STANDARD
INSPECTION
TEST PLAN
FOR
PIPELINE JOBS
PAGE: 1 of 4
1.0
GENERAL
The enclosed ITPs shall be followed for the works to be performed by the Contractor
under this Tender. The provisions indicated for stagewise inspection by HPCL are a
minimum and the contractor shall develop a detailed ITP and obtain approval for the
same prior to commencement of work. Contractor to carry out 100% examination of all
activities.
2.0
LEGEND
HP:
W:
Hold point;
A point which requires inspection/ verification and acceptance by HPCL before
any further processing is permitted. The Contractor shall not process the
activity/ item beyond a Hold point without written approval by HPCL.
Witness Point;
An activity which requires witnessing by HPCL when the activity is performed.
Rw:
S:
WC:
PAGE: 2 of 4
____________________________________________________________________
S.NO.
ACTIVITY
CONTRACTOR
________________________________________________________________________
A.
HPCL
PRIOR TO FABRICATION
1.
WC
HP
2.
WC
HP
3.
Incoming Material
Owners Supply
Contractors supply, including check testing
4.
5.
WC
WC
Rw
HP
WC
WC
Rw
W
WC
HP
WC
WC
HP
HP
WC
WC
W
HP
Note : Party to establish WPS/PQR within 15 days from the date of LOI
6.
7.
WC
HP
8.
WC
HP
B.
1.
2.
3.
4.
Sequence of welding
WC
5.
Baking of electrodes
WC
6.
Inter-pass cleaning
WC
WC
WC
PAGE: 3 of 4
7.
8.
9.
Erection of valves
10.
11.
Hydrotesting
WC
WC
W
HP
WC
W
WC
WC
W
HP
PAGE: 4 of 4