Beruflich Dokumente
Kultur Dokumente
CERTIFICATION
This is to certify that hereunder projects in total amount of TWENTY MILLION
SIXTY FOUR THOUSAND PESOS (20,064,000.00) are urgently needed and
essential for the immediate rehabilitation/improvement of various projects in the
Abra District Engineering Office which were badly damaged during the onslaught of
Tropical Storm CARINA on August 01, 2016. The Abra River, that winds through
hereunder municipalities is gradually eating away the agricultural lands along its
banks and even threatening to wash away residences and huge segments of
inhabited areas. Without the application of scientific methodology, the constant
scouring of the river banks will result in the total wipe out of private domains and
public infrastructure. The release of funds for these flood control projects will
result in the containment of the flow of water within the channels and will
provide a lasting solution to the recurring problem of managing the
torrential waters of the Abra River that become uncontrollable during
typhoons.
1) REPAIR/REHABILITATION/IMPROVEMENT OF ABRA-ILOCOS NORTE ROAD
DAMAGED BY TROPICAL STORM "CARINA"
1. Abra-Ilocos Norte Road; K0434+480; Nagaparan, Danglas, Abra
200,000.00
2. Abra-Ilocos Norte Road; K0438+150;
2,110,000.00
3. Abra-Ilocos Norte Road; K0440+600;
538,000.00
4. Abra-Ilocos Norte Road; K0444+500;
220,000.00
5. Abra-Ilocos Norte Road; K0445+200; Nagaparan, Danglas, Abra
50,000.00
75,000.00
290,000.00
8. Abra-Ilocos Norte Road; K0446+500;
160,000.00
2)
REPAIR/REHABILITATION/IMPROVEMENT
OF
ABRA-KALINGA
ROAD
375,000.00
309,000.00
3. Abra-Kalinga Road; K0435+078; San Isidro, Lagangilang, Abra
690,000.00
4. Abra-Kalinga Road; K0436+910; San Isidro, Lagangilang, Abra
350,000.00
5. Abra-Kalinga Road; K0441+980; San Isidro, Lagangilang, Abra
297,000.00
6. Abra-Kalinga Road; K0442+010; Bonglo, Baay-Licuan, Abra
1,095,000.00
Page 2 of 3; Certification
133,000.00
8. Abra-Kalinga Road; K0444+400 Bonglo, Baay-Licuan, Abra
998,000.00
9. Abra-Kalinga Road; K0444+550 Bonglo, Baay-Licuan, Abra
408,000.00
10. Abra-Kalinga Road; K0448+550 Lenneng, Baay-Licuan, Abra
285,000.00
11. Abra-Kalinga Road; K0448+580 Lenneng, Baay-Licuan, Abra
275,000.00
12. Abra-Kalinga Road; K0450+210 Lenneng, Baay-Licuan, Abra
177,000.00
13. Abra-Kalinga Road; K0450+720 Lenneng, Baay-Licuan, Abra
365,000.00
14. Abra-Kalinga Road; K0451+550 Lenneng, Baay-Licuan, Abra
162,000.00
15. Abra-Kalinga Road; K0453+500 Lenneng, Baay-Licuan, Abra
196,000.00
16. Abra-Kalinga Road; K0455+850 Poblacion, Baay-Licuan, Abra
1,614,000.00
17. Abra-Kalinga Road; K0456+750 Poblacion, Baay-Licuan, Abra
270,000.00
18. Abra-Kalinga Road; K0457+750 Poblacion, Baay-Licuan, Abra
841,000.00
409,000.00
20. Abra-Kalinga Road; K0462+500 Tumalip, Baay-Licuan, Abra
348,000.00
21. Abra-Kalinga Road; K0462+800 Tumalip, Baay-Licuan, Abra
293,000.00
22. Abra-Kalinga Road; K0468+150; Nalbuan, Baay-Licuan, Abra
750,000.00
23. Abra-Kalinga Road; K0474+000; Aguibo, Malibcong, Abra
100,000.00
24. Abra-Kalinga Road; K0474+700; Aguibo, Malibcong, Abra
750,000.00
25. Abra-Kalinga Road; K0484+700; Duldulao, Malibcong, Abra
250,000.00
26. Abra-Kalinga Road; K0485+100; Duldulao, Malibcong, Abra
75,000.00
75,000.00
100,000.00
29. Abra-Kalinga Road; K0488+500; Gacab, Malibcong, Abra
200,000.00
30. Abra-Kalinga Road; K0489+800; Gacab, Malibcong, Abra
50,000.00
4,180,000.00
Gangal, Sallapadan, Abra
Total:
20,064,000.00
Page 3 of 3; Certification
This certification is being issued to attest that the above stated projects need the
urgent release of funds to immediately rehabilitate and improve these said projects.
LORETO B. DACOROON
_______________________________________________________________________________________________________
Tineg River, that winds through the above municipalities, is gradually eating away
the agricultural lands along its banks and even threatening to wash away residences
and huge segments of inhabited areas. Without the application of scientific
methodology, the constant scouring of the river banks will result in the total wipe
out of private domains and public infrastructure.
The release of funds for these flood control projects will result in the containment of
the flow of water within the channels and will provide a lasting solution to the
recurring problem of managing the torrential waters of the Abra River that become
uncontrollable during typhoons.
Executive Director
Road Board Secretariat
2nd Floor Ave. Maria Building
1517 Quezon Avenue cor. Examiner St.
Quezon City, Metro Manila
Sir:
I hereby certify that the proposed REPAIR/ REHABILITATION/ IMPROVEMENT OF
NATIONAL ROADS; ABRA - CERVANTES ROAD; S00604LZ; K0431+(-527) K0432+150 is free from obstruction and will not duplicate any other request for
the same road section.
Very truly yours,
LORETO B. DACOROON
Assistant District Engineer
Caretaker
CAR 8.3 adgb/etb