MERALCO ADMS Project

ADMS System Performance Metrics


Position Letter

Version 1.0

1. REVISION HISTORY
Version

Authors

Date

1.0

Schneider Electric

2.0

Schneider Electric

3.0

Schneider Electric

12-Oct2015
14-Oct2015
15-Oct2015

Comments
<Initial Version>
Updated Position Paper
Updated Position Paper

2. BACKGROUND
Testing Activities Pre-FAT
Internal Schneider Electric Testing activities prior to Factory Acceptance Test
(Pre-FAT) commenced last April 13, 2015 and ended last June 19, 2015. The
purpose of this activity was for Schneider Electric to internally execute the
agreed structured test cases and resolve possible defects that may arise prior
to start of the actual Factory Acceptance Test (FAT).
This Pre-FAT activity was planned for 2 Cycles where ADMS functionalities will
be executed on a Network Model of 82 circuits and shall be monitored by
MERALCO project team remotely through the issuance of Test Reports by
Schneider Electric daily. Unfortunately, Cycle 1 of Pre-FAT commenced with
only a network model size of 12 circuits. Only during Pre-FAT Cycle 2 was
when the network model size of 82 circuits was achieved. However, the said
82 network model size was incomplete and thus, not all agreed structured
test cases were executed or tested during this activity, meaning that some of

Table of Contents

the test cases were either failed or blocked, due to lack of data within network
1. REVISION HISTORY.....................................................................................................2
2. BACKGROUND............................................................................................................3
3. SCOPE OF THIS DOCUMENT.....................................................................................6
4. MERALCOS RFP DEFINITION OF PERFORMANCE SCENARIOS.........................7
4.1. MERALCO DEFINITION OF RESPONSE TIMES.......................................................9

1. REVISION HISTORY
Version

Authors

1.0

Schneider Electric

2.0

Schneider Electric

3.0

Schneider Electric

Date
12-Oct2015
14-Oct2015
15-Oct2015

Comments
<Initial Version>
Updated Position Paper
Updated Position Paper

2. BACKGROUND
Testing Activities Pre-FAT
Internal Schneider Electric Testing activities prior to Factory Acceptance Test
(Pre-FAT) commenced last April 13, 2015 and ended last June 19, 2015. The
purpose of this activity was for Schneider Electric to internally execute the
agreed structured test cases and resolve possible defects that may arise prior
to start of the actual Factory Acceptance Test (FAT).
This Pre-FAT activity was planned for 2 Cycles where ADMS functionalities will
be executed on a Network Model of 82 circuits and shall be monitored by
MERALCO project team remotely through the issuance of Test Reports by
Schneider Electric daily. Unfortunately, Cycle 1 of Pre-FAT commenced with
only a network model size of 12 circuits. Only during Pre-FAT Cycle 2 was
when the network model size of 82 circuits was achieved. However, the said
82 network model size was incomplete and thus, not all agreed structured
test cases were executed or tested during this activity, meaning that some of
4.2.
SYSTEMS
INTEGRATION
ADAPTERS
RESPONSE
the MERALCO
test cases DEFINITION
were either OF
failed
or blocked,
due to lack
of data within
network
TIMES..........................................................................................................................10
5. PERFORMANCE TEST METHODOLOGY................................................................11
5.1. ADMS SYSTEM OVERLOAD PERFORMANCES.....................................................12
5.1.1. Test Scenario Definition..........................................................12
5.1.1.1. SCADA and Trouble Calls Load Scenario Details..................13

1. REVISION HISTORY
Version

Authors

1.0

Schneider Electric

2.0

Schneider Electric

3.0

Schneider Electric

Date
12-Oct2015
14-Oct2015
15-Oct2015

Comments
<Initial Version>
Updated Position Paper
Updated Position Paper

2. BACKGROUND
Testing Activities Pre-FAT
Internal Schneider Electric Testing activities prior to Factory Acceptance Test
(Pre-FAT) commenced last April 13, 2015 and ended last June 19, 2015. The
purpose of this activity was for Schneider Electric to internally execute the
agreed structured test cases and resolve possible defects that may arise prior
to start of the actual Factory Acceptance Test (FAT).
This Pre-FAT activity was planned for 2 Cycles where ADMS functionalities will
be executed on a Network Model of 82 circuits and shall be monitored by
MERALCO project team remotely through the issuance of Test Reports by
Schneider Electric daily. Unfortunately, Cycle 1 of Pre-FAT commenced with
only a network model size of 12 circuits. Only during Pre-FAT Cycle 2 was
when the network model size of 82 circuits was achieved. However, the said
82 network model size was incomplete and thus, not all agreed structured
test cases were executed or tested during this activity, meaning that some of
5.1.1.2.
Trouble
Calls
Load Scenario
Details......................................14
the test cases were
either
failed
or blocked,
due to
lack of data within network
5.1.1.3. DMS Functions Execution......................................................15
5.1.2. ADMS System Configuration...................................................16
5.1.2.1. DMS Calculations...................................................................16
5.1.2.2. OMS Configuration.................................................................17
5.1.3. Performance Test Verification..................................................18

1. REVISION HISTORY
Version

Authors

1.0

Schneider Electric

2.0

Schneider Electric

3.0

Schneider Electric

Date
12-Oct2015
14-Oct2015
15-Oct2015

Comments
<Initial Version>
Updated Position Paper
Updated Position Paper

2. BACKGROUND
Testing Activities Pre-FAT
Internal Schneider Electric Testing activities prior to Factory Acceptance Test
(Pre-FAT) commenced last April 13, 2015 and ended last June 19, 2015. The
purpose of this activity was for Schneider Electric to internally execute the
agreed structured test cases and resolve possible defects that may arise prior
to start of the actual Factory Acceptance Test (FAT).
This Pre-FAT activity was planned for 2 Cycles where ADMS functionalities will
be executed on a Network Model of 82 circuits and shall be monitored by
MERALCO project team remotely through the issuance of Test Reports by
Schneider Electric daily. Unfortunately, Cycle 1 of Pre-FAT commenced with
only a network model size of 12 circuits. Only during Pre-FAT Cycle 2 was
when the network model size of 82 circuits was achieved. However, the said
82 network model size was incomplete and thus, not all agreed structured
test cases were executed or tested during this activity, meaning that some of
User either
Operations
Response
Times.....................................18
the test 5.1.4.
cases were
failedand
or blocked,
due
to lack of data within network
5.1.5. Appendix.................................................................................20
5.1.5.1. Database Queries..................................................................20
Switching Operations.........................................................................20
Calls received.....................................................................................20
Active calls.............................................................................................20

1. REVISION HISTORY
Version

Authors

1.0

Schneider Electric

2.0

Schneider Electric

3.0

Schneider Electric

Date
12-Oct2015
14-Oct2015
15-Oct2015

Comments
<Initial Version>
Updated Position Paper
Updated Position Paper

2. BACKGROUND
Testing Activities Pre-FAT
Internal Schneider Electric Testing activities prior to Factory Acceptance Test
(Pre-FAT) commenced last April 13, 2015 and ended last June 19, 2015. The
purpose of this activity was for Schneider Electric to internally execute the
agreed structured test cases and resolve possible defects that may arise prior
to start of the actual Factory Acceptance Test (FAT).
This Pre-FAT activity was planned for 2 Cycles where ADMS functionalities will
be executed on a Network Model of 82 circuits and shall be monitored by
MERALCO project team remotely through the issuance of Test Reports by
Schneider Electric daily. Unfortunately, Cycle 1 of Pre-FAT commenced with
only a network model size of 12 circuits. Only during Pre-FAT Cycle 2 was
when the network model size of 82 circuits was achieved. However, the said
82 network model size was incomplete and thus, not all agreed structured
test cases were executed or tested during this activity, meaning that some of
Archived
calls........................................................................................20
the test cases were
either
failed or blocked, due to lack of data within network
5.2. SYSTEMS INTEGRATION ADMS ADAPTERS TEST...............................................21
5.2.1. Test Scenario Definition..........................................................21
5.2.1.1. MDM Adapter..........................................................................23
5.2.1.2. OMS Adapter..........................................................................24
5.2.1.3. WOM Adapter.........................................................................26

1. REVISION HISTORY
Version

Authors

1.0

Schneider Electric

2.0

Schneider Electric

3.0

Schneider Electric

Date
12-Oct2015
14-Oct2015
15-Oct2015

Comments
<Initial Version>
Updated Position Paper
Updated Position Paper

2. BACKGROUND
Testing Activities Pre-FAT
Internal Schneider Electric Testing activities prior to Factory Acceptance Test
(Pre-FAT) commenced last April 13, 2015 and ended last June 19, 2015. The
purpose of this activity was for Schneider Electric to internally execute the
agreed structured test cases and resolve possible defects that may arise prior
to start of the actual Factory Acceptance Test (FAT).
This Pre-FAT activity was planned for 2 Cycles where ADMS functionalities will
be executed on a Network Model of 82 circuits and shall be monitored by
MERALCO project team remotely through the issuance of Test Reports by
Schneider Electric daily. Unfortunately, Cycle 1 of Pre-FAT commenced with
only a network model size of 12 circuits. Only during Pre-FAT Cycle 2 was
when the network model size of 82 circuits was achieved. However, the said
82 network model size was incomplete and thus, not all agreed structured
test cases were executed or tested during this activity, meaning that some of
Schneider
Position regarding
Adapters
Performance
the test 5.2.2.
cases were
eitherElectrics
failed or blocked,
due to lack
of data within
network
27
6. CONCLUSION............................................................................................................28