8. Edit Task 4 (Power Service) to give it the name Install Temporary Power
Service.
9. Insert a blank task above Sign Contract and Notice to Proceed and enter
the new task Get Permits with a duration of 2 days.
10.
11.
Move the task Get Permits Above the task Clear Lot.
12.
13. Enter a Milestone task for Home construction Complete at the end of the
project.
14.
Insert new one day task General Conditions on the top of all the tasks
15.
Insert a new one day task Site Work above Clear Lot
16.
Insert a new one day task Foundation above Excavate for foundations
17.
Insert a new one day task Framing above Install first floor Joists
18.
Select the task No 2 and 3 and indent them below General Conditions
19. Select the tasks Clear Lot through to Install Underground Utilities and
indent them below Site Work.
20. Select the tasks Excavate Foundations through to Backfill foundations
and indent them below Foundations.
21. Select the tasks Install First floor Joists through to Conduct framing
inspections and indent them below Framing.5
22. Attach a note to the Get Permits task reading Obtaining permits may
increase in duration by as much as 4 weeks.
23. Clear lot and install temporary power service can have a link type of
Start-Start.
24. Add a lag of 2 days between Excavate for foundations and form
basement walls
25.
26.
27. Adjust time scale setting to reflect top tier as Quarter, middle tier as month
and bottom tier as weeks.
28.
29.
30. Create a new column to reflect the location of all the activities as per
following
a. Locate a new Site
b. Write Proposals
Head Office
c. Site Remodelling
d. Board Approval
Head Office
Head Office
g. Move Furniture
Head Office
h. Reassemble Furniture
i. Reconnect Computers
j. Move Warehouse
Head Office
k. Move Complete
Head Office
31.
Create a filer of all of the tasks having their location of Head office
32.