Sie sind auf Seite 1von 3

Mechanical Static Equipments(3 Days)

2.1 Design Codes, Engineering Standard Practices & Clients Specifications


2.2 Abbreviations, Definitions, Symbols and Nomenclature

2.3 Engineering Fundamental, Process Mechanical Equipments

2.4 FEA (Finite Element Analysis) & Mechanical Data Sheet

2.5 Material Selection, Detail Drawing Preparations

2.6 Pressure Vessel & Reactors, Separation/Filtration, Tanks & Storage

2.7 Heat Transfer & Energy Conservation Equipments

2.8 Drying / Distillation & Evaporation Equipments

2.9 ITP (Inspection Test Plan), Fabrication Shop Audit

2.10 Welding Procedures WPS / PQR / WQT Review

2.11 Mill Certificates Review & Verifications, Certified As-Built Drawings

2.12 Non-Classified Pressure Equipments Launchers & Receivers

Mechanical Rotating Equipments (3 Days)


3.1
3.2
3.3
3.4

Design

Codes,

Engineering

Abbreviations,
Engineering
Machine

3.5

Process

3.6

Material

Standard

Definitions,

Fundamentals

Selection

Machine:

Mechanical

&

Construction,

Clients

Specifications

and
Balancing,

The

Equipments
&

&

Symbols

Rotating

Elements

Practices

Nomenclature
Vibration

Drive

Noise

Components

Mechanical
Detail

&

Data

Drawing

Sheet
Preparations

3.7 Pumps Types, Drives, Application Transfer, Circulations, Booster, Injection, Operations, Performance
Curves

Analysis

3.8

Control

3.9

ITP

3.10

Reliability

Valves
(Inspection
Factors,

System,
Test
Mill

Flow

Meters,

Plan),
Certificates

Fabrication

Review

Piping
Shop
&

Layouts
Audit
Verifications

3.11

Certified

As-Built

Drawings,

Basic

Mechanical

Design

3.12 Fluid Mechanics, Organizations And Associations Machinery Directives

Piping Plant Layout, Key Plan, Plot Plan And Equipment Layout(2 Days)
4.1

Design

4.2

Codes,

Abbreviations,

4.3
4.4

And

Storage
Underground

System

4.9

Fire

4.10

Roads,

Plant

Power

Generation,

4.12

Plant

Operation

4.13

Overhead

Explosion

4.15

Buildings
Venting

And

In

Waste

Water

Area

Assembly

Rack

&

Office

Area

Pipe

Sleepers

Plant

Area,

Lighting

Facilities

Treatment

&

Plant

Control

Rooms

Administration

Proof

Applications

And
&

Pipe

Drains

Plant

4.14

Facilities

Farms
And

System

Monsoon

4.11

4.16

Tank

Fighting

Functionality
Classifications

Supporting

Routes

Area,

Nomenclature

Area

Process

Escape

In

Specifications

and

Process

&

Emergency

Clients

Mechanical

Designations,

Area

&

Symbols

Process
OSBL

Utility
Plant

Practices

Definitions,

And

4.6
4.8

Standard

Understanding
ISBL

4.5
4.7

Engineering

Structural

Plant

Release

Building

In

Processing

For
Of

Plants

Processing

Gases

Equipments

Emission,

Flaring

Tower

4.17 Plant Security System

Piping General Plant Piping Arrangement (Piping GAs)(3 Days)


5.1

Design

5.2

Codes,

Engineering

Abbreviations,

5.3

Piping

5.4

Process

Piping

5.5

Fire

Fighting

5.6

Configuring

5.7

Layouts

Identifications

5.8

Plan,

Layout,

Main

Standard

Utilities

Around
Headers,

of

Piping

5.11

Piping

Around

Skid

Piping

Around

5.13

Risers,

Pipelines,

Cooling

5.15

Pipe

And

System
Spacing

Lines

Branch

Fighting

&

Systems
Package

Onto

Plant

System

Pressure

Vessels

Vessel
Heat

Drains

&

Conservation

System,

Equipments

Piping

Components

Horizontal

Pressure

Piping,
Between

Tie-Ins

Around

Heating

Layouts

Flow

Sub-System

&

Piping

System
And

Fire

Details

&

&

Vertical

&

Process
Headers

Specifications
Nomenclature

Supporting

Utilities

Package

Pumps,

5.12
5.14

&

Distributions

Package
Around

Sections

Equipments

Skid

5.10

Elevations,
System,

Lines,

Clients
and

Piping

Sub-Headers,

Process

&

Symbols

Process

Mechanical

5.9

Practices

Definitions,

Venting

And

Others

Towers
Piping
System
Facilities

5.16 Overhead Piping System, Underground Piping, Pipe Supports

Piping Piping Isometric And Material Take-Off (MTO)(3 Days)


6.1

Design

Codes,

6.2

Abbreviations,

6.3

Sketching

6.4

Engineering

Standard

Definitions,
&

Instrumentation

Practices

&

Symbols

Preparing
Tagging

Clients
and

An

Isometric
&

Specifications
Nomenclature
Drawings
Designations

6.5
6.6

Line
North

6.7
6.8
6.9

6.12
6.13
6.14

Standard

Arrow

Coordinates

&

Elevations,

of

Detail

Components,

Cut-Out,

Line

Call-ups,
Numbers

Title

Blocks

General

6.15

&
&

Notes

6.17

Field

Columns,

Take-Of
Design

Data

Specifications

Reference
HOLD

Drawings
Items

List

Drawing

Numbers

Test

Instructions

&

Weld

Tags
Take-Of

Process

Instructions,

Requirements

Flow

Spool

Class

ISOMETRIC

NDT

Routing

Material

Material

Special

Pipe

Material

Call-ups,

Revision

&

Assigning

6.16

Supports

Format

Process

Item

Pipe

&

&

Fabrication

Erection

Item

&

Call-ups

Shop

Ship-Loose
Specialty

Fonts

Direction,

Dimensioning
Identifications

6.10
6.11

Type,

&

Field-Fit

Weld

6.18 New, Modification And Demolition ISOMETRIC Drawings

Process Engineering Via HYSYS Software (8 Days)


15.1

Introduction

15.2
15.3

Advanced

15.4

Equipment

Sizing

Line

Sizing

15.6

Process

Instrument

Relieving

Process

to

Thermodynamics

15.5
15.7

to

Introduction
in

In

HYSYS
HYSYS,

Process

Engineering,

Criteria,
Design

Fluid
Hydraulic

and

Sizing,

Temperature

15.8 Process Simulations Examples & Utilities Calculations

Engineering

Simulation
Composition
Equipment

Analysis

via

Simulation

via

Analysis
Blowdown

Determination

Software

via

Analysis
via

HYSYS
HYSYS
HYSYS

via

HYSYS
HYSYS

Das könnte Ihnen auch gefallen