This paper will guide you to adjusting your perspective about corpo-
rate change, help rid you of status quo approaches and suggest steps
to ensure your organization and its people start and finish change
successfully, not just once, but consistently. Included are the initial
Executive TOC Fast Change CCM Languaging 5 W’s High Level Change About
Summary Change that works
© 2010 Vision to Work, Inc. www. vision to work.com
Table of
Contents
Executive Summary 2
Dealing with Fast Change 4
Establishing a High Level Change Entity 5
Corporate Change Management 5
Big Picture 6
Context 7
Horizontals 8
Participation 8
Structure 9
Where 11
Who 11
What 12
When 12
How 12
Executive TOC Fast Change CCM Languaging 5 W’s High Level Change About
Summary Change that works
© 2010 Vision to Work, Inc. www. vision to work.com
Establishing a High Level Change Entity
Corporate Change Management
Establishing a high level (VP and above) change entity in your orga-
nization elevates the significance of change and ties that significance
directly to the corporate strategy. Done correctly a balance between
external and internal competencies can provide the skills to tie the
change to the work and feed into a process that makes the right lists
given to the most competent individuals.
We say “entity” because there must be the ability to morph and
reshape to match the environment, the end state and resources. This
is in contrast to a function that quickly becomes vertical, defined and
structured.
You will be tempted to set this up just like other functions, with the
same kind of performance system, the same hierarchy and the same
politics. That would be an expensive recreation of what probably
exits in your organization now. Your rewards will need to be different;
your structure of reporting and collaboration will be different. Done
correctly, you will include key external resources that view their per-
formance as the accomplishment of business objectives and are not
subject to the vagaries of internal politics.
To be successful this entity would need a high-level reporting struc-
ture disconnected from any vertical function. It is important at this
level of change management to have flexibility, equal connection
throughout the organization and, most importantly, no organizational
performance measurement ties.
The members of a Corporate Change Management Group must focus
on people and strategic business objectives not their next perfor-
mance review.
To structure the change entity this way is innovative, smart and dis-
tanced from the status quo.
Executive TOC Fast Change CCM Languaging 5 W’s High Level Change About
Summary Change that works
Keep in mind that at the core of this new approach is the individual,
context and strategic intent (or big picture, or greater good or busi-
ness objectives).
Big Picture
Can you lay out an overarching description of the change and the
environment? That will be the Big Picture. The other terms we have
heard (from stakeholders) are, “greater good”, “corporate strategy”
and for governmental change “civic responsibility”.
Executive TOC Fast Change CCM Languaging 5 W’s High Level Change About
Summary Change that works
© 2010 Vision to Work, Inc. www. vision to work.com
End State
This is the description of the change completed.
That description may be different for different stakeholders.
The End State, will give stakeholders a vision and feeling of what their
world will be like after the change. Once that description is in place,
not before, then a path is illustrated.
With transformational change this could have very little to do with
the current state. In fact including the current state and, especially
starting with the current state is automatically a negative perspective
(hence the resistance most initiatives get right at the start).
End State back is the crucial perspective for successful Corporate
Change Management. That is very different from the status quo his-
torical “gap” approach to change management.
Context
Stakeholders will always want and need to understand how their
work fits in to the bigger picture, the path, the company, the external
environment and the relation to other stakeholders. With a status
quo, historical change management approach those stakeholders get
either a list or a demand. Neither has much potential for motivation.
An end state back approach forces a definition of context early on
(you will see later in the paper that to determine stakeholders context
must be defined).
Executive TOC Fast Change CCM Languaging 5 W’s High Level Change About
Summary Change that works
© 2010 Vision to Work, Inc. www. vision to work.com
coined term because Organizational Change Management (OCM) typi-
cally means any change that touches the organization, which is differ-
ent from change in the whole organization. The other term thrown
about is Enterprise Change Management. It too carries the “touches”
definition and defines large scale IT projects (since they always touch
the whole organization).
For the purpose of this paper and our work at Vision to Work, Corpo-
rate Change Management is as much about the perspective, approach
and methods as it is about the separate change initiatives (no matter
who they touch or how big).
Creating a Corporate Change Management entity ensures a culture
that understands change, approaches change from the people side
equally with the business side and does so efficiently.
Horizontals
These are the invisible strings of connection, the matrix, which occurs
when collaboration is necessary in organizations. Horizontals can be
defined and included in the organizational structure. This is a consid-
eration in creating a Corporate Change Management entity if formal-
ization is important.
The most essential horizontal is the first row in the organization. This
could be SVP’s, VP’s or the CEO/Board depending on the size of the
organization. In terms of change initiatives, it is important that they
can operate with shared purpose toward business objectives. Ad-
dressing the competing objectives and resultant rewards that exist in
all organizations (especially at this first horizontal) as roadblocks to
change is essential in the design of a Corporate Change Management
Group.
Executive TOC Fast Change CCM Languaging 5 W’s High Level Change About
Summary Change that works
Structure
Corporate Change Management has a loose and malleable structure
in terms of who will be involved in any particular change initiative.
The process is structured when it gets to the PMO project level but
that is more project management than change management (and they
are not the same and work better in partnership because of skill dif-
ferences).
A good and experienced Corporate Change Management consultant
will have a structure to help guide the change, but it too has flexibility.
It must.
Key elements to Corporate Change Management are translations
and translation phases. Idea, Plan, Action and Use are the translation
phases. There are roles in the transitions from phase to phase. These
are the translators.
An example-
Idea to Plan might be a handoff from the CEO and an external consul-
tant to the first horizontal and the implementation team (senior PMO
and internal Change consultants).
Plan to Action a pass from the first horizontal/implementation team
to the project team (PMO and junior change consultants internal and
Executive TOC Fast Change CCM Languaging 5 W’s High Level Change About
Summary Change that works
Executive TOC Fast Change CCM Languaging 5 W’s High Level Change About
Summary Change that works
© 2010 Vision to Work, Inc. www. vision to work.com
Why
Change as an understandable, easy to communicate process starts
with defining why. This is the first step to create the end state. It must
include the CEO and leader connection to change (as stakeholders not
leaders), a picture of what the environment and culture will look like,
the improvements, the relationships, the interactions and the new
technology (if applicable).
Where
With why you can determine where this change will land. This in-
cludes all of the groups of people who may participate, be effected by
or be aware of the change initiative. This is not just internal areas but
also external partners, customers and the greater business environ-
ment. At this point, there are no lists, no timelines, no procedures and
no rules. Where is to build understanding of what this change is, how
big an area it covers and get clear on strategy/big picture/vision and
be ready to translate that into the end state.
Who
However tempted you may be to figure out what, Who is the next
step. Who determines individual and group stakeholders and their
general responsibilities. It is important to differentiate between who
will participate and who will be effected by the change. This determi-
nation is valuable for the communication process later in the timeline.
Executive TOC Fast Change CCM Languaging 5 W’s High Level Change About
Summary Change that works
© 2010 Vision to Work, Inc. www. vision to work.com
little what, little when and little how…
These are items of secondary importance (to change management).
This is the start of the lists, the timelines, the checkoffs, resource
determination etc. We make them “little” because status quo ap-
proaches, focus on these, especially with a PMO led change initiative.
That focus is detrimental to the people/corporate strategy side of our
equation (at least at the beginning). This is a differentiator in our ap-
proach. People and strategy first; plan and action later.
What
Why, Where and Who have set up the frame work for the specifics of
Action or, the big What. Now is the time to create a tight timeline for
work effort. The project management PMO process can begin includ-
ing formalization of resource and budget alignment, agreements and
responsibilities. Metrics are also defined for process measurement.
When
The previous when (the little one) covered the planning of dates in the
timeline. The When of the 5 W’s is the Adoption date or the date in
which a transition to the new change has become inevitable. It is not
necessarily the date of the end state, but close.
This date is the time to transition from work to use. The past, present
and future must begin to tie together to form the End State.
When that date arrives, there must be celebration, support and a
commitment to Adoption and or the behavioral change needed for
the End State to be a success.
How
From a change management perspective How is the use of the right
person at the right time with the right skills and competencies. If they
are not present internally they will have to be contracted. How is also
the process and approach to use throughout the change timeline.
Executive TOC Fast Change CCM Languaging 5 W’s High Level Change About
Summary Change that works
© 2010 Vision to Work, Inc. www. vision to work.com
A High Level Change Entity gives you…
Executive TOC Fast Change CCM Languaging 5 W’s High Level Change About
Summary Change that works
© 2010 Vision to Work, Inc. www. vision to work.com
Change that Works- Again and again
Today’s leaders have not been able to keep pace with the need
to manage change. They are pulled from one side with the expec-
tation of business results and on the other with the necessity of
addressing the people and the work involved. The design and in-
clusion of a Change Management entity operating at the highest
level of the organization, separate from the vertical/operational
status quo structure, narrows the gap between ability and need.
Executive TOC Fast Change CCM Languaging 5 W’s High Level Change About
Summary Change that works
© 2010 Vision to Work, Inc. www. vision to work.com
About Vision to Work
For the executive that means confidence that strategy has a path for
implementation and for the individual stakeholder it means a con-
nection between their work and the goals of the organization. The
result is the ability to address present efficiency and mold capacity
for current and future change.
15