NAME OF WORK

Construction of Ground Level Balancing Reservoir at Vandur Gutta, Atmakur municipality.

Design Data:Capacity

1000

KL

Average G.L +

100.00 M

LEVEL

L.W.L

99.45 M

LEVEL

M.W.L

102.70 M

LEVEL

Depth of water

3.25

Free board

0.45

Dead storage

0.15

S.B.C

100

kN/M2

Foundn. Depth

1.00

m.

Concrete mix

M.30 Grade (Design mix)

Steel

Fe - 415 Grade (HYSD)

References:

IS: 3370 Parts (I, II & IV)


IS: 875 - 1987
IS:456-2000
IS:11682 - 1985
IS:1893 -1984
IS:1893 -2002
SP - 16: 1980 (Design Aids for reinforced
concrete to IS: 456-1978)
RCC structures by BC Punmia

Capacity calculations:
Volume in cylindrical portion :
1256.6

M^3 >

M-

3.1416 /4*(

30

20.00 2 )*
4 =
Net capacity =

1256.6 M3
1256.6 M3

1000 M3
OK

Design of Roof Dome:ThickNess at crown

120.00

mm

ThickNess at Springs

150.00

mm

1700

mm.

Rise ( h )

Diameter upto inner face of top inner ring beam :

12500

mm.

Radius (a)

6250

mm.

180/Pi =

57.2958

Surface radius of dome - r


=

( h2 + a2)/(2*h)

1700 x 0.5 + 6250 ^ 2 / ( 2 x 1700 )

Sin

a/r

30.465 o

6250 / 12338.971
<

51 o

12338.971

0.507

mm.
or

0.532

radians.

Hence, the dome is under compression

LOADS CALCULATION:
Live load
Dead load

( 0.12 + 0.15 ) x 0.5 x 25

Finishings
Total (w)
Meridional thrust - T
=

1.5

kN/m2

3.375

kN/m2

1.00

kN/m2

5.875

kN/m2

w x r / ( 1 + Cos )

5.875 x 12.339
(1 + Cos 0.532 )

38.936

kN/m

(Max at sprining i.e., at 30.465 deg.)


Meridional stress

Meridional thrust / t

Hoop thurst
Max. at crown i.e.,

0.324

Wr ( Cos -

Max. Hoop stress

38.936
120

N/mm2

<

1.6 N/mm2

36.246

SAFE

1
)
1 + Cos

5.875 x 12.339 x ( 1 - 0.5 )

Hoop thrust / thickNess

0.302

kN/m

36.246
120.00

N/mm2

<

1.60

N/mm2

Meridional stress & hoop stress does not exceed 1.6 N/mm 2 i.e., less tha maximum permissible stress in direct
compression.Hence provide mini,um reinforcement.
Minimum Area of reinforcement
Minimumn Ast

120 x 0.24 x 10

Provide
8 mm Tor @
with due curtailment of meridionals.
Provided As

0.24% of cross sectional area

150

335.1032

( as per Cl:7.1.1 of IS:3370 Part II )

288.0

mm2/m

mm c/c in the form of merdionals and circumferentials

mm2/m

SAFE

BENDING MOMENT:
Due to continuous effect, BM at springing

Wxrxt
4 x SQRT(3)

1.256

kN m/m

ThickNess required from uncracked consideration at edge


=

SQRT(6 x 1.256 / (1000 x 2 )

Increasing the thickNess of dome at springing from


Area of steel required

120

M/(150 x 0.87 x 95)

SQRT(6 x M/ ( b x 2.0 ))

61.3840

mm.

mm to

150 mm

101.0784

mm2/m

For 1500mm length from springing, edge thickening shall be done from 120 mm to 150 as shown in the drawing In this
portion provide extra 8 mm Tor at 150 mm mm c/c at top both radially and circumferentially to take care of edge moments
Design of Top ring beam over side walls or below top dome Size of ring top

350

Hoop tension in ring beam due to dome


=

x
=

600

T x Cos() x (d2 - b1) / 2000

38.936 x 0.862 x 12500 / 2000

Required hoop reinforcement

mm.

Hoop tension x 1000 / 190

209718 / 190

209.718

kN/m

1103.779

mm2

Dia.of hoop reinforcement

16

mm.Tor, Required Nos

Hoop reinforcement to be provided

16

mm Tor Reqd.No. of rods

Provide
16
4 Nos. of
( 4 nos on each face of the beam )
Tensile stress

=
=

5.49 Nos.
6

Nos.

mm. Tor on each vertical side face of beam as hoop reinforcement.

Hoop tension / ((b-12*2)*(D-12)+(m-1)Ash)


1.042

N/mm2

<

1.50 N/mm2

SAFE

LOAD ALCULATION :
Load from roof dome

2 x PI()12.339 x 1.7 x 5.875

774.311

kN

37.535

kN

318.086

kN

87.312

kN

1217.245

kN

25.324

Load due to increased thickNess of dome at springing


=

2TT( (Diai-b1)/2000 -1.5*2/3)1.5 x 0.05 /2 x25

Self weight of top inner ring beam

pi*d2*b1*d1*25

PI() x 15 x 0.6 x 0.45 x 25


Self weight of top slab
( 50 % on beam )

/ 4 ( 20 - 12.30 ) ^ 2 & x 0.15 x 25 x 0.5 =

Total W
Load on the ring beam per 'm' run

No.of supports

22.5 o

BM @ support

1217.245 / ( PI() x 15.3 )

; Angle formed by 2 columns

radians

0.3927

45

kN/m

kN m

w(D1/2)2 (TT/n*Sin + TT/n*Cot *Cos - 1)


38.788

For max.Torsion angle ()


=

-76.977

Max. Torsion

W / (Pi*D1)

w(D1/2)2( TT/n* Sin + TT/n* Cot * Cos o - 1)

=
BM @ mid span

kN m
9.00

or

0.1571

radians

w*(D1/2)2* [ TT/n* Cos - TT/n*Cot x Sin q - ( TT/n- TT/180*) ]

5.8328

kN m

DESIGN OF ROOF RING BEAM :


a) At face of support :
Size of beam

350

600

Effective depth (d)

Bending moment

76.977

kN m;

Torsional moment (T)

5.833

kN m

( D - 20 -12- 8 - 16/2 )

Equilvalent bending moment Mt

=
=

Total bending moment Me


t

9.313
=

190 N/mm2

cbc
k

mm

552.00

mm

T / 1.7*(1+D/b)
kN m < BM ;

(BM+Mt)

=
0.321

10
;

86.290

kN m

N/mm2
j

0.89 ;

Balanced moment of the section


Me

86.290

<

Balanced

Area of steel required Ast

Q bd2/106

BM

0.22% x b x d

Top reinforcement:-

3
2

Nos.of
Nos.of

Provide
and

Ast provided

1005.31

mm2

kN m

924.438

mm2

425.04

mm2

152.50

Me*106/(190*0.89*d)

Minimum area of steel Ast min

152.504

16
16

mmTor through
mm Tor extra over supports.

SAFE

Check for shear :


Shear at ' d ' from face of support(V)

w(Pi*D2/(2*n)- d1/2 -d)/1000

=
Torsional moment (T)

5.833

Equilvalent shear force Ve

Shear stress v

c max.

=
=

Using
Asv

kN m

2.20

0.440

84.964

kN

N/mm2

N/mm2
=

1005.310
0.520

mmTor

100.531

Ve*1000/(b*d)

Ast*100/(b*d) =
8

kN

V+ 1.6*T/b

Ast provided at face of supports


Provided pt =

58.300

mm2

%;

mm2
Corrsponding c =

> c

Legged vertical stirrups at 200 mm c/c

and

tsv =

175.0

N/mm2

The allowable spacing must be minimum of the following


1. Sv

Asv*sv/(b*(ve - c))

399.6595277 mm. c/c

Asv = T*Sv/(b1*d11*tsv) +V*Sv/(2.5*d11*tsv)


b1 =
2. Sv

254 mm.
=

d1=

504 mm

164.208 mm. C/c

X1 = (b-2*(20)-8) =

302 mm.

Y1 = ( d - 2*(20) - 8) =

3. Sv = Least of X1 or Y1 =

4. Sv = (X1+Y1)/4 =
fy
=
Min. Asv condiion; Sv =Asv*fy/(0.4*b) =

Therefore provide

Design of mid span section

mmTor

=
415 N/mm2

552 mm
302

mm. C/c

213.5 mm. C/c


298.003 mm. c/c

Max Sv =

164

mm. c/c

Sv =

164

mm. c/c

Lgd vertl. Stirrups @

125 mm. c/c

SAFE

0.314

Mid span bending moment


t

1.64

150 N/mm2

38.788

cbc

10

N/mm2

0.375

Balanced moment of the section

Area of steel required Ast

kN m

Q bd2/106

Me*106/(150*0.875*d)

Minimum area of steel Ast min

0.22% x b x d

Nos.of

Nos.of

0.875

174.900

kN m

535.373

mm2

462.00

mm2

Bottom Reinforcement :Bott. reinforcement:-

Provide

Ast provided

829.38

mm2

16

mmTor through and


12

mm Tor extra over supports.

SAFE

Design of Roof slab between side wall and Columns :


Clear width of slab

3550.0

Thickness of slab

150 mm

mm

Loading
Worst condn.
5.00

Live load

1.50

Dead load

3.75

3.75

Finishings

1.00

1.00

6.25 kN/m

9.75 kN/m

Total =
Effective depth - d

Max Bending moment

150 - 30 - 5
W x l ^ 2/ 10

Area of steel required - Ast

=
=

115.00

12.287

M/(190*0.89*d)

mm

kN m

631.859

Main Reinforcement
Provide

10

mm Tor at

Ast provided

Distribution steel

100

785.4 mm2/m

mm c/c at top as main reinforcement.


SAFE

0.12% of cross sectional area

180.00

Distribution Reinforcement
Provide
Asd provided

mm Tor at

200 mm c/c as distribution reinforcement.

251.327

mm2/m

Design of Columns in side the Tank :


No. of columns

Nos.

Size (bxD) =

SAFE

mm2/m

mm2/m

Size of column

b xD

300

300 mm

720.0 mm2

Loading
Load from top ring beam

Self weight of all columns

58.50

kN

1275.75

kN

Load on each column

159.468

kN

clear length of column (L)

4.27

Provide Longitudinal reinf. Of

Nos. of

columns

1217.245

kN

m.

Min As
16

mm. dia with 8 mm. Tor Lateral ties at

150

'e' min = L /500 + D/30 subject to a minimum of 20 mm


Reduction factor(Rf) = 1.25 -L/(48*b)

Load carrying capacity of column

0.953
Rf x 8 * (bD+ (9-1)x4x201/1000

735.577 kN >

159.47 kN

SAFE

Design of Side wall


ThickNess at floor level

300

mm ;

Average thickNess (T)

275

mm

ThickNess to be considered in design calculations

ThickNess at top

275 - 12

Internal Diameter @ mid water depth(D)

20275.0

Total water Height(H) for static condition

3.40

H^2/(DT)

mm.

263.00

mm

20.28

2.168

Due to Seismic effect


As per clause 5.2.7 of IS:1893-1984
Pressure at a depth 'y' from top water level
Pr = Ah*w*H*sqrt(3)*cos(F)[y/H-0.5*(y/H)2]*tanh[sqrt(3)*(R/H)]

Ah =

0.005

3.40 mts.

from seismic calculations.

y=Depth of water from MWL


y/H
0.00
0.10
0.20
0.30
0.40
0.50
0.60

y
(m)
0.000
0.340
0.680
1.020
1.360
1.700
2.040

Pw
(kN/m^2)
0.0000
0.0280
0.0530
0.0751
0.0943
0.1105
0.1237

Hoop Tension=Pw*R
(kN/m)
0.00
0.30
0.60
0.80
1.00
1.20
1.30

mm

Here F = 0 degrees, w = 10.0 kN/m3 and H =

250

0.70
0.80
0.90
1.00

2.380
2.720
3.060
3.400

0.1340
0.1414
0.1458
0.1473

1.40
1.50
1.50
1.50

At Base increase in Pr due to seismic effect

0.1473

kN/m^2

Increase in head for calculation of Vert. BM

0.015

m.

Total water Height(H) including seismic effect(H1)

3.415

mts.

For bending moment calculations coefficients are obtained from tables corresponding to H1^2/(DT) = 2.168 and H1 is
considered for cailculation of bending moments.
The side wall is treated as Hinged at bottom and free at top for moment caliculations and hinged at bottom for computing
tension as per Clause 3.1.1 & 3, 12 of IS: 3370 (Part-IV) H1^2/(DT)

2.168

Vertical Bending Moment:


Bending moment

C x 10 x H1 3

10 x H13

398.1705

From table - 10 of IS : 3370 (Part-IV)


Maximum + Ve moment
(i.e., @

0.0120 *10*H

0.50 H from Top water level)

25

mm

4.7780

kN m/m

(+Ve sign indicates tension on out side)

*10*H13
Mbase
=
-0.0419
(-Ve sign indicates tension on water face)
Min.clr. Cover

3
1

-16.683

kN m/m.

@ 1.00 H from MWL

Assumed Dia of Vert. Reinf.

Extra cover on water face in case of corrosive water


(as per clause: 7.2.1 of IS: 3370 ( part- 2 ) -1967)
Depth interms of H from MWL
ThickNess of side wall (mm)

0.00
250

0.4
270

12

mm.

0.7
285

0.8
290

0.9
295

12 mm.

0.5
275

0.60
280

1.0
300

At Base of the wall :


Total ThickNess

300

Eff. ThickNess for strength criteria


Eff. Depth( d)

mm
=

257.0

Bending moment

288.0
mm

mm.

0.892

From Table 2.5 of DESIGN OF WATER RETAINING STRUCTURES USING Tor STEEL
M/(bD2)

3.531

Required uncracked Depth


At

0.50

217.38

288.0

mm

SAFE

H from top water level

Total ThickNess

275

mm

Eff. ThickNess for strength criteria


Eff. Depth( d)

mm >

BM

=
=

232.0

mm

263.00
=

4.778
mm.
0.882

kN m

-16.683

From Table 2.5 of DESIGN OF WATER RETAINING STRUCTURES USING Tor STEEL
M/(bD2)

3.524

Required uncracked Depth


t

150 N/mm2
9

116.44
cbc

; k

mm >
=

0.375

275.0

mm

SAFE

; Q

10

N/mm2

; j

0.875

1.64

VERTICAL REINFORCEMENT
On water face required Ast at base

M/(150*j*d)

494.596

mm2/m

On outside face reqired Ast


at
0.5 H from MWL

M/(150*j*d)

156.914

mm2/m

Minimum steel as per IS : 3370 :

For Tor steel

ThickNess
250.0
275.0
290.0
300.0

Minimum As on each face


257.143 mm2/m
275.000 mm2/m
285.029 mm2/m
291.429 mm2/m

Minimum As(mm2/m)
514.29
mm2/m
550.00
mm2/m
570.06
mm2/m
582.86
mm2/m

mm
mm
mm
mm

Vertical Reinforcement: Inside (water face)


Provide

10

mm Tor @

125

mm c/c from base and curtail alternate rods at 2500mm height from base

Total Ast provided at base on water face

628.32

mm2/m >

494.596

mm2/m

Outside (Air face)


Provide
Ast provided

mm Tor @
402.124

8
=

125 mm c/c on outside face.


mm /m >
291.429
mm2/m

SAFE

Ring Tension (Hoop tension)


For computing ring tension the side wall is treated as hinged at bottom and free at top
(as per Clause 3.1.2 of IS: 3370 (Part-IV Table -12)
Hoop tension
W

10.00

Coefficient x WH1(D/2)
kN/m3; H1

Avg internal dia (D)


=

20.28

3.415

m.
H12 / DT

346.17

2.168

Tension Due to
seismic.

WH1(D/2)

Area of steel
required =Total
Tension/ 150
(mm2/m)

4.30 m

0.0 H

0.183

63.400

0.000

422.67

3.87 m

0.1 H

0.256

88.700

0.300

593.33

3.44 m

0.2 H

0.319

110.500

0.600

740.67

Height
above floor
slab
(m)

Depth from top

Coefficient table 12
IS.3370 (IV)

Tension (kN/m) static

Steel to be provided on both face


(height from floor slab top)

12
from
12
from
12

mm Tor at
3.87 m. to
mm Tor at
3.44 m. to
mm Tor at

3.01 m

0.3 H

0.374

129.500

0.800

868.67

2.58 m

0.4 H

0.414

143.400

1.000

962.67

2.15 m

0.5 H

0.439

152.000

1.200

1021.33

1.72 m

0.6 H

0.425

147.200

1.300

990.00

1.29 m

0.7 H

0.376

130.200

1.400

877.33

0.86 m

0.8 H

0.286

99.100

1.500

670.67

0.43 m

0.9 H

0.155

53.70

1.500

368.00

from
12
from
12
from
12
from
12
from
12
from
12
from
12
from

3.01 m. to
mm Tor at
2.58 m. to
mm Tor at
2.15 m. to
mm Tor at
1.72 m. to
mm Tor at
1.29 m. to
mm Tor at
0.86 m. to
mm Tor at
0.43 m. to
mm Tor at
0.00 m. to

Note:- The above hoop reinforcement is to be staggered on both faces


Maximum Hoop tension(Tmax) is at
ThickNess side wall at

0.50

0.50 H from top water level

ThickNess of wall for strength calculations


Total hoop reinforcement provided at
Tensile stress

275 - 12
H

Shear at base of cyllindrical tank

1.50

=
275.0

mm

263.00

mm.

=
=

N/mm2

Coeff. x w* H12

153.20

is Ash

Tmax*1000/((twallx 1000) + (9-1) x Ash/m)


=

=
0.50

Max. allowable tensile stress

Coeff.

H ; Tmax.

1021.3

0.565

kN/m.

mm2/m

N/mm2

ok

SAFE
=

34.165

kN/m.

0.293

Shear stress at base of tank

Shear/(b*j*d) =

0.152 N/mm2 <

2.20 N/mm2 SAFE

Design of base slab of side wall :


40

Cm thick slab below side wall as shown.


25.324

3.40

3.85

0.275

0.15

0.300

0.65

Assuming 4.0 m length of base slab with

2.50
3.075

Particulars

W1

0.3x 0.15 x 18

W2

Load in Kn

12.851

64.72

70.42

76.65
Force

Lever arm

Moment kN - m

0.81

0.15

0.12

0.275 x 3.85 x 25

26.47

0.44

11.580

W3

2.5x 3.4 x 10

85.00

1.83

155.125

W5

3.075 x 0.65 x 25

49.97

1.538

76.83

25.32

0.438

11.08

Top dom

Total

187.57

16.68

254.73

Over turning moment

Kn m

Net stabilizing moment

Eccentricity from A

238.05
187.57

1.269 m

Eccentricity from center

3.08
2

1.269

254.733 - 16.683

238.05

Kn m

0.268

Extreme Pressure intensity on the base :


p

W
b

( 1 + ( 6e / b) )

Pmax

60.9989

1.523

187.6
3.08
=

Pmin

61.00

0.47707

(1 + (6 x 0.268/3.075))
92.897

kN/m2

<

SBC

29.101

kN/m2

>

0.00

Net upward pressure :


Maximum

92.897 - 25 x 0.65

76.647 KN / m 2

Minimum

29.101 - 25 x 0.65

12.851 KN / m 2

Mxx

=
=

Myy

70.423 x 0.3 x 0.3 x 0.5


3.169

0.187

12.851 x 2.5 x 2.5 x 0.5

0.5 x 0.3 x 6.224 x (2/3) x 0.3


3.356 Kn m

0.5 x 2.5 x 51.867 x (1/3) x 2.5 -

2.5x 3.4 x 3.4 x 0.5

40.159

Uncracked depth requried

+
=

54.028

14.45

79.738 x 1000000

79.74

Kn m

79738000.0

3.516 x 1000

150.59

3516.00
< 500 mm

Effective depth provided

650 - 30 - 2 x 5

610.00

Ast required at bottom

79.738 x 1000000

79738000.0

150 x 0.893 x 610


Using

16

mm dia. Bars spacing requried

201.062 x 1000

Hence Safe.

Cm
=

975.87

81709.5

201062.40

975.872

206.0336

mm

975.872

Provide 16 mm dia. Bars @ 150 mm c/c at ( water face )


Ast required at bottom

3.356 x 1000000

3356000.0

150 x 0.893 x 610

Mimimum area of steel

Minimun area of steel in each direction

1830 x 0.5

Using

201.062 x 1000

1830.00
=
=

915.000

Using

16 mm dia. Bars spacing requried

201.062 x 1000
915.000

Provide 16 mm dia. Bars @ 200 mm c/c at bottom.

41.07

81709.5

0.3 x 610 x 1000 / 100

16 mm dia. Bars spacing requried

mm 2
915.00

201062.40

mm 2
=

219.7403

219.7403

915.000

201062.40
915.000

Check for bond :


Shear force

Bond stress

( 76.647 + 70.423 ) x 0.5 x 0.3


22061.000

Check for Uplift :

x 1.6 x 3400 x 610

0.002 N / mm 2

22.061

kn

22061.00
10419776

<

1.50

N / mm 2

Hence safe

( Tank empty condition )

Weight of dome

811.846

kN

Weight of ring beam

318.086

kN

Weight of top slab

174.624

kN

Weight of side wall

d x H x t x 25 =

3.14 x 20.275 x 3.85 x 0.275 x

1685.09

0.7854 x 20.55 ^ 2 x 0.65 x 25

5389.74

6755.70

Weight of base slab :


Dai meter of footing base
Weight

Total load

20.55 m

D 2 x t x 25

811.846 + 318.086 + 174.624 + 1685.093 + 5389.741

Uplift lift load due to water

Factor of safety

Check for Uplift :

Total load

Factor of safety

Check for Uplift :


Weight of soil

Internal dia

D 2 x d x 10

0.7854 x 20.55 ^ 2 x 1 x 10

6755.70
3316.76

3316.76

kN

kN

2.037 > 1.20 Hence Safe

( Tank full condition no soil outide)

Weight of structure
Weight of water

6755.7 m

D 2 x h x 10

6755.698 + 10681.44
=

17437.14
3316.76

0.7854 x 20 ^ 2 x 3.4 x 10

=
=

17437.14

kN

5.257 > 1.40 Hence Safe

( Tank full condition with soil outide)


=

D 2 x h1 x 18

0.7854 x 21.15 ^ 2 x 1 x 18

6323.888

kN

0.7854 x 20.55 ^ 2 x 1 x 18

5970.175

kN

10681.440

Net weight of soil

6323.888 - 5970.175

353.713

kN

Total vertical laod

17437.138 + 353.713

17790.85

kN

Area of footing base


Upward pressure

=
=

D 2
4
17790.85

0.7854 x 20.55 ^ 2

53.639 kN / m 2

331.676

< 100.0 Kn/m2

m2
Hence Safe

Desig of base slab :

( INNER PORTION)

Diameter of internal slab :

12.50 m

+Ve bending moment


( center of span)

qo x r 2 (3/ 16)

0.1875 x 53.639 x 6.25 ^ 2

=
-Ve bending moment
( Support)

qo x r 2 / 8

392.86

0.125 x 53.639 x 6.25 ^ 2

=
Circumferential moment
( Support)

qo x r 2 / 16

261.91

Provide overall depth


Effective depth

=
=

700

130.96

392.864 10 ^ 6
1.64 x 1000

kN m

489.44

mm

mm

700 - 50 - 16

Area of steel required at center

Using

M
Qxb

kN m

0.0625 x 53.639 x 6.25 ^ 2

=
Depth required

kN m

M
st x j x d

4721.214

20 mm dia spacing required in both sides

634.00 mm

392.864 10 ^ 6
150 x 0.875 x 634

392864000
83212.500

mm 2
=

314.16 x 1000 x 2
4721.214

133.0844

Provide 20 mm dia @ 125mm c/c in both ways


Area of steel required at support

=
Using

M
st x j x d

3147.472

16 mm dia spacing required in both sides

261.909
150 x 0.875 x 634

201.0624 x 1000 x 2
3147.472

130.955
150 x 0.875 x 634

201.0624 x 1000 x 2
1573.742

261909000
83212.500

mm 2
127.7612

Provide 16 mm dia @ 125mm c/c in both ways


Area
of
steel
required
Circumferential moment

at

=
Using

M
st x j x d

1573.742

16 mm dia spacing required in both sides

Provide 16 mm dia @ 125mm c/c in both ways

130955000
83212.500

mm 2
=

255.5214

unicipality.

SAFE
in direct

:3370 Part II )

e drawing In this
of edge moments

1.43

0.314

N/mm2

Hence safe

mm. c/c
OK

2.168 and H1 is

om for computing ring

kN m

1.64

m height from base


SAFE

provided on both faces


from floor slab top)

150
4.60
150
3.87
150

mm c/c
m.
mm c/c
m.
mm c/c

3.44
100
3.01
100
2.58
100
2.15
100
1.72
100
1.29
100
0.86
100
0.43

m.
mm c/c
m.
mm c/c
m.
mm c/c
m.
mm c/c
m.
mm c/c
m.
mm c/c
m.
mm c/c
m.

mm

Hence Safe.

mm 2

mm 2

219.7403
mm

219.7403

mm

Hence safe

kN

kN

kN

10681.440

kN

Hence Safe

92864000
3212.500

mm

61909000
3212.500

mm

30955000
3212.500

mm

ONGOLE Mplty- 800 KL ELSR at Islampet park site

NAME OF WORK
ONGOLE MPLTY. -- Construction of 800 KL. ELSR at Islampet park site
AT ONGOLE(off site) under APUSP

Design Data:Capacity
Average G.L +
L.W.L
+
M.W.L
+
Depth of water
Free board
Dead storage
Staging
S.B.C
Foundn. Depth
Wind pressure
Concrete mix
Steel
References:

1500 KL
10.00 M
LEVEL
15.00 M
LEVEL
20.00 M
LEVEL
5.00 m
0.30 m
0.15 m
5.00 m
125 KN/M2 assumed.
3.00 m.
3.5 KN/M2
M.30 Grade (Design mix)
MFe - 415 Grade (HYSD)
IS: 3370 Parts (I, II & IV)
IS: 875 - 1987
IS:456-2000
IS:11682 - 1985
IS:1893 -1984
IS:1893 -2002
SP - 16: 1980 (Design Aids for reinforced
concrete to IS: 456-1978)
RCC structures by BC Punmia

Two rows of columns; No. of columns in each row (n) =


Columns type-Square columns ;
Size of each INNER row column
Size of each OUTER row column
Number of columns inside the container
Size of each square column(inside the container)
Diameter up to center of OUTER row columns (Diao) =
Diameter up to center of INNER row columns(Diai) =
Rise of top dome upto bottom surface @ crown (h 1) =
Thickness of top dome at crown(t1) =
spRn
Length of tapering portion of dome from springing
Thickness of annular slab(ta1)
Size of top inner ring beam (b1 xD1) =
Thickness of side wall @ top (S1) =
Thickness of side wall @ floor slab level (S2) =

30

20 Nos.
=
=
=
=

400 x
400 x
300 x

=
150 cRn

300 x

400 mm.
400 mm.
20 Nos.
300 mm.
17000 mm.
11500 mm.
1500 mm.
100 mm.
1550 mm.
200 mm.
380 mm.
200 mm.
250 mm.

Side wall out side vertical and inside tapering.

page 33 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

A
1

Total depth of water under static condition (H) =


Rise of bottom dome upto top surface @ crown (h 2)=
Thickness of bottom dome at crown (t2)=

spr

250 cRn

Length of tapering portion of bottom dome from springing


Top surface of dome coincide with center of inner ring beam
Thickness of floor slab (ta2) =
Width of gallary slab
Thickness of gallary slab at floor level
Size of inner ring beam at floor level (b 2 x D2) =
Size of outer ring beam at floor level (b 3 x D3) =

Density of concrete =

Name of the Town is


ONGOLE
0
0
0

300 x
300 x

400 mm.
750 mm.
120 mm.
850 mm.
850 mm.
4 levels
600 mm.
600 mm.

500 x
500 x

750 mm.
750 mm.

120
400 x
400 x

Chord braces and Radial braces are provided at


Size of each chord brace
Size of each radial brace
Foundations
Size of inner ring beam at foundation level (b4 xD4)=
Size of outer ring beam at foundation level (b5 x D5)=

5.15 mts.
1500 mm.
200 mm.
1550 mm.

25.00 KN/m3

ONGOLE
Seismic data as per IS:1893 - 2002
Zone 3

Type of foundation soil is


Hard soil
Importance factor ( I ) =
Design of structure is as per IS: 456-2000
Response reduction factor (R) =
Zone 3
Zone factor (Z) =

Assumed
1.5
3
0.16

Capacity calculations:
1 Volume in cylindrical portion :
3.1416 /4*(
16.90 2 )*
2 Volume over slant portion of side wall
Pi*( D1+d3-2*S2+2/3*(S2-S1))*0.5*(S2-S1)*H
Deduct
3 Volume in dead storage =Pi/4*((D1+d3-2*S2)2-(D2-d3)2)*0.15
4 Volume occupied by bottom dome portion =PI/6*h*(3*a^2+h^2)

page 34 of 70

5.15 =

1155.24 M3

6.85 M3

-18.07 M3
-79.67 M3

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

6
5

Volume occupied by tappered portion of dome =


Volume occupied by inside columns =
Net capacity =
1053.8 M^3 <

-1.2742 M3
-9.27 M3
1053.8 M3

1500 M

NOT OK. CHANGE THE DIAMETER

page 35 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Design of Roof Dome:100 mm thick(t)@ crown &


Rise ( h )
Diameter upto inner face of top inner ring beam :
Radius (a)
180/Pi =
57.2958
Surface radius of dome (r) =( h2 + a2)/(2*h) =
Sin x =a/r =

Loads:Live load =
Dead load =
Finishings =

150 mm at springing

x 0.523427 radians.
29.991 Degrees
Hence, the dome is under compression

=
=
=

1500 mm.
11200 mm.
5600 mm.

11203 mm.

0.49985 ;

=
=
=

(0.1+0.15)*0.5 *25

Meridional thrust (T)=


(Max @ sprining i.e., at29.991 deg.)
Meridional stress = Meridional thrust/ t =

< 51 Degrees

4.63 *

0.75 KN/m2
3.125 KN/m2
0.75 KN/m2
Total (w) =
4.63 KN/m2
11.203 /(1+ cos(x))
= 27.7665 KN/m
27.767 /

100
<

Max Hoop thrust (Max. at crown i.e., at x = 0) = Wr/2 =


Max. Hoop stress = Hoop thrust/thk =

25.908 /

100
<

Meridional stress & hoop stress does not exceed 1.6 N/mm
i.e., less tha maximum permissible stress in direct compression.
2

= 0.27767 N/mm2
1.6 N/mm2
SAFE
= 25.9077 KN/m
= 0.25908 N/mm2
1.6 N/mm2
SAFE

Minimum Area of reinforcement = 0.24% of cross sectional area =


=
Provide
8 mm Tor @
120 mm c/c in the form of merdionals
and circumferentials with due curtailment of meridionals.
Spacing measured at springing i.e., at r =
5600 mm
2
Provided As =
418.879 mm /m
SAFE

240 mm2/m

BENDING MOMENT:
Due to continuous effect, BM at springing = w*r*t/(4*sqrt(3)) =
= 0.74789 KNM/m
Required uncracked thickness = sqrt(6*M/(b*2.0)) =
= 47.3674 mm.
Increasing the thickness of dome at springing from
100 mm to
150 mm
Required Ast for BM = M/(150*0.87*95) =
= 60.1876 mm2/m
For
2000 mm length from springing, edge thickening shall be done from
from
100 mm to
150 mm as shown in the drawing. In this portion
provide extra
8 mm Tor at
240 mm c/c at top both radially
and circumferentially to take care of edge moments.

page 36 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

3.

Design of Annular Roof Slab:Loading:


Dead load=
ta1 *
25.0
Finishings =
Live load - (access provided) =
Total (w2)=

200 mm thick
=
=
=
=

( t2 )

5.00 KN/m2
0.00 KN/m2
1.50 KN/m2
6.50 KN/m2

Effective span of the annular slab


(l) =(Diao/2+b2/2-S1-(Diai/2+b1/2)+ta1-25) =
Max support bending moment (m1)= w2l2 /10 =
Max mid span bending moment = w2l2/10 =
Total depth to be considered for strength requirements =
Depth required under uncranked condition = sqrt(6*m1*1000/2)

=
2775 mm.
=
2.775 mts.
= 5.00541 KNM.
= 5.00541 KNM.
200- 12 =
188 mm.
= 122.541 mm
<
188 mm.
Safe
=
158 mm.
= 187.344 mm2/m

Effective depth =(ta1-25-12-5)


=
Ast at support and at mid span= m1*10^6/(190*0.89*eff.d)
Reinforcement
Provide
8 mm Tor at
100 mm c/c at bottom at mid span.
and crank alternate bars near supports.(Spacing measured at mid span)
Also Provide extra
8 mm Tor at
200 mm c/c on top at supports.
2
Ast provided =
502.65 mm /m
SAFE

4.

Distribution steel = 0.12% of cross sectional area =


240 mm2/m
Reinforcement
Provide
8 mm Tor at
200 mm c/c as distribution reinforcement.
Asd provided =
251.33 mm2/m
SAFE
Design of Top ring beam over inner columns:Size =
300 X
380
mm.
Hoop tension in ring beam due to dome =T*Cos(x)* (d2-b1)/2000
= 134.674 KN/m
Required hoop reinforcement = hoop tension*1000/190
= 708.81 mm2
Dia.of hoop reinforcement=
12 mm.Tor, Required Nos.=
= 6.26725 Nos.
Hoop reinforcement to be provided =
12 mm Tor Reqd.No. of rods=
7 Nos.
Provide
4 Nos. of
12 mm. Tor on each vertical side face of beam.
as hoop reinforcement.
Tensile stress=
hoop tension/((b-12*2)*(D-12)+(m-1)Ash)
= 1.24812 N/mm2
<
1.5 N/mm2
SAFE
Loading:
Load from roof dome =
= 488.349 KN
Load due to increased thickness of dome at springing
=2TT( (Diai-b1)/2000 -2*2/3)2 x 0.05/2x25.00
= 27.7965 KN
Load from roof annular slab
= Pi/4*((Diao+b3-2*S1+Diai+b1)/2)2-(Diai+b1)2)*w2 =
= 347.759 KN
Self weight of top inner ring beam = pi*d2*b1*d1*25/(1000)3 =
= 102.966 KN

page 37 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Total W

Load on the ring beam per 'm' run = W/(Pi*d1)


No.of supports =

20

2A =

18 Degrees.

BM @ support =w(D2/2)2( TT/n* Sin o + TT/n* Cot A * Cos o - 1)=


BM @ mid span =w(D2/2)2 (TT/n*Sin A + TT/n*Cot A *Cos A - 1)=

; A =
A =

966.87 KN
= 26.7621 KN/m
9 Degrees
0.15708 radians
-7.2894 KNM

= 3.64919 KNM
0.0663 radians

For max.Torsion angle (B)=


3.8 Degrees
=
Max. Torsion =
w*(D2/2)2* [ TT/n* CosB - TT/n*Cot A x Sin B - ( TT/n- TT/180*B) ]
=
0.22054 KNM
Design of beam
At face of support
Size of beam =
300 x
380 mm
Effective depth (d) =( D - 20 -12- 8 - 16/2 ) =
332 mm
BM =
7.289 KNM;
Torsion(T) =
0.2205 KNM
Mt = T/1.7*(1+D/b) =
= 0.294052
KNM <BM ;
Me = (BM+Mt) =
=
7.583
KNM
2
2
t =190 N/mm ;
cbc=10 N/mm ; m= 9 ; k =0.321; j=0.89; Q =1.43
Balanced moment of the section = Q bd 2/106 =
=
47.2861 KNM
Me(=
7.583 ) < Balanced BM ( =
47.286 )
Required Ast =Me*106/(190*0.87*d) =
=
135.078 mm2
2
Min. Ast = 0.22/100*b*d =
219.12 mm
Top reinforcement:Provide
2 Nos.of
12 mmTor through
and
1 Nos.of
12 mm Tor extra over supports.
Ast provided =
339.292 mm2
SAFE
Shear at ' d ' from face of support(V) =w(Pi*D2/(2*n)- d1/2 -d)/1000 =
= 11.2724 KN
T=
0.221 KNM
Ve =V+ 1.6*T/b =
12.449 KN
Shear stress( tve) = Ve*1000/(b*d) =
0.125 N/mm2
2
tc max. =
2.2 N/mm
Ast provided at face of supports =
339.29 mm2
Provided pt =Ast*100/(b*d) =
0.340655 % ;
Corrsponding tc =
=
0.259 N/mm2
Using
8 mmTor
2 Legged vertical stirrups
2
Asv =
100.531 mm
and
tsv =
175 N/mm2
The allowable spacing must be minimum of the following
1. Sv =Asv*tsv/(b*(tve - tc)) =
-437.59 mm. c/c
Asv = T*Sv/(b1*d11*tsv) +V*Sv/(2.5*d11*tsv)
b1 =
204 mm.
d1=
284 mm
2. Sv =
=
766.12 mm. C/c
X1 = (b-2*(20)-8) =
252 mm. Y1 = ( d - 2*(20) - 8) =
=
332 mm
3. Sv = Least of X1 or Y1 =
=
252 mm. C/c
4. Sv = (X1+Y1)/4 =
=
146 mm. C/c
2
fy
=
415 N/mm
Min. Asv condiion; Sv =Asv*fy/(0.4*b) =
347.67 mm. c/c
Max Sv =
-437 mm. c/c
Negative value
Sv =
146 mm. c/c

page 38 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Therefore provide

8 mmTor

2 Lgd vertl. Stirrups @


SAFE

page 39 of 70

120 mm. C/c

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Design of mid span section


Mid span B.M=
3.64919 KNM
t=150 N/mm2
c= 10 N/mm2; m= 9 ; k =0.375 ; j = 0.875 ; Q = 1.64
Balance B.M = Qbd2 =
54.23021 KNM
6
Required Ast = M*10 /(150*0.875*d) =
83.745 mm2
Minimum Ast = 0.22% of section =
250.8 mm2
Bottom Reinforcement :-Provide
3 Nos. of
12 mm Tor at bottom through
Ast provided at mid span at bottom =
339.29 mm2
SAFE
Design of Gallary at floor level
Clear width of gallary slab =
750 mm
Thickness at support =
100 mm
Thickness at edge =
100 mm.
Loading
Worst condn.
Live load =
=
1.50 KN/m
5.00
Dead load =
0.1 X
25.00
=
2.50 KN/m
2.50
Finishings =
=
0.00 KN/m
0.00
Total =
=
4.00 KN/m
7.50
Weight of hand railing posts (10 x 10 cm) = 0.10 x 0.10 x 0.75 x 25.00 =
Weight of horizontal hand railing = 2 x 0.05 x 0.10 x 0.75 x 25.00 =
Total

=
=
=
say

eff d =
100 -30-5
=
65 mm
Max Bending moment =w x l2/2 +0.6 xl =
Required Ast = M/(190*0.89*effd) =
Main Reinforcement
Provide
8 mm Tor at
Ast provided =

0.19 KN/m
0.19 KN/m
0.38 KN/m
0.60 KN/m

= 2.55938 KNM
= 232.85 mm2/m
150 mm c/c at top as main reinforcement.
335.1 mm2/m
SAFE

Distribution steel = 0.12% of cross sectional area =


120 mm2/m
Distribution Reinforcement
Provide
8 mm Tor at
240 mm c/c as distribution reinforcement.
Asd provided =
209.44 mm2/m
SAFE
Design of Columns in side the Reservoir portion
No. of columns =
20 Nos.
Size (bxD) =
300 x
300 mm
Loading
Load from top ring beam =
=
966.87 KN
Self weight of all columns =
=
237.15 KN
Total load on
20 columns =
1204 KN
Load on each column =
60.20098 KN
clear length of column (L) =
5.27 m.
Min As =
720 mm2
Provide
Longitudinal reinf. of
4 Nos. of
16 mm. Tor
OK
with 8 mm. Tor Lateral ties a 150 mm. c/c
'e' min = L /500 + D/30 subject to a minimum of 20 mm
Reduction factor(Rf) = 1.25 -L/(48*b)
=
0.884
Load carrying capacity of column =

page 40 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Rf x 8 * (bD+ (9-1)x4x201/1000

682 KN > 60.201 KN


SAFE

Design of Side wall


Thickness at floor level =
250 mm ; Thickness at top
Average thickness (T) =
225 mm
Thickness to be considered in design calculations =
225- 12
Internal Diameter @ mid water depth(D) =

Total water Height(H) for static condition =


H^2/(DT) =

200 mm

=
=
=
=

213 mm
16950 mm.
16.95 mts.
5.15 mts.

7.3462

Due to Seismic effect


As per clause 5.2.7 of IS:1893-1984
Pressure at a depth 'y' from top water level
Pr = Ah*w*H*sqrt(3)*cos(F)[y/H-0.5*(y/H)2]*tanh[sqrt(3)*(R/H)]
Here F = 0 degrees, w = 10.0 KN/m3 and H =
5.15 mts.
Ah =
0.1 from seismic calculations.
y=Depth of water from MWL
y/H

y
(m)
0.00
0.10
0.20
0.30
0.40
0.50
0.60
0.70
0.80
0.90
1.00

0
0.515
1.03
1.545
2.06
2.575
3.09
3.605
4.12
4.635
5.15

Pw
Hoop Tension=Pw*R
(KN/m^2)
(KN/m)
0.0000
0.00
0.8418
7.20
1.5950
13.60
2.2595
19.20
2.8354
24.10
3.3228
28.20
3.7215
31.60
4.0316
34.20
4.2531
36.10
4.3860
37.20
4.4304
37.60

At Base increase in Pr due to seismic effect =


Increase in head for calculation of Vert. BM =
Total water Height(H) including seismic effect(H1) =

4.4304 KN/m^2
0.443 m.
5.593 mts.

For bending moment calculations coefficients are obtained from tables


corresponding to H1^2/(DT) =
7.3462 and H1 is considered for
calculation of BMs.
The side wall is treated as fixed at bottom and free at top for moment caliculations and
hinged at bottom for computing ring tension as per Clause 3.1.1 & 3, 12 of
IS: 3370 (Part-IV) H1^2/(DT) =
7.346
Vertical Bending Moment:
10*H13
Moment = C x 10 x H13 and
= 1749.6
From table - 10 of IS : 3370 (Part-IV)

page 41 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Maximum + Ve moment =
0.0043 *10*H
(i.e., @
0.7 H from Top water level)
(+Ve sign indicates tension on out side)

3
1

page 42 of 70

= 7.5234 KNM/m

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site


3
Mbase
=
-0.0160 *10*H1
= -27.994 KNM/m.
@ 1.00 H from MWL
(-Ve sign indicates tension on water face)
Min.clr. cover=
25 mm
Assumed Dia of Vert. Reinf.
=
Extra cover on water face in case of corrosive water
=
(as per clause: 7.2.1 of IS: 3370 ( part- 2 ) -1967)
Depth interms of H from MWL 0.00
0.4
0.5
0.60 0.7
0.8
Thickness of side wall (mm)
200
220
225
230 235
240

12 mm.
12 mm.
0.9
245

1.0
250

At Base
Total Thickness
=
250 mm
BM
=
-27.994 KNM
Eff. Thickness for strength criteria =
238 mm.
Eff. Depth( d)
=
207 mm
K
=
0.869
From Table 2.5 of DESIGN OF WATER RETAINING STRUCTURES USING Tor STEEL
M/(bD2) =
3.51554
Required uncracked Depth =
282.19 mm >
238 mm
NOT SAFE
At
0.7 H from top water level
Total Thickness
=
235 mm
BM
=
7.5234 KNM
Eff. Thickness for strength criteria =
223 mm.
Eff. Depth( d)
=
192 mm
K
=
0.86
From Table 2.5 of DESIGN OF WATER RETAINING STRUCTURES USING Tor STEEL
M/(bD2) =
3.5096
Required uncracked Depth =
146.4122 mm >
235 mm
SAFE
t=150 N/mm2
c= 10 N/mm2; m= 9 ; k =0.375 ; j = 0.875 ; Q = 1.64
VERTICAL REINFORCEMENT
On water face required Ast = M/(150*j*d) =
1030.4 mm2/m
at base
On outside face reqired Ast =M/(150*j*d) =
298.55 mm2/m
at
0.7 H from MWL
Minimum steel as per IS : 3370
For Tor steel
Thickness
Minimum As(mm2/m)
Minimum As on each face
2
200
mm
434.2857 mm /m
217.14 mm2/m
235
mm
491.4857 mm2/m
245.74 mm2/m
240
mm
499.2 mm2/m
249.6 mm2/m
250
mm
514.2857 mm2/m
257.14 mm2/m

230

0.60
1.00

Vertical Reinforcement:
Inside (water face)
Provide
10 mm Tor @
curtail alternate rods at
Total Ast provided at base on water face =

100 mm c/c from base and


1500 mm height from base.
785.4 mm2/m >

1030.37 mm2/m
NOT SAFE

Outside (Air face)

page 43 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Provide

8 mm Tor @
Ast provided =

150 mm c/c on outside face.


335.1 mm2/m >
298.546 mm2/m
SAFE

Height
above floor
slab
(m)
5.15 m
4.64 m
4.12 m
3.61 m
3.09 m
2.58 m
2.06 m
1.55 m
1.03 m
0.52 m

Coefficient
Tension
table 12
Depth from top
(KN/m)
IS.3370
static
(IV)

0.0 H

-0.014

-6.7

Tension Due to
seismic.

Ring Tension (Hoop tension)


For computing ring tension the side wall is treated as hinged at bottom and free
at top (Clause 3.1.2 of IS: 3370 (Part-IV)
Hoop tension : Coefficient x WH1(D/2)
W=
10.00 KN/m3 ; H1=
5.59304 m. ;
Avg internal dia (D) =
2
WH1(D/2) =
H
/
DT
=
474.01
7.346
1

Area of steel
required =Total
Tension/ 150
(mm2/m)

16.95 m.

Steel to be provided on both faces


(height from floor slab top)

-44.67

8 mm Tor at
80 mm c/c
from
4.64 m. to
5.45 m.
0.1 H
0.099
47
7.20 361.3333
8 mm Tor at
80 mm c/c
from
4.12 m. to
4.64 m.
0.2 H
0.213
101
13.60
764
8 mm Tor at
80 mm c/c
from
3.61 m. to
4.12 m.
0.3 H
0.331
156.9
19.20 1174
8 mm Tor at
50 mm c/c
from
3.09 m. to
3.61 m.
0.4 H
0.450
213.4
24.10 1583.333
10 mm Tor at
50 mm c/c
from
2.58 m. to
3.09 m.
0.5 H
0.565
267.9
28.20 1974
10 mm Tor at
50 mm c/c
from
2.06 m. to
2.58 m.
0.6 H
0.654
310.1
31.6 2278
12 mm Tor at
60 mm c/c
from
1.55 m. to
2.06 m.
0.7 H
0.680
322.4
34.2 2377.333
12 mm Tor at
60 mm c/c
from
1.03 m. to
1.55 m.
0.8 H
0.597
283
36.1 2127.333
12 mm Tor at
60 mm c/c
from
0.52 m. to
1.03 m.
0.9 H
0.367
174
37.2 1408
12 mm Tor at
100 mm c/c
from
0.00 m. to
0.52 m.
Note:- The above hoop reinforcement is to be staggered on both faces
Maximum Hoop tension(Tmax) is at
0.7 H ; Tmax. = 356.6 KN/m.
Thickness side wall at
0.7 H from top water level =
235 mm
Thickness of wall for strength calculations=
235-12 =
223 mm.
Total hoop reinforcement provided at
0.7 H is Ash = 2377.3 mm2/m
Tensile stress = Tmax*1000/((twallx 1000) + (9-1) x Ash/m) =
1.47344 N/mm2
Max. allowable tensile stress =
1.5 N/mm2
SAFE
Shear at base of cyllindrical tank = coeff. X w* H 12 =
=
56.9334 KN/m.
coeff.=
0.182
Shear stress at base of tank = shear/(b*j*d) =
=
0.31433 N/mm2
<
2.2 N/mm2

page 44 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 45 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Check for compressive stress:For roof slab


Diameter upto outer face of side wall (K 1)=(Diao+b3) =
Diameter upto outer face of top inner ring beam(K 2)=(Diai+b1) =

17.40 m.
11.80 m.

Average Dia. Upto center of annular roof slab


(Kavg)=(K1-2*S1+K2)/2 =

14.4 m.

Loads
From annular roof slab =Pi/4(( K1 )2 - Kavg2)*w =
Weight of hand railing at roof level =Pi*K1*0.6 =
Weight of side wall =
Pi*( K1 - S1)*S1*(H+0.3)*
tapering=Pi*(K1-2*S2+4/3*(S2-S1))*0.5*(S2-S1)*(H+0.3)*

25.00
25.00

Weight of water over tapered portion of side wall


Pi*(K1-2*S2+2/3*(S2-S1))*0.5*(S2-S1)*

10.00 =
Total W =

Total load per running meter(c1) =W /(Pi* Diao) =


Maximum compressive stress = c1/S2
Max. allowable comp. Stress =
Haunch
Provide a haunch of size
at
8

200 mm. X
200 mm with reiforcement of
150 mm c/c in both directions.

Design of bottom dome:Thickness at crown =


Rise at crown up to top surface (h) =
Diameter upto c/c of inner columns =
Top surface of dome coincide with center of inner ring beam
Diameter upto center of beam=
Radius a =
11.50 /2 =
Spherical radius of dome (r) = (h2 + a2)/(2*h) =
Sin x =a/r =

x 0.510365 radians.
29.242 Degrees
Hence, the dome is under compression

487.025 KN
32.7982 KN
1472.46 KN
181.561 KN
68.492 KN
2242.34 KN
41.9858 KN/m
0.17641 N/mm2
8.00 N/mm2
SAFE
8 mm Tor

0.20 m
1.50 m
11.50 m
11.50 m
5.75 m
11.77 m

0.4885 ;

< 51 Degrees

Loadings
Self weight of dome = 2 * Pi * r * (h) * Thickness*
25.00
=
Dome tapering portion =
Pi*(2*a - 1.55*2/3)*1.55*(0+0.05)*0.5*25.0
=
Finishings =
=
Weight of water over dome =
(Pi/4*(D2-b2)*h - Volume of Dome)*10.00
=
Total (W) =
Spherical area of the Dome= 2*Pi*r*h =
=
2
Load per m ( c2) = W/Surface area of dome
=
Meridional thrust (T)=
46.21 *
11.771 /(1+ cos(x)) =
(Maximum @ sprining i.e., at
29.242 Degrees)
Meridional stress = Meridional thrust/ t =
290.47 /
200 =
<

page 46 of 70

554.687 KN
31.85 KN
0.00 KN
4539.82 KN
5126.4 KN
110.937 m2
46.21 KN/m2
290.47 KN/m
1.45235 N/mm2
1.6 N/mm2

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Max Hoop thrust (Max. at crown i.e., at x = 0) = C 2r/2 =


Max. Hoop stress =

hoop thrust/t2 =

=
=
<

SAFE
271.962 KN/m
1.35981 N/mm2
1.6 N/mm2
SAFE

Meridional stress & hoop stress should not exceed 1.6 N/mm 2
i.e., less than maximum permissible stress in direct compression for domes.
For
200 mm thick minimum pt =
0.2171 % for Tor steel.
minimum As =
434.29 mm2/m
Minimum As on each face =
217.14 mm2/m
Reinforcement
Provide
8 mm Tor @
150 mm c/c in the form of merdionals and
circumferentials at each face (ie., each at top and bottom) with due curtailment of meridionals.
Spacing measured at springing (i.e., at r =
5750 mm)
Provided As on each face =
335 mm2/m
>
217 mm2/m
SAFE
End moment due to restraint (Mend) = (c2)*r*thk/(4*sqrt(3)) =
15.7017 KNM/m
Thickness required from uncranked consideration
sqrt(6*Mend*106/(1000*2)) =
217.037 mm
<
250 mm SAFE
Length of stiffening to be done
in dome from springing = 0.76sqrt(r*thk) =
1.1661 m.
Increase thickness @ springing to
250 mm and taper to
200 mm
in a length of
1550 mm from springing.
Ast required for edge moment = Medge*10 6/(150*0.87*(t-30-12-5)) =
591.349 mm2/m
Reinforcement
Provide extra
10 mm Tor @
150 mm c/c on top face in the form of meridionals
and circumferentials up to a length of
1550 mm from springing.
Ast provided for edge moment =
524 mm2/m >
591.349 mm2/m
NOT SAFE
Design of floor slab:Thickness of floor slab =
400 mm
Total depth of water =
5.15 m.
Loading:Water load =
5.15 *
10.00 =
51.5 KN/M2
Self weight of slab =
0.4 *
25.00 =
10.0 KN/M2
Weight of pipes errection per sqm =
say
0.5 KN/M2
Total (c3) =
62.00 KN/M2
C/C span of floor slab (Leff) = (Diao-Diai)/2 =
2.75 mts.
Clear
span(
l
)
=
Width of supports
=
400 mm
2350 mm
1
l1/12 =
195.833 mm
Width of supports
> l1/12
effective span (Leff) =
2350 mm. =
2
Max. support moment = c3*(Leff) /10 =
Aa per cl. 5.2.7 of IS: 1893-1984
Hydro dynamic pressure on floor slab due to seismic effect
Pressure pb =Ah*w*h*sqt(3)/2*[sinh(sqrt(3)*x/h)/cosh(sqrt(3)*l'/h)]

page 47 of 70

2.35 mts.
34.24 KNM/m

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Here
Ah =
w =
h=

0.1
10 KN/m3 ;
5.15 m.

x =
l' =
R=

in m.
in m.
16.95 / 2=

page 48 of 70

8.475 m.

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

x
(m)
5.4703
5.9927
6.4922
6.9423
7.3396
7.681
7.9639
8.1862
8.2929

l'
pb
(m) (KN/m2)
6.47317
3.063
5.99273
4.304
5.44762
6.101
4.86106
8.571
4.2375 11.882
3.58169 16.152
2.89862 21.347
2.19349 27.130
1.74758 30.682

For simply supported condition


Max span BM = say
Mid span BM =

8 KNM @ X =
8 KNM.say

Mid span BM =

m.

8 KNM.

Max. span moment =


c3*(Leff)2 /10 =
=
34.24 KNM/m
Total span BM =
8+ 34.24
=
42.24 KNM/m
Total support BM =
34.24+ 8
=
42.24 KNM/m
Required Overall thickness for uncranked condition
sqrt(
6*M*106/(1000*2.0))
=
355.98 mm
Thickness to be considered in design =
400-12
=
388 mm.
Provided thickness =
388 mm. >
355.98 mm.
SAFE
Total Thickness =

400 mm

Clear cover =
extra cover =
Effective depth =(t -30-12 -16/2) =
350 mm
Ast required at support on top = M*10 6/(150*0.87*deff) =
Ast required at mid span at bottom = M*10 6/(190*0.89*deff) =

30 mm
12 mm.
924.795 mm2/m
713.694 mm2/m

Thickness
Minimum As(mm2/m)
Minimum As on each face
400 mm
685.7143 mm2/m
342.86 mm2/m
Reinforcement in radial direction (Main reinf.)
At top provide
12 mm Tor through bars at
200 mm c/c
(spacing measured at outer ring beam) and
at supports provide extra
12 mm Tor @
200 mm c/c
upto a distance of
900 mm from face of supports.
On top Ast provided at supports =
1131 mm2/m >
924.795 mm2/m
SAFE
at top
at mid span =
565.49 mm2/m >
342.857 mm2/m
SAFE
At bottom provide
12 mm Tor at
120 mm c/c
(spacing measured at outer ring beam)
At bottom provided Ast
=
942.48 mm2/m >
713.694 mm2/m
SAFE

page 49 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Hoop tension induced in the annular slab due to dome


Size of INNER ring beam at floor level =
400
x
850
mm.
Internal radial force = Meridional thrust * Cos(X) =
253.454 KN/m
Hoop thrust = Radial force*(Diai-b2)/2 =
1406.67 KN
Max.Hoop thrust to beconsidered in inner ring beam=
say
459
KN
Providing
8 nos.
20 mm Tor on both face of inner
floor ring beam(ie.
4
Nos of
20
mm Tor on each vertical face)
2
Ash1 provided =
2513.274 mm as hoop reinforcement in inner ring beam.
Hoop tension taken by
inner ring beam (T1) =
8
x
314.16 X
150/1000
376.991 KN
However Hoop tension capacity beam considered ( T ) =
376.991 KN
Induced tensile stress in beam = ( T )*1000/(b*(d-12) + (9-1)Ash1) =
1.06103 N/mm2
<
1.5
N/mm2
Radial force resisted by inner ring beam =( T )*2/Diai =
Balance radial force =
253.4541 -65.564

But, this is not distributed uniformly in the slab. Applying the LAMI's equation
(Treating the annular slab as thick cylinder)
P= b -a
F= b +a
x2
x2
P = pressure applied at 'X' from centre
F = Hoop tension produced at 'X' from centre
a, b are constants
Horizontal thrust is acting on the slab with inner radius of
However, consider inner radius as outer face of inner ring beam =
Inner radius of outer ring beam = (D2-b3)/2 =
8.3
m.
At' X1'=
5.95
mts. P =
187.8904 KN
At' X2'=
8.30
mts. P =
0
KN
Therefore
b/(X1)2 -a =
187.89
2
b/(X2) -a =
0
From the above two equations values of 'a' and 'b' are
a =
198.635 and b =
13684
2
Hoop tension (F) = b/x + a
Minimum As(mm2/m) =

page 50 of 70

SAFE
65.5637 KN
187.89 KN

5.55
5.95

m.
m

685.714

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Sl.
No.

Radius
x

Hoop Tension Fx =
b/x^2+a

Area of Hoop
reif. Reqd. Ash =
F/150

(m)
5.95

KN/m
585.16

(mm2/m)
3901.1

6.45

527.56

3517.0

6.95

481.93

3212.9

7.45

445.18

2967.9

7.95

415.14

2767.6

8.30

397.27

2648.5

8.30

397.27

2648.5

Total Hoop Reinforcement on both faces

12 Tor @
29 mm c/c (
from radius
5.95 mts.
12 Tor @ 32.2 mm c/c (
from radius
6.45 mts.
12 Tor @ 35.2 mm c/c (
from radius
6.95 mts.
12 Tor @ 38.1 mm c/c (
from radius
7.45 mts.
12 Tor @ 40.9 mm c/c (
from radius
7.95 mts.
12 Tor @ 42.7 mm c/c (
from radius
8.30 mts.
12 Tor @ 42.7 mm c/c (
from radius
8.30 mts.

3901.07 mm2/m)
to
6.45
2
3517 mm /m)
to
6.95
3212.88 mm2/m)
to
7.45
2
2967.88 mm /m)
to
7.95
2767.63 mm2/m)
to
8.30
2
2648.47 mm /m)
to
8.30
2648.47 mm2/m)
to
0.00

Note : The above reinforcement must be staggered on both faces


Tmax =
585.16 KN/m; Thickness of Floor slab =
Eff. Total thickness for strength criteria
=
Provided hoop reinforcement
=
3901.1 mm2/m
Induced tensile stress in concrete= Tmax/(1000*D+(9-1)*Ash) =

400 mm
388 mm

<
10

Design of Inner floor ring beam


(Top of ring beam flushed with top of floor slab)
Size =
400 mm X
850 mm
Loading
1. Load from bottom dome =
2. Load from floor annular slab
Pi/4(((Diai+b2+Diao-b3)/2)2-(Diai+b2)2)*
3. Weight of water over width of ring beam Pi*(D 1)*b2*h*10.00
3.Self weight of ring beam= TT * D1* b2*d2*
25.00

5126.4 KN
62.00

Total (W) =
Load per 'meter' run('S) = W/(Pi*D1)=
Dia.upto center of columns =
supports =
20

2A=

1.39587 N/mm2
1.5 N/mm2

2992.41 KN
744.243 KN
307.091 KN
9170.1 KN
253.82 KN/m

11500 mm.
18 Degrees.

BM @ support =S*(D2/2)2(TT/n* Sin o + TT/n* Cot A * Cos o -1)=

page 51 of 70

A =
A =

9 Degrees
0.15708 radians
-69.135 KNM

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

BM @ mid span =S*(D2/2)2(TT/n* Sin A + TT/n* Cot A * Cos A -1)=


For max.Torsion angle (B) =
3.8 Degrees.
Width of column =
400 mm
Distance of max. torsion from face of supports =
Max. Torsion =
S*(D2/2)2*[TT/n* CosB -TT/n*Cot A x Sin B - ( TT/n- TT/180*B)] =
angle (beta)in between center and face of column

34.6101 KNM
0.0663 radians
181.35 mm
2.09 KNM
0.0348 radians.
1.9929 degrees.

=
BM @ face of support =
S(D2/2)2 ( TT/n* Sin(beta) + TT/n* Cot A * Cos(beta) - 1)=
=
-28.328 KNM
Design of support section:
Size =
400 mm
X
850 mm
eff. Depth = (Total D -30-12-10-20-20/2) =
768 mm
BM at face =
28.3275 KNM ; Torsion =
2.09 KNM
Mt =T/1.7*(1+D/b) =
3.844963 KNM
Me = M+Mt =
32.17249 KNM
t=150 N/mm2 ; cbc = 10 N/mm2 ; m = 9 ; k= 0.375 ; j = 0.875 ; Q = 1.64
Balance B.M = Q*b*(deff)2 =
386.9245 KNM
Hence OK
6
Required Ast = Me*10 /(150*0.875*(deff))
319.172 mm2
Minimum steel = 0.224/100*(b*d) =
688.128 mm2
Reinforcement
Provide
2 Nos of
16 mm Tor Through bars on top
and extra
1 Nos of
20 mm Tor on top at supports.
Ast provided on top at supprt

716.28 mm2

>

688.128 mm2
SAFE

Design of mid span section:Mid span B.M =


34.61006 KNM
2
2
t = 190 N/mm ; cbc = 10 N/mm ; m = 9 ; k = 0.321 ; j = 0.892; Q = 1.42
Balanced moment = Qb(effd)2 =
=
335.02 KNM
Hence OK
Required Ast = M*106/(190*0.87*(effd) =
=
265.903 mm2
Minimum steel = 0.224/100*(b*d) =
=
688.128 mm2
Bottom reinforcement
Provide
3 Nos of
16 mm Tor Through bars
and extra
0 Nos of
0 mm Tor at bottom.
2
Ast provided
=
603.1858 mm
>
688.13 mm2
NOT SAFE
Hoop Reinforcement
Provide
8 nos.
20 mm Tor on both face of inner
floor ring beam(ie.
4
Nos of
20
mm Tor on each vertical side face
in order to take care of part of hoop force coming from bottom dome
Design for shear:Shear at a distance ' (effd)' from face of support =

page 52 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

V =
S*(Pi*D1/(2*n)-(col.width/2-effd)) =
Max. Torsion =
Equivalent shear at face of support (Ve) = V+1.6*T/b =
Equivalent shear stress (tve) = (Ve)/(b*effd) =
For M30 grade concrete
tcmax. =

11.

=
=
=
=
2.2 N/mm2

>

-16.446 KN
2.09 KNM
-8.0789 KN
-0.0263 N/mm2
-0.0263 N/mm2
SAFE

At face of support
At face of support provided Ast =
716.28 mm2
pt = Ast/(b*effd)*100 =
0.233165 % ;
tc =
0.224 N/mm2
b1 = (b-2*(30+10+20/2)) =
300 mm
d1 = (d-2*(30-12-10-20/2)) =
726 mm
Using
10 mmTor
2 Legged vertical stirrups
2
Asv =
157.08 mm and tsv =
175 N/mm2
The allowable spacing must be minimum of the following
1.Sv =Asv*tsv/(b*(tve - tc)) =
-274.561 mm. C/c
Asv = T*Sv/(b1*d11*tsv) +V*Sv/(2.5*d11*tsv)
2. Sv =
-3037.01 mm. C/c
X1 = (b-2*(30)-10) =
330 mm. Y1 = (d - 2*(30) -12-10) =
768 mm
3.Sv = least of X1 and Y1 =
330 mm. C/c
4. Sv = (X1+Y1)/4 =
274.5 mm. C/c
Min. Asv condiion; Sv =Asv*fy/(0.4*b) =
407.43 mm. c/c
Max Sv =
-3037 mm. c/c
Negative value
Sv =
-3037 mm. c/c
Therefore provide
10 mmTor
2 Lgd vertl. stirrups@
200 mm. C/c
NOT SAFE
Design of Outer ring beam at floor level
Size =
400 mm x
850 mm
Loading
Load from side wall =
=
2242.34 KN
Weight of water over off set of ring beam
Pi*(D2-b3+(b3-S2))*(b3-S2)*h*10.0=
=
406.502 KN
Load from floor annular slab =
Pi/4((D2-b3)2- ((D1+b2+D2-b3)/2)2)*
62.00 =
3530.24 KN
Weight of gallary at floor level =
Pi/4*((D2+b3+2*width)2-(D2+b3)2)*w =
=
171.06 KN
Hand railing= Pi*(D2+b3+2*width)*0.6 =
=
35.63 KN
Self weight of beam = TT (D1) * b3 * d3 *
25.00 =
=
453.96 KN
Total W =
=
6839.7 KN
Load per 'meter' run('S) = W/(Pi*D1)=
128.1 KN
Dia.upto center of columns =
17000 mm.
No.of supports =
20
2A=
18 Degrees.
; A =
9 Degrees
A =
0.15708 radians
BM @center of support
S*(D2/2)2 ( TT/n* Sin o + TT/n* Cot A * Cos o -1)=
=
-76.228 KNM
BM @ mid span =S*(D2/2)2(TT/n* Sin A + TT/n* Cot A * Cos A - 1)=
For max.Torsion. Angle(B) =

3.8 Degrees.

page 53 of 70

=
38.1609 KNM
0.0663 radians

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Width of column =
400 mm
Distance of max. torsion from face of supports =
=
Max. Torsion (T) =
S*(D2/2)2 [ TT/n* CosB -TT/n*Cot A x Sin B - ( TT/n- TT/180*B)] =
angle (beta) in between center and face of column =
=

363.74 mm
=

2.30625 KNM

0.0235 radians.
1.3481 Degrees.

BM @ face of support =
S(D2/2)2 ( TT/n* Sin(beta) + TT/n* Cot A * Cos(beta) - 1)=

-44.57 KNM

Design of support section:


Size =
400 mm
X
850 mm
eff. Depth = (Total'd' -30-12-10-20-20/2) =
768 mm
BM at face(M)=
44.57 KNM; Torsion(T)=
2.3063 KNM
Mt =T/1.7*(1+D/b) =
4.239436 KNM
Me = M+Mt =
48.81 KNM
2
2
t=150 N/mm ; cbc = 10 N/mm ; m = 9 ; k= 0.375 ; j = 0.875 ; Q = 1.64
Balanced B.M = Q*b*(deff)2 =
386.9245 KNM
>
48.81 KNM
Sinly reinforced section
6
Required Ast = Me*10 /(150*0.87*(deff)) =
=
484.243 mm2
Minimum steel = 0.224/100*(b*D) =
=
688.128 mm2
Reinforcement
Provide
2 Nos of
20 mm Tor Through bars on top
and extra
1 Nos of
20 mm Tor on top at supports.
Ast provided on top at support

942.48 mm2

>

688.128 mm2
SAFE

Design of mid span section:Mid span B.M =


38.16087 KNM
t = 190 N/mm2 ; cbc = 10 N/mm2 ; m = 9 ; k = 0.321 ; j = 0.892; Q = 1.42
Balanced moment = Qb(effd)2 =
335.02 KNM >
38.1609 KNM
Sinly reinforced section
6
Required Ast = M*10 /(190*0.87*(effd) =
=
293.18 mm2
Minimum steel = 0.224/100*(b*d) =
=
688.13 mm2
Bottom reinforcement
Provide
3 Nos of
20 mm Tor Through bars
and extra
0 Nos of
0 mm Tor bars at bottom.
Ast provided
=
942.4778 mm2 >
688.13 mm2
SAFE
Area of side face reinforcement (As1)= 0.1% of cs area =
=
340 mm2
Area of reinforcement on each vertical side face = As1/2 =
=
170 mm2
Max allowable spacing =
300 mm.c/c
Side face Reinforcement :Provide
3 nos. of
10 mm Tor on each vertocal side face
Design for shear:SAFE
Shear at a distance ' (effd)' from face of support
V =
S*(Pi*D1/(2*n)-(col.width/2-effd)) =
=
47.0236 KN

page 54 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Max. Torsion (T) =


Equivalent shear at face of support (Ve) = V+1.6*T/b =
Equivalent shear stress (tve) = (Ve)/(b*effd) =
For M30 grade concrete
tcmax. =
2.2 N/mm2 >
At face of support
At face of support provided Ast =
942.48 mm2
pt = Ast/(b*effd)*100 =
0.306796 % ;
tc =
b1 = (b-2*(30+10+20/2)) =
300 mm
d1 = (d-12-2*(30+10+20/2)) =
738 mm
Using
10 mmTor
2 Legged vertical stirrups
Asv =
157.08 mm2 and tsv =
175 N/mm2

page 55 of 70

=
=
=

2.30625 KNM
56.2486 KN
0.1831 N/mm2
0.1831 N/mm2
SAFE
0.248 N/mm2

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

12

The allowable spacing must be minimum of the following


1.Sv = Asv*tsv/(b*(tve - tc)) =
-1058.91 mm. C/c
Negative value
Asv = T*Sv/(b1*d11*tsv) +V*Sv/(2.5*d11*tsv)
2. Sv =
765 mm. c/c
X1 = (b-2*(30)-10) =
330 mm. Y1 = ( d -12- 2*(30) -10) =
768 mm
3.Sv = least of X1 and Y1 =
330 mm. c/c
4. Sv = (X1+Y1)/4 =
274.5 mm. c/c
Min. Asv condiion; Sv =Asv*fy/(0.4*b) =
407.43 mm. c/c
Max Sv =
-1058 mm. c/c
Negative value
Therefore provide
10 mmTor
2 Lgd vertl. Stirrups @
200 mm. C/c
NOT SAFE
Wind Analysis:IS : 875 ( part 3 ) - 1987
Location of municipality in wind zone
=
=
5
Basic wind speed (Vb)
=
50 m/sec
Modification factor for Vb
=
1.15
Modified Vb = Vb1 =Vb * modification factor =
=
57.5 m/sec
Height of structure above GL (5+0.15+5+0.3+0.2+1.5)
=
12.150 m.
Risk coefficient ( k1) as per table 1
=
1.080
Terrain, heght and structure size factor ( k2 ) from table 2
=
0.936
Value of K3 as per clause 5.3.3.1
=
1.000
Design wind speed ( Vz ) = Vb1 * k1 * k2 * k3
=
58.113 m/sec
Design wind pressure = 0.6* Vz2
=
2026.3 N/m2
2.03 KN/m2
Wind pressure considered =
3.50 KN/m2
>
2.03
SAFE
Intencity of wind pressure on projected dome surface = 0.5 P
Intencity of wind pressure on cylindrical and conical surface = 0.70 P
Intencity of wind pressure on chord braces = 0.80 P
Ground Level
=
Depth of foundation
=
Bottom Level of Raft foundation
=
Assumed Depth of Foundation INNER ring beam
Assumed Depth of Foundation OUTER ring beam
Top Level of Foundation ring beam
=
Bottom Level of First chord brace (ie., GL)
=
Bottom Level of Second chord brace
=
Bottom Level of Third chord brace
=
Bottom Level of Fourth chord brace
=
Bottom Level of inner Floor ring beam
Bottom Level of outer Floor ring beam
Top Level of Floor slab
Top Level of Roof slab

+
+
+
+
+

10.00 M. LEVEL
3.00 m.
7.00 M. LEVEL
750 mm.
750 mm.
7.75 M. LEVEL
10 M. LEVEL
11.00 M. LEVEL
12 M. LEVEL
13 M. LEVEL

+
+
+
+

14 M.
14 M.
14.85 M.
20.5 M.

+
=
=

=
=
=
=

LEVEL
LEVEL
LEVEL
LEVEL

Size of inner,outer chord braces

page 56 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

and radial braces =


No. of columns in each row =
20 nos.
Size of each INNER row column
Size of each OUTER row column
No. of columns in each row (n) =
Clear height of columns
In between footing raft beam and 1st brace (L1) =
In between 1st brace and 2nd brace (L2) =
In between 2nd brace and 3rd brace (L3) =
In between 3rd brace and 4th brace (L4) =
Inbetween 4th brace and Floor ring beam (L5) =

300 x

600 mm.

400 x
400 x

400 mm.
400 mm.
20 Nos.
2.25 m.
0.4 m.
0.4 m.
0.4 m.
0.4 m.

Outer dia.of cyllindrical side wall (Do) =


17.40 m.
Height of water upto MWL
5.15 m.
Chord length of top dome (S1)=
11.20 m.
Rise of top dome at crown up to top surface (h)= (h1+t1) =
1.60 m.
Depth of floor outer ring beam (e) =
0.85 m.
Wind pressure coefficient for curved surfaces =
0.7
for braces =
0.8
for projected area of dome surface =
0.5
2
Intensity of wind =(F) =
3.50 KN/m
Pw = wind load(KN);
y = lever arm above top of foundation(m)
Mw = Wind moment =(Pw*y)in KNM

Members

Wind load calculations

Top Dome

0.5*F*4/3*h1*sqrt(D32/4+2/3*h12)

Cyllindrical
wall

0.7*Do*(H+fb+T)*F

240.860

9.925

2390.53

Outer ring
beam

0.7*Do*e*F

36.2355

6.675

241.87

4th panel
columns

2n*width of col*L5*F

22.400

6.050

135.52

4th brace

0.8*Do*Dbr*F

29.232

5.55

162.24

3rd panel
columns

2n*width of col*L4*F

22.400

5.05

113.12

3rd brace

0.8*Do*Dbr*F

29.232

4.55

133.01

2nd panel
columns

2n*width of col*L3*F

22.400

4.05

90.72

2nd brace

0.8*Do*Dbr*F

29.232

3.55

103.77

page 57 of 70

Pw(KN)

y(m)

21.468 13.417

Mw(KNM)
288.03

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

1st panel
columns

2n*width of col*L2*F

22.400

3.05

68.32

1st brace

0.8*Do*Dbr*F

29.232

2.55

74.54

columns

2n*width of col*L1*0

0.000
505.091

1.125

0.00
3801.67

Total =
Thrust due to wind Load on farthest leeward column
On outer column (To) =4*M*(D1*a1)/(n*a1*D12+n*a2*D22) =
On inner column (Ti) =4*M*(D2*a2)/(n*a1*D12+n*a2*D22) =
12

Calculation of effective lengths of columns


Inner row columns
Size of each column =
400 X
Size of inner chord brace =
300 X
Size of radial brace
=
300 X
Size of foundn. ring beam =
500 X
Size of floor Lvl ring beam =
400 X
Thickness of floor slab =
400 mm

400
600
600
750
850

30.6841 KN
20.7569 KN

MI
= 0.00213 m4
MI
=
0.0054 m4
MI
=
0.0054 m4
MI
= 0.01758 m4
MI
= 0.02047 m4
MI
= 0.00533 m4
(considering 1000mm width)
For columns in between foundation ring beam & 1st Brace
Clear length L1 =
MI/L1 = kc= 0.00095
2.25 m.
At top joint
Clear length of top column L2=
0.4 m. MI/L2 = kc=
0.00533
Clear length of chord brace Lc =
1.399 m. MI/Lc= kbx= 0.00386
Clear length of radial brace Lr =
2.55 m. MI/Lr =kby= 0.00212
beta1 in X-direction = (sigma kc)/(sigma kc+sigma kb) =
0.44864
beta1 in Y-direction = (sigma kc)/(sigma kc+sigma kb) =
0.74787
at bottom joint
Clear length of foundation ring beam Lfn
=
1.4064 m.
MI/Lfn =
0.0125
beta2 in X-direction = (sigma kc)/(sigma kc+sigma kb) =
0.03654
beta2 in Y-direction = (sigma kc)/(sigma kc+sigma kb) =
1.00
From IS: 456-2000
Lex/L =
1.05
Lex
=
2.3625 m.
Ley/L =
2.25
Ley
=
5.0625 m. Slender column Change column size
For columns in between 1st Chord brace to
4 th chord brace(equal clear lengths)
Clear length L2 =
MI/L2 = kc= 0.00533
0.4 m.
At top joint
beta1 in X-direction = (sigma kc)/(sigma kc+sigma kb) =
0.58014
beta1 in Y-direction = (sigma kc)/(sigma kc+sigma kb) =
0.83436
At bottom joint
beta2 in X-direction = (sigma kc)/(sigma kc+sigma kb) =
0.44864
beta2 in Y-direction = (sigma kc)/(sigma kc+sigma kb) =
0.74787
From IS: 456-2000
Lex/L =
1.08
Lex
=
0.432 m.

page 58 of 70

mm.
mm.
mm.
mm.
mm.

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Ley/L =
1.26
For columns in between
Clear length L5 =

Ley

=
0.504 m.
4 th chord brace and floor level ring beam
MI/L5 = kc= 0.00533
0.4 m.

For floor level ring beam


Clear length Lfo =
1.406416 m.
MI/Lfo=kbx=
For floor slab
Clear length Lslab =
2.55 m.
MI/Lslb=kby=
At top joint
beta1 in X-direction = (sigma kc)/(sigma kc+sigma kb) =
beta1 in Y-direction = (sigma kc)/(sigma kc+sigma kb) =
At bottom joint
beta2 in X-direction = (sigma kc)/(sigma kc+sigma kb) =
beta2 in Y-direction = (sigma kc)/(sigma kc+sigma kb) =
From IS: 456-2000
Lex/L =
1.04
Lex
=
0.416 m.
Ley/L =
1.09
Ley
=
0.436 m.
Outer row columns
Size of each column =
Size of outer chord brace =
Size of radial brace
=
Size of foundn. ring beam =
Size of floor Lvl ring beam =
Thickness of floor slab =

400 X
300 X
300 X
500 X
400 X
400 mm

0.01456
0.00209
0.15484
0.71831
0.58014
0.6639

MI
= 0.00213 m4
MI
=
0.0054 m4
MI
=
0.0054 m4
MI
= 0.01758 m4
MI
= 0.02047 m4
MI
= 0.00533 m4
(considering 1000mm width)
For columns in between foundation ring beam & 1 st Brace
Clear length L1 =
MI/L1 = kc
2.25 m.
0.00095
At top joint
Clear length of top column L2=
0.4 m. MI/L2 = kc=
0.00533
Clear length of chord brace Lc =
2.2594 m. MI/Lc= kbx= 0.00239
Clear length of radial brace Lr =
2.55 m. MI/Lr =kby= 0.00212
beta1 in X-direction = (sigma kc)/(sigma kc+sigma kb) =
0.56787
beta1 in Y-direction = (sigma kc)/(sigma kc+sigma kb) =
0.74787
at bottom joint
Clear length of foundation ring beam Lfn
=
2.2704 m.
MI/Lfn =
0.0077
beta2 in X-direction = (sigma kc)/(sigma kc+sigma kb) =
0.06
beta2 in Y-direction = (sigma kc)/(sigma kc+sigma kb) =
1.00
From IS: 456-2000
Lex/L =
1.09
Lex
=
2.4525 m.
Ley/L =
2.25
Ley
=
5.0625 m. Slender column Change column size
For columns in between 1st Chord brace to
4 th chord brace(equal clear lengths)
Clear length L2 =
MI/L2 = kc= 0.00533
0.4 m.
At top joint
beta1 in X-direction = (sigma kc)/(sigma kc+sigma kb) =
0.69055
beta1 in Y-direction = (sigma kc)/(sigma kc+sigma kb) =
0.83436

page 59 of 70

400 mm.
600 mm.
600 mm.
750 mm.
850 mm.

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

At bottom joint
beta2 in X-direction = (sigma kc)/(sigma kc+sigma kb) =
0.69055
beta2 in Y-direction = (sigma kc)/(sigma kc+sigma kb) =
0.83436
From IS: 456-2000
Lex/L =
1.11
Lex
=
0.444 m.
Ley/L =
1.21
Ley
=
0.484 m.
For columns in between
4 th chord brace and floor level ring beam
Clear length L5 =
MI/L5 = kc= 0.00533
0.4 m.
For floor level ring beam
Clear length Lfo =
2.270354 m.
MI/Lfo=kbx= 0.00902
For floor slab
Clear length Lslab =
2.55 m.
MI/Lslb=kby=
0.00209
At top joint
beta1 in X-direction = (sigma kc)/(sigma kc+sigma kb) =
0.22825
beta1 in Y-direction = (sigma kc)/(sigma kc+sigma kb) =
0.71831
At bottom joint
beta2 in X-direction = (sigma kc)/(sigma kc+sigma kb) =
0.69055
beta2 in Y-direction = (sigma kc)/(sigma kc+sigma kb) =
0.83436
From IS: 456-2000
Lex/L =
1.06
Lex
=
0.424 m.
Ley/L =
1.16
Ley
=
0.464 m.
SEISMIC
Calculation of Moment of Inertia( MI ) of columns
Inner Row columns =
20 Nos.
Size of each column
=
400 x
400 mm.
MI of each column = D4/12
0.002133 m4.
Total MI of inner row columns ( Ici)=
0.0427 m4.
Outer row columns =
20 Nos.
Size of each column
=
400 x
400 mm.
MI of each column = D4/12
0.002133 m4.
Total MI of outer row columns ( Ico)=
0.0427 m4.
Grade of concrete = M30 Grade Design mix.
Modulus of elasticity of concrete (Ec)=5000*sqrt(fck)*1000=
3E+007 KN/m2
Kc = 12*Ec*(Ici+Ico) / Le^3
12*Ec*(Ici)
=
1E+007 ;
12*Ec*(Ico) = 1E+007
Translation stiffness and Horizontal deflection
a)
In between Ftg. Raft beam & 1st brace
Clear height of column (L1)=
2.25 m.
Effective heights of columns
Inner lex1
=
2.3625 m.
Outer lex1 = 2.4525 m.
Inner ley1
=
5.0625 m.
outer ley1 = 5.0625 m.
Kc1 = 12 Ec Ic / le13 = 12 x Ec x[(Ici)/le13+(Ico) / le13]
=
538336
b)

In between First & Second braces


Clear height of column (L2)=
Effective heights of columns
Inner lex1
=

0.432 m.

0.4 m
Outer lex1 =

page 60 of 70

0.444 m.

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Inner ley1

c)

e)

outer ley1 =

In between Second & Third braces


Clear height of column (L3)=
Effective heights of columns
Inner lex1
=
Inner ley1
=

d)

0.504 m.

3E+008

0.444 m.
0.484 m.
Kc3 =

3E+008

0.444 m.
0.484 m.
Kc4 =

3E+008

0.424 m.
0.464 m.
Kc5 =

3E+008

0.4 m

0.432 m.
0.504 m.

In between Third & Fourth Braces


Clear height of column (L4)=
Effective heights of columns
Inner lex1
=
0.432 m.
Inner ley1
=
0.504 m.

Outer lex1 =
outer ley1 =

0.4 m
Outer lex1 =
outer ley1 =

Inbetween Fourth brace and floor ring beam


Clear height of column (L5)=
Effective heights of columns
Inner lex1
=
Inner ley1
=

0.484 m.
Kc2 =

0.416 m.
0.436 m.

0.4 m

Outer lex1 =
outer ley1 =

Total load from INNER ring beam at floor level =


Total load from columns inside container =
Total load from OUTER ring beam at floor level =
Container
Total (DL+Waterload+LL) =
Water Load=
(
1053.8 +
18.07 ) x 10.00 =
Live Load
From roof dome =
79.192
From roof annular slab =
From floor level gallary slab =
Container
Total Live Load
=
Staging
No. of INNER row columns =
20 nos. Size =
400 x
No. of OUTER row columns =
20 nos. Size =
400 x
Total length of each column =
6.25 m.
Inner chord brace
Size
=
300 x
600 mm
c/c length
=
1.798996 m. Clear length =
1.399 m.
Outer chord brace
Size
=
300 x
600 mm
c/c length
=
2.659386 m. Clear length =
2.2594 m.
Radial brace
Size
=
300 x
600 mm
c/c length
=
2.75 m. Clear length =
2.35 m.
No. of levels = at
4 Levels
Self wt. of
Columns

= Nos* L*b*D x

page 61 of 70

25.00 =

TOTAL
9170.1 KN
1204.0 KN
6839.73 KN
17214 KN
10719 KN
79.1917 KN
211.527 KN
64.1474 KN
354.866 KN
400 mm.
400 mm.

1000 KN

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Inner chord braces =


Outer chord braces
Radial braces

= Nos* L*b*D x
25.00 =
= Nos* L*b*D x
25.00 =
= Nos* L*b*D x
25.00 =
Staging Total weight
=

page 62 of 70

503.639 KN
813.379 KN
846 KN
3163 KN

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Calculation of sesimic loads


Tank empty condition
Total (DL+LL) of container =
Deduct LL (-) =
Deduct water load (-) =
Total weight of container
under tank empty condition(W1) =

17214 KN
-354.87 KN
-10719 KN
6140 KN

Total weight of staging (W 2) =


Total horizontal load Wept = W1+W 2/3 =

3163 KN
7194.6 KN

Point of action of the load W = Mid height container


Point of action of Load 'W' from top levelof raft ring beam(y) =

a)
b)
c)
d)

e)

for horizontal
deflection calculations.
9.925 m.

Calculations of Lateral defflections


In between footing Raft beam and first brace (delta1) =
Delta1 = Wept/kc1 *1000
In between first and second braces (delta2) =
Delta2 = Wept/kc2 *1000
In between second and third braces (delta3) =
Delta3 = Wept/kc3 *1000
In between third and fourth braces (delta4) =
Delta4 = Wept/kc4 *1000

In between last brace and floor ring beam ( delta5)


Delta5 = Wept/kc5 *1000
Total defflection(sigma delta) =

13.3645 mm.

0.02596 mm.

0.02596 mm.

0.02596 mm.

0.02106 mm.
13.4634 mm.
0.01346 mts.
0.23277 seconds.

=
Time period (T) =2TTsqrt(sigma delta/g) =
Type of foundation soils =
Hard soil
From page no 16 of IS: 1893 - 2002 (Sa /g) =
From table 6 of IS: 1893 - 2002; Importance factor (I) =
Design of structure is as per IS: 456-2000
From table 7 of IS: 1893 - 2002; Response reduction factor (R) =
Zone 3
From table no 2 of Is:1893 -2002, Zone factor (Z)
Horiontal earth quake force coefficient (Ah) = Z*I/(2*R)*(Sa/g) =
(See clause 6.4.2 of IS: 1893-2002 )
Horiontal earth quake force Wh1 = Ah1*Wept =
Point of action of seismic force from top of foundn. Ring beam =
Therefore M = Wh1
*
9.925 =

1
=
=

2.5
1.5

=
=

3
0.16
0.1
719.459 KN
9.925 m.
7140.63 KNM

Thrust due to seismic Load on farthest leeward column


On outer column (To) =4*M*(D1*a1)/(n*a1*D12+n*a2*D22) =
On inner column (Ti) =4*M*(D2*a2)/(n*a1*D12+n*a2*D22) =

page 63 of 70

57.6335 KN
38.9874 KN

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Tank full condition (DL)


Total vertical load of container(DL) and 1/3 weight of staging
Add weight of water when tank full.
Total horizontal load with tank full condition =Wfull=

=
=
=

7194.6 KN
10719 KN
17913 KN for horizontal
deflection calculations.

Point of action of the load Wfull = Mid height container


Point of action of Load 'Wfull' from top levelof raft ring beam(y) =

a)
b)
c)
d)

e)

Calculations of Lateral defflections


In between footing Raft beam and first brace (delta1) =
Delta1 = Wfull / kc1 *1000
In between first and second braces (delta2) =
Delta2 = Wfull / kc2 *1000
In between second and third braces (delta3) =
Delta3 = Wfull / kc3 *1000
In between third and fourth braces (delta4) =
Delta4 = Wfull / kc4 *1000

9.925 m.

33.2754 mm.

0.06463 mm.

0.06463 mm.

0.06463 mm.

0.05244 mm.
33.5217 mm.
0.03352 mts.
0.3673 seconds.

In between last brace and floor ring beam ( delta5)


Delta5 = Wfull / kc5 *1000
Total deflection(sigma delta) =
=
Time period (T) =2TTsqrt(sigma delta/g) =

Type of foundation soils =


Hard soil
1
From Fig. 2 of IS : 1893 - 2002; (Sa /g) =
=
From table 6 of IS: 1893 - 2002; Important factor (I) =
=
Design of structure is as per IS: 456-2000
From table 7 of IS: 1893 - 2002; Response reduction factor (R) =
=
Zone 3
Zone factor (Z) =
0
0
0
Horiontal earth quake force coefficient (Ah 2) = Z*I/(2*R)*(Sa/g) =
Horiontal earth quake force(Wh2) = Ah2*Wfull =
Point of action of seismic force from top of foundn. Ring beam =
Therefore M = Wh2
*
9.925 =

2.5
1.5
3
0.16

0.1
1791.33 KN
9.925 m.
17779 KNM

Thrust due to seismic Load on farthest leeward column


On outer column (To) =4*M*(D1*a1)/(n*a1*D12+n*a2*D22) =
On inner column (Ti) =4*M*(D2*a2)/(n*a1*D12+n*a2*D22) =
TOTAL HORIZONTAL WIND / SEISMIC LOADS
Wind load (Pw) =
Seismic Load

page 64 of 70

143.498 KN
97.0722 KN
505.1 KN

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Tank empty condition (Wh1) =


Tank full condition (Wh2) =
CRITICAL horizontal force

719.5 KN
1791.3 KN
1791.3 KN

page 65 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Calculation of wind/seismic shears @ mid height of columns


In between top of raft beam and 1st brace
Shear Q1 =
1791.3 KN;

(GL Brace)
c/c length of column (h1) =

2.85 m.

In between 1st brace and 2nd brace


Shear Q2 =
1791.3 KN;

c/c length of column (h2)

1.00 m.

In between 2nd brace and 3rd brace


Shear Q3 =
1791.3 KN;

c/c length of column (h3) =

1.00 m.

In between 3rd brace and


4 th braces
Shear Q4 =
c/c length of column (h4) =
1791.3 KN;

1.00 m.

In between last brace and bottom of floor ring beam


Shear Q5 =
c/c length of column (h5) =
1791.3 KN;

1.00 m.

Calculation of max moments in chord braces


No. of rows =
2 nos.
No.of columns in a row (n) =
20 nos.
Size of outer row columns =
400 X
400 mm
2
Sectional area (a1) =
0.16 m per each column
Size of inner row columns =
400 X
400 mm
2
Sectional area (a2) =
0.16 m per each column
For max moments in chord braces Tan (k) x Tan ( k + TT/n ) = 0.5
k=
0.3646 radians =
20.89 degrees.
2
Cos (k) =
0.87285 ; Sin (k+TT/n) ) =
0.4983 ;Sin(2*TT/n) =

0.30902

Max BM in chord brace = (Q1*h1+Q2*h2)*Cos2(k)*Sin(k+TT/n)*a


Sin(2*TT/n)
For outer chord brace
Max.BMs
In 1st chord brace M11

= (Q1*h1+Q2*h2)*Cos2(k)*Sin(k+TT/n)*a1
(n*a1+n*a2)
Sin(2*TT/n)
=

In 2nd chord brace M21

126.0748 KNM

= (Q3*h3+Q4*h4)*Cos2(k)*Sin(k+TT/n)*a1
(n*a1+n*a2)
Sin(2*TT/n)
=

In 4th chord brace M41

242.694 KNM

= (Q2*h2+Q3*h3)*Cos2(k)*Sin(k+TT/n)*a1
(n*a1+n*a2)
Sin(2*TT/n)
=

In 3rd chord brace M31

(n*a1+n*a2)

126.0748 KNM

= (Q4*h4+Q5*h5)*Cos2(k)*Sin(k+TT/n)*a1
(n*a1+n*a2)
Sin(2*TT/n)
=
126.0748 KNM

page 66 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Minimum BMs on the other end of outer chord braces.


Cos2(k-2TT/n) =
In 1st chord brace M'11

0.997458 ; Sin(k-3TT/n) =

= (Q1*h1+Q2*h2)*Cos2(k-2TT/n)*Sin(k-3TT/n)*a1
(n*a1+n*a2)
Sin(2*TT/n)
=

In 2nd chord brace M'21

In 1st chord brace =


In 2nd chord brace =
In 3rd chord brace =
In 4th chord brace =

For inner chord brace


Max.BMs
In 1st chord brace M12

113.18 KN

58.795 KN

58.795 KN

58.795 KN

242.694 KNM

= (Q2*h2+Q3*h3)*Cos2(k)*Sin(k+TT/n)*a2
(n*a1+n*a2)
Sin(2*TT/n)
126.0748 KNM

= (Q3*h3+Q4*h4)*Cos2(k)*Sin(k+TT/n)*a2
(n*a1+n*a2)
Sin(2*TT/n)
=

In 4th chord brace M42

= (Q1*h1+Q2*h2)*Cos2(k)*Sin(k+TT/n)*a2
(n*a1+n*a2)
Sin(2*TT/n)

=
In 3rd chord brace M32

-30.7719 KNM

2.659386 m.
(Q1*h1+Q2*h2)*2*Cos2(k)*a1
Lb* (n*a1+n*a2)
(Q2*h2+Q3*h3)*2*Cos2(k)*a1
Lb* (n*a1+n*a2)
(Q3*h3+Q4*h4)*2*Cos2(k)*a1
Lb* (n*a1+n*a2)
(Q4*h4+Q5*h5)*2*Cos2(k)*a1
Lb* (n*a1+n*a2)

=
In 2nd chord brace M22

-30.7719 KNM

= (Q4*h4+Q5*h5)*Cos2(k-2TT/n)*Sin(k-3TT/n)*a1
(n*a1+n*a2)
Sin(2*TT/n)
=

Shear Force
c/c length of brace ( Lb1 ) =

-30.7719 KNM

= (Q3*h3+Q4*h4)*Cos2(k-2TT/n)*Sin(k-3TT/n)*a1
(n*a1+n*a2)
Sin(2*TT/n)
=

In 4th chord brace M'41

-59.2358 KNM

= (Q2*h2+Q3*h3)*Cos2(k-2TT/n)*Sin(k-3TT/n)*a1
(n*a1+n*a2)
Sin(2*TT/n)
=

In 3rd chord brace M'31

-0.1064

126.0748 KNM

= (Q4*h4+Q5*h5)*Cos2(k)*Sin(k+TT/n)*a2

page 67 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Sin(2*TT/n)
126.0748 KNM

page 68 of 70

(n*a1+n*a2)

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Minimum BMs on the other end of inner chord braces.


Cos2(k-2TT/n) =
In 1st chord brace M'12

0.997458 ; Sin(k-3TT/n) =

-0.1064

= (Q1*h1+Q2*h2)*Cos2(k-2TT/n)*Sin(k-3TT/n)*a2
(n*a1+n*a2)
Sin(2*TT/n)
=

In 2nd chord brace M'22

= (Q2*h2+Q3*h3)*Cos2(k-2TT/n)*Sin(k-3TT/n)*a2
(n*a1+n*a2)
Sin(2*TT/n)
=

In 3rd chord brace M'32

In 1st chord brace =


In 2nd chord brace =
In 3rd chord brace =
In 4th chord brace =

-30.7719 KNM

= (Q4*h4+Q5*h5)*Cos2(k-2TT/n)*Sin(k-3TT/n)*a2
(n*a1+n*a2)
Sin(2*TT/n)
=

Shear Force
c/c length of brace ( Lb2 ) =

-30.7719 KNM

= (Q3*h3+Q4*h4)*Cos2(k-2TT/n)*Sin(k-3TT/n)*a2
(n*a1+n*a2)
Sin(2*TT/n)
=

In 4th chord brace M'42

-59.2358 KNM

-30.7719 KNM

1.798996 m.
(Q1*h1+Q2*h2)*2*Cos2(k)*a2
Lb2* (n*a1+n*a2)
(Q2*h2+Q3*h3)*2*Cos2(k)*a2
Lb2* (n*a1+n*a2)
(Q3*h3+Q4*h4)*2*Cos2(k)*a2
Lb2* (n*a1+n*a2)
(Q4*h4+Q5*h5)*2*Cos2(k)*a2
Lb2* (n*a1+n*a2)

167.31 KN

86.914 KN

86.914 KN

86.914 KN

Radial braces
Size=
300 x
600 mm.
c/c length of brace ( Lbr ) =
2.75 mts.
Induced moment in radial brace
at first brace level
outer = (Q1*h1+Q2*h2)*Cos2(k)*a1/(n*a1+n*a2)*Sin(k) =
inner = (Q1*h1+Q2*h2)*Cos2(k)*a2/(n*a1+n*a2)*Sin(k) =

53.6623 KNM
53.6623 KNM

at second,third and fourth braces levels


outer = (Q2*h2+Q3*h3)*Cos2(k)*a1/(n*a1+n*a2)*Sin(k) =
inner = (Q2*h2+Q3*h3)*Cos2(k)*a2/(n*a1+n*a2)*Sin(k) =

27.8765 KNM
27.8765 KNM

Critical BM =
Shear force =

53.6623 KNM
20.2738 KN.

Design of chord braces

Outer chord braces


Size (bxD) =

300 x

600 mm.

page 69 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

c/clength(Lb1) =

2.65939 m.
width of support =

Clear length( ) =
400 mm.

page 70 of 70

2.2594 m.
0.4 m.

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

First outer chord brace


@ the centre of column
Due to wind/Seismic force Max. BM
=
On the other end Min. BM =
Max. BM at the face of support =
Max. SF =
Due to self weight of brace Max. BM =
SF =
Total BM =
222.6 KNM; Total SF =

242.69 KNM
-59.236 KNM
219.99 KNM
113.18 KN
2.6521 KNM
5.9836 KN
119.16 KN

Design of section
Clear cover =
30 mm. Dia.of main reinf. =
20 mm.
Expected No. of layers of reinforcement =
2
Dia.of vertical stirrups
=
8 mm. Tor
2 Legged
Effective cover=
68 mm.
Effective depth =
532 mm.
Grade of concrete = M30 Design mix.
sigma cbc =
10 N/mm2
sigma St (t) =
230 N/mm2
ratio (m) =
9
;k =
0.28125 ; j =
0.9063 ; Q= 1.2744
2
Moment of resistance of balanced section (Mr)= Qbd =
108.21 <
222.6 KNM.
Therefore the beam is to be design as doubly reinforced section
Ast1 =
Mr/(t*j*d) =
975.8152 mm2
Unbalanced moment (M2)= (M-Mr) =
114.43 KNM
Ast2 = M2/(t*(D-d' )) =
1072.3 mm2
Total required Ast= Ast1+ Ast2 =
2048.1 mm2
Max. allowable reinf. = 0.04*b*D =
7200 mm2 and min. =
357.504 mm2
Dia of main reinforcement =
20 mm Tor Required no. of rods = 6.51925 Nos.
Provide
6 Nos. of
20 mm Tor
and
0 Nos. of
0 mm Tor through bars at Top
Provide
6 Nos. of
20 mm Tor
and
0 Nos. of
0 mm Tor through bars at bottom.
Therefore Ast provided on each face =
1885 mm2 >
2048.08 mm2
NOT SAFE
Design for Shear
Size of section (bxD)=
300 x
600 mm.
effective depth =
532 mm.
Total SF (V) =
119.16 KN
Shear stress = V/(b*d)*1000 =
0.7466 N/mm2 < (tcmax. =2.20 N/mm2 )
Ast.provided =
1885 mm2 ;
pt =
1.181 %
From Table 23 of IS: 456-2000 ;
tc =
0.438 N/mm2
0.438
Vs = V- tc*b*d/1000 =
49.25823 KN.
Dia.of vertical stirrups =
8 mm Tor ; No. of legs =
2 nos.
Asv =
100.531 mm2
tsv =
230 N/mm2
Spacing of vertical stirrups = tsv*Asv*d/Vs =
249.72 mm c/c.
As per cl. 26.5.1.6 of IS: 456- 2000
Max . Allowable Sv = Asv*0.87*fy/(0.4*b) =
302.47 mm c/c.
As per cl.
of IS: 456- 2000
Max . Allowable Sv = 0.75*d =
399 mm c/c.

page 71 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Provide

8 mm Tor

Sv =
249 mm c/c.
2 legged vertical stirrups @
SAFE

200 mm c/c.

Second,third
Size (bxD) =
c/clength(Lb1) =

4th outer chord braces


300 x
600 mm.
2.65939 m.
Clear length( ) =
2.2594 m.
width of support =
400 mm. =
0.4 m.
@ the centre of column
Due to wind/Seismic force Max. BM
=
126.07 KNM
On the other end Min. BM =
-30.772 KNM
Max. BM at the face of support =
114.28 KNM
Max. SF =
58.795 KN
Due to self weight of brace Max. BM =
2.6521 KNM
SF =
5.9836 KN
Total BM =
116.9 KNM; Total SF =
64.78 KN
Design of section
Clear cover =
30 mm. Dia.of main reinf. =
20 mm.
Expected No. of layers of reinforcement =
3
Dia.of vertical stirrups
=
8 mm. Tor
2 Legged
Effective cover=
88 mm.
Effective depth =
512 mm.
Grade of concrete = M30 Design mix.
sigma cbc =
10 N/mm2
sigma St (t) =
230 N/mm2
ratio (m) =
9
; k=
0.28125 ; j = 0.9063 ; Q = 1.2744
2
M.R. of balanced section (Mr)= Qbd =
100.22 KNM. <
116.9 KNM.
Therefore the beam is to be design as doubly reinforced section
Ast1 =
Mr/(t*j*d) =
939.1304 mm2
Unbalanced moment (M2)= (M-Mr) =
16.7 KNM
Ast2 = M2/(t*(D-d' )) =
171.32 mm2
Total required Ast= Ast1+ Ast2 =
1110.5 mm2
Max. allowable reinf. = 0.04*b*D =
7200 mm2
Dia of main reinforcement =
20 mm Tor Required no. of rods = 3.53468 Nos.
Provide
8 Nos of
20 mm Tor
and
0 Nos of
0 mm Tor through bars at top
Provide
8 Nos of
20 mm Tor
and
0 Nos of
0 mm Tor through bars at bottom.
Therefore Ast provided on each face =
2513.3 mm2 >
1110.45 mm2
SAFE
Design for Shear
Size of section (bxD)=
300 x
600 mm.
effective depth =
512 mm.
Total SF (V) =
64.78 KN
Shear stress = V/(b*d)*1000 =
0.4217 N/mm2 <
2.2 N/mm2
SAFE
2
Ast.provided =
2513.27 mm ;
pt =
1.6362 %
From Table 23 of IS: 456-2000 ;
tc =
0.490 N/mm2
Vs = V- tc*b*d/1000 =
-10.4859 KN.

page 72 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Dia.of vertical stirrups

8 mm Tor ; No. of legs =

Asv =
100.531 mm2
tsv =
Spacing of vertical stirrups = tsv*Asv*d/Vs =
As per cl. 26.5.1.6 of IS: 456- 2000
Max . Allowable Sv = Asv*0.87*fy/(0.4*b) =
As per cl.
of IS: 456- 2000
Max . Allowable Sv = 0.75*d =
Provide

8 mm Tor

2 nos.

230 N/mm2
-1129 mm.
302.47 mm
384 mm.
Sv =
302 mm c/c.
2 legged vertical stirrups @
SAFE

200 mm c/c.

Inner chord braces


Size (bxD) =
c/clength(Lb1) =

300 x
1.799 m.
width of support =

600 mm.
Clear length( ) =
400 mm.

First inner chord brace


@ the centre of column
Due to wind/Seismic force Max. BM
=
On the other end Min. BM =
Max. BM at the face of support =
Max. SF =
Due to self weight of brace Max. BM =
SF =
Total BM =
210.3 KNM; Total SF =

1.399 m.
0.4 m.

242.69 KNM
-59.236 KNM
209.13 KNM
167.31 KN
1.2136 KNM
4.0477 KN
171.36 KN

Design of section
Clear cover =
30 mm. Dia.of main reinf. =
20 mm.
Expected No. of layers of reinforcement =
2
Dia.of vertical stirrups
=
8 mm. Tor
2 Legged
Effective cover=
68 mm.
Effective depth =
532 mm.
Grade of concrete = M30 Design mix.
sigma cbc =
10 N/mm2
sigma St (t) =
230 N/mm2
ratio (m) =
9
;k =
0.28125 ; j =
0.9063 ; Q= 1.2744
2
MR of balanced section (Mr)= Qbd =
108.21 KNM. <
210.341 KNM.
Therefore the beam is to be design as doubly reinforced section
Ast1 =
Mr/(t*j*d) =
975.8152 mm2
Unbalanced moment (M2)= (M-Mr) =
102.13 KNM
Ast2 = M2/(t*(D-d' )) =
957.03 mm2
Total required Ast= Ast1+( Ast2 or Asc) =
1932.8 mm2
Max. allowable reinf. = 0.04*b*D =
7200 mm2
Dia of main reinforcement =
20 mm Tor Required no. of rods = 6.15244 Nos.
Provide
6 Nos of
20 mm Tor
and
0 Nos of
0 mm Tor through bars at top
Provide
6 Nos of
20 mm Tor
and
0 Nos of
0 mm Tor through bars at bottom.

page 73 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Therefore Ast provided on each face =

1885 mm2 >


NOT SAFE

1932.85 mm2

Design for Shear


Size of section (bxD)=
300 x
600 mm.
effective depth =
532 mm.
Total SF (V) =
171.36 KN
Shear stress = V/(b*d)*1000 =
1.0737 N/mm2 < (tcmax. =2.20 N/mm2 )
Ast.provided =
1885 mm2 ;
pt =
1.181 %
From Table 23 of IS: 456-2000 ;
tc =
0.438 N/mm2
Vs = V- tc*b*d/1000 =
101.4516 KN.
Dia.of vertical stirrups =
8 mm Tor ; No. of legs =
2 nos.
2
2
Asv =
100.531 mm
tsv =
230 N/mm
Spacing of vertical stirrups = tsv*Asv*d/Vs =
121.25 mm.
As per cl. 26.5.1.6 of IS: 456- 2000
Max . Allowable Sv = Asv*0.87*fy/(0.4*b) =
302.47 mm
As per cl.
of IS: 456- 2000
Max . Allowable Sv = 0.75*d =
399 mm.
Sv =
121 mm c/c.
Provide
8 mm Tor
2 legged vertical stirrups @
200 mm c/c.
NOT SAFE
Second,third &
4th inner chord braces
Size (bxD) =
300 x
600 mm.
c/clength(Lb1) =
1.799 m.
Clear length( ) =
1.399 m.
width of support =
400 mm. =
0.4 m.
@ the centre of column
Due to wind/Seismic force Max. BM
=
126.07 KNM
On the other end Min. BM =
-30.772 KNM
Max. BM at the face of support =
108.64 KNM
Max. SF =
86.914 KN
Due to self weight of brace Max. BM =
1.2136 KNM
SF =
4.0477 KN
Total BM =
109.9 KNM; Total SF =
90.96 KN
Design of section
Clear cover =
30 mm. Dia.of main reinf. =
20 mm.
Expected No. of layers of reinforcement =
3
Dia.of vertical stirrups
=
8 mm. Tor
2 Legged
Effective cover=
78 mm.
Effective depth =
522 mm.
Grade of concrete = M30 Design mix.
sigma cbc =
10 N/mm2
sigma St (t) =
230 N/mm2
ratio (m) =
9
; k=
0.28125 ; j = 0.9063 ; Q = 1.2744
MR of balanced section (Mr)= Qbd2 =
104.18 KNM. <
108.638 KNM.
Therefore the beam is to be design as doubly reinforced section
Ast1 =
Mr/(t*j*d) =
957.4728 mm2
Unbalanced moment (M2)= (M-Mr) =
4.4605 KNM
Ast2 = M2/(t*(D-d' )) =
43.679 mm2
Total required Ast= Ast1+ Ast2 =
1001.2 mm2

page 74 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Max. allowable reinf. = 0.04*b*D =


7200 mm2
Dia of main reinforcement =
20 mm Tor Required no. of rods = 3.18676 Nos.
Provide
7 Nos of
20 mm Tor
and
0 Nos of
0 mm Tor through bars at top
Provide
7 Nos of
20 mm Tor
and
0 Nos of
0 mm Tor through bars at bottom.
Therefore Ast provided on each face =
2199.1 mm2 >
1001.15 mm2
Design for Shear
Size of section (bxD)=
300 x
600 mm.
effective depth =
522 mm.
Total SF (V) =
90.96 KN
Shear stress = V/(b*d)*1000 =
0.5809 N/mm2 < (tcmax. =2.20 N/mm2 )
Ast.provided =
2199.11 mm2 ;
pt =
1.4043 %
From Table 23 of IS: 456-2000 ;
tc =
0.468 N/mm2
Vs = V- tc*b*d/1000 =
17.67255 KN.
Dia.of vertical stirrups =
8 mm Tor ; No. of legs =
2 nos.
2
tsv =
150 N/mm
Asv =
100.531 mm2
tsv =
230 N/mm2
Spacing of vertical stirrups = tsv*Asv*d/Vs =
682.97 mm.
As per cl. 26.5.1.6 of IS: 456- 2000
Max . Allowable Sv = Asv*0.87*fy/(0.4*b) =
302.47 mm
As per cl.
of IS: 456- 2000
Max . Allowable Sv = 0.75*d =
391.5 mm.
Sv =
302 mm c/c.
Provide
8 mm Tor
2 legged vertical stirrups @
150 mm c/c.
SAFE
Design of radial braces
Size (bxD) =
300 x
600 mm.
c/clength(Lb1) =
2.75 m.
Clear length( ) =
2.35 m.
width of outer column =
400 mm. =
0.4 m.
width of inner column =
400 mm. =
0.4 m.
Due to wind/Seismic force Max. BM
=
53.662 KNM
Max. SF =
20.274 KN.
Due to self weight of brace Max. BM =
2.8359 KNM
SF =
6.1875 KN.
Total BM =
56.5 KNM; Total SF =
26.46 KN
Design of section
Clear cover =
50 mm. Dia.of main reinf. =
20 mm.
Expected No. of layers of reinforcement =
2
Dia.of vertical stirrups
=
8 mm. Tor
2 Legged
Effective cover=
88 mm.
Effective depth =
512 mm.
Grade of concrete = M30 Design mix.
sigma cbc =
10 N/mm2
sigma St (t) =
230 N/mm2
ratio (m) =
9
;k =
0.28125 ; j =
0.9063 ; Q= 1.2744
2
MR of balanced section (Mr)= Qbd =
100.22 KNM >
56.5 KNM.
Singly reinforced section
Ast1 =
Mr/(t*j*d) =
939.1304 mm2

page 75 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Unbalanced moment (M2)= (M-Mr) =

0 KNM
Ast2 = M2/(t*(D-d' )) =
0 mm2
Total required Ast= Ast1+ Ast2 =
939.13 mm2
Max. allowable reinf. = 0.04*b*D =
7200 mm2
Dia of main reinforcement =
20 mm Tor Required no. of rods = 2.98935 Nos.
Provide
4 Nos of
20 mm Tor through bars at top
Provide
4 Nos of
20 mm Tor through bars at bottom.
Therefore Ast provided on each face =
1256.6 mm2 >
939.13 mm2
SAFE
Design for Shear
Size of section (bxD)=
300 x
600 mm.
effective depth =
512 mm.
Total SF (V) =
26.46 KN
Shear stress = V/(b*d)*1000 =
0.1723 N/mm2
< 2.2 N/mm2
SAFE
2
Ast.provided =
1256.64 mm ;
pt =
0.8181 %
From Table 23 of IS: 456-2000 ;
tc =
0.380 N/mm2
Vs = V- tc*b*d/1000 =
-31.9067 KN.
Dia.of vertical stirrups =
8 mm Tor ; No. of legs =
2 nos.
2
2
Asv =
100.531 mm
tsv =
230 N/mm
Spacing of vertical stirrups = tsv*Asv*d/Vs =
-371 mm c/c.
As per cl. 26.5.1.6 of IS: 456- 2000
Max . Allowable Sv = Asv*0.87*fy/(0.4*b) =
302.47 mm c/c.
As per cl.
of IS: 456- 2000
Max . Allowable Sv = 0.75*d =
384 mm c/c.
Sv =
302 mm c/c.
Provide
8 mm Tor
2 legged vertical stirrups @
200 mm c/c.
SAFE
Side face reinforcement for all braces(including radial braces)
Total depth of beam =
600 mm.
>
450 mm.
Provide side face reinforcement
Provide
3 Nos.
8 mm Tor on each vertical side face.
As provided on each vertical side face =
150 >
90 mm^2
safe
Actual spacing =
150 mm. <
300 mm.
safe
Calculation of wind/seismic shears & wind/seismic moments in columns
Number of columns in outer row (n1) =
20 Nos.
Size of each column =
400 X
400 mm
Sectional area of each column (a1)
=
0.16 m2
Number of columns in inner row (n2) =
20 Nos.
Size of each column =
400 X
400 mm
Sectional area of each column (a2)
=
0.16 m2
Wind shear on outer column = 2 Qw*a1 /(n1*a1+n2*a2)
Wind shear on inner column = 2 Qw*a2 /(n1*a1+n2*a2)
Tank empty condition

page 76 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

(a)

(b)

(c)

(d)

(e)

(a)

(b)

Wind Load (Pw)


=
505.1 KN Seismic force
=
Critical Load
=
719.5 KN
In between footing raft beam and 1st brace
Shear Q1 =
719.5 KN;
c/c length of column (L1) =
Wind shear on outer column = 2 Q1*a1 /(n1*a1+n2*a2)
=
Wind shear on inner column = 2 Q1*a2 /(n1*a1+n2*a2)
=
Moment in outer row column =
35.973 X
2.850 /2 =
Moment in inner row column =
35.973 X
2.850 /2 =
In between 1st brace and 2nd brace
Shear Q2 =
719.5 KN;
c/c length of column (L2) =
Wind shear on outer column = 2 Q2*a1 /(n1*a1+n2*a2)
=
Wind shear on inner column = 2 Q2*a2 /(n1*a1+n2*a2)
=
Moment in outer row column =
35.973 X
1 /2 =
Moment in inner row column =
35.973 X
1 /2 =
In between 2nd brace and 3rd brace
Shear Q3 =
719.5 KN;
c/c length of column (L3) =
Wind shear on outer column = 2 Q3*a1 /(n1*a1+n2*a2)
=
Wind shear on inner column = 2 Q3*a2 /(n1*a1+n2*a2)
=
Moment in outer row column =
35.973 X
1 /2 =
Moment in inner row column =
35.973 X
1 /2 =
In between 3rd brace and
4 th braces
Shear Q4 =
719.5 KN;
c/c length of column (L4) =
Wind shear on outer column = 2 Q4*a1 /(n1*a1+n2*a2)
=
Wind shear on inner column = 2 Q4*a2 /(n1*a1+n2*a2)
=
Moment in outer row column =
35.973 X
1 /2 =
Moment in inner row column =
35.973 X
1 /2 =
In between
4 th brace and floor ring beam
Shear Q5 =
719.5 KN;
c/c length of column (L5) =
Wind shear on outer column = 2 Q5*a1 /(n1*a1+n2*a2)
=
Wind shear on inner column = 2 Q5*a2 /(n1*a1+n2*a2)
=
Moment in outer row column =
35.973 X
1 /2 =
Moment in inner row column =
35.973 X
1 /2 =
Tank full condition
Wind Load (Pw)
=
505.1 KN Seismic force
=
Critical Load
=
1791.3 KN
In between footing raft beam and 1st brace
Shear Q1 =
1791.3 KN;
c/c length of column (L1) =
Wind shear on outer column = 2 Q1*a1 /(n1*a1+n2*a2)
=
Wind shear on inner column = 2 Q1*a2 /(n1*a1+n2*a2)
=
Moment in outer row column =
89.567 X
2.850 /2 =
Moment in inner row column =
89.567 X
2.850 /2 =
In between 1st brace and 2nd brace
Shear Q2 =
1791.3 KN;
c/c length of column (L2) =
Wind shear on outer column = 2 Q2*a1 /(n1*a1+n2*a2)
=
Wind shear on inner column = 2 Q2*a2 /(n1*a1+n2*a2)
=
Moment in outer row column =
89.567 X
1 /2 =

page 77 of 70

719.459 KN

2.850 m.
35.9729 KN
35.9729 KN
51.2614 KNM
51.2614 KNM
1.00 m.
35.9729 KN
35.9729 KN
17.9865 KNM
17.9865 KNM
1.00 m.
35.9729 KN
35.9729 KN
17.9865 KNM
17.9865 KNM
1.00 m.
35.9729 KN
35.9729 KN
17.9865 KNM
17.9865 KNM
1.00 m.
35.9729 KN
35.9729 KN
17.9865 KNM
17.9865 KNM

1791.33 KN

2.850 m.
89.5666 KN
89.5666 KN
127.632 KNM
127.632 KNM
1.00 m.
89.5666 KN
89.5666 KN
44.7833 KNM

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

(c)

(d)

(e)

Moment in inner row column =


89.567 X
1 /2 =
In between 2nd brace and 3rd brace
Shear Q3 =
1791.3 KN;
c/c length of column (L3) =
Wind shear on outer column = 2 Q3*a1 /(n1*a1+n2*a2)
=
Wind shear on inner column = 2 Q3*a2 /(n1*a1+n2*a2)
=
Moment in outer row column =
89.567 X
1 /2 =
Moment in inner row column =
89.567 X
1 /2 =
In between 3rd brace and 4th brace
Shear Q4 =
1791.3 KN;
c/c length of column (L4) =
Wind shear on outer column = 2 Q4*a1 /(n1*a1+n2*a2)
=
Wind shear on inner column = 2 Q4*a2 /(n1*a1+n2*a2)
=
Moment in outer row column =
89.567 X
1 /2 =
Moment in inner row column =
89.567 X
1 /2 =
In between 3rd brace and
4 th braces
Shear Q5 =
1791.3 KN;
c/c length of column (L5) =
Wind shear on outer column = 2 Q5*a1 /(n1*a1+n2*a2)
=
Wind shear on inner column = 2 Q5*a2 /(n1*a1+n2*a2)
=
Moment in outer row column =
89.567 X
1 /2 =
Moment in inner row column =
89.567 X
1 /2 =

page 78 of 70

44.7833 KNM
1.00 m.
89.5666 KN
89.5666 KN
44.7833 KNM
44.7833 KNM
1.00 m.
89.5666 KN
89.5666 KN
44.7833 KNM
44.7833 KNM
1.00 m.
89.5666 KN
89.5666 KN
44.7833 KNM
44.7833 KNM

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Calculation of loads on outer row columns


No. of columns in a row =
20 nos.
Size of outer row columns =
400 X
Total length of column
=
c/c Length of outer chord brace
=
Clear Length of outer chord brace
=
Size =
300 X
600 mm
c/c Length of Radial brace
=
Clear Length of Radial brace
=
Size =
300 X
600 mm

400 mm
6.25 m.
2.6594 m.
2.2594 m.
2.75 m.
2.35 m.

Dead load
From annular roof slab =
487.0254 X
Weight of hand railing at roof level =
Weight of side wall
Straight portion =
Tapering portion of side wall =
Load from floor annular slab =
3530.243 x
Wt. of gallary at floor level =
171.0597 x
Hand railing at floor level =
Self weight of floor level ring beam =
Self weight of Chord braces at four levels =
Self weight of Radial braces at four levels =
Self weight of outer row columns =

5.00 /

Total =

62
Total =

68.492 KN
406.5 KN
2847.0 KN
3322 KN

1.50
1.50

/
/

6.50
4.00
Total =

112.39 KN
64.15 KN
176.5 KN

5077.6
3322
176.5

/
/
/

20
20
20

12 /
2.500 /

62 =
4.00 =

846 /

3530.243 X

50

Live Load
From annular roof slab =
From floor level gallary slab =

487.0254 X
171.0597 X

=
=

374.635 KN
32.7982 KN
1472.46 KN
181.561 KN
683.273 KN
106.912 KN
35.63 KN
453.96 KN
813.379 KN
423 KN
500.00 KN
5077.61 KN

Water Load
over tapered portion of side wall =
over off set of ring beam =
from floor annular slab =

Loads on each outer row columns


Self weight(DL)
Water load(DL)
Live Load (LL)

6.50

=
=
=

253.9 KN
166.1 KN
8.8 KN

Design of outer row columns using limit state design method


Size of outer row columns =
Grade of concrete =
M
Clear cover to later ties =
Max.c/c length of column =
L effctive in X direction =

400 X
30
40 mm
2.850 m.
2.4525 m

400 mm
Grade of steel = Fe - 415
Max.Clear length
=
L effctive in Y direction =

page 79 of 70

2.25 m.
5.0625 m.

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Lex/D =
6.13125
Ley/D =
12.6563
Min.eccentricity ex = L/500+D/30
Min.eccentricity ey = L/500+D/30
Tank empty.
Vertical Loading
Dead load =
Live load =
Seismic/Wind load
Axial Thrust =
Moment =

I.

<12
>12

Short column
Long column. Revise the Section
17.8 mm
20 mm.
17.8 mm
20 mm.

=
=

20
20

253.9 KN
8.8 KN
+/-

57.63354 KN
51.26142 KNM

(DL + Live load) condition


a)
For all outer row columns
Dead Load =
Live Load =
Seismic/Wind axial thrust =
Total =

253.9 KN
8.8 KN
0 KN
262.7 KN

Seismic/Wind Moment =
0 KNM
Load factor
=
1.5
Factored load (Pu) =
394.06 KN
Factored Moment (Mux) =
0 KNM
Factored Mex
=
7.8812 KNM
Factored Mey
=
7.8812 KNM
Total Design moments are
Mux =
7.88122 KNM; Muy =
7.8812 KNM
Clear cover
=
40 mm Dia of main bar =
20 mmTor
Dia. Of lateral ties =
8 mm; d'/D =
0.145
2
Asc =
1256 mm
p =
0.785 %
p/fck=
0.026167
Pu/(fck*b*D) =
0.0821
Reiforcement equally distributed on all four sides.
Chart 45 of SP-16
Mux1/(fck*b*D2)
=
Muy1/(fck*D*b2)
=
0.073
Mux1 = Muy1 =
140.16 KNM
Area of concrete Ac = (Ag-Asc)
=
158744 mm2
Puz = 0.45*fck*Ac+0.75*fy*Asc
=
2534 KN
Pu/Puz =
0.155511
alfa =
1
CHECK
(Mux/Mux1)alfa +(Muy/Muy1)alfa
=
0.1125 < 1.00 Safe
II.

(D.L + Wind/Seismic Load) Condition


a)
For columns on bending axis
Dead Load =

page 80 of 70

253.9 KN

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Seismic/Wind axial thrust =


Total =

b)

0 KN
253.9 KN

Seismic/Wind Moment =
51.261 KNM
Load factor
=
1.5
Factored load (Pu) =
380.82 KN
Factored Moment (Mux) =
76.89 KNM
Factored Mex
=
7.6164 KNM
Factored Mey
=
7.6164 KNM
Total Design moments are
Mux =
76.89213 KNM; Muy =
7.6164 KNM
Clear cover
=
40 mm Dia of main bar =
20 mmTor
Dia. of lateral ties =
8 mm; d'/D =
0.145
Asc =
3316 mm2 : p =
2.0725 %
p/fck=
0.069083
Pu/(fck*b*D) =
0.07934
Reiforcement equally distributed on all four sides.
Chart 45 of SP-16
Mux1/(fck*b*D2)
=
Muy1/(fck*D*b2)
=
0.123
Mux1 = Muy1 =
236.16 KNM
Area of concrete Ac = (Ag-Asc)
=
156684 mm2
Puz = 0.45*fck*Ac+0.75*fy*Asc
=
3147.34 KN
Pu/Puz =
0.120998
alfa =
1
CHECK
(Mux/Mux1)alfa +(Muy/Muy1)alfa
=
0.3578 < 1.00 Safe
For column on windward direction
Dead Load =
Seismic/Wind axial thrust =
Total =

253.9 KN
57.634 KN
311.5 KN

Seismic/Wind Moment =
0 KNM
Load factor
=
1.5
Factored load (Pu) =
467.27 KN
Factored Moment (Mux) =
0 KNM
Factored Mex
=
9.3454 KNM
Factored Mey
=
9.3454 KNM
Total Design moments are
Mux =
9.345419 KNM; Muy =
9.3454 KNM
Clear cover
=
40 mm Dia of main bar =
20 mmTor
Dia. of lateral ties =
8 mm; d'/D =
0.145
2
Asc =
1256 mm
p =
0.785 %
p/fck=
0.026167
Pu/(fck*b*D) =
0.09735
Reiforcement equally distributed on all four sides.
Chart 45 of SP-16
Mux1/(fck*b*D2)
=
Muy1/(fck*D*b2)
=
0.075
Mux1 = Muy1 =
144 KNM
Area of concrete Ac = (Ag-Asc)
=
158744 mm2

page 81 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Puz = 0.45*fck*Ac+0.75*fy*Asc
Pu/Puz =
0.184402
CHECK
(Mux/Mux1)alfa +(Muy/Muy1)alfa
=
c)

For column on Leeward direction


Dead Load =
Seismic/Wind axial thrust =
Total =

=
alfa =

2534 KN
1

0.1298 < 1.00 Safe

253.9 KN
-57.634 KN
196.2 KN

Seismic/Wind Moment =
0 KNM
Load factor
=
1.5
Factored load (Pu) =
294.37 KN
Factored Moment (Mux) =
0 KNM
Factored Mex
=
5.8874 KNM
Factored Mey
=
5.8874 KNM
Total Design moments are
Mux =
5.887407 KNM; Muy =
5.8874 KNM
Clear cover
=
40 mm Dia of main bar =
20 mmTor
Dia. of lateral ties =
8 mm; d'/D =
0.145
2
Asc =
1256 mm
p =
0.785 %
p/fck=
0.026167
Pu/(fck*b*D) =
0.06133
Reiforcement equally distributed on all four sides.
Chart 45 of SP-16
Mux1/(fck*b*D2)
=
Muy1/(fck*D*b2)
=
0.062
Mux1 = Muy1 =
119.04 KNM
Area of concrete Ac = (Ag-Asc)
=
158744 mm2
Puz = 0.45*fck*Ac+0.75*fy*Asc
=
2534 KN
Pu/Puz =
0.116169
alfa =
1
CHECK
(Mux/Mux1)alfa +(Muy/Muy1)alfa
=
0.0989 < 1.00 Safe
III.

(D.L + Live Load+ Wind/Seismic Load) Condition


a)
For columns on bending axis
Dead Load =
Live Load =
Seismic/Wind axial thrust =
Total =

253.9 KN
8.8 KN
0 KN
262.7 KN

Seismic/Wind Moment =
51.261 KNM
Load factor
=
1.2
Factored load (Pu) =
315.25 KN
Factored Moment (Mux) =
61.514 KNM
Factored Mex
=
6.305 KNM
Factored Mey
=
6.305 KNM
Total Design moments are
Mux =
61.51371 KNM; Muy =
6.305 KNM
Clear cover
=
40 mm Dia of main bar =

page 82 of 70

20 mmTor

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

b)

Dia. of lateral ties =


8 mm; d'/D =
0.145
2
Asc =
2512 mm
p =
1.57 %
p/fck=
0.052333
Pu/(fck*b*D) =
0.06568
Reiforcement equally distributed on all four sides.
Chart 45 of SP-16
Mux1/(fck*b*D2)
=
Muy1/(fck*D*b2)
=
0.101
Mux1 = Muy1 =
193.92 KNM
Area of concrete Ac = (Ag-Asc)
=
157488 mm2
Puz = 0.45*fck*Ac+0.75*fy*Asc
=
2907.95 KN
Pu/Puz =
0.108409
alfa =
1.00
CHECK
(Mux/Mux1)alfa +(Muy/Muy1)alfa
=
0.3497 < 1.00 Safe
For column on windward direction
Dead Load =
Live Load =
Seismic/Wind axial thrust =
Total =

253.9 KN
8.8 KN
57.634 KN
320.3 KN

Seismic/Wind Moment =
0 KNM
Load factor
=
1.2
Factored load (Pu) =
384.41 KN
Factored Moment (Mux) =
0 KNM
Factored Mex
=
7.6882 KNM
Factored Mey
=
7.6882 KNM
Total Design moments are
Mux =
7.688181 KNM; Muy =
7.6882 KNM
Clear cover
=
40 mm Dia of main bar =
20 mmTor
Dia. of lateral ties =
8 mm; d'/D =
0.145
Asc =
1256 mm2
p =
0.785 %
p/fck=
0.026167
Pu/(fck*b*D) =
0.08009
Reiforcement equally distributed on all four sides.
Chart 45 of SP-16
Mux1/(fck*b*D2)
=
Muy1/(fck*D*b2)
=
0.075
Mux1 = Muy1 =
144 KNM
Area of concrete Ac = (Ag-Asc)
=
158744 mm2
Puz = 0.45*fck*Ac+0.75*fy*Asc
=
2534 KN
Pu/Puz =
0.151702
alfa =
1
CHECK
(Mux/Mux1)alfa +(Muy/Muy1)alfa
=
0.1068 < 1.00 Safe
c)

For column on Leeward direction


Dead Load =
Live Load =
Seismic/Wind axial thrust =
Total =

253.9 KN
8.8 KN
-57.634 KN
205.1 KN

page 83 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Seismic/Wind Moment =
0 KNM
Load factor
=
1.2
Factored load (Pu) =
246.09 KN
Factored Moment (Mux) =
0 KNM
Factored Mex
=
4.9218 KNM
Factored Mey
=
4.9218 KNM
Total Design moments are
Mux =
4.921771 KNM; Muy =
4.9218 KNM
Clear cover
=
40 mm Dia of main bar =
20 mmTor
Dia. of lateral ties =
8 mm; d'/D =
0.145
Asc =
1256 mm2
p =
0.785 %
p/fck=
0.026167
Pu/(fck*b*D) =
0.05127
Reiforcement equally distributed on all four sides.
Chart 45 of SP-16
Mux1/(fck*b*D2)
=
Muy1/(fck*D*b2)
=
0.06
Mux1 = Muy1 =
115.2 KNM
Area of concrete Ac = (Ag-Asc)
=
158744 mm2
Puz = 0.45*fck*Ac+0.75*fy*Asc
=
2534 KN
Pu/Puz =
0.097116
alfa =
1
CHECK
(Mux/Mux1)alfa +(Muy/Muy1)alfa
=
0.0854 < 1.00 Safe
Tank full
Vertical Loading
Dead load =
Water load =
Live load =
Seismic/Wind load
Axial Thrust =
Moment =

I.

253.9 KN
166.1 KN
8.8 KN
+/-

143.498 KN
127.6325 KNM

(DL + Water load +Live load) condition


a)

For all inner row columns


Dead Load =
Water Load =
Live Load =
Seismic/Wind axial thrust =
Total =
Seismic/Wind Moment =
Load factor
=
Factored load (Pu) =
Factored Moment (Mux) =
Factored Mex
=
Factored Mey
=

253.9 KN
166.1 KN
8.8 KN
0 KN
428.8 KN
0 KNM
1.5
643.21 KN
0 KNM
12.864 KNM
12.864 KNM

page 84 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

ToTal Design moments are


Mux =
12.86417 KNM; Muy =
12.864 KNM
Clear cover
=
40 mm Dia of main bar =
Dia. Of lateral ties =
8 mm; d'/D =
0.145
2
Asc =
1256 mm
p =
0.785 %
p/fck=
0.026167
Pu/(fck*b*D) =
Reiforcement equally distributed on all four sides.
Chart 45 of SP-16
Mux1/(fck*b*D2)
=
Muy1/(fck*D*b2)
=
Mux1 = Muy1 =
144 KNM
Area of concrete Ac = (Ag-Asc)
=
Puz = 0.45*fck*Ac+0.75*fy*Asc
=
Pu/Puz =
0.253834
CHECK
(Mux/Mux1)alfa +(Muy/Muy1)alfa
=

II.

(D.L + Water Load +Wind/Seismic Load) Condition


For columns on bending axis
Dead Load =
Water Load =
Seismic/Wind axial thrust =
Total =

20 mmTor

0.134

0.075

alfa =

158744 mm2
2534 KN
1.08972

0.1439 < 1.00 Safe

253.9 KN
166.1 KN
0 KN
420.0 KN

Seismic/Wind Moment =
127.63 KNM
Load factor
=
1.5
Factored load (Pu) =
629.97 KN
Factored Moment (Mux) =
191.45 KNM
Factored Mex
=
12.599 KNM
Factored Mey
=
12.599 KNM
Total Design moments are
Mux =
191.4487 KNM; Muy =
12.599 KNM
Clear cover
=
40 mm Dia of main bar =
20 mmTor
Dia. of lateral ties =
8 mm; d'/D =
0.145
Asc =
3316 mm2
p =
2.0725 %
p/fck=
0.069083
Pu/(fck*b*D) =
0.13124
Reiforcement equally distributed on all four sides.
Chart 45 of SP-16
Mux1/(fck*b*D2)
=
Muy1/(fck*D*b2)
=
0.125
Mux1 = Muy1 =
240 KNM
Area of concrete Ac = (Ag-Asc)
=
156684 mm2
Puz = 0.45*fck*Ac+0.75*fy*Asc
=
3147.34 KN
Pu/Puz =
0.200159
alfa =
1.00026
CHECK
(Mux/Mux1)alfa +(Muy/Muy1)alfa
=
0.8501 < 1.00 Safe

page 85 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

b)

For column on windward direction


Dead Load =
Water Load =
Seismic/Wind axial thrust =
Total =

253.9 KN
166.1 KN
143.5 KN
563.5 KN

Seismic/Wind Moment =
0 KNM
Load factor
=
1.5
Factored load (Pu) =
845.21 KN
Factored Moment (Mux) =
0 KNM
Factored Mex
=
16.904 KNM
Factored Mey
=
16.904 KNM
Total Design moments are
Mux =
16.9043 KNM; Muy =
16.904 KNM
Clear cover
=
40 mm Dia of main bar =
20 mmTor
Dia. of lateral ties =
8 mm; d'/D =
0.145
Asc =
1256 mm2
p =
0.785 %
p/fck=
0.026167
Pu/(fck*b*D) =
0.17609
Reiforcement equally distributed on all four sides.
Chart 45 of SP-16
Mux1/(fck*b*D2)
=
Muy1/(fck*D*b2)
=
0.074
Mux1 = Muy1 =
142.08 KNM
Area of concrete Ac = (Ag-Asc)
=
158744 mm2
Puz = 0.45*fck*Ac+0.75*fy*Asc
=
2534 KN
Pu/Puz =
0.333553
alfa =
1.22259
CHECK
(Mux/Mux1)alfa +(Muy/Muy1)alfa
=
0.1482 < 1.00 Safe
c)

For column on Leeward direction


Dead Load =
Water Load =
Seismic/Wind axial thrust =
Total =

253.9 KN
166.1 KN
-143.5 KN
276.5 KN

Seismic/Wind Moment =
0 KNM
Load factor
=
1.5
Factored load (Pu) =
414.72 KN
Factored Moment (Mux) =
0 KNM
Factored Mex
=
8.2944 KNM
Factored Mey
=
8.2944 KNM
Total Design moments are
Mux =
8.29442 KNM; Muy =
8.2944 KNM
Clear cover
=
40 mm Dia of main bar =
Dia. of lateral ties =
8 mm; d'/D =
0.145
Asc =
1256 mm2
p =
0.785 %
p/fck=
0.026167
Pu/(fck*b*D) =
Reiforcement equally distributed on all four sides.

page 86 of 70

20 mmTor

0.0864

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Chart 45 of SP-16
Mux1/(fck*b*D2)
=
Muy1/(fck*D*b2)
Mux1 = Muy1 =
144 KNM
Area of concrete Ac = (Ag-Asc)
Puz = 0.45*fck*Ac+0.75*fy*Asc
Pu/Puz =
0.163664
CHECK
(Mux/Mux1)alfa +(Muy/Muy1)alfa
=
III.

0.075

=
=
alfa =

158744 mm2
2534 KN
1

0.1152 < 1.00 Safe

(D.L + Water Load + Live Load+ Wind/Seismic Load) Condition


a)
For columns on bending axis
Dead Load =
253.9 KN
Water Load =
166.1 KN
Live Load =
8.8 KN
Seismic/Wind axial thrust =
0 KN
Total =
428.8 KN

b)

Seismic/Wind Moment =
127.63 KNM
Load factor
=
1.2
Factored load (Pu) =
514.57 KN
Factored Moment (Mux) =
153.16 KNM
Factored Mex
=
10.291 KNM
Factored Mey
=
10.291 KNM
Total Design moments are
Mux =
153.159 KNM; Muy =
10.291 KNM
Clear cover
=
40 mm Dia of main bar =
20 mmTor
Dia. of lateral ties =
8 mm; d'/D =
0.145
2
Asc =
2060 mm
p =
1.2875 %
p/fck=
0.042917
Pu/(fck*b*D) =
0.1072
Reiforcement equally distributed on all four sides.
Chart 45 of SP-16
Mux1/(fck*b*D2)
=
Muy1/(fck*D*b2)
=
0.092
Mux1 = Muy1 =
176.64 KNM
Area of concrete Ac = (Ag-Asc)
=
157940 mm2
Puz = 0.45*fck*Ac+0.75*fy*Asc
=
2773.37 KN
Pu/Puz =
0.185539
alfa =
1
CHECK
(Mux/Mux1)alfa +(Muy/Muy1)alfa
=
0.9253 < 1.00 Safe
For column on windward direction
Dead Load =
Water Load =
Live Load =
Seismic/Wind axial thrust =
Total =

page 87 of 70

253.9 KN
166.1 KN
8.8 KN
143.5 KN
572.3 KN

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Seismic/Wind Moment =
0 KNM
Load factor
=
1.2
Factored load (Pu) =
686.76 KN
Factored Moment (Mux) =
0 KNM
Factored Mex
=
13.735 KNM
Factored Mey
=
13.735 KNM
Total Design moments are
Mux =
13.73529 KNM; Muy =
13.735 KNM
Clear cover
=
40 mm Dia of main bar =
20 mmTor
Dia. of lateral ties =
8 mm; d'/D =
0.145
Asc =
1256 mm2
p =
0.785 %
p/fck=
0.026167
Pu/(fck*b*D) =
0.14308
Reiforcement equally distributed on all four sides.
Chart 45 of SP-16
Mux1/(fck*b*D2)
=
Muy1/(fck*D*b2)
=
0.074
Mux1 = Muy1 =
142.08 KNM
Area of concrete Ac = (Ag-Asc)
=
158744 mm2
Puz = 0.45*fck*Ac+0.75*fy*Asc
=
2534 KN
Pu/Puz =
0.271023
alfa =
1.11837
CHECK
(Mux/Mux1)alfa +(Muy/Muy1)alfa
=
0.1466 < 1.00 Safe
c)

For column on Leeward direction


Dead Load =
Water Load =
Live Load =
Seismic/Wind axial thrust =
Total =

253.9 KN
166.1 KN
8.8 KN
-143.5 KN
285.3 KN

Seismic/Wind Moment =
0 KNM
Load factor
=
1.2
Factored load (Pu) =
342.37 KN
Factored Moment (Mux) =
0 KNM
Factored Mex
=
6.8474 KNM
Factored Mey
=
6.8474 KNM
Total Design moments are
Mux =
6.847381 KNM; Muy =
6.8474 KNM
Clear cover
=
40 mm Dia of main bar =
20 mmTor
Dia. of lateral ties =
8 mm; d'/D =
0.145
2
Asc =
1256 mm
p =
0.785 %
p/fck=
0.026167
Pu/(fck*b*D) =
0.07133
Reiforcement equally distributed on all four sides.
Chart 45 of SP-16
Mux1/(fck*b*D2)
=
Muy1/(fck*D*b2)
=
0.071
Mux1 = Muy1 =
136.32 KNM
Area of concrete Ac = (Ag-Asc)
=
158744 mm2

page 88 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Puz = 0.45*fck*Ac+0.75*fy*Asc
Pu/Puz =
0.135112
CHECK
(Mux/Mux1)alfa +(Muy/Muy1)alfa
=

2534 KN
1

alfa =

0.1005 < 1.00 Safe

REINFORCEMENT REQUIREMENT FOR OUTER ROW COLUMNS UNDER DIFFERENT CONDITIONS


size of column =
400
x
400 mm. ; M
30 Grade. ; Fe415
Clear cover to lateral ties =
Required Area of reinforcement in mm2

40 mm.

condition

columns on
bending axis

windward

Leeward

Tank empty
(DL+ LL)

1256

Safe

(DL+WL/EL)

3316

Safe

1256

Safe

1256 Safe

(DL+LL+WL/EL)

2512

Safe

1256

Safe

1256 Safe

Tank Full
(DL+ LL)

1256

Safe

(DL+WL/EL)

3316

Safe

1256

Safe

1256 Safe

(DL+LL+WL/EL)

2060

Safe

1256

Safe

1256 Safe

Required critical reinforcement =


Longitudinal reinforcement =
and
Dia. of lateral ties =
Spacing
=
No. of lateral ties per set =

3316 mm2
8 Nos. of
20 mm. Tor
4 Nos. of
16 mm. Tor ;
8 mm Tor
200 mm c/c per set.
3 ties per set.

Provided As=

3317.52 mm2
SAFE

Calculation of loads on inner row columns


No. of columns in a row =
Size of inner row columns =
Total length of column =
c/c Length of inner chord brace =
Clear Length of inner chord brace =
Size =
300 X
c/c Length of Radial brace =
Clear Length of Radial brace =
Size =
300 X

20 nos.
400 X

400 mm
6.25 m.
1.799 m.
1.399 m.

600 mm
2.75 m.
2.35 m.
600 mm

LOADS
Load from inner floor ring beam=

page 89 of 70

9170.1 KN

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Load from columns inside container =


=
Self weight of inner Chord braces at four levels =
=
Self weight of Radial braces at four levels =
=
Self weight of inner row columns =
=
Total (DL +Water+LL)
=
WATER LOAD
Water load from bottom dome
=
Water load over inner ring beam width
744.24 21.677 =
Water load from floor annular slab
2992.41 x
50 /
62
=
Total Water load on
20 nos. inner row cols. =
LIVE LOAD
From roof dome =
488.3488 x
0.75 /
4.63 =
From annular roof slab=
347.7586 x
1.50 /
6.50 =
Total Water load on
20 nos. inner row cols. =
Therefore total self Weight =
11800.8 7675.6 159.44 =
Loads on each inner row columns
Self weight(DL)
Water load(DL)
Live Load (LL)

=
=

3965.7
7675.6
159.4

/
/
/

20
20
20

=
=
=

1204 KN
503.639 KN
423 KN
500 KN
11800.8 KN
4539.82 KN
722.566 KN
2413.23 KN
7675.62 KN
79.1917 KN
80.252 KN
159.444 KN
3965.7 KN

198.3 KN
383.8 KN
8.0 KN

Design of inner row columns using limit state design method


Size of inner row columns =
Grade of concrete =
M
Clear cover to later ties =
Max.c/c length of column =
L effctive in X direction =
Lex/D =
5.90625
Ley/D =
12.6563
Min.eccentricity ex = L/500+D/30
Min.eccentricity ey = L/500+D/30
Tank empty.
Vertical Loading
Dead load =
Live load =
Seismic/Wind load
Axial Thrust =
Moment =

I.

400 X
30
40 mm
2.850 m.
2.3625 m
<12
>12
=
=

400 mm
Grade of steel = Fe - 415
Max.Clear length
=
L effctive in Y direction =

2.25 m.
5.0625 m.

Short column
Long column. Revise the Section
17.833 mm
20 mm.
17.833 mm
20 mm.

20
20

198.3 KN
8.0 KN
+/-

38.9874 KN
51.26142 KNM

(DL + Live load) condition


a)
For all inner row columns
Dead Load =
Live Load =

198.3 KN
8.0 KN

page 90 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Seismic/Wind axial thrust =


Total =

0 KN
206.3 KN

Seismic/Wind Moment =
0 KNM
Load factor
=
1.5
Factored load (Pu) =
309.39 KN
Factored Moment (Mux) =
0 KNM
Factored Mex
=
6.1877 KNM
Factored Mey
=
6.1877 KNM
Total Design moments are
Mux =
6.187716 KNM; Muy =
6.1877 KNM
Clear cover
=
40 mm Dia of main bar =
20 mmTor
Dia. Of lateral ties =
8 mm; d'/D =
0.145
Asc =
1256 mm2
p =
0.785 %
p/fck=
0.026167
Pu/(fck*b*D) =
0.06446
Reiforcement equally distributed on all four sides.
Chart 45 of SP-16
Mux1/(fck*b*D2)
=
Muy1/(fck*D*b2)
=
0.07
Mux1 = Muy1 =
134.4 KNM
Area of concrete Ac = (Ag-Asc)
=
158744 mm2
Puz = 0.45*fck*Ac+0.75*fy*Asc
=
2534 KN
Pu/Puz =
0.122095
alfa =
1
CHECK
(Mux/Mux1)alfa +(Muy/Muy1)alfa
=
0.0921 < 1.00 Safe
II.

(D.L + Wind/Seismic Load) Condition


a)
For columns on bending axis
Dead Load =
Seismic/Wind axial thrust =
Total =

198.3 KN
0 KN
198.3 KN

Seismic/Wind Moment =
51.261 KNM ; My =
Load factor
=
1.5
Factored load (Pu) =
297.43 KN
Factored Moment (Mux) =
76.892 KNM; Muy =
Factored Mex
=
5.9486 KNM
Factored Mey
=
5.9486 KNM
Total Design moments are
Mux =
76.89213 KNM; Muy =
5.9486 KNM
Clear cover
=
40 mm Dia of main bar =
Dia. of lateral ties =
8 mm; d'/D =
0.145
Asc =
3316 mm2
p =
2.0725 %
p/fck=
0.069083
Pu/(fck*b*D) =
Reiforcement equally distributed on all four sides.
Chart 45 of SP-16
Mux1/(fck*b*D2)
=
Muy1/(fck*D*b2)
=
Mux1 = Muy1 =
224.64 KNM

page 91 of 70

0 KNM

0 KNM

20 mmTor

0.072

0.117

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

b)

Area of concrete Ac = (Ag-Asc)


Puz = 0.45*fck*Ac+0.75*fy*Asc
Pu/Puz =
0.094501
CHECK
(Mux/Mux1)alfa +(Muy/Muy1)alfa
=
For column on windward direction
Dead Load =
Seismic/Wind axial thrust =
Total =

=
=
alfa =

156684 mm2
3147.34 KN
1

0.3688 < 1.00 Safe

198.3 KN
38.987 KN
237.27 KN

Seismic/Wind Moment =
0 KNM
Load factor
=
1.5
Factored load (Pu) =
355.91 KN
Factored Moment (Mux) =
0 KNM
Factored Mex
=
7.1182 KNM
Factored Mey
=
7.1182 KNM
Total Design moments are
Mux =
7.118172 KNM; Muy =
7.1182 KNM
Clear cover
=
40 mm Dia of main bar =
20 mmTor
Dia. of lateral ties =
8 mm; d'/D =
0.145
Asc =
1256 mm2
p =
0.785 %
p/fck=
0.026167
Pu/(fck*b*D) =
0.07415
Reiforcement equally distributed on all four sides.
Chart 45 of SP-16
Mux1/(fck*b*D2)
=
Muy1/(fck*D*b2)
=
0.072
Mux1 = Muy1 =
138.24 KNM
Area of concrete Ac = (Ag-Asc)
=
158744 mm2
Puz = 0.45*fck*Ac+0.75*fy*Asc
=
2534 KN
Pu/Puz =
0.140455
alfa =
1
CHECK
(Mux/Mux1)alfa +(Muy/Muy1)alfa
=
0.103 < 1.00 Safe
c)

For column on Leeward direction


Dead Load =
Seismic/Wind axial thrust =
Total =
Seismic/Wind Moment =
Load factor
=
Factored load (Pu) =
Factored Moment (Mux) =
Factored Mex
=
Factored Mey
=
Total Design moments are
Mux =
4.778929 KNM;

198.3 KN
-38.987 KN
159.3 KN
0 KNM
1.5
238.95 KN
0 KNM
4.7789 KNM
4.7789 KNM
Muy =

page 92 of 70

4.7789 KNM

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Clear cover
=
40 mm Dia of main bar =
20 mmTor
Dia. of lateral ties =
8 mm; d'/D =
0.145
Asc =
1256 mm2
p =
0.785 %
p/fck=
0.026167
Pu/(fck*b*D) =
0.04978
Reiforcement equally distributed on all four sides.
Chart 45 of SP-16
Mux1/(fck*b*D2)
=
Muy1/(fck*D*b2)
=
0.06
Mux1 = Muy1 =
115.2 KNM
Area of concrete Ac = (Ag-Asc)
=
158744 mm2
Puz = 0.45*fck*Ac+0.75*fy*Asc
=
2534 KN
Pu/Puz =
0.094297
alfa =
1
CHECK
(Mux/Mux1)alfa +(Muy/Muy1)alfa
=
0.083 < 1.00 Safe
III.

(D.L + Live Load+ Wind/Seismic Load) Condition


a)
For columns on bending axis
Dead Load =
Live Load =
Seismic/Wind axial thrust =
Total =

b)

198.3 KN
8.0 KN
0 KN
206.3 KN

Seismic/Wind Moment =
51.261 KNM
Load factor
=
1.2
Factored load (Pu) =
247.51 KN
Factored Moment (Mux) =
61.514 KNM
Factored Mex
=
4.9502 KNM
Factored Mey
=
4.9502 KNM
Total Design moments are
Mux =
61.51371 KNM; Muy =
4.9502 KNM
Clear cover
=
40 mm Dia of main bar =
20 mmTor
Dia. of lateral ties =
8 mm; d'/D =
0.145
2
Asc =
2512 mm
p =
1.57 %
p/fck=
0.052333
Pu/(fck*b*D) =
0.05156
Reiforcement equally distributed on all four sides.
Chart 45 of SP-16
Mux1/(fck*b*D2)
=
Muy1/(fck*D*b2)
=
0.1
Mux1 = Muy1 =
192 KNM
Area of concrete Ac = (Ag-Asc)
=
157488 mm2
Puz = 0.45*fck*Ac+0.75*fy*Asc
=
2907.95 KN
Pu/Puz =
0.085115
alfa =
1
CHECK
(Mux/Mux1)alfa +(Muy/Muy1)alfa
=
0.3462 < 1.00 Safe
For column on windward direction
Dead Load =
Live Load =
Seismic/Wind axial thrust =

198.3 KN
8.0 KN
38.987 KN

page 93 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Total =

245.2 KN

Seismic/Wind Moment =
0 KNM
Load factor
=
1.2
Factored load (Pu) =
294.29 KN
Factored Moment (Mux) =
0 KNM
Factored Mex
=
5.8859 KNM
Factored Mey
=
5.8859 KNM
Total Design moments are
Mux =
5.88587 KNM; Muy =
5.8859 KNM
Clear cover
=
40 mm Dia of main bar =
20 mmTor
Dia. of lateral ties =
8 mm; d'/D =
0.145
2
Asc =
1256 mm
p =
0.785 %
p/fck=
0.026167
Pu/(fck*b*D) =
0.06131
Reiforcement equally distributed on all four sides.
Chart 45 of SP-16
Mux1/(fck*b*D2)
=
Muy1/(fck*D*b2)
=
0.072
Mux1 = Muy1 =
138.24 KNM
Area of concrete Ac = (Ag-Asc)
=
158744 mm2
Puz = 0.45*fck*Ac+0.75*fy*Asc
=
2534 KN
Pu/Puz =
0.116139
alfa =
1
CHECK
(Mux/Mux1)alfa +(Muy/Muy1)alfa
=
0.0852 < 1.00 Safe
c)

For column on Leeward direction


Dead Load =
Live Load =
Seismic/Wind axial thrust =
Total =

198.3 KN
8.0 KN
-38.987 KN
167.3 KN

Seismic/Wind Moment =
0 KNM
Load factor
=
1.2
Factored load (Pu) =
200.72 KN
Factored Moment (Mux) =
0 KNM
Factored Mex
=
4.0145 KNM
Factored Mey
=
4.0145 KNM
Total Design moments are
Mux =
4.014475 KNM; Muy =
4.0145 KNM
Clear cover
=
40 mm Dia of main bar =
20 mmTor
Dia. of lateral ties =
8 mm; d'/D =
0.145
Asc =
1256 mm2
p =
0.785 %
p/fck=
0.026167
Pu/(fck*b*D) =
0.04182
Reiforcement equally distributed on all four sides.
Chart 45 of SP-16
Mux1/(fck*b*D2)
=
Muy1/(fck*D*b2)
=
0.06
Mux1 = Muy1 =
115.2 KNM

page 94 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Area of concrete Ac = (Ag-Asc)


Puz = 0.45*fck*Ac+0.75*fy*Asc
Pu/Puz =
0.079213
CHECK
(Mux/Mux1)alfa +(Muy/Muy1)alfa
=
Tank full
Vertical Loading
Dead load =
Water load =
Live load =
Seismic/Wind load
Axial Thrust =
Moment =

I.

=
=
alfa =

158744 mm2
2534 KN
1

0.0697 < 1.00 Safe

198.3 KN
383.8 KN
8.0 KN
+/-

97.07217 KN
127.6325 KNM

(DL + Water load +Live load) condition


a)
For all inner row columns
Dead Load =
Water Load =
Live Load =
Seismic/Wind axial thrust =
Total =

198.3 KN
383.8 KN
8.0 KN
0 KN
590.0 KN

Seismic/Wind Moment =
0 KNM
Load factor
=
1.5
Factored load (Pu) =
885.06 KN
Factored Moment (Mux) =
0 KNM
Factored Mex
=
17.701 KNM
Factored Mey
=
17.701 KNM
ToTal Design moments are
Mux =
17.70114 KNM; Muy =
17.701 KNM
Clear cover
=
40 mm Dia of main bar =
20 mmTor
Dia. Of lateral ties =
8 mm; d'/D =
0.145
Asc =
1256 mm2
p =
0.785 %
p/fck=
0.026167
Pu/(fck*b*D) =
0.18439
Reiforcement equally distributed on all four sides.
Chart 45 of SP-16
Mux1/(fck*b*D2)
=
Muy1/(fck*D*b2)
=
0.072
Mux1 = Muy1 =
138.24 KNM
Area of concrete Ac = (Ag-Asc)
=
158744 mm2
Puz = 0.45*fck*Ac+0.75*fy*Asc
=
2534 KN
Pu/Puz =
0.349276
alfa =
1.24879
CHECK
(Mux/Mux1)alfa +(Muy/Muy1)alfa
=
0.1536 < 1.00 Safe
II.

(D.L + Water Load +Wind/Seismic Load) Condition

page 95 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

For columns on bending axis


Dead Load =
Water Load =
Seismic/Wind axial thrust =
Total =

198.3 KN
383.8 KN
0 KN
582.1 KN

Seismic/Wind Moment =
127.63 KNM
Load factor
=
1.5
Factored load (Pu) =
873.1 KN
Factored Moment (Mux) =
191.45 KNM
Factored Mex
=
17.462 KNM
Factored Mey
=
17.462 KNM
Total Design moments are
Mux =
191.4487 KNM; Muy =
17.462 KNM
Clear cover
=
40 mm Dia of main bar =
20 mmTor
Dia. of lateral ties =
8 mm; d'/D =
0.145
2
Asc =
3316 mm
p =
2.0725 %
p/fck=
0.069083
Pu/(fck*b*D) =
0.1819
Reiforcement equally distributed on all four sides.
Chart 45 of SP-16
Mux1/(fck*b*D2)
=
Muy1/(fck*D*b2)
=
0.12
Mux1 = Muy1 =
230.4 KNM
Area of concrete Ac = (Ag-Asc)
=
156684 mm2
Puz = 0.45*fck*Ac+0.75*fy*Asc
=
3147.34 KN
Pu/Puz =
0.277409
alfa =
1.12901
CHECK
(Mux/Mux1)alfa +(Muy/Muy1)alfa
b)

0.8657 < 1.00 Safe

For column on windward direction


Dead Load =
Water Load =
Seismic/Wind axial thrust =
Total =

198.3 KN
383.8 KN
97.072 KN
679.14 KN

Seismic/Wind Moment =
0 KNM
Load factor
=
1.5
Factored load (Pu) =
1018.7 KN
Factored Moment (Mux) =
0 KNM
Factored Mex
=
20.374 KNM
Factored Mey
=
20.374 KNM
Total Design moments are
Mux =
20.37414 KNM; Muy =
20.374 KNM
Clear cover
=
40 mm Dia of main bar =
Dia. of lateral ties =
8 mm; d'/D =
0.145
2
Asc =
1256 mm
p =
0.785 %

page 96 of 70

20 mmTor

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

p/fck=
0.026167
Pu/(fck*b*D) =
0.21223
Reiforcement equally distributed on all four sides.
Chart 45 of SP-16
Mux1/(fck*b*D2)
=
Muy1/(fck*D*b2)
=
0.07
Mux1 = Muy1 =
134.4 KNM
Area of concrete Ac = (Ag-Asc)
=
158744 mm2
Puz = 0.45*fck*Ac+0.75*fy*Asc
=
2534 KN
Pu/Puz =
0.40202
alfa =
1.3367
CHECK
(Mux/Mux1)alfa +(Muy/Muy1)alfa
=
0.1606 < 1.00 Safe
c)

For column on Leeward direction


Dead Load =
Water Load =
Seismic/Wind axial thrust =
Total =
Seismic/Wind Moment =
Load factor
=
Factored load (Pu) =
Factored Moment (Mux) =
Factored Mex
=
Factored Mey
=

198.3 KN
383.8 KN
-97.072 KN
484.99 KN
0 KNM
1.5
727.49 KN
0 KNM
14.55 KNM
14.55 KNM

Total Design moments are


Mux =
14.54981 KNM; Muy =
14.55 KNM
Clear cover
=
40 mm Dia of main bar =
Dia. of lateral ties =
8 mm; d'/D =
0.145
2
Asc =
1256 mm
p =
0.785 %
p/fck=

0.026167

Pu/(fck*b*D)

Reiforcement equally distributed on all four sides.


Chart 45 of SP-16
Mux1/(fck*b*D2)
=
Muy1/(fck*D*b2)
=
Mux1 = Muy1 =
138.24 KNM
Area of concrete Ac = (Ag-Asc)
=
Puz = 0.45*fck*Ac+0.75*fy*Asc
=
Pu/Puz =
0.287095
CHECK
(Mux/Mux1)alfa +(Muy/Muy1)alfa
=
III.

20 mmTor

0.15156

0.072

alfa =

158744 mm2
2534 KN
1.14516

0.1518 < 1.00 Safe

(D.L + Water Load + Live Load+ Wind/Seismic Load) Condition


a)
For columns on bending axis
Dead Load =
198.3 KN
Water Load =
383.8 KN
Live Load =
8.0 KN
Seismic/Wind axial thrust =
0 KN

page 97 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Total =

b)

590.0 KN

Seismic/Wind Moment =
127.63 KNM
Load factor
=
1.2
Factored load (Pu) =
708.05 KN
Factored Moment (Mux) =
153.16 KNM
Factored Mex
=
14.161 KNM
Factored Mey
=
14.161 KNM
Total Design moments are
Mux =
153.159 KNM; Muy =
14.161 KNM
Clear cover
=
40 mm Dia of main bar =
20 mmTor
Dia. of lateral ties =
8 mm; d'/D =
0.145
2
Asc =
2060 mm
p =
1.2875 %
p/fck=
0.042917
Pu/(fck*b*D) =
0.14751
Reiforcement equally distributed on all four sides.
Chart 45 of SP-16
Mux1/(fck*b*D2)
=
Muy1/(fck*D*b2)
=
0.094
Mux1 = Muy1 =
180.48 KNM
Area of concrete Ac = (Ag-Asc)
=
157940 mm2
Puz = 0.45*fck*Ac+0.75*fy*Asc
=
2773.37 KN
Pu/Puz =
0.255302
alfa =
1.09217
CHECK
(Mux/Mux1)alfa +(Muy/Muy1)alfa
=
0.8979 < 1.00 Safe
For column on windward direction
Dead Load =
Water Load =
Live Load =
Seismic/Wind axial thrust =
Total =

198.3 KN
383.8 KN
8.0 KN
97.072 KN
687.1 KN

Seismic/Wind Moment =
0 KNM
Load factor
=
1.2
Factored load (Pu) =
824.53 KN
Factored Moment (Mux) =
0 KNM
Factored Mex
=
16.491 KNM
Factored Mey
=
16.491 KNM
Total Design moments are
Mux =
16.49065 KNM; Muy =
16.491 KNM
Clear cover
=
40 mm Dia of main bar =
20 mmTor
Dia. of lateral ties =
8 mm; d'/D =
0.145
Asc =
1256 mm2
p =
0.785 %
p/fck=
0.026167
Pu/(fck*b*D) =
0.17178
Reiforcement equally distributed on all four sides.
Chart 45 of SP-16
Mux1/(fck*b*D2)
=
Muy1/(fck*D*b2)
=
0.075
Mux1 = Muy1 =
144 KNM

page 98 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Area of concrete Ac = (Ag-Asc)


Puz = 0.45*fck*Ac+0.75*fy*Asc
Pu/Puz =
0.325391
CHECK
(Mux/Mux1)alfa +(Muy/Muy1)alfa
=
c)

=
=
alfa =

158744 mm2
2534 KN
1.20899

0.1456 < 1.00 Safe

For column on Leeward direction


Dead Load =
Water Load =
Live Load =
Seismic/Wind axial thrust =
Total =

198.3 KN
383.8 KN
8.0 KN
-97.072 KN
493.0 KN

Seismic/Wind Moment =
0 KNM
Load factor
=
1.2
Factored load (Pu) =
591.56 KN
Factored Moment (Mux) =
0 KNM
Factored Mex
=
11.831 KNM
Factored Mey
=
11.831 KNM
Total Design moments are
Mux =
11.83118 KNM; Muy =
11.831 KNM
Clear cover
=
40 mm Dia of main bar =
20 mmTor
Dia. of lateral ties =
8 mm; d'/D =
0.145
2
Asc =
1256 mm
p =
0.785 %
p/fck=
0.026167
Pu/(fck*b*D) =
0.12324
Reiforcement equally distributed on all four sides.
Chart 45 of SP-16
Mux1/(fck*b*D2)
=
Muy1/(fck*D*b2)
=
0.074
Mux1 = Muy1 =
142.08 KNM
Area of concrete Ac = (Ag-Asc)
=
158744 mm2
Puz = 0.45*fck*Ac+0.75*fy*Asc
=
2534 KN
Pu/Puz =
0.233451
alfa =
1.05575
CHECK
(Mux/Mux1)alfa +(Muy/Muy1)alfa
=
0.145 < 1.00 Safe

REINFORCEMENT REQUIREMENT FOR INNER ROW COLUMNS UNDER DIFFERENT CONDITIONS

size of column =
Clear cover to lateral ties =
Area of reinforcement in mm2

400

x
400 mm. ;
40 mm.

condition

30 Grade. ; Fe-

415

columns on
bending axis

Tank empty
(DL+ LL)

1256 Safe

(DL+WL/EL)

3316 Safe

page 99 of 70

windward dirn

Leeward dirn

1256 Safe

1256 Safe

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

(DL+LL+WL/EL)

2512 Safe

1256 Safe

1256 Safe

Tank Full
(DL+ LL)

1256 Safe

(DL+WL/EL)

3316 Safe

1256 Safe

1256 Safe

(DL+LL+WL/EL)

2060 Safe

1256 Safe

1256 Safe

Required critical reinforcement =


Longitudinal reinforcement =
and
Dia. of lateral ties =
Spacing
=
No. of lateral ties per set =

3316 mm2
8 Nos. of
20 mm. Tor
4 Nos. of
16 mm. Tor ;
8 mm Tor
200 mm c/c
3 ties per set.

Provided As=

Calculation of Thrust due to Horizontal loads on farthest leeward column


Due to wind
Total wind force Pw =
upto top level of foundation ring beam M=
Height' Y1' from top level of foundn. Ring beam = M/Pw=
Size of foundn. Ring beam=
500 x
750 mm
Total height upto bottom level of foundatin (Y2=Y1+depth of ring beam) =
Total M up to bottom level of foundn. Ring beam(M1)= Pw x Y2 =
Axial Thrust due to wind Load on farthest leeward column
On outer column (To) =4*M1*(D1*a1)/(n*a1*D12+n*a2*D22) =
On inner column (Ti) =4*M1*(D2*a2)/(n*a1*D12+n*a2*D22) =

page 100 of 70

3317.52 mm2
SAFE

505.1 KN
3801.7 KNM
7.5267 m.
8.2767 m
4180.49 KNM
33.7416 KN
22.8252 KN

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Due to Seismic load


Tank empty condition
Total seismic force under tank empty condition
=
Point of action of C.G. of force from top level of foundn. Ring beam =
Size of foundn. Ring beam=
500 x
Point of action of C.G. of force from bottom level of fndn. Ring beam =
Over turnig Moment upto bottom level (M1)=
Axial Thrust due to wind Load on farthest leeward column
On outer column (To) =4*M1*(D1*a1)/(n*a1*D12+n*a2*D22) =
On inner column (Ti) =4*M1*(D2*a2)/(n*a1*D12+n*a2*D22) =
Tank full condition
Total seismic force under tank full condition
=
Point of action of C.G. of force from top level of foundn. Ring beam =
Size of foundn. Ring beam=
500 x
Point of action of C.G. of force from bottom level of fndn. Ring beam =
Over turnig Moment upto bottom level (M1)=

719.459 KN
9.925 m.
750 mm
10.675 m.
7680.22 KNM
61.9887 KN
41.9335 KN

1791.33 KN
9.925 m.
750 mm
10.675 m.
19122 KNM

On outer column (To) =4*M1*(D1*a1)/(n*a1*D12+n*a2*D22) =


On inner column (Ti) =4*M1*(D2*a2)/(n*a1*D12+n*a2*D22) =

154.342 KN
104.408 KN

DESIGN OF FOUNDATIONS
Design of outer raft beam:Size =
500 x
750 mm.
No. of columns in outer row =
20 nos.
size of each column =
400 x
Load from each column
DL
=
Water load
=
LL
=
GrossTotal without seismic/wind force =
Axial thrust due to seismic/wind =
Gross total with seismic/wind force =

Total load from outer columns =


Dia.upto center of ring beam =
Load per 'meter' run('S) = W/(Pi*D1)=
No.of supports =

20

2A=

400 mm.
253.9 KN
166.1 KN
8.8 KN
428.8 KN
154.35 KN
583.2 KN

20 X 583.16 =
17.00 mts.

11663.2 KN
=

18 Degrees.

BM @center of support
S*(D2/2)2 ( TT/n* Sin o + TT/n* Cot A * Cos o -1)=

page 101 of 70

A =
A =

218.4 KN/m.
9 Degrees
0.15708 radians
-129.98 KNM

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

BM @ mid span =S*(D2/2)2(TT/n* Sin A + TT/n* Cot A * Cos A - 1)=

65.0724 KNM
0.0663 radians

For max.Torsion. Angle(B) =


3.8 Degrees.
=
Width of column =
400 mm
Distance of max. torsion from face of supports =
363.74 mm
Max. Torsion (T) =
S*(D2/2)2 [ TT/n* CosB -TT/n*Cot A x Sin B - ( TT/n- TT/180*B)] =
3.93265 KNM
angle (beta)in between center and face of column =
0.0235 radians.
=
1.3481 Degrees.
BM @ face of support =
S(D2/2)2 ( TT/n* Sin(beta) + TT/n* Cot A * Cos(beta) - 1)=
-76.005 KNM
Design of support section:
Size =
500 mm
X
750 mm
Clear cover =
60 mm. Dia. Of vertical stirrups =
8 mm
2 -Legged
Dia. of main reinforcement=
20 mm
Dia. of main reinforcement of annular raft slab =
12 mm.
Expected No. of layers of reinforcement in beam =
2 Nos.
Effective cover=
=
110 mm.
eff. Depth = Total D-eff. cover =
640 mm
BM at face(M)=
76.0051 KNM; Torsion(T)=
3.9327 KNM
Mt =T/1.7*(1+D/b) =
5.783312 KNM
Me = M+Mt =
81.78843 KNM
t=230 N/mm2
c= 10 N/mm2; m= 9 ; k =0.2812 ; j = 0.906 ; Q = 1.274
Balanced B.M = Q*b*(deff)2 =
260.9152 KNM
>
81.788 KNM
singly reinforced section
Required Ast = Me*106/(230*0.906*(deff)) =
613.276 mm2
Min Ast = 0.85*b*D/fy
=
768.072 mm2
Reinforcement
Provide
3 Nos of
16 mm Tor Through bars at bottom.
and extra
2 Nos of
16 mm Tor at bottom at supports.
Ast provided at bottom at support

1005.3 mm2

Design of mid span section:Mid span B.M =


Balanced moment = Qb(effd)2 =

65.07241 KNM

>
SAFE

768.072 mm2

260.92 KNM >


65.0724 KNM
singly reinforced section
487.93 mm2
768.07 mm2

Required Ast = M*106/(230*0.906*(effd)) =


Minimum steel = 0.85*b*D/fy =
Top reinforcement at mid span
Provide
5 Nos of
16 mm Tor Through bars at top
and extra
0 Nos of
0 mm Tor bars at top at mid span.
2
Ast provided
=
1005.31 mm >
768.07 mm2
SAFE
Area of side face reinforcement (As1)= 0.1% of cs area =
375 mm2
Area of reinforcement on each vertical side face = As1/2 =
187.5 mm2
Max allowable spacing =
300 mm.c/c

page 102 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Side face Reinforcement :provide


3 Nos. of
Provided side face reinf. on each face =

12 mm Tor on each vertical face


339.29 mm2 >

187.5 mm2

SAFE
Design for shear:Shear at a distance ' (effd)' from face of support
V =
S*(Pi*D1/(2*n)-(col.width/2+effd)) =
=
108.138 KN
Max. Torsion (T) =
=
3.93265 KNM
Equivalent shear at eff.d from face of support (Ve) = V+1.6*T/b =
=
120.723 KN
Equivalent shear stress (tve) = (Ve)/(b*effd) =
=
0.37726 N/mm2
For M30 grade concrete
tcmax. =
2.2 N/mm2 >
0.37726 N/mm2
At face of support
SAFE
2
At face of support provided Ast =
1005.3 mm
pt = Ast/(b*effd)*100 =
0.3142 % ; tc =
0.250 N/mm2
b1 = (b-2*(60+10+main/2)) =
344 mm
d1 = (d-2*(60+10+main/2))-16 =
582 mm
Using
8 mmTor
2 Legged vertical stirrups
2
Asv =
100.531 mm and tsv =
230 N/mm2
The allowable spacing must be minimum of the following
1.Sv = Asv*tsv/(b*(tve - tc)) =
363.3882 mm. C/c
Asv = T*Sv/(b1*d11*tsv) +V*Sv/(2.5*d11*tsv)
2. Sv =
246 mm. c/c
X1 = (b-2*(60)-10) =
370 mm. Y1 = ( d - 2*(60) -10)-16 =
610 mm
3.Sv = least of X1 and Y1 =
370 mm. c/c
4. Sv = (X1+Y1)/4 =
245 mm. c/c
As per min Asv condition Sv=
208.6018 mm. c/c
Therefore Sv =
208 mm. c/c
Therefore provide
8 mmTor
2 Lgd vertl. Stirrups @
120 mm. C/c
SAFE
Design of inner raft beam:Size =
500 x
No. of columns in outer row =
size of each column =
Load from each column
DL
Water load
LL

750 mm.
20 nos.
400 x
=
=
=
Total

Axial thrust due to seismic/wind =


Gross total =

400 mm.
198.3 KN
383.8 KN
8.0 KN
590.0 KN
104.41 KN
694.5 KN

page 103 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Total load from outer columns =


Dia.upto center of ring beam =
Load per 'meter' run('S) = W/(Pi*D1)=
No.of supports =

20

2A=

20 X 694.45 =
11.50 mts.

13889 KN
384.4 KN/m.

18 Degrees.

page 104 of 70

A =
A =

9 Degrees
0.15708 radians

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

BM @center of support
S*(D2/2)2 ( TT/n* Sin o + TT/n* Cot A * Cos o -1)=
BM @ mid span =S*(D2/2)2(TT/n* Sin A + TT/n* Cot A * Cos A - 1)=

-104.71 KNM
52.4203 KNM
0.0663 radians

For max.Torsion. Angle(B) =


3.8 Degrees.
=
Width of column =
400 mm
Distance of max. torsion from face of supports =
181.35 mm
Max. Torsion (T) =
S*(D2/2)2 [ TT/n* CosB -TT/n*Cot A x Sin B - ( TT/n- TT/180*B)] =
3.16802 KNM
Angle (beta)in between center and face of column =
0.0348 radians.
=
1.9929 Degrees.
BM @ face of support =
S(D2/2)2 ( TT/n* Sin(beta) + TT/n* Cot A * Cos(beta) - 1)=
-42.905 KNM
Design of support section:
Size =
500 mm
X
750 mm
Clear cover =
60 mm. Dia. Of vertical stirrups =
8 mm
2 -Lgd
Dia. of main reinforcement=
20 mm
Dia. of main reinforcement of annular raft slab =
16 mm.
Expected No. of layers of reinforcement =
2 Nos.
Effective cover=
=
114 mm.
eff. Depth = (Total'D' -eff.cover) =
636 mm
BM at face(M)=
42.9047 KNM; Torsion(T)=
3.168 KNM
Mt =T/1.7*(1+D/b) =
4.658851 KNM
Me = M+Mt =
47.5636 KNM
t=230 N/mm2
c= 10 N/mm2; m= 9 ; k =0.2812 ; j = 0.906 ; Q = 1.274
Balanced B.M = Q*b*(deff)2 =
257.664 KNM
>
47.564 KNM
Singly reinforced section
6
Required Ast = Me*10 /(230*0.906*(deff)) =
358.89 mm2
Min Ast = 0.85*b*D/fy
=
768.072 mm2
Reinforcement
Provide
3 Nos of
16 mm Tor Through bars at bottom.
and extra
2 Nos of
16 mm Tor at bottom at supports.
Ast provided at bottom at support
=
1005.3 mm2
>
768.072 mm2
SAFE
Design of mid span section:Mid span B.M =
Balanced moment = Qb(effd)2 =

52.42025 KNM
257.66 KNM >
52.4203 KNM
Singly reinforced section
395.54 mm2
768.07 mm2

Required Ast = M*106/(230*0.906*(effd)) =


Minimum steel = 0.85*b*D/fy =
Top reinforcement at mid span
Provide
5 Nos of
16 mm Tor Through bars at top
and extra
0 Nos of
0 mm Tor bars at top at mid span.
2
Ast provided
=
1005.31 mm
>
768.07 mm2
SAFE
Area of side face reinforcement (As1)= 0.1% of cs area =
375 mm2

page 105 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Area of reinforcement on each vertical side face = As1/2 =

187.5 mm2

Max allowable spacing =


300 mm.c/c
Side face Reinforcement :provide
3 Nos. of
Provided side face reinf. on each face =

187.5 mm2

12 mm Tor on each vertical face


339.29 mm2 >
SAFE

Design for shear:Shear at a distance ' (effd)' from face of support


V =
S*(Pi*D1/(2*n)-(col.width/2+effd)) =
25.8371 KN
Max. Torsion (T) =
3.16802 KNM
Equivalent shear at eff.d from face of support (Ve) = V+1.6*T/b =
35.9747 KN
Equivalent shear stress (tve) = (Ve)/(b*effd) =
0.11313 N/mm2
For M30 grade concrete
tcmax. =
2.2 N/mm2 >
0.11313 N/mm2
SAFE
At face of support
At face of support provided Ast =
1005.3 mm2
pt = Ast/(b*effd)*100 =
0.3161 % ; tc =
0.251 N/mm2
b1 = (b-2*(60+sec+main/2)) =
344 mm
d1 = (d-2*(60+10+20/2))-16 =
578 mm
Using
8 mmTor
2 Legged vertical stirrups
2
Asv =
100.531 mm and tsv =
230 N/mm2
The allowable spacing must be minimum of the following
1.Sv = Asv*tsv/(b*(tve - tc)) =
-335.415 mm. C/c
Asv = T*Sv/(b1*d11*tsv) +V*Sv/(2.5*d11*tsv)
2. Sv =
684 mm. c/c
X1 = (b-2*(60)-sec) =
372 mm. Y1 = ( d - 2*(60) -sec)-16 =
606 mm
3.Sv = least of X1 and Y1 =
372 mm. c/c
4. Sv = (X1+Y1)/4 =
244.5 mm. c/c
As per min Asv condition Sv=
208.6018 mm. c/c
Max Sv =
-335 mm. c/c
Negative value
Sv =
208 mm. c/c
Therefore provide
8 mmTor
2 Lgd vertl. Stirrups @
150 mm. C/c
SAFE
Design of outer annular raft slab.
Safe Bearing capacity of soil =
125 KN/m2
Load on foundation outer Ring beam
=
11663 KN
DL of rig beam =TT*D*b*D1*dencity of conrete
=
500.691 KN
Self wt. of Annular raft slab Say 10 % of above total load
=
1217 KN
Total Load on soil (W) =
13381 KN
Required Area of footing (A1) = W/SBC =
=
107.047 m2
Dia.upto center of foundation outer ring beam
=
17.00 m.
Radius ( R ) =
=
8.5 m.
Width of ring beam
0.5 m.
Let Ri =Raius of inner free edge of annular raft (m).
Ro =Raius of outer free edge of annular raft (m).
TT*(Ro2 -R2) = A1/ 2 =
=
53.5236 m2
From the above equation , value of Ro =
=
9.449 m.
Say
=
9.45 m.

page 106 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

(R2-Ri2) = (Ro2-R2)
From the above equation , value of Ri =
Say
Pressure on soil =W / (TT*(Ro2-Ri2)) =
must be Less than

=
=
=

7.4295 m.
7.42 m.
124.372 KN/m2
125 KN/m2

SAFE
Upward pressure considered for design of ftg.
=
125 KN/m2
Length of outer portion of outer annular raft slab =
=
0.7 m.
Length of inner portion of outer annular raft slab =
=
0.83 m.
considering 1 m width of slab
Max BM (M1) =
=
43.0563 KNM/m
t=230 N/mm2
c= 10 N/mm2; m= 9 ; k =0.2812 ; j = 0.906 ; Q = 1.274
From BM consideration
Reqd. eff depth at support =sqrt(M1*106/(1000*-Q)) =
183.837 mm.
Type of section =
Flat section
At support provided Total depth (D1)=
450 mm.
At free edge provided Total depth (D2)=
450 mm.
Clear cover to reinforcement =
65 mm. Dia of main reinf. =
12 mm.
At support Available eff. Depth (d)=
379 mm.
Required Ast = M/(t*j*d) =
545.181 mm2/m
Min. Ast = 0.22/100* D /m =
833.8 mm2/m
Check for beam shear
eff. Depth at critical section =
379 mm.
Induced Shear stress in concrete =
0.14875 N/mm2
From table 23 of IS: 456 - 2000
corresponding pt =
0.15 %
Ast reqd. =
568.5 mm2/m
Chech for punching shear
eff. Depth at critical section =
379 mm.
Induced Shear stress in concrete =
0.21125 N/mm2
From cl. 31.6.3.1 of IS : 456 - 2000
max. allowable punching shear stress =0.16*sqrt(fck)=
0.87636 N/mm2
SAFE
Check Ld
Dia of main reinf. =
12 mm Tor & Ld in Tension =
451.2 mm.
Providing 150 mm L- bend on both sides of each rod.
Length of main reinf. From face of support =
880 mm.
Required Ast =
833.8 mm2/m
Using
12 mm Tor reqd. spacing =
135.641 mm c/c
Provided main reinf.(Radials)
Provide
12 mm Tor radial reinforcement @
100 mm c/c .
(spacing measured at outer face of raft beam).
SAFE
Distribution reinf.
Avg. thickness of annular raft slab =
450 mm
Min Distrbution reinf. =0.12%*b*Davg. =
540 mm2/m
Circumferential reinforcement
Provide
10 mm Tor radial reinforcement @
100 mm c/c .

page 107 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

as distribution reinf. (in the form of circumferentials)


Provided Asd =
785.4 mm2/m
SAFE

page 108 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Design of inner row annular raft slab


Safe Bearing capacity of soil =
125 KN/m2
Load on foundation outer Ring beam
=
13889 KN
DL of rig beam =TT*D*b*D1*dencity of conrete
=
338.703 KN
Self wt. of Annular raft slab say 10 %of above total load
=
1423 KN
Total Load on soil (W) =
15651 KN
Required Area of footing (A1) = W/SBC =
=
125.206 m2
Dia. Upto center of foundation outer ring beam
=
11.50 m.
Radius ( R ) =
=
5.75 m.
Width of ring beam
0.5 m.
Let Ri =Raius of inner free edge of annular raft (m).
Ro =Raius of outer free edge of annular raft (m).
TT*(Ro2 -R2) = A1/ 2 =
=
62.6028 m2
From the above equation , value of Ro =
=
7.2794 m.
Say
=
7.28 m.
FOUNDATIONS ARE NOT OVERLAPPING. HENCE SAFE
(R2-Ri2) = (Ro2-R2)
From the above equation , value of Ri =
=
3.62307 m.
Say
=
3.62 m.
2
2
Pressure on soil =W / (TT*(Ro -Ri )) =
=
124.875 KN/m2
must be Less than
125 KN/m2
SAFE
Length of outer portion of inner annular raft slab =
=
1.28 m.
Length of inner portion of inner annular raft slab =
=
1.88 m.
considering 1 m width of slab
Design of inner portion of inner raft slab
Length of inner portion of inner annular raft slab =
1.88 m.
SBC of soil =
125.00 KN/m2
Max BM (M1) =
=
220.9 KNM/m
t=230 N/mm2
c= 10 N/mm2; m= 9 ; k =0.2812 ; j = 0.906 ; Q = 1.274
From BM consideration
Reqd. eff depth at support =sqrt(M1*106/(1000*-Q)) =
416.402 mm.
Type of section =
Tapered section
At support provided Total depth (D1)=
700 mm.
At free edge provided Total depth (D2)=
450 mm.
Clear cover to reinforcement =
65 mm. Dia of main reinf. =
16 mm.
At support Available eff. Depth (d)=
627 mm.
Required Ast = M/(t*j*d) =
1690.72 mm2/m
Min. Ast = 0.22/100* d /m =
1379.4 mm2/m
Check for beam shear
eff. Depth at critical section =
543.622 mm.
Induced Shear stress in concrete =
0.28811 N/mm2
From table No. 23 of IS:456 - 2000 corresponding pt =
0.432 %
Ast reqd. =
2348.45 mm2/m
Chech for punching shear
eff. Depth at critical section =
585.311 mm.
Induced Shear stress in concrete =
0.33454 N/mm2

page 109 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

From cl. 31.6.3.1 of IS : 456 - 2000


max. allowable punching shear stress =0.16*sqrt(fck)=

0.87636 N/mm2
Hence safe.

Check Ld
Dia of main reinf. =
16 mm Tor & Ld in Tension =
601.6 mm.
providing 150 mm L- bend on both sides of each rod.
Length of main reinf. From face of support =
1930 mm.
Required Ast =
2348.45 mm2/m
Provided main reinf.(Radials)
Required Ast =
2348.4 mm2/m
Dia of main reinf. =
16 mm Tor. Reqd. spacing =
85.6148 mm c/c .
Provide
16 mm Tor radial reinforcement @
120 mm c/c .
(spacing measured at inner face of raft beam).
Provided Ast =
1675.5 mm2/m >
2348.45 mm2/m
NOT SAFE
Distribution reinf.
Avg. thickness of annular raft slab =
575 mm
Min Distrbution reinf. =0.12%*b*Davg. =
690 mm2/m
Provide
10 mm Tor radial reinforcement @
100 mm c/c .
as distribution reinf. (in the form of circumferentials)
Provided Asd =
785.4 mm2/m >
690 mm2/m
SAFE
Design of outer portion of inner raft slab
Length of outer portion of inner annular raft slab =
1.28 m.
SBC of soil =
125.00 KN/m2
Max BM (M1) =
=
102.4 KNM/m
t=230 N/mm2
c= 10 N/mm2; m= 9 ; k =0.2812 ; j = 0.906 ; Q = 1.274
From BM consideration
Reqd. eff depth at support =sqrt(M1*106/(1000*-Q)) =
283.508 mm.
Type of section =
Tapered section
At support provided Total depth (D1)=
700 mm.
At free edge provided Total depth (D2)=
450 mm.
Clear cover to reinforcement =
65 mm. Dia of main reinf. =
16 mm.
At support Available eff. Depth (d)=
627 mm.
Required Ast = M/(t*j*d) =
783.748 mm2/m
Min. Ast =0.22/100*b*d =
1379.4 mm2/m
Check for beam shear
eff. Depth at critical section =
504.539 mm.
Induced Shear stress in concrete =
0.16178 N/mm2
From table No. 23 of IS:456 - 2000 corresponding pt =
0.15 %
Ast reqd.
756.809 mm2/m
Chech for punching shear
eff. Depth at critical section =
565.77 mm.
Induced Shear stress in concrete =
0.21354 N/mm2
From cl. 31.6.3.1 of IS : 456 - 2000
max. allowable punching shear stress =0.16*sqrt(fck)=
0.87636 N/mm2

page 110 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

SAFE
Check Ld
Dia of main reinf. =
16 mm Tor & Ld in Tension =
providing 150 mm L- bend on both sides of each rod.
Length of main reinf. From face of support =
Required Ast =
Provided main reinf.(Radials)
Required Ast =
1379.4 mm2/m
Dia of main reinf. =
16 mm Tor Reqd. spacing =
Provide
16 mm Tor radial reinforcement @
(spacing measured at outer face of raft beam).
Provided Ast =
1535.9 mm2/m
>

601.6 mm.
1330 mm.
1379.4 mm2/m

145.76 mm c/c .
130.909 mm c/c .
1379.4 mm2/m
SAFE

Distribution reinf.
Avg. thickness of annular raft slab =
575 mm
Min Distrbution reinf. =0.12%*b*Davg. =
690 mm2/m
Provide
10 mm Tor radial reinforcement @
100 mm c/c .
as distribution reinf. (in the form of circumferentials)
Provided Asd =
785.4 mm2/m
>
690 mm2/m
SAFE
STABILITY OF STRUCTURE
Tank full condition
Total load on outer raft =
Total load on inner raft =
Dia.of outer row columns (D) =
Total restoring moment (Mr)=0.9*W*D/2 =

20 x
428.8 =
20 x
590.0 =
Total (W) = =
=
=

Critical lateral force


Point of action of lateral force from footing bottom =
Total overturning moment (Mo) =
Factor of safety against overturning =Mr/Mo =

8576.2 KN
11800.8 KN
20377 KN
17.00 m.
155884 KNM

=
=
=
8.7679
SAFE

1791.33 KN
9.925 m.
17779 KNM
>

1.2

Tank empty condition


Total load under tank full condition =
=
Deduct water load =
1053.8 x
10.0 =
Net total load (W1)
=
Dia. Of outer row columns (D) =
=
Total restoring moment (Mr)=0.9*W*D/2 =
=

20377 KN
-10538 KN
9838.93 KN
17 m.
75268 KNM

Critical lateral force


Point of action of lateral force footins bottom =
Total overturning moment (Mo) =

719.46 KN
9.925 m.
7140.63 KNM

page 111 of 70

=
=
=

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Factor of safety against overturning =Mr/Mo =

page 112 of 70

10.541
SAFE

>

1.2

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

ABSTRACT OF STRUCTURAL COMPONENTS


Outer row annular raft ( tapered section )
Outer portion
Total depth
=
and
Inner portion
Total depth

=
and

450 mm at Radius =
450 mm at Radius =

9450 mm
8750 mm

450 mm at Radius =
450 mm at Radius =

8250 mm
7420 mm

Reinforcement
Radials
12 mm Tor @
100 mm. C/c
(spacing measured at Radius
8250 mm.)
Circumferentials
10 mm Tor @
100 mm. C/c
Inner row annular raft ( tapered section )
Outer portion
Total depth
=
and
Inner portion
Total depth

=
and

450 mm at Radius =
700 mm at Radius =

7280 mm
6000 mm

700 mm at Radius =
450 mm at Radius =

5500 mm
3620 mm

Reinforcement
Radials
16 mm Tor @
120 mm. C/c
(spacing measured at Radius
5500 mm.)
Circumferentials
10 mm Tor @
100 mm. C/c
Outer raft beam
Size
=
500 x
Dia. up to center of beam =
Reinforcement
At bottom
extra
At top
extra
Side face reinf
For shear provide
8 mmTor
Inner raft beam
Size
=
500 x
Dia. up to center of beam =
Reinforcement
At bottom
extra
At top
extra
Side face reinf

750 mm
17000 mm
3 Nos. of
16 mm Tor Through and
2 Nos. of
16 mm Tor at supports.
5 Nos. of
16 mm Tor Through and
0 Nos. of
0 mm Tor at mid span.
3 Nos. of
12 mm Tor on each vertical side face.
2 Lgd vertl. Stirrups @
120 mm. C/c
750 mm
11500 mm
3 Nos. of
2 Nos. of
5 Nos. of
0 Nos. of
3 Nos. of

page 113 of 70

16 mm Tor Through and


16 mm Tor at supports.
16 mm Tor Through and
0 mm Tor at mid span.
12 mm Tor on each vertical side face.

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

For shear provide

8 mmTor

2 Lgd vertl. Stirrups @

page 114 of 70

150 mm. C/c

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Outer row Columns


Nos. =
20 Nos.
Size
=
400 x
400 mm
Dia. up to center of columns =
17000 mm
Reinforcement
Longitudinals =
8 Nos. of
20 mm. Tor
and
4 Nos. of
16 mm. Tor
Lateral ties set =
8 mm Tor @
200 mm. C/c per set
No. of ties per set =
3 Nos.
Inner row Columns
Nos. =
20 Nos.
Size
=
400 x
400 mm
Dia. up to center of columns =
11500 mm
Reinforcement
Longitudinals =
8 Nos. of
20 mm. Tor
and
4 Nos. of
16 mm. Tor
Lateral ties set =
8 mm Tor @
200 mm. C/c per set
No. of ties per set =
3 Nos.
Chord braces
First brace
size =
300 x
600 mm
Outer chord brace
Clear length= 2259.4 mm.
Reinforcement
At top
6 Nos. of
20 mm Tor
and
0 Nos. of
0 mm Tor through.
At bottom
6 Nos. of
20 mm Tor
and
0 Nos. of
0 mm Tor through.
For shear
8 mm. Tor
2 -Legged Vertical
stirrups @
200 mm. C/c
On each vertical Side face
Provide
3 Nos. of
8 mm. Tor
Inner chord brace
Clear length=
1399 mm.
Reinforcement
At top
6 Nos. of
20 mm Tor
and
0 Nos. of
0 mm Tor through.
At bottom
6 Nos. of
20 mm Tor
and
0 Nos. of
0 mm Tor through.
For shear
8 mm. Tor
2 -Legged Vertical
stirrups @
200 mm. C/c
On each vertical Side face
Provide
3 Nos. of
8 mm. Tor
2nd, 3rd & 4th braces
size =
300 x
600 mm
Outer chord brace
Clear length= 2259.4 mm.
Reinforcement
At top
8 Nos. of
20 mm Tor
and
0 Nos. of
0 mm Tor through.
At bottom
8 Nos. of
20 mm Tor
and
0 Nos. of
0 mm Tor through.
For shear
8 mm. Tor
2 -Legged Vertical

page 115 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

stirrups @
On each vertical Side face
Provide
3 Nos. of

200 mm. C/c


8 mm. Tor

page 116 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Inner chord brace

Clear length=

Reinforcement
At top
and
At bottom
and
For shear
stirrups @
On each vertical Side face
Provide
3 Nos. of
All Radial braces
size =
300 x
Clear length=
2350 mm
Reinforcement
At top
At bottom
For shear
stirrups @
On each vertical Side face
Provide
3 Nos. of
Floor level outer ring beam
size =
Dia. up to center of beam =
Reinforcement
At bottom
extra
At top
extra
Side face reinf
For shear provide
10 mmTor

1399 mm.

7 Nos. of
20 mm Tor
0 Nos. of
0 mm Tor through.
7 Nos. of
20 mm Tor
0 Nos. of
0 mm Tor through.
8 mm. Tor
2 -Legged Vertical
150 mm. C/c
8 mm. Tor
600 mm.

4 Nos. of
20 mm Tor through.
4 Nos. of
20 mm Tor through.
8 mm. Tor
2 -Legged Vertical
200 mm. C/c
8 mm. Tor
400 x
17000 mm

850 mm.

3 Nos. of
20 mm Tor Through and
0 Nos. of
0 mm Tor at bottom at mid span.
2 Nos. of
20 mm Tor Through and
1 Nos. of
20 mm Tor at supports.
3 Nos. of
10 mm Tor on each vertical side face.
2 Lgd vertl. Stirrups @
200 mm. C/c

Floor level inner ring beam


size =
400 x
850 mm.
Dia. up to center of beam =
11500 mm
Reinforcement
At bottom
3 Nos. of
16 mm Tor Through and
extra
0 Nos. of
0 mm Tor at mid span.
At top
2 Nos. of
16 mm Tor Through and
extra
1 Nos. of
20 mm Tor at supports.
Hoop reinf.
4 Nos. of
20 mm Tor on each vertical side face.
For shear provide
10 mmTor
2 Lgd vertl. Stirrups @
200 mm. C/c
Floor slab
Thickness=
400 mm.
Reinforcement
Hoop reinf.
12 mm Tor at
29 mm c/c to
40
Radials
mm c/c
at Top
12 mm Tor at
200 mm c/cThrough.
extra
12 mm Tor at
200 mm c/c on top over support
at bottom
12 mm Tor at
120 mm c/cThrough.

page 117 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Gallery slab at floor level

Thickness at support =
and tapered to
Width
=
Main reif. At top
Distribution reinf.

100 mm
100 mm at free edge.
750 mm.
8 mm Tor at
150 mm c/c
8 mm Tor at
240 mm c/c

Dome at floor level

Reinforcement
At bottom
At top
Top extra
at springing upto

Thickness at crown =
200 mm
Thickness at springing =
250 mm. Tapering length =
Hoop reinf.
Meridional reinf.
8 mm Tor at
150 mm c/c
8 mm Tor at
8 mm Tor at
150 mm c/c
8 mm Tor at
10 mm Tor at
150 mm c/c
10 mm Tor at
1550 mm from springing

1550
150
150
150

Columns inside container


Nos. =
20 Nos.
Size
=
300 x
300 mm
Dia. up to center of columns =
11500 mm
Reinforcement
Longitudinals =
4 Nos. of
16 mm. Tor
and
0 Nos. of
0 mm. Tor
Lateral ties set =
8 mm Tor @
150 mm. C/c per set
No. of ties per set =
1 Nos.
Haunch

Side wall

Provide
200 mm x
200 mm Haunch at inner side
of base slab and side wall junction.
Reinforcement
8 mm Tor at
150 mm c/c both ways.
Thickness at base=
250 mm and tapered to
200 mm at roof slab level.
(Inside tapering)
Reinforcement
Vertical
On water face:
10 mm Tor @
100 mm.c/c upto
1500
height from base and curtail alternate rods at
1500 mm above base.
On outer face
8 mm Tor @
150 mm. C/c through.
Hoop reinforcement
As specified in detailed calculations.

Roof annular slab

Thickness =
200 mm
Provide
8 mm Tor at
100 mm c/c at bottom at mid span.
and crank alternate bars near supports.(spacing measured at mid span)
Also Provide extra
8 mm Tor at
200 mm c/c on top at supports.
Provide
8 mm Tor at
200 mm c/c as distribution reinforcement.
Top ring beam over inner columns
Size =
300 X
380
mm.
Reinforcement
At top
2 Nos. of
12 mm Tor through and
extra
1 Nos. of
12 mm Tor at supports.
At bottom
3 Nos. of
12 mm Tor through.

page 118 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

For shear provide


8 mm Tor
2 -Legged Vertical stirrups at
at
120 mm c/c.
Hoop reinf.ment.
8 Nos. of
12 mm Tor (total nos.)

page 119 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Roof dome
Thickness at crown =
100 mm
Thickness at springing =
150 mm. Tapering length =
Reinforcement
Meridionals and hoops
8 mm Tor at
120 mm c/c both ways
At edge provide extra
8 mm Tor at
240 mm c/c both ways
up to a distance of
2000 mm from springing.

page 120 of 70

2000

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 121 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 122 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 123 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 124 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 125 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 126 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 127 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 128 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 129 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 130 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 131 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 132 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 133 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 134 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 135 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 136 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 137 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 138 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

mts.
mts.
mts.
mts.
mts.
mts.
mts.

SAFE

page 139 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 140 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 141 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 142 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 143 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 144 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 145 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

n size
ngths)

page 146 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

n size
ngths)

page 147 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 148 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 149 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 150 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 151 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 152 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 153 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 154 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 155 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 156 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 157 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 158 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 159 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 160 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 161 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 162 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

SAFE

page 163 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 164 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 165 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 166 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 167 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 168 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 169 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 170 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 171 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 172 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 173 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 174 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 175 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 176 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 177 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 178 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 179 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 180 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 181 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 182 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 183 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 184 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 185 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 186 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 187 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 188 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 189 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 190 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 191 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 192 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 193 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 194 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 195 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 196 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 197 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 198 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 199 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 200 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 201 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 202 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 203 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 204 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 205 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

mm.
mm c/c
mm c/c
mm c/c

mm
ove base.

page 206 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

page 207 of 70

DESCON associates Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

mm.

page 208 of 70

DESCON associates Hyd.

Name of Work:- ONGOLE Mplty - Construction of 800KL ELSR at ISLAMPET park site, ONGOLE (off site)
under APUSP

DATA

Qty.

Sl.No
1

Description of work

rate

Earthwork excavation in all soils upto


SDR and stone matrix with machinery
with in a radius of 5mts. I.e. cut and
dump as per S.S. - 1.00 cum
1.00 cum Basic rate as per SSR
Add VAT @ 4%

Amount

13.00 cum

13.00
0.52
13.52

213.88 cum
11.20 cum

213.88
11.20
2.24
227.32
9.09
236.41

Cost of 40mm (SS-5) graded HBG M/C


metal - 1.00 cum
0.40 cum cost of 40mm HBG metal
0.40 cum Cost of 20mm HBG meta
0.20 cum cost of 10mm HBG metal

630.68 cum
957.23 cum
761.73 cum

252.27
382.89
152.35
787.51

Cost of 20mm (SS-5) graded HBG M/C


metal - 1.00 cum
0.60 cum Cost of 20mm HBG meta
0.40 cum cost of 10mm HBG metal

957.23 cum
761.73 cum

574.34
304.69
879.03

Supply, delivery and fabrication of TOR


Steel including cost of steel, binging
wire and fabrication charges, VAT etc.,
complete as per SS - 1.00 kg
Cost of Steel
fabrication charges

27300.00 M.T
4.70 Kg

27.30
4.70
32.00
1.28
33.28

Providing sand bedding including cost


of sand, labour charges, VAT etc.,
complete as per S.S. - 1.00 cum
1.00 cum Cost of Sand
1.00 cum filling including watering and ramming
Add MAA @20%
Add VAT @ 4%

per

1.00 Kg
1.00 Kg

Add VAT @ 4%
6
Providing precast/ cast in situ inCC M30
design mix using 20mm graded
aggregates conforming to IS 383,
subject to recovery of deference cost of
cement if cement content as per mix
design is less then 400 kg/cum of
concrete, including cost and
conveyance of all materials, VAT,
machinery, labour, cetering, vibration,
curing for 21 days and all incidental
charges etc., complete but excluding
cost of steel and fabrication conforming
to Standard specification for the
following items of work - 1.00 cum

209 of 263

Sl.No

Qty.
Description of work
0.92 cum cost of 20mm(SS-5) graded metal
0.46 cum Cost of Sand

210 of 263

rate
per
879.03 cum
258.70 cum

Amount
808.71
119.00

Qty.
400.00 kg
1.00 cum
1.00 cum
0.12 Nos
0.28 Nos
2.10 Nos
3.50 Nos

Sl.No

Description of work
cost of cement
machine mixing charges
vibration charges
mason Ist class
mason Iind class
Man mazdoor
Woman mazdoor
Add MAA @20%

rate
per
3400.00 M.T
33.80 cum
34.60 cum
166.00 Each
146.00 Each
116.00 Each
116.00 Each

Add VAT @ 4%
7

0.92 cum
0.46 cum
165.00 kg
1.00 cum
1.00 cum
0.06 Nos
0.14 Nos
1.80 Nos
1.40 Nos

Laying VCC (1:4:8) using 40mm (SS-5)


graded HBG M/C metal and OPC for
under raft including cost and
conveyance of all materials, labour
charges, centering, curing, VAT etc.,
complete as per SS -1.00 cum
cost of 40mm(SS-5) graded metal
Cost of Sand
cost of cement
machine mixing charges
vibration charges
mason Ist class
mason Iind class
Man mazdoor
Woman mazdoor
Add MAA @20%

787.51 cum
258.70 cum
3400.00 M.T
33.80 cum
34.60 cum
166.00 Each
146.00 Each
116.00 Each
116.00 Each

724.51
119.00
561.00
33.80
34.60
9.96
20.44
208.80
162.40
80.32
1954.83
78.19
2033.02

3208.59 cum
sqm

3208.59
0.00
3208.59
128.34
3336.93

3208.59 cum
sqm

3208.59
0.00
3208.59
128.34
3336.93

3208.59 cum
292.50 sqm

3208.59
3343.28
6551.86
262.07
6813.94

3208.59 cum

3208.59

Add VAT @ 4%
Providing VRCC M30 for outer row raft
- 1.00 cum
1.00 cum cost of VRCC M30 mix
sqm cetering and scaffolding charges
Add VAT @ 4%
Providing VRCC M30 for inner row raft
- 1.00 cum
1.00 cum cost of VRCC M30 mix
sqm cetering and scaffolding charges
Add VAT @ 4%
Providing VRCC M30 for columns of
size 350x350mm from raft beam to
5.00m above G.L. - 1.00 cum
1.00 cum cost of VRCC M30 mix
11.43 sqm cetering and scaffolding charges
Add VAT @ 4%
Providing VRCC M30 for columns of
size 350x350mm from 5.00mts to
8.00m above G.L. - 1.00 cum
1.00 cum cost of VRCC M30 mix

211 of 263

Amount
1360.00
33.80
34.60
19.92
40.88
243.60
406.00
142.08
3208.59
128.34
3336.93

Sl.No

Qty.
Description of work
11.43 sqm cetering and scaffolding charges
1.00 cum lifting charges
Add VAT @ 4%

212 of 263

rate
per
292.50 sqm
56.60 cum

Amount
3343.28
56.60
6608.46
264.34
6872.80

Sl.No

Qty.

Description of work

rate

Providing VRCC M30 for columns of


size 350x350mm from 8.00mts to
11.00m above G.L. - 1.00 cum
1.00 cum cost of VRCC M30 mix
11.43 sqm cetering and scaffolding charges
1.00 cum lifting charges

3208.59
3343.28
113.20
6665.06
266.60
6931.67

3208.59 cum
292.50 sqm
169.80 cum

3208.59
3343.28
169.80
6721.66
268.87
6990.53

3208.59 cum
292.50 sqm
56.60 cum

3208.59
2925.00
56.60
6190.19
247.61
6437.80

3208.59 cum
292.50 sqm

3208.59
1170.00
4378.59
175.14
4553.73

3208.59 cum
710.30 sqm
226.40 cum

3208.59
3302.90
226.40
6737.88
269.52
7007.40

3208.59 cum
710.30 sqm
339.60 cum

3208.59
6179.61
339.60
9727.80
389.11
10116.91

Add VAT @ 4%
Providing VRCC M30 for raft beam of
500mm thick. - 1.00 cum
1.00 cum cost of VRCC M30 mix
10.00 sqm cetering and scaffolding charges
1.00 cum lifting charges
Add VAT @ 4%
Providing VRCC M30 for columns of
size 350x350mm from 5.00mts to
8.00m above G.L. - 1.00 cum
1.00 cum cost of VRCC M30 mix
4.00 sqm cetering and scaffolding charges
Add VAT @ 4%
Providing VRCC M30 for dome at floor
level of thick 200mm at crown and 230
at springings. - 1.00 cum
1.00 cum cost of VRCC M30 mix
4.65 sqm cetering and scaffolding charges
1.00 cum lifting charges
Add VAT @ 4%
Providing VRCC M30 for dome at roof
level of thick 100mm at crown and 130
at springings. - 1.00 cum
1.00 cum cost of VRCC M30 mix
8.70 sqm cetering and scaffolding charges
1.00 cum lifting charges
Add VAT @ 4%

213 of 263

Amount

3208.59 cum
292.50 sqm
113.20 cum

Add VAT @ 4%
Providing VRCC M30 for columns of
size 350x350mm from 11.00mts to
13.95m above G.L. - 1.00 cum
1.00 cum cost of VRCC M30 mix
11.43 sqm cetering and scaffolding charges
1.00 cum lifting charges

per

Sl.No

Qty.

Description of work

rate

Providing VRCC M30 for side wall of


curved surfaces with 4 extra lifts over
an initial lift of 5.0mts. - 1.00 cum
1.00 cum cost of VRCC M30 mix
8.40 sqm cetering and scaffolding charges
1.00 cum lifting charges

3208.59
5507.88
226.40
8942.87
357.71
9300.58

3208.59 cum
655.70 sqm
283.00 cum

3208.59
7160.24
283.00
10651.83
426.07
11077.91

3208.59 cum
320.50 sqm
226.40 cum

3208.59
3499.86
226.40
6934.85
277.39
7212.24

3208.59 cum
320.50 sqm
226.40 cum

3208.59
1958.26
226.40
5393.24
215.73
5608.97

3208.59 cum
320.50 sqm
283.00 cum

3208.59
3631.27
283.00
7122.85
284.91
7407.77

3208.59 cum
437.40 sqm
283.00 cum

3208.59
2733.75
283.00
6225.34
249.01
6474.35

Add VAT @ 4%
Providing VRCC M30 for haunch with 4
extra lifts over an initial lift of 5.0mts. 1.00 cum
1.00 cum cost of VRCC M30 mix
10.92 sqm cetering and scaffolding charges
1.00 cum lifting charges
Add VAT @ 4%
Providing VRCC M30 for inner & outer
ring beams at floor level of size
400x900mm with 4 extra lifts over an
initial lift of 5.0mts. - 1.00 cum
1.00 cum cost of VRCC M30 mix
6.11 sqm cetering and scaffolding charges
1.00 cum lifting charges
Add VAT @ 4%
Providing VRCC M30 for inner ring
beam at roof level of size 230x380mm
with 5 extra lifts over an initial lift of
5.0mts. - 1.00 cum
1.00 cum cost of VRCC M30 mix
11.33 sqm cetering and scaffolding charges
1.00 cum lifting charges
Add VAT @ 4%
Providing VRCC M30 for roof slab of
160mm thick with 5 extra lifts over an
initial lift of 5.0mts. - 1.00 cum
1.00 cum cost of VRCC M30 mix
6.25 sqm cetering and scaffolding charges
1.00 cum lifting charges
Add VAT @ 4%

214 of 263

Amount

3208.59 cum
655.70 sqm
226.40 cum

Add VAT @ 4%
Providing VRCC M30 for side wall of
curved surfaces with 5 extra lifts over
an initial lift of 5.0mts. - 1.00 cum
1.00 cum cost of VRCC M30 mix
10.92 sqm cetering and scaffolding charges
1.00 cum lifting charges

per

Sl.No

Qty.

Description of work

rate

Providing VRCC M30 for floor slab of


400mm thick with 4 extra lifts over an
initial lift of 5.0mts. - 1.00 cum
1.00 cum cost of VRCC M30 mix
2.50 sqm cetering and scaffolding charges
1.00 cum lifting charges

3208.59
4335.75
226.40
7770.74
310.83
8081.57

3208.59 cum
867.50 sqm
226.40 cum

3208.59
7229.17
226.40
10664.16
426.57
11090.72

3208.59 cum
292.50 sqm

3208.59
2436.53
5645.11
225.80
5870.92

3208.59 cum
292.50 sqm
56.60 cum

3208.59
2436.53
56.60
5701.71
228.07
5929.78

3208.59 cum
292.50 sqm
169.80 cum

3208.59
2436.53
169.80
5814.91
232.60
6047.51

3208.59 cum
292.50 sqm
226.40 cum

3208.59
3899.03
226.40
7334.01
293.36
7627.38

Add VAT @ 4%

Providing VRCC M30 for Ist and Iind


brasings of size 300x600. - 1.00 cum
1.00 cum cost of VRCC M30 mix
8.33 sqm cetering and scaffolding charges
Add VAT @ 4%
Providing VRCC M30 for IIIrd brasings
of size 300x600 with one extra lift over
initial lift. - 1.00 cum
1.00 cum cost of VRCC M30 mix
8.33 sqm cetering and scaffolding charges
1.00 cum lifting charges
Add VAT @ 4%
Providing VRCC M30 for IV brasings of
size 300x600 with 3 extra lifts over
initial lift. - 1.00 cum
1.00 cum cost of VRCC M30 mix
8.33 sqm cetering and scaffolding charges
1.00 cum lifting charges
Add VAT @ 4%
Providing VRCC M30 for columns
inside container of size 300x300 with 4
extra lifts over initial lift. - 1.00 cum
1.00 cum cost of VRCC M30 mix
13.33 sqm cetering and scaffolding charges
1.00 cum lifting charges
Add VAT @ 4%

215 of 263

Amount

3208.59 cum
1734.30 sqm
226.40 cum

Add VAT @ 4%
Providing VRCC M30 for galery slab of
120mm thick with 4 extra lifts over an
initial lift of 5.0mts. - 1.00 cum
1.00 cum cost of VRCC M30 mix
8.33 sqm cetering and scaffolding charges
1.00 cum lifting charges

per

Sl.No

Qty.

Description of work

rate

Providing VRCC M30 for columns


inside container of size 300x300 with 5
extra lifts over initial lift. - 1.00 cum
1.00 cum cost of VRCC M30 mix
13.33 sqm cetering and scaffolding charges
1.00 cum lifting charges

3208.59
3899.03
283.00
7390.61
295.62
7686.24

3208.59 cum
320.50 sqm

3208.59
340.96
3549.55
141.98
3691.53

3208.59 cum
320.50 sqm

3208.59
241.89
3450.48
138.02
3588.50

3208.59 cum
320.50 sqm

3208.59
1282.00
4490.59
179.62
4670.21

3208.59 cum
478.20 sqm

3208.59
182.59
3391.18
135.65
3526.82

3208.59 cum
292.50 sqm

3208.59
3249.68
6458.26
258.33
6716.60

3208.59 cum
292.50 sqm
56.60 cum

3208.59
3249.68
56.60
6514.86
260.59
6775.46

Add VAT @ 4%
Providing VRCC M30 for inner raft flat
portion as per SS - 1.00 cum
1.00 cum cost of VRCC M30 mix
0.75 sqm cetering and scaffolding charges
Add VAT @ 4%

Providing VRCC M30 for outer and


inner raft beams as per SS - 1.00 cum
1.00 cum cost of VRCC M30 mix
4.00 sqm cetering and scaffolding charges
Add VAT @ 4%
Providing VRCC M30 for stair case
footings as per SS - 1.00 cum
1.00 cum cost of VRCC M30 mix
0.38 sqm cetering and scaffolding charges
Add VAT @ 4%
Providing VRCC M30 for stair case
columns upto 5.0m above G.L. as per
SS - 1.00 cum
1.00 cum cost of VRCC M30 mix
11.11 sqm cetering and scaffolding charges
Add VAT @ 4%
Providing VRCC M30 for stair case
columns 5.0 to 8.0m above G.L. as per
SS - 1.00 cum
1.00 cum cost of VRCC M30 mix
11.11 sqm cetering and scaffolding charges
1.00 cum lifting charges
Add VAT @ 4%

216 of 263

Amount

3208.59 cum
292.50 sqm
283.00 cum

Add VAT @ 4%
Providing VRCC M30 for outer raft flat
portion as per SS - 1.00 cum
1.00 cum cost of VRCC M30 mix
1.06 sqm cetering and scaffolding charges

per

Sl.No

Qty.

Description of work

rate

Providing VRCC M30 for stair case


columns 8.0-11.0m above G.L. as per
SS - 1.00 cum
1.00 cum cost of VRCC M30 mix
11.11 sqm cetering and scaffolding charges
1.00 cum lifting charges

3208.59
3249.68
113.20
6571.46
262.86
6834.32

3208.59 cum
292.50 sqm
169.80 cum

3208.59
3249.68
169.80
6628.06
265.12
6893.19

3208.59 cum
292.50 sqm
226.40 cum

3208.59
3249.68
226.40
6684.66
267.39
6952.05

3208.59 cum
292.50 sqm
283.00 cum

3208.59
3249.68
283.00
6741.26
269.65
7010.92

3208.59 cum
292.50 sqm
339.60 cum

3208.59
3249.68
339.60
6797.86
271.91
7069.78

3208.59 cum
292.50 sqm

3208.59
3175.71
6384.30
255.37
6639.68

Add VAT @ 4%
Providing VRCC M30 for stair case
columns 14.0-17.0m above G.L. as per
SS - 1.00 cum
1.00 cum cost of VRCC M30 mix
11.11 sqm cetering and scaffolding charges
1.00 cum lifting charges
Add VAT @ 4%
Providing VRCC M30 for stair case
columns 17.0-20.0m above G.L. as per
SS - 1.00 cum
1.00 cum cost of VRCC M30 mix
11.11 sqm cetering and scaffolding charges
1.00 cum lifting charges
Add VAT @ 4%
Providing VRCC M30 for stair case
columns 20.00-20.35m above G.L. as
per SS - 1.00 cum
1.00 cum cost of VRCC M30 mix
11.11 sqm cetering and scaffolding charges
1.00 cum lifting charges
Add VAT @ 4%

Providing VRCC M30 for stair case


brasings and landing beams upto 5.0m
above G.L. as per SS - 1.00 cum
1.00 cum cost of VRCC M30 mix
10.86 sqm cetering and scaffolding charges
Add VAT @ 4%

217 of 263

Amount

3208.59 cum
292.50 sqm
113.20 cum

Add VAT @ 4%
Providing VRCC M30 for stair case
columns 11.0-14.0m above G.L. as per
SS - 1.00 cum
1.00 cum cost of VRCC M30 mix
11.11 sqm cetering and scaffolding charges
1.00 cum lifting charges

per

Sl.No

Qty.

Description of work

rate

Providing VRCC M30 for stair case


brasings and landing beams 5.0 to
8.0m above G.L. as per SS - 1.00 cum
1.00 cum cost of VRCC M30 mix
10.86 sqm cetering and scaffolding charges
1.00 cum lifting charges

3208.59
3175.71
56.60
6440.90
257.64
6698.54

3208.59 cum
292.50 sqm
113.20 cum

3208.59
3175.71
113.20
6497.50
259.90
6757.40

3208.59 cum
292.50 sqm
169.80 cum

3208.59
3175.71
169.80
6554.10
262.16
6816.27

3208.59 cum
292.50 sqm
226.40 cum

3208.59
3175.71
226.40
6610.70
264.43
6875.13

3208.59 cum
292.50 sqm
283.00 cum

3208.59
3175.71
283.00
6667.30
266.69
6934.00

3208.59 cum
292.50 sqm

3208.59
3175.71

Add VAT @ 4%

Providing VRCC M30 for stair case


brasings and landing beams 11.014.0m above G.L. as per SS - 1.00 cum
1.00 cum cost of VRCC M30 mix
10.86 sqm cetering and scaffolding charges
1.00 cum lifting charges
Add VAT @ 4%

Providing VRCC M30 for stair case


brasings and landing beams 14.017.0m above G.L. as per SS - 1.00 cum
1.00 cum cost of VRCC M30 mix
10.86 sqm cetering and scaffolding charges
1.00 cum lifting charges
Add VAT @ 4%

Providing VRCC M30 for stair case


brasings and landing beams 17.020.0m above G.L. as per SS - 1.00 cum
1.00 cum cost of VRCC M30 mix
10.86 sqm cetering and scaffolding charges
1.00 cum lifting charges
Add VAT @ 4%
Providing VRCC M30 for stair case
brasings and landing beams 20.0020.35m above G.L. as per SS - 1.00
cum
1.00 cum cost of VRCC M30 mix
10.86 sqm cetering and scaffolding charges

218 of 263

Amount

3208.59 cum
292.50 sqm
56.60 cum

Add VAT @ 4%

Providing VRCC M30 for stair case


brasings and landing beams 8.0-11.0m
above G.L. as per SS - 1.00 cum
1.00 cum cost of VRCC M30 mix
10.86 sqm cetering and scaffolding charges
1.00 cum lifting charges

per

Sl.No

Qty.
Description of work
1.00 cum lifting charges

rate
per
339.60 cum

Add VAT @ 4%

219 of 263

Amount
339.60
6723.90
268.96
6992.86

Sl.No

Qty.

Description of work

rate

Providing VRCC M30 for stair case


landing and inclined slab upto 5.0m
above G.L. as per SS - 1.00 cum
1.00 cum cost of VRCC M30 mix
6.67 sqm cetering and scaffolding charges

3208.59
5783.33
8991.92
359.68
9351.60

3208.59 cum
867.50 sqm
56.60 cum

3208.59
5783.33
56.60
9048.52
361.94
9410.46

3208.59 cum
867.50 sqm
113.20 cum

3208.59
5783.33
113.20
9105.12
364.20
9469.33

3208.59 cum
867.50 sqm
169.80 cum

3208.59
5783.33
169.80
9161.72
366.47
9528.19

3208.59 cum
867.50 sqm
226.40 cum

3208.59
5783.33
226.40
9218.32
368.73
9587.06

3208.59 cum
867.50 sqm
283.00 cum

3208.59
5783.33
283.00
9274.92
371.00
9645.92

Add VAT @ 4%
Providing VRCC M30 for stair case
landing and inclined slab 8.0-11.0m
above G.L. as per SS - 1.00 cum
1.00 cum cost of VRCC M30 mix
6.67 sqm cetering and scaffolding charges
1.00 cum lifting charges
Add VAT @ 4%
Providing VRCC M30 for stair case
landing and inclined slab 11.0-14.0m
above G.L. as per SS - 1.00 cum
1.00 cum cost of VRCC M30 mix
6.67 sqm cetering and scaffolding charges
1.00 cum lifting charges
Add VAT @ 4%
Providing VRCC M30 for stair case
landing and inclined slabs 14.0-17.0m
above G.L. as per SS - 1.00 cum
1.00 cum cost of VRCC M30 mix
6.67 sqm cetering and scaffolding charges
1.00 cum lifting charges
Add VAT @ 4%
Providing VRCC M30 for stair case
landing and inclined slabs 17.0-20.0m
above G.L. as per SS - 1.00 cum
1.00 cum cost of VRCC M30 mix
6.67 sqm cetering and scaffolding charges
1.00 cum lifting charges
Add VAT @ 4%

220 of 263

Amount

3208.59 cum
867.50 sqm

Add VAT @ 4%
Providing VRCC M30 for stair case
landing and inclined slab 5.0 to 8.0m
above G.L. as per SS - 1.00 cum
1.00 cum cost of VRCC M30 mix
6.67 sqm cetering and scaffolding charges
1.00 cum lifting charges

per

Sl.No

Qty.

Description of work

rate

Providing VRCC M30 for stair case


landing and inclined slabs 20.0020.35m above G.L. as per SS - 1.00
cum
1.00 cum cost of VRCC M30 mix
6.67 sqm cetering and scaffolding charges
1.00 cum lifting charges

3208.59
5783.33
339.60
9331.52
373.26
9704.78

1899.72 cum
0.00 cum

1899.72
0.00
1899.72
75.99
1975.71

1899.72 cum
56.60 cum

1899.72
56.60
1956.32
78.25
2034.58

1899.72 cum
113.20 cum

1899.72
113.20
2012.92
80.52
2093.44

1899.72 cum
169.80 cum

1899.72
169.80
2069.52
82.78
2152.30

1899.72 cum
226.40 cum

1899.72
226.40
2126.12
85.04
2211.17

Add VAT @ 4%
Providing steps with BM in CM(1:3) for
stair case 5.0 to 8.0m above G.L. as
per SS - 1.00 cum
1.00 cum cost of VRCC M30 mix
1.00 cum lifting charges
Add VAT @ 4%
Providing steps with BM in CM(1:3) for
stair case 8.0-11.0m above G.L. as per
SS - 1.00 cum
1.00 cum cost of VRCC M30 mix
1.00 cum lifting charges
Add VAT @ 4%
Providing steps with BM in CM(1:3) for
stair case 11.0-14.0m above G.L. as
per SS - 1.00 cum
1.00 cum cost of VRCC M30 mix
1.00 cum lifting charges
Add VAT @ 4%
Providing steps with BM in CM(1:3) for
stair cases 14.0-17.0m above G.L. as
per SS - 1.00 cum
1.00 cum cost of VRCC M30 mix
1.00 cum lifting charges
Add VAT @ 4%

221 of 263

Amount

3208.59 cum
867.50 sqm
339.60 cum

Add VAT @ 4%
Providing steps with BM in CM(1:3) for
stair case upto 5.0m above G.L. as per
SS - 1.00 cum
1.00 cum cost of VRCC M30 mix
1.00 cum lifting charges

per

Sl.No

Qty.

Description of work

rate

Providing steps with BM in CM(1:3) for


stair case 17.0-20.0m above G.L. as
per SS - 1.00 cum
1.00 cum cost of VRCC M30 mix
1.00 cum lifting charges

per

Amount

1899.72 cum
283.00 cum

1899.72
283.00
2182.72
87.31
2270.03

1899.72 cum
339.60 cum

1899.72
339.60
2239.32
89.57
2328.90

Cost of Country Bricks (22x 11x 5CM)


Cost of CM(1:3)
Brick Layer Ist Class
Brick Layer IInd Class
Man Mazdoor
Woman Mazdoor
Add 20 % MAA on Labour on 410.8

1323.24 1000 Nos


1915.06 cum
166.00 Each
146.00 Each
116.00 Each
116.00 Each
82.16 cum

793.94
612.82
54.78
112.42
81.20
162.40
82.16
1899.72

Cost of CM(1:3) 1.00 Cum


Cost of sand for Mortar
cost of cement
mixing charges
Add 20 % MAA

258.70 cum
3400.00 M.T.
20.30 cum
4.06 cum

258.70
1632.00
20.30
4.06
1915.06

Add VAT @ 4%
Providing steps with BM in CM(1:3) for
stair case 20.00-20.35m above G.L. as
per SS - 1.00 cum
1.00 cum cost of VRCC M30 mix
1.00 cum lifting charges
Add VAT @ 4%
Brickwork in CM(1:3) using county
Bricks including cost and conveyance of
all materials, labour charges, curing
etc., complete as per SS 1.00 Cum
600.00 Nos
0.32 cum
0.33 Nos
0.77 Nos
0.70 Nos
1.40 Nos
1.00 cum

1.00 cum
480.00 kg
1.00 cum
1.00 cum

Supply, delivery of the following sizes of


CI / DF sluice valves at P.H. stores
Ongole as per SS
200 mm dia
Initial rate as per SSR
6600.00
Excise duty @ 16.32%
571.20
Transportation charges @10% on basic
rate
350.00
VAT @ 12.5%
825.00
8346.20
VAT @ 4%
333.85
8680.05

1.00 no.

Lowering, laying and keeping in position


of CI D/F sluice valves true to
alignment, for following sizes as per SS 200 mm dia
Initial rate as per SSR
76.30
Add 20% MAA
15.26
91.56
VAT @ 4%
3.66
95.22

222 of 263

300 mm
dia
350 mm dia
11500.00
35734.00
1583.04
5831.79
970.00
1437.50
15490.54
619.62
16110.16

3573.40
4466.75
49605.94
1984.24
51590.18

300 mm
dia
350 mm dia
156.80
268.70
31.36
53.74
188.16
322.44
7.53
12.90
195.69
335.34

Sl.No

Qty.

1.00 m.

Description of work

rate

Lowering of CI D/F pipes and fittings


with flanged ends carefully in treanches
and laying them true to alignment and
gradient including all sundries but
excluding conveyance from source of
supply as per SS
200 mm dia
Initial rate as per SSR
18.70
Add 20% MAA
3.74
22.44
VAT @ 4%
0.90
23.34

per

Amount

300 mm
dia
350 mm dia
27.30
48.70
5.46
9.74
32.76
58.44
1.31
2.34
34.07
60.78

Jointing of CI pipes, fittings and valves


with flanged ends excluding cost of
jointing materials such as bolts and
nuts, rubber insertions white lead and
including filling with water with water
lead 500 mts. and testing to reqd.
pressure etc., complete as per SS
200 mm dia 300 mm dia 350 mm dia
1.00 joint Initial rate as per SSR
105.90
156.80
171.60
Add 20% MAA
21.18
31.36
34.32
127.08
188.16
205.92
VAT @ 4%
5.08
7.53
8.24
132.16
195.69
214.16
Supply, delivery of rubber packing with
6mm thick including cost and
conveyance etc., complete --1.00Kg
Initial rate as per SSR
VAT @ 4%

39.05
1.56
40.61

Supply and delivery of bolts and nuts


with double washers including cost and
conveyance etc., complete --1.00Kg
Initial rate as per SSR
VAT @ 4%

41.40
1.66
43.06

Construction of Sluice valve pit of size


1.20x1.05m including earthwork
excavation, CC(1:3:6) bed, CC(1:3:6)
walls and RCC(1:1 1/2:3) etc., complete
as shown in drawing
Earthwork excavation in loamy and
clayey soils like black cotton soils, red
earth and ordinary gravel SS 20B
Qty. of Earthwork = 2.35x2.20x2.001.30x2.20x2
4.62 Cum rate for earthwork
CC(1:4:8) for bed
Qty of CC(1:4:8) = 2.2x2.35x0.30
1.55 Cum Cost of CC(1:4:8) for bed
CC(1:3:6) for side walls
Qty = (1.90x1.75-1.20x1.05)x1.702x22/7x0.50x0.50x0.35
2.96 Cum Cost of CC(1:3:6) for side walls
RCC(1:1 1/2:3) for slab

223 of 263

4.62 Cum
13.52 Cum

62.46

1.55 Cum
2033.02

3151.19

2.96 Cum
2646.97 Cum

7835.04

Sl.No

Qty.

Description of work
Qty = 1.90x1.75x0.10
0.33 Cum Cost of RCC(1:1 1/2:3)
Steel including fabrication
Qty = 0.33x 80
26.60 kgs cost of steel including fabrication
Total (a+b+c+d+e)
VAT (TOT) @4%

224 of 263

rate
0.33 Cum
4077.64 Cum
26.60 Kg
33.28 Kg

per

Amount
1345.62

885.25
13279.56
531.18
13810.74

Sl.No

Qty.

Description of work

rate

per

Amount

Construction of Sluice valve pit of size


1.05x1.05m including earthwork
excavation, CC(1:3:6) bed, CC(1:3:6)
walls and RCC(1:1 1/2:3) etc., complete
as shown in drawing

3.96 Cum

1.45 Cum

3.13 Cum

0.31 Cum

24.80 kgs

0.92 Cum
0.46 Cum
220.80 kgs
0.06 Nos
0.14 Nos
1.80 Nos
1.40 Nos
1.00 Cum
1.00 Cum
1.00 Cum

Earthwork excavation in loamy and


clayey soils like black cotton soils, red
earth and ordinary gravel SS 20B
Qty. of Earthwork = 2.20x2.20x2.001.30x2.20x2
rate for earthwork
CC(1:4:8) for bed
Qty of CC(1:4:8) = 2.2x2.20x0.30
Cost of CC(1:4:8) for bed
CC(1:3:6) for side walls
Qty = (1.75x1.75-1.05x1.05)x1.702x22/7x0.30x0.30x0.35
Cost of CC(1:3:6) for side walls
RCC(1:1 1/2:3) for slab
Qty = 1.75x1.75x0.10
Cost of RCC(1:1 1/2:3)
Steel including fabrication
Qty = 0.31x 80
cost of steel including fabrication
Total (a+b+c+d+e)
VAT (TOT) @4%
CC (1:3:6) mix using 40mm HBG
metal
including
cost
and
conveyance of all materials, labour
charges etc, complete for bed
1Cum
cost of 40mm HBG metal
cost of sand
cost of cement
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor
machine mixing charges
vibration charges
centering charges
Add MAA 20%
VAT (TOT) @4%

225 of 263

3.96 Cum
13.52 Cum

53.54

1.45 Cum
2033.02

2947.89

3.13 Cum
2646.97 Cum

8285.03

0.31 Cum
4077.64 Cum

1264.07

24.80 Kg
33.28 Kg

630.68 Cum
258.70 Cum
3400.00 M.T
166.00 Each
146.00 Each
116.00 Each
116.00 Each
33.80 Cum
34.60 Cum
544.90 Cum

825.34
13375.87
535.03
13910.90

580.23
119.00
750.72
9.96
20.44
208.80
162.40
33.80
34.60
544.90
80.32
2545.17
101.81
2646.97

Sl.No

Qty.

0.92 Cum
0.46 Cum
441.00 kgs
0.12 Nos
0.28 Nos
2.10 Nos
3.50 Nos
1.00 Cum
1.00 Cum

Description of work

rate

Providing RCC (1:1 1/2:3) mix


using 20mm HBG metal including
cost and conveyance
of all
materials, labour charges etc,
complete 1Cum
cost of 20mm HBG metal
cost of sand
cost of cement
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor
machine mixing charges
vibration charges
Add MAA 20%

per

957.23 Cum
258.70 Cum
3400.00 M.T
166.00 Each
146.00 Each
116.00 Each
116.00 Each
33.80 Cum
34.60 Cum

880.65
119.00
1499.40
19.92
40.88
243.60
406.00
33.80
34.60
142.08
3419.93
136.80
3556.73

3942.54
129.90 Cum

3942.54
129.90
5.20
4077.64

864.00 25kg
166.00 Each
146.00 Each
116.00 Each
116.00 Each

120.96
24.90
51.10
58.00
116.00
50.00
420.96
16.84
437.80

420.96 10.00sq.m
36.30 10.00sq.m

420.96
36.30
457.26
18.29

VAT (TOT) @4%


Providing RCC (1:1 1/2:3) mix
using 20mm HBG metal including
cost and conveyance
of all
materials, labour charges etc,
complete for precast slab 1Cum
1.00 Cum cost of RCC (1:1 1/2:3) mix
1.00 Cum centering charges
VAT (TOT) @4%

3.50 kgs
0.15 Nos
0.35 Nos
0.50 Nos
1.00 Nos

Painting to external surfaces of walls,


columns, braces, beams and stair case
with snowcem or other equivalent
approved cement paints of brand
shades on one coat over primary coat
(total two coats) including cost and
conveyance of all materials to
site,labour charges,scaffolding, curing
etc., complete for finished item of work
Snowcem paint
Painter Ist class
Painter IInd class
Man mazdoor
Woman mazdoor
Add MAA 20%
Add VAT @4%

Painting with snowcem paint from 3.667.32m above G.L


10.00 sq.m Basic cost
10.00 sq.m scaffoding charges
Add VAT @4%

226 of 263

Amount

Sl.No

Qty.

Description of work

rate

per

Amount
475.55

Painting with snowcem paint from 7.3210.98m above G.L


10.00 sq.m Basic cost
10.00 sq.m scaffoding charges

420.96 10.00sq.m
72.60 10.00sq.m

420.96
72.60
493.56
19.74
513.30

420.96 10.00sq.m
108.90 10.00sq.m

420.96
108.90
529.86
21.19
551.05

420.96 10.00sq.m
134.90 10.00sq.m

420.96
134.90
555.86
22.23
578.09

420.96 10.00sq.m
160.90 10.00sq.m

420.96
160.90
581.86
23.27
605.13

Add VAT @4%


Painting with snowcem paint from
10.98-14.64m above G.L
10.00 sq.m Basic cost
10.00 sq.m scaffoding charges
Add VAT @4%
Painting with snowcem paint from
14.64-18.30m above G.L
10.00 sq.m Basic cost
10.00 sq.m scaffoding charges
Add VAT @4%
Painting with snowcem paint from
18.30m to upto top dome above G.L
10.00 sq.m Basic cost
10.00 sq.m scaffoding charges
Add VAT @4%

227 of 263

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Name of Work:- ONGOLE Mplty - Construction of 800KL ELSR at ISLAMPET park site, ONGOLE
(off site) under APUSP

Detailed Estimate
Sl.
No

Description of work

Sl.
No

Measurements
No
L

1 Earthwork excavation in all soils upto SDR and stone


matrix with machinery with in a radius of 5mts. I.e.
cut and dump as per S.S.
outer raft foundation

1 x

1 x

3.14 x

16.87

2.33

2.90

inner raft foundation

1 x

1 x

3.14 x

10.90

3.96

2.90

outer raft foundation

1 x

1 x

3.14 x

16.87

2.33

0.20

inner raft foundation

1 x

1 x

3.14 x

10.90

3.96

0.20

2 Providing sand bedding including cost of sand,


labour charges, VAT etc., complete as per S.S. -

Total

3 Laying VCC (1:4:8) using 40mm (SS-5) graded HBG


M/C metal and OPC for under raft including cost and
conveyance of all materials, labour charges,
centering, curing, VAT etc., complete as per SS

outer raft foundation

1 x

1 x

3.14 x

16.87

2.33

0.20

inner raft foundation

1 x

1 x

3.14 x

10.90

3.96

0.20
Total

4 Providing cast in situ inVRCC M30 design mix using


20mm graded aggregates conforming to IS 383,
subject to recovery of deference cost of cement if
cement content as per mix design is less then 400
kg/cum of concrete, including cost and conveyance
of all materials, VAT, machinery, labour, cetering,
vibration, curing for 21 days and all incidental
charges etc., complete but excluding cost of steel
and fabrication conforming to Standard specification
for the following items of work

outer raft

rectangular portion

1 x

228 of [14]

1 x

3.14 x

16.87

2.03

0.45

DESCON associates, Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Sl.
No

Sl.
No

Description of work

Measurements
No
L

ii

trepizoidal portion

1 x

1 x

3.14

16.87 (2.03+0.

0.00

iii

beam

1 x

1 x

3.14 x

17.00

0.50

0.30

inner raft foundation

rectangular portion

1 x

1 x

3.14 x

10.90

0.45

ii

trepizoidal portion

1 x

1 x

3.14 x

3.66
(3.66+
10.90 0.5)/2

iii

beam

1 x

1 1x2 3.14 x

11.50

0.50

0.05

columns from raft beam to 5.00m above


G.L

0.25

Outer columns

16 x

1 x

1 x

0.35

0.35

6.75

Inner columns

16 x

1 x

1 x

0.35

0.35

6.75
Total

columns from 5.00 to 8.00m above G.L


Outer columns

16 x

1 x

1 x

0.35

0.35

3.00

Inner columns

16 x

1 x

1 x

0.35

0.35

3.00
Total

columns from 8.00 to 11.00m above G.L


Outer columns

16 x

1 x

1 x

0.35

0.35

3.00

Inner columns

16 x

1 x

1 x

0.35

0.35

3.00
Total

columns from 11.00 to 13.95m above G.L


Outer columns

16 x

1 x

1 x

0.35

0.35

3.15

Inner columns

16 x

1 x

1 x

0.35

0.35

3.15
Total

Ist braces
outer chord brasings

16 x

1 x

1 x

2.26

0.30

0.60

inner chord brasings

16 x

1 x

1 x

1.40

0.30

0.60

radial brasings

16 x

1 x

1 x

2.35

0.30

0.60
Total

229 of [14]

DESCON associates, Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Sl.
No

Description of work

Sl.
No

Measurements
No
L

2nd braces
outer chord brasings

16 x

1 x

1 x

2.26

0.30

0.60

inner chord brasings

16 x

1 x

1 x

1.40

0.30

0.60

radial brasings

16 x

1 x

1 x

2.35

0.30

0.60
Total

3rd braces
outer chord brasings

16 x

1 x

1 x

2.26

0.30

0.60

inner chord brasings

16 x

1 x

1 x

1.40

0.30

0.60

radial brasings

16 x

1 x

1 x

2.35

0.30

0.60
Total

4 th braces
outer chord brasings

16 x

1 x

1 x

2.26

0.30

0.60

inner chord brasings

16 x

1 x

1 x

1.40

0.30

0.60

radial brasings

16 x

1 x

1 x

2.35

0.30

0.60
Total

outer ring beam at floor level

1 x

1 x

3.14 x

16.70

0.35

0.70

inner ring beam at floor level

1 x

1 x

3.14 x

10.70

0.35

0.70

floor slab

1 x

1 x

3.14 x

13.70

2.65

0.40

galery slab

1 x

1 x

3.14 x

17.95

0.90

0.12

dome at floor level

1 x

2 x

3.14 x

11.77

1.70

0.20

columns inside container

16 x

1 x

1 x

2.15

0.30

0.30

columns inside container

16 x

1 x

1 x

2.07

0.30

0.30

haunch

1 x

0.5 x

3.14 x

16.44

0.20

0.20

side wall (RL 165.05 to 167.20)

1 x

1 x

3.14 x

16.48

0.22

2.15

side wall (RL 167.20 to 169.50 )

1 x

1 x

3.14 x

16.53

0.17

2.30

Roof inner ring beam

1 x

1 x

3.14 x

10.70

0.30

0.38

roof annular slab

1 x

1 x

3.14 x

14.03

3.03

0.15

Roof dome

2 x

1 x

3.14 x

11.20

1.70

0.14

230 of [14]

DESCON associates, Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Sl.
No

Description of work

Sl.
No

Measurements
No
L

231 of [14]

DESCON associates, Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Sl.
No

Description of work

Sl.
No

Measurements
No
L

Dog legged stair case

A Earthwork excavation in all soils upto SDR and stone


matrix with machinery with in a radius of 5mts. I.e.
cut and dump as per S.S.
4 x

1 x

1 x

1.80

1.80

2.65

4 x

1 x

1 x

1.80

1.80

0.20

4 x

1 x

1 x

1.80

1.80

0.20

B Providing sand bedding including cost of sand,


labour charges, VAT etc., complete as per S.S. C Laying VCC (1:4:8) using 40mm (SS-5) graded HBG
M/C metal and OPC for under raft including cost and
conveyance of all materials, labour charges,
centering, curing, VAT etc., complete as per SS
D Providing precast/ cast in situ inCC M30 design mix
using 20mm graded aggregates conforming to IS
383, subject to recovery of deference cost of cement
if cement content as per mix design is less then 400
kg/cum of concrete, including cost and conveyance
of all materials, VAT, machinery, labour, cetering,
vibration, curing for 21 days and all incidental
charges etc., complete but excluding cost of steel
and fabrication conforming to Standard specification
for the following items of work

for footings

4 x

1 x

1 x

1.50

1.50

0.45

for columns of size 450x300mm upto 5m


above G.L.

4 x

1 x

1 x

0.45

0.30

7.00

for columns of size 450x300mm from 5m to


8m above G.L.

4 x

1 x

1 x

0.45

0.30

3.00

for columns of size 450x300mm from 8m to


11m above G.L.

4 x

1 x

1 x

0.45

0.30

3.00

for columns of size 450x300mm from 11m to


14m above G.L.

4 x

1 x

1 x

0.45

0.30

3.00

for columns of size 450x300mm from 14m to


17m above G.L.

4 x

1 x

1 x

0.45

0.30

3.00

for columns of size 450x300mm from 17m to


20.00 m above G.L.

4 x

1 x

1 x

0.45

0.30

3.00

for columns of size 450x300mm from 20.00m


to 20.35m above G.L.

4 x

1 x

1 x

0.45

0.30

0.45

For bracings and landing beams upto


5.00m above GL
for Ist brasing of size 250x350mm at
starting

2 x

1 x

1 x

3.60

0.25

0.35

for Ist brasing of size 250x350mm at


starting in width direction

2 x

1 x

1 x

2.40

0.25

0.35

for IInd brasing of size 250x350mm

2 x

1 x

1 x

3.60

0.25

0.35

e
f
g
h

232 of [14]

DESCON associates, Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Sl.
No

Sl.
No

Description of work

Measurements
No
L

for IIIrd brasing of size 250x350mm

2 x

1 x

1 x

3.60

0.25

0.35

for Ist landing beam of size


250x350mm

1 x

1 x

1 x

2.40

0.25

0.35

for IInd landing beam of size


250x350mm

1 x

1 x

1 x

2.40

0.25

0.35
Total

For bracings and landing beams from


5.00m to 8.00m above GL
l

for IVth brasing of size 250x350mm


for IIIrd landing beam of size
250x350mm

2 x

1 x

1 x

3.60

0.25

0.35

1 x

1 x

1 x

2.40

0.25

0.35
Total

For bracings and landing beams from


8.00m to 11.00m above GL
m

for Vth brasing of size 250x350mm


for IVth landing beam of size
250x350mm

2 x

1 x

1 x

3.60

0.25

0.35

1 x

1 x

1 x

2.40

0.25

0.35
Total

For bracings and landing beams from


11.00m to 14.00m above GL
n

for VIth brasing of size 250x350mm


for Vth landing beam of size
250x350mm

2 x

1 x

1 x

3.60

0.25

0.35

1 x

1 x

1 x

2.40

0.25

0.35
Total

For bracings and landing beams from


14.00m to 17.00m above GL
o

for VIIth brasing of size 250x350mm


for VIIIth brasing of size
250x350mm
for VIth landing beam of size
250x350mm
for VIIth landing beam of size
250x350mm

2 x

1 x

1 x

3.60

0.25

0.35

2 x

1 x

1 x

3.60

0.25

0.35

1 x

1 x

1 x

2.40

0.25

0.35

1 x

1 x

1 x

2.40

0.25

0.35
Total

For bracings and landing beams from


17.00m to 20.00m above GL
for IXth brasing of size 250x350mm
for VIIIth landing beam of size
250x350mm

2 x

1 x

1 x

3.60

0.25

0.35

1 x

1 x

1 x

2.40

0.25

0.35
Total

an

staircase waist & landing slab upto 5.00m


above G.L

2 x

233 of [14]

1 x

1 x

7.15

1.20

0.15

DESCON associates, Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Sl.
No

Description of work

Sl.
No

Measurements
No
L

inclined slab from 5.00m to 8.00m above


G.L

ao
ap

inclined slab from 8.00m to 11.00m above G.L


inclined slab from 1100m to 14.00m above
aq
G.L
inclined slab from 14.00m to 17.00m above
ar
G.L
inclined slab from 17.00m to 20.00m above
as
G.L
E Brickwork in CM(1:3) using county Bricks including
cost and conveyance of all materials, labour charges,
curing etc., complete as per SS

1 x

1 x

1 x

7.15

1.20

0.15

2 x

1 x

1 x

7.15

1.20

0.15

1 x

1 x

1 x

7.15

1.20

0.15

1 x

1 x

1 x

7.15

1.20

0.15

2 x

1 x

1 x

7.15

1.20

0.15

Tread =300 mm;

Rise =160

steps from 0.00 to 5.00m above G.L

2 x

1 x

1 x

1.20

0.25

0.08

steps from 5.00 to 8.00m above G.L


steps from 8.00 to 11.00m above
G.L
steps from 11.00 to 14.00m above
G.L
steps from 14.00 to 17.00m above
G.L
steps from 17.00 to 20.00m above
G.L

1 x

1 x

1 x

1.20

0.25

0.08

2 x

1 x

1 x

1.20

0.25

0.08

1 x

1 x

1 x

1.20

0.25

0.08

1 x

1 x

1 x

1.20

0.25

0.08

2 x

1 x

1 x

1.20

0.25

0.08

1 x

1 x

1 x

214 kgs/each

c
d
e
f
6

Supply and delivery and stacking at P.H. Stores


Ongole for following sizes of CI D/F pipes, specials
and valves for proposed ELSRs of inlet, outlet,
overflow connections etc., complete as per SS

7
i

ii

A. Inlet connections
350 mm dia CI D/F duckfoot bend
350
350
350
350

mm dia x 2.00 m long CI D/F pipes

2.0 m.

16 x

1 x

1 x

305 kgs/each

mm dia x 1.00 m long CI D/F pipes

1.0 m.

1 x

1 x

1 x

171.5 kgs/each

mm dia x 0.90 m long CI D/F pipes

0.9 m.

2 x

1 x

1 x

158.2 kgs/each

mm dia x 0.60 m long CI D/F pipes

0.6 m.

1 x

1 x

1 x

118.1 kgs/each
Total

iv

350 mm dia CI Bellmouth

1 x

1 x

1 x

58 kgs/each

1 x

1 x

1 x

214 kgs/Each

16 x

1 x

1 x

305 kgs/Each

B. Outlet connections
i

ii

350 mm dia CI D/F duck foot bend

350 mm dia x 2.00 m long CI D/F pipes

2.0 m.

234 of [14]

DESCON associates, Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Sl.
No

Description of work

Sl.
No

Measurements
No
L

350 mm dia x 1.00 m long CI D/F pipes

1.0 m.

1 x

1 x

1 x

171.5 kgs/Each

350 mm dia x 0.90 m long CI D/F pipes

0.9 m.

2 x

1 x

1 x

158.5 kgs/Each

350 mm dia x 0.60 m long CI D/F pipes

0.6 m.

1 x

1 x

1 x

118.1 kgs/Each
Total

iv
v
C
I

ii

350 mm dia 90 degrees CI D/F bends


350 mm dia CI Flanged Bellmouth

1 x

1 x

1 x

137 kgs/Each

16 x

1 x

1 x

58 kgs/Each

1 x

1 x

1 x

214 kgs/Each

Overflow connections
350 mm dia CI D/F duck foot bend

350 mm dia x 2.00 m long CI D/F pipes

2.0 m.

25 x

1 x

1 x

305 kgs/Each

350 mm dia x 1.00 m long CI D/F pipes

1.0 m.

1 x

1 x

1 x

171.5 kgs/Each

350 mm dia x 0.90 m long CI D/F pipes

0.9 m.

2 x

1 x

1 x

158.2 kgs/Each

350 mm dia x 0.60 m long CI D/F pipes

0.6 m.

1 x

1 x

1 x

118.1 kgs/Each
Total

iv
v
D
I

ii

350 mm dia 90 degrees CI D/F bends

1 x

1 x

1 x

137 kgs/Each

350 mm dia CI Flanged Bell mouth

1 x

1 x

1 x

58 kgs/Each

1 x

1 x

1 x

74 kgs/Each

Scour connections
200 mm dia CI D/F duck foot bend

200 mm dia x 2.00 m long CI D/F pipes

2.0 m.

12 x

1 x

1 x

138.8 kgs/Each

200 mm dia x 1.00 m long CI D/F pipes

1.0 m.

1 x

1 x

1 x

78.7 kgs/Each

200 mm dia x 0.90 m long CI D/F pipes

0.9 m.

4 x

1 x

1 x

72.69 kgs/Each

200 mm dia x 0.60 m long CI D/F pipes

0.6 m.

1 x

1 x

1 x

54.66 kgs/Each
Total

iv
v

200 mm dia 90 degrees CI D/F bends

1 x

1 x

1 x

49 kgs/Each

200 mm dia CI Flanged Bellmouth

1 x

1 x

1 x

23 kgs/Each

235 of [14]

DESCON associates, Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Sl.
No

Description of work

Sl.
No

Measurements
No
L

Manufacture,supply and delivery of the following


sizes of CI D/F sluice valves PN 1.6 conforming to IS
14846 / 2000 with amendments No. 1 &2 including
cost and conveyance but excluding taxes etc.
complete. The valves shall be tested for against
hydraulic test requirement and embosed with ISI
mark.
350 mm dia. CI D/F Sluice valve with
hand wheel for inlet
350 mm dia. CI D/F Sluice valve with
hand wheel for outlet
200 mm dia. CI D/F Sluice valve with
hand wheel for scour
E Earthwork excavation in all soils upto SDR and stone
matrix with machinery with in a radius of 5mts. I.e.
cut and dump as per S.S.
I
ii

1 x

1 x

1 x

350 mm dia CI D/F Pipe line

1 x

85

1.00

1.50

200 mm dia CI D/F pipe line

1 x

30

1.00

1.50
Total

F
I
ii
iii

Lowering and laying of following sizes of CI D/F pipes


true to alignment and gradient as per SS
350 mm dia

1 x

71.0

350 mm dia

1 x

54.0

200 mm dia

1 x

30.0

G
Jointing of the following sizes of CI D/F pipes and
specials excluding cost of jointing materials but
including cost of labour charges for jointing as per SS
I
iii

350 mm dia

76 x

200 mm dia

19 x

350 mm dia

2 x

200 mm dia

1 x

H Lowering, laying and keeping in position true to


alignment of following sizes of CI D/F valves as per
SS
I
iii
I

Refilling the pipeline trench with excaved soils after


completion of pipeline work as per SS

as per E.W
J Supply and delivery of bolts and nuts to P.H. stores
Markapur suitable to CI D/F pipes and valves
236 of [14]

DESCON associates, Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Sl.
No

Sl.
No

Description of work

Measurements
No
L

Supply and delivery of rubber packing 6mm thick to


P.H. stores Markapur suitable to CI D/F pipes and
valves

L Construction of following sizes of CI D/F sluice valve


pits as per standard approved designs
mm dia valve pit of size 1.20 x 1.05
350 m
mm dia valve pit of size 1.20 x 1.05
iii
200 m
8
Supply, delivery and fabrication of TOR Steel
including cost of steel, binging wire and fabrication
charges, VAT etc., complete as per SS
I

2 x

1 x

For ELSR
Footings

122.62 Cum

50 Kgs/cum

8.91 Cum

120 Kgs/cum

Columns

62.33 Cum

294 Kgs/cum

Braces

69.22 Cum

230 Kgs/cum

Floor ring beams

21.09 Cum

120 Kgs/cum

Floor slab

45.62 Cum

90 Kgs/cum

6.09 Cum

80 Kgs/cum

25.15 Cum

100 Kgs/cum

Columns inside container

6.08 Cum

130 Kgs/cum

Haunch

1.03 Cum

70 Kgs/cum

Side wall

45.04 Cum

100 Kgs/cum

3.83 Cum

100 Kgs/cum

Roof annular slab

19.99 Cum

80 Kgs/cum

Roof dome

16.16 Cum

80 Kgs/cum

Raft beams

Gallery slab
Bottom dome

Roof inner ring beam

Hand railings
Total VRCC

453.16 Cum

Sub total

Foe Stair case


Footings

4.05

Cum

80 Kgs/cum

Columns

12.12

Cum

150 Kgs/cum

7.77

Cum

100 Kgs/cum

Bracings and Landing beams

237 of [14]

DESCON associates, Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Sl.
No

Sl.
No

Description of work

Measurements
No
L

Stair case waist slab and landing


slab

11.58

Cum

35.53

Cum

80 Kgs/cum

Hand railings
Total VRCC

Sub total

Total

( 60231 + 4347 ) =

9
Painting to external surfaces of walls, columns,
braces, beams and stair case with snowcem or other
equivalent approved cement paints of brand shades
on one coat over primary coat (total two coats)
including cost and conveyance of all materials to
site,labour charges,scaffolding, curing etc., complete
for finished item of work
a

0.00 m to 3.66m above G.L.


ELSR
columns

16 x

1 x

1 x

3.66

1.40 --

Outer brasings

16 x

1 x

1 x

2.26

1.80 --

Inner brasings

16 x

1 x

1 x

1.40

1.80 --

Radial brasings

16 x

1 x

1 x

2.35

1.80 --

Columns

4 x

1 x

1 x

3.66

1.50 --

brasings

2 x

2 x

1 x

4.50

1.20 --

landing beam rib

3 x

1 x

1 x

2.40

0.71 --

going including Landing

2 x

1 x

1 x

7.15

1.20 --

Stair case

Total =
b

3.66m to 7.32 m above G.L.


ELSR
columns

16 x

2 x

1 x

3.66

1.40 --

Outer brasings

16 x

2 x

1 x

2.26

1.80 --

Inner brasings

16 x

2 x

1 x

1.40

1.80 --

Radial brasings

16 x

2 x

1 x

2.35

1.80 --

Stair case
238 of [14]

DESCON associates, Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Sl.
No

Description of work

Sl.
No

Measurements
No
L

Columns

4 x

1 x

1 x

3.66

1.50 --

brasings

2 x

2 x

1 x

4.50

1.20 --

landing beam

3 x

1 x

1 x

2.40

0.71 --

going including Landing

2 x

1 x

1 x

7.15

1.20 -Total =

7.32m to 10.98m above G.L.


ELSR
columns

16 x

2 x

1 x

3.66

1.40 --

Outer brasings

16 x

2 x

1 x

2.26

1.80 --

Inner brasings

16 x

2 x

1 x

1.40

1.80 --

Radial brasings

16 x

2 x

1 x

2.35

1.80 --

Columns

4 x

1 x

1 x

3.66

1.50 --

brasings

2 x

1 x

1 x

4.50

1.20 --

landing beam

2 x

1 x

1 x

2.40

0.71 --

going including Landing

2 x

1 x

1 x

7.15

1.20 --

Stair case

Total =
d

10.98m to 14.64m above G.L.


ELSR
columns

16 x

2 x

1 x

3.17

1.40 --

Outer brasings

16 x

1 x

1 x

2.26

1.80 --

Inner brasings

16 x

1 x

1 x

3.66

1.80 --

Radial brasings

16 x

1 x

1 x

2.26

1.80 --

inner ring beam

1 x

1 x

3.14 x

10.70

1.35 --

floor slab

1 x

1 x

3.14 x

13.70

2.65 --

outer ring beam

1 x

1 x

3.14 x

16.70

1.35 --

4 x

1 x

1 x

3.66

1.50 --

Stair case
Columns

239 of [14]

DESCON associates, Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Sl.
No

Description of work

Sl.
No

Measurements
No
L

brasings

2 x

1 x

1 x

4.50

1.20 --

landing beam

2 x

1 x

1 x

2.40

0.71 --

going including Landing

2 x

1 x

1 x

7.15

1.20 -Total =

14.64m to 18.30m above G.L.


ELSR
floor dome

1 x

2 x

3.14 x

11.77

1.70 --

Vertical wall

1 x

1 x

3.14 x

17.05

3.66 --

Columns

4 x

1 x

1 x

3.66

1.50 --

brasings

2 x

1 x

1 x

4.50

1.20 --

landing beam

2 x

1 x

1 x

2.40

0.71 --

going including Landing

2 x

1 x

1 x

7.15

1.20 --

Stair case

Total =
f

18.30m to top dome


ELSR
Vertical wall

1 x

1 x

3.14 x

17.05

1.30 --

Top dome

1 x

2 x

3.14 x

11.20

1.70 --

Columns

4 x

1 x

1 x

2.50

1.50 --

brasings

2 x

1 x

1 x

4.50

1.20 --

landing beam

2 x

1 x

1 x

2.40

0.71 --

going including Landing

2 x

1 x

1 x

7.15

1.20 --

Stair case

Total =
Refilling foundations with
excavated earth
Quantity of earth work excavation for ELSR
Quantity of earth work excavation for staircase

240 of [14]

DESCON associates, Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Sl.
No

Sl.
No

Description of work

Measurements
No
L

Total
10
11
12
13
14
15
16

CI manhole frame and cover : 0.60 x 0.60 m


size
RCC mosquito proof ventilators
RCC precast ladders 0.45m wide
RCC hand railing 0.75m height alround at
floor level, roof level and for staircase
Water level indicators of approved pattern
Lightening arresters with all its accessories
complete including earthing
Three coats of epoxy paint to inner surface of
the reservoir including roof dome
Provision for contingencies at 2%
Provision for unforeseen items at 2%
Provision for technical personnel employed by the contractor at 1%
Provision for Ban commission charges at 3% on EMD ie.,
2.5% on estimate amount for 2.25 years.
Provision for Advertisement charges at 1%
Insurance charges at 0.2% for 2.25 years
Provision for scruitiny charges at 1%

241 of [14]

DESCON associates, Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

ite, ONGOLE

Contents

358.11
393.25
751.36 cum

24.70
27.12
51.82 cum

24.70
27.12
51.82 cum

48.41 cum

242 of [14]

DESCON associates, Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Contents

0.00 cum
8.01 cum

56.40 cum
17.81 cum
0.90 cum

13.23
13.23
26.46 cum

5.88
5.88
11.76 cum

5.88
5.88
11.76 cum

6.17
6.17
12.35 cum

6.51
4.03
6.77
17.30 cum

243 of [14]

DESCON associates, Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Contents

6.51
4.03
6.77
17.30 cum

6.51
4.03
6.77
17.30 cum

6.51
4.03
6.77
17.30 cum
12.85 cum
8.24 cum
45.62 cum
6.09 cum
25.15 cum
3.10 cum
2.98 cum
1.03 cum
24.32 cum
20.72 cum
3.83 cum
19.99 cum
16.16 cum
244 of [14]

DESCON associates, Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Contents

245 of [14]

DESCON associates, Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Contents

34.34 cum

2.59 cum

2.59 cum

4.05 cum
3.78 cum
1.62 cum
1.62 cum
1.62 cum
1.62 cum
1.62 cum
0.24 cum

0.63 cum
0.42 cum
0.63 cum
246 of [14]

DESCON associates, Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Contents

0.63 cum
0.21 cum
0.21 cum
2.73 cum

0.63 cum
0.21 cum
0.84 cum

0.63 cum
0.21 cum
0.84 cum

0.63 cum
0.21 cum
0.84 cum

0.63 cum
0.63 cum
0.21 cum
0.21 cum
1.68 cum

0.63 cum
0.21 cum
0.84 cum
2.57 cum
247 of [14]

DESCON associates, Hyd.

m;

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Contents

1.29 cum
2.57 cum
1.29 cum
1.29 cum
2.57 cum

Rise =160 mm.


0.05 cum
0.02 cum
0.05 cum
0.02 cum
0.02 cum
0.05 cum

214 Kgs

4880 Kgs
171.5 Kgs
316.3 Kgs
118.1 Kgs
5486 Kgs
58 Kgs

214 Kgs

4880 Kgs
248 of [14]

DESCON associates, Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Contents

171.5 Kgs
317 Kgs
118.1 Kgs
5487 Kgs
137 Kgs
928 Kgs

214 Kgs

7625 Kgs
171.5 Kgs
316.3 Kgs
118.1 Kgs
8231 Kgs
137 Kgs
58 Kgs

74 Kgs

1665.6 Kgs
78.7 Kgs
290.76 Kgs
54.66 Kgs
2090 Kgs
49 Kgs
23 Kgs

249 of [14]

DESCON associates, Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Contents

1 Nos
1 Nos
1 Nos

127.5 cum
45 cum
172.5 cum

71.0 Mts
54.0 Mts
30.0 Mts

76 Joints
19 Joints

2 Nos
1 Nos
172.5 cum

500 Kgs
250 of [14]

DESCON associates, Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Contents

100 Kgs

2 Nos
1 Nos

6131 Kgs
1070 Kgs
18325 Kgs
15920 Kgs
2531 Kgs
4106 Kgs
488 Kgs
2515 Kgs
790 Kgs
73 Kgs
4505 Kgs
384 Kgs
1600 Kgs
1293 Kgs
500 Kgs
60231 Kgs

324 Kgs
1819 Kgs
777 Kgs
251 of [14]

DESCON associates, Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Contents

927 Kgs
500 Kgs
4347 Kgs
64578 Kgs

81.98 Sqm.
65.07
40.29
67.68

21.96
21.60
5.11
17.16
320.9 sq.m

163.97 Sqm.
130.14
80.58
135.36

252 of [14]

DESCON associates, Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Contents

21.96
21.60
5.11
17.16
575.88 sq.m

163.97 Sqm.
130.14
80.58
135.36

21.96
10.80
3.41
17.16
563.38 sq.m

142.02 Sqm.
65.07
105.41
65.07
45.40
114.11
70.86

21.96
253 of [14]

DESCON associates, Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Contents

10.80
3.41
17.16
661.3 sq.m

125.75 sq.m
196.07

21.96
10.80
3.41
17.16
375.14 sq.m

69.64 sq.m
119.68

15.00
10.80
3.41
17.16
235.69 sq.m

751.36 cum
34.34 cum

254 of [14]

DESCON associates, Hyd.

ONGOLE Mplty- 800 KL ELSR at Islampet park site

Contents

785.7 cum
2 Nos
2 Nos
2 Nos

1 Nos
1 Nos
L.S
L.S
L.S
L.S
L.S
L.S
LS
LS

255 of [14]

DESCON associates, Hyd.

ONGOLE Mplty - 800 KL ELSR at slampet park site under APUSP

Name of Work:- ONGOLE Mplty - Construction of 800KL ELSR at ISLAMPET park site, ONGOLE (off site)
under APUSP

Abstract Estimate
Sl.No

Qty

Description of work
For ELSR

751.36 Cum

Earthwork excavation in all soils upto SDR and stone


matrix with machinery with in a radius of 5mts. I.e. cut
and dump as per S.S.

51.82 Cum

Providing sand bedding including cost of sand, labour


charges, VAT etc., complete as per S.S. -

51.82 Cum

Laying VCC (1:4:8) using 40mm (SS-5) graded HBG M/C


metal and OPC for under raft including cost and
conveyance of all materials, labour charges, centering,
curing, VAT etc., complete as per SS

3
4

Est. Cost : Rs.73.70 lakhs


Rate
per Amount

13.52 Cum

10158

236.41 Cum

12250

2033.02 Cum

105348

Providing cast in situ VRCC M30 design mix using 20mm


graded aggregates conforming to IS 383, subject to
recovery of deference cost of cement if cement content
as per mix design is less then 400 kg/cum of concrete,
including cost and conveyance of all materials, VAT,
machinery, labour, cetering, vibration, curing for 21 days
and all incidental charges etc., complete but excluding
cost of steel and fabrication conforming to Standard
specification for the following items of work
outer raft

a
I

48.41 Cum

rectangular portion

3336.93 Cum

161555

ii

0.00 Cum

trepizoidal portion

3336.93 Cum

iii

8.01 Cum

beam

4670.21 Cum

37413

inner raft foundation

56.40 Cum

rectangular portion

3336.93 Cum

188199

ii

17.81 Cum

trepizoidal portion

3336.93 Cum

59419

iii

0.90 Cum

beam

4670.21 Cum

4218

26.46 Cum

columns (from raft beam to 5.00m above G.L

6813.94 Cum

180297

11.76 Cum

columns (from 5.00 to 8.00m above G.L

6872.80 Cum

80824

11.76 Cum

columns (from 8.00 to 11.00m above G.L

6931.67 Cum

81516

12.35 Cum

columns (from 11.00 to 13.95m above G.L

6990.53 Cum

86319

256 of [7]

DESCON associates, Hyd.

ONGOLE Mplty - 800 KL ELSR at slampet park site under APUSP

Sl.No

Qty

Description of work

Rate

per

Amount

17.30 Cum

Ist brasings

5870.92 Cum

101591

17.30 Cum

IInd brasings

5870.92 Cum

101591

17.30 Cum

IIIrd brasings

5929.78 Cum

102610

17.30 Cum

IVth brasings

6047.51 Cum

104647

12.85 Cum

outer ring beam at floor level

5608.97 Cum

72097

8.24 Cum

inner ring beam at floor level

5608.97 Cum

46194

45.62 Cum

floor slab

8081.57 Cum

368699

6.09 Cum

galery slab

11090.72 Cum

67546

25.15 Cum

dome at floor level

10116.91 Cum

254398

3.10 Cum

columns inside container

7627.38 Cum

23614

2.98 Cum

columns inside container

7686.24 Cum

22911

1.03 Cum

haunch

7212.24 Cum

7448

24.32 Cum

side wall (RL 165.05 to 167.20)

9300.58 Cum

226228

20.72 Cum

side wall (RL 167.20 to 169.50 )

11077.91 Cum

229517

Roof level inner ring beam

5608.97 Cum

21494

6474.35 Cum

129439

10116.91 Cum

163440

34.34 Cum

Earthwork excavation in all soils upto SDR and stone


matrix with machinery with in a radius of 5mts. I.e. cut
and dump as per S.S.

13.52 Cum

464

2.59 Cum

Providing sand bedding including cost of sand, labour


charges, VAT etc., complete as per S.S. -

236.41 Cum

613

2.59 Cum

Laying VCC (1:4:8) using 40mm (SS-5) graded HBG M/C


metal and OPC for under raft including cost and
conveyance of all materials, labour charges, centering,
curing, VAT etc., complete as per SS

2033.02 Cum

5270

3.83 Cum
u

19.99 Cum

roof annular slab

16.16 Cum

Roof dome

5
A

Dog legged stair case

B
C

257 of [7]

DESCON associates, Hyd.

ONGOLE Mplty - 800 KL ELSR at slampet park site under APUSP

Sl.No
D

Qty

Description of work

Rate

per

Amount

Providing precast/ cast in situ inCC M30 design mix


using 20mm graded aggregates conforming to IS 383,
subject to recovery of deference cost of cement if
cement content as per mix design is less then 400
kg/cum of concrete, including cost and conveyance of all
materials, VAT, machinery, labour, cetering, vibration,
curing for 21 days and all incidental charges etc.,
complete but excluding cost of steel and fabrication
conforming to Standard specification for the following
items of work
a

4.05 Cum

3.78 Cum

1.62 Cum

1.62 Cum

1.62 Cum

1.62 Cum

1.62 Cum

0.24 Cum

for footings
for columns of size 400x300mm upto 5m above
G.L.
for columns of size 400x300mm from 5m to 8m
above G.L.
for columns of size 400x300mm from 8m to 11m
above G.L.
for columns of size 400x300mm from 11m to 14m
above G.L.
for columns of size 400x300mm from 14m to 17m
above G.L.
for columns of size 400x300mm from 17m to 20m
above G.L.
for columns of size 400x300mm from 20.00m to
20.35m above G.L.

2.73 Cum
0.84 Cum
0.84 Cum
0.84 Cum
1.68 Cum
0.84 Cum
2.57
ao

1.29 Cum

ap

2.57 Cum

aq

1.29 Cum

ar

1.29 Cum

3526.82 Cum

14284

6716.60 Cum

25389

6775.46 Cum

10976

6834.32 Cum

11072

6893.19 Cum

11167

6952.05 Cum

11262

7010.92 Cum

11358

7069.78 Cum

1718

For bracings and landing beams upto 5.00m


above GL

6639.68 Cum

18126

For bracings and landing beams from 5.00m to


8.00m above GL

6698.54 Cum

5627

6698.54 Cum

5627

6757.40 Cum

5676

6816.27 Cum

11451

6934.00 Cum

5825

9351.60 Cum

24071

9410.46 Cum

12111

9469.33 Cum

24374

9528.19 Cum

12263

9587.06 Cum

12339

For bracings and landing beams from 8.00m to


11.00m above GL
For bracings and landing beams from 11.00m to
14.00m above GL
For bracings and landing beams from 14.00m to
17.00m above GL
For bracings and landing beams from 17.00m to
20.00m above GL
staircase waist & landing slab upto 5.00m above
G.L
staircase waist & landing slab from 5.00 to 8.00m
above G.L
staircase waist & landing slab from 8.00 to 11.00m
above G.L
staircase waist & landing slab from 11.00 to
14.00m above G.L
staircase waist & landing slab from 14.00 to
17.00m above G.L

258 of [7]

DESCON associates, Hyd.

ONGOLE Mplty - 800 KL ELSR at slampet park site under APUSP

Sl.No
as

Qty

Description of work
staircase waist & landing slab from 17.00 to
20.00m above G.L

2.57 Cum

Rate

per

Amount

9645.92 Cum

24829

Providing steps with BM in CM(1:3) for stair case

0.05 Cum

steps from 0.00 to 5.00m abover G.L

1975.71 Cum

95

0.02 Cum

steps from 5.00 to 8.00m abover G.L

2034.58 Cum

49

0.05 Cum

steps from 8.00 to 11.00m abover G.L

2093.44 Cum

100

0.02 Cum

steps from 11.00 to 14.00m abover G.L

2152.30 Cum

52

0.02 Cum

steps from 14.00 to 17.00m abover G.L

2211.17 Cum

53

f
6

0.05 Cum

steps from 17.00 to 20.00m abover G.L

2270.03 Cum

109

64578 Kgs

Supply, delivery and fabrication of TOR Steel including


cost of steel, binging wire and fabrication charges, VAT
etc., complete as per SS

33.28 Kg

2149156

7
Supply and delivery and stacking at P.H. Stores
Markapur for following sizes of CI D/F pipes, specials
and valves for proposed ELSRs of inlet, outlet, overflow
connections etc., complete as per SS
A

A. Inlet connections

214 Kgs

350

mm dia duckfoot bend

45.25 Kg

9684

ii

4880 Kgs

350

mm dia CI D/F pipes

45.25 Kg

220827

iv

58 Kgs

350

mm dia CI Bellmouth

45.25 Kg

2625

B. Outlet connections

214 Kgs

350

mm dia duckfoot bend

45.25 Kg

9684

ii

5487 Kgs

350

mm dia CI D/F pipes

45.25 Kg

248294

iv

137 Kgs

350

mm dia 90 degrees CI D/F bends

45.25 Kg

6199

928 Kgs

350

mm dia CI Bellmouth

45.25 Kg

41993

C. Overflow connections

214 Kgs

350

mm dia duckfoot bend

45.25 Kg

9684

ii

8231 Kgs

350

mm dia CI D/F pipes

45.25 Kg

372453

iv

137 Kgs

350

mm dia 90 degrees CI D/F bends

45.25 Kg

6199

259 of [7]

DESCON associates, Hyd.

ONGOLE Mplty - 800 KL ELSR at slampet park site under APUSP

Sl.No
v

Qty
58 Kgs

Description of work
350

Rate

mm dia CI Bellmouth

260 of [7]

per
45.25 Kg

Amount
2625

DESCON associates, Hyd.

ONGOLE Mplty - 800 KL ELSR at slampet park site under APUSP

Sl.No

Qty

Description of work

Rate

per

Amount

D. Scour connections

74 Kgs

200

mm dia duckfoot bend

45.25 Kg

3349

ii

2090 Kgs

200

mm dia CI D/F pipes

45.25 Kg

94573

iv

49 Kgs

200

mm dia 90 degrees CI D/F bends

45.25 Kg

2217

23 Kgs

200

mm dia CI Bellmouth

45.25 Kg

1041

1 Nos
1 Nos
1 Nos
E

Manufacture,supply and delivery of the following sizes of


CI D/F sluice valves PN 1.6 conforming to IS 14846 /
2000 with amendments No. 1 &2 including cost and
conveyance but excluding taxes etc. complete. The
valves shall be tested for against hydraulic test
requirement and embosed with ISI mark.
350 mm dia. CI D/F Sluice valve with hand wheel for
inlet
350 mm dia. CI D/F Sluice valve with hand wheel for
outlet
200 mm dia. CI D/F Sluice valve with hand wheel for
scour

51590.18 Each

51590

51590.18 Each

51590

8680.05 Each

8680

13.52 Cum

2332

Earthwork excavation in all soils upto SDR and stone


matrix with machinery with in a radius of 5mts. I.e. cut
and dump as per S.S.
172.5 Cum

For Pipe line


Lowering and laying of following sizes of CI D/F pipes
true to alignment and gradient as per SS

71.0 Rmt

350 mm dia

60.78 Rmt

4315

ii

54.0 Rmt

350 mm dia

60.78 Rmt

3282

iii
G

30.0 Rmt

200 mm dia

23.34 Rmt

700

Jointing of the following sizes of CI D/F pipes and


specials excluding cost of jointing materials but including
cost of labour charges for jointing as per SS
I

76 Joints

350 mm dia

214.16 Each

16276

iii
H

19 Joints

200 mm dia

132.16 Each

2511

Lowering, laying and keeping in position true to


alignment of following sizes of CI D/F valves as per SS
I

1 Nos

350 mm dia

335.34 Each

335

ii

1 Nos

350 mm dia

195.69 Each

196

261 of [7]

DESCON associates, Hyd.

ONGOLE Mplty - 800 KL ELSR at slampet park site under APUSP

Sl.No
iii
I

Qty
1 Nos

Description of work

Rate

172.50 Cum

200 mm dia
Refilling the pipeline trench with excaved soils after
completion of pipeline work as per SS as per E.W

785.71 Cum

Refilling foundations with excavated earth

500.00 Kgs

Supply and delivery of bolts and nuts to P.H. stores


Markapur suitable to CI D/F pipes and valves

100.00 Kgs

Supply and delivery of rubber packing 6mm thick to P.H.


stores Markapur suitable to CI D/F pipes and valves
Construction of following sizes of CI D/F sluice valve pits
as per standard approved designs

per

Amount

95.22 Each

95

7.90 Cum

1363

7.90 Cum

6210

43.06 kg

21528

40.61 kg

4061

2 Nos

350 mm dia valve pit of size 1.20 x 1.05 m

13810.74 Each

27621

iii
8

1 Nos

200 mm dia valve pit of size 1.20 x 1.05 m

13810.74 Each

13811

Painting to external surfaces of walls, columns, braces,


beams and stair case with snowcem or other equivalent
approved cement paints of brand shades on one coat
over primary coat (total two coats) including cost and
conveyance of all materials to site,labour
charges,scaffolding, curing etc., complete for finished
item of work

320.86 sq.m

0.00 m to 3.66m above G.L.

10.0
437.80 Sq.m

14047

ii

576 sq.m

3.66m to 7.32 m above G.L.

10.0
475.55 Sq.m

27386

iii

563 sq.m

7.32m to 10.98m above G.L.

10.0
513.30 Sq.m

28918

iv

661 sq.m

10.98m to 14.64m above G.L.

10.0
551.05 Sq.m

36439

375 sq.m

14.64m to 18.30m above G.L.

10.0
578.09 Sq.m

21687

vi

236 sq.m

18.30m to top dome

10.0
605.13 Sq.m

14263

2 Nos

CI manhole frame and cover : 0.60 x 0.60 m size

L.S.

5000

10

2 Nos

RCC mosquito proof ventilators

L.S.

3000

11

2 Nos

RCC precast ladders 0.45m wide


RCC hand railing 0.75m height alround at floor
level, roof level and for staircase

L.S.

20000

L.S.

50000

Water level indicators of approved pattern

L.S.

15000

12
13

1 Nos

262 of [7]

DESCON associates, Hyd.

ONGOLE Mplty - 800 KL ELSR at slampet park site under APUSP

Sl.No
14

15

Qty
1 Nos

L.S

Description of work

Rate

per

Amount

Lightening arresters with all its accessories


complete including earthing

L.S.

20000

Three coats of epoxy paint to inner surface of the


reservoir including roof dome

L.S.

100000
7070171

16

Provision for contingencies at 2%

141404

17
18

Provision for unforeseen items at 2%


Provision for technical personnel employed by the
contractor at 1%
Provision for Ban commission charges at 3% on
EMD ie., 2.5% on estimate amount for 2.25
years.

141404

19
20
21

70702
11931

Provision for Advertisement charges at 1%

70702

Insurance charges at 0.2% for 2.25 years

31816

Provision for scruitiny charges at 1%

70702

22
7608832
say Rs. 73.7 lakhs

263 of [7]

DESCON associates, Hyd.