

Distribution Documentation

After the package documentation is complete, you need to detail how the distribution is going to
be done. This step is the form filling that helps get the package sent through the proper channels.
Youve already done the work, so you simply need to compile it into clear and short reports.
As Figure 6.3 shows, Ive included a sample distribution document form for you to review. As
you can see, the form takes up only one page, includes common answers that only have to be
checked if needed, and provides basic data to get started. The document shows the form
completed for a deployment of Adobe Reader 5.0. All this data is saved off to the application
source server in the application directory. Of course, the source server is backed up so that all the
data can be recovered when the server fails. (We all know that hardware fails, it is never a matter
of if, only when.)
Filling out the simple form takes only a few minutes, and it provides the basic points from which
to start a deployment. As new versions of the application are rolled out, updates are done to the
document. You can create entirely new sheets, create a copy and update the new data, or scratch
over the old data. Personally, I like creating a copy of the previous version, updating the changed
information, versioning the document, and keeping all the versions in the same place. This way
you can track changes by version.

146

Chapter 6

Distribution Sheet
Item

Value

Name of Deployment

Adobe Reader

Version

5.0

Initial Deployment Date

January 19, 2002

Base Package:

Commercial Vendor

Source location:

\\bear\source\adobe50

Programmer (if custom):

N/A

Manuals / documents

\\bear\source\adobe50\docs

Notes

Web download for


source; free Reader
version

Dependencies
Applications

N/A

%PATH%

N/A

Specific Server

No special server needed

Variables

%USER%, %DPRTMNT%

OS

Win2K, Windows XP

Corp. Base OS
Image

Version 1.342 or later

Reboot Needed?

No

Deployment Method:

Standard

Check document for


Problem Definition
Form application
issues.

Target Group(s)

All

Check with Project


Manager for target
list.

Deployment restrictions

Must be done after normal business Normal


hours.
considerations; no
special issues

Rebuild Instructions

Trigger standard repair first. If not


successful, remove/install

Figure 6.3: A sample distribution document.

147

Chapter 6

So far weve created the following documentation for the application deployment:

The overview document

Conflict listing

File / registry data

Distribution sheet

Will these four documents solve any and all issues encountered with the application? Obviously,
they wont. Will the documents enable a deployment-knowledgeable person to come along at a
later time and deploy the application properly? They shouldassuming the person is familiar
with the deployment methods in use within the company. The documentation is not a primer on
how to perform the basics of the job. If problems arise in the future, can the documents provide
help in solving them? They should be able to provide a starting point for file or registry
references along with listing any known issues.
If you are part of an organization that has been doing deployments for some time, your
documentation requirements might be more extensive to fit the unique situations within your
enterprise. If you are starting off, use the provided samples as a starting point and adjust as your
needs grow. Now, lets move into a big part of the overall enterprise strategycoordinating the
multitude of changes.
Change Management
Any enterprise, no matter what the size, needs a form of change management. It is critical for the
integrity of the applications and the environment. If possible, the change-management people
should not be the same people that do the distributions. Otherwise it becomes a case of the fox
guarding the chicken coop, and the entire process becomes a joke. Change management has a
simple directive: Review all production changes that impact the production environment and
ensure the changes dont cause outages.

That large umbrella directive is a daunting task. The larger the enterprise, the harder the task
becomes. Lets start with a mom-and-pop shop. One person does it all. Because only one person
is doing all the work, that person generally doesnt try to deploy applications while converting
the entire shop from Token Ring to Ethernet. That one person understands that the Web server is
not really down, its just being upgraded with new hard drives and memory. Anything that
happens in the small shop is generally known throughout the organization.
Now look at the large enterprise that employs 500 staff members in the IT shop. You sent out a
deployment last night and are getting reports of problems this morning. Not from everyone, just
from some end points. You start digging and after an hour (or more), you find only the clients
that were homed to a specific server failed to get the dark window deployment. A little more
digging, calling around, and casually talking to the other members of the department, and you
find the server was down for maintenance last night during the dark window. Now you have to
reschedule the deployment and perform the normal reviews again in the morning. Lets see: an
hour for basic troubleshooting, 30 minutes to confirm the server is functional for your needs, 10
minutes for the reschedule job, another hour to recover the end clients that got only part of the
deployment before the server went down, and 30 minutes to review the rescheduled deployment.
Three hours and 10 minutes wasted. And dont forget the reporting time to management on the
reason for the failure. Four hours gone from your life. Change management is a process
148

Chapter 6

(remember, PP&D) that works to prevent those wasted 4 hours. By coordinating with all areas
that impact the production world, needless outages are eliminated. Ideally, Ill admit.
Because change management is a process it does slow things down. Having to go through
another procedure and another person prevents the casual production changes that get tossed in
on a whim. Because of the process, it also tends to stop some installs. A simple tweak may not
get installed because someone decides the benefit of the tweak is not worth the effort of going
through the process. This result could be a good thing.
One benefit of change management that is overlooked is that it helps prevent duplication of
effort. If a change goes through the process, someone may realize it is identical to another project
and tie them together. Otherwise, both projects could proceed and end up stepping on each other.
Effective change-management enforcement will pay for itself quickly in terms of preventive
costs. If you figure your current environment experiences three outages a week totaling 3 hours a
week, you need to figure all the costs associated with finding resolutions:

The number of full-time employees required for troubleshooting an issue.

The number of full-time employees required to provide the fix (or fixes).

On-call phone support of your staff (plus any off-hour call-ins).

Lost income (real or potential) of the impacted application or system.

Costs of vendor support, including vendor support calls; vendor call outs; and software
creation, testing, and deployment.

If the application or system is customer interfacing, figure in the cost of the lost goodwill
from the customer. If the application directly impacts the customers, they will start
becoming wary of using your systems if they cant be sure your systems will remain
functional.

Do a spreadsheet on your own for the last outage you went through. Add up everything involved
and try to associate a cost with it. Be sure to include the pizza and soda for the late night
emergency work you did. If you havent totaled up an outage before, you might be surprised how
much it actually costs. By controlling the change process, enforcing effective peer reviews,
ensuring all the back out or rollback plans are in place and workable, change management can
reduce or eliminate preventable outages. That is the goal.
One comment about the peer review process. Make it valid. If your shop has only one or two IT
people, the review is simple. Hey Tim, check out the package and tell me if I missed something,
would you? is all it would take to get a package reviewed. If your shop is large, the review
process may involve a separate department that could require an entire process itself (which
might add days or weeks to the scheduling date). Remember I said that size does not matter? In
this case, the practical application of the peer review is impacted by size, but the concept is not.
The idea is that someone with acknowledged skills will review your entire application. This
review is not a certification step in which the application is tested against all images and
applications, but a review of the package. The peer review checks for syntax errors, logic flow,
completeness of the documentation, effectiveness of the package (is the delivery method going to
work?), and compliance with company (and/or legal) policies and standards. Even having a
buddy check your work is a good thing to run through. We so often get swallowed up in one
logic flow that we miss alternatives and overlook the simple mistakes. The situation is analogous
to spell check. When spell check runs against a document, does it go threw it two check for
149

Chapter 6

proper word use? The previous sentence made it through the spell check, but is obviously using
the wrong spelling. Another set of eyes will catch a lot of those simple mistakes.
To really make sure the entire package is correct, send it to someone that you dont really get along
with. There is nothing like having a known antagonist review your work to ensure its correct!

A danger of the change-management process is having too much interference. When the process
becomes a hindrance, a review of the process is required. Make sure all the steps that have been
added bring a value to the process and arent just included to make someone to feel important.
How does a change-management process work? In keeping with the simple directive, anything
that will impact the production environment needs to be reviewed prior to implementation. Thus,
changes and updates are scheduled long before they need to be installed. This time lets everyone
review the change request. It also forces people to plan ahead. OK, OK, OK, I know. Forcing
changes to be planned in advance is Nirvana. A strong change-management process will balance
the needs of a true emergency with the need of a Project Manager to meet a looming deadline.
As the change-management process gets better, the need for true emergency updates will decline.
To staff a change-management process, you need to have at least two technical (underline that
part) people in the shop. One peer reviews the other. Thus, the person creating the install does
not do the review and schedule the change. In a two person shop, trading off the changemanagement review hat would be expected. Larger shops would have a dedicated person in the
role. The change-management process reviews all documentation, thus forcing it to be completed
on time. And the process ensures the documentation is useable, not just slapped together.
Change-Management Request Forms

Lets go over the change-management process in a general manner. Prior to applying any
changes to the production environment, the change is submitted to the process in the form of a
request. The change request consists of

Any documentation (as discussed earlier).

A description of the change.

The scope of the change (how many clients, servers, users, and so on).

Who exactly will be impacted? Which business units?

Who is doing the change? (In a small shop, it will usually be the same person each time.)

What steps are needed to implement the change?

How is a rollback or back out performed? Is there any backup that needs to be done first?

What are the dark windows? Is the change going to be within the accepted dark window
or is it being done at some other time?

How is a rollback decided on? Does the installer make the decision? Is there a drop-dead
time needed to ensure there is enough time to perform the rollback?

What steps are needed to verify the change and who does the change?

Are any signatures needed for the change?

150

Chapter 6

Figure 6.4 shows an example form that you can use as a starting point, if you dont
already have a change request form template.
Change Request Form

1) Application name
_____________________________________________________
2) Name of submitter
_____________________________________________________
3) Short Description of the change:
_______________________________________________________________________
_______________________________________________________________________
4) Areas of impact:
_______________________________________________________________________
5) Date of install
___/___/___ 6) Time of install ___:____
AM / PM
7) Duration of install ___:____
8) Back out deadline ___:___
AM / PM
9) Installer: (name or department)
____________________________________________
10) Within dark windows? Yes ___ No ___
10a) If No, has the impacted area been notified? Yes ___ No ____
11) Critical category:
Emergency ___
Important ___

Routine ___ Informational ___

12) Peer review:


Scheduled: Yes / No
To Be Done By:
________________________________
Date ___/___/___
13) Documentation Completed? Yes ___
Application ___
Network ___
Support ___

No ____

Back out ___

14) Install actions to be performed. Attach a separate sheet or the


application documentation.
15) Detail the back out actions. Attach a separate sheet or the
application documentation.
16) Detail the verification actions. Attach a separate sheet or the
application documentation.
Approvals:
Change Management
______________________________________________________
I.T.
______________________________________________________
Figure 6.4: An example change request form template.

The Change Management Coordinator

To properly implement a change-management policy, there must be a Change Management


Coordinator. Dont rotate the duties; keep one person as the Change Management Coordinator.

151

Chapter 6

This provides the consistency needed to make the policy work. If you must rotate the duties,
keep the tour of duty 6 months or so.
The main function of the Change Management Coordinator is to do a cursory review of all the
requests and ensure everything has been addressed. The Change Management Coordinator is a
process coordinator with a good understanding of technology. The jobs main duties include:

Reviewing all the required documentation for completeness.

Keeping the change calendar accurate and available for everyone.

Ensuring that the proper people review a request for conflicts or problems.

Distributing the requests prior to the formal scheduling meetings.

Calling emergency reviews as needed.

A Change Management Coordinator must understand the technology enough to know whether
the data they collect is accurate and to get the right people involved as needed. Could the Change
Management Coordinator be an administrative assistant? Sure. Many of the duties involved
compliment each other nicely. Ive seen this double duty work in many shops; it all depends on
the person doing the functions.
Flexibility is important to a good Change Management Coordinator. Not all change requests
warrant a full process. Other changes may require added information. That is where the technical
knowledge of the Change Management Coordinator comes into play.
If you are rolling out a registry change that adds text to the Winlogon\LegalNoticeText, the
process is pretty simple. The change is not a major change to the production environment. A peer
review would ensure the script was tested and does not accidentally apply the change to a
different registry key. The back out is easy, so the overall issue is pretty simple. The Change
Management Coordinator would confirm the basic documentation was in place, the peer review
was done, and that the method of delivery is a proven method. Time of distribution is not a
problem.
Now take the same change request and apply it to a service pack upgrade. In addition to the
service pack install, you are going to apply added registry tweaks and modifications to
workstations and servers. Now you have a complicated process that will take more care in
reviewing and ensuring all the testing is done for the install and roll back. The Change
Management Coordinator is going to carefully review the request and ensure the business part of
the enterprise is aware of the request and expected install date. A little more work will be applied
to the request.
Obviously, the two examples are on either side of the extreme scale. It is important to realize the
change-management process needs that type of flexibility. If a rigid system was in place that
followed a detailed process from step 1 to step 700, making simple changes would never happen.
The balancing act is being able to adjust as needed without going too far to either side.
A good Change Management Coordinator will review all the steps, follow the procedures, and
know when to call a halt to a process or just delay it. If a critical deployment is needed and the
only thing amiss in the procedures is a missed field on a document, the deployment would not be
held up. However, if the review process shows that problems are evident, the Change
Management Coordinator should put a stop to the change until all the issues are addressed.

152

Chapter 6

The Change Management Coordinator does not need to be the sole decision maker. A committee
can be used and usually is. The members of the committee can rotate depending on the technical
knowledge needed of the request. In these cases, the Change Management Coordinator is acting as
the chairperson of the committee, not the sole decision maker.

An effective change-management process becomes the de facto enforcement arm of the IT shop.
Everyone will know what kind of fallout will happen by not following the process and that will
prevent many last-minute adjustments or rollouts. And by forcing everyone to schedule the
changes, those implementations that are not planned out will be reduced or eliminated. The key
to success is having the proper management buy-in of the process. When someone circumvents
the process, some form of retribution needs to be uniformly applied. And if the process
circumvention causes an outage, the enforcement should be swift and mildly publica town
square flogging is probably a bad idea, but making it public knowledge that someone on the
project team is in trouble might a good idea. Otherwise the change-management process is a
waste of time for everyone. Either everyone follows the process or the process should be
removed.
If a change is a true emergency, the change-management process should have a clearly defined
method of streamlining the process to facilitate a time-critical change. Review that emergency
process often to keep it accurate and not too burdensome or easy.
An Example Change-Management Process

Its time for an example of the process. Lets take the Microsoft security rollup package for
Win2K Pro. You need to get the application out to a static group of users via your commercial
application distribution system. The package has been adjusted and tested, and you have done all
the due diligence required to ensure the security rollup package will deploy properly without
issue. Your defined change-management process requires that you
1. Submit a request to the change-management group that includes an overview of the

application. The overview is high level only and will be used for general reference during
the change-management process.
2. Schedule the request one week in advance.
3. Attend a scheduling meeting to discuss the changes. The frequency of the scheduling

meeting is dependent on the number of changes the enterprise experiences. Weekly is


common for most shops. Larger shops in a dynamic environment often have daily
meetings.
4. The Change Management Coordinator will review the required documentation before the

scheduling meeting and distribute the information accordingly. Doing so gives the
attendees time to review the documents and process before the meeting.

153

Chapter 6
5. Get signatures from specific groups or people before the meeting. If another department

will be doing the distribution, you need to have their buy-in that the proposed date and
process is OK for their schedule. Because the security rollup package will require a
reboot, you need to confirm that the timeframe is within an agreed upon dark window and
that there are no changes to the window during your proposed time. The scheduling
meeting also prevents conflicts between groups; your goal for your application is to
ensure that the targeted machines are available. Scheduling a reboot on March 14th at
4:30 for the accounting department most likely will not win many friends for you (tax
crunch time for the number crunchers).
Youve submitted your proposal, have checked with major parties involved, and have your
documentation in line. Youve identified the rollback options and have had a peer review done.
Youve done the change proposal request and have all your ducks in a row. The date for the
scheduling meeting arrives. Now it is time to sweat a little.
A good scheduling meeting should make you nervous. You know you will be facing a tough
audience that will be checking whether youre prepared and youve done everything. You will
also be placed in to a negotiation stance if there are conflicts with other changes.
Another strong payback to the change-management process is that you can schedule changes to
prevent conflicts. If you are sending out changes and the network suddenly goes down, wouldnt
it have been nice to know the routers were going to be undergoing firmware updates before you
got part of your deployment rolling? The scheduling meeting will not only review the
applications for completeness, but will also be looking for conflicts and overlaps in other
changes. For that reason, it is critical to have a single scheduling meeting instead of offshoots for
each discipline. One meeting for NT, one for UNIX, one for network, or one for mainframe most
likely will not work as overlaps will occur.
The scheduling meeting begins and you are in the hot seat. The Change Management
Coordinator brings up your request (gives a little evil laugh) and begins the review process. The
group reviews the basic request, confirms that all the is are dotted and ts are crossed, and
confirms the request conforms to the standards and policies. Not technically, just in the
procedural arena first. Because you are an efficient professional, nothing is amiss. Now the
Change Management Coordinator begins the technical review. Because everyone in the meeting
has reviewed the request before the meeting (we can only wish for Nirvana), you give only an
overview of the request. You identify the groups that will receive the security rollup package,
explain that it will be sent out Friday after business hours, note that it requires a reboot which
might impact anyone working late, and tell the group that you will be in on Sunday afternoon to
review the deployment for any issues that might cause problems Monday morning. The Change
Management Coordinator opens the floor for general comments and the questions come in. After
fielding a barrage of questions, the group admits that you have thought of all the possible
problems and how to resolve them. Your request is approved for scheduling.
The Change Management Coordinator then checks the schedule and finds that the building you
are going to be sending the application to will be experiencing a power outage on Sunday for
normal maintenance. Your request is adjusted a little in that you will have to confirm the
package deployment on Saturday afternoon or evening instead of Sunday afternoon. Although
this change shortens the time of the deployment by a day, it also keeps you from wasting a trip
into the office on Sunday. And your part of the meeting only lasted 10 minutes. In summary, the
change-management process
154

Chapter 6

Acts as the enforcement arm for change control.

Prevents conflicts in scheduling.

Tracks changes.

Forces compliance with company and legal standards and policies.

Ensures documentation is complete.

Ensures back out processes are defined.

Keeps the flaky installs to a minimum.

Where is the Source?


Here is a difference between deployments in large and small enterprises: Where do you keep the
source files for an application and how do you get it distributed? When I ask systems
administrators this question, they quickly reply Oh, it is stored on server X. Everyone knows
that. Excellent. The next question: Is that source SECURED? The usual response is Huh?

Here is where the size difference comes in to play. Depending on the commercial application
distribution software you use, you will deal with three general types of source locations for
software deployment:
1. Application sourceThis source is a CD-ROM or floppy for shrink-wrap packages or a

source location for in-house created software. This source is generally the unedited and
unpackaged source data that is has not been modified for your distributions.
2. Deployment sourceThis source contains the edited and deployment-ready packages. It

is sometimes called the Golden server.


3. Distribution endpointsYour commercial application distribution software generally

likes to have a place to find the software-modified source or your custom deployment
solution has locations from which the files can be installed.
Dealing with the application source is easy. The files are generally read-only on the CD-ROM
(or floppy or downloaded file). Smaller shops generally have a desk drawer in a systems
administrators desk designated as the place to put all the CD-ROMs. The larger the shop, the
more sophisticated the storage location becomes. It moves from a desk drawer to a file cabinet.
Not much difference, just a larger storage location. As the shop gets larger, the source files move
to a server location for easier access between buildings. The source files are still resident on the
CD-ROM, so if the server location gets wiped out or the files are modified, the original source
files can be replaced. No problem so far.
Now we deal with source location number twodeployment-ready source. You have worked
hard to create the package and have it ready to go. No matter which distribution method you use,
that deployment-ready package needs to reside someplace prior to being inserted into the
commercial application distribution software or your custom method. And the prepared package
is usually the only copy around that includes all the final tweaks and modifications.
If anything were to happen to the package, your life would become very difficult. Worse, if
something happens to only one file, you could spend days figuring out what happened. Not just a
file deletion or version update that breaks things, but maybe a registry INI file is modified and a
value is changed by one digit, and the change only happens after 75 percent of the deployment is
155

Chapter 6

done. Now you have a troubleshooting nightmare. The solution is easy. Ensure the packageprepared source files are read-only and limited as to who can modify them. If that means you
burn a CD-ROM of each application and store it with your other CD-ROM source files or you
lock down the central location server, the end result should be to protect those files from any
modifications after the package is ready to go. If you rely on a server lockdown, check your
backup strategy on a regular basis and confirm that the data is valid on the backup media. A
couple of minutes each week to confirm that the backups are working will save you from trying
to rebuild a package that was created last year.
I recommend a combination of the CD-ROM and server methods. After the package is setup and
ready to distribute, I like to burn a CD-ROM copy of the application and store it in the central
corporate store. If it is a package that Ive created or worked on, another CD-ROM is created and
stored in my desk drawer for my own archives. In large companies in which duties change and
re-organizations occur on occasion, the source CD-ROM location can sometimes get lost in the
shuffle. Plus, Im paranoid and believe you cant have too many backups.
For the source server, you want to do two things:
1. Ensure everyone that needs access can get to the data when they need it.
2. Prevent unauthorized users from changing the data, even if by accident.

To accomplish these two goals, the source server needs some minor adjustments. The source
server does not need to be a dedicated box (unless your volume is that large and warrants the
cost). Because it only needs to provide file storage, nothing fancy is needed in the processor
department. Sharing the load with other functions is a good cost-saving mode, which will endear
you to the accounting folks.
Read-Only User ID

For the read-only user ID, create a userid that is used solely for read access to the source location
directory. Set the password to something easy and dont change it. Ensure that the user ID is a
simple one, either a domain user or machine resident, depending on the role of the server. For
example, a user ID called SourceRead or AppView is generic enough to be remembered easily
by the technical staff. You can set the password to be the same as the user ID to make it even
easier to remember them both. Ive seen implementations that have created department- or
enterprise-level read-only IDs. That allows further segmentation of the source directory and who
gets into it.
Why a user ID with a simple password or the same password as the user ID? It is easy to remember,
wont be locked out as much, and is for general use by all parties. It keeps the unwanted out by virtue
of the user ID and password, but still provides read-only access. You only keep out 50 percent of the
computer population.

Set the directory permissions to read-only for that user ID. Make sure you leave an administrator
user ID with full access (more about this requirement in a couple of paragraphs). Remove the
Everyone group. Yes, you could also set the Everyone group to read-only. By requiring a
separate user ID to access the data, you prevent the temporary mail clerk from downloading all
your software when he accidentally stumbles across the source location. Using a specific group
to do the same thing might work, assuming you restrict the user IDs in the group. You can use
this method to track which departments or groups are using the directories.
156

Chapter 6

Create a share name for the read-only user ID to connect to. I suggest that this is the exception to
normal share creations. Limit the access to the read-only user IDyou want to make the access
available to those that know of it, not to the entire company. (Unless that is your goal, then leave
it wide open). Make sure your technical staff is aware of the read-only ID and password.
Of course, make sure your security staff is aware of the need for and the use of the read-only user
ID. They should be aware of the process and the simplification of the password, as it might be
contrary to the security policy for the company.
You need to ensure that other groups or user IDs have access to the directory. SYSTEM needs
full access for backups and other basic OS needs. Be sure to remove Domain Admin or
Administrators from the directory access. Why? You want to control who has change access to
the directory. Create a separate group with full access. Call it CM or Release Mgmt or whatever
you like. Place only specific users into that full access group and limit the number of those users.
If the group is opened too wide, you defeat the purpose of edit control.
You have now accomplished both goals. Anyone that needs access to the source application files
can get it with the read-only user ID while only a small group is available to configure changes
to the directory and contents. You are one step closer to a Golden server concept in which the
files resident on the server are a known quality and dont get accidentally modified (or deleted).
Be sure to turn on auditing for the server and for the directory and subfolders. If there is any
discrepancy with the source content, you can use the Event Viewer to determine who was
updating that particular location. It also helps to keep folks honest if they know they are being
audited, so be sure to publish that piece of information.
Along the same lines of the packaged source location and including change-management
functions, you may want to add a few procedures to protect this location. It depends on your
environment. The larger it is and the larger the access to the source files, the more you need to
track who is doing what. Some sort of paper trail is a good thing. Possibly include in the
scheduling meeting when the files are to be moved to the application source server from the
certification group. Nothing should be on the source location without being approved by the
certification group. By having the responsible people agree when a package is ready to go, you
add greater validity to the Golden server concept. The entire enterprise then knows the files
located in the source server are Golden and are the source files for distribution.
If you place the applications from the certification group onto the Golden server immediately
after certification, there is a chance that the application may be on the source too early. The
application may not be scheduled for deployment until the following month and could be an
update to an existing deployment. See the problem? The new data could be overwriting the old
too soon or there may be dual applications on the Golden server. Which one does the field
systems administrator use? The concept of the Golden server is to be the source location for all
production applications. Therefore, dont move the files too soon.
Small or large, your enterprise should have the first two source setups: The original files and the
Golden server distribution files. If your user base is widely dispersed (across the country or
across the ocean), a geographically close copy of the source server would benefit everyone. It
would reduce the network usage and provide faster local access to large files. Trying to
download a ghosted image from Denver for every workstation you are installing in London
would take a long time. Downloading the same image to London one time when the network
usage is low (at night or on the weekend), then having the image creations calling the local

157

Chapter 6

server in London suddenly has increased the image speed, reduced the network bandwidth use,
and reduced network conflicts with other business needs. Evaluate your connections, file sizes,
and use to determine the best fit.
Mirroring

One issue with the duplicate source server is mirroring. Each source server must stay identical to
the master Golden server at all times. Without fail and without question, the duplicate must be
verified against the Golden server master on a regular basis. Lock down the duplicate servers just
as tightly as the Golden server. Possibly even tighter if you can, so the only way that new files
can be placed on the duplicates is from the master.
There are several methods available to provide the mirroring needed for the slave servers. The
commercial applications have some enhanced features that allow for real-time mirroring.
Mirroring means that any changes (additions, deletions, modifications) to the source location are
duplicated to the slave locations. This functionality requires some added capital investment.
Your ROI evaluation will determine whether mirroring is worth the cost for your situation. If you
perform large numbers of modifications to the Golden server, having such a product is worth it.
If you only make one or two (or less) modifications a week, the added cost may not be worth it.
One commercial replication solution is provided by Legato Systems. For information about RepliStor,
check out http://portal2.legato.com/products/replistor/.

As Figure 6.5 shows, you can use the NT resource kit ROBOCOPY utility for replication. Use a
release version of 1.95 or later, as it supports the /MIR (mirror) and /SEC (security) options. By
setting up an AT command on the Golden master, you can have the master server replicate to the
slaves on a fixed time schedule. Be aware that the /MIR option will delete files as well as copy,
so make sure you have the source and destination parameters set up properly. It would be
disastrous to mix up the two servers and have the Golden server overwritten by the duplicate!

Figure 6.5: You can use ROBOCOPY for replication.

Whichever method you use, be sure to copy the security settings on the files and directories so
that you dont have problems. Otherwise, plan on adjusting the security settings after the copy
process is done each time.

158

Chapter 6

When replicating to slave servers, whether via a commercial product or ROBOCOPY or other
means, dont rely on only replicating just the changes. Do a full replication of the master server
to the slaves on a regular basis. That way, the consistency of the files is always confirmed. In a
Golden server and slave server environment that experiences heavy source modifications, verify
the consistency once a week.
Verification

If the commercial application distribution software you use can reliably replicate data without
problems, verification is not needed. In fact, it may be impossible to force a replication or to
update the data outside of the commercial application distribution softwares method. You will
need to carefully review the process and watch it, especially when you first install the software.
Verification is an issue. How to do it quickly is always a concern. WINDIFF, that infamous fileverification utility is a good way to check things, but its speed is not the best for large directories
or over long distances. Check the Web for freeware utilities. ROBOCOPY works, as it only
replicates files that it believes are different, though it tends to only check the filename, size, and
date. Servers in different time zones can cause false readings. If you use the /XO (eXclude
Older) switch, it will prevent some time zone issues. Test it for your situation.
The commercial application distribution software you use may have slave servers that it uses to
speed up the distribution to the clients. Often the structure of the softwares servers is not
directly editable by anyone, so the contents are safe from accidental modification. If the
commercial application distribution software places the files in standard directories, you always
run the danger of having a file or setting modified by accident. Check into the softwares
documentation for information about having the files verified on the distribution endpoints to
keep those accidents from happening.
Be careful about locking down a commercial application distribution software distribution point.
Review your documentation carefully and check what access rights the software is looking for. If
you lock down the distribution point to only your read-only user ID and a few select user IDs,
the software (or GPO, if you use it) may not have access to directories. Make sure you dont lock
the systems out. If your software relies on service user IDs, keep those IDs functional in the
directories. Keeping SYSTEM at full access generally keeps the OS considerations functional.
Test it before you roll it out.
If you dont use commercial application distribution software for deployment but still opt to have
remote distribution points, you can use the same Golden server that I discussed earlier. Keep the
access restricted and things should be fine. The main points about the source location are:

Keep the source files locked from unauthorized modifications. Accidents happen. Dont
assume the Domain Administrators will never adjust the files. Assume a mistake will
happen and prepare for it.

Keep the original source separate from the packaged deployment source.

For replicated servers, verify the files and replicate changes on a regular basis.

Track who makes changes to the files and keep that access to a very small group.

Keep the Golden and slave (duplicate) servers consistent at all times. Dont let their
reputation ever become tainted or it will be difficult to trust the contents in the future.

159

Chapter 6
Hardware Thoughts
In previous chapters, I brought up hardware: I discussed the need to know your targets, ensure
that you test against a good representation of what you have in the target list, and have a good
understanding of the hardware drivers. The importance of this topic warrants a short recap of the
subject in this chapter.

The question often pops up whether it is better to have a mass-marketed computer or to create a
scratch-built unit. The discussion usually centers on the initial cost of the unit. The common
argument states it is cheaper to go to the local PC store and put together a system out of parts on
sale this week than spend the extra money to purchase a mass-marketed system. The technical
folks usually argue that they can build a better system cheaper with more features than can be
purchased in a pre-made configuration. To those statements, I always agree. By carefully
shopping around on a regular basis, you can save a few hundred dollars in piecing a system
together.
However, the issue is consistency. For the mom-and-pop shops that have maybe a dozen
machines, piecing together a system each time you need one and saving money is the prime
concern. Because in this type of environment most distributions are probably done via
Sneakernet, saving the money is more important.
For any organization that uses an automatic deployment method and has several machines to
deploy against, knowing what you have out there is more important than the initial cost savings.
Having a consistent and known hardware environment is important as it saves the back-end costs
of troubleshooting and having to adjust packages for one or two machines.
Suppose that your environment has 100 machines that were all built from spare parts. You dont
really know how many different video cards are out there, which driver versions there are, or
even how many different manufactures of the cards exist. For example, if you roll out a service
pack update, you cant test the video driver effectively.
Now take that same 100 machines and figure that they are all from a major maker (insert your
favorite hardware company). If it took 2 years to build up the 100 machines, you have a good
understanding of what is out there. Major makers dont bounce around much in the major
components. You will see different versions of video cards but you can be pretty certain that the
cards are from the same maker, thus the number of variances are smaller. And most companies
work to keep the drivers backward compatible within a generation or two. Instead of having to
locate the video driver for each card variance on the video card Web site, the PC maker may
incorporate the variations in a driver download.
A side note about vendor hardware: watch the model lines. Buying nothing but Dell or Compaq or
IBM machines does not mean the systems will be consistent between the various lines or within the
model line. Different model lines within the vendor may have different end-of-life schedules for
components. As a general rule, higher-end models aimed at the business world tend to stay
consistent and compatible longer than the entry-level lines aimed at the consumer market. Do your
research.

The point is that you can save money upfront to the tune of a couple hundred dollars (maybe) per
unit and pay higher back-end maintenance costs in the form of distribution rollout
troubleshooting. Or you can go for the longer term savings of lower maintenance costs in the
rollouts with a slightly higher up-front cost.

160

Chapter 6

The same goes for the servers. Dont build Frankenstein-type models and expect them to be the
same from region to region or offer identical functionality. Keeping a known environment will
solve many problems and you can adjust the packages and distribution methods accordingly
beforehand because you know what issues to expect. Consistency is the mantra to follow.
Repeatable Processes
Big or small, an enterprise gets the best cost savings (money and labor) from deployment
methods and procedures when the entire process is repeatable. The methods talked about in the
past few chapters describe how to set up a distribution method and testing environment and how
to get the applications rolled out. After youve done the first deployment, the subsequent
methods are easier to use as the setup work is done.

The change-management methods discussed in this chapterthe process and formsare time
consuming for the initial setup. After they are developed, the same steps are followed each time.
What may have taken a day to set up initially is now an executable step that takes only a few
minutes.
When you are doing the design work, keep in mind that everything needs to be done again and
again by others. Review the process with an eye toward a new person being able to read the
documents and continue the process without problems.
Software Metering
Software vendors have an annoying tendency to nag you for payments. They like getting paid for
all the copies of their software. Payment may be a flat fee, per user, per concurrent use, or by
some other rather creative method. Every contract is different, and the same software license can
even vary from company to company, depending on how sharp your purchasing department is.
Compliance with the terms of the license relies on you. Paying for a one-workstation copy and
sending it to 3000 workstations is not compliance. The software vendor and their lawyers would
have issues with such a manner of deployment.

In recent years, software piracy has been raised from the classic stealing and selling of the
software on the black market to the soft lifting of businesses not paying for all the versions they
have. Unless the software license specifically allows it, a copy at the office is not permitted for
home installation. Making a copy for archival purposes is allowed per the Copyright Act, Title
17, Section 117 of the US Code. If you arent sure about the rules for your software, check the
license very carefully.
Staying compliant with the software license is not just the venue of the budget department. With
the publicity that the Software & Information Industry Association (SIIA) has been doing about
reporting software piracy at work and other areas, doing so has become a revenge tactic for
disgruntled employees. If the Software Publishers Association (SPAa division of SIIA) comes
into your shop, your company needs to show how compliance is being done with the license
agreements. Suddenly, you are in a legal hot seat.
Check out http://www.spa.org/piracy/default.asp for details about SPAs report software piracy
program.

161

Chapter 6

You can use software metering to help avoid any conflicts. Software metering isnt just doing an
inventory of what is on the workstations in your control, but actively controlling use in
compliance with the various agreements. Life would be easier if all the license agreements were
complimentary.
The big problem that faces you is wading through the myriad of agreement terms. For the
licenses that require payment for each copy resident on a computer, all you need to do is gather
your inventory and count the instances of residence. Most commercial application distribution
software offers an inventory method, or you can do a simple check for critical files when a user
signs on. However, if you are being charged by concurrent use or you can make a copy for the
office and the home, the inventory solution wont work. Trying to figure if a copy is duplicated
at a paired home and office system or how many copies are being used at the same time at any
point can drive you crazy. How does your license agreement handle terminal server sessions?
The software is on one system but is being accessed by multiple users. Does the one-copy permachine clause work in this case or do you need a separate copy for each session? The issues
keep getting bigger and bigger.
Software metering is one solution. It not only covers the inventory aspect but can also control
who gets a copy of the program. Because your license may be based on active use, not just
workstation residence, knowing which copies are actively being used is critical. Metering has
been around for a long time. The idea is to monitor actual use, not just inventory residency. With
most metering, a high-water limit is set and enforcement is either activated or set to a warning
notice. For example, suppose application XYZ can have 3000 active users. When user 3001 tries
to activate the program, the user is locked out from use until a license opens up or a warning is
generated indicating the high-water level has been raised.
When you first install metering, it is a good idea to set it in a warning mode for awhile. You may
have licenses for 3000 users but find active use is 4000 or even 2000. By setting the metering
software to monitor and not lock out, you can find the true active use without upsetting users by
suddenly and perhaps needlessly locking them out.
Monitoring software and not enforcing lockouts or license limitations is termed passive metering.
Enforcing license limits is termed active metering.

When metering is first installed in a company, there will be problems and complaints when
enforcement of limits is activated. Over advertise the need and reason for the software to ease the
calls to your Help desk and managers.

Metering software requires an agent to be loaded on the client piece. If it is included in a suite
such as SMS 2.0, the installation is easy. Otherwise, it is another service application to roll out.
The client piece will contact a central controlling interface and relay the use on the local client.
Even if applications are only resident on the workstation, the client metering piece contacts the
central location for approval. Some metering software lets the application start while the
confirmation is being negotiated. Should use exceed the limit, the metering client may cancel the
application (annoying as it is). If the central location cant be reached, the application continues
to run. This behavior allows offline use on laptops and the like.

162

Chapter 6

Each metering software vendor has its own methods for handling offline users. Check the vendor
carefully when you are shopping for a product.

An important software-metering feature to be looked for is a VIP override switch. You dont
want to prevent your CEO or CIO from opening Excel because of a software license limitation.
Especially if it happens to be near the time for your raise. You do want them to get access but to
have the use reported to you if it exceeds the license limit. Dont allow exceptions to the license
limit. Instead monitor the excessive use and true up the license as needed.
The software-metering product should also report to you the number of users that are waiting for
a free license to become available. To keep licenses available, a timeout parameter should be set
so that a user who opens a copy of Excel on Monday morning shuts it down before Friday night.
If the user actively uses the copy for the entire time, the user has a legitimate right to it.
However, if the user simply uses the copy occasionally, a timeout parameter would catch that
and remove the license. Check to see how your metering software handles inactive users.
Getting the money to purchase metering software can be hard. Its one of those essential items
that does not bring a visible benefit to the organization. Instead, it constantly brings up the need
for more licenses, is considered an invasion of privacy, and is a software cop that prevents
people from freely using the software as they want. Try this selling point: It can save money by
pointing out a reduction in licenses is needed: When you purchased the XYZ application, the
price was based on concurrent use. Unless you knew exactly how many users would use it on a
high-water mark, the license number was probably guessed at and guessed high. Installing a
metering package and monitoring the active use, the high-water mark shows only 589 concurrent
users out of 3000 licenses for 10,000 users. Add a little for growth, then return 2400 licenses. At
$25 a copy, a savings of $60,000 is realized. Not a bad savings.
For a partial list of metering software, check out http://www.spa.org/priacy/asset/default.asp and
http://www.appdeploy.com.

Summary
Deploying software in the enterprise is a process and procedure that needs to be documented. As
techies, PP&D are areas we tend to avoid as much as possible. However, to have a deployment
system that is workable without our direct involvement in all stages, the steps need to be known
by others. The best way to get that known and repeatable process is to clearly document the
policies of the deployment use, the procedures to create and implement the applications, and the
entire process. If PP&D is effectively implemented, vacations can actually be vacations and not a
series of check-ins.

163

Chapter 7

Chapter 7: Installation Tool Alternatives


Being the expert software deployment technician that you obviously are, you keep abreast of all
the new technology. You have a list of favorite Web sites to review, you keep up on Microsoft
changes, and you know your workstations. Making new changes are not that big of a deal. So if a
new process comes along that is not compatible with your existing environment, you have a bag
of tricks available that will help you solve the problem, right?
No matter what type of deployment method you have in your environment, there will come a
time when you will need to adjust or modify the standards. To that end, you need to stay up on
the various methods and tools available to you. The biggest tools out in the Windows world right
now are Windows Installer and the resource kit utilities.
Windows Installer
If you have a Win2K or later OS on your system, you already have access to some pretty good
tools. Youve heard of Microsoft Installer (MSIit also goes by the name of Windows Installer
and MSIEXEC, which is the name of the executable). In this chapter, Ill use the names
Windows Installer and MSI interchangeably to reference the same technology.
For more information about MSI, you can do a search on the Microsoft Web site. Doing so gives you
lots of hits with several key pages to check for further details. Do the same for Windows Installer on
http://www.zdnet.com and you will get a large number of hits.

Microsoft has placed a major emphasis on the technologymost of their applications are written
to support MSI. Other companies are following suit when they create their installer programs.
Check out http://www.appdeploy.com, which has several pages devoted to the MSI world, including a
good cross reference that shows which packaging technologies are compliant (or use) MSI.

So what the heck is this thing everyone is using? In short, it is a tool that works to ensure the
consistency and viability of an application. Application installation is controlled with a standard
set of procedures. Elevating user privileges can be done within the process (if you are on the
proper OS). DLL Hell becomes a quaint term from past nightmares. (Well, not 100 percent, but
pretty close). By monitoring files, registry entries, and source locations, MSI strives to keep
applications functional.
Windows Installer 2.0 will run on Win95, Win98, Windows ME, NT 4.0, Win2K, and Windows
XP. Though native with Win2K and Windows XP, a version of the installer service is available
for the earlier OSs. Functionality is a little different for the older OSs and not all options (such as
advertising) are available for all versions; you may need to do some minor upgrading to get all
the goodies. Using a combination of an internal database, files, and comparisons, Windows
Installer can ensure that an application has all the components needed to run the application as
you packaged it. Applications can be repaired, updated, and upgraded using internal logic to the
technology without having to go through massive design hurdles to design the logic flow.
Like all technology, Windows Installer is not 100 percent foolproof. If an application is not
designed for MSI use, even Microsoft states that the repackaged application will only be
installed via Windows Installer and not truly managed by installer rules. Ill explain this caveat
in more detail later.
164

Chapter 7
Overview

Before I get too far into a discussion of Windows Installer, an overview of this technology is
needed. Windows Installer 2.0 is the current release version and runs as a 32-bit or 64-bit
service, depending on the OS and the hardware platform you are using. For 64-bit use, the Intel
IA64 hardware platform is required along with either Windows XP Pro or Windows .NET
Server. 64-bit applications are not available for installation on a 32-bit OS. Because Windows
Installer 1.1 is 32-bit based, most of the install packages available today are 32-bit. Any
application that is engineered for 64-bit use will be clearly marked as such.
Windows Installer uses a series of files and databases to perform its functions. The primary
package is contained in a file with an .MSI extension. This file contains the database and the
instructions and data needed by the Installer service to properly manipulate the application. An
.MSI file contains details about how to install, upgrade, or remove the application plus how to
change features in the application. If you look at an MSI-compliant application suite (such as
Office XP), you will see several *.MSI files listed in the setup directory. If you right-click one of
the files, you will see additional options in the pop-up menu: install, repair, and uninstall, as
Figure 7.1 illustrates. This pop-up menu gives fast access to the canned functionality of the
package. Notice that I said canned functionality.
From the users point of view, an MSI file gives greater flexibility for installs than past mass
technologies. But only to the limit the install developer is willing to offer the user. The true
power of Windows Installer lies in its nuts and bolts. All those setup files make adjustments to
the way the application is installed. The various parts of the application are called elements in the
world of MSI.

Figure 7.1: The pop-up menu options for the MSI install file are different from the standard pop-up menu
options.

165

Chapter 7

To understand the technology, I need to dig a little deeper into the terminology and logic of
Windows Installer. Within an MSI file, details about how to deal with the various elements are
included. An element is one of three general containers: components, features, or products.

ComponentA collection of the files, registry keys, shortcuts, or databases that are to be
worked on, components are considered required for install or removal and are acted on
together, not separately. Components are the smallest of the elements and are the base
level. Picture them as small modules with only a couple of files, registry entries, or OLE
registrations (or other actions) inside.

FeaturesWorking up the size ladder, a group of components is called features. During


the install (or uninstall) process, a user chooses a feature to act on. The feature would call
the proper components to perform the action. Opting to install Word Perfect Help when
you install MS Word is an example of selecting a feature.

ProductThis element is just as you expecta collection of features create a product.


MS Word is a product comprised of features.

A suite is a collection of products. The Microsoft Office suite is a collection of products. One
variance to the logic; if a native Windows Installer package is used to control the setup of the
products, the entire setup is considered a product, not a suite. So if you install just Word via
Windows Installer, it is a product. If you install Office and include the applications Word, Excel,
PowerPoint, Access (and everything else), then the entire Office install is considered a product
and the individual applications are the features. If you install each application separately, the
grouping is a suite. The key is the Installer package; any major grouping within the Installer
package becomes a feature of the Installer package. As Figure 7.2 shows, each element builds on
the previous piece.

Figure 7.2: Windows Installer element hierarchy.

166

Chapter 7

The component level is the basic building block. One of the functions for which MSI uses the
component is verification of package consistency. In other words, when a Windows Installer
based application starts up, Windows Installer can do a verification to ensure that nothing has
been removed or overwritten. For the verification function, Windows Installer does the check at
the component level. In the component, one of the files or registry entries is designated as the
keypath. When the application does a call to the component, the keypath is the part that is
actually called rather than each file. For this reason, the components are usually small.
If a file that is defined within a component is deleted, the call to the component identifies that the
file is missing; the component also defines where to go for the proper source to restore the
component pieces to operational level. That proper source location is called the installation
point. This is the location from where the application was originally installed.
Can you have a single file as a member of multiple components? Sure, if the file reference is
created within the component properly. And that is the catchthe component must be defined
properly during the creation process.
From your point of view as the administrator, knowing that a file is referenced by multiple
components is good troubleshooting basics. When a package is removed, knowing why a file is
removed (or not) can help determine why another application is suddenly breaking.
If a file is part of both Component A and Component B, and you removed Component B, the
system would know that the references to Component A still exist. For files that are shared
between products, the applications include the same component. Microsoft says that the
components are small pieces and only include resources that are directly related to the function
of the component. The MSI internal database records that two applications are using the file.
When one of the applications is removed or changed, the database tracks the change and strives
to keep the modification from impacting the other application. In other words, a series of
building blocks are tied together by the Windows Installer service, and the Installer service acts
as the traffic cop to keep everyone moving properly.
As a software deployment expert, you are familiar with the term GUID. Windows uses these
identifiers extensively to keep track of the numerous aspects of the operation of the computer. To
keep track of which application is using which component, a GUID is assigned to each
component and product. The technical terms are component code and product code, respectively.
I wont get too deep into a discussion about the use of GUIDs; just remember that a Windows
Installer database tracks which component code (such as a file) is assigned to which product
code (such as an application).
Windows Installer removes files from a system only with the other elements of the component
and when the magic reference counter (refcount) shows 0 for that file. Thus, removing an
application that is controlled by Windows Installer does not accidentally remove a file from
another Windows Installer application. In Chapter 3, I discussed the
HKEY_LOCAL_MACHINE\SOFTWARE\Microsoft\Windows\CurrentVersion\SharedDLLs
registry key? That key does a reference count on how many applications are registered to use a
DLL. The Windows Installer database does much the same, only instead of just listing the
number of associations, it can actually tell you which application is using the file. This tracking
extends past the DLL tracking and includes any component installed via the Windows Installer
process.

167

Chapter 7

Features group the components together into a logical collection. Within the installer file, the
user chooses which features to work with. Instead of the user (or you) having to figure out which
file and registry element is needed to work with those features, Windows Installer does the work
for the user (or you) by referencing the components. So selecting the WordPerfect Help feature
in Microsoft Word will install the proper components, which means that the proper files, registry
entries, and hooks into Word are installed. The grouping makes life easier for everyone.
When an application is installed, Windows Installer will provide four main choices for each
configurable feature:

Installed on local hard disk

Installed to run from source

Advertised

Not installed

The first two options are pretty clear. You can install the application to the local hard drive to run
it locally or choose to install (or execute) the application from the defined source. The source
location could be a server or a CD-ROM depending on how you have the application set up. If
you need to save space on a workstation and dont have issues with network bandwidth, opting
to install and run from the source might be the best option for you. Within a product, you could
mix the install options depending on how you see the need. For example, you could install all the
basic features locally to provide faster processing for the commonly used items. Additional fonts,
wizards, templates, and other lesser-used features could be left to install to run from source (or
install on first use). This setup provides a good mix for the end userfaster response for most
items and access to additional features as the user needs.
Advertising applications is a heavy concept in the software distribution world. When you
advertise an application in AD deployments, you essentially are telling the user that an
application exists but the application is not yet installed. When the user clicks the file icon, an
install program is activated to drop the program onto the machine or userid. Basically, consider
MSI as repairing the entire application because none of the components are present on the
system.
In Windows Installer, the same concept is available at the feature level. In Figure 7.3, which
shows a custom install for Microsoft Access 2002, notice the disk icon with the number 1 in it.
This graphic represents that the feature is to be installed on first use. Thus, the components are
not yet installed on the system, but the keypath in the features component defines where the
files are located for install. Shortcuts may be installed and OLE registration may be done,
depending on the configuration needs.

168

Chapter 7

Figure 7.3: Feature installation options.

In the highlighted graphic of the snapshot, the Additional Wizards feature is only a ghost entry
on the computer; the added wizards dont exist yet. In the course of using Access, a call to a
wizard that is not installed may be encountered. At this time, the Windows Installer kicks off,
presents a pop-up window indicating that the system is going out to get the added files
(components), and the feature is installed.
You can see how this functionality saves space on a system. Why load a bunch of features if you
dont use them? Having the space taken up on the drive by unused features only wastes the
space. If you think a feature might be used, loading it might be worth the tradeoff. Older
technology and some other systems give you the option to install a feature set or not. Because
you might have a need for a feature at some point, not loading a feature meant going through the
setup process again if you discovered that you need the option. This process is time consuming
its a hassle to find the data source and a major interruption to work. By having the advertise
ability within Windows Installer, the application loads in the feature with only a few minutes
delay. This discussion assumes, of course, that the source is located someplace convenient and
the new feature is not a major tweak that requires reboots.
Windows Installer Transforms
All this data and more are included in the .MSI file. The .MSI package is the base file system for
a Windows Installer application and will install an application in a manner and method that the
installation creator chooses. If you want to adjust those install options, a transform file is needed
to effect those adjustments without having to modify the vendors MSI. The file extension of
.MST identifies transform files.
169

Chapter 7

A transform lets you make changes to the base .MSI files at install time. Instead of letting users
adjust the installation features to their whims, you can create separate transforms for various
features, depending on the need. Creating a transform for different departments is a common
example. The Accounting Department does not need the same features of Word that the
Warehouse Department needs. By applying your group distribution methods, each department
could call a Windows Installer application that loads specific transforms to Word the first time
that Word is loaded.
Transforms are applied when an application is first installed. Transforms created from .MST files are
not used for making modifications to existing applications; those changes are done via .MSP (that is,
patch) files.
When doing GPO distributions in a Win2K Server or .NET Server environment, transforms are the
supported method for customizing the base application during the MSI-based installation process

Transforms give you access to feature sets as if you were doing the install. After the transform
modification is saved, you can create a different transform from the same base .MSI application
that could have an entirely different feature set. Saving the transforms with a reference in the
name to the reason for the modifications will help you manage the variances. This way, the Word
.MSI application can have a unique install for both the Accounting Department and the
Warehouse Department without having to create entirely separate packages for each department.
If you are deploying a commercially available application via Windows Installer, a method of
creating transforms is sometimes included. Now you will understand why Ive been using
Microsoft Office products as the examples for this chapter. The transform tools are readily
available for you to use while you get a good understanding of Windows Installer.
The Office XP resource kit and toolbox Web site
(http://www.microsoft.com/office/ork/xp/appndx/appc00.htm) has the utilities to do customizations.
The Office resource kit tools are located about halfway down the page. The executable is called
OrkTools.exe. (And yes, the executable is a Windows Installer setup.)

After the resource kit is installed, you can begin the customization by opening the Microsoft
Office Custom Installation Wizard. The welcome splash screen, which Figure 7.4 shows, gives
you the overview.

170

Chapter 7

Figure 7.4: This screen gives you an overview of the functions that the utility will perform.

The next series of screens guides you through the process of selecting the base .MSI file, naming
the MST file and location, and selecting various options. You dont need to save the .MST file to
the same location as the .MSI file. In fact, if you are going to do many transforms for the base
application, you might want to create a separate directory in which you can save the transforms.
Ive selected the word.MSI file stored on my server for customizing and have instructed the
program to save the transform file called WordTest.MST to the C:\RTP directory. For this
example, Ive changed the feature installation state for the Help for WordPerfect Users to Not
Available, as Figure 7.5 shows. All other features remain as they are currently configured.

Figure 7.5: Disabling the feature Help for WordPerfect Users.

171

Chapter 7

One type of Microsoft Officespecific file needs a quick mention at this point; the OPS file. This
file contains default custom user settings for applications that are applied to a computer. These
settings are mostly the configuration options in the Tools, Options menu and include such
common items as toolbar use, menu options, and positioning of toolbars. You can create the file
with the Profile Wizard from the resource kit, and import the settings into the transform. If
youre not familiar with or dont want to use the Profile Wizard (an administrator-level
function), you can get the same results from the Save My Settings Wizard (which is for the user
level). What is configured is dependent on the INI file settings. (See the Help file in the Profile
Wizard for more details.) In this case, Ive opted to use the Microsoft default settings, as Figure
7.6 illustrates.

Figure 7.6: Default settings page.

The next major screen, which Figure 7.7 shows, gives you the option to customize several user
settings for the products that the transform supports. The screen indicates that These settings are
applied to all users on the computer and overwrite existing settings. After the transform is
applied, the settings become active.
Be careful when you are in this screen. If you change a setting and decide that the setting isnt
correct, simply backing out or canceling the action does not really mean the change has not been
written to the transform.

Be sure that what you have changed is what you really need to use. Click Help and review the
information in the screen for more details.

172

Chapter 7

Figure 7.7: In this screen, most of the configuration options are changed in the Office XP transform editor.

Subsequent screens step you through adding or removing files, adding or removing registry
settings, modifying security settings, specifying any server locations, including additional
programs, and choosing any setup properties. You then reach the end, and by clicking Finish,
save the .MST file. At the end of this transform-creation process, a sample command line is
given to you about how to include the transform, as Figure 7.8 shows.

Figure 7.8: The summary screen provides a sample of the MSI command line needed to include the .MST file.

173

Chapter 7

For a complete discussion about Windows Installer properties, download the Windows Installer SDK
at http://msdn.microsoft.com/library/default.asp?url=/library/en-us/msi/wiport_6gf9.asp or
http://www.microsoft.com/windows/reskits/webresources and select Windows Installer SDK).

If you needed to create other transforms that are similar but have minor adjustments, open the
same .MST file, make your adjustments, and save the transform with a different name. This
method lets you easily create multiple transforms that have different default save locations.
Transform creation GUIs are different between applications and vendors. The previous example
was used to help show the process. Different vendors will create different transform utilities (if at
all), and even within the same vendor, the various products could have their own GUIs that differ
greatly from each other. Which features you are able to modify depends on what the developer is
willing to create for you. Normally, if the option is part of the install process, the transform GUI
will have the same option defined.
Can the MST file be viewed without the transform utility? Only if you enjoy looking at garbled
data. The Office XP resource kit has a Windows Installer Transform Viewer that lets you view
the data in a Notepad format. You need to specify the base package (.MSI file) and the
associated transform (.MST file). The WordTest transform that I created (which had only a
single change within it) produced Listing 7.1 from the Transform Viewer. All the settings listed
in the file will be applied during installation of the Office.MSI file if the transform is specified in
the setup command line. You can also specify the MSI file in the GPO customization tab when
you define the package properties in the GPO. Take some time to review the listing. You can see
the GUIDs of the product codes clearly listed along with the setup properties. The section in
which the Help for WordPerfect Users change is listed is boldfaced in this listing. You can use
listings such as this for troubleshooting problems.
Enforce Validation Flags: False
Base package: S:\Office10\WORD.MSI
ProductCode: {901B0409-6000-11D3-8CFE-0050048383C9};
ProductVersion: 10.0.2627.01; UpgradeCode: {001B0000-6000-11D3-8CFE0050048383C9}
Transform: C:\RTP\WordTest.MST
Expected values - ProductCode: {901B0409-6000-11D3-8CFE-0050048383C9};
ProductVersion: 10.0.2627.01; UpgradeCode: {001B0000-6000-11D3-8CFE0050048383C9}
Validate Major Version
Validate Version is Equal
Validate UpgradeCode
Ignore Error of AddExistingRow
Ignore Error of DeleteNonExistingRow
Ignore Error of AddExistingTable
Ignore Error of UpdateNonExistingRow
CREATED - OCW_Opt_Props DisplayName (s128*)
Value (S0) ActualName
(s128)
Type (I2)
+
ALLUSERS
2
ALLUSERS
8
+
ARPCOMMENTS
ARPCOMMENTS 12
+
ARPCONTACT
ARPCONTACT 12
+
ARPHELPLINK http://www.microsoft.com/support
ARPHELPLINK 12
+
ARPHELPTELEPHONE
ARPHELPTELEPHONE 12
+
ARPNOMODIFY
ARPNOMODIFY 14
174

Chapter 7
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+

ARPNOREMOVE
ARPNOREMOVE 15
ARPNOREPAIR
ARPNOREPAIR 16
COMPLETEINSTALLDESCRIPTION
<Default>
COMPLETEINSTALLDESCRIPTION
11
CUSTOMINSTALLDESCRIPTION
<Default>
CUSTOMINSTALLDESCRIPTION
11
DEFAULTREMOVECHOICEDESCRIPTION
<Default>
DEFAULTREMOVECHOICEDESCRIPTION
11
DISABLESCMIGRATION
DISABLESCMIGRATION
17
NOFEATURESTATEMIGRATION
NOFEATURESTATEMIGRATION 18
RUNFROMSOURCEINSTALLDESCRIPTION
<Default>
RUNFROMSOURCEINSTALLDESCRIPTION
11
RUNFROMSOURCETEXT <Default>
RUNFROMSOURCETEXT 11
StrContactInfo
StrContactInfo
12
TRANSFORMSSECURE
TRANSFORMSSECURE 19
TYPICALINSTALLDESCRIPTION
<Default>
TYPICALINSTALLDESCRIPTION
11
TYPICALINSTALLTEXT
<Default>
TYPICALINSTALLTEXT
TYPICALUPGRADEDESCRIPTION
<Default>
TYPICALUPGRADEDESCRIPTION
11
TYPICALUPGRADETEXT
<Default>
TYPICALUPGRADETEXT

11
11

CREATED - OCW_Strings
Name (s64*) Value (s128)
+
Msi_ProductVersion
10.0.2627.01
+
Msi_UpgradeCode
{001B0000-6000-11D3-8CFE-0050048383C9}
ALTERED - Feature Feature
Feature_Parent
Title Description
Display
Level Directory_ Attributes Lock (I2)
OCW_DisableRFS (I2)
OCW_DisableJIT (I2)
<>
WORDHelpForWPFiles
100{1}
4{20}
DATA CHANGE - _Validation
Table Column
Nullable
MinValue
MaxValue
KeyTable
KeyColumn
Category
Set
Description
+
Feature
Lock Y
0
1
Lock
+
Feature
OCW_DisableJIT
Y
0
1
OCW_DisableJIT
+
Feature
OCW_DisableRFS
Y
0
1
OCW_DisableRFS
+
OCW_Opt_Props
ActualName N
Identifier
Actual Name of OCW_Opt_Props property-like
record
+
OCW_Opt_Props
DisplayName N
Identifier
Display Name of OCW_Opt_Props property-like
record
+
OCW_Opt_Props
Type N
Integer
Type of OCW_Opt_Props property-like record
+
OCW_Opt_Props
Value Y
Text
Value of OCW_Opt_Props property-like record
+
OCW_Strings Name N
Identifier
Name of OCW_Strings property-like record
+
OCW_Strings Value N
Text
Value
of OCW_Strings property-like record
DATA CHANGE - ActionText
Action
Description Template
+
OCW_Create_AppDataFolder
Removing temporary working files
DATA CHANGE - Binary

Name

Data
175

Chapter 7
+

OCW_CPYF.DLL

Binary.OCW_CPYF.DLL

DATA CHANGE - CustomAction


Action
Type Source
Target
+
OCW_Create_AppDataFolder
1
OCW_CPYF.DLL
_OCW_Create_AppDataFolder@4
+
OCW_INST_LOC_NEW 51
INSTALLLOCATION
[ProgramFilesFolder]\Microsoft Office
+
OCW_INSTALL_MP_ADDED_CONTENT 51
OCW_INSTALL_MP_ADDED_CONTENT
yes
+
OCW_INSTALL_MR_ADDED_CONTENT 51
OCW_INSTALL_MR_ADDED_CONTENT
yes
+
OCW_INSTALL_UP_ADDED_CONTENT 51
OCW_INSTALL_UP_ADDED_CONTENT
yes
+
OCW_INSTALL_UR_ADDED_CONTENT 51
OCW_INSTALL_UR_ADDED_CONTENT
yes
+
OCW_SET_COMPANY_NAME
51
COMPANYNAME RealTimePublishers
DATA CHANGE - Feature
Feature
Display
Level Directory_
<>
WORDHelpForWPFiles
4{20}

Feature_Parent
Attributes

Title Description
100{1}

DATA CHANGE - InstallExecuteSequence


Action
Condition
Sequence
+
OCW_Create_AppDataFolder
(NOT AppDataFolder) AND
(OCW_DestDirUsesAppData OR OCW_UserSettingsUsesAppData OR
OCW_AddFileUsesAppData OR OCW_ShortcutUsesAppData)
799
+
OCW_INSTALL_MP_ADDED_CONTENT $OCW_Added_Content_MP=3 AND
OCW_AC_REGKEYPATH_FOUND_MP)
1399
+
OCW_INSTALL_MR_ADDED_CONTENT $OCW_Added_Content_MR=3 AND
OCW_AC_REGKEYPATH_FOUND_MR)
1399
+
OCW_INSTALL_UP_ADDED_CONTENT $OCW_Added_Content_UP=3 AND
OCW_AC_REGKEYPATH_FOUND_UP)
1399
+
OCW_INSTALL_UR_ADDED_CONTENT $OCW_Added_Content_UR=3 AND
OCW_AC_REGKEYPATH_FOUND_UR)
1399
+
OCW_SET_COMPANY_NAME
NOT DONTUSEOCIWORGNAME 799

(NOT
(NOT
(NOT
(NOT

DATA CHANGE - InstallUISequence


Action
Condition
Sequence
+
OCW_Create_AppDataFolder
(NOT AppDataFolder) AND
(OCW_DestDirUsesAppData OR OCW_UserSettingsUsesAppData OR
OCW_AddFileUsesAppData OR OCW_ShortcutUsesAppData)
999
+
OCW_SET_COMPANY_NAME
NOT DONTUSEOCIWORGNAME 999
DATA CHANGE - LaunchCondition Condition
Description
+
ReleaseType <> 1 [CANNOTRUNCIWTRANSFORMS]
DATA CHANGE - Property Property
Value
+
CIWVersion 10.0.3228
+
COMPANYNAME RealTimePublishers
+
DISABLEFEATURECONDITIONS
Yes
+
OCW_INST_LOC_NEW [ProgramFilesFolder]\Microsoft Office
+
REMOVELPK
0
+
TransformType
Customization
<>
SKIPREMOVEPREVIOUSDIALOG
1{0}
Listing 7.1: Transform viewer output.

176

Chapter 7

Could you manually make modifications to the .MST file and execute it that way? You could.
However, unless you are sharp on the Windows Installer variables and values for the application
as well as the interrelationships of the entries, I suggest sticking with the GUI method.
Windows Installer Patches
Remember that the .MST file is used for initial setup tweaking. After you have an application out
to your clients and you want to make adjustments, Microsoft says that you need to create an
.MSP file. The patch file (.MSP) modifies the .MSI information. The advantage of the .MSP file
is the ability to modify the .MSI file without requiring a fresh install of the application. The
patch can be a simple data change or a complete upgrade. Whereas the .MSI file contains all the
databases and data stream of the application, the .MSP contains a database transform that
modifies the .MSI database. Patches are generally created by the initial developer of the
application and deployed using your usual deployment methods.

Although you, as the deployment administrator, might never create a patch file, understanding
how it works when you get one from your application vendor is needed for your troubleshooting
skills. In shops in which multiple job functions are combined, the packaging side of your duties
might require you to create a patch file.
Fixing Damaged Applications
In the past couple of chapters, one of the many minor points that was raised is how to repair an
application remotely. If a user removes files accidentally or other applications overwrite files
needed for another application, how do you deal with the resulting damage? If you write your
own distribution method, this situation can reduce the number of hairs on your head very
quickly. Commercially available delivery systems (CADSs) have numerous methods for
handling repairs. Some work, some dont. Windows Installer addresses this issue.

Two main functions are available in Windows Installer files when working on damaged
applications: Rollback and Repair (or Verify). Rollback is putting a system back to a known preinstall state. During application installations, if the install fails, Windows Installer controlled
setup will attempt to remove all the changes back to a known state. Windows Installer keeps
track of the changes as they occur and will create a rollback file for replaced files. After an
install is complete, the rollback files are removed from the system. Rollbacks are generally
performed automatically by the setup logic.
A rollback is not always possible. If changes to a schema are performed, the changes are in the
system for good or bad. If an application is running with custom programs, the logic of the
custom program needs to account for the rollback possibilities. You are at the mercy of the
developer in those cases.
Repair is a part of the verify process. When a product is launched, it automatically does a
component verification based on the keypath data of the component. If the keypath is not in a
known state, Windows Installer attempts to replace the keypath data based on the source location
in the component.

177

Chapter 7

A little clarification on this point is needed. As always, the level of performance that the MSI
process does is dependent on the level of intelligence that the developer applies to the package. If
the developer of the MSI package does not specify full repair abilities (such as version and
corruption checking), the repair option will check for existence of the keypath and apply a repair
process only if the keypath is not there.
You can also trigger a repair function from the command line. By specifying the repair property
within the parameters of your command, you can force the application to do a full repair.
However, if the user has customized the application and you have not taken this fact into
consideration, the users tweaks could be removed and replaced with the data from the .MSI and
.MST files. Of course, that may be the goal of the repair. Using this feature works great in
training situations in which you want to return an application to a known state between classes.
Be sure to test the repair function and fully understand what is being done before you trigger it
globally.
Check out http://msdn.microsoft.com/library/default.asp?url=/library/en-us/msi/wiport_6gf9.asp for
details about repair functions. There are several considerations for using this feature properly,
including the ability to prevent rollbacks.

Windows Installer Elevated Privileges


A major advantage of Windows Installer packages is the ability to elevate the security context of
the install process. If your users are locked down, running installations at their security level
could prevent the successful installation. With Windows Installer, you can adjust the security
context for the duration of the package installation. Because users of Win95, Win98, and ME
already have administrative rights on their systems, elevating privileges is not available to those
folks. For the rest of the Windows users, this ability solves many problems for distributions.

Right now, to fully use the elevation principle, you need to be using Group Policy distributions
within Win2K Server or .NET. Other deployment methods are beginning to support the elevation
concept but implement it differently. Check the documentation on your CADS for the details.
To turn on the elevated rights option, adjust the local registry (the same key applies to the
HKEY_LOCAL_MACHINE hive):
HKEY_CURRENT_USER\Software\Policies\Microsoft\Windows\Installer
AlwaysInstall Elevated = REG_DWORD:00000001

Creating a Windows Installer File


If you have a package that is not a native Windows Installerbased application and would like to
take advantage of the functionality of the Installer functions, there are many methods available to
do the conversions. Several third-party applications are available and more are coming along all
the time.
You can get a list of third-party applications that support .MSI files on the Web. Authoring tools are
also included in the lists. To get you started, check out http://www.appdeploy.com,
http://www.microsoft.com, and http://www.zdnet.com.

178

Chapter 7

Many of the major software companies provide support for creating Windows Installer files in
some form or another. If you decide to start creating your own Windows Installer setup
applications, make sure you fully understand your needs and review the products available
before you settle on a packages. A few of the companies that have Windows Installer creation
capabilities include New Boundary Technologies, Wise Solutions, InstallShield, Microsoft (of
course), and Veritas.
New Boundary Technologies Prism Deploy provides the ability to create Installer packages.
After you create a Prism Deploy package and save it as a Portable Windows Change (PWC) file,
you can create the Installer file. This method gives you some advantages over a standard
Windows Installer package. You can use the snapshot abilities of Prism Deploy to get an
accurate package. Using the Adobe Acrobat 5.0 package created in Prism Deploy from a
previous chapter, I converted the PWC package into an .MSI package.
To do so, open the Prism Deploy Editor, and select the PWC file of the package, in this case, the
AdobeFive0_1 package was selected. From the Package menu, select Create Windows Installer
File, as Figure 7.9 shows.

Figure 7.9: Starting the Windows Installer creation process within Prism Deploy.

The process will then ask for basic author data such as package name and the name of the
manufacturer (company name). After entering this data and clicking Next, the editor begins the
process of converting the PWC formatted file into the Installer format. Status messages similar to
those that Figure 7.10 shows give you a progress report.

179

Chapter 7

Figure 7.10: Status messages presented during the Prism Deploy Windows Installer conversion process.

After a few minutes, the Windows Installer Conversion Results window appears with a status of
the package process. Any errors listed should be investigated and resolved before you use the
resultant .MSI file. In this case, the messages listed in Figure 7.11 are warning messages that are
indicating differences between the Prism Deploy setup and the Windows Installer process.

Figure 7.11: The results screen from the Prism Deploy Windows Installer conversion process.

180

Chapter 7

Clicking Close closes the conversion window. When you complete the conversion process, you
end up with an .MSI file in the chosen directory, as Figure 7.12 illustrates.

Figure 7.12: Snapshot showing the Prism PWC and Installer packages.

Running an Installer File

After you have the package created, you need to be able to run the application on the target
system. The command-line format to do so is rather simple
msiexec /i \\server\share\filename options

To install the Adobe package I just created, the target machine would run
msiexec /i \\server\sharename\AdobeFive0_1.msi /qb

where the /qb option sets the user interface to the basic level. You can include logging options,
an .MST file, and parameters for the properties in the command line or included files. For a
complete list of the options and the requirements for each, review the Installer Web site for
details (http://msdn.microsoft.com/library/default.asp?url=/library/en-us/msi/wiport_6gf9.asp).
There is a large amount of data available about Windows Installer. The preceding information
will hopefully give you enough of an understanding to start delving into the data pile.
Resource Kits
Whether you need to create a simple distribution package or just run a simple script to your
workstations, you might need some utilities to create the package for you. Using the proper
resource kit for the OS you are targeting is a time-saving method as many functions are already
created for you. As the software distribution guru of your company, you should be aware of the
various utilities in the resource kits.

Many of the utilities found in older resource kits work within new OSs. Some utilities written for
NT 3.51 still work with Windows XP. Additionally, some of the older utilities that worked so
well in the older technologies have been updated for each succeeding OS as needed. As with any
utility you work with, test it to your satisfaction before you release it into the production world.
181

Chapter 7

If you havent played with the resource kits for your OS, you should take a few hours away from
the demands of the day and play. Excuse me, I meant you should enhance your contribution to
the departmental goals by proactively fine-tuning your skills and enhancing your knowledge of
OS functionalities to meet your quarterly objectives in a timely manner. Everyone knows youre
playing productively, it just looks better on the status reports using larger phrasings.
Two good Microsoft sites to visit for resource kit information include
http://www.microsoft.com/windows/reskits/default.asp and
http://www.microsoft.com/windows/reskits/webresources/default.asp.

Resource kits are a collection of utilities that have been written to perform various functions. Not all
the tools are from Microsoft programmers, and support for the tools is not always available. Microsoft
states throughout the resource kit documentation that support is not provided and the products are
used as is. Microsoft is mainly doing distribution of the tools that have proven effective from the
companys viewpoint. Although most are safe and dont cause problems, you need to prove that to
yourself first. With that word of caution, we can proceed.

After you start using the tools, several will become staples in your growing arsenal of utilities.
Some help with distributions, some with customizations, some with data gathering, and others
with data manipulation. In just the Win2K Server resource kit, more than 300 tools are included.
Many of the resource kits (and many of the individual tools) are available on the Microsoft Web
site for free.
Some of the tools available in a resource kit are not functional tools but references to
documentation or information for your use. Much of the information files can be found in other
areas of the Web. Keep searching for those pearls of wisdom. Overall, the kits are essentially a
requirement for anyone doing serious support work for a Windows environment. Because the
tools in the resource kits are not fully supported, their structure and user interfaces can be unique.
It was quite common when the resource kits first came out to notice typographical errors in the
Help files and instructions. But the tools work well and are worth using. Many of the tools are
command-line driven, some are GUI-based. Most can be used remotely to distant machines or
combined with other resource kit tools to create custom utilities for your needs. As an example
of the mix that you can do with resource kit tool versions, Ive included a simple reportgathering script for fun.
One point before we get into the script example: The process used as an example can be done via
numerous other methods. There are other ways to obtain the same data. The point here is to highlight
the ease of use the resource kit tools can provide to solve a problem. With a skeleton script in place,
adding resource kit tools into the method can give you fast data to solve problems. When creating
application packages to solve problems when your CADS does not provide the functionality you need
for the task, a resource kit utility may be just what you need.

Here is the scenario for out example: You need to identify whether a certain hotfix has been
applied to the NT workstations that are currently online. Additionally, youll need to gather the
information from the hotfix registry key. (An assumption is made that the userid being used to
run the script has administrative authority on the target machines in the queried domain.)

182

Chapter 7

As a modular quick-run script, the script is actually two scripts: Listing 2 shows SPRAY.BAT
and Listing 3 shows HTFX.BAT.
REM ** SPRAY.BAT **
@echo off
REM ** Generic dynamic spray script.
REM ** Input variables.
REM ** %1 is the name of of the domain to check.
REM ** %2 is the name of the batch file to spawn.
REM ** Housekeeping. Create a report directory.
REM ** If an report dir exists, clean it out.
if not exist .\report md .\report
if exist .\report\*.txt del .\report\*.txt
REM
REM
REM
net

** Create the source to use.


** Assumes the common name of workstations start
** With \\NT??????? for a max of 10 characters.
view /domain:%1 | findstr \\NT > %1.txt

REM ** The loop generator.


for /f "tokens=1" %%i in (%1.txt) do call %2.bat

%%i

REM ** Report time.


echo . > .\report\Report.txt
echo Total machines searched >> .\report\Report.txt
find /c /i "\\NT" %1.txt >> .\report\Report.txt
echo . >> .\report\Report.txt
echo Total entries found >> .\report\Report.txt
find /c /i "Report" .\report\good.txt >> .\report\Report.txt
echo . >> .\report\Report.txt
echo Total Bad connections >> .\report\Report.txt
find /c /i "failed" .\report\BadC.txt >> .\report\report.txt
REM ** Pop up the final report summary
start notepad .\report\report.txt
:End
Listing 7.2: The SPRAY.BAT file.

183

Chapter 7

REM ** HTFX.BAT **
@echo off
REM ** Check for connection to the target machine
If NOT exist %1\c$\boot.ini goto :BadC
REM ** Remove the slashes from the NETVIEW generated name.
set MCHN=%1
echo %MCHN%
set MCHN=%MCHN:~2,10%
REM ** Do the work. Save the output to a file for each machine.
REM ** This allows research per machine if needed.
dumpel -l system -e 4359 -m NTServicePack -f .\report\%MCHN%.txt -s %1
REM ** Find the trigger keyword for the report
find "Q300845" .\report\%MCHN%.txt >> .\report\Good.txt
REM ** The searched for string is checked, grab the entire HOTfix list
for reference.
regdmp -m %1 "\Registry\Machine\SOFTWARE\Microsoft\Windows
NT\CurrentVersion\Hotfix"
goto :end
:BadC
REM ** Report that a NETVIEW found machine could not be connected.
echo %MCHN% connection failed >> .\report\BadC.txt
:end
Listing 7.3: The HTFX.BAT file.

The process is started by calling SPRAY.BAT with two operandsthe domain to review and the
work script to feed the machine names into. SPRAY.BAT is used as a shell for other small
scripts so that you have the same front end and only need to adjust the core work script.
The NET VIEW command is used by the script to gather the list of machines available in the
domain browser list for the target domain. The browser list is not 100 percent complete, it shows
only machines that have contacted the browser and announced their presence. As there can be
different browser masters depending on the network, using NET VIEW will show only the
machines that are online and talking to the same browser master that you are. In practice, the list
shows between 95 percent and 99 percent of the online machines when you do a NET VIEW
statement. It depends on your network and segmentation factors.
The NET VIEW statement pipes the results to a FIND command that searches only for machine
names beginning with \\NT, assuming all the NT workstations are named NTsomething. The
results of the FIND command are fed into a domain.txt file for later use. SPRAY.BAT then
parses the domain.txt file one entry at a time, and feeds the machine name to the core work batch
file called HTFX.BAT.
HTFX.BAT uses a simple test to see whether it can talk to the target machine. It checks for the
existence of the C:\boot.ini file on the target machine. There are only four results possible from
the check:
184

Chapter 7
1. The target machine is online and reachable
2. The target machine is not online
3. The script does not have authority on the target machine
4. The target machine does not have a boot.ini file

The script only needs the first condition (online and reachable). Any other condition is not a
concern of the script. Failed connections are recorded in a bad connection log file. After
HTFX.BAT confirms that the target can be reached, the resource kit utility DUMPEL is run.
This utility is useful and has been around since the NT 3.5 resource kit. The Win2K Server
version (dated 12/99) is the one used for this example. This utility can obtain data from event
logs and parse the information into different formats. This ability lets you place the event log
information into spread sheets or other databases for massaging as you need. DUMPEL has
options for changing the separator character, changing the output results, filtering, and selecting
which log to use.
This script grabs any system events related to hotfix installs and sends the results to a text file
that starts with the machine name. This information all goes into a directory called REPORT for
ease of data collection. As the script is tailored to search for a particular hotfix number
(Q300845), a quick search to the saved off file is done. After the FIND /C command completes
the filtering, another resource kit utility is called to dump the registry for all hotfixes. The
REGDMP utility (from Supplement 4 of the NT resource kit) is called in case the event logs
happened to wrap and the installed hotfixes have rolled off. REGDMP is one of several REG*
utilities that provide a simple means of gathering registry data or manipulating the registry
contents.
After the data is gathered for the target machine, HTFX.BAT ends and returns control back to
SPRAY.BAT. After the entire domain.txt file has been individually processed, SPRAY.BAT
does a fast count of the results and presents them in the form of a notepad report. If you have a
CADS, the hotfix data may already be available in any inventory report the CADS generates.
Additionally, most CADS will provide methods to gather the same data dynamically from inside
their processing methods.
REGDMP and DUMPEL are both resource kit utilities that were originally designed for older
NT-based OSs. For this example, I ran the script from a Windows XP Pro workstation to an NT
4.0 SP6 workstation, a Win2K Server, a Win2K workstation, and to another Windows XP
system. All four systems returned the proper data as expected without problems. Thus, dont
limit yourself to only the resource kit for your particular OS.
You can remotely install services by using other resource kit tools: the command-line INSTSRV tool,
which is great for scripting needs, or the GUI-based SRVINSTW tool, which guides you through the
process.

If you need to remotely install a service, the SRVINSTW.EXE tool can do the trick. The steps
are pretty easy:
1. Copy the source files for the service to the remote machine. Place them in the proper

directories depending on the needs of the server.


2. Start SRVINSTW and follow the prompts. (Figure 7.17 shows the startup screen.)

185

Chapter 7

Figure 7.17: The startup screen for SRVINSTW.exe.

3. When the service asks for the source location, be sure to use the remote machines point

of view. Files placed on the remote machines disk should be referenced by C:\, not a
UNC or network connection, as Figure 7.18 shows.

Figure 7.18: Be sure to specify the proper source location from the remote machines point of view.

4. After the wizard completes, start the service via normal remote service install methods.

Another resource kit tool that you may have already used is the Remote Command Service.
RCMD is a UNIX-like command-line tool that provides access to a client. It requires installation
186

Chapter 7

of a service (RCMDSVC.EXE) on the client, and the service must be running on the target
machine before you can start the service.
RCMD needs the RCMDSVC.EXE file copied to the target machine first, then the RCMDSVC
service installed on the target machine. You can use either of the previously mentioned tools to
install the service on the client if it isnt already installed. As RCMD logs you onto the machine
using the userid you are currently using, your userid must have the proper access level for the
target machine.
RCMD is a great scripting and troubleshooting tool. It is limited to command-line aspects only.
Any command you enter from the machine youre on will run as if you were physically at the
target machine. A Windows XP machine can gain access to any other Windows machine via
RCMD.
For software distributions, you can use RCMD for triggering scripts for silent installs, activating
AT commands, or making modifications to directories. At times you might find that performing
functions on a target machine works better than attempting to do the function remotely. One
example is installing software remotely when the source is closer to the target than to you. Using
RCMD to gain access to the target machine, map a drive via the NET USE command to a source
server, then activating the silent install can speed the process. If your install package was not part
of your software deployment method and you had no other way to activate the install, RCMD is
a fast solution. The goal is to have different methods to perform the needed functions.
Be aware that RCMD is a little buggy and there are various versions out there. Commands entered
via RCMD must run without user interaction on the target machine or the machine hangs. If a
command calls up a GUI window, you will never see the window and the RCMD session is hung until
the window is closed. That same hang condition happens if a pop-up window, such as an error
message, happens. In scripting, you need to test the logic as RCMD might handle things a little
differently than you expect.

The big consideration to remember with RCMD is to execute the commands locally with the
local drive mapping logic. Because the RCMD session will not appear to the user, you can come
in under the covers and execute PSTAT or TLIST or KILL commands for troubleshooting
processes, but you cant see what the user is seeing. It is not a remote-control service, just a
remote execution. The overhead for RCMD is lower than for remote-control services.
When scripting, you can copy a batch file to a known location on the target machine, then have
your script call the batch file as if you were on the system. The command
rcmd \\machine c:\temp\run.bat

will connect to machine, execute the c:\temp\run.bat command and return focus back to your
machine to continue on with your script. This process is a down-and-dirty method to make
simple changes or activate processes on remote machines.
Resource Kit tools are not just focused on the distribution world. You can find utilities for
managing AD, monitoring the network, monitoring API calls, verifying your cluster,
manipulating the registry, manipulating services, and gathering hardware data. As I mentioned
earlier, there are more than 300 utilities in just the Win2K Server resource kit. Instead of trying
to cover all the utilities from all the resource kits, Ive listed some of my favorites that have
proven useful at one point or another within my software-distribution experiences (see Table
7.1).
187

Chapter 7

Utility

Comments

APIMON

Monitor API calls; great for troubleshooting

DELSRV

Delete services installed on clients

DIRUSE

Obtain data on a directory structure; great for checking for size limits when
space is an issue

DRIVERS

Locate data on installed drivers; great for pre-checking systems when


preparing packages

DUREG

Check the size of registriesnot just the space, but the actual data size

EXTRACT

Expand cab files

GETSID

Obtain the SID of two different userids

GPRESULT

Determine the impact that a GPO has on a userid

HEAPMON

Troubleshoot unknown issues or occasional hangs in processes or systems

IFMEMBER

Use in logon scripts for group membership branch logic

INUSE

Replace system reserved files great if you create your own installers

NOW

Determine what time is it NOW

OH

Determine what handles are open; great for troubleshooting

OLEview

Check out OLE and COM stuff

PSTAT

Determine how many processes are running on a system; this utility helps
locate problems

RPCDUMP

Check the RPC side of the network

RCMD

Get console access to a remote machine; has some limitations but works well
for most command-line needs

Robocopy

Mirror and filter very quickly; only copies what it needs to (if the file exists as
you directed, it skips copying it over); great copy utility

SCOPY

Copy the security aspects of directories and files

SOON

Run a process inside the next 24 hours (like the AT command)

TIMETHIS

Determine how long it took to run a process

Whoami

Check a userid prior to running a script

XCACLS

Modify security parameters for directories; good for new machines or resetting
older machines to standards

Table 7.1: Some useful resource kit utilities.

188

Chapter 7

Summary
It is good to have a standard deployment method and to use it as much as possible. Being aware
of other options and possibilities expands your scope and abilities to perform those one-off jobs
that creep up once in awhile. Many of the tools needed to do simple distributions or data
gathering are available free on the Web.
Although every deployment method has its own interface and rules for use, Windows Installer
has an increasing presence in the deployment field. As a result, even if you dont use it or plan
to, you should still be familiar with it and how it works. Commercially available applications
may only provide setups within the Installer framework, and understanding the technology will
assist you in creating the application package and deployment design that best fits your
environment.
Resource kits are a wealth of tools that are needed in every administrators bag of tricks. The
documentation may not be the best for all the tools and not every tool will fit into your
environment. However, the little gems that you find will quickly become a staple for your daily
administrative functions.

189

Appendix

Appendix
Chapter Summaries
I like having a short summary of chapters for reference books. Aside from the compiled index,
the summary helps me in grabbing the overall thoughts of a chapter when I need to review a
book for a single piece of information. This review is kept very simple, just the highlights in a
note format to help me scan for data.
Chapter 1: The Foundation of Software Deployment
Provided a historical review of software and deployments.

Discussed linking files/libraries (both dynamic and static).

Explored DLL hell and how it impacts installations.

Provided a general overview of licensing, deployments, testing, and ROI.

Discussed the deployment life cycle.

Chapter 2: Conformance Evaluation


Began reviewing software deployment concepts. The three main items covered:

AcquisitionIncorporates the process of verifying whether the software is


necessary and achieving a plan of deployment.

DistributionIncludes delivery, maintenance, and reporting of the software


packages.

SupportEncompasses the responsibility of maintaining the existing software


in a productive state for the end user.

Introduced the test environment concept.

Discussed the standardization of images and how to enforce it.

Reviewed repackaging, retooling, and scratch package creation.

Discussed image delivery (push, pull, advertise, and so on).

Reviewed software management:

InventoryKeeps a record of what is currently installed and by which user.

DeliveryProvides a means of getting the install package to users


computers.

LicensingKeeps a record of in-use vs. available licenses.

ReportingCreates a variety of status reports.

WarehousingPhysically provides storage space for distribution images.

Managing componentsPerforms a limited automated support role for the


distributed software.
190

Appendix
Chapter 3: Repackaging
Reviewed the repackaging process.

Discussed testing, which generally involves three levels of computers:

A clean test computer is one that has the core OS installed, all drivers are
present, and any required general network settings done.

A baseline test computer is built on the clean system and has all the service
packs, patches, user accounts, Group Policies, and other existing applications
applied that make it look like a normal system in use in the target
environment.

The working test computer is the end result after the new application or
software has been applied and is functioning.

Described that when you are performing your tests, being able to roll back to the baseline
state (or clean, depending on the type of testing) is important. Scripting the levels of
application installations can be done if needed.

Discussed that when testing, keep backups of everything. Dont overwrite the sole source
of the application.

Explained that you should know your target environment, know what is out in the
production environment, understand both the hardware and software levels to perform
valid testing.

Described the questions to ask during the beginning of the packaging process.
Understand the expectations of the package sponsor.

Explored how to document the install and package as you go. Provide enough data in the
documentation to assist with troubleshooting 18 months down the line.

Explained how snapshot software provides a comparison of your test system before and
after installs. Use it to confirm what the install programs are doing to your systems.
Review the results with a careful eye as some of the changes may not really be needed
and may cause serious problems when committed to target workstations.

Outlined the eight steps of packaging:

Create a base rollout specification.

Run the native install program and incorporate the results into the
specification.

Interview team members and submit the first pass of the rollout specification.

Take a snapshot of the application on a clean machine with the required


baseline.

Profile the application for linked libraries.

Process the snapshot and profiling results into the distribution package.

Update the rollout specification.

Test and iterate.


191

Appendix
Chapter 4: Methods for Deploying Software.
Outlined six general deployment methods:

SneakernetManually installing software to each machine.

Simple scriptingCan be used to enhance more complex methods or used


solo for special projects.

EmailCommonly used but hard to track for compliance and reliability.


Either the package is in the email, a link is provided, or instructions are given
for how to do the install.

WebUsed with other methods for delivering applications. A link is provided


for access or another method calls the Web-based location to provide the
application.

Image inclusionThe easiest to ensure that applications are installed and


clean. The application is included in the image when it is laid down; however,
the image is hard to update in a timely manner without causing issues to the
end user.

Third-party solutions aboundMicrosoft also has suggested solutions. Which


option is best depends on your needscheck them out carefully.

Discussed that when it is time to roll out the application, ensure the testing was done to
the proper environment and roll it out in a controlled manner to prevent the unseen from
appearing.

Finally, discussed that you need to check the deployment. Have a reporting method of
some type to confirm the applications rolled as you expected to the target audience.

Chapter 5: Deploying to Remote Users


Defined remote as a definition, not always a condition. A remote user can be in the next
building or the next state.

Described that line speed plays a big part in your deployment methods. The size of the
deployment package can impact the slow line speed connections.

Explained how security in remote deployment is equally as important as line speed. Make
sure the application goes to the intended machine.

Explored how user impact is only an issue if the deployments are long or if bandwidth is
impacted for other applications.

Grouped remote users into four types:

Remotely hardwired machinesConnected to the LAN/WAN but in a


location some distance from your deployment center.

Remote stationaryThis machine is not part of the LAN/WAN and does not
move around much (for example, home machines).

Roaming users and machinesLaptops and their users; you never really know
when and where they are going to connect.
192

Appendix

Rarely connectedThese machines rarely connect to your network and often


are only online for a short time when they do hook up.

Chapter 6: Deploying in the Enterprise


Defined deploying software as not just the technical aspects. The Process, Procedures,
and Documentation (PP&D) of a company play just as large a role.

Warned you to document everythingthe package, the process to roll it out, the method
of deployment, how to fix it, and what the targets are. The data will come in handy at a
later time during troubleshooting issues or when a package from last year needs to
deployed again.

Explained how to use your packaging software to help create the package documentation.

Implemented a change management process. The change management group should be


the overall controllers of change in the enterprise to help prevent conflicts and do
scheduling among widely spread groups.

Described how to control the source locationkeep it golden; not only the primary
source the package was created from, but also the source of the final deployment
package. Only a few people should have access to make changes to the golden source
packages.

Advised keeping an eye on your hardware. Know what is out there and strive for
consistency that you can account for in the deployments.

Keep the entire deployment process repeatable for any deployment. Minor
adjustments are expected, but the overall process should stay known and
consistent.

Software metering is becoming a larger issue. Investigate the need for license
compliance in your environment.

Chapter 7: Installation Tool Alternatives


Explored how Windows Installer (MSI) is a major player. It pays to become familiar with
it even if your use is low.

Used the Office MSI and transform processes as an example; however, the methods are
similar to other applications. As MSI is flexible for the developers on the tools and
processes, expect variances in implementation and support of MSI-compliant
applications.

Explained how resource kits provide many tools that can assist in improving deployment
methods.

193

Appendix

MSI Commands
Windows Installer installations are called via the msiexec.exe command. Use the information in
Table A.1 for quick reference about the options and parameters of the command line.
Option

Parameter

Comments

/I

Package

Installs the product.

/f

[p|o|e|d|c|a|u|m|s|v] Package

Repairs the product. The default


is 'pecms'.
pReinstall if a file is missing.
oReinstall if a file is missing or
an older version of the file is
installed.
eReinstall if a file is missing or
the currently installed file is an
equal or older version.
dReinstall if a file is missing or
the installed version is different.
cReinstall if file is missing or
the stored checksum does not
equal the computed checksum.
aForce a full file reinstall.
uRewrite all required user
registry entries.
mRewrite all required
computer-specific registry
entries.
sOverwrite existing shortcuts.
vRun from the source point
and re-cache the local package.

/a

Package

Admin installInstalls a product


on the network.

/x

Package

Removes the product.

/j

[u|m]Package or [u|m]Package /t
Transform List or [u|m]Package
/g LanguageID

Advertises the product.


uAdvertise to the current user.
mAdvertise to all users of a
machine.
gLanguage ID.
tApply the transform to the
advertised package

/L

[i|w|e|a|r|u|c|m|o|p|v|+|!]Logfile

Logging optionSpecifies the


path and data to log.
iStatus messages.
wNon-fatal warnings.
eAll error messages.

194

Appendix
aStart up of actions.
rAction-specific records.
uUser requests.
cInitial UI parameters.
mOut-of-memory or fatal exit
information.
o Out-of-disk-space messages.
pTerminal properties.
vVerbose output.
+Append to existing file.
!Flush each line to the log.
"*"Wildcardlog all information
except for the v option. To
include the v option, specify
"/l*v".
/m

filename

Generates an SMS status .mif


file. Either -i, -x, -a, or f needs to
be specified.

/p

PatchPackage

Applies a patch.

/q

n|b|r|f

Sets the UI interaction.


q, qnNo UI.
qbThe basic interface.
qrReduced interface.
qfThe Full interface.

/y

module

Calls DllRegisterServer to selfregister modules from the


command line.

/z

module

Opposite of the /y command; unregisters the modules.

Table A.1: MSI command-line options and parameters.

MSI Error codes are lengthy in size. One good place to identify what the codes are is the
Microsoft Web site (http://www.microsoft.com).

195

Appendix

Deployment Tools
The list of tools that can do deployments is ever increasing. By now, you have some tools that
are favorites; Table A.2 lists a few others to look into.
Tool

Description

http://www.kixscripts.c
om

An enhancement to KIX32 that comes in the resource kit; RWK Systems has
added new functionality and smoothed some of the older processes. Check out
the Web site for more information.

kix32

Part of the Windows NT 4.0 resource kit, this scripting process provides
functionality for doing simple scripts. Though some folks claim KIX is a dying
language, remember the same thing was said for COBOL. It is worth checking
into.

Windows Script Host


(WSH)

No surprise here, the Microsoft product is making headway into the Windows
world. Providing a method to tie in Jscript, VBScript, API calls, and other hooks
from other languages, WSH gives you a fast method for creating enhanced
scripts beyond the old standby of simple batch scripting. Check out
http://msdn.microsoft.com/library/default.asp?url=/nhp/Default.asp?contentid=28
001169.

QChain

There will come a time when you need to install multiple hotfixes in a single run.
With the increasing number of patches being released each month, chances are
you have already run into the annoying requirement of rebooting between each
hot fix install. Microsofts QChain eliminates the need for most of the reboots.
Many hotfixes need to update files that are in use by the system and cant be
modified immediately. When the system is rebooted, the hotfix marked file
replaces the previously-in-use system file. When you install multiple hotfixes,
you run the danger of having the same file replaced with an incorrect version.
QChain reviews the list of marked items and keeps them straight. In your
package, execute QChain after all the hotfixes have run and before you reboot
the system. For more information, check out the Microsoft article Use
QChain.exe to Install Multiple Hotfixes with Only One Reboot (Q296861).

Table A.2: Deployment Tool Options

196

Appendix

Web Resources
Although far from exhaustive, the information in Table A.3 will get you started in your quest for
software deployment expertise.
Resource

Description

http://www.spa.org

The home site of the Software & Information Industry Association


provides good references for metering and license compliance.

http://www.appdeploy.com

Good site for general searching of software deployment issues.


The site stays current on new products, provides some hints and
tips about deployments, and has a good collection of tools.

http://www.newboundaries.com/

This site provides good information and tools for packaging and
deployment (makers of Prism Deploy).

http://www.marimba.com

This site provides good information about packaging and


deployment.

http://www.wise.com

This site provides good information about packaging and


deployment.

http://www.dependencywalker.com

Access to the freeware utility (currently version 2.1) that


investigates modules (exe, com, dll, and so on) and presents a
view of the dependent modules as well as other views. Good
troubleshooting tool when you need to get into the nitty gritty.

http://www.systemtools.com

Makers of Hyena, a tool to ease management of your enterprise


that works well with deployment methodologies.

http://desktopengineer.com

Administration site with many articles and tips.

http://www.swynk.com

Primarily an administration site for Microsoft products, this site


has good information about deployment issues, although the
main focus is Group Policy Object (GPO) and Systems
Management Server (SMS) deployments.

http://www.symantec.com

This site provides drive replication software to reproduce disk


images.

http://www.powerquest.com

This site provides drive replication software to reproduce disk


images.

http://www.installshield.com

This site is the home of InstallShield.

http://www.winscriptingsolutions.com

This site provides information about Windows scripting.

http://cwashington.netreach.net

This site provides information about Win32 scripting.

http://www.userfriendly.org/

Classic computer humorno operating system is immune!

http://www.zdnet.com/downloads

This site provides all kinds of downloads (freeware, trials, demos,


and so on).

http://www.rational.com/products/test
foundation/index.jsp

This site provides information about the Test Foundation for


Windows 2000 (provides tools for testing software applications).

News groups

Check your local news group server for some off-the-cuff help.
However, the answers are not always from experts, so take the
advice with a strong dose of caution. Some suggested search
words include Microsoft, deployment, windows, windowsinstaller,
wise, installshield, and installer.

http://www.microsoft.com/smserver/d
efault.asp

This site provides information about SMS deployment.

http://www.microsoft.com/technet/tre

This site provides a good overview starting point for Microsoft


197

Appendix
eview/default.asp?url=/TechNet/prod
technol

product information.

http://www.microsoft.com/technet/def
ault.asp

The Technet home page.

http://www.microsoft.com/windows/re
skits/default.asp

The resource kit home site for Microsoft products.

http://www.microsoft.com/windows/re
skits/webresources/default.asp

This site provides greater detail about the resource kits and the
contents of each in a table format.

http://www.microsoft.com/windows20
00/techinfo/reskit/en-us/default.asp

The Microsoft site for online Windows 2000 resource kit manuals.
Server, professional, registry reference, performance counters,
GPO, error messages, and a glossary are all included.

Table A.3: Software deployment resources.

198

Glossary

Glossary
Acquisition
The process of verifying whether the software is necessary and achieving a plan of
deployment.
Application Documentation
See Package Documentation
Application Source
The unedited and unpackaged data for applicationswhat the packaging process starts with.
Assigned Applications
An application that is available for users but not installed at user sign on. It is installed
when a user clicks the application icon.
Baseline Test Computer
A test computer that is built on a clean computer and has had service packs and any
required patches applied and user accounts, Group Policies, and any other existing
applications installed that you are likely to see in the end-user environment.
Change Management
A process to prevent conflicts in deployments.
Change Management Coordinator
A central contact that provides coordination in the change management process and
ensures that the processes are followed.
Clean Test Computer
A test computer that has the core OS installed, all drivers installed, and any required
general network settings configured.
Conflict Resolution
The process to resolve problems identified during a review process.
Conformance Testing
Testing to verify that software applications function with existing software.
Deployment Method
How an application is distributed.

199

Glossary
Deployment Source
Location that contains the edited and deployment-ready package.
Distribution
The delivery, maintenance, and reporting of software packages.
Distribution Documentation
A document to detail the deployment method and source location of the application.
Distribution Endpoints
Your commercial application distribution software generally likes to have a place to find
the software-modified source or your custom deployment solution has locations from
which the files can be installed.
DLL Hell
An annoying residual effect of installing multiple applicationsa situation in which each
application installs its own DLL files. Version conflicts, overwrites, and unforeseen
modifications can result. Deployment software in recent years is focusing more and more
on controlling this problem.
Elevated Privileges
When applications are installed on a client system, the installer may require privileges to
the computer at a higher level than the user context (such as getting edit access to the
registry). Windows Installer has a method for elevating the privileges of the application.
If the deployment method relies on an installed service, the service can be installed with a
userid (or system access) that has elevated privileges.
Email Deployment Method
Aside from the obvious use for sending information, email deployment can send links or
executables (for example) to users.
Enterprise
A generic term that describes a business unit, company, division, or departmental
division.
Explicit Linking
An executable will attempt to load any needed libraries when the application calls for the
file.
Image

Generally, a snapshot of the computer operating system.

200

Glossary
Image Inclusion Deployments
A deployment method that packages applications into an image snapshot. The application
is deployed by the act of imaging a workstation.
Implicit Linking
The list of libraries an executable needs is located within the header of the executable.
Installation Point
Location where the application was originally installed.
Mass Deployments
The process of distributing applications to all end points in one deployment.
Package Documentation
A form that contains data needed by the deployment group to get an application out; it
should be customized for your particular environment. Some suggested headings:
Overview, Contact, Prerequisites, Detailed Steps, Post Steps, Troubleshooting, Process
Overview, Known Issues and Optional Items. Its primary focus is the application, not the
distribution.
Peer Review
A good practice to catch errors prior to a deployment. After the product or application or
deployment method is completed, a technically knowledgeable person that was not
involved in the process reviews all aspects, looking for errors or conflicts. Having
another set of eyes (and a different viewpoint) can find overlooked areas.
Phased Rollouts
A process of sending applications out in small sections.
PP&D

Process, Procedure, and Documentation.


Published Application
An application that is available to the user but not installed at user sign on.
Pull Technology
A distribution technology that primarily relies on client end points triggering the
deployment event.
Push Technology
A distribution technology that primarily relies on servers (distribution points) triggering
the deployment event.
201

Glossary
Redistributables
Libraries that are needed and not included in the original operating systemthe libraries
are contained within the software application.
Remote Users
Users not physically located in the same location as the deployment starting point.
Repackaging
The process of getting a software application prepared for deploying to your
environment.
Resource Kit
A collection of utilities focused on a particular product.
Rollout
The overall process of getting an application distributed.
Rollout Team
The group of people involved in the creation of the deployment application.
Shared Resources
Basically anything an application will need to function, including (but is not limited to)
file extensions, user document workspace, ActiveX controls, Open Database
Connectivity (ODBC) databases, drivers, fonts, shortcuts, DLLs, and so on.
SLA

Service level agreement, which is a document that describes the relationship between the
owner of the application or process and the support organization. Although the
documents content is very flexible, the agreement normally details the acceptable outage
durations, who to contact on both sides, when dark windows are allowed, critical times
for the application to be online and any processes needed to resolve issues. Documenting
the backup process and what it takes to restore the data is also a good inclusion item. By
detailing the information ahead of time, conflicts are prevented or at least more easily
resolved.
Snapshot Software
Software used to take a status image of an application or operating system.
Sneakernet
A deployment method that describes the manual method of deployment.

202

Glossary
Software Metering
Process to control and monitor software licenses.
Source
The starting point; where the data is located.
Standardization (or Standards)
A set of criteria that all applications abide by to ensure compatibility and mutual
functionality.
Target Systems
The distribution end-point computers.
Test Computer
Computer used for testing.
Web Deployment
A deployment method that provides a Web page with links. Users click the link and the
application is installed.
Windows File Protection
WFP is a process in Windows 2000 and later that ensures the core operating system files
arent inadvertently overwritten.
Windows Installer Transforms
A method to modify Windows Installer files.
Working Test Computer
A test computer that has the software application installed and functioning properly. It is
the final and desired state of the testing process.