Sie sind auf Seite 1von 2

Brought to you by Building Plan Unit, PUB

NEWSLETTER

KEEPING YOU INFORMED

NEWS

UPDATED SUBMISSION FORMS


In our last issue, we have shared that PUB
and NEA will operate as separate Technical
Agencies (TAs) with effect from 1st Jan 2017.

Issue 4 Dec 2016


The new forms will be available on CORENET
from 1 Jan 2017. Please use the new
application forms from 1 Jan 2017. These
application forms are to be submitted to the
new PUBBPU-PUB-SINGAPORE NATIONAL
WATER AGENCY mailbox in CORENET.
Refer to the links below for the circulars.
https://corenet.gov.sg/document150331.aspx
https://corenet.gov.sg/document150564.aspx

In view of the formation of separate TAs, PUB


has updated the following application forms
for sewerage, sanitary and drainage
submissions.
Submission For
Old Forms
Application for Development Control
ENV-CBPU-DCCLR-NEW
Clearance (DC)
ENV-CBPU-DCCLR-RESUB
Application for Detailed Plan Clearance
PUB-BPU-CLRDP01

Sanitary Work

Sewer / RC Trench / M&E Work

Works Affecting Minor and Other


Drainage Works
Application for Drainage Clearance for TOP
Application for Sanitary and Sewerage
Clearance for TOP & CSC
Application for Drainage Clearance for CSC
Application for Works Affecting the Public
Sewerage System

PUB-BPU-COMPOFWORK

New Forms
PUB-DCCLR

PUB-DPCLR

PUB-DRATOP

PUB-DD-CSIDRA
PUB-SEW-CLRDEV-OVERSEW

PUB-BPUCOMPOFWORK
PUB-DD-CSIDRA
PUB-SEW-CLRDEVOVER-SEW

Application for Permit to Work in Public


Sewerage System

PUB-SEW-FORM_B

PUB-SEW-FORM_B

End of DLP Inspection for Public Sewer


Correspondence to PUB

PUB-SEW-FORM_DLP
ESS-CORR
ENV-CBPU-CORR

PUB-SEW-FORM_DLP
ESS-CORR

Brought to you by Building Plan Unit, PUB

NEWSLETTER

Issue 4 Dec 2016

KEEPING YOU INFORMED

SIMPLIFIED SUBMISSION PROCESS

UPCOMING BRIEFINGS

PUB will also introduce a Simplified


Submission (SS) Scheme from 1 Jan 2017.
Projects that meet certain criteria can
obtain lodgement for drainage or
sewerage/sanitary works without the
need for technical clearance from PUB
at DC and DP stage.

We will be organising the following


technical briefing sessions in 2017.

Projects which are under the Simplified


Submission Scheme are required to
obtain TOP and CSC clearance for
drainage and sewerage/sanitary works
carried out on site. The relevant
clearance for TOP/CSC from PUB,
among other documents, shall be
submitted to BCA for the application of
TOP/CSC.

Please note that submission under the


SS scheme are subjected to audit check
by PUB at TOP and CSC clearance stage.

Please refer to the following link on QP


Portal for the details
https://www.pub.gov.sg/compliance/indust
ry/circulars

Date
24 Feb
3 pm
31 Mar
3 pm
28 Apr
3 pm
26 May
3 pm
30 Jun
3 pm
28 Jul
3 pm

Topic
Revisions to Landed Housing
Guidelines in Low-lying Areas
Protection of PUB Watermains
Regulations and Protection of
Sewerage Infrastructure
Air Test Requirements
Post TOP Declaration
Water Efficiency Requirements
and Best Practices
Air Test Requirements

Venue : Waterhub Auditorium, 80 Toh Guan


Road East Singapore 608575
Please email to PUB_BPU@pub.gov.sg with
your details to register for the briefing
session. Limited seats available.
Name
Organisation/Company
Email Address
Contact Number

Das könnte Ihnen auch gefallen