PRADHAN MANTRI GRAM SADAK YOJANA (PMGSY)

PHASE - I.A.P.

GOVERNMENT OF ANDHRA PRADESH


GRANT: PMGSY-X

PACKAGE No. : AP01-X-035

Name of the District

ADILABAD

Name of the Circle

ADILABAD

Name of the Division

ASIFABAD

Name of the Sub-Divn

MANCHERIAL

Name of the Mandal

CHENNUR

Name of the work

ROAD FROM CHENNUR TO


SOMANPALLY(LAXMIPUR)

Type of Proposal

New Connectivity

Estimate cost

RS. 113.00

Length of the road

2.80

Length proposed

2.80 Km

Road Number

T02

Lakhs

SoR 2012-2013
PANCHAYAT RAJ ENGINEERING DEPARTMENT

SPECIFICATION REPORT
NAME OF THE WORK: R/F xxxxxxxxxxxxxxxxxxxxxxxx to yyyyyyyyyyyyyyyyyyy
PMGSY - IAP (UC)
Estimate cost : Rs.
113.00
GRANT: PMGSY -X

Lakhs
PACKAGE NO:

The above work has been administratively sanctioned for Rs.113.00 Lakhs. Vide G.O.Ms No.362
dated: 09-11-2012 of Panchayat raj and Rural Development Department under PMGSY-X in IAP Districts.

EXISTING FEATURES
A.

Road surface
The proposed road is completely over existing formation.

PROVISIONS MADE IN THE ESTIMATE


The Road work estimate is prepared with the following provisions with MORD Specifications as per PMGSY
guidelines.
1

Clearingand grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees
of girth up to 300mm as per technical specification clause 201-1 of MORD.

Construction and widening of existing embankment with approved materails deposited at site materail obtained
from roadway cutting as per the requirement of Table 300-1 and 300-2 as per technical specification clause
301.5 of MORD.

Construction and widening of existing embankment with approved materails deposited at site obtained from
borrow pits with a lift upto 1.50mtrs, as per the requirement of Table 300-1 and 300-2 with a lead upto
1000mtrs and as per technical specification clause 301.5 of MORD.

Construction of granular sub base by providing well graded meterial (i.e Stone aggregates of 9.5 mm to 4.75
mm size Gravel of 66% and sand of size < 2.6mm @ 34% )in uniform layers of loose thickness of not more
than 225mm as per IRC technical specification clause 402 of MORD.

Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam
specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100
kN in stages to proper grade and camber grading 2 as per Technical Specification Clause 405

Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam
specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100
kN in stages to proper grade and camber Grading 3 as per Technical Specification Clause 405 with .40-45 mm
metal of HG with Machine Crushing (82 %) and 19-22.40 mm HG metal with Machine Crushing(18 %).

Providing and applying Prime Coat with butimen emulsion (Slow Setting- SS-1) as clause 502 of MORD.

Providing and applying Tack Coat with butimen emulsion (Rapid Setting- RS-1) using emulsion distributor as
clause 503 of MORD.

Providing and laying Open Graded Premix Carpet (OGPC) surfacing material of 20 mm thick composed of
13.20 mm to 5.60 mm size machine crushed hard blasted granite chips using bitumen of 60/70 grade as per
clause 508 of MORD.

10 Providing and laying bituminous liquid seal coat (Type A) comprising of a layer of bitumuneous binder followed
by a cover of stone chipping of grading as defined in table 500.16 of MOST at 0.09 cum/10sqm of chips to be
laid simultaneously along with the bitumunous course using 9.80 kgs of bitumen 60/70 grade as per technical
specification clause 510 of MORD.
11

Construction of Granualar shoulder by providing well graded meterial having soaked CBR not less than 15% s
per IRC technical specification clause 402 of MORD.

12 Actually 3 Nos of CD works are proposed in the approved DPR which is prepared with SoR 2011-12. Now this
estimate is prepared with current SoR2012-13. Due to increase the cost of estimate, no CD works are
proposed in this estimate.
13 Amount proposed for road furniture like KM, HM stones, Sign boards, logo boards, foundation & inaguration
stone.
14 The total length of the road is 2.800kms from 0/0 to 2/80 km there is existing formation . Side drain one side of
the road and C.C. Pavement is proposed at village portions 1/125 to 1/375 & 2/700 to 2/800, Now this estimate
is prepared with current SoR2012-13. Due to increase the cost of estimate,C.C. Pavement is proposed at
village portions 1/125 to 1/375 & 2/700 to 2/800, and one side drain is not proposed

The estimate is prepared with the SoR for the year 2012-2013.

ASST.EXE.ENGINEER
0.00

DY.EXECUTIVE ENGINEER

EXECUTIVE ENGINEER

SUPERINTENDING ENGINEER

GENERAL ABSTRACT
Grant: PMGSY-X Phase

Package: AP-01-X-017

NAME OF THE WORK: R/F xxxxxxxxxxxxxxxxxxxxxxxx to yyyyyyyyyyyyyyyyyyy

Estimate amount Rs:


S. No.

113.00 Lakhs

Desription

Amount

PART - A
1

Road portion

CD works

Cost of road furniture

Construction of side drain

Add 5% VAT

Add Seignorage charges

Preparation of DPR Rs.10,000/- per KM

Add L.S. for rounding off

2.800 KM

10171754

0 Nos

0
21254

0 Mts

10193008

509650
563805

2.800 KM

28000
5537

PART - A TOTAL

11300000

PART - B
1
2

Maintenance of BT road per KM for 5 years


BT renewal coat at the end of 5th year 5.00
lakhs per KM
PART - B TOTAL

2.800 KM

420000

2.800 KM

1400000
1820000
13120000

PART A + PART B

ASST.EXE.ENGINEER
0

DY.EXECUTIVE ENGINEER

EXECUTIVE ENGINEER

SUPERINTENDING ENGINEER

3632769.2

11300000

11294463

4035714

ABSTRACT (PART -B)


NAME OF THE WORK: R/F xxxxxxxxxxxxxxxxxxxxxxxx to yyyyyyyyyyyyyyyyyyy
4.20 Lakhs

Estimation Cos
.

Amount
per KM

Amount in
Rupees

5.00%

7500.00

21000.00

2 Providing for 2nd year Maintaince ### 10.00%

###

42000.00

3 Providing for 3rd year Maintaince ### 15.00%

###

63000.00

4 Providing for 4th year Maintaince ### 30.00%

###

126000.00

5 Providing for 5th year Maintaince ### 40.00%

###

168000.00

Sl.NO

Discription of Iteam

Length Percenta
in Kms
ge
3

1 Providing for 1st year Maintaince ###

Total

ASST.EXE.ENGINEER
0

420000.00

DY.EXECUTIVE ENGINEER

EXECUTIVE ENGINEER

SUPERINTENDING ENGINEER

FORMAT - F6

DETAILED AND ABSTRACT ESTIMATE


PMGSY Ph.IAP
GRANT: PMGSY -X

PACKAGE NO:

NAME OF THE WORK: R/F xxxxxxxxxxxxxxxxxxxxxxxx to yyyyyyyyyyyyyyyyyyy


ASIFABAD

SUB DIVISION :

Length

2.800 Kms

As per MORD specifications


Sl.
No.
1
1

Description of Item

No

Length (m)

Width( Thinkness(
m)
m)
5

2000.00

2.00

8000.00
-3200.00
4800.00
Sqm

14068.442
cum

Amount
(Rs)
10

1.86 /Sqm

8928

62.16 /1cum

874479

Construction of embankment with approved material obtained from


borrow pits with all lifts, transporting to site, spreading, grading to
required slope and compacting to meet requirement of Tables 300.1 and
300.2 with a lead upto 1000 m as per Technical Specification Clause
301.5 MORD/ 305 MORTH including overhead charges & Contractor
profit, But excluding VAT
297.187
cum

Rate (Rs) unit per

Construction of embankment with approved materials deposited at site


from roadway cutting and excavation from drain (not exceeding 0.6 m
depth) and foundation of other structures graded and compacted to meet
requirement of Tables 300.1 and 300.2 as per Technical Specification
Clause 301.5 MORD/ 305 MORTH including overhead & Contract profit
but excluding VAT
As per Calculation sheets

Quantity

Clearing and grubbing road land including uprooting wild vegetation,


grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal
of stumps of such trees cut earlier and disposal of unserviceable
materials and stacking of serviceable material to be used or auctioned,
upto a lead of 1000 m including removal and disposal of top organic soil
not exceeding 150 mm in thickness as per Technical Specification
Clause 201 MORD/MORTH including overhead & Contractor profit but
excluding VAT .
0/0 to 1/125 & 1/375 to 2/700
Deduct 40% voids

Estt.Cost.Rs. 101.72 Lakhs

Construction of granular sub-base by providing well graded material


(28% metal chips, 72% gravel), spreading in uniform layers with motor
grader on prepared surface, mixing by mix in place method with
rotavator at OMC, and compacting with three wheel 80-100 kN static
roller / Vibratory Roller 80-100 kN capacity to achieve the desired
density and CBR not less than 30%, complete as per Technical
Specification Clause 402 MORD
0/0 to 1/125 & 1/375 to 2/700
(Bottom layer) BT road Portion

2440.00

6.90

0.100

1683.60

155.12 /Cum

46101

Sl.
No.

Description of Item

No

Length (m)

Width( Thinkness(
m)
m)
5

Quantity
7

Rate (Rs) unit per


8

0/0 to 1/125 & 1/375 to 2/700


(Top layer)

2440.00

3.20

0.150

1171.20

1/125 to 1/375, 2/700 to 2/800 km


(CC road portion)

350.00

5.00

0.150

262.50

Bell mouth at 0/0

10.00 11+3.2
2

0.150

10.65

Approach road 20mts at 0/825

20.00

3.20

0.150

9.60

Approach road 20mts at 1/025

20.00

3.20

0.150

9.60

Approach road 20mts at 1/075

20.00

3.20

0.150

9.60

Approach road 20mts at 2/575

20.00

3.20

0.150

9.60

For curve length @ 0/475


For tangention length

1
2

25.00
75.000

0.60
0.6+0
2

0.250
0.250

3.75
11.25

For curve length @ 1/075

39.00

0.60

0.250

5.85

For tangention length

72.000

0.6+0
2

0.250

10.80

For curve length @ 2/250

88.00

0.60

0.250

13.20

For tangention length

72.000

0.6+0
2

0.250

10.80

For curve length @ 2/575


For tangention length

1
2

54.00
72.000

0.60
0.6+0
2

0.250
0.250

8.10
10.80

3240.90 1,128.77 /Cum


cum
5

Providing, laying, spreading and compacting stone aggregates of


specific sizes to water bound macadam specification including spreading
in uniform thickness, hand packing, rolling with smooth wheel roller 80100 kN in stages to proper grade and camber, applying and brooming,
stone screening to fill-up the interstices of coarse aggregate, watering
and compacting to the required density Grading 3 as per Technical
Specification Clause 405 MORD/ MORTH 404. For compacted thickness
of 75 mm, including overhead charges & Contractor profit, But excluding
VAT
0/0 to 1/125 & 1/375 to 2/700

Bell mouth at 0/0

Approach road 20mts at 0/825

2440.00

3.00

0.075

549.00

10.00 11+3.2
2

0.075

5.33

20.00

3.00

0.075

4.50

Approach road 20mts at 1/025

20.00

3.00

0.075

4.50

Approach road 20mts at 1/075

20.00

3.00

0.075

4.50

Approach road 20mts at 2/575

20.00

3.00

0.075

4.50

Amount
(Rs)
10

3658227

Sl.
No.

Description of Item

No

Length (m)

5
0.60
0.6+0
2
0.60
0.6+0
2
0.60
0.6+0
2
0.60
0.6+0
2

For curve length @ 0/475


For tangention length

1
2

25.00
75.000

For curve length @ 1/075


For tangention length

1
2

39.00
72.000

For curve length @ 2/250


For tangention length

1
2

88.00
72.000

For curve length @ 2/575


For tangention length

1
2

54.00
72.000

Width( Thinkness(
m)
m)
6

Quantity
7

Rate (Rs) unit per


8

0.075
0.075

1.12
3.37

0.075
0.075

1.75
3.24

0.075
0.075

3.96
3.24

0.075
0.075

2.43
3.24

594.68 3,113.59 /Cum

Amount
(Rs)
10

1851590

cum
6

Providing and applying primer coat with bitumen emulsion (SS-1) on


prepared surface of granular base including cleaning of road surface and
spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means
as per Technical Specification Clause 502 MORD (for use on Wet mix
macadam & WBM) ,including overhead charges & Contractors profit but
excluding VAT.
0/0 to 1/125 & 1/375 to 2/700

Bell mouth at 0/0

10.00 11+3.2
2

71.00

For curve length @ 0/475


For tangention length

1
1
1
1
1
2

60.00
60.00
60.00
60.00
15.00
45.00

For curve length @ 1/075


For tangention length

1
2

For curve length @ 2/250


For tangention length

1
2

For curve length @ 2/575


For tangention length

1
2

20.00 3.00
20.00 3.00
20.00 3.00
20.00 3.00
25.00
0.60
75.000
0.6+0
2
39.00
0.60
72.000
0.6+0
2
88.00
0.60
72.000
0.6+0
2
54.00
0.60
72.000
0.6+0
2

Approach road 20mts


Approach road 20mts
Approach road 20mts
Approach road 20mts

at 0/825
at 1/025
at 1/075
at 2/575

2440.00

3.00

7320.00

23.40
43.20
52.80
43.20
32.40
43.20
7929.20

Providing and applying tack coat with Bitumen emulsion (RS-1) using
emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the
prepared granular surfaces treated with primer & cleaned with Hydraulic
broom as per Technical Specification Clause 503 MORD,including
overhead charges & Contractors profit but excluding VAT.

0/0 to 1/125 & 1/375 to 2/700

2440.00

3.00

7320.00

31.00 /1 sqm

245805

Sl.
No.

Description of Item

No

Length (m)

Bell mouth at 0/0

Width( Thinkness(
m)
m)
5

Quantity
7

10.00 11+3.2
2

71.00

For curve length @ 0/475


For tangention length

1
1
1
1
1
2

60.00
60.00
60.00
60.00
15.00
45.00

For curve length @ 1/075


For tangention length

1
2

For curve length @ 2/250


For tangention length

1
2

For curve length @ 2/575


For tangention length

1
2

20.00 3.00
20.00 3.00
20.00 3.00
20.00 3.00
25.00
0.60
75.000
0.6+0
2
39.00
0.60
72.000
0.6+0
2
88.00
0.60
72.000
0.6+0
2
54.00
0.60
72.000
0.6+0
2

Approach road 20mts


Approach road 20mts
Approach road 20mts
Approach road 20mts

at 0/825
at 1/025
at 1/075
at 2/575

Amount
(Rs)
10

23.40
43.20
52.80
43.20
32.40
43.20
7929.20

Rate (Rs) unit per

11.13 /1 sqm

88252

166.65 /1 sqm

1321401

Providing, laying and rolling of open-graded premix carpet of 20 mm


thickness composed of 13.2 mm to 5.6 mm aggregates either using
penetration grade bitumen or emulsion to required line, grade and level
to serve as wearing course on a previously prepared base, including
mixing a suitable plant, laying and rolling with a three wheel 0-100 kN
static roller capacity, finished to required level and grades to be followed
by seal coat of either type A or Type B or Type C as per Technical
Specification Clause 508 MORD.

0/0 to 1/125 & 1/375 to 2/700

Bell mouth at 0/0

10.00 11+3.2
2

71.00

For curve length @ 0/475


For tangention length

1
1
1
1
1
2

60.00
60.00
60.00
60.00
15.00
45.00

For curve length @ 1/075


For tangention length

1
2

For curve length @ 2/250


For tangention length

1
2

For curve length @ 2/575


For tangention length

1
2

20.00 3.00
20.00 3.00
20.00 3.00
20.00 3.00
25.00
0.60
75.000
0.6+0
2
39.00
0.60
72.000
0.6+0
2
88.00
0.60
72.000
0.6+0
2
54.00
0.60
72.000
0.6+0
2

Approach road 20mts


Approach road 20mts
Approach road 20mts
Approach road 20mts

at 0/825
at 1/025
at 1/075
at 2/575

2440.00

3.00

7320.00

23.40
43.20
52.80
43.20
32.40
43.20
7929.20

Sl.
No.

Description of Item

No

Length (m)

Width( Thinkness(
m)
m)
5

Quantity
7

Rate (Rs) unit per


8

Amount
(Rs)
10

Providing and laying seal coat sealing the voids in a bituminous surface
laid to the specified levels, grade and cross fall using Type A, Type B and
Type C as per Technical Specification Clause 510 MORD. (using Three
wheel 80-100 kN static roller)
0/0 to 1/125 & 1/375 to 2/700

Bell mouth at 0/0

10.00 11+3.2
2

71.00

For curve length @ 0/475


For tangention length

1
1
1
1
1
2

60.00
60.00
60.00
60.00
15.00
45.00

For curve length @ 1/075


For tangention length

1
2

For curve length @ 2/250


For tangention length

1
2

For curve length @ 2/575


For tangention length

1
2

20.00 3.00
20.00 3.00
20.00 3.00
20.00 3.00
25.00
0.60
75.000
0.6+0
2
39.00
0.60
72.000
0.6+0
2
88.00
0.60
72.000
0.6+0
2
54.00
0.60
72.000
0.6+0
2

Approach road 20mts


Approach road 20mts
Approach road 20mts
Approach road 20mts

at 0/825
at 1/025
at 1/075
at 2/575

2440.00

3.00

7320.00

23.40
43.20
52.80
43.20
32.40
43.20
7929.20

48.69 /1 sqm

386073

10 Construction of
un-reinforced, dowel jointed at expansion and
construction joint only, plain cement concrete pavement, thickness as
per design, over a prepared sub base, with 43 grade cement or any
other type as per Clause 1501.2.2 M30 (Grade), coarse and fine
aggregates conforming to IS : 383, maximum in a concrete mixer of not
less than 0.2 cum capacity and appropeiate weigh batcher using
approved mix design, laid in approved fixed side formwork (steel
channel, laying and fixing of 125 mictron thick polythene film, wedges,
steel plates including levelling the formwork as per drawing), spreading
the concrete with sholvels, rakes, compacted using needle, scareed and
plate vibrators and finished in continuous operation including provision of
contraction and expansion, construction joints, applying debonding
strips, primer, sealant, dowel bars, near approaches to bridge / culvert
and construction joints, admixtures as approved, curing of concrete slabs
for 14- days, curing compound (where specified) and water finishing to
lines and grade as per drawing and Technical Specification Clause 1501
MORD including overhead charges & Contractors profit but excluding
VAT.

1/125 to 1/375 & 2/700 to 2/800

350.00

3.00

0.175

183.75
183.75 6,006.63 /Cum

1103717

Sl.
No.

Description of Item

No

Length (m)

11

Width( Thinkness(
m)
m)
5

Quantity

Rate (Rs) unit per

Amount
(Rs)
10

Construction of gravel shoulders by providing well graded material,


spreading in uniform layers with motor grader on prepared surface,
mixing by mix in place method with rotavator at OMC, and compacting
with three wheel 80-100 kN static roller / Vibratory Roller 80-100 kN
capacity to achieve the desired density, complete as per Technical
Specification Clause 402 MORD, including overhead charges &
Contractor profit, But excluding VAT
0/0 to 1/125 & 1/375 to 2/700
1/125 to 1/375 & 2/700 to 2/800

2
2

2450.00 1.400
350.00 1.000

0.225
0.175

1543.50
122.50
1666.00

352.45 /Cum

587180

cum
10171754

ASST.EXE.ENGINEER
0

DY.EXECUTIVE ENGINEER

EXECUTIVE ENGINEER

SUPERINTENDING ENGINEER

FORMAT - F7

PMGSY Ph. IAP


COST OF CROSS DRAINAGE WORKS (CD WORKS)
GRANT: PMGSY -X

PACKAGE NO:

NAME OF THE WORK: R/F xxxxxxxxxxxxxxxxxxxxxxxx to yyyyyyyyyyyyyyyyyyy


Est.Cost : Rs
Sl.
No
1

Lakhs

Description of Item

Vent Size

Location of C.D.Work
at km

Qty.

Rate

Per

Amount

1000mm dia RCC NP3 pipe


culvert

1Vent

NIL

176407

Each

TOTAL

ASST.EXE.ENGINEER
0

0.00

DY.EXECUTIVE ENGINEER

EXECUTIVE ENGINEER

SUPERINTENDING ENGINEER

FORMAT - F7

PMGSY Ph. IAP


COST ESTIMATE FOR ROADS CONSTRUCTION OF CROSS DRAINAGE WORKS
NAME OF THE WORK: R/F xxxxxxxxxxxxxxxxxxxxxxxx to yyyyyyyyyyyyyyyyyyy
Type of Cross Drainage work:

1 Vent RCC NP3 pipe culvert (1000mm dia)


Estt.Cost.Rs.

Sl.
No.

Description of Item

No

Length (m)

Width( Thinkness(
m)
m)
5

Quantity

Rate
(Rs)

unit per

Amount
(Rs)

10

Head Walls

5.20

1.40

1.200

17.472

Beddinhg for pipes

4.70

1.25

0.300

1.763
19.235

83.99

1616.00

3994.06

24486.00

4402.31

96290.00

Providing concrete for plain concrete M 10 grade in open foundations


using 40 mm nominal size Graded hard stone aggregate, mechanically
mixed, placed in foundation and compacted by vibration including curing
for 14 days complete as per drawings and technical specifications
Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH
,including overhead charges & Contractors profit but excluding VAT.

Head Walls

5.20

1.40

0.300

4.368

Beddinhg for pipes

4.70

1.25

0.300

1.763

NET :
3

Lakhs

Earthwork in excavation for structures as per drawing and technical


specifications Clause 305.1 including setting out, construction of shoring
and bracing, removal of stumps and other deleterious material and
disposal upto a lead of 50 m, dressing of sides and bottom and
backfilling in trenches with excavated suitable material as per Technical
Specification 305 MORD / 304 MORTH ,including overhead charges &
Contractors profit but excluding VAT.

NET :
2

1.76

6.131

Plain cement concrete M 15 grade using 40,20 & 10mm metal


mechanically mixed in substructure complete as per drawings and
technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204
MORD and 1500, 1700 & 2200 MORTH ,including overhead charges &
Contractors profit but excluding VAT.
Head Walls Sloped

5.00

Head Walls parapet wall

5.00

Deductions:
1000MM Dia vent PC

3.14 X (1.0X1.0) X 0.75 / 4


NET :

1.3+0.4
2

0.40

2.500

21.250

0.450

1.800
-1.178
21.873

Sl.
No.

Description of Item

No

Length (m)

1
4

Width( Thinkness(
m)
m)
5

Quantity

Rate
(Rs)

unit per

Amount
(Rs)

10

Providing and laying reinforced cement concrete pipe NP3 for culverts on
first class bedding of granular material including fixing collar with
cement mortar 1:2 but excluding excavation, protection works, backfilling,
concrete and masonry works in head wall and parapets. Tech
Specification Clause 1106 MORD ,including overhead charges &
Contractors profit but excluding VAT.
1 - VENT- 1000MM PC

7.50

7.500

7202.00

TOTAL :

ASST.EXE.ENGINEER
0

DY.EXECUTIVE ENGINEER

EXECUTIVE ENGINEER

SUPERINTENDING ENGINEER

54015.00

Rs

176407.00

FORMAT - F7

PMGSY Ph. IAP


COST ESTIMATE FOR ROADS CONSTRUCTION OF CROSS DRAINAGE WORKS
NAME OF THE WORK: R/F xxxxxxxxxxxxxxxxxxxxxxxx to yyyyyyyyyyyyyyyyyyy
Type of Cross Drainage work:

2 Vent RCC NP3 pipe culvert (1000mm dia)


Estt.Cost.Rs.

Sl.
No.

Description of Item

No

Length (m)

2
1

8.20
4.70

1.40
3.00
NET :

1.200
1.550

Rate (Rs) unit per


9

Amount
(Rs)

10

27.552
21.855
49.407

83.99

4150.00

3994.06

61900.00

4402.31

149960.00

Providing concrete for plain concrete M 10 grade in open foundations


using 40 mm nominal size Graded hard stone aggregate, mechanically
mixed, placed in foundation and compacted by vibration including curing
for 14 days complete as per drawings and technical specifications
Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH
,including overhead charges & Contractors profit but excluding VAT.

Head Walls

8.20

1.40

0.300

6.888

Beddinhg for pipes

8.20

3.00

0.350

8.610

NET :
3

Quantity

Lakhs

Earthwork in excavation for structures as per drawing and technical


specifications Clause 305.1 including setting out, construction of shoring
and bracing, removal of stumps and other deleterious material and
disposal upto a lead of 50 m, dressing of sides and bottom and
backfilling in trenches with excavated suitable material as per Technical
Specification 305 MORD / 304 MORTH ,including overhead charges &
Contractors profit but excluding VAT.
Head Walls
Beddinhg for pipes

Width( Thinkness(
m)
m)

3.24

15.498

Plain cement concrete M 15 grade using 40,20 & 10mm metal


mechanically mixed in substructure complete as per drawings and
technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204
MORD and 1500, 1700 & 2200 MORTH ,including overhead charges &
Contractors profit but excluding VAT.
Head Walls Sloped

7.90

Head Walls parapet wall

7.90

Deductions:
1000MM Dia vent PC

3.14 X (1.0X1.0) X 0.75 / 4

1.3+0.4
2

0.40

NET :

2.500

33.575

0.450

2.844
-2.355
34.064

Sl.
No.

Description of Item

No

Length (m)

Width( Thinkness(
m)
m)
5

Quantity
7

Rate (Rs) unit per


8

10

Providing and laying reinforced cement concrete pipe NP3 for culverts on
first class bedding of granular material including fixing collar with
cement mortar 1:2 but excluding excavation, protection works, backfilling,
concrete and masonry works in head wall and parapets. Tech
Specification Clause 1106 MORD ,including overhead charges &
Contractors profit but excluding VAT.
2 - VENT- 1000MM PC

7.50

15.000

7202.00

TOTAL :

ASST.EXE.ENGINEER
0

Amount
(Rs)

DY.EXECUTIVE ENGINEER

EXECUTIVE ENGINEER

SUPERINTENDING ENGINEER

108030.00

Rs

324040.00

FORMAT - F7

PMGSY Ph. IAP


COST ESTIMATE FOR ROADS CONSTRUCTION OF CROSS DRAINAGE WORKS
NAME OF THE WORK: R/F xxxxxxxxxxxxxxxxxxxxxxxx to yyyyyyyyyyyyyyyyyyy
Type of Cross Drainage work:

3 Vent RCC NP3 pipe culvert (1000mm dia)


Estt.Cost.Rs.

Sl.
No.

Description of Item

No

Length (m)

2
1

8.20
4.50

1.50
4.00
NET :

1.200
1.550

Quantity

Rate
(Rs)

unit per

Amount
(Rs)

10

29.520
27.900
57.420

83.99

4823.00

3994.06

51044.00

4402.31

144777.00

Providing concrete for plain concrete M 10 grade in open foundations


using 40 mm nominal size Graded hard stone aggregate, mechanically
mixed, placed in foundation and compacted by vibration including curing
for 14 days complete as per drawings and technical specifications
Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH
,including overhead charges & Contractors profit but excluding VAT.

Head Walls

8.20

1.50

0.300

7.380

Bedding for pipes

4.50

4.00

0.300

5.400

NET :
3

Lakhs

Earthwork in excavation for structures as per drawing and technical


specifications Clause 305.1 including setting out, construction of shoring
and bracing, removal of stumps and other deleterious material and
disposal upto a lead of 50 m, dressing of sides and bottom and
backfilling in trenches with excavated suitable material as per Technical
Specification 305 MORD / 304 MORTH ,including overhead charges &
Contractors profit but excluding VAT.
Head Walls
Beddinhg for pipes

Width( Thinkness(
m)
m)

3.63

12.780

Plain cement concrete M 15 grade using 40,20 & 10mm metal


mechanically mixed in substructure complete as per drawings and
technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204
MORD and 1500, 1700 & 2200 MORTH ,including overhead charges &
Contractors profit but excluding VAT.
Head Walls Sloped

7.90

Head Walls parapet wall

7.90

Deductions:
1000MM Dia vent PC

3.14 X (1.0X1.0) X 0.75 / 4

1.3+0.4
2

0.40

NET :

2.500

33.575

0.450

2.844
-3.533
32.887

Sl.
No.

Description of Item

No

Length (m)

Width( Thinkness(
m)
m)
5

Quantity

Rate
(Rs)

unit per

Amount
(Rs)

10

Providing and laying reinforced cement concrete pipe NP3 for culverts on
first class bedding of granular material including fixing collar with
cement mortar 1:2 but excluding excavation, protection works, backfilling,
concrete and masonry works in head wall and parapets. Tech
Specification Clause 1106 MORD ,including overhead charges &
Contractors profit but excluding VAT.
3 - VENT- 1000MM PC

7.50

22.500

7202.00

TOTAL :

ASST.EXE.ENGINEER
0

DY.EXECUTIVE ENGINEER

EXECUTIVE ENGINEER

SUPERINTENDING ENGINEER

162045.00

Rs

362689.00

FORMAT - F7

PMGSY Ph. IAP


COST ESTIMATE FOR ROADS CONSTRUCTION OF CROSS DRAINAGE WORKS
NAME OF THE WORK: R/F xxxxxxxxxxxxxxxxxxxxxxxx to
yyyyyyyyyyyyyyyyyyy
1V 5M Span RCC slab culvert
Type of Cross Drainage work:
Sl.
No
1

Description of item

Nos

Qty in
cum

Rate

Per

Amount

83.99

1 cum

3346

3.98
3.98
3994.06 1Cum

15896

Earthwork in excavation for structures as per drawing and technical


specifications Clause 305.1 including setting out, construction of
shoring and bracing, removal of stumps and other deleterious
material and disposal upto a lead of 50 m, dressing of sides and
bottom and backfilling in trenches with excavated suitable material
as per Technical Specification 305 MORD / 304 MORTH ,including
overhead charges & Contractors profit but excluding VAT.
Open foundation

3.20

8.300

1.50

39.84
39.84
Cum

Providing concrete for plain concrete M 10


grade in open
foundations using 40 mm nominal size Graded hard stone
aggregate, mechanically mixed, placed in foundation and
compacted by vibration including curing for 14 days complete as per
drawings and technical specifications Clause 802, 803, 1202 &
1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead
charges & Contractors profit but excluding VAT.
Open foundation

3.20

8.30

0.15

Cum
3

Plain cement concrete M 15 grade using 40,20 & 10mm metal


mechanically mixed in substructure complete as per drawings and
technical specification Clauses 802, 804, 805, 806, 807, 1202 and
1204 MORD and 1500, 1700 & 2200 MORTH ,including overhead
charges & Contractors profit but excluding VAT.
Footings for abutments-1,

1.20

8.10

0.20

3.88

Footings for abutments-2

1.00

7.90

0.20

3.16

Footings for abutments-3

0.80

7.70

0.20

2.46

For Aburtment

0.6+0.4
2

7.500

0.90

6.75
16.25

4402.31 1Cum

71538

Sl.
No

Description of item

Nos

Qty in
cum

Rate

Per

Amount

Cum
4

Providing concrete for reinforced concrete M 20 grade (Design Mix)


in open foundations using 20 & 10 mm nominal size Graded hard
stone aggregate, mechanically mixed, placed in foundation and
compacted by vibration including curing for 14 days complete as per
drawings and technical specifications Clause 802, 803, 1202 &
1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead
charges & Contractors profit but excluding VAT.
For Aburtment Bed blocks

7.50

0.400

0.20

1.20
1.200
5327.00 1Cum

6392

4.05 5925.02 1Cum

23996

Reinforced cement concrete M25 grade (Design Mix) using 20 &


10mm metal mechanically mixed in substructure complete as per
drawings and technical specification Clauses 802, 804, 805, 806,
807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH
,including overhead charges & Contractors profit but excluding VAT
upto 5m height.
Slab

1.80

7.50

0.30

Backfilling behind abutment, wing wall and return wall complete as


per drawings & technical specification Clause 1204.3.8 MORD /
710.14 of IRC, 78 & 2200 MORTH
for Approaches

5.00

6.50

0.3+0.9
2

39.00

39.00
7

467.45

1Cum

Supplying, fitting, and placing HYSD bar reinforcement in


superstructure complete as per drawing and technical specifications
Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars
below 36 mm dia including over laps and wastage, where they are
not welded ,including overhead charges & Contractors profit but
excluding VAT.
1.00

52536.44 MT

Total:

ASST.EXE.ENGINEER
0

18231

DY.EXECUTIVE ENGINEER

EXECUTIVE ENGINEER

SUPERINTENDING ENGINEER

52536

191935

FORMAT - F7

PMGSY Ph. IAP


COST ESTIMATE FOR ROADS CONSTRUCTION OF CROSS DRAINAGE WORKS
NAME OF THE WORK: R/F xxxxxxxxxxxxxxxxxxxxxxxx to
yyyyyyyyyyyyyyyyyyy
1V 5M Span RCC slab culvert
Type of Cross Drainage work:
Sl.
No
1

Description of item

Nos

Qty in
cum

Rate

Per

Amount

83.99

1 cum

19066

3994.06 1Cum

196867

Earthwork in excavation for structures as per drawing and technical


specifications Clause 305.1 including setting out, construction of shoring
and bracing, removal of stumps and other deleterious material and disposal
upto a lead of 50 m, dressing of sides and bottom and backfilling in
trenches with excavated suitable material as per Technical Specification
305 MORD / 304 MORTH ,including overhead charges & Contractors profit
but excluding VAT.
For open foundation

7.00

10.000

2.00

140.00

Return walls

5.00

2.900

1.50

87.00
227.00
Cum

Providing concrete for plain concrete M 10 grade in open foundations


using 40 mm nominal size Graded hard stone aggregate, mechanically
mixed, placed in foundation and compacted by vibration including curing for
14 days complete as per drawings and technical specifications Clause 802,
803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including
overhead charges & Contractors profit but excluding VAT.

for open foundation


Return walls

1
2

x
x

1
2

7.00
5.00

10.00
2.90

0.30
0.23

21.00
13.34

For approaches

5.00

6.50

0.23

14.95
49.29
Cum

Plain cement concrete M 15 grade using 40,20 & 10mm metal


mechanically mixed in substructure complete as per drawings and technical
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and
1500, 1700 & 2200 MORTH ,including overhead charges & Contractors
profit but excluding VAT.
For Abuments 1st Footing

2.70

8.700

0.40

18.79

Return walls

5.00

2.700

0.40

21.60

For Abuments 2nd Footing

2.30

8.30

0.40

15.27

Sl.
No

Description of item

Nos

Qty in
cum

Return walls

5.00

2.30

0.40

18.40

For Abuments 3rd Footing

1.90

7.90

0.40

12.01

Return walls

5.00

1.90

0.40

15.20
101.27

Rate

Per

Amount

4402.31 1Cum

445831

4402.31 1Cum

321974

3.60
3.00
6.600

5327.00 1Cum

35158

18.54

5925.02 1Cum

109872

14.63
14.63

1853.12 1Cum

27102

Cum
4

Plain cement concrete M 15 grade using 40,20 & 10mm metal


mechanically mixed in substructure complete as per drawings and technical
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and
1500, 1700 & 2200 MORTH ,including overhead charges & Contractors
profit but excluding VAT.
For Aburtment

1.55+0.76
2

7.500

1.50

25.99

Return walls

5.00

1.55+0.5
2

2.30

47.15
73.14
Cum

Providing concrete for reinforced concrete M 20 grade (Design Mix) in open


foundations using 20 & 10 mm nominal size Graded hard stone aggregate,
mechanically mixed, placed in foundation and compacted by vibration
including curing for 14 days complete as per drawings and technical
specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 &
2100 MORTH ,including overhead charges & Contractors profit but
excluding VAT.
For Aburtment
Dirt wall

x
x

2
2

7.50
7.50

0.800
0.40

0.30
0.50

Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm
metal mechanically mixed in substructure complete as per drawings and
technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204
MORD and 1500, 1700 & 2200 MORTH ,including overhead charges &
Contractors profit but excluding VAT upto 5m height.
Slab

1
1

7.50

5.75

0.43

Providing and laying pitching on slopes laid over prepared filter media as
per drawing and technical specifications Clause 1302 MORD / 2504
MORTH
for Approaches

5.00

6.50

0.225

Sl.
No
8

Description of item

Nos

Qty in
cum

Rate

Per

467.45

1Cum

139768

3.23
4.88
8.11

5673.06 1Cum

46005

5.00

52536.44 MT

Backfilling behind abutment, wing wall and return wall complete as per
drawings & technical specification Clause 1204.3.8 MORD / 710.14 of IRC,
78 & 2200 MORTH
for Approaches

20.00

6.50

2+0.3
2

299.00
299.00

Amount

Providing and laying cement concrete wearing course M 30 (Design Mix)


grade using 20 & 10mm metal mechanically mixed excluding reinforcement
complete as per drawing and technical specifications Clauses 800 and
1206.3 MORD and 2702 MORTH ,including overhead charges &
Contractors profit but excluding cost of steel and VAT.
on slab
Approaches

1
1

x
x

1
2

7.50
5.00

5.75
6.50

0.075
0.075

10 Supplying, fitting, and placing HYSD bar reinforcement in superstructure


complete as per drawing and technical specifications Clauses 1002, 1010
and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over
laps and wastage, where they are not welded ,including overhead charges
& Contractors profit but excluding VAT.

11 50mm at GI pipes of of CB

50

400.00
Total:

ASST.EXE.ENGINEER
0

DY.EXECUTIVE ENGINEER

EXECUTIVE ENGINEER

SUPERINTENDING ENGINEER

Rmt

262682
20000
1624325

FORMAT - F7

GRANT: PMGSY -X

PACKAGE NO:

COST ESTIMATE FOR ROADS CONSTRUCTION OF CROSS DRAINAGE WORKS


NAME OF THE WORK: R/F xxxxxxxxxxxxxxxxxxxxxxxx to yyyyyyyyyyyyyyyyyyy
Type of Cross Drainage work:

CONSTRUCTION OF SIDE DRAIN


Estt.Cost.Rs. 0.00 Lakhs

Sl.
No.

Description of Item

No

Length (m)

Width(m Thinkness(
)
m)
5

0.00

1.00

0.500

unit
per

Amount
(Rs)

10

175.000

NET :

175.000

83.99

3994.06

4402.31

Rs

Providing concrete for plain concrete M 10 grade in open foundations


using 40 mm nominal size Graded hard stone aggregate, mechanically
mixed, placed in foundation and compacted by vibration including curing
for 14 days complete as per drawings and technical specifications Clause
802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including
overhead charges & Contractors profit but excluding VAT.
1/125 to 1/375

0.00

1.00

0.100

0.000

NET :
3

Rate
(Rs)

Earthwork in excavation for structures as per drawing and technical


specifications Clause 305.1 including setting out, construction of shoring
and bracing, removal of stumps and other deleterious material and
disposal upto a lead of 50 m, dressing of sides and bottom and backfilling
in trenches with excavated suitable material as per Technical
Specification 305 MORD / 304 MORTH ,including overhead charges &
Contractors profit but excluding VAT.
1/125 to 1/375

Quantity

0.000

Plain cement concrete M 15 grade using 40,20 & 10mm metal


mechanically mixed in substructure complete as per drawings and
technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204
MORD and 1500, 1700 & 2200 MORTH ,including overhead charges &
Contractors profit but excluding VAT.
1/125 to 1/375

0.00

0.23+0.15
2

0.600

0.000

0.00

0.23+0.15
2

0.600

0.000

NET :

0.000
TOTAL :

ASST.EXE.ENGINEER

DY.EXECUTIVE ENGINEER

EXECUTIVE ENGINEER

SUPERINTENDING ENGINEER

25

SUB ESTIMATE FOR ROAD FURNITURE


NAME OF THE WORK: R/F xxxxxxxxxxxxxxxxxxxxxxxx to
yyyyyyyyyyyyyyyyyyy
As per MORD specifications

Estt.Cost.Rs.

Sl.
No.

Description of Item

No

Length (m)

0.21

Lakhs

Width( Thinkness(
Amount
Quantity Rate (Rs) unit per
m)
m)
(Rs)
5

10

1 Reinforced cement concrete M15 grade kilometre stone/local stone of


standard design as per IRC:8 fixing in position including painting and
printing, etc as per drawing and Technical Specification Clause 1703
MORD / 804 MORTH
KM stones

1793.68 1 Each

7175

HM stone (200m stone)

11

11

507.29 1 Each

5580

507.29 1 Each

2401.19 1 Each

1699.87 1 Each

8499

Guard
stones
approaches)

(Bridge 0

2 Providing and erecting direction and place identifications of semi reflective


sign boards as per IRC:67 made of 2 mm thick M.S. Sheet duly stove
enameled paint in white colour in front and grey colour on back with red
reflective border of 70 mm width and required message, letters, figures
with reflective engineering grade tape as per MORD specifications of
required shade and colour. supported and welded on 47 mm x 47 mm of
12 SWG Square tube of 3050 mm height duly strengthened by 25 mm x 5
mm M/s flat iron on edges on back firmly fixed to the ground by means of
properly designed foundation with M15 grade cement concrete 450 mm x
450 mm x 600 mm, 600 mm below ground level as per drawings and
Technical Specification Clause 1701 MORD.

Village boards

3 Providing and fixing of semi reflective cautionary, mandatory and


informatory sign board as per IRC:67 made of 1.5 mm thick MS Sheet
duly stove white colour in front and gray colour on back with red reflective
border of 65 mm width and required letters and figures with reflective tape
engineering grade as per Clause 1701.3.9 of MORD for Rural Roads of
required shade and colour supported and welded on 47 mm x 47 mm 12
SWG sheet tube firmly fixed to the ground by means of properly designed
foundation with M15 grade cement concrete 450 mm x 450 mm x 600
mm, 600 mm below ground level as per drawings and Technical
Specification Clause 1701 MORD
Caution boards

Sl.
No.

Description of Item

No

Length (m)

Width( Thinkness(
Amount
Quantity Rate (Rs) unit per
m)
m)
(Rs)
5

10

4 Providing and fixing of typical PMGSY informatory sign board with as per
MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top
and middle plate duly welded with MS flat iron 25mm x 5m size on back
on edges. The lower plate will be we welded with MS angle irone frame of
25 mm x 25 mm x 5 mm. The angle iron frame of the lower most plate and
flat iron frame of middle plate will be welded to 2 nos. 75 mm x 75 mm of
12 SWG sheet tubes posts duly embedded in cement concrete M-15
grade blocks of 450 mm x 450 mm x 600 mm, 600 mm below ground
level. The top most diamond plate will be welded to middle plate by 47 mm
x 47mm of 12 SWG sheet tube. All M.s. will be stove enameled on both
sides. Lettering and printing arrows, border etc., will be pointed with ready
mixed synthetic enamel paint of superior quality in required shade and
colour. All sections of framed posts and steel tube will be painted with
primer and two coats of epoxy paint as per drawing clause 1701 MORD

Logo boards

8755.87 1 Each

5 Inforamtion board

10000.00 1 Each

6 Citizen information board

15000.00 1 Each

7 Inaguaration
stone

10000.00 1 Each

and

foundation

21254

ASST.EXE.ENGINEER
0

DY.EXECUTIVE ENGINEER

EXECUTIVE ENGINEER

SUPERINTENDING ENGINEER

Calculation of Seignorage Charges


NAME OF THE WORK: R/F xxxxxxxxxxxxxxxxxxxxxxxx to yyyyyyyyyyyyyyyyyyy
S.
No

Item

E/w for widening (side earth)

E/w for widening (Carted


earth)
GSB (35% metal & 65%
gravel)

Quantity
(finished
item)

Unit

Material

14068.44

Cum

Earth

14068.44

22.00

309506

297.19

Cum

Earth

297.19

22.00

6538

3240.90

Cum

Gravel

2689.95

22.00

59179

Metal

1458.41

50.00

72921

WBM Gr-II

0.00

Cum

WBM Gr-III

594.68

OGPC

Seal coat

CC pavement

9 Shoulders (100% gravel)


10 CD Works

Qty (collected)

Rate

Seignorage
Amount

0.00

50.00

Cum

Metal &
stone dust
Metal

862.29

50.00

43115

7929.20

Sqm

Metal

214.09

50.00

10705

7929.20

Sqm

Sand

47.575

40.00

1903

183.75

Sqm

Metal

165.38

50.00

8269

1666.00

Cum

Sand
Gravel

82.69
2015.86

40.00
22.00

3308
44349

175.00

Cum

Earth

175.00

22.00

3850

0.00

Cum

Metal

0.00

50.00

Sand

0.00

40.00

Metal

0.00

50.00

Sand

0.00

40.00

Metal

0.86

50.00

43

Sand

0.52

40.00

21

Metal

0.42

50.00

21

Sand

0.25

40.00

10

Metal

0.40

50.00

20

Sand

0.24

40.00

10

Metal

0.00

50.00

Sand

0.00

40.00

Metal

0.50

50.00

25

Sand

0.30

40.00

12

NIL

11 Side drain
E/W pipe culvert
M10 for foundations

M15 for Body walls

0.00

Cum

12 Road furniture
KM Stones

HM Stones

11

LOGO Board

Informatory Board

Sign Boards

Each
Each
Each
Each

Total Seignorage amount

ASST.EXE.ENGINEER

DY.EXECUTIVE ENGINEER

563805

EXECUTIVE ENGINEER

SUPERINTENDING ENGINEER

RATE ANALSIS AS PER MORD

Data Sheet

RATE ANALYSIS (2012-13)


GRANT: PMGSY -X

PACKAGE NO:

NAME OF THE WORK: R/F xxxxxxxxxxxxxxxxxxxxxxxx to yyyyyyyyyyyyyyyyyyy


S. No.

Index
Code

Description of item

Unit

Qty

Rate

Amount

Clearing and Grubbing Road Land

Clearing and grubbing road land including uprooting wild vegetation,

RBR-STCL-2

grass, bushes, shrubs, saplings and trees of girth upto 300 mm,
removal of stumps of such trees cut earlier and disposal of
unserviceable materials and stacking of serviceable material to be
used or auctioned, upto a lead of 1000 m including removal and
disposal of top organic soil not exceeding 150 mm in thickness as per
Technical Specification Clause 201 MORD/MORTH

including

overhead & Contractor profit but excluding VAT .


By Machanical Means
In area of non Throny Jungle (Light Jungle)
Unit =10 Sqm
Out put = 1 Hectare
a)

b)

c)

Labour
Mate
Mazdoor (un-skilled)
Machinery

day

0.00

day

4.16

250.00

1040.00

Dozer D-50 with attachment or suitable


machinery for removal of trees & stumps

hour

10.00

1499.25

14992.50

Tractor with trolley 3t


Total
Over head charges & Contractors profit @
18.00% on (a+b)
Rate for hectare

hour

1.00

361.00

361.00
16393.50
2950.83
19344.33

Deduct VAT @4.00%

-773.77
18570.56

Rate per 10 Sqm = (a+b+c)/10000


Construction of embankment with material obtained from road
way cutting by using Machinery
RBR-EECD-3

1.86

Construction of embankment with approved materials deposited at site


from roadway cutting and excavation from drain (not exceeding 0.6 m
depth) and foundation of other structures graded and compacted to
meet requirement of Tables 300.1 and 300.2 as per Technical
Specification Clause 301.5 MORD/ 305 MORTH including overhead
& Contract profit but excluding VAT

a)

Taking Out put = 100 Cum


Labour
Mate
Mazdoor

b)

Machinery
Dozer D-50 for spreading @ 200 cum per hour

day

0.52

260.00
250.00

0.00
130.00

hour

0.50

1499.25

749.63

RATE ANALSIS AS PER MORD


S. No.

Index
Code

Description of item

Unit

Data Sheet
Qty

Rate

Tractor with grader for grading @ 25 cum per


hour
Water tanker 6kl capacity

hour

4.00

361.00

1444.00

hour

2.00

372.00

744.00

Vibratory Roller 80-100 KN @100cum per hour

hour

1.00

2384.90

2384.90

Total
d)

Amount

5452.53

Add 18.00 % for Over head charges & Contractors profit

981.46

Rate for 100 cum

6433.99

Deduct VAT @4.00%

-218.10
6215.89

Rate per cum


3

62.16

RBR-EECD-4

Construction of Embankment with Material Obtained from Borrow


pits by Machinery
Construction of embankment with approved material obtained from
borrow pits with all lifts, transporting to site, spreading, grading to
required slope and compacting to meet requirement of Tables 300.1
and 300.2 with a lead upto 1000 m as per Technical Specification
Clause 301.5 MORD/ 305 MORTH including overhead charges &
Contractor profit, But excluding VAT
Unit = cum
a)

Taking output = 100 cum


Labour
day

1.04

250.00

260.00

b)

Mazdoor (Unskilled)
Machinery
Hydraulic Excavator 0.9 cum bucket capacity
@ 60 cum per hr

hour

1.67

2,600.30

4342.50

Tipper 5.5cum with 10T capacity

hour

4.50

818.30

3682.35

Dozer D50 for spreading @ 200 cum per hour

hour

0.50

1,499.25

749.63

Tractor with Grader @ 25 cum per hour


Water tanker 6 KL capacity
Vibratory Roller 80-100 KN @100cum per hour
Basic rate of formation of road with
borrow soils per Cum

hour
hour
hour

4.00
2.00
1.00

361.00
372.00
2384.90

1444.00
744.00
2384.90
13607.38

d)

Add 18.00 % for Over head charges & Contractors profit

2449.32
16056.70

Deduct VAT @4.00%

-544.29
15512.41

Rate per cum


Gravel / Soil - Aggregate Base (Table 400.2) Grading C
Construction of granular sub-base by providing well graded material
RBR-SBBS-2

(Gravel) , spreading in uniform layers with motor grader on prepared


surface, mixing by mix in place method with rotavator at OMC, and
compacting with three wheel 80-100 kN static roller / Vibratory Roller
80-100 kN capacity to achieve the desired density, complete as per
Technical Specification Clause 402 MORD, including overhead
charges & Contractor profit, But excluding VAT

155.12

RATE ANALSIS AS PER MORD


S. No.

Index
Code

Description of item

Data Sheet

Unit

Qty

Rate

Amount

Taking out put = 300 cum


a)

b)

c)

Labour
Mazdoor (Skilled)

day

2.40

250.00

600.00

Mazdoor (Un-Skilled)

day

8.00

250.00

2000.00

Vibratory Roller 80-100 KN @10cum per hour

hour

6.00

2384.90

14309.40

Water tanker 6kl capacity


Tractor with grader @ 25 cum per hour
Tractor with rotavator @ 25 cum per hour

hour
hour
hour

5.00
12.00
12.00

372.00
361.00
361.00

1860.00
4332.00
4332.00

cum

364.00

75.00

27300.00

Machinery

Material
Well graded granular sub-base material as per
table 400.2
Cost of materials
Gravel
Basic rate of Granular sub base for 300 cum

54733.40

a)

Basic rate of Granular sub base cum

182.44

c)

Add 18.00 % for Over head charges &


Contractors profit
Deduct VAT @4.00%

32.84
182.44

Rate per cum

207.98

Add for conveyance of gravel

cum

1.21

119.40

Rate per cum

144.47
352.45

Granular Sub-Base with Coarse Graded Material (Table:- 400- 2)


Construction of granular sub-base by providing well graded material
RBR-SBBS-2

-7.30

(28% metal chips, 72% gravel), spreading in uniform layers with motor
grader on prepared surface, mixing by mix in place method with
rotavator at OMC, and compacting with three wheel 80-100 kN static
roller / Vibratory Roller 80-100 kN capacity to achieve the desired
density and CBR not less than 30%, complete as per Technical
Specification Clause 402 MORD
Unit = cum
Taking output = 300 cum
a)

b)

Labour
Mate

day

Mazdoor skilled

day

2.40

315.00

756.00

Mazdoor

day

8.00

250.00

2000.00

Mortar Grader 110 HP @ 50 cum per hour

hour

6.00

2797.00

16782.00

Vibratory roller 8 -10 tonne

hour

6.00

2384.90

14309.40

Water tanker 6 KL capacity

hour

5.00

372.00

1860.00

367.00
361.00

4404.00
4332.00

Machinery

Tractor with rotavator @ 25 cum per hour


Tractor with Grader @ 25 cum per hour
c)

Material

For coarse graded Granular


Materials per table 400-2

sub-base

hour
hour

12.00
12.00

RATE ANALSIS AS PER MORD


S. No.

Index
Code

Data Sheet

Description of item

Unit

Qty

For grading-I Material (CBR Value minimum


30)
26.5 mm to 9.5 mm @ 28 per cent *2/3rd

cum

71.68

981.00

70318.08

35.84

723.13

25916.80

cum

276.48

75.00

20736.00

KL

18.00

9.5 to 4.75 mm @ 28 per cent * 1/3rd


Gravel 72 percent
Cost of water

Rate

Amount

0.00

Basic rate of Granular sub base for 300 cum

161414.28

a)

Basic rate of Granular sub base cum

538.05

c)

Add 18.00 % for Over head charges &


Contractors profit
Deduct VAT @4.00%

96.85
538.05

Rate per cum

613.38

Add for conveyance of gravel

cum

0.92

119.40

109.85

Add for conveyance of metal

cum

0.36

1126.50

405.54

Rate per cum

1128.77

WBM Grading 2 (using Graded Metal)

RBR-SBBS-9

-21.52

Providing, laying, spreading and compacting stone aggregates of


specific sizes to water bound macadam specification including
spreading in uniform thickness, hand packing, rolling with smooth
wheel roller 80-100 kN in stages to proper grade and camber, applying
and brooming, stone screening/binding materials to fill-up the
interstices of coarse aggregate, watering and compacting to the
required density grading 2 as per Technical Specification Clause 405
MORD .For compacted thickness of 75 mm including overhead
charges & Contractor profit, but excluding VAT
By Manual means
Taking out put = 360 cum

a)

b)

c)

Labour
Mazdoor (Skilled)

day

12.08

250.00

3020.00

Mazdoor (unskilled)

day

250.00

250.00

62500.00

Vibratory Roller 80-100 KN @60cum per hour

hour

6.00

2384.90

14309.40

Water tanker 6kl capacity

hour

24.00

372.00

8928.00

Cum

217.80

448.00

97574.40

Cum

200.38

600.00

120228.00

Cum

17.42

1068.00

18604.56

cum

86.40

526.25

45468.00

cum

28.80

260.00

7488.00

Machinery

Material (Total Qty 435.60 Cum)


60-63 mm IRC HBG Metal (50% of 435.60
cum)
40-45 mm IRC HBG Metal (46% of 435.60
cum)
19-22 mm IRC HBG Metal (4% of 435.60 cum)
Stone Screening
Type B 11.2 mm for Grading 2 @ 0.18 / 0.20
cum/10sqm
Binding Material @ 0.06 cum per 10 sqm for
Grading 2 material
Basic rate for 360 Cum
Rate per Cum

378120.36
1050.33

RATE ANALSIS AS PER MORD


S. No.

Index
Code

d)
e)

Description of item

Data Sheet

Unit

Qty

Rate

189.06

Over head charges & Contractors profit @


18.00%
Deduct VAT @4.00%
Add for conveyance of metal

cum

1.53

1050.33

-42.01

1126.50

1723.55

Rate per cum

2920.93

WBM Grading 3 (using Graded Metal)

RBR-SBBS-9

Amount

(i) Providing, laying, spreading and compacting stone aggregates of


specific sizes to water bound macadam specification including
spreading in uniform thickness, hand packing, rolling with smooth
wheel roller 80-100 kN in stages to proper grade and camber, applying
and brooming, stone screening to fill-up the interstices of coarse
aggregate, watering and compacting to the required density Grading 3
as per Technical Specification Clause 405 MORD/ MORTH 404. For
compacted thickness of 75 mm, including overhead charges &
Contractor profit, But excluding VAT
By Manual means
Taking out put = 360 cum

a)

b)

c)

Labour
Mazdoor (Skilled)

day

12.08

250.00

3020.00

Mazdoor (unskilled)

day

250.00

215.00

53750.00

Vibratory Roller 80-100 KN @60cum per hour

hour

6.00

2384.90

14309.40

Water tanker 6kl capacity

hour

24.00

372.00

8928.00

Cum

357.19

732.50

261641.68

Cum

78.41

1317.50

103305.18

86.40

260.00

22464.00

Machinery

Material (total Qty of Metal 435.60 Cum)


40-45 mm IRC HBG M/c Metal ( 82% of 435.60
Cum)
19-22.40 mm IRC HBG M/c Metal ( 18% of
435.60 cum)
Stone Screening
Type -B 11.2mm @ 0.18 cum per 10 sqm
(rate of 2.36 mm & below)
Binding Material

cum

Basic rate for 360 Cum

467418.26

Rate per Cum


d)

Over head charges & Contractors profit @


18.00%
Deduct VAT @4.00%
Add for conveyance of metal
Rate per cum
Cement Concrete Pavement

RBR-CCPV-5

1298.38
233.71

cum

1.45

1298.38

-51.94

1126.50

1633.43
3113.59

RATE ANALSIS AS PER MORD


Index
Code

RBR-CCPV-5

S. No.

Description of item

Unit

Data Sheet
Qty

Rate

Amount

Construction of
un-reinforced, dowel jointed at expansion and
construction joint only, plain cement concrete pavement, thickness as
per design, over a prepared sub base, with 43 grade cement or any
other type as per Clause 1501.2.2 M30 (Grade), coarse and fine
aggregates conforming to IS : 383, maximum in a concrete mixer of
not less than 0.2 cum capacity and appropeiate weigh batcher using
approved mix design, laid in approved fixed side formwork (steel
channel, laying and fixing of 125 mictron thick polythene film, wedges,
steel plates including levelling the formwork as per drawing),
spreading the concrete with sholvels, rakes, compacted using needle,
scareed and plate vibrators and finished in continuous operation
including provision of contraction and expansion, construction joints,
applying debonding strips, primer, sealant, dowel bars, near
approaches to bridge / culvert and construction joints, admixtures as
approved, curing of concrete slabs for 14- days, curing compound
(where specified) and water finishing to lines and grade as per
drawing and Technical Specification Clause 1501 MORD including
overhead charges & Contractors profit but excluding VAT.
Unit = cum
Taking output = 75cum (172.50 t)
(100x3.75 x 0.200)

a)

b)

Labour
Mason (1st class)

day

5.00

315.00

1575.00

Mason (2nd class)


Mazdoor (unskilled)

day
day

5.00
150.00

285.00
250.00

1425.00
37500.00

Mazdoor(skilled)
Surveyor

day
day

6.00
2.00

250.00
250.00

1500.00
500.00

Mazdoor (semi-skilled)

day
day

6.00
1.00

250.00
315.00

1500.00
315.00

Concrete mixer 0.28/0.40 cum capacity ( 6


mixers) with weight batcher and suitable
capacity calibrated water tank
Needle vibrator

Hour

36.00

370.00

13320.00

Hour

9.00

0.00

0.00

Screed vibrator

Hour

9.00

42.00

378.00

Plate vibrator

Hour

9.00

42.00

378.00

Water tanker 6 Kl. Capacity

Hour

5.00

372.00

1860.00

Air compressor ( 1hour initial + 1 hour final)

Hour

2.00

402.00

804.00

Cum
Cum
cum

44.55
22.95
33.75

1183.75
811.25
335.00

52736.06
18618.19
11306.25

28.125

5000.00

140625.00

Black smith for cutting of dowel bars including


removal of burrs, fabrications & fixing of dowel
bars
Machinery

c)

Material

(I)

Crushed stone coarse aggregates, grading will


be as per clause 1501.2.4.1 (Table 1500.1) of
specifications @ 0.90 Cum/cum of concrete

(ii)
(iii)

20mm
10mm
Sand as per IS:383 and conforming to clause
1500.2.4.2. @ 0.45 cum of concrete
Cement @ 375 Kg/cum of concrete

RATE ANALSIS AS PER MORD


S. No.

Index
Code

Description of item

(iv)

Polythene sheet 125 micron

(v)

Mild steel dowel bar 25mm dia of grade S


240.500 mm long 20 Nos. at culvert/bridge
slab and at construction joiont including 5
percent wastage
(4x20x0.500) + 5 per cent wastage = 42m @
2.80 Kg per m = 117.6 kg.

Unit

Qty

Rate

sqm

412.5

17.00

7012.50

Kg

117.6

45.50

5350.80

0.005

36807.49

184.04

Litre

19.00

38.00

722.00

Jute rope 12mm dia including 5 per cent wastage

90.00

6.00

540.00

Debonding strips 3.75m. (length) x 10mm


(width) x 5 mm (thick) cut-out of rubber fillter
board of similar material including 5 per cent
wastage

90.00

10.00

900.00

Polythene sheathing, covering 2/3rd dowel


bars (20x23) and tight fit including 5 per cent
wastage

No

483.00

0.55

265.65

Plasticizer 0.5 per cent by weight of cement

Litre

122.00

60.00

7320.00

Curing compound (if used) @ 0.33 litre per


sqm
Joint filler board 20mm thick as per IS:1838
(4x3.75x0.200 = 3 sqm)

Litre
sqm

131.25
3.00

60.00
750.00

7875.00
2250.00

Form work @ 3% on (a+b+c)

316760.49
9502.81

Cost for 75 cum = a+b+c+d

326263.30

Rate per Cum = (a+b+c+d+e)/75


(e)

4350.18

Over head charges & contracots profit @


18.00% on (a+b+c+d)
Deduct VAT @ 4%

783.03
4350.18

-174.01

Add for conveyance of metal

Cum

0.90

1126.50

1013.85

Add for conveyance of sand

Cum

0.45

74.60

33.57

Rate per cum

6006.63

Prime Coat
Low porosity
RBR-BASC-1

Amount

Bitumenous sealant 800 ml. Per joint for 23 joints

Bitumen primer @ 200ml. Per joint for 23 joints

(d)

Data Sheet

Providing and applying primer coat with bitumen emulsion (SS-1) on


prepared surface of granular base including cleaning of road surface
and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical
means as per Technical Specification Clause 502 MORD (for use on
Wet mix macadam & WBM) ,including overhead charges &
Contractors profit but excluding VAT.
Unit = sqm
Taking output = 1750 sqm
a) Labour
Mate
Mazdoor (Unskilled)

day
day

0.000
1.040

250.00
250.00

0.00
260.00

Hydraulic broom @ 1250 sqm per hour

hour

1.400

310.00

434.00

Air compressor 210 cfm

hour

1.400

402.00

562.80

Bitumen emulsion pressure distributor @ 1750


sqm/hour

hour

1.000

748.00

748.00

b) Machinery

RATE ANALSIS AS PER MORD


S. No.

Index
Code

Description of item

Data Sheet

Unit

Qty

hour

0.500

372.00

186.00

Bitumen emulsion (SS-1) @ 0.85 kg per sqm

1.480

30667.26

45387.54

Water

kl

3.000

0.00

0.00

Water tanker 6 kl capacity 1 trip per hour

Rate

Amount

c) Material

Cost of 1750 sqm = a+b+c

47578.34

(d)

Rate per sqm = (a+b+c)/1750

27.19

(e)

d,e)Over head charges & contracots profit


@ 18.00% on (a+b+c+d)
Deduct VAT @ 4%

4.89
27.19

Rate per sqm


10

-1.09
31.00

RBR-BASC-2

Providing and applying tack coat with Bitumen emulsion (RS-1) using
emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the
prepared granular surfaces treated with primer & cleaned with
Hydraulic

broom

as

per

Technical

Specification

Clause

503

MORD,including overhead charges & Contractors profit but excluding


VAT.
Unit = sqm
Taking output = 1750 sqm
a) Labour
Mate

day

0.000

250.00

0.00

Mazdoor (Unskilled)

day

1.040

250.00

260.00

hour
hour
hour

1.400
1.400
1.000

310.00
402.00
748.00

434.00
562.80
748.00

0.480

31405.03

15074.41

b) Machinery
Hydraulic broom @ 1250 sqm per hour
Air compressor 210 cfm
Emulsion pressure distributor @1750 sqm per
hour
c) Material
Bitumen emulsion (RS-1) @ 0.275 kg per sqm

(d)
(e)

e)Over head charges & contracots profit @


18.00% on (a+b+c+d)
Deduct VAT @ 4%
20mm thick Open-Graded Premix Carpet using Bituminous
(penetration grade/modified bitumen) Binder
Providing, laying and rolling of open-graded premix carpet of 20 mm

RBR-BASC-14

11

Cost of 1750 sqm = (a+b+c)


Rate per sqm = a+b+c/1750

thickness composed of 13.2 mm to 5.6 mm aggregates either using


penetration grade bitumen or emulsion to required line, grade and
level to serve as wearing course on a previously prepared base,
including mixing a suitable plant, laying and rolling with a three wheel
0-100 kN static roller capacity, finished to required level and grades to
be followed by seal coat of either type A or Type B or Type C as per
Technical Specification Clause 508 MORD.
Case - II By Mechanical Means
Bitumen (S-65)
Unit = sqm
Taking output = 4000 sqm (80 cum)

17079.21
9.76
1.76
9.76

-0.39
11.13

RATE ANALSIS AS PER MORD


S. No.

Index
Code

Description of item

Data Sheet

Unit

Qty

a) Labour
Mate
Mazdoor (Unskilled)
Mazdoor (Skilled)
b) Machinery

day
day
day

0.000
10.000
3.520

250.00
250.00
250.00

0.00
2500.00
880.00

HMP 30/40 t per hour

hour

6.000

16626.00

99756.00

Electric generator set 125 KVA

hour

6.000

1148.00

6888.00

Front end loader 1 cum bucket capacity

hour

6.000

1431.00

8586.00

Tipper 5.5 cum - 10 t capacity

hour

3.640

818.30

2978.61

Paver finisher

hour

6.000

2664.00

15984.00

Three wheel 80-100 kN static roller

hour

16.000

2384.90

38158.40

c) Material
Bitumen (S-65) @ 14.60 kg per 10 sqm
Crushed stone chipping, 13.2 mm to 5.6 mm
@ 0.27 cum per 10 sqm

t
cum

5.840
108.000

36807.49
808.33

214955.74
87300.00

d&e) Overheads & Contractors Profit

18.00%

477986.75

86037.62

Deduct 4% VAT
Cost of 4000 sqm = a+b+c+d+e

-4.00%

477986.75

-19119.47
544904.90

Rate per sqm = (a+b+c+d+e)/4000


Add for conveyance of metal

Cum

0.027

Rate

1126.50

Rate per Sqm

RBR-BASC-17

12

Amount

136.23
30.42
166.65

Seal Coat
Providing and laying seal coat sealing the voids in a bituminous
surface laid to the specified levels, grade and cross fall using Type A,
Type B and Type C as per Technical Specification Clause 510 MORD.
(using Three wheel 80-100 kN static roller)
Case - II : Type B (510 - MORD)
Bitumen (S-65)
Unit = sqm
Taking output = 1250 sqm
a) Labour
Mate
Mazdoor (Unskilled)
Mazdoor (Semi-Skilled)
b) Machinery

day
day
day

0.000
15.000
2.850

250.00
250.00
250.00

0.00
3750.00
712.50

Mixall 6/10 t capacity

hour

2.500

520.00

1300.00

Three wheel 80-100 kN static roller


Bitumen boiler oil fired 1000 litre capacity fitted
with spray set

hour
hour

2.500
2.500

2384.90
182.00

5962.25
455.00

t
cum

0.850
7.500

36807.49
335.00

31286.37
2512.50

18.00%
-4.00%

45978.62
45978.62

8276.15
-1839.14
52415.63
41.93
6.76

c) Material
Bitumen (S-65) @ 6.80 kg per 10 sqm
Crushed sand or grit as passing 2.36 mm sieve
and retained on 180 micron sieve applied @
0.06 cum/10 sqm
d&e) Overheads & Contractors Profit
Deduct 4% VAT
Cost of 1250 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/1250
Add for conveyance of sand
Rate per Sqm

Cum

0.006

1126.50

48.69

RATE ANALYSIS AS PER MORD

(CD WORKS)
S.
No.

Index
Code

13

Description of item

Unit

Qty

Rate

Amount

Excavation for Structures

RBR-FNDN-1

Excavation of structures:
Earthwork in excavation for structures as per drawing and technical
specifications Clause 305.1 including setting out, construction of shoring and
bracing, removal of stumps and other deleterious material and disposal upto
a lead of 50 m, dressing of sides and bottom and backfilling in trenches with
excavated suitable material as per Technical Specification 305 MORD / 304
MORTH ,including overhead charges & Contractors profit but excluding VAT.
Note : Classifications of Earth Work Specification are as per 302.2.1(a)
of MORD and 301.2.1 of MORT&H
Ordinary soil
Mechanical Means
i

Upto 3 m depth
Unit = cum
Taking output = 240 cum
a) Labour
Mate

day

0.00

250.00

0.00

Mazdoor (Unskilled)

day

8.32

250.00

2080.00

hour

6.00

2600.30

15601.80

b) Machinery
Hydraulic Excavator 1 cum bucket capacity

17681.80
Overheads & Contractors Profit @18%

3182.72

Cost for 240 cum = a+b+c+d

20864.52

Deduct 4% VAT

-707.27
20157.25

Rate per cum = /240

83.99

Note : 1. Cost of dewatering upto 5% of a+b may be added, where required,


up to 10 per cent of labour cost. Assessment for dewatering shall be made
as per site conditions.

RBR-FNDN-4

14

Providing concrete for plain concrete M 10 grade in open foundations


using 40 mm nominal size Graded hard stone aggregate, mechanically
mixed, placed in foundation and compacted by vibration including curing for
14 days complete as per drawings and technical specifications Clause 802,
803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including
overhead charges & Contractors profit but excluding VAT.
P.C.C grade M 10
Nominal mix 1:3:6
Unit = cum
(a) Material
Cement

0.22

5000.00

1100.00

Coarse sand

cum

0.45

335.00

150.75

40 mm aggregate

cum

0.9

732.50

659.25

RATE ANALYSIS AS PER MORD

(CD WORKS)
S.
No.

Index
Code

Description of item
Water

Unit
kl

Qty

Rate

Amount

1.2

0.00

0.00

(b) Labour
Mate

day

250.00

0.00

Mason (1st Class)

day

0.10

315.00

31.50

Mazdoor (Unskilled)

day

1.39

250.00

347.50

Mechanical concrete mixer 0.4/0.28 cum capacity fitted


with water measuring device and preferably also with
load cell.

hour

0.40

370.00

148.00

Water tanker 6 kl capacity

hour

0.13

372.00

48.36

4.00%

2485.36

99.41

(c) Machinery

(d) Formwork @ 4% on cost of material, labour and


machinery (a+b+c)

2584.77
Overheads & Contractors Profit @18%

465.26

Deduct 4% VAT

2584.77

-103.39

Add for conveyance of sand

cum

0.45

74.60

33.57

Add for conveyance of metal

cum

0.90

1126.50

1013.85

Rate per cum = a+b+c+d+e+f

RBR-PCVT-3

15

3994.06

Providing and Laying Reinforced Cement Concrete Pipe NP3 as per


design.
Providing and laying reinforced cement concrete pipe NP3 for culverts on
first class bedding of granular material including fixing collar with cement
mortar 1:2 but excluding excavation, protection works, backfilling, concrete
and masonry works in head wall and parapets. Tech Specification Clause
1106 MORD ,including overhead charges & Contractors profit but excluding
VAT.
Unit = m
Taking output = 7.5 m

34

(3 pipes of 2.5 m length each)

i)

1000 mm dia
a) Labour
Mate

day

0.00

315.00

Mason (1st Class)

day

0.25

315.00

78.75

Mazdoor (Unskilled)

day

2.09

250.00

522.50

Laying & fixing of Pipes with colors in position including


lifting, aligning etc.,
b) Material

rm

cum

0.04

335.00

13.40

Cement at site

0.03

5000.00

150.00

RCC pipe NP3 pipe including collar at site

7.50

5966.40

44748.00

nos

2.00

932.88

1865.76

Sand at site

RCC pipe NP3 collar at site

0.00

47378.41
Overheads & Contractors Profit @ 18%

8528.11

Deduct 4% VAT

47378.41

Cost for 7.5 m = a+b+c+d

54011.39

Rate per m = (a+b+c+d)/7.5


Add for conveyance of sand

-1895.14
7201.52

cum

0.01

74.60

0.75

RATE ANALYSIS AS PER MORD

(CD WORKS)
S.
No.

Index
Code

Description of item

Unit

Qty

Rate

Rate per m =
iii)

Amount
7202.00

600 mm dia
a) Labour
Mate
Mason (1st Class)
Mazdoor (Unskilled)

0.00
0.15
1.25

315.00
315.00
250.00

0.00
47.25
312.50

-0.20

359.75

-71.95

cum

0.024

335.00

8.04

Cement at site

0.018

5000.00

90.00

RCC pipe NP3 pipe including collar at site

7.50

2372.28

17792.10

nos

2.00

374.40

748.80

Laying & fixing of Pipes with colors in position including


lifting, aligning etc.,
Deduct 20% for 600 mm dia pipes

day
day
day
rm

b) Material
Sand at site

RCC pipe NP3 collar at site

18926.74
Overheads & Contractors Profit @ 18%

3406.81

Deduct 4% VAT

22333.55

Cost for 7.5 m = a+b+c+d

21440.21

Rate per m = (a+b+c+d)/7.5


Add for conveyance of sand

2858.69
cum

0.01

74.60

Rate per m =

RBR-SBST-5

16

-893.34

0.75
2859.00

Plain cement concrete M 15 grade using 40,20 & 10mm metal


mechanically mixed in substructure complete as per drawings and
technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204
MORD and 1500, 1700 & 2200 MORTH ,including overhead charges &
Contractors profit but excluding VAT.
Note : Water for concrete : A provision for cost of water may be added at 1.2
kl / 1 cum (including curing purpose) keeping the site conditions
Coarse Aggregate : Single grade nominal size can also be used instead of
graded metal, keeping the site conditions in view
For height upto 5 m
Unit = cum
P.C.C grade M 15
Nominal mix (1:2.5:5) using CC Mixer (MORD)
Unit = cum
(a) Material
Cement

0.275

5000.00

1375.00

Coarse sand
40 mm aggregate

cum
cum

0.480
0.480

335.00
732.50

160.80
351.60

20 mm aggregate
10 mm aggregate

cum
cum

0.240
0.080

1183.75
811.25

284.10
64.90

Mate

day

0.000

250.00

0.00

Mason (1st Class)

day

0.100

315.00

31.50

(b) Labour

RATE ANALYSIS AS PER MORD

(CD WORKS)
S.
No.

Index
Code

Description of item
Mazdoor (Unskilled)

Unit

Qty

Rate

Amount

day

1.390

250.00

347.50

hour

0.400

370.00

148.00

10.00%

2763.40

276.34

(c) Machinery
Concrete mixer 0.4/0.28 cum capacity
(d) Formwork @ 10% on cost of material, labour and
machinery (a+b+c)

3039.74
Overheads & Contractors Profit @ 18%

547.15

Deduct 4% VAT

3039.74

-121.59

Add for conveyance of sand

cum

0.48

74.60

35.81

Add for conveyance of metal

cum

0.80

1126.50

901.20

Rate per cum = a+b+c+d+e+f


6

17

RBRTSRA-6

4402.31

Painting Two Coats on New Concrete Surfaces


Painting two coats including primer coat after filling the surface with synthetic
enamel paint in all shades on new, plastered / concrete surfaces as per
drawing and Technical Specification Clause 1701MORD.
Unit = sqm
Taking output = 40 sqm
a) Labour
Mate

day

Painter (1st Class)


Painter Assistant

day
day

3.00

350.00

1050.00

Mazdoor (Unskilled)
b) Material
Cement Primer as per specifications

day

2.20

250.00

550.00

litre

3.00

90.00

270.00

Paint conforming to requirement of Clause 1701.3.8

litre

6.00

200.00

1200.00

3070.00
3070.00

552.60
-122.80
3499.80

Add for scaffolding @ 1 per cent of labour cost where


required
Filling Material on Paint Cost
c&d) Overheads & Contractors Profit at 18%
Deduct 4% VAT
Cost for 40 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/40
18

RBRPTWK-5

87.50

Providing and laying pitching on slopes laid over prepared filter media as per
drawing and technical specifications Clause 1302 MORD / 2504 MORTH
Stone/Boulder
Unit = cum
(a) Material
Stone boulder (25 kg minimum) /(MORTH - 40 kg)

cum

1.00

110.00

110.00

Stone spalls of minimum 25 mm size

cum

0.20

110.00

22.00

Mate

day

0.00

Mason 1st Class

day

0.35

(b) Labour
0.00
315.00

110.25

RATE ANALYSIS AS PER MORD

(CD WORKS)
S.
No.

Index
Code

Description of item
Mazdoor (Unskilled)

Unit
day

Overheads & Contractors Profit @18%


Deduct 4% VAT
Add for conveyance of stone

cum

Qty

Rate

Amount

0.79

250.00

197.50

18.00%

439.75

79.16

-4.00%

439.75

-17.59

1.20

1126.50

1351.80

Rate per cum = (a+b+c+d)

1853.12

Printing New Letters and Figures of any Shade


19

RBRTSRA-1

Printing new letter and figures of any shade with synthetic enamel paint black
or any other approved colour to give an even shade as per drawings and
Technical Specification Clause 1701 MORD / 801 MORTH
English and Roman
Hyphens, commas and the like not to be measured and
paid for.
Detail for 100 letters of 160 mm height, i.e. 1600 cm
Unit = per cm height per letter
a) Labour
Mate

day

Painter 1st Class

day

Painter Assistant

day

Mazdoor (Unskilled)

1.25

350.00

437.50

day

0.57

250.00

142.50

litre

0.50

200.00

100.00

c&d) Overheads & Contractors Profit at 18%

680.00

122.40

Deduct 4% VAT

680.00

b) Material
Paint

Cost for 1600 cm = a+b+c+d


Rate per cm height per letter = (a+b+c+d)/1600

20

RBRTSRA-9

-27.20
775.20
0.48

Painting on Concrete/Steel Surfaces with Epoxy


Painting two coats including prime coat with epoxy paint of approved brand
on concrete/steel surfaces after through cleaning of surface to give an even
shade as per drawing and Technical Specification Clause 1701 MORD
Unit = sqm
Taking output = 10 sqm
a) Labour
Mate

day

Painter (1st Class)

day

0.60

350.00

210.00

Mazdoor (Unskilled)

day

0.65

250.00

162.50

Epoxy primer / Red-oxide

litre

0.60

110.00

66.00

Epoxy paint

litre

1.25

200.00

250.00

Add @ 1 per cent on cost of material for scaffolding


wherever required
c&d) Overheads & Contractors Profit at 18%

688.50

123.93

Deduct 4% VAT

688.50

-27.54

b) Material

RATE ANALYSIS AS PER MORD

(CD WORKS)
S.
No.

Index
Code

Description of item

Unit

Qty

Rate

Cost for 10 sqm = a+b+c+d

784.89

Rate per sqm = (a+b+c+d)/10


21

Amount

78.49

Kilometre Stone
RBRTSRA-13

Reinforced cement concrete M15 grade kilometre stone/local stone of


standard design as per IRC:8 fixing in position including painting and
printing, etc as per drawing and Technical Specification Clause 1703 MORD /
804 MORTH
Ordinary Kilometer Stone (Precast)
Unit = each
Taking output = 14 Nos.
a) M-15 grade of concrete
As per item No. 5 (i) or (ii) of Chapter 12
b) Steel reinforcement @ 5 kg per sqm
As per item No. 6 of Chapter 12
c) Excavation in soil for foundation
As per item No. 1 of Chapter 11
d) Painting two coats on concrete surface

cum

3.77

4402.31

16596.72

kg

26.32

57.58

1515.39

cum

2.77

83.99

232.65

11.41

87.50

998.32

1680.00

0.48

813.96

day
day
day

1.00
7.32

350.00
250.00

350.00
1830.00

hour

6.00

361.00
4346.00

2166.00
782.28

4346.00

-173.84

As per item No.6 of Chapter 10


sqm
e) lettering on km post (average 12 letters of 10 cm
height each)
As per item No. 1 of Chapter 10
per cm
high per
letter
Transportation and fixing
f) Labour
Mate
Mason (1st Class)
Mazdoor (Unskilled)
g) Machinery
50 HP Tractor with trolley
h&i) Overheads & Contractors Profit at 18% on
Labour
Deduct 4% VAT on labour
j) Cost for 14 Nos. ordinary km
(a+b+c+d+e+f+g+h+i)
Rate for each ordinary km stone = j/ 14

stone

25111.48
1793.68

200 m / Hectometer stone (precast)


Unit = each
Taking output = 33 Nos.
a) M-15 grade of concrete
As per item No. 5 (i) or (ii) of Chapter 12

cum

1.58

4402.31

6955.66

b) Steel reinforcement @ 5 kg per sqm


As per item No. 6 of Chapter 12

kg

66.00

57.58

3800.00

c) Excavation in soil for foundation


As per item No. 1 of Chapter 11
d) Painting two coats on concrete surface

cum

1.39

83.99

116.75

As per item No.5 of Chapter 10

sqm

6.27

87.50

548.59

per cm
high per
letter

330.00

0.48

159.89

e) lettering on km post (average 1 letter of 10 cm height


each)
As per item No. 1 of Chapter 10

RATE ANALYSIS AS PER MORD

(CD WORKS)
S.
No.

Index
Code

Description of item

Unit

Qty

Rate

Amount

day
day

1.50
7.34

350.00
250.00

525.00
1835.00

hour

6.00

361.00
4526.00

2166.00
814.68

4526.00

-181.04

Transportation and fixing


f) Labour
Mason (1st Class)
Mazdoor (Unskilled)
g) Machinery
50 HP Tractor with trolley
h&i) Overheads & Contractors Profit at 18% on
Labour
Deduct 4% VAT on labour
j) Cost for 33 Nos. 200m stone = (a+b+c+d+e+f+g+h+i)

16740.53

Rate for each 200 m stone = j / 33

507.29

Note : 1. The rate for excavation, cement concrete, steel reinforcement, painting and lettering
may be taken from respective Chapters.
2. In case local stone is to be used in place of precast RCC stones, then rate of cement
concrete and steel reinforcement may be deleted.
B

RBR-TSRA-2

22

Semi Reflective Traffic Signs


Providing and fixing of semi reflective cautionary, mandatory and informatory
sign board as per IRC:67 made of 1.5 mm thick MS Sheet duly stove white
colour in front and gray colour on back with red reflective border of 65 mm
width and required letters and figures with reflective tape engineering grade
as per Clause 1701.3.9 of MORD for Rural Roads of required shade and
colour supported and welded on 47 mm x 47 mm 12 SWG sheet tube firmly
fixed to the ground by means of properly designed foundation with M15
grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground
level as per drawings and Technical Specification Clause 1701 MORD
Unit = Each
Taking output = one traffic sign
(i) Excavation for foundation
As per item No. 1 of Chapter 11

cum

0.126

83.99

10.58

cum

0.126

4402.31

554.69

sqm

0.46

78.49

36.10

day
day

0.26

250.00

65.00

(I) 47 mm x 47 mm x 12 SWG Sheet 3050 mm long

kg

12.40

50.50

626.20

(II) Angle iron 50 x 50 x 6 mm for hold fast including 5%


wastage
Add 3% cost of MS Sheet tube 12 SWG and angle irons
towards the cost of fabrication, drilling holes, nuts and
bolts etc.

kg

1.06

50.50

53.53

3%

679.73

20.39

(ii) Cement concrete M15 grade


As per item No. 4 (A) (iii) or (iv) of Chapter 11
(iii) Painting two coats including prime coat on
concrete surface with Epoxy Paint as per
specifications
As per item No. 9 of this Chapter
(a) labour (For fixing at site)
Mate
Mazdoor (Unskilled)
b) Material
Support of M.S. Sheet tube

RATE ANALYSIS AS PER MORD

(CD WORKS)
S.
No.

Index
Code

Description of item

Unit

Qty

Rate

(III) 1.5 mm thick M.S. Sheet duly painted with stove


enameled paint including lettering, signs, border,
message with reflective tape of engineering grade
required size, shade and colour as per Technical
Specifications

sqm

0.36

(vi) 600 mm x 600 mm square (0.36SQm X 0.0015m X


7850/Kgcum)
(c) Machinery
Tractor with trolley

Kg

4.24

40.00

hour

0.08

361.00
963.60
963.60

Amount

169.60

28.88
173.45
Deduct 4% VAT
-38.54
Rate per traffic sign = (i+ii+iii+a+b+c+d+e)
1699.87
Note : 1. Any one area of M.S. Sheet given at (i) to (viii) may be adopted as per site requirement and
in accordance with IRC-67.
d&e) Overheads& Contractors Profit on a+b+c 18%

2. The rate for excavation, cement concrete M-15, and painting may be taken from respective
Chapters.
3. The depth of foundation and quantity of cement in the foundation are indicative. These may
be increased for areas having higher wind velocities like in coastal area. This is applicable to
all road signs and direction boards.
B

Semi-Reflective Traffic signs


Direction and place identification signs up to 0.9 sqm size board

RBR-TSRA-3

23

Providing and erecting direction and place identifications of semi reflective


sign boards as per IRC:67 made of 2 mm thick M.S. Sheet duly stove
enameled paint in white colour in front and grey colour on back with red
reflective border of 70 mm width and required message, letters, figures with
reflective engineering grade tape as per MORD specifications of required
shade and colour. supported and welded on 47 mm x 47 mm of 12 SWG
Square tube of 3050 mm height duly strengthened by 25 mm x 5 mm M/s flat
iron on edges on back firmly fixed to the ground by means of properly
designed foundation with M15 grade cement concrete 450 mm x 450 mm x
600 mm, 600 mm below ground level as per drawings and Technical
Specification Clause 1701 MORD.

Unit = each
Take Output = 0.9 sqm
(i) Excavation for foundation
As per item No. 1 of Chapter 11

cum

0.126

83.99

10.58

cum

0.126

4402.31

554.69

sqm

0.59

78.49

46.31

(ii) Cement concrete M15 grade


As per item No. 4 (A) (iii) or (iv) of Chapter 11
(iii) Painting on M.S. tube post with primer and two
coat of epoxy paint as per specifications
As per item No.9 of Chapter 10
(a) labour (For fixing at site)
Mate

day

Mazdoor (Unskilled)

day

0.26

250.00

65.00

kg

12.40

50.50

626.20

b) Material
(i) Support of MS sheet tube
47 mm x 47 mm of 12 SWG sheet 3050 mm long

RATE ANALYSIS AS PER MORD

(CD WORKS)
S.
No.

Index
Code

Description of item

Unit

Qty

(ii) Angle iron 50 x 50 x 6 mm for lugs including 5%


wastage
(iii) 2 mm thick MS sheet strengthened by 25 mm x 5 mm
MS flat iron & painted with stove enameled paint
including lettering, signs, message, border with reflective
tape of engineering grade of required shade and colour
as per Technical Specifications.

kg

1.06

sqm

0.90

(0.90 Sqm X 0.002m X 7850/Kgcum)


Add 3% cost of MS sheet angle iron towards the cost of
fabrications, drilling, holes, nuts, bolts etc.
(c) Machinery
Tractor with trolley
d&e) Overheads& Contractors Profit on a+b+c 18%

hour

Rate

Amount

50.50

53.53

14.13

40.00

565.20

3%

679.73

20.39

0.08

361.00
1359.20

28.88
244.66

Deduct 4% VAT
1359.20
-54.37
Cost for 0.9 sqm = (i+ii+iii+a+b+c+d+e)
2161.07
Rate per sqm (for sign having area upto 0.9 sqm) =
2401.19
(i+ii+iii+a+b+c+d+e)/0.90
Note : Rate for excavation, cement concrete M15 and painting may be taken from respective
Chapters.
Providing and Fixing 'Informatory sign' of Project

RBR-TSRA-20

24

Providing and fixing of typical informatory sign board with as per MORD
specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle
plate duly welded with MS flat iron 25mm x 5m size on back on edges. The
lower plate will be we welded with MS angle irone frame of 25 mm x 25 mm x
5 mm. The angle iron frame of the lower most plate and flat iron frame of
middle plate will be welded to 2 nos. 75 mm x 75 mm of 12 SWG sheet
tubes posts duly embedded in cement concrete M-15 grade blocks of 450
mm x 450 mm x 600 mm, 600 mm below ground level. The top most
diamond plate will be welded to middle plate by 47 mm x 47mm of 12 SWG
sheet tube. All M.s. will be stove enameled on both sides. Lettering and
printing arrows, border etc., will be pointed with ready mixed synthetic
enamel paint of superior quality in required shade and colour. All sections of
framed posts and steel tube will be painted with primer and two coats of
epoxy paint as per drawing clause 1701 MORD
Unit = Each
Taking out put = one typical board
i) Excavation for foundation
As per item No. 1 of Chapter 11
(ii) Cement Concrete M15 grade

cum

0.252

83.99

21.17

As per item No. 4 (A) (iii) or (iv) of Chapter 11


(iii) Painting on MS Steel tubes with primer and two
coats of epoxy paint
2x2.05x.30 = 1.23

cum

0.252

4402.31

1109.38

sqm

1.80

78.49

141.28

1x1.10x188 = 0.21
As per item no. 9 of Chapter 10
(iv) Printing new letters and figures of any shade
with synthetic enamel paint black or any other
approved colour to give an even shade.
Logo Border 60x4x5 = 1200 per cm height per letter
Figure 60x10 = 600 per cm height per letter

RATE ANALYSIS AS PER MORD

(CD WORKS)
S.
No.

Index
Code

Description of item

Unit

Qty

per cm
height /
letter

4532.50

day
day

Rate

Amount

Middle plate words 28x5 = 140 per cm height per letter


Bottom plate border 150x2x5 = 1500 per cm height per
letter
Bottom plate border 60x2x5 = 600 per cm height per
letter
Words 101x2.5 = 252.5
Words 80x3 = 240.00
Total (4532.5 per cm height per letter)
As per item No. 1 of Chapter 10
a) Labour (for fixing at site)
Mate
Mazdoor (Unskilled)
b) Material
2 nos. MS tubes 75mx75mm of 12 SWG sheet 2650 mm
long
1 No. MS tube 47mm x 47mm of 12 SWG 1100 mm long
Angle iron 50mm x 50mm x 5 mm for lugs
1.6 mm thick MS sheet strengthened by 25mm x 5 MS flat iron
on logo and middle plate angle iron 25mm x 25mm x 5mm on
bottom plate painting with stove enameled paint on both sides
as per MORD specifications

0.48

2196.00

0.78

250.00

195.00

kg

63.15

50.5

3189.08

kg

4.47

50.5

225.74

kg

2.12

50.5

107.06

sqm

1.44

(1.44 Sqm X 0.0016m X 7850/Kgcum)


Add 3% cost of MS tube and angle iron towards the cost
of fabrications, drilling holes, nuts, bolts, etc.
c) Machinery
Tractor with trolley
d&e) Overheads&Contractors Profit (a+b+c) at 18%

hour

0.00

18.09
3%

40.00
3716.88

723.60
111.51

0.24

361.00
4638.63

86.64
834.95

Deduct 4% VAT

4638.63

Cost for one Board= (i+ii+iii+iv+a+b+c+d+e)


Printing and lettering for blank spaces on the lower plate will be written as
required and paid separately.

ASST.EXE.ENGINEER
0

DY.EXECUTIVE ENGINEER

EXECUTIVE ENGINEER

-185.55
8755.87

SUPERINTENDING ENGINEER

RATE ANALYSIS AS PER MORD

(CD WORKS)
S.
No.

Index
Code

13

Description of item

Unit

Qty

Rate

Amount

Excavation for Structures

RBR-FNDN-1

Excavation of structures:
Earthwork in excavation for structures as per drawing and technical
specifications Clause 305.1 including setting out, construction of shoring and
bracing, removal of stumps and other deleterious material and disposal upto
a lead of 50 m, dressing of sides and bottom and backfilling in trenches with
excavated suitable material as per Technical Specification 305 MORD / 304
MORTH ,including overhead charges & Contractors profit but excluding VAT.
Note : Classifications of Earth Work Specification are as per 302.2.1(a)
of MORD and 301.2.1 of MORT&H
Ordinary soil
Mechanical Means
i

Upto 3 m depth
Unit = cum
Taking output = 240 cum
a) Labour
Mate

day

0.00

250.00

0.00

Mazdoor (Unskilled)

day

8.32

250.00

2080.00

Hydraulic Excavator 1 cum bucket capacity

hour

6.00

2600.30

15601.80

Add seignorage charges

cum

240.00

0.00

b) Machinery
0.00
17681.80
Overheads & Contractors Profit @18%

3182.72

Cost for 240 cum = a+b+c+d

20864.52

Deduct 4% VAT

-707.27
20157.25

Rate per cum = /240

83.99

Note : 1. Cost of dewatering upto 5% of a+b may be added, where required,


up to 10 per cent of labour cost. Assessment for dewatering shall be made
as per site conditions.

NOTE:
ii

3 m to 6 m depth
Mechanical Means
Unit = cum
Taking output = 210 cum
a)

Labour

Mate

day

0.00

260.00

0.00

Mazdoor (Unskilled)

day

8.32

215.00

1788.80

Hydraulic excavator 1.0 cum bucket capacity

hour

6.00

2009.50

12057.00

Add seignorage charges

cum

210.00

0.00

0.00

b)

Machinery

RATE ANALYSIS AS PER MORD

(CD WORKS)
S.
No.

Index
Code

Description of item

Unit

Qty

Rate

Amount
13845.80

Overheads & Contractors Profit @18%

2492.24

Deduct 4% VAT

13845.80

Cost for 210 cum = a+b+c+d

-553.83
15784.21

Rate per cum = (a+b+c+d)/210

75.16

Note : Cost of dewatering upto 5 per cent of (a+b) may be added, where
required. Assessment for dewatering shall be made as per site conditions.

14

RBRFNDN-2

2. Cost of shoring and shuttering, where needed, may be taken @ 10 per


cent on cost of excavation for open foundation.
Filling in foundation trenches as per drawing and technical specification
Clause 305.3.9 MORD & 304 MORTH ,including overhead charges &
Contractors profit but excluding VAT.
Sand filling
Unit = cum
a) Labour
Mate
Mazdoor (Unskilled)

day
day

0.00
0.31

250.00
250.00

0.00
77.50

b) Material
Sand for filling

cum

1.00

248.00

248.00
325.50
58.59

Overheads & Contractors Profit @18%


Deduct 4% VAT
Add for conveyance of sand filling

cum

1.00

325.50
74.60

Rate per cum = a+b+c+d

RBR-FNDN-4

15

-13.02
74.60
445.67

Providing concrete for plain concrete M 10 grade in open foundations


using 40 mm nominal size Graded hard stone aggregate, mechanically
mixed, placed in foundation and compacted by vibration including curing for
14 days complete as per drawings and technical specifications Clause 802,
803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including
overhead charges & Contractors profit but excluding VAT.
P.C.C grade M 10
Nominal mix 1:3:6
Unit = cum
(a) Material
Cement

0.22

5000.00

1100.00

Coarse sand

cum

0.45

335.00

150.75

40 mm aggregate

cum

0.9

732.50

659.25

kl

1.2

0.00

0.00

Water
(b) Labour
Mate

day

250.00

0.00

Mason (1st Class)

day

0.10

315.00

31.50

Mazdoor (Unskilled)

day

1.39

250.00

347.50

(c) Machinery

RATE ANALYSIS AS PER MORD

(CD WORKS)
S.
No.

Index
Code

Description of item

Unit

Mechanical concrete mixer 0.4/0.28 cum capacity fitted


with water measuring device and preferably also with
load cell.

hour

0.40

370.00

148.00

Water tanker 6 kl capacity

hour

0.13

372.00

48.36

4.00%

2485.36

99.41

(d) Formwork @ 4% on cost of material, labour and


machinery (a+b+c)

Qty

Rate

Amount

2584.77
Overheads & Contractors Profit @18%

465.26

Deduct 4% VAT

2584.77

-103.39

Add for conveyance of sand

cum

0.45

74.60

33.57

Add for conveyance of metal

cum

0.90

1126.50

1013.85

Rate per cum = a+b+c+d+e+f

RBR-PCVT-3

16

3994.06

Providing and Laying Reinforced Cement Concrete Pipe NP3 as per


design.
Providing and laying reinforced cement concrete pipe NP3 for culverts on
first class bedding of granular material including fixing collar with cement
mortar 1:2 but excluding excavation, protection works, backfilling, concrete
and masonry works in head wall and parapets. Tech Specification Clause
1106 MORD ,including overhead charges & Contractors profit but excluding
VAT.
Unit = m
Taking output = 7.5 m

34

(3 pipes of 2.5 m length each)

i)

1000 mm dia
a) Labour
Mate

day

0.00

315.00

0.00

Mason (1st Class)

day

0.25

315.00

78.75

Mazdoor (Unskilled)

day

2.09

250.00

522.50

Laying & fixing of Pipes with colors in position including


lifting, aligning etc.,
b) Material

rm

Sand at site

cum

0.04

335.00

13.40

Cement at site

0.03

5000.00

150.00

RCC pipe NP3 pipe including collar at site

7.50

5966.40

44748.00

nos

2.00

932.88

1865.76

RCC pipe NP3 collar at site

47378.41
Overheads & Contractors Profit @ 18%

8528.11

Deduct 4% VAT

47378.41

Cost for 7.5 m = a+b+c+d

54011.39

Rate per m = (a+b+c+d)/7.5


Add for conveyance of sand

7201.52
cum

0.01

74.60

Rate per m =
ii)

-1895.14

0.75
7202.00

700 mm dia
a) Labour
Mate

day

0.00

260.00

0.00

Mason (1st Class)

day

0.15

285.00

42.75

RATE ANALYSIS AS PER MORD

(CD WORKS)
S.
No.

Index
Code

Description of item

Unit

Mazdoor (Unskilled)

day

Laying & fixing of Pipes with colors in position including


lifting, aligning etc.,
b) Material
Sand at site

rm

Cement at site
RCC pipe NP3 pipe including collar at site
RCC pipe NP3 collar at site

Qty

Rate

1.25

215.00

268.75

cum

0.024

335.00

8.04

t
m

0.018
7.50

5000.00
2924.11

90.00
21930.83

nos

2.00

505.44

1010.88
23351.25

Overheads & Contractors Profit @ 18%


Deduct 4% VAT

23351.25

Cost for 7.5 m = a+b+c+d


Rate per m = (a+b+c+d)/7.5
Add for conveyance of sand
Rate per m =
iii)

Amount

4203.23
-934.05
26620.43
3549.39

cum

0.01

74.60

0.75
3550.00

day
day

0.00
0.15

315.00
315.00

0.00
47.25

day
rm

1.25

250.00

312.50

-0.20

359.75

-71.95

cum

0.024

335.00

8.04

0.018

5000.00

90.00

7.50

2372.28

17792.10

nos

2.00

374.40

748.80

600 mm dia
a) Labour
Mate
Mason (1st Class)
Mazdoor (Unskilled)
Laying & fixing of Pipes with colors in position including
lifting, aligning etc.,
Deduct 20% for 600 mm dia pipes
b) Material
Sand at site
Cement at site
RCC pipe NP3 pipe including collar at site
RCC pipe NP3 collar at site

18926.74
Overheads & Contractors Profit @ 18%

3406.81

Deduct 4% VAT

22333.55

Cost for 7.5 m = a+b+c+d

21440.21

Rate per m = (a+b+c+d)/7.5


Add for conveyance of sand

2858.69
cum

0.01

74.60

RBR-FNDN-7

Rate per m =
17

-893.34

0.75
2859.00

Supplying, fitting and placing HYSD bar reinforcement in foundation


complete as per drawings and technical specifications Clauses 1000 and
1202 MORD & 1100, 1600 MORTH for Bars below 36 mm dia including over
laps and wastage, where they are not welded ,including overhead charges &
Contractors profit but excluding VAT.
Unit = t
(a) Material
HYSD bars including 5 per cent for overlaps and wastage
Binding wire

t
kg

1.05 45500.00
6.00

65.00

47775.00
390.00

RATE ANALYSIS AS PER MORD

(CD WORKS)
S.
No.

Index
Code

Description of item

Unit

Qty

Rate

Amount

(b) Labour for cutting, bending, shifting to site, tying


and placing in position
Mate

day

0.00

250.00

0.00

Blacksmith

day

2.00

315.00

630.00

Mazdoor (Unskilled)

day

6.40

250.00

1600.00
50395.00

Overheads & Contractors Profit @ 18%

9071.10

Deduct 4% VAT

50395.00

Rate per t = a+b+c+d

RBR-FNDN-4

18

-2015.80
57450.30

Providing concrete for reinforced concrete M 20 grade (Design Mix) in open


foundations using 20 & 10 mm nominal size Graded hard stone aggregate,
mechanically mixed, placed in foundation and compacted by vibration
including curing for 14 days complete as per drawings and technical
specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100
MORTH ,including overhead charges & Contractors profit but excluding VAT.
R.C.C grade M 20 (Design Mix) using 20 mm Graded
Metal (MORTH)
CASE I : Using Concrete Mixer
Unit = cum
(a) Material
Cement

0.347

5000.00

1735.00

Coarse sand

cum

20 mm aggregate

cum

0.45

335.00

150.75

0.54

1183.75

639.23

10 mm aggregate

cum

0.36

811.25

292.05

Mate

day

250.00

0.00

Mason (1st Class)

day

0.1

315.00

31.50

Mazdoor (Unskilled)

day

1.39

250.00

347.50

hr / cum

0.4

370.00

148.00

hour

0.4

664.00

265.60

4.00%

3609.63

144.39

(b) Labour

(c) Machinery
Concrete mixer 0.4/0.28 cum capacity
Generator 33 KVA
(d) Formwork @ 4% on (a+b+c)

3754.02
Overheads & Contractors Profit @ 18%

675.72

Deduct 4% VAT

RBR-SBST-5

-150.16

Add for conveyance of sand

cum

0.45

74.60

33.57

Add for conveyance of metal

cum

0.90

1126.50

1013.85

Rate per cum = a+b+c+d+e+f


19

3754.02

Plain cement concrete M 15 grade using 40,20 & 10mm metal


mechanically mixed in substructure complete as per drawings and
technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204
MORD and 1500, 1700 & 2200 MORTH ,including overhead charges &
Contractors profit but excluding VAT.

5327.00

RATE ANALYSIS AS PER MORD

S.
No.

RBR-SBST-5

(CD WORKS)
Index
Code

Description of item

Unit

Qty

Rate

Amount

Note : Water for concrete : A provision for cost of water may be added at 1.2
kl / 1 cum (including curing purpose) keeping the site conditions
Coarse Aggregate : Single grade nominal size can also be used instead of
graded metal, keeping the site conditions in view
For height upto 5 m
Unit = cum
P.C.C grade M 15
Nominal mix (1:2.5:5) using CC Mixer (MORD)
Unit = cum
(a) Material
Cement
Coarse sand
40 mm aggregate

t
cum
cum

0.275
0.480
0.480

5000.00
335.00
732.50

1375.00
160.80
351.60

20 mm aggregate
10 mm aggregate

cum
cum

0.240
0.080

1183.75
811.25

284.10
64.90

Mate

day

0.000

250.00

0.00

Mason (1st Class)

day

0.100

315.00

31.50

Mazdoor (Unskilled)

day

1.390

250.00

347.50

hour

0.400

370.00

148.00

10.00%

2763.40

276.34

(b) Labour

(c) Machinery
Concrete mixer 0.4/0.28 cum capacity
(d) Formwork @ 10% on cost of material, labour and
machinery (a+b+c)

3039.74
Overheads & Contractors Profit @ 18%

547.15

Deduct 4% VAT

3039.74

-121.59

Add for conveyance of sand

cum

0.48

74.60

35.81

Add for conveyance of metal

cum

0.80

1126.50

901.20

Rate per cum = a+b+c+d+e+f

RBR-SBST-6

20

4402.31

Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in


substructure complete as per drawings and technical specification Clauses
1002, 1005, 1010 & 1202 MORD / Sections 1600 & 2200 MORTH for Bars
below 36 mm dia including over laps and wastage, where they are not
welded ,including overhead charges & Contractors profit but excluding VAT.
Unit = t
(a) Material
HYSD bars including 5 per cent overlaps and wastage

1.050 45500.00

47775.00

Binding wire

kg

6.000

65.00

390.00

(b) Labour for cutting, bending, shifting to site, tying,


and placing in position
Mate

day

0.000

250.00

0.00

Blacksmith

day

2.000

315.00

630.00

Mazdoor (Unskilled)

day

6.840

250.00

1710.00

RATE ANALYSIS AS PER MORD

(CD WORKS)
S.
No.

Index
Code

Description of item

Unit

Qty

Rate

Amount
50505.00

Overheads & Contractors Profit @ 18%

9090.90

Deduct 4% VAT

50505.00

Rate per t = a+b+c+d


RBR-SBST-5

21

-2020.20
57575.70

Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm
metal mechanically mixed in substructure complete as per drawings and
technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204
MORD and 1500, 1700 & 2200 MORTH ,including overhead charges &
Contractors profit but excluding VAT upto 5m height.
R.C.C. grade M 25 (Design Mix)
Unit = cum
Height upto 5m
Case I : Using concrete Mixer
(a) Material
Cement

0.403

5000.00

2015.00

Coarse sand

cum

0.450

335.00

150.75

20 mm aggregate

cum

0.540

1183.75

639.23

10 mm aggregate

cum

0.360

811.25

292.05

Mate

day

0.00

250.00

0.00

Mason (1st Class)

day

0.10

315.00

31.50

Mazdoor (Unskilled)

day

1.39

250.00

347.50

Concrete mixer 0.4/0.28 cum capacity

hour

0.40

370.00

148.00

Generator 33 KVA

hour

0.40

664.00

265.60

Vibrator

hour
10.00%

3889.63

388.96

(b) Labour

(c) Machinery

(d) Formwork @ 10% on (a+b+c)

4278.59
Overheads & Contractors Profit @18%

770.15

Deduct 4% VAT

RBRSBST-5

-171.14

Add for conveyance of sand

cum

0.45

74.60

33.57

Add for conveyance of metal

cum

0.90

1126.50

1013.85

Rate per cum = a+b+c+d+e+f


22

4278.59

Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm
metal mechanically mixed in substructure complete as per drawings and
technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204
MORD and 1500, 1700 & 2200 MORTH ,including overhead charges &
Contractors profit but excluding VAT 5 to 10m height.
R.C.C. grade M 25 (Design Mix)
Height 5m to 10m
Case I : Using concrete Mixer

5925.02

RATE ANALYSIS AS PER MORD

(CD WORKS)
S.
No.

Index
Code

Description of item

Unit

Per Cum Basic Cost of Labour, Material & Machinery


(a+b+c) of Item VI (i) Case I excluding of Formwork

cum

Qty

Rate

Amount

3889.63

3889.63

11.80%

3889.63

458.98

1.80%

3889.63

70.01

d) formwork
Add on cost of material, labour and machinery (a+b+c)
for Formwork
Add on cost of material, Labour and machinery excluding
formwork to cater for extra lift

4418.62
Overheads & Contractors Profit @18%

795.35

Deduct 4% VAT

4418.62

22

RBR-SPST-2

Rate perm (a+b+c+d+e+f)

-176.74
5037.23

Supplying, fitting, and placing HYSD bar reinforcement in superstructure


complete as per drawing and technical specifications Clauses 1002, 1010
and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over
laps and wastage, where they are not welded ,including overhead charges &
Contractors profit but excluding VAT.
Unit = t
(a) Material
HYSD bars including 5 per cent for laps and wastage

1.05 45500.00

47775.00

Binding wire

kg

8.00

65.00

520.00

(b) Labour for cutting, bending, tying and placing in


position
Mate

day

0.00

250.00

0.00

Blacksmith/ Rod Binder

day

3.00

315.00

945.00

Mazdoor (Unskilled)

day

8.44

250.00

2110.00
51350.00

Overheads & Contractors Profit @18%

9243.00

Deduct 4% VAT

51350.00

Rate per t = a+b+c+d

RBR-SPST-1

23

-2054.00
58539.00

Providing and laying reinforced cement concrete M25 grade (Design Mix)
using 20 & 10mm metal mechanically mixed in superstructure as per
drawing and technical specifications Clauses 800, 1205.4 and 1205.5 MORD
/ Sections 1500, 1600 & 1700 MORTH ,including overhead charges &
Contractors profit but excluding VAT upto 5m height.
R.C.C M 25 Grade (Design Mix)
Unit =cum
(i) Height upto 5m
Case I : Using Concrete Mixer.
(a) Material
Cement

0.40

5000.00

2000.00

Coarse sand

cum

0.45

335.00

150.75

20 mm aggregate

cum

0.54

1183.75

639.23

10 mm aggregate

cum

0.36

811.25

292.05

(b) Labour

RATE ANALYSIS AS PER MORD

(CD WORKS)
S.
No.

Index
Code

Description of item

Unit

Qty

Rate

Amount

Mate

day

0.00

250.00

0.00

Mason (1st Class)

day

0.10

315.00

31.50

Mazdoor (Unskilled)

day

1.39

250.00

347.50

hour/cu
m
hour

0.40

370.00

148.00

0.40

664.00

265.60

20.00%

3874.63

774.93

c) Machinery
Concrete mixer 0.4/0.28 cum capacity
Generator 33 KVA
d) For formwork and staging refer to sub-item I (B)
case I above
d)
Formwork and staging of (a+b+c)

4649.56
Overheads & Contractors Profit @18%

836.92

Deduct 4% VAT

4649.56

-185.98

Add for conveyance of sand

cum

0.45

74.60

33.57

Add for conveyance of metal

cum

0.90

1126.50

1013.85

Rate per cum = a+b+c+d+e+f


25

RBRSPST-1

6347.92

Providing and laying reinforced cement concrete M25 grade (Design Mix)
using 20 & 10mm metal mechanically mixed in superstructure as per
drawing and technical specifications Clauses 800, 1205.4 and 1205.5 MORD
/ Sections 1500, 1600 & 1700 MORTH ,including overhead charges &
Contractors profit but excluding VAT 5 to 10m height.
R.C.C M 25 Grade (Design Mix)
Unit =cum
Height 5m to 10m
Case I : Using Concrete Mixer.
(a) Material
Cement

0.40

5000.00

2000.00

Coarse sand

cum

0.45

335.00

150.75

20 mm aggregate

cum

0.54

1183.75

639.23

10 mm aggregate

cum

0.36

811.25

292.05

Mate

day

0.00

260.00

0.00

Mason (1st Class)

day

0.10

285.00

28.50

Mazdoor (Unskilled)

day

1.39

215.00

298.85

hour/cu
m
hour

0.40

345.00

138.00

0.40

620.00

248.00

25.00%

3795.38

948.85

(b) Labour

c) Machinery
Concrete mixer 0.4/0.28 cum capacity
Generator 33 KVA
d) For formwork and staging refer to sub-item I (B)
case I above
d)
Formwork and staging of (a+b+c)

4744.23
Overheads & Contractors Profit @18%
Deduct 4% VAT

853.96
4744.23

-189.77

RATE ANALYSIS AS PER MORD

(CD WORKS)
S.
No.

Index
Code

Description of item

Unit

Qty

Rate

Add for conveyance of sand

cum

0.45

74.60

33.57

Add for conveyance of metal

cum

0.90

1126.50

1013.85

RBR-SPST-5

Rate per cum = a+b+c+d+e+f


24

6455.84

Providing and laying cement concrete wearing course M 30 (Design Mix)


grade using 20 & 10mm metal mechanically mixed excluding reinforcement
complete as per drawing and technical specifications Clauses 800 and
1206.3 MORD and 2702 MORTH ,including overhead charges & Contractors
profit but excluding cost of steel and VAT.
Unit = cum
(a) Material
Cement
Sand
20 mm aggregate
10 mm aggregate
HYSD bar reinforcement including binding wire (Rate as
per item 13.2) except OH & CP
(b) Labour

t
cum
cum
cum
t

Mate

day

0.00

250.00

0.00

Mason (1st Class)

day

0.10

315.00

31.50

Mazdoor (Unskilled)

day

1.39

250.00

347.50

Mazdoor (Unskilled) for cleaning deck slab concrete


surface
c) Machinery

day

0.15

250.00

37.50

Concrete mixer 0.4/0.28 cum capacity

hour

0.40

370.00

148.00

Generator 33 KVA.

hour

0.40

664.00

265.60

3.00%

3681.53

110.45

4057.58

4057.58
730.36
-162.30

74.60
1126.50

33.57
1013.85

(d) Formwork @ 3% of cost of concrete

0.407
5000.00
0.45
335.00
0.54
1183.75
0.36
811.25
0.075 51350.00

Overheads & Contractors Profit @18%


Deduct 4% VAT
Add for conveyance of sand
Add for conveyance of metal

cum
cum

0.45
0.90

Rate per cum = a+b+c+d+e+f


27

RBRSPST-7

Amount

Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 & 10 mm


nominal size aggregate, true to line and grade, tolerance of vertical railing
post not to exceed 1 in 500, centre-to-centre spacing between vertical posts
not to exceed 2000 mm as per drawing and technical specifications Clauses
800, 900 and 1208.3 MORD ,including overhead charges & Contractors
profit but excluding cost of steel and VAT.

Unit = Running m
Taking output = 4x12 m
Span = 48 m
(a) M 25 grade R.C.C.
No. of vertical posts = (6+1) 4 = 28 nos
Cross-sectional area of vertical post = 0.25x0.275 =
0.069 sqm
Concrete in vertical posts = 0.069x28x1.00 = 1.932 cum

2035.00
150.75
639.23
292.05
0.00

5673.06

RATE ANALYSIS AS PER MORD

(CD WORKS)
S.
No.

Index
Code

Description of item

Unit

Qty

Rate

Amount

4744.23

29660.93

1.36 51350.00

69836.00

Hand rail in 3 tiers = 3x48 = 144 m


Cross-sectional area = 0.17x0.175 = 0.03 sqm
Concrete in hand rails = 0.03 x 144 = 4.32 cum
Total concrete = 1.932+4.32 = 6.252 cum
(b) HYSD bar reinforcement (Rate as per item 13.2)

cum
t

6.252

99496.93
Overheads & Contractors Profit @18%

17909.45

Deduct 4% VAT

117406.38

Cost for 48 m = (a+b+c+d)

-4696.26
112710.12

Rate per m = (a+b+c+d)/48

2348.13

Sub Analysis for Rate of Concrete


(a) Material
Cement

0.40

5000.00

2000.00

Coarse sand

cum

0.45

335.00

150.75

20 mm aggregate

cum

0.54

1183.75

639.23

10 mm aggregate

cum

0.36

811.25

292.05

260.00

0.00

(b) Labour
Mate

day

Mason (1st Class)

day

0.12

285.00

34.20

Mazdoor (Unskilled)

day

2.09

215.00

449.35

hour

0.40

345.00

138.00

12.00%

3703.58

444.43

c) Machinery
Concrete mixer 0.4/0.28 cum capacity
Formwork @ 12%
Add for conveyance of sand

cum

0.45

74.60

33.57

Add for conveyance of metal

cum

0.90

1126.50

1013.85

Total (a+b+c+d)
28

RBRSPST-12

5195.43

P.C.C. M 15 ordinary grade (1:2.5:5) using 40,20 & 10mm metal


mechanically mixed leveling course below approach slab complete as per
drawing and technical specifications Clauses 800 and 1211 MORD & 2700
MORTH ,including overhead charges & Contractors profit but excluding VAT.
Nominal mix (1:2.5:5) / PCC M 15 using Concrete
Mixture
Unit = cum
(a) Material
Cement

0.275

5000.00

1375.00

Coarse sand

cum

0.48

335.00

160.80

40 mm aggregate

cum

0.54

732.50

395.55

20 mm aggregate

cum

0.27

1183.75

319.61

10 mm aggregate

cum

0.09

811.25

73.01

Mate

day

0.00

260.00

0.00

Mason (1st Class)

day

0.10

285.00

28.50

Mazdoor (Unskilled)

day

1.39

215.00

298.85

(b) Labour

RATE ANALYSIS AS PER MORD

(CD WORKS)
S.
No.

Index
Code

Description of item

Unit

Qty

Rate

Amount

c) Machinery
Concrete mixer 0.4/0.28 cum capacity

hour

0.40

345.00

138.00

Generator 33 KVA.

hour

0.40

620.00

248.00
3037.32

Overheads & Contractors Profit @18%

546.72

Deduct 4% VAT

3037.32

-121.49

Add for conveyance of sand

cum

0.48

74.60

35.81

Add for conveyance of metal

cum

0.90

1126.50

1013.85

Rate per cum = a+b+c+d+e+f


29

RBRSPST-13

4512.20

Reinforced Cement Concrete M 25 grade approach slab using 20 & 10mm


metal mechanically mixed excluding reinforcement complete as per drawing
and technical specifications Clauses 800 and 1211 MORD / 1500, 1600,
1700 & 2704 MORTH ,including overhead charges & Contractors profit but
excluding VAT.
Unit = cum
(a) Material
Reinforced cement concrete M 25 grade
Cement

0.403

5000.00

2015.00

Coarse sand
20 mm aggregate

cum
cum

0.45
0.54

335.00
1183.75

150.75
639.23

10 mm aggregate
(b) Labour
Mate

cum

0.36

811.25

292.05

day

260.00

0.00

Mason (1st Class)


Mazdoor (Unskilled)

day
day

0.1
1.39

285.00
215.00

28.50
298.85

Bhisti
(c) Machinery

day

260.00

0.00

0.4

345.00

138.00

2.00%

3562.38

71.25
3633.63

Concrete mixer 0.4/0.28 cum capacity

hr / cum

(d) Formwork @ 2.00% on (a+b+c)


Overheads & Contractors Profit @18%
HYSD reinforcement
Rate per item 2
Deduct 4% VAT

RBR-SBST10

t
3633.63

-145.35

Add for conveyance of sand

cum

0.45

74.60

33.57

Add for conveyance of metal

cum

0.90

1126.50

1013.85

Rate per cum = (a)


25

654.05

Backfilling behind abutment, wing wall and return wall


complete as per drawings & technical specification
Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200
MORTH
Unit = cum
Taking output = 10 cum
Granular material
(a) Material

5189.76

RATE ANALYSIS AS PER MORD

(CD WORKS)
S.
No.

Index
Code

Description of item
Granular material
(b) Labour
Mate
Mazdoor (Unskilled)
(c) Machinery
Plate compactor / power rammer
Water Tanker
Overheads & Contractors Profit @18%
Deduct 4% VAT
Add for conveyance of gravel

Unit

Qty

cum

12.000

75.00

900.00

day
day

0.000
7.280

250.00

0.00
1820.00

hour

2.500

42.00

105.00

hour

0.050
18.00%

372.00
2843.60

18.60
511.85

-4.00%
12.00

2843.60
119.40

-113.74
1432.80
4674.51
467.45

cum

Rate

Cost for 10 cum of granular backfill = a+b+c+d+e


Rate per cum = (a+b+c+d+e)/10
6

26

RBRTSRA-6

Amount

Painting Two Coats on New Concrete Surfaces


Painting two coats including primer coat after filling the surface with synthetic
enamel paint in all shades on new, plastered / concrete surfaces as per
drawing and Technical Specification Clause 1701MORD.
Unit = sqm
Taking output = 40 sqm
a) Labour
Mate
Painter (1st Class)

day
day

3.00

350.00

1050.00

Painter Assistant
Mazdoor (Unskilled)

day
day

2.20

250.00

550.00

b) Material
Cement Primer as per specifications

litre

3.00

90.00

270.00

Paint conforming to requirement of Clause 1701.3.8

litre

6.00

200.00

1200.00

Add for scaffolding @ 1 per cent of labour cost where


required
Filling Material on Paint Cost
c&d) Overheads & Contractors Profit at 18%
Deduct 4% VAT
Cost for 40 sqm = a+b+c+d

3070.00

552.60

3070.00

-122.80
3499.80

Rate per sqm = (a+b+c+d)/40


27

RBRPTWK-5

87.50

Providing and laying pitching on slopes laid over prepared filter media as per
drawing and technical specifications Clause 1302 MORD / 2504 MORTH
Stone/Boulder
Unit = cum
(a) Material
Stone boulder (25 kg minimum) /(MORTH - 40 kg)

cum

1.00

110.00

110.00

Stone spalls of minimum 25 mm size

cum

0.20

110.00

22.00

Mate

day

0.00

Mason 1st Class

day

0.35

315.00

110.25

Mazdoor (Unskilled)

day

0.79

250.00

197.50

(b) Labour
0.00

RATE ANALYSIS AS PER MORD

(CD WORKS)
S.
No.

Index
Code

Description of item

Unit

Qty

Rate

Amount

Overheads & Contractors Profit @18%

18.00%

439.75

79.16

Deduct 4% VAT

-4.00%

439.75

-17.59

1.20

1126.50

1351.80

Add for conveyance of stone

cum

Rate per cum = (a+b+c+d)

1853.12

Printing New Letters and Figures of any Shade


28

RBRTSRA-1

Printing new letter and figures of any shade with synthetic enamel paint black
or any other approved colour to give an even shade as per drawings and
Technical Specification Clause 1701 MORD / 801 MORTH
English and Roman
Hyphens, commas and the like not to be measured and
paid for.
Detail for 100 letters of 160 mm height, i.e. 1600 cm
Unit = per cm height per letter
a) Labour
Mate

day

Painter 1st Class

day

Painter Assistant

day

Mazdoor (Unskilled)

1.25

350.00

437.50

day

0.57

250.00

142.50

litre

0.50

200.00

100.00

c&d) Overheads & Contractors Profit at 18%

680.00

122.40

Deduct 4% VAT

680.00

b) Material
Paint

Cost for 1600 cm = a+b+c+d


Rate per cm height per letter = (a+b+c+d)/1600

29

RBRTSRA-9

-27.20
775.20
0.48

Painting on Concrete/Steel Surfaces with Epoxy


Painting two coats including prime coat with epoxy paint of approved brand
on concrete/steel surfaces after through cleaning of surface to give an even
shade as per drawing and Technical Specification Clause 1701 MORD
Unit = sqm
Taking output = 10 sqm
a) Labour
Mate

day

Painter (1st Class)

day

0.60

350.00

210.00

Mazdoor (Unskilled)

day

0.65

250.00

162.50

Epoxy primer / Red-oxide

litre

0.60

110.00

66.00

Epoxy paint

litre

1.25

b) Material
200.00

250.00

Add @ 1 per cent on cost of material for scaffolding


wherever required
c&d) Overheads & Contractors Profit at 18%

688.50

123.93

Deduct 4% VAT

688.50

-27.54

Cost for 10 sqm = a+b+c+d

784.89

RATE ANALYSIS AS PER MORD

(CD WORKS)
S.
No.

Index
Code

Description of item

Unit

Qty

Rate

Rate per sqm = (a+b+c+d)/10


30

Amount
78.49

Kilometre Stone
RBRTSRA-13

Reinforced cement concrete M15 grade kilometre stone/local stone of


standard design as per IRC:8 fixing in position including painting and
printing, etc as per drawing and Technical Specification Clause 1703 MORD /
804 MORTH
5th Kilometre Stone (precast)
Unit = each
Taking output = 6 Nos.
a) M-15 grade of concrete
As per item No. 5 (i) or (ii) of Chapter 12

cum

2.35

4402.31

10345.44

kg

22.08

57.58

1271.27

cum

1.68

83.99

141.10

sqm

9.85

87.50

861.83

1800.00

0.48

872.10

b) Steel reinforcement @ 5 kg per sqm


As per item No. 6 of Chapter 12
c) Excavation in soil for foundation
As per item No. 1 of Chapter 11
d) Painting two coats on concrete surface
As per item No.6 of Chapter 10

e) lettering on km post (average 30 letters of 10 cm


height each)
As per item No. 1 of Chapter 10
per cm
high per
letter
Transportation and fixing
f) Labour
Mate

day

Mason (1st Class)

day

0.60

285.00

171.00

Mazdoor (Unskilled)

day

6.26

215.00

1345.90

hour

6.00

345.00

2070.00

3586.90

645.64

3586.90

-143.48
17580.81

g) Machinery
50 HP Tractor with trolley
h&i) Overheads & Contractors Profit at 18% on
Labour
Deduct 4% VAT on labour
j )Cost for 6 Nos. 5th km stone = a+b+c+d+e+f+g+h+i
Rate for each 5th km stone = j/6

2930.13

Ordinary Kilometer Stone (Precast)


Unit = each
Taking output = 14 Nos.
a) M-15 grade of concrete
As per item No. 5 (i) or (ii) of Chapter 12

cum

3.77

4402.31

16596.72

b) Steel reinforcement @ 5 kg per sqm


As per item No. 6 of Chapter 12

kg

26.32

57.58

1515.39

cum

2.77

83.99

232.65

c) Excavation in soil for foundation


As per item No. 1 of Chapter 11
d) Painting two coats on concrete surface

RATE ANALYSIS AS PER MORD

(CD WORKS)
S.
No.

Index
Code

Description of item

Unit

As per item No.6 of Chapter 10

sqm

j) Cost for 14 Nos. ordinary km


(a+b+c+d+e+f+g+h+i)
Rate for each ordinary km stone = j/ 14

stone

Rate

Amount

11.41

87.50

998.32

1680.00

0.48

813.96

day
day
day

1.00
7.32

350.00
250.00

350.00
1830.00

hour

6.00

361.00
4346.00

2166.00
782.28

4346.00

-173.84

e) lettering on km post (average 12 letters of 10 cm


height each)
As per item No. 1 of Chapter 10
per cm
high per
letter
Transportation and fixing
f) Labour
Mate
Mason (1st Class)
Mazdoor (Unskilled)
g) Machinery
50 HP Tractor with trolley
h&i) Overheads & Contractors Profit at 18% on
Labour
Deduct 4% VAT on labour

Qty

25111.48
1793.68

200 m / Hectometer stone (precast)


Unit = each
Taking output = 33 Nos.
a) M-15 grade of concrete
As per item No. 5 (i) or (ii) of Chapter 12
b) Steel reinforcement @ 5 kg per sqm

cum

1.58

4402.31

6955.66

As per item No. 6 of Chapter 12


c) Excavation in soil for foundation
As per item No. 1 of Chapter 11

kg

66.00

57.58

3800.00

cum

1.39

83.99

116.75

d) Painting two coats on concrete surface


As per item No.5 of Chapter 10

sqm

6.27

87.50

548.59

per cm
high per
letter

330.00

0.48

159.89

day
day
day

1.50
7.34

350.00
250.00

525.00
1835.00

hour

6.00

361.00
4526.00

2166.00
814.68

e) lettering on km post (average 1 letter of 10 cm height


each)
As per item No. 1 of Chapter 10
Transportation and fixing
f) Labour
Mate
Mason (1st Class)
Mazdoor (Unskilled)
g) Machinery
50 HP Tractor with trolley
h&i) Overheads & Contractors Profit at 18% on
Labour
Deduct 4% VAT on labour
j) Cost for 33 Nos. 200m stone = (a+b+c+d+e+f+g+h+i)
Rate for each 200 m stone = j / 33

4526.00

-181.04
16740.53
507.29

Note : 1. The rate for excavation, cement concrete, steel reinforcement, painting and lettering
may be taken from respective Chapters.
2. In case local stone is to be used in place of precast RCC stones, then rate of cement
concrete and steel reinforcement may be deleted.
B

Semi Reflective Traffic Signs

RATE ANALYSIS AS PER MORD

(CD WORKS)
S.
No.

Index
Code

RBR-TSRA-2

31

Description of item

Unit

Qty

Rate

Amount

Providing and fixing of semi reflective cautionary, mandatory and informatory


sign board as per IRC:67 made of 1.5 mm thick MS Sheet duly stove white
colour in front and gray colour on back with red reflective border of 65 mm
width and required letters and figures with reflective tape engineering grade
as per Clause 1701.3.9 of MORD for Rural Roads of required shade and
colour supported and welded on 47 mm x 47 mm 12 SWG sheet tube firmly
fixed to the ground by means of properly designed foundation with M15
grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground
level as per drawings and Technical Specification Clause 1701 MORD

Unit = Each
Taking output = one traffic sign
(i) Excavation for foundation
As per item No. 1 of Chapter 11

cum

0.126

83.99

10.58

cum

0.126

4402.31

554.69

sqm

0.46

78.49

36.10

day
day

0.26

250.00

65.00

kg
kg

12.40
1.06

50.50
50.50

626.20
53.53

3%

679.73

20.39

169.60

(ii) Cement concrete M15 grade


As per item No. 4 (A) (iii) or (iv) of Chapter 11
(iii) Painting two coats including prime coat on
concrete surface with Epoxy Paint as per
specifications
As per item No. 9 of this Chapter
(a) labour (For fixing at site)
Mate
Mazdoor (Unskilled)
b) Material
Support of M.S. Sheet tube
(I) 47 mm x 47 mm x 12 SWG Sheet 3050 mm long
(II) Angle iron 50 x 50 x 6 mm for hold fast including 5%
wastage
Add 3% cost of MS Sheet tube 12 SWG and angle irons
towards the cost of fabrication, drilling holes, nuts and
bolts etc.
(III) 1.5 mm thick M.S. Sheet duly painted with stove
enameled paint including lettering, signs, border,
message with reflective tape of engineering grade
required size, shade and colour as per Technical
Specifications

sqm

0.36

(vi) 600 mm x 600 mm square (0.36SQm X 0.0015m X


7850/Kgcum)
(c) Machinery
Tractor with trolley

Kg

4.24

40.00

hour

0.08

361.00
963.60
963.60

28.88
173.45
Deduct 4% VAT
-38.54
Rate per traffic sign = (i+ii+iii+a+b+c+d+e)
1699.87
Note : 1. Any one area of M.S. Sheet given at (i) to (viii) may be adopted as per site requirement and
in accordance with IRC-67.
d&e) Overheads& Contractors Profit on a+b+c 18%

2. The rate for excavation, cement concrete M-15, and painting may be taken from respective
Chapters.
3. The depth of foundation and quantity of cement in the foundation are indicative. These may
be increased for areas having higher wind velocities like in coastal area. This is applicable to
all road signs and direction boards.
32

Semi-Reflective Traffic signs


Direction and place identification signs up to 0.9 sqm size board

RATE ANALYSIS AS PER MORD

(CD WORKS)
Index
Code

RBR-TSRA-3

S.
No.

Description of item

Unit

Qty

Rate

Amount

Providing and erecting direction and place identifications of semi reflective


sign boards as per IRC:67 made of 2 mm thick M.S. Sheet duly stove
enameled paint in white colour in front and grey colour on back with red
reflective border of 70 mm width and required message, letters, figures with
reflective engineering grade tape as per MORD specifications of required
shade and colour. supported and welded on 47 mm x 47 mm of 12 SWG
Square tube of 3050 mm height duly strengthened by 25 mm x 5 mm M/s flat
iron on edges on back firmly fixed to the ground by means of properly
designed foundation with M15 grade cement concrete 450 mm x 450 mm x
600 mm, 600 mm below ground level as per drawings and Technical
Specification Clause 1701 MORD.

Unit = each
Take Output = 0.9 sqm
(i) Excavation for foundation
As per item No. 1 of Chapter 11

cum

0.126

83.99

10.58

cum

0.126

4402.31

554.69

sqm

0.59

78.49

46.31

Mate

day

Mazdoor (Unskilled)

day

0.26

250.00

65.00

47 mm x 47 mm of 12 SWG sheet 3050 mm long

kg

12.40

50.50

626.20

(ii) Angle iron 50 x 50 x 6 mm for lugs including 5%


wastage
(iii) 2 mm thick MS sheet strengthened by 25 mm x 5 mm
MS flat iron & painted with stove enameled paint
including lettering, signs, message, border with reflective
tape of engineering grade of required shade and colour
as per Technical Specifications.

kg

1.06

50.50

53.53

sqm

0.90

14.13

40.00

565.20

3%

679.73

20.39

0.08

361.00
1359.20

28.88
244.66

(ii) Cement concrete M15 grade


As per item No. 4 (A) (iii) or (iv) of Chapter 11
(iii) Painting on M.S. tube post with primer and two
coat of epoxy paint as per specifications
As per item No.9 of Chapter 10
(a) labour (For fixing at site)

b) Material
(i) Support of MS sheet tube

(0.90 Sqm X 0.002m X 7850/Kgcum)


Add 3% cost of MS sheet angle iron towards the cost of
fabrications, drilling, holes, nuts, bolts etc.
(c) Machinery
Tractor with trolley
d&e) Overheads& Contractors Profit on a+b+c 18%

hour

Deduct 4% VAT
1359.20
-54.37
Cost for 0.9 sqm = (i+ii+iii+a+b+c+d+e)
2161.07
Rate per sqm (for sign having area upto 0.9 sqm) =
2401.19
(i+ii+iii+a+b+c+d+e)/0.90
Note : Rate for excavation, cement concrete M15 and painting may be taken from respective
Chapters.
33

Providing and Fixing 'Informatory sign' of Project

RATE ANALYSIS AS PER MORD

(CD WORKS)
Index
Code

RBR-TSRA-20

S.
No.

Description of item

Unit

Qty

Rate

Amount

Providing and fixing of typical informatory sign board with as per MORD
specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle
plate duly welded with MS flat iron 25mm x 5m size on back on edges. The
lower plate will be we welded with MS angle irone frame of 25 mm x 25 mm x
5 mm. The angle iron frame of the lower most plate and flat iron frame of
middle plate will be welded to 2 nos. 75 mm x 75 mm of 12 SWG sheet
tubes posts duly embedded in cement concrete M-15 grade blocks of 450
mm x 450 mm x 600 mm, 600 mm below ground level. The top most
diamond plate will be welded to middle plate by 47 mm x 47mm of 12 SWG
sheet tube. All M.s. will be stove enameled on both sides. Lettering and
printing arrows, border etc., will be pointed with ready mixed synthetic
enamel paint of superior quality in required shade and colour. All sections of
framed posts and steel tube will be painted with primer and two coats of
epoxy paint as per drawing clause 1701 MORD
Unit = Each
Taking out put = one typical board
i) Excavation for foundation
As per item No. 1 of Chapter 11

cum

0.252

83.99

21.17

(ii) Cement Concrete M15 grade


As per item No. 4 (A) (iii) or (iv) of Chapter 11

cum

0.252

4402.31

1109.38

sqm

1.80

78.49

141.28

per cm
height /
letter

4532.50

0.48

2196.00

day
day

0.78

250.00

195.00

2 nos. MS tubes 75mx75mm of 12 SWG sheet 2650 mm


long
1 No. MS tube 47mm x 47mm of 12 SWG 1100 mm long

kg

63.15

50.5

3189.08

kg

4.47

50.5

225.74

Angle iron 50mm x 50mm x 5 mm for lugs

kg

2.12

50.5

107.06

(iii) Painting on MS Steel tubes with primer and two


coats of epoxy paint
2x2.05x.30 = 1.23
1x1.10x188 = 0.21
As per item no. 9 of Chapter 10
(iv) Printing new letters and figures of any shade
with synthetic enamel paint black or any other
approved colour to give an even shade.
Logo Border 60x4x5 = 1200 per cm height per letter
Figure 60x10 = 600 per cm height per letter
Middle plate words 28x5 = 140 per cm height per letter
Bottom plate border 150x2x5 = 1500 per cm height per
letter
Bottom plate border 60x2x5 = 600 per cm height per
letter
Words 101x2.5 = 252.5
Words 80x3 = 240.00
Total (4532.5 per cm height per letter)
As per item No. 1 of Chapter 10
a) Labour (for fixing at site)
Mate
Mazdoor (Unskilled)
b) Material

RATE ANALYSIS AS PER MORD

(CD WORKS)
S.
No.

Index
Code

Description of item

Unit

Qty

1.6 mm thick MS sheet strengthened by 25mm x 5 MS flat iron


on logo and middle plate angle iron 25mm x 25mm x 5mm on
bottom plate painting with stove enameled paint on both sides
as per MORD specifications

sqm

1.44

(1.44 Sqm X 0.0016m X 7850/Kgcum)

18.09

Rate

0.00

40.00

723.60

3%

3716.88

111.51

0.24

361.00

86.64

d&e) Overheads&Contractors Profit (a+b+c) at 18%

4638.63

834.95

Deduct 4% VAT
Cost for one Board= (i+ii+iii+iv+a+b+c+d+e)

4638.63

-185.55
8755.87

Add 3% cost of MS tube and angle iron towards the cost


of fabrications, drilling holes, nuts, bolts, etc.
c) Machinery
Tractor with trolley

hour

Printing and lettering for blank spaces on the lower plate will be written as
required and paid separately.

ASST.EXE.ENGINEER
0

Amount

DY.EXECUTIVE ENGINEER

EXECUTIVE ENGINEER

SUPERINTENDING ENGINEER

LEAD CHARGES (2012-13)


GRANT: PMGSY -X

PACKAGE NO:

NAME OF THE WORK: R/F xxxxxxxxxxxxxxxxxxxxxxxx to yyyyyyyyyyyyyyyyyyy

Sl.
No.

(1)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
19
20
21

Description

(2)
60-63 mm IRC HBG Metal
50-55 mm IRC HBG Metal
40-45 mm IRC HBG Metal
25-27 mm IRC HBG Metal
19-22 mm IRC HBG Metal
40-45 mm IRC HBG Metal
25-27 mm IRC HBG Metal
19-22 mm IRC HBG Metal
12-14 mm IRC HBG Metal
9.5-11.2 mm for Grading 2
5-7 mm IRC HBG Metal
2.36 mm HBG metal
40mm HBG chips-SS5
20mm HBG chips-SS5
12mm HBG chips-SS5
10mm HBG chips-SS5
2.36mm Below metal
Rough stone
Gravel
Sand for mortar
Sand for Filling
Bitumen 60/70

Quarry

(3)
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
Local
y
Local
Vizag

Lead in
KM

Initial
Cost

(4)
(5)
113.00
378.00
113.00
410.00
113.00
530.00
113.00
874.00
113.00
998.00
113.00
530.00
113.00
874.00
113.00
998.00
113.00
727.00
113.00
593.00
113.00
452.00
113.00
278.00
113.00
530.00
113.00
891.00
113.00
727.00
113.00
593.00
113.00
260.00
113.00
160.00
9.00
75.00
5.00
335.00
5.00
248.00
1020.00 32449.51

Conveyance
Charges

Blasting
charges

(6)
(7)
1126.50
70.00
1126.50
70.00
1126.50
70.00
1126.50
70.00
1126.50
70.00
1126.50
70.00
1126.50
70.00
1126.50
70.00
1126.50
70.00
1126.50
70.00
1126.50
70.00
1126.50
70.00
1126.50
70.00
1126.50
70.00
1126.50
70.00
1126.50
70.00
1126.50
1126.50
119.40
74.60
74.60
3060.00 1297.98

Add 25%
extra for
machine
crushing

(8)

132.50
218.50
249.50
181.75
148.25
113.00
69.50
132.50
222.75
181.75
148.25

Total
Deduc
amount Conveay
t for
excluding
nce
Remarks
stocki
conveyan chargs
ng
ce

(9)

(10)
448.00
480.00
600.00
944.00
1068.00
732.50
1162.50
1317.50
978.75
811.25
635.00
417.50
732.50
1183.75
978.75
811.25
260.00
-50
110.00
75.00
335.00
248.00
36807.49

(11)
1126.50
1126.50
1126.50
1126.50
1126.50
1126.50
1126.50
1126.50
1126.50
1126.50
1126.50
1126.50
1126.50
1126.50
1126.50
1126.50
1126.50
1126.50
119.40
74.60
74.60

(12)
831.17 53-26
981.00 26-4.75
723.13 9.5-4.75

1070.83
832.00
895.00
723.13
808.33
526.25

WBMM
WMM
WMM
OGPC
Gr.II

Sl.
No.

(1)
22
23
24
25
26
27
28
29
30
31

Description

Quarry

Lead in
KM

Initial
Cost

Conveyance
Charges

Blasting
charges

Add 25%
extra for
machine
crushing

(2)
(3)
(4)
(5)
(6)
(7)
(8)
Bitumen emulsion (SS-1)
Vizag
1020.00 26545.44 3060.00 1061.82
Bitumen emulsion (RS-1)
Vizag
1020.00 27254.84 3060.00 1090.19
Cement
Local
5000.00
Steel
45500.00
1000mm dia pipes (Part-I)
Z
63.00
5170
589.60
206.8
700mm dia pipes (Part-I)
Z
63.00
2512
311.63 100.48
600mm dia pipes (Part-I)
Z
63.00
2020
271.48
80.8
1000mm dia collars (Part-I)
Z
63.00
897
35.88
700mm dia collars (Part-I)
Z
63.00
486
19.44
600mm dia collars (Part-I)
Z
63.00
360
14.4
Certified that the above leads are correct and nearest to the work site to best of my knowledge
The stone quarry is of blasting type. Hence provided blasting charges

ASST.EXE.ENGINEER

DY.EXECUTIVE ENGINEER

EXECUTIVE ENGINEER

SUPERINTENDING ENGINEER

Total
Deduc
amount Conveay
t for
excluding
nce
Remarks
stocki
conveyan chargs
ng
ce

(9)

(10)
30667.26
31405.03
5000.00
45500.00
5966.40
2924.11
2372.28
932.88
505.44
374.40

(11)

(12)

FORMAT F-8
PRADHAN MANTRI GRAM SADAK YOJANA (PMGSY)

RATE ANALYSIS
State : Andhra Pradesh

NAME OF THE WORK: R/F xxxxxxxxxxxxxxxxxxxxxxxx to


yyyyyyyyyyyyyyyyyyy
Material
Stone
(Crushed
Metal)
Bituminous

Source

Lead (in Km)


113

x
Vizag

Cement

Local

Hume Pipes

1020
63

Any other
Gravel

Local

Sand

Sl. No. Sl. No.


Description
Units
as per
MORD
SDB for
A.Rural
CONSTRUCTION ACTIVITIES
Roads
1
Clearing and grubbing road land including Cum
uprooting wild vegetation, grass, bushes,
shrubs, saplings and trees of girth upto 300
mm, removal of stumps of such trees cut
earlier and disposal of unserviceable
materials and stacking of serviceable
material to be used or auctioned, upto a lead
of 1000 m including removal and disposal of
top organic soil not exceeding 150 mm in
thickness as per Technical Specification
Clause 201 MORD/MORTH
including
overhead & Contractor profit but excluding
VAT .

Construction of Embankment with


Material Obtained from Roadway
Cutting
Construction of embankment with approved
materials deposited at site from roadway
cutting and excavation from drain (not
exceeding 0.6 m depth) and foundation of
other structures graded and compacted to
meet requirement of Tables 300.1 and 300.2
as per Technical Specification Clause 301.5
MORD/ 305 MORTH including overhead &
Contract profit but excluding VAT

Qty

4800.00

14068.44

Rate (Rs)

Amount
(Rs.)

1.86 /
S
q
m

8928

62.16 /
874479
1
c
u
m

Construction of Embankment with


Material Obtained from Borrow pits
Construction of embankment with approved
material obtained from borrow pits with all
lifts, transporting to site, spreading, grading
to required slope and compacting to meet
requirement of Tables 300.1 and 300.2 with
a lead upto 1000 m as per Technical
Specification Clause 301.5 MORD/ 305
MORTH including overhead charges &
Contractor profit, But excluding VAT
Gravel/Soil-Aggregate Base (Table
400.2) Grading C
Construction of granular sub-base
by
providing well graded material (28% metal
chips, 72% gravel), spreading in uniform
layers with motor grader on prepared
surface, mixing by mix in place method with
rotavator
at OMC, and compacting with
three
wheel 80-100 kN static roller /
Vibratory Roller 80-100 kN capacity to
achieve the desired density and CBR not
less than 30%, complete as per Technical
Specification Clause 402 MORD
WBM Grade-III
Providing, laying, spreading and compacting
stone aggregates of specific sizes to water
bound macadam specification including
spreading in uniform thickness, hand
packing, rolling with smooth wheel roller 80100 kN in stages to proper grade and
camber, applying and brooming, stone
screening to fill-up the interstices of coarse
aggregate, watering and compacting to the
required density Grading 3 as per Technical
Specification Clause 405 MORD/ MORTH 404.
For compacted thickness of 75 mm,
including overhead charges & Contractor
profit, But excluding VAT
Prime Coat
Providing and applying primer coat with
bitumen emulsion (SS-1) on prepared surface
of granular base including cleaning of road
surface and spraying primer at the rate of
0.70-1.0 kg/sqm using mechanical means as
per Technical Specification Clause 502 MORD
(for use on Wet mix macadam & WBM)
,including overhead charges & Contractors
profit but excluding VAT.

297.19

155.12 /
C
u
m

46101

3240.90

1128.77 / 3658227
C
u
m

594.68

3113.59 / 1851590
C
u
m

7929.20

31.00 /
1
s
q
m

245805

10

Tack Coat
Providing and applying tack coat with
Bitumen emulsion (RS-1) using emulsion
distributor at the rate of 0.25 to 0.30 kg per
sqm on the prepared granular surfaces
treated with primer & cleaned with Hydraulic
broom as per Technical Specification Clause
503 MORD,including overhead charges &
Contractors profit but excluding VAT.
20mm thick Open-Graded Premix
Carpet using Bituminous (penetration
grade/modified bitumen) Binder
Providing, laying and rolling of open-graded
premix carpet of 20 mm thickness composed
of 13.2 mm to 5.6 mm aggregates either
using penetration grade bitumen or emulsion
to required line, grade and level to serve as
wearing course on a previously prepared
base, including mixing a suitable plant,
laying and rolling with a three wheel 0-100
kN static roller capacity, finished to required
level and grades to be followed by seal coat
of either type A or Type B or Type C as per
Technical Specification Clause 508 MORD.
Seal Coat
Providing and laying seal coat sealing the
voids in a bituminous surface laid to the
specified levels, grade and cross fall using
Type A, Type B and Type C as per Technical
Specification Clause 510 MORD. (using Three
wheel 80-100 kN static roller)
CC pavement
Construction of un-reinforced, dowel jointed
at expansion and construction joint only,
plain cement concrete pavement, thickness
as per design, over a prepared sub base,
with 43 grade cement or any other type as
per Clause 1501.2.2 M30 (Grade), coarse
and fine aggregates conforming to IS : 383,
maximum in a concrete mixer of not less
than 0.2 cum capacity and appropeiate
weigh batcher using approved mix design,
laid in approved fixed side formwork (steel
channel, laying and fixing of 125 mictron
thick polythene film, wedges, steel plates
including levelling the formwork as per
drawing), spreading the concrete with
sholvels, rakes, compacted using needle,
scareed and plate vibrators and finished in
continuous operation including provision of
contraction and expansion, construction
joints, applying debonding strips, primer,
sealant, dowel bars, near approaches to
bridge / culvert and construction joints,
admixtures as approved, curing of concrete
slabs for 14- days, curing compound (where
specified) and water finishing to lines and
grade as per drawing
and Technical
Specification Clause 1501 MORD including
overhead charges & Contractors profit but
excluding VAT.

7929.20

11.13 /
1

88252

s
q
m

7929.20

166.65 / 1321401
1
s
q
m

7929.20

48.69 /
1

386073

s
q
m
183.75

6006.63 / 1103717
C
u
m

Gravel Shoulders
Construction
of
gravel
shoulders
by
providing well graded material, spreading in
uniform layers with motor grader on
prepared surface, mixing by mix in place
method with rotavator
at OMC, and
compacting with three wheel 80-100 kN
static roller / Vibratory Roller 80-100 kN
capacity to achieve the desired density,
complete as per Technical Specification
Clause 402 MORD, including overhead
charges & Contractor profit, But excluding
VAT

11

12

1000mm dia RCC NP3 pipe culvert 1vent

13
14
15
16
17
18

Cost of road furniture


Construction of side drain
Add 4% VAT
Add Seignorage charges
Preparation of DPR Rs.13,500/- per KM
Add L.S. for rounding of

1666.00

352.45 /
587180
C
u
m

0
21254
0
509650
563805
28000
5537
11300000

TOTAL
B. MAINTENANCE ACTIVITIES (YEAR WISE)

Provision for 1st year Maintanance

2.80

5.00%

7500

21000

Provision for 2nd year Maintanance

2.80

10.00%

15000

42000

Provision for 3rd year Maintanance

2.80

15.00%

22500

63000

Provision for 4th year Maintanance

2.80

30.00%

45000

126000

Provision for 5th year Maintanance

2.80

40.00%

60000

168000

TOTAL

420000

Note:
1.
Rate
2.

Analysis shall cover all the items such as Site Clearance, Earthwork, Drainage, Granular
Sub Base, & Surface Course, CD works, Traffic Signs, PMGSY Board & Logo& Maintenance
activities
Where local material e used at site and the specif cations a rate analysis are not found in BOS
&SDB. for Rural Roads .the analysis & nomenclature of the item can be suitably used based on
other standards such as PWD Schedule or Rate or assessment based on field observation.

3.

Completed items rates including feadfor carriage of materials should be shown

ASST.EXE.ENGINEER
0

DY.EXECUTIVE ENGINEER

EXECUTIVE ENGINEER

SUPERINTENDING ENGIN

Earth, Sand,
Metal,
Gravel
Stone
Rate

lead

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41

28.80
39.20
52.20
63.40
74.60
85.80
97.00
108.20
119.40
130.60
141.80
153.00
164.20
175.40
186.60
197.80
209.00
220.20
231.40
242.60
253.80
265.00
276.20
287.40
298.60
309.80
321.00
332.20
343.40
354.60
363.90
373.20
382.50
391.80
401.10
410.40
419.70
429.00
438.30
447.60
456.90

26.70
37.40
52.20
63.40
74.60
85.80
97.00
108.20
119.40
130.60
141.80
153.00
164.20
175.40
186.60
197.80
209.00
220.20
231.40
242.60
253.80
265.00
276.20
287.40
298.60
309.80
321.00
332.20
343.40
354.60
363.90
373.20
382.50
391.80
401.10
410.40
419.70
429.00
438.30
447.60
456.90

1000mm dia
lead
Rate

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41

155.76
155.76
155.76
155.76
155.76
163.24
170.72
178.20
185.68
193.16
200.64
208.12
215.60
223.08
230.56
238.04
245.52
253.00
260.48
267.96
275.44
282.92
290.40
297.88
305.36
312.84
320.32
327.80
335.28
342.76
350.24
357.72
365.20
372.68
380.16
387.64
395.12
402.60
410.08
417.56
425.04

900 mm RCC pipes


700mm dia
lead
Rate
lead
Rate

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41

129.30
129.30
129.30
129.30
129.30
136.78
144.26
151.74
159.22
166.70
174.18
181.66
189.14
196.62
204.10
211.58
219.06
226.54
234.02
241.50
248.98
256.46
263.94
271.42
278.90
286.38
293.86
301.34
308.82
316.30
323.78
331.26
338.74
346.22
353.70
361.18
368.66
376.14
383.62
391.10
398.58

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41

81.95
81.95
81.95
81.95
81.95
85.91
89.87
93.83
97.79
101.75
105.71
109.67
113.63
117.59
121.55
125.51
129.47
133.43
137.39
141.35
145.31
149.27
153.23
157.19
161.15
165.11
169.07
173.03
176.99
180.95
184.91
188.87
192.83
196.79
200.75
204.71
208.67
212.63
216.59
220.55
224.51

42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86

466.20
475.50
484.80
494.10
503.40
512.70
522.00
531.30
540.60
549.90
559.20
568.50
577.80
587.10
596.40
605.70
615.00
624.30
633.60
642.90
652.20
661.50
670.80
680.10
689.40
698.70
708.00
717.30
726.60
735.90
745.20
754.50
763.80
773.10
782.40
791.70
801.00
810.30
819.60
828.90
838.20
847.50
856.80
866.10
875.40

466.20
475.50
484.80
494.10
503.40
512.70
522.00
531.30
540.60
549.90
559.20
568.50
577.80
587.10
596.40
605.70
615.00
624.30
633.60
642.90
652.20
661.50
670.80
680.10
689.40
698.70
708.00
717.30
726.60
735.90
745.20
754.50
763.80
773.10
782.40
791.70
801.00
810.30
819.60
828.90
838.20
847.50
856.80
866.10
875.40

42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86

432.52
440.00
447.48
454.96
462.44
469.92
477.40
484.88
492.36
499.84
507.32
514.80
522.28
529.76
537.24
544.72
552.20
559.68
567.16
574.64
582.12
589.60
597.08
604.56
612.04
619.52
627.00
634.48
641.96
649.44
656.92
664.40
671.88
679.36
686.84
694.32
701.80
709.28
716.76
724.24
731.72
739.20
746.68
754.16
761.64

42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86

406.06
413.54
421.02
428.50
435.98
443.46
450.94
458.42
465.90
473.38
480.86
488.34
495.82
503.30
510.78
518.26
525.74
533.22
540.70
548.18
555.66
563.14
570.62
578.10
585.58
593.06
600.54
608.02
615.50
622.98
630.46
637.94
645.42
652.90
660.38
667.86
675.34
682.82
690.30
697.78
705.26
712.74
720.22
727.70
735.18

42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86

228.47
232.43
236.39
240.35
244.31
248.27
252.23
256.19
260.15
264.11
268.07
272.03
275.99
279.95
283.91
287.87
291.83
295.79
299.75
303.71
307.67
311.63
315.59
319.55
323.51
327.47
331.43
335.39
339.35
343.31
347.27
351.23
355.19
359.15
363.11
367.07
371.03
374.99
378.95
382.91
386.87
390.83
394.79
398.75
402.71

87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135

884.70
894.00
903.30
912.60
921.90
931.20
940.50
949.80
959.10
968.40
977.70
987.00
996.30
1005.60
1014.90
1024.20
1033.50
1042.80
1052.10
1061.40
1070.70
1080.00
1089.30
1098.60
1107.90
1117.20
1126.50
1135.80
1145.10
1154.40
1163.70
1173.00
1182.30
1191.60
1200.90
1210.20
1219.50
1228.80
1238.10
1247.40
1256.70
1266.00
1275.30
1284.60
1293.90
1303.20
1312.50
1321.80
1331.10

884.70
894.00
903.30
912.60
921.90
931.20
940.50
949.80
959.10
968.40
977.70
987.00
996.30
1005.60
1014.90
1024.20
1033.50
1042.80
1052.10
1061.40
1070.70
1080.00
1089.30
1098.60
1107.90
1117.20
1126.50
1135.80
1145.10
1154.40
1163.70
1173.00
1182.30
1191.60
1200.90
1210.20
1219.50
1228.80
1238.10
1247.40
1256.70
1266.00
1275.30
1284.60
1293.90
1303.20
1312.50
1321.80
1331.10

87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135

769.12
776.60
784.08
791.56
799.04
806.52
814.00
821.48
828.96
836.44
843.92
851.40
858.88
866.36
873.84
881.32
888.80
896.28
903.76
911.24
918.72
926.20
933.68
941.16
948.64
956.12
963.60
971.08
978.56
986.04
993.52
1001.00
1008.48
1015.96
1023.44
1030.92
1038.40
1045.88
1053.36
1060.84
1068.32
1075.80
1083.28
1090.76
1098.24
1105.72
1113.20
1120.68
1128.16

87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135

742.66
750.14
757.62
765.10
772.58
780.06
787.54
795.02
802.50
809.98
817.46
824.94
832.42
839.90
847.38
854.86
862.34
869.82
877.30
884.78
892.26
899.74
907.22
914.70
922.18
929.66
937.14
944.62
952.10
959.58
967.06
974.54
982.02
989.50
996.98
1004.46
1011.94
1019.42
1026.90
1034.38
1041.86
1049.34
1056.82
1064.30
1071.78
1079.26
1086.74
1094.22
1101.70

87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135

406.67
410.63
414.59
418.55
422.51
426.47
430.43
434.39
438.35
442.31
446.27
450.23
454.19
458.15
462.11
466.07
470.03
473.99
477.95
481.91
485.87
489.83
493.79
497.75
501.71
505.67
509.63
513.59
517.55
521.51
525.47
529.43
533.39
537.35
541.31
545.27
549.23
553.19
557.15
561.11
565.07
569.03
572.99
576.95
580.91
584.87
588.83
592.79
596.75

136
137
138
139
140
141
142
143
144
145
146
147
148
149
150

Loading
Unloading

1340.40
1349.70
1359.00
1368.30
1377.60
1386.90
1396.20
1405.50
1414.80
1424.10
1433.40
1442.70
1452.00
1461.30
1470.60

1340.40
1349.70
1359.00
1368.30
1377.60
1386.90
1396.20
1405.50
1414.80
1424.10
1433.40
1442.70
1452.00
1461.30
1470.60

34.30
10.90

12.80
8.70

136
137
138
139
140
141
142
143
144
145
146
147
148
149
150

1135.64
1143.12
1150.60
1158.08
1165.56
1173.04
1180.52
1188.00
1195.48
1202.96
1210.44
1217.92
1225.40
1232.88
1240.36

136
137
138
139
140
141
142
143
144
145
146
147
148
149
150

1109.18
1116.66
1124.14
1131.62
1139.10
1146.58
1154.06
1161.54
1169.02
1176.50
1183.98
1191.46
1198.94
1206.42
1213.90

136
137
138
139
140
141
142
143
144
145
146
147
148
149
150

600.71
604.67
608.63
612.59
616.55
620.51
624.47
628.43
632.39
636.35
640.31
644.27
648.23
652.19
656.15

600mm dia
lead
Rate

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41

73.70
73.70
73.70
73.70
73.70
77.11
80.52
83.93
87.34
90.75
94.16
97.57
100.98
104.39
107.80
111.21
114.62
118.03
121.44
124.85
128.26
131.67
135.08
138.49
141.90
145.31
148.72
152.13
155.54
158.95
162.36
165.77
169.18
172.59
176.00
179.41
182.82
186.23
189.64
193.05
196.46

Gravel
Sand for Filling
60-63mm HBG metal
50 -55mm HBG Metal
40-45mm HBG Metal
25-27mm HBG Metal
19 - 22mm HBG metal
40-45mm HBG M/c Metal
25-27mm HBG M/C Metal
19 - 22mm HBG M/C metal
12-14 mm HBG M/C Metal
9.5-11.2 mm HBG M/C Metal
5-7 mm HBGM/C Metal
2.36 -5 mmHBG M/CMetal
Sand for Mortor
40 mm HBG Metal-SS5
20 mm HBG Chips-SS5
12 mm HBG Chips-SS5
10 mm HBG Metal-SS5
2.36 mm Below Metal
Bitumen emulsion (SS-1)
Bitumen emulsion (RS-1)
Bitumen 60/70
1000mm Dia NP3 Class
1000mm Dia Collar
900mm Dia NP3 Class
900mm Dia Collar
700mm Dia NP3 Class
700mm Dia Collar
600mm Dia NP3 Class
600mm Dia Collar
Cement (As on Sep'2010)
Mild Steel (As on Oct'2012)
Steel (Fe 415 as on Oct'2012)
Rough stone

75
248
378
410
530
874
998
530
874
998
727
593
452
278
335
530
891
727
593
260
26545.44
27254.84
32449.51
5170
897
4166
716
2512
486
2020
360
5000
45500
44400
160

42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86

199.87
203.28
206.69
210.10
213.51
216.92
220.33
223.74
227.15
230.56
233.97
237.38
240.79
244.20
247.61
251.02
254.43
257.84
261.25
264.66
268.07
271.48
274.89
278.30
281.71
285.12
288.53
291.94
295.35
298.76
302.17
305.58
308.99
312.40
315.81
319.22
322.63
326.04
329.45
332.86
336.27
339.68
343.09
346.50
349.91

87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135

353.32
356.73
360.14
363.55
366.96
370.37
373.78
377.19
380.60
384.01
387.42
390.83
394.24
397.65
401.06
404.47
407.88
411.29
414.70
418.11
421.52
424.93
428.34
431.75
435.16
438.57
441.98
445.39
448.80
452.21
455.62
459.03
462.44
465.85
469.26
472.67
476.08
479.49
482.90
486.31
489.72
493.13
496.54
499.95
503.36
506.77
510.18
513.59
517.00

136
137
138
139
140
141
142
143
144
145
146
147
148
149
150

520.41
523.82
527.23
530.64
534.05
537.46
540.87
544.28
547.69
551.10
554.51
557.92
561.33
564.74
568.15

Sl
No.

Item

Rate 201112

1
2
3
4
5
6
7
8
9

LABOUR CHARGES
Mazdoor Unskilled
Mazdoor skilled
Mazdoor semi skilled
Mason (1st class)
Mason (2nd class)
Surveyor Mazdoor
Driller
Blaster
Black smith for cutting of dowel bars including
removal of burrs, fabrications & fixing of dowel
bars

215.00
215.00
215.00
285.00
260.00
260.00
285.00
310.00
285.00

10

Mate

260.00

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32

MACHINERY
AC Pipe 100 mm dia class 1
Dozer D 80
Paver Finisher Hydrostatic with sensor control 100
TPH
Air Compressor
Dozer D 50
Electric generator set 125 KVA
Plate Compactor
Binding Wire
Emulsion Pressure Distributor
Smooth wheeled roller 8 tonne
Tractor with trolley
Bitumen boiler oil fired
Front end loader
Stone Boulder
Tractor with grader
Vibratory Roller 80-100
Bitumen boiler oil fired, capacity1000 lts fitted with
spray set
Generator 250 KVA
Tipper 5.5cum
Tractor with rotavator
Water Tanker 6 KL
Bitumen Pressure Distributor
Generator 35 KVA
Wet Mix Plant
Concrete mixer 0.28/0.40 cum
HMP 40/60
Hydraulic broom @ 1250
Hydraulic Chip Spreader
Hydraulic Excavator
Joint Filler
Mild Steel - 7/2011
Mortor Grader

Rate 2012-13
250
250
250
315
285
315
355

315

188.00
1881.00
2530.00

2398.80
2664.00

370.00
1081.19
1090.00
40.00
55.00
690.00
844.40
345.00
170.00
1320.00
90
345.00
1886.90
170.00

402.00
1499.25
1148.00
42.00
65.00
748.00
920.60
361.00
182.00
1431.00

1550.00
696.40
345.00
345.00
940.00
620.00
1320.00
345.00
15525.00
290.00
2070.00
2009.50
540.00
41000.00
2600.00

1609.00
818.30
367.00
372.00
1016.00
664.00
1431.00
370.00
16626.00
310.00
2232.00
2600.30

361.00
2384.90
182.00

2797.00

Paint
Painter
Binding Wire

184
300
300

350.00
65.00

1499.25

Das könnte Ihnen auch gefallen