Beruflich Dokumente
Kultur Dokumente
http://www.linkedin.com
Professional Summary
IBEW LXXX Journeyman
Wireman #XXXXXXX
Software
GIS/Smallworld Cadence
FPGA (ISE)
SEL interface
Matlab
Excel/Word
@a
Google Earth
Outlook
Solidworks
Powerworld
Maps
Synergi
Education
State University o Masters of Science in Electrical Engineering (Electrical Power and Energy Systems)
o Bachelor of Science in Electrical Engineering (Electrical Power and Energy Systems), GPA: 3.5/4.0, Cum Laude
In Progress
Dec 2016
Community Colleges o
o
May 2014
Community College
o Electrical Apprenticeship: Certificate
May 2006
Professional Experience
Aug 2016 - Current
Engineering Internship / Engineering Services
o Short circuit
A force analysis on
500kV east/west yards, assisted in creating a report highlighting complex issues with
simple illustration.
o EMF measurements at transmission lines, substations and residential meter/panel by using an iPhone app and a EMDEX EMF meter.
Results report has been distributed to
, consumer affairs and in consideration for
s external site.
o Lateral Fusing Project: determine circuits that will benefit from this program, designed a standard templet to convey current, length and
location information of runs to engineering and lineman.
o Fault Location: designing a new model-based software tool for locating faults in a distribution system by sourcing fault data from:
digital relay (ELV), last gasp and RFI, sequence impedance data and determining effectiveness.
o HE
event research to determine reasonable actions.
o Guard Post analysis on pad mounted equipment. Recording data of each incident while working with the standards department to
propose changes that will increase safety for the public and protect/minimize transformer damage.
o Historic American Engineering Record (HAER) documentation for 22 transmission towers near
.
o Dry band arcing test for ADSS cable 25-16 kV in compliance with IEEE 1222-2011 standards.
o Designed and installed a door interlock system for
high voltage testing Faraday cage. Ensured proper grounding and transformer
tap connections via high voltage probe, oscilloscope and fault current testing.
Project Coordinator
o Upgrade of
LSS system from IRC-3 to a SCADA based Siemens system.
o Implemented a scheduling system accessible by each subcontractor involved in decommission and commissioning each sensor to be
changed from the old control system to the new control system.
o Presented weekly meetings to discuss progress and the current week schedule including impact of system shutdown when taking the
sensor offline and communicating with the appropriate personnel.
Journeyman Wireman
o Installed and troubleshot switch gear, panels, breakers, transformers, grounding systems, conduit, lighting fixtures, various gas control
equipment & LSS sensors (
), lighting control systems and more.
Research
National Science Foundation
Dec 2015 Dec 2016
o NSF /
.
o Develop an algorithm to locate the fault zone using symmetrical components through MATLAB and LabVIEW.
ASCEND! Community College Aug 2014 Dec 2014
o Designed payload enclosure for high-altitude conditions.