PROJECT : B+G+1 RESIDENTIAL VILLA

PLOT & AREA : 362-937 AT UMM SUQUIEMM SECOND


OWNER : ABDUL AZIZ MOHAMMAD MOHD AL ABDULKADER
CONSULTANT : AL ASRI ENGINEERING CONSULTANT
MAIN CONTRACTOR : GAMMA CINTRACTING LLC

DRAINAGE & WATER SUPPLY SYSTEM


AS PER TENDER
Sl. No.
1
2
3
4

Items
MANHOLES
MANHOLES - FIC
MANHOLES - LAUNDRY ROOM
SANDTRAP

Qty
11
1
1
1

Unit
Nos.
No.
No.
No.

PBMH

No.

GULLY TRAP AT OUTSIDE

Nos.

7
8
9
10

GULLY TRAP - LAUNDRY ROOM


TOILET - DRAINAGE PIPING
CATCH BASIN
RAIN WATER OUTLETS

1
10
2
5

No.
Nos.
Nos.
Nos.

11

RAIN WATER PIPING

40

Mtr.

12
13
14

FLOOR TRAP
FLOOR CLEAN OUT
FLOOR CLEAN OUT COVER - H D

15
3
3

Nos.
Nos.
Nos.

15

DRAINAGE PIPING AT BASEMENT

LS

16
17
18
19
20
21
22
23
24
25

SUMP PUMP
CHANNEL GRATTING FOR RAMP
TRANSFER PUMP SET
BOOSTER PUMP SET
ROOF WATER TANK - 800 GAL
PRESSURE PIPES FOR WATER SUPPLY
TOILET - HOT & COLD WATER SUPPLY
SANITARY WARE INSTALLATION
WATER METER CABINET WITH FITTINGS
VALVES & FITTINGS

1
LS
1
1
1
25
10
LS
1
LS

26

ROOF WATER SUPPLY

LS

27

160 MM DIA UPVC PIPE

97

No.
No.
No.
No.
Mtr.
Nos.
No.

Mtr.

AFTER DISCOUNT

AS PER TENDER
Rate
1,100.00
3,000.00
3,000.00
3,000.00
1,100.00
500.00
1,000.00
1,500.00
1,500.00
500.00

Total
12,100.00
3,000.00
3,000.00 CANCELLED
3,000.00

Remark

1,100.00
4,000.00 GTs ARE AT OUTSIDE OF BLDG
1,000.00 CANCELLED
15,000.00
3,000.00
2,500.00

100.00

4,000.00

500.00
400.00
500.00

7,500.00
1,200.00
1,500.00

3,000.00

3,000.00

25,000.00
5,000.00
20,000.00
23,500.00
5,000.00
200.00
1,500.00
3,000.00
2,000.00
5,000.00

25,000.00
5,000.00
20,000.00
23,500.00
5,000.00
5,000.00
15,000.00
3,000.00
2,000.00
5,000.00

3,000.00

3,000.00

350.00

33,950.00

TOILET BLOCK WAS AROUND CENTER OF


THE BLDG

R DISCOUNT

210,350.00

199,500.00

AS PER SITE & REQUIRMENTS


Sl. No.
1
2
3
4

Items
MANHOLES ON RCC
MANHOLES - FIC
FLOOR GULLY-LAUNDRY ROOM
SAND TRAP

Qty
6
1
1
1

Unit
Nos.
No.
No.
No.

Rate
3,000.00
3,000.00
1,000.00
3,000.00

PBMH

No.

3,000.00

GULLY TRAP ON RCC

Nos.

1,000.00

7
8
9
10

FLOOR GULLY - PUMP ROOM


TOILET - DRAINAGE PIPING
CATCH BASIN
RAIN WATER OUTLET

1
8
2
6

No.
Nos.
Nos.
Nos.

1,000.00
1,500.00
1,500.00
500.00

11

RAIN WATER PIPING

45

Mtr.

100.00

12
13
14

FLOOR TRAP
FLOOR CLEAN OUT
FLOOR CLEAN OUT COVER - H D

12
2
3

Nos.
Nos.
Nos.

500.00
400.00
500.00

15

DRAINAGE PIPING AT BASEMENT

LS

16
17
18
19
20
21
22
23
24
25

SUMP PUMP
CHANNEL GRATTING FOR RAMP
TRANSFER PUMP SET
BOOSTER PUMP SET
ROOF WATER TANK - 800 GAL
PRESSURE PIPES FOR WATER SUPPLY
TOILET - HOT & COLD WATER SUPPLY
SANITARY WARE INSTALLATION
WATER METER CABINET WITH FITTINGS
VALVES & FITTINGS

1
LS
1
1
1
25
8
-1
LS

26

ROOF WATER SUPPLY

LS

27
28

URINAL
200MM DIA UPVC PIPE

2
30

5,000.00
No.
No.
No.
No.
Mtr.
Nos.
-No.

25,000.00
5,000.00
20,000.00
23,500.00
5,000.00
200.00
1,500.00
-2,000.00
2,500.00
5,000.00

Nos.
Mtr.

1,000.00
500.00

29

160 MM DIA UPVC PIPE

135

Mtr.

350.00

QUIRMENTS
Total
18,000.00
3,000.00
1,000.00
3,000.00

Remarks
QUANTITY REDUCED
SAME
NEW ITEM. APPLIED RATE OF GT
SAME
QUANTITY SAME. PBMH HAS CONSTRUCTED
3,000.00
ON RCC
5,000.00

1,000.00
12,000.00
3,000.00
3,000.00
4,500.00
6,000.00
800.00
1,500.00

GT ON RCC SO APPLIED LAUNDRY ROOM GT


PRICE FROM TENDER RATE
NEW ITEM. APPLIED RATE OF GT
QUANTITY REDUCED
SAME
QUANTITY INCRESED.
QUANTITY INCRESED. DUE TO 1NO.EXTRA
RWO
QUANTITY REDUCED
QUANTITY REDUCED
SAME. AT BASEMENT

TOILET BLOCK HAS RELOCATED TO END OF


5,000.00 THE BLDG. AROUND 20M SOIL & WASTE
PIPES QTY HAS INCRESED.
25,000.00
5,000.00
20,000.00
23,500.00
5,000.00
5,000.00
12,000.00
-2,000.00
2,500.00
5,000.00

SAME
SAME
SAME
SAME
SAME
SAME
QUANTITY REDUCED
NOTHING HAS INSTALLED
SAME
QUANTITY & AMMOUNT REDUCED
ONE TOILET BLOCK HAS ADDED AT ROOF
AND PIPING FOR SOALR WATER HEATER

2,000.00 NEW ITEM.


15,000.00 NEW ITEM. USED AT BASEMENT

160MM PIPE HAS USED AROUND 38M EXTRA


TO SEPARATE THE GF DRAINAGE
47,250.00
CONNECTION FROM FIRST & ROOF FLOORS
AS PER DM ENGINEER INSTRUCTION.

239,050.00