DEL

The following table represents the authorities under the Contract that are delegated by the Engineer to the Assistant
Any issue or responsibility which is not specifically listed shall remain the responsibility of the Engineer.
S.No.

FIDIC Clause

3.2 Delegation by the Engineer. PRIOR APPROVAL REQUIRED FROM EMPLOYER

3.3 Instructions of the Engineer Design related instructions (no cost or time)

3.3 Instructions of the Engineer Design related instructions (with cost and/or time
impact) PRIOR APPROVAL REQUIRED FROM EMPLOYER

3.3 Instructions of the Engineer Design related instructions (with cost and/or time
impact) PRIOR APPROVAL REQUIRED FROM EMPLOYER

3.3 Instructions of the Engineer construction related instructions (no cost or time)

3.3 Instructions of the Engineer construction related instructions (with cost and/or
time impact) PRIOR APPROVAL REQUIRED FROM EMPLOYER

3.3 Instructions of the Engineer construction related instructions (with cost and/or
time impact) PRIOR APPROVAL REQUIRED FROM EMPLOYER

3.3 Instructions for remedying defects (relating to defects liability period)

3.5 Determinations (Also refer to specific Clauses for the Employer/Engineers


authority) PRIOR APPROVAL REQUIRED FROM EMPLOYER FOR TIME AND/OR COST

10

4.1 Contractors General Obligations Site operations and methods of construction

11

4.1 Contractors General Obligations Design of temporary works

12

4.1 Contractors General Obligations Design of permanent works

13

4.1 Contractors General Obligations As built documents and operations and


maintenance manuals

14

4.3 Consent to Contractors Representative

15

4.4 Consent to Subcontractors

16

4.4 Approval of Subcontract Conditions of Contract

17

4.7 Setting out Notification

18

4.9 Quality Assurance audit

19

4.12 Instructions relating to unforeseeable Physical Conditions

20

4.17 Consent to remove Contractors Equipment

21

4.23 Contractors Operations on Site, consent to offsite working areas

22

6.5 Working Hours consent to working outside normal working hours. PRIOR
APPROVAL REQUIRED FROM EMPLOYER

23

6.7 Health and Safety Engineers requirements

24

6.9 Contractors Personnel Requirement to remove

25

6.10 Records of Contractors Personnel and Equipment Approval of form of


submission

26

7.2 Consent to Samples

27

7.3 Inspection carry out

28

7.4 Testing Endorse test certificates

29

7.5 Rejection notice of or requirement for re-testing

30

7.6 Remedial Work instructions

31

8.3 Programme Notice of Contractor non-compliance

32

8.4 Extension of Time for Completion determination. PRIOR APPROVAL REQUIRED


FROM EMPLOYER

33

8.6 Rate of Progress instructions to revise programme

34

8.8 Suspension of Work. PRIOR APPROVAL REQUIRED FROM EMPLOYER

35

8.12 Resumption of Work - permission

36

9.3 Retesting requirements to retest

37

9.4(a) Failure to Pass Tests on Completion order repeat tests

38

9.4(b) Failure to Pass Tests on Completion reject Works or Section

39

9.4(b) Failure to Pass Tests on Completion issue Taking Over Certificate PRIOR
APPROVAL REQUIRED FROM EMPLOYER

40

10.0 Employers Taking Over issue Taking Over Certificate. PRIOR APPROVAL
REQUIRED FROM EMPLOYER

41

10.0 Employers Taking Over Reject request

42

11.1(a) Completion of Outstanding Work and remedying Defects issue of


instructions

43

11.1(b) Completion of Outstanding Work and remedying Defects issue of


instructions at end of defects liability period

44

11.8 Contractor to Search instruct Contractor to search

45

11.9 Performance Certificate issue. PRIOR APPROVAL REQUIRED FROM EMPLOYER

46

12.1 Works to be Measured Issue requirement to measure

47

12.3 Evaluation of work

48

13.1 Right to Vary issue instructions. PRIOR APPROVAL REQUIRED FROM


EMPLOYER

49

13.1 Right to Vary request for proposal. PRIOR APPROVAL REQUIRED FROM
EMPLOYER

50

13.2 Value Engineering - approval. PRIOR APPROVAL REQUIRED FROM EMPLOYER

51

13.3 Variation Procedure request proposal. PRIOR APPROVAL REQUIRED FROM


EMPLOYER

52

13.3 Variation Procedure respond to proposal. PRIOR APPROVAL REQUIRED FROM


EMPLOYER

53

13.3 Variation Procedure request proposal. PRIOR APPROVAL REQUIRED FROM


EMPLOYER

54

13.5 Provisional Sums instructions.

55

13.6 Daywork instructions for work to be carried out

56

14.3 Application for Interim Payment Certificates approval of statement form

57

14.4 Schedule of Payments determine revised installments

58

14.5 Plant and Materials Intended for the Works determine and certify

59

14.6 Issue of Interim Payment Certificates issue. PRIOR APPROVAL REQUIRED


FROM EMPLOYER

60

15.1 Notice to Correct

61

18.1 General Insurance Requirements Evidence of policies or policies

62

20.1 Contractors Claims notices

63

20.1 Contractors Claims contemporary records for scope change variations

64

20.1 Contractors Claims contemporary records for extensions of time or additional


payment other than for scope change variations

65

20.1 Contractors Claims submission of detailed claim for scope change variations

66

20.1 Contractors Claims submission of detailed claim for extensions of time or


additional payment other than for scope change variations

67

20.1 Contractors Claims determination

DELEGATION OF THE ENGINEERS AUTHORITY - FIDIC 1999 -

gineer to the Assistants named below.

Project
Director

Budget & Cost


Manager

Design
Managers

Design Manager

Commercial
Manager

Senior Construction
Manager

Deputies

X
X
X
X
X
X
X
X

X
X
X
X
X

X
X
X
X
X

X
X
X
X

X
X
X
X

X
X
X

X
X
X

X
X
X

X
X
X
X

X
X
X
X
X
X
X
X
X
X
X

X
X

FIDIC 1999 - Red Book

PMs

MEP CM &
Lead Designer
Project Engineer

Construction
Supervision

X
X
X
X
X

X
X

Instructions and Directions issued via

Letter

Engineers Instruction, Letter

Engineers Instruction, Letter

RFI Response
RFIs with Cost and Time Impact

Engineers Instruction, Letter

Engineers Instruction.. Letter

RFI Response
(Field RFI Response)

Engineers Instruction

Letter

Letter

Letter

Letter

Letter

Letter
Letter
Letter
Letter
Letter
Engineers Instruction
Letter
Letter

Letter
Letter
Letter
Letter
Aconex Workflow

Inspection Request or Letter via Aconex


Letter or Test Certificate via Aconex
Non-Conformance Report. Letter
Non-Conformance Report. Letter
Letter
Letter
Letter
Engineers Instruction
Engineers Instruction
Non Conformance Report. Letter
Non-Conformance Report. Letter
Non Conformance Report. Letter
Taking Over Certificate

Taking Over Certificate


Letter
Engineers Instruction

Engineers Instruction
Engineers Instruction
Performance Certificate

Letter
Letter
Engineers Instruction
Letter
Engineers Instruction
Letter

Letter

Letter
Engineers Instruction
Engineers Instruction
Letter
Letter
Payment Certificate
Payment Certificate
Engineers Instruction
Letter
Letter
Letter

Letter

Letter

Letter
Letter