Sie sind auf Seite 1von 6

Uniclass2 Entities by form table

This table classifies construction entities according to their


physical form

10 BRIDGES AND VIADUCTS


10_10 Arch bridges
10_20 Cable stayed bridges
10_25 Cantilever bridges
10_50 Moveable bridges
10_50_10 Bascules
10_50_70 Retractable bridges
10_50_75 Swing bridges
10_50_80 Tilt bridges
10_50_90 Vertical lift bridges

10_70 Simple span bridges


10_70_10 On abutments
10_70_15 On access towers

10_75 Suspension bridges


10_90 Viaducts

15 BUILDINGS
15_20 Floating buildings
15_50 Mobile and temporary buildings
15_50_20 Demountable buildings
15_50_50 Mobile buildings
15_50_80 Temporary buildings

Draft: September 2013 (V4)

Uniclass2 Entities by form table


15_ 70 Permanent buildings
15_90 Underground buildings

20 CABLES
20_10 Buried
20_70 Suspended

25 CONTAINING STRUCTURES
25_30 Gasholders
25_30_65 Rigid gasholders
25_30_75 Telescopic gasholders

25_50 Ponds
25_55 Reservoirs
25_60 Silos
25_75 Tanks
25_75_20 Enclosed tanks
25_75_50 Open tanks

30 DIVIDING STRUCTURES
30_30 Dividing walls
30_35 Dividing fences

35 GROUND CONTOURING

Draft: September 2013 (V4)

Uniclass2 Entities by form table


35_30 Dredging
35_40 Earthworks
35_45 Ground remediation
35_90 Unreinforced earth embankments

60 JETTIES, PIERS, PLATFORMS AND QUAYS


60_40 Jetties
60_40_30 Floating jetties, anchored
60_40_35 Floating jetties, moored to land
60_40_40 Jetties floating one end
60_40_50 Open piled jetties
60_40_55 Part solid, part open piled jetties
60_40_60 Solid jetties

60_45 Piers
60_40_30 Floating piers, anchored
60_40_35 Floating piers, moored to land
60_40_50 Open piled piers
60_40_55 Part solid part open piled piers
60_40_60 Piers floating one end
60_45_65 Solid piers

60_60 Platforms
60_60_20 Double sided platforms
60_60_65 Single sided platforms

60_50 Quays
60_50_50 Open piled quays
60_50_55 Sheet pile quays
60_50_65 Solid quays

Draft: September 2013 (V4)

Uniclass2 Entities by form table


40 LANDSCAPING
40_20 Decorative accessible planted landscaping
40_25 Decorative in-accessible planted landscaping
40_50 Open landscaping

50 OPEN CONDUITS
50_20 Canals
50_25 Channels
50_30 Ditches
50_70 Trenches

45 PAVEMENTS
40_10 Area pavements
40_50 Linear pavements
40_50_10 Single carriageway
40_50_40 Dual carriageway
40_50_70 Grade separated carriageway

55 PIPELINES AND DUCTS


55_20 Ducts
55_20_70 Supported
55_20_90 Underground

55_60 Pipelines
55_60_70 Supported
55_60_90 Underground

Draft: September 2013 (V4)

Uniclass2 Entities by form table


65 RAILWAYS
65_20 Cable car railways
65_30 Guided bus ways
65_40 Magnetic levitation railways
65_45 Monorails
65_60 Rack railways
65_65 Railways
65_65_30 Heavy railways
65_65_35 High-speed railways
65_65_50 Light railways

65_70 Suspended cableways


65_80 Tramways

75 RETAINING STRUCTURES
75_25 Dams
75_25_05 Arch dams
75_25_10 Buttress dams
75_25_20 Embankment dams
75_25_30 Gravity arch dams
75_25_35 Gravity dams

75_55 Reinforced embankments


70_60 Retaining/protection walls
70_60_50 Protection walls
70_60_60 Retaining walls

Draft: September 2013 (V4)

Uniclass2 Entities by form table


80 SUPPORT STRUCTURES AND TOWERS
80_20 Chimneys
80_25 Cooling towers
80_40 Gantries
80_50 Masts
80_55 Ornamental
80_70 Towers
80_80_50 Solid towers
80_80_60 Hollow towers
80_80_70 Lattice towers

90 TUNNELS AND SHAFTS


90_10 Bored tunnels
90_20 Cut and cover tunnels
90_40 Immersed tube tunnels
90_70 Shafts

95 WELLS
95_10 Bored wells
95_20 Driven wells
95_25 Dug wells

Draft: September 2013 (V4)

Das könnte Ihnen auch gefallen