Beruflich Dokumente
Kultur Dokumente
30
Reg. No. :
30
2.
3.
What are the merits of Squirrel cage Induction generators for wind energy
conversion?
4.
5.
6.
7.
30
4
1.
8.
List out the issues to be addressed while integrating the solar PV systems with
grid.
9.
10.
What are the merits of Hybrid RES over the isolated RES?
PART B (5 16 = 80 marks)
(i)
(ii)
(b)
12.
(a)
(ii)
(a)
30
11.
(8)
(8)
(a)
(i)
Draw the block diagram of the solar PV system and explain the
principle of operation in detail.
(8)
(ii)
30
13.
(b)
Or
(b)
(a)
(i)
AC voltage controller
(8)
(ii)
(8)
(i)
(ii)
30
4
14.
(b)
Or
(i)
(ii)
(8)
97946
(i)
Explain the need of Hybrid systems for the renewable energy power
generation.
(5)
(ii)
(b)
(a)
30
15.
Draw the block diagram of the Hybrid Renewable energy system which
integrates Wind energy system and Solar PV system and explain the
operation in detail. Also explain the issues and challenges in the
operation of Hybrid systems.
(16)
30
4
30
97946